A bridge construction method
By using the support beam and guide rope system in bridge construction, combined with the design of the tank and funnel modules, the problems of liquid residue and difficult flow control in spraying vehicles were solved, and effective discharge of liquid and marking accuracy were achieved.
Patent Information
- Application Number
- CN202310012697.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-01-05
AI Technical Summary
In the existing bridge construction technology, the funnel design of the spray vehicle has problems such as liquid residue, difficulty in flow control, liquid blockage, difficulty in valve body installation, and piston cylinder sealing restrictions, resulting in inaccurