A construction method for prefabricated RC frame structure
Through the construction method of prefabricated prefabricated RC frame structure of mold shell, the integrity and seismic resistance of prefabricated RC structure in medium and low-rise residential buildings are solved, the continuity and seismic resistance of the structure are improved, and the construction process is simplified.
Patent Information
- Application Number
- CN202211609799.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-12
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-12-12
AI Technical Summary
The application of prefabricated RC structures in medium and low-rise residential buildings is restricted by structural integrity, transportation of prefabricated components and construction quality issues, resulting in poor seismic resistance.
The construction method of prefabricated RC frame structure of mold shell is used to produce prefabricated beams and columns in the factory, and water hardened and hoisted at the construction site as part of the construction formwork and structure to ensure the core concrete and mold shell material of the beams and columns. Hydration during the same period will enhance the bonding strength.
The continuity and integrity of the structure are improved, the seismic resistance is the same as the cast-in-place RC structure, and the construction procedures are simplified, the production and transportation costs of components are reduced, and the construction quality is improved.
Smart Images

Figure CN115772996B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of assembled concrete structures, and in particular to a construction method of a formwork prefabricated assembled RC frame structure. Background Art
[0002] The core of the modernization of the construction industry is the industrialization of new buildings, and the development of prefabricated RC structures is the only way to achieve the industrialization of buildings. Abroad, in Europe and the United States, the use of prefabricated construction of RC structures has become very common, mainly including two series: prefabricated exterior walls and prefabricated structural components. A series of engineering standards and application manuals have been compiled; Japan has developed a variety of prefabricated integral RC structures based on the successful experience of Europe and the United States, such as cast-in-place core concrete of prefabricated side panels, prefabricated beams, and cast-in-place core concrete of column shells.
[0003] Domestically, the study of prefabricated RC structures began in the 1950s and 1960s. Currently, a variety of prefabricated structural forms have been applied and promoted in my country. Among them, prefabricated large-panel structures now dominate the domestic prefabricated structure market, mainly used in high-rise residential buildings. According to the basic national policy of rural urbanization, it can be foreseen that low- and medium-rise residential buildings will occupy a large market in the construction industry in the future. For low- and medium-rise residential buildings, the use of RC frame structures has greater economic advantages than large-panel structures.
[0004] For the RC structure prefabricated construction method, the integrity of the structure, the transportation of prefabricated components, and the quality of construction are all important factors that restrict its development. Among them, the integrity of the structure is particularly prominent, resulting in its seismic performance being inferior to that of cast-in-place structures.
[0005] The shell is prefabricated and the core is cast in situ. The prefabricated shell of beams and columns is used as both the construction template of beams and columns and as part of the structure. This type of structure has a high degree of industrialization because the shells of beams and columns are all made in the factory. At the same time, because a large amount of core concrete of beams, columns, slabs and nodes is cast in situ, the integrity of the structure is guaranteed to a certain extent, so its seismic performance is similar to that of cast-in-situ RC structures.
[0006] A key issue with prefabricated cement-based shell and permanent formwork structures is that the shell and formwork are prefabricated in the factory, then transported to the construction site for hoisting and then the internal concrete is poured. When the internal concrete is poured, the prefabricated shell or permanent formwork has a long hardening time, and the hydration reaction of its cement matrix has been basically completed. Therefore, the chemical bonding of the cement matrix between the shell or formwork and the cast-in-place concrete is weak, resulting in poor bonding performance between the prefabricated and cast-in-place parts of the structural components, which directly affects the integrity and seismic performance of the structure. Summary of the invention
[0007] In order to solve the above technical defects in the prior art, the present invention provides a construction method of a prefabricated RC frame structure of a formwork shell, which can effectively solve the problems in the background technology.
[0008] In order to solve the above technical problems, the technical solutions provided by the present invention are as follows:
[0009] The invention discloses a construction method of a prefabricated RC frame structure, comprising the following steps:
[0010] Step 1: prefabricate a permanent beam formwork and a permanent column formwork, and transport the permanent beam formwork and the permanent column formwork to the construction site, the permanent beam formwork includes a first beam formwork and a second beam formwork, the permanent column formwork includes a first column formwork and a second column formwork, the first beam formwork includes a first formwork body, the first formwork body includes a first three-dimensional fabric net, a first fiber cloth, a first PVA water-soluble cloth and a first mixture, the second beam formwork includes a second formwork body, the second formwork body includes a second three-dimensional fabric net, a second fiber cloth, a second PVA water-soluble cloth and a second mixture; the first column formwork includes a first formwork body, the first formwork body includes a first three-dimensional fabric net, a first fiber cloth, a first PVA water-soluble cloth and a first mixture, the second column formwork includes a second formwork body, the second formwork body includes a second three-dimensional fabric net, a second fiber cloth, a second PVA water-soluble cloth and a second mixture;
[0011] Step 2: tensioning the beam permanent formwork and the column permanent formwork through the first fiber cloth and the second fiber cloth to maintain the flatness of the sides of the beam permanent formwork and the column permanent formwork;
[0012] Step 3: Watering to harden the first mixture and the second mixture, and to dissolve the first PVA water-soluble cloth and the second PVA water-soluble cloth;
[0013] Step 4: Cut the parts of the first fiber cloth and the second fiber cloth extending outside the end surface, and sequentially hoist the second column formwork, the first beam formwork, the second beam formwork, and the first column formwork, and fix them after correcting their positions;
[0014] Step 5: Set up the floor slab formwork, lay out the floor slab reinforcement, and continuously pour the core concrete of the beams and columns and the floor slab concrete;
[0015] Step 6: After the concrete curing is completed, remove the floor slab formwork and complete the construction.
[0016] In any of the above solutions, preferably, the first beam formwork and the second beam formwork have the same structure, and the first column formwork and the second column formwork have the same structure.
[0017] In any of the above schemes, preferably, the first beam formwork also includes a beam reinforcement cage, the first formwork body is provided with a first molding cavity, the beam reinforcement cage is located in the first molding cavity, and the beam reinforcement cage is connected to the first formwork body.
[0018] In any of the above schemes, it is preferred that the first mold shell body also includes: a first three-dimensional fabric net and a first fiber buckle, the first fiber cloth is wrapped around the outer periphery of the first three-dimensional fabric net; the first PVA water-soluble cloth is wrapped around the inner periphery of the first three-dimensional fabric net; the first fiber buckle is arranged on the inner periphery of the first three-dimensional fabric net, and the first fiber buckle extends to the outside of the first PVA water-soluble cloth and is connected to the beam reinforcement cage; the first mixture is filled in the first three-dimensional fabric net.
[0019] In any of the above schemes, it is preferred that the beam reinforcement cage includes beam longitudinal reinforcements and beam stirrups, and the beam longitudinal reinforcements are connected to the beam stirrups.
[0020] In any of the above schemes, preferably, the second column formwork also includes a column reinforcement cage, the second formwork body is provided with a second molding cavity, the column reinforcement cage is located in the second molding cavity, and the column reinforcement cage is connected to the second formwork body.
[0021] In any of the above schemes, preferably, the second mold shell body also includes a second three-dimensional fabric mesh and a second fiber buckle, the second fiber cloth is wrapped around the outer periphery of the second three-dimensional fabric mesh, the second PVA water-soluble cloth is wrapped around the inner periphery of the second three-dimensional fabric mesh, the second fiber buckle is arranged on the inner periphery of the second three-dimensional fabric mesh, and the second fiber buckle extends to the outside of the second PVA water-soluble cloth and is connected to the column reinforcement cage, and the second mixture is filled in the second three-dimensional fabric mesh.
[0022] In any of the above schemes, it is preferred that the column reinforcement cage includes column longitudinal reinforcements and column stirrups, and the column longitudinal reinforcements are connected to the column stirrups.
[0023] In any of the above schemes, preferably, two groups of tongues and grooves are respectively provided on both sides of the first column formwork, and the two groups of tongues and grooves are respectively used to connect the first beam formwork and the second beam formwork.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] The invention provides a construction method of a formwork prefabricated RC frame structure, wherein the permanent beam formwork and the permanent column formwork are used as construction templates of the beam and the column respectively during the construction of the beam and the column, and can be used as a part of the beam and the column after the construction of the beam and the column is completed, and are not removed, and the permanent beam formwork and the permanent column formwork can be factory-produced, are easy to manufacture, and the quality of components is easy to be guaranteed, and are light in weight, convenient to transport and hoist; the RC frame structure is constructed by the permanent beam formwork and the permanent column formwork, and the construction procedure is simple and the construction quality is easy to be guaranteed; at the same time, since the cement base material of the permanent beam formwork, the permanent column formwork and the cast-in-place core concrete is hydrated at the same time, the completed beam and column structure has good continuity and integrity, and has the same earthquake resistance as the cast-in-place beam and column structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The accompanying drawings are used for further understanding of the present invention and are used to explain the present invention together with the embodiments of the present invention, but do not constitute a limitation of the present invention.
[0027] Figure 1 It is a schematic diagram of the connection structure of the beam permanent formwork and the column permanent formwork in the construction method of the formwork prefabricated assembled RC frame structure of the present invention;
[0028] Figure 2 It is a schematic diagram of a beam permanent formwork structure of a construction method of a formwork prefabricated assembled RC frame structure of the present invention;
[0029] Figure 3 It is a schematic diagram of a column permanent formwork structure of a construction method of a formwork prefabricated assembled RC frame structure of the present invention;
[0030] Figure 4 It is a schematic diagram of the tongue-and-groove structure of the construction method of the formwork prefabricated assembled RC frame structure of the present invention.
[0031] Figure 5 It is a schematic diagram of a column prefabricated formwork in a construction method of a formwork prefabricated assembled RC frame structure of the present invention.
[0032] Figure 6 It is a schematic diagram of a loading device of a construction method of a formwork prefabricated assembled RC frame structure of the present invention.
[0033] Figure 7 It is a schematic diagram of the loading system of the construction method of the formwork prefabricated assembled RC frame structure of the present invention.
[0034] Figure 8 It is a schematic diagram of the development of XZ-A cracks in the construction method of the formwork prefabricated assembled RC frame structure of the present invention.
[0035] Fig. 9It is a schematic diagram of the development of KZ-B cracks in the construction method of the formwork prefabricated assembled RC frame structure of the present invention.
[0036] Fig.10 It is a schematic diagram of the XZ-A load-displacement hysteresis curve of the construction method of the formwork prefabricated assembled RC frame structure of the present invention.
[0037] Fig.11 It is a schematic diagram of an XZ-B load-displacement hysteresis curve of the construction method of the formwork prefabricated assembled RC frame structure of the present invention.
[0038] Description of the numbers in the figure:
[0039] 1. First fiber cloth; 2. First three-dimensional fabric net; 3. First PVA water-soluble cloth; 4. First fiber buckle; 5. Tongue and groove; 6. Longitudinal reinforcement of beam; 7. Stirrups of beam; 8. Longitudinal reinforcement of column; 9. Stirrups of column; 10. First beam formwork; 11. Second beam formwork; 12. First column formwork; 13. Second column formwork; 1', second fiber cloth; 2', second three-dimensional fabric net; 3', second PVA water-soluble cloth; 4', second fiber buckle. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0041] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0042] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0043] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0044] In order to better understand the above technical solution, the technical solution of the present invention will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0045] like Figures 1 to 4 As shown, a prefabricated RC frame structure permanent formwork includes: a beam permanent formwork and a column permanent formwork for forming a frame structure; the beam permanent formwork includes: a first beam formwork 10 and a second beam formwork 11 having two groups and being symmetrical with the column permanent formwork; the column permanent formwork includes: a first column formwork 12 and a second column formwork 13 having two groups and being symmetrical with the beam permanent formwork.
[0046] like Figures 1 to 4 As shown, the first beam formwork 10 has the same structure as the second beam formwork 11, the first column formwork 12 has the same structure as the second column formwork 13, the first beam formwork 10 includes a first formwork body and a beam reinforcement cage, the first formwork body is provided with a first molding cavity, the beam reinforcement cage is located in the first molding cavity, and the beam reinforcement cage is connected to the first formwork body.
[0047] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the first beam formwork 10 is a "U"-shaped structure, and the upper surface of the first beam formwork 10 is flush with the bottom surface of the floor of the RC frame structure, and the top surface of the beam reinforcement cage is higher than the upper surface of the "U"-shaped structure of the first beam formwork 10, and the height difference is determined according to the height of the designed reinforcement cage extending into the floor.
[0048] like Figures 1 to 4 As shown, the first mold shell body includes: a first three-dimensional fabric net 2; a first fiber cloth 1, the first fiber cloth 1 is wrapped around the outer periphery of the first three-dimensional fabric net 2; a first PVA water-soluble cloth 3, the first PVA water-soluble cloth 2 is wrapped around the inner periphery of the first three-dimensional fabric net 2; a first fiber buckle 4, the first fiber buckle 4 is arranged on the inner periphery of the first three-dimensional fabric net 2, and the first fiber buckle 4 extends to the outside of the first PVA water-soluble cloth 3 and is connected to the beam reinforcement cage; a first mixture, the first mixture is filled in the first three-dimensional fabric net 2.
[0049] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the first fiber cloth 1 extends outside the "U"-shaped structural end surface of the first beam formwork 10, and the extended length is determined by the requirements of the tensioning equipment on the construction site.
[0050] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the first mixture is a mixture of cement powder and coarse sand dry-mixed in a certain proportion. Preferably, the weight ratio of cement powder to coarse sand is 1:1.5. By dry-mixing cement powder and coarse sand in a certain proportion, the first mixture can be hardened when reacting with water, and then the first formwork body can form a certain strength, which is convenient for lifting.
[0051] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the first PVA water-soluble cloth 3 is water-soluble and can be dissolved by watering. The dissolution rate can be designed according to construction requirements. At the same time, the products after dissolution are water and carbon dioxide, which has no effect on the performance of cement-based materials and does not pollute the environment.
[0052] In the assembled RC frame structure permanent formwork described in the embodiment of the present invention, the first fiber cloth 1 and the first three-dimensional fabric mesh 2 can increase the crack resistance and durability of the first formwork body, which is better than cast-in-place.
[0053] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the beam reinforcement cage is arranged in the first molding cavity of the first beam formwork 10, and is connected to the first beam formwork 10 through the first fiber buckle 4 to ensure that the outer shell is not deformed too much during lifting, loading and transportation.
[0054] like Figures 1 to 4 As shown, the beam reinforcement cage includes beam longitudinal reinforcement 6 and beam stirrups 7, and the beam longitudinal reinforcement 6 is connected to the beam stirrups 7.
[0055] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the beam longitudinal reinforcement 6 can be fixed and limited by the beam stirrups 7 to improve the stability of the overall structure of the beam reinforcement cage.
[0056] like Figures 1 to 4 As shown, the second column formwork 13 includes a second formwork body and a column reinforcement cage, the second formwork body is provided with a second molding cavity, the column reinforcement cage is located in the second molding cavity, and the column reinforcement cage is connected to the second formwork body.
[0057] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the second column formwork 13 is a "mouth" shaped structure.
[0058] like Figures 1 to 4As shown, the second mold shell body includes: a second three-dimensional fabric net 2'; a second fiber cloth 1', the second fiber cloth 1' is wrapped around the outer periphery of the second three-dimensional fabric net 2'; a second PVA water-soluble cloth 3', the second PVA water-soluble cloth 2' is wrapped around the inner periphery of the second three-dimensional fabric net 2'; a second fiber buckle 4', the second fiber buckle 4' is arranged on the inner periphery of the second three-dimensional fabric net 2', and the second fiber buckle 4' extends to the outside of the second PVA water-soluble cloth 3' and is connected to the column reinforcement cage; a second mixture, the second mixture is filled in the second three-dimensional fabric net 2'.
[0059] In the assembled RC frame structure permanent formwork described in the embodiment of the present invention, the second fiber cloth 1' extends outside the "mouth"-shaped structural end surface of the second column formwork 13, and the extension length is determined by the requirements of the tensioning equipment on the construction site.
[0060] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the second mixture is a mixture of cement powder and coarse sand dry-mixed in a certain proportion. Preferably, the weight ratio of cement powder to coarse sand is 1:1.5. By dry-mixing cement powder and coarse sand in a certain proportion, the second mixture can be hardened when reacting with water, and then the second formwork body can form a certain strength, which is convenient for lifting.
[0061] In the assembled RC frame structure permanent formwork described in the embodiment of the present invention, the second PVA water-soluble cloth 3' is water-soluble and can be dissolved by watering. The dissolution rate can be designed according to construction requirements. At the same time, the products after dissolution are water and carbon dioxide, which has no effect on the performance of cement-based materials and no environmental pollution.
[0062] In the assembled RC frame structure permanent formwork described in the embodiment of the present invention, the first fiber cloth 1 and the first three-dimensional fabric mesh 2 can increase the crack resistance and durability of the first formwork body, which is better than cast-in-place.
[0063] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the column reinforcement cage is arranged in the second molding cavity of the second column formwork 13, and is connected to the second column formwork 13 through the second fiber buckle 4' to ensure that the outer shell is not deformed too much during lifting, loading and transportation.
[0064] like Figures 1 to 4 As shown, the column reinforcement cage includes column longitudinal reinforcement 8 and column stirrups 9, and the column longitudinal reinforcement 8 is connected to the column stirrups 9.
[0065] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the column longitudinal reinforcement 8 can be fixed and limited by the column stirrups 9 to improve the stability of the overall structure of the column reinforcement cage.
[0066] Two groups of tongues and grooves 5 are respectively provided on both sides of the first column formwork 12 , and the two groups of tongues and grooves 5 are respectively used to connect the first beam formwork 10 and the second beam formwork 11 .
[0067] In the permanent formwork of the assembled RC frame structure described in the embodiment of the present invention, the tongue and groove 5 is a "U"-shaped structure, which is arranged at the intersection of the lower end of the "mouth"-shaped outer shell of the first column formwork 12 and the first beam formwork 10 and the second beam formwork 11. The width of the tongue and groove 5 is the outer edge width of the first beam formwork 10 and the second beam formwork 11, and its height is the height from the bottom of the beam of the first beam formwork 10 and the second beam formwork 11 to the board surface; the tongue and groove 5 can enhance the connection strength between the permanent beam formwork and the permanent column formwork, increase the sealing of the connection, and enhance the stability of the overall structure.
[0068] A construction method of a prefabricated RC frame structure, comprising the following steps:
[0069] Step 1: Prefabricate the beam permanent formwork and column permanent formwork, and transport the beam permanent formwork and column permanent formwork to the construction site;
[0070] Step 2: tensioning the first fiber cloth 1 and the second fiber cloth 1' extending out of the end surfaces of the beam permanent formwork and the column permanent formwork to maintain the flatness of the side surfaces of the beam permanent formwork and the column permanent formwork;
[0071] Step 3: watering to harden the first mixture filled in the first three-dimensional fabric net 2 and the second mixture filled in the second three-dimensional fabric net 2', and at the same time, the first PVA water-soluble cloth 3 and the second PVA water-soluble cloth 3' are water-soluble;
[0072] Step 4: cutting the portions of the first fiber cloth 1 and the second fiber cloth 1' extending outside the end surfaces;
[0073] Step 5: hoist the permanent formwork 13 of the second column, and fix it after correcting the position;
[0074] Step 6: hoist the first beam permanent formwork 10 and the second beam permanent formwork 11. During the hoisting process, the beam longitudinal reinforcement 6 of the first beam permanent formwork 10 is extended out of the end surface at its right end, passes through the beam-column connection node area, and extends into the second beam permanent formwork 11 to complete the lap connection of the beam longitudinal reinforcement 6 of the first beam permanent formwork 10 and the second beam permanent formwork 11. At the same time, the beam longitudinal reinforcement 6 is fixed by the beam stirrups 7;
[0075] Step 7: hoist the first column permanent formwork 12, during which the column longitudinal reinforcement 8 of the second column permanent formwork 13 is made to extend beyond the end surface at its upper end through the beam-column connection node area and into the first column permanent formwork 12 to complete the overlap connection of the column longitudinal reinforcement 8 of the first column permanent formwork 12 and the second column permanent formwork 13, and at the same time, the column longitudinal reinforcement 8 is fixed by the column stirrups 9;
[0076] Step 8: Set up the floor slab formwork and lay out the floor slab reinforcement;
[0077] Step 9: Continuously pour the core concrete of beams and columns and the concrete of floor slabs;
[0078] Step 10: After the concrete curing period, remove the floor slab formwork and complete the construction of the beams, columns and floor slabs of this floor.
[0079] In the construction method of the formwork prefabricated assembled RC frame structure described in the present invention, after the permanent formwork of the beam and the permanent formwork of the column are prefabricated in the factory, they are transported to the construction site, and watering is performed before hoisting to harden the first mixture and the second mixture, and then the core concrete of the beam and the column is directly cast after hoisting, which can ensure that the two are hydrated at the same time, and the core concrete can be directly and fully in contact with the first mixture and the second mixture, which can increase the bonding strength between them, so that the completed beam and column structure has better continuity and integrity, and has the same seismic performance as the cast-in-place beam and column structure; furthermore, through the first fiber cloth 1 and the first three-dimensional fabric net 2 and the second fiber cloth 1' and the second three-dimensional fabric net 2', the crack resistance and durability of the completed RC beam and column components can be better than those of the cast-in-place beam and column structure.
[0080] Compared with the prior art, the present invention has the following beneficial effects:
[0081] The invention provides a construction method of a formwork prefabricated RC frame structure, wherein the permanent beam formwork and the permanent column formwork are used as construction templates of the beam and the column respectively during the construction of the beam and the column, and can be used as a part of the beam and the column after the construction of the beam and the column is completed, and are not removed, and the permanent beam formwork and the permanent column formwork can be factory-produced, are easy to manufacture, and the quality of components is easy to be guaranteed, and are light in weight, convenient to transport and hoist; the RC frame structure is constructed by the permanent beam formwork and the permanent column formwork, and the construction procedure is simple and the construction quality is easy to be guaranteed; at the same time, since the cement base material of the permanent beam formwork, the permanent column formwork and the cast-in-place core concrete is hydrated at the same time, the constructed beam and column structure has good continuity and integrity, and has the same earthquake resistance as the cast-in-place beam and column structure.
[0082] The following are the test results:
[0083] 1 Experimental design
[0084] 1.1 Raw materials and properties
[0085] The weight ratio of cement powder to coarse sand in the first mixture and the second mixture is 1:1.5. The cement is silicate cement with a grade of 52.5, and the sand is river sand, which is sieved with a 4.75mm square hole sieve.
[0086] The properties of the fibers used in the three-dimensional fabric net and fiber cloth are as follows:
[0087] Table 1 Fiber performance parameters
[0088] Fiber Type F / N <![CDATA[Af / mm 2 ]]> <![CDATA[f f / MPa]]> <![CDATA[E f / GPa]]> <![CDATA[ε cfu ]]> Carbon Fiber 941 0.45 2091.1 234 0.009743
[0089] Note: f =F / A f , A f =t / ρ f , t—linear density of fiber roving, unit: tex.
[0090] The measured mechanical properties of hot-rolled steel bars with the steel grades of HRP335 and HPB300 and diameters of 14 mm and 8 mm respectively for the steel cage are shown in Table 2.
[0091] Table 2 Mechanical properties of steel bars
[0092]
[0093] The design strength grade of cast-in-place core concrete is C30, and the actual strength test results are shown in Table 3.
[0094] Table 3 Actual compressive and flexural strength of concrete at different ages
[0095]
[0096] 1.2 Specimen size and reinforcement
[0097] A total of two specimens were made, one of which was a traditional cast-in-place RC column as a comparison specimen, and the other was a prefabricated RC frame column in a formwork shell. The specimen numbers were XZ-A and KZ-B, and the two specimens had the same size and reinforcement.
[0098] 1.3 Formwork prefabricated RC frame column specimen production
[0099] The RC column prefabricated formwork is manufactured according to the above process. The prefabricated formwork is assembled and hardened by watering the mixture. Figure 5 , and then pour the RC column core concrete in the prefabricated formwork to complete the specimen production.
[0100] 1.4 Loading device and loading method
[0101] In order to investigate the seismic performance of prefabricated RC frame columns, low-cycle repeated loading was performed on two specimens in this test, and the test results were compared. In order to simulate the stress characteristics of the column in the actual structure, a set vertical force was first applied to the top of the specimen and maintained unchanged during the entire loading process, that is, to simulate the axial pressure borne by the column in the actual structure. Then, displacement control was used to apply horizontal loads in stages according to a certain loading system until the specimen was destroyed or the load dropped to less than 85% of the ultimate load. The loading device was as follows: Figure 6 shown.
[0102] 1.5 Loading system
[0103] The mixed loading method of equal and variable amplitude is adopted. At the beginning of the test, the vertical load is applied in place at one time and kept still for 5 minutes. For the horizontal load, each level is 1 cycle before the component cracks, and each level is 3 cycles after the component cracks. The loading amplitudes are 2mm, 4mm, 6mm, 8mm, 10mm×3, 14mm×3, respectively. Figure 7 shown.
[0104] 2 Test results
[0105] 2.1 Experimental observation
[0106] For specimen KZ-B, there was no peeling between the precast formwork and the core concrete until the load reached failure, indicating that the mixture in the precast formwork and the core concrete had good bonding performance due to synchronous hydration.
[0107] During the loading process, the crack development of specimen KZ-B lags behind that of the comparative specimen XZ-A, and the crack morphology is characterized by being fine and dense. That is, until the middle and late stages of loading, the crack development of specimen KZ-B is more than that of the comparative specimen XZ-A, but the cracks are much smaller in number, as shown in Fig. Figure 8 and Fig. 9 This indicates that the fabric mesh in the prefabricated formwork has a bridging effect, which makes the stress distribution of the column body uniform, resulting in slow development of cracks in the column body, thereby improving the crack resistance of the RC column and further improving the durability of the column.
[0108] 2.2 Hysteresis performance
[0109] The load-displacement hysteresis curves of specimens XZ-A and KZ-B are shown in Fig.10 and Fig.11 As shown in the figure. In the initial stage of loading, the load-displacement curves of both types of columns show a linear growth relationship. After the cracks appear, the load-displacement curves show slightly nonlinear characteristics, but as far as the entire hysteresis curve is concerned, it can be approximately linear, and the area enclosed by the hysteresis loop is very small.
[0110] With the further increase of horizontal displacement and load, the load-displacement curves of the two types of columns show an obvious nonlinear relationship, the hysteresis loop is in an inverted "S" shape, and the area enclosed by the hysteresis loop continues to increase.
[0111] As the horizontal displacement continues to increase, the bearing capacity of both types of columns decreases. From the load-displacement hysteresis curve, it can be seen that the two types of columns have good deformation capacity and energy dissipation capacity, and the characteristics of the load-displacement hysteresis curve are basically the same.
[0112] Based on the above, it can be considered that the two types of columns have basically the same seismic performance.
[0113] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction method for a prefabricated RC frame structure. Features: The construction method comprises the following steps: Step 1: Prefabricate the beam permanent formwork and column permanent formwork, and transport the beam permanent formwork and column permanent formwork to the construction site; Step 2: tensioning the beam permanent formwork and the column permanent formwork through the first fiber cloth and the second fiber cloth to maintain the flatness of the sides of the beam permanent formwork and the column permanent formwork; Step 3: watering to harden the first mixture and the second mixture, and to dissolve the first PVA water-soluble cloth (3) and the second PVA water-soluble cloth (3'); Step 4: cutting the portions of the first fiber cloth and the second fiber cloth extending outside the end surface, and sequentially hoisting the second column formwork (13), the first beam formwork (10), the second beam formwork (11) and the first column formwork (12), and fixing them after correcting their positions; Step 5: Set up the floor slab formwork, lay out the floor slab reinforcement, and continuously pour the core concrete of the beams and columns and the floor slab concrete; Step 6: After the concrete curing is completed, the floor slab formwork is removed to complete the construction; The permanent beam formwork comprises a first beam formwork (10) and a second beam formwork (11); the permanent column formwork comprises a first column formwork (12) and a second column formwork (13); the first beam formwork (10) comprises a first formwork body, the first formwork body comprises a first fiber cloth (1), a first PVA water-soluble cloth (3) and a first mixture; the second column formwork (13) comprises a second formwork body, the second formwork body comprises a second fiber cloth (1'), a second PVA water-soluble cloth (3') and a second mixture; two sets of tongues and grooves (5) are respectively provided on both sides of the first column formwork (12), and the two sets of tongues and grooves (5) are respectively provided on both sides of the first column formwork (12). 5) are used to connect the first beam formwork (10) and the second beam formwork (11) respectively; the tongue (5) is a "U"-shaped structure, which is arranged at the intersection of the lower end of the "mouth"-shaped outer shell of the first column formwork (12) and the first beam formwork (10) and the second beam formwork (11); the width of the tongue (5) is the width of the outer edge of the first beam formwork (10) and the second beam formwork (11), and its height is the height from the bottom of the first beam formwork (10) and the second beam formwork (11) to the board surface; the tongue (5) is used to strengthen the connection between the permanent beam formwork and the permanent column formwork The connection strength of the formwork shell is increased, and the sealing of the connection is increased to enhance the stability of the overall structure; the first formwork shell body also includes: a first three-dimensional fabric net (2) and a first fiber buckle (4), the first fiber cloth (1) is wrapped around the outer periphery of the first three-dimensional fabric net (2); the first PVA water-soluble cloth (3) is wrapped around the inner periphery of the first three-dimensional fabric net (2); the first fiber buckle (4) is arranged on the inner periphery of the first three-dimensional fabric net (2), and the first fiber buckle (4) extends to the outside of the first PVA water-soluble cloth (3) and is connected to the beam reinforcement cage; the first mixture is filled in the first The second formwork body further comprises a second three-dimensional fabric mesh (2') and a second fiber buckle (4'), the second fiber cloth (1') is wrapped around the outer periphery of the second three-dimensional fabric mesh (2'), the second PVA water-soluble cloth (3') is wrapped around the inner periphery of the second three-dimensional fabric mesh (2'), the second fiber buckle (4') is arranged on the inner periphery of the second three-dimensional fabric mesh (2'), and the second fiber buckle (4') extends to the outside of the second PVA water-soluble cloth (3') and is connected to the column reinforcement cage, and the second mixture is filled in the second three-dimensional fabric mesh (2').
2. The construction method of the prefabricated RC frame structure according to claim 1, Features: The first beam formwork (10) and the second beam formwork (11) have the same structure, and the first column formwork (12) and the second column formwork (13) have the same structure.
3. The construction method of the prefabricated RC frame structure according to claim 2, Features: The first beam formwork (10) further comprises a beam reinforcement cage, the first formwork body is provided with a first molding cavity, the beam reinforcement cage is located in the first molding cavity, and the beam reinforcement cage is connected to the first formwork body.
4. The construction method of the prefabricated RC frame structure according to claim 3, Features: The second column formwork (13) further comprises a column reinforcement cage, the second formwork body is provided with a second molding cavity, the column reinforcement cage is located in the second molding cavity, and the column reinforcement cage is connected to the second formwork body.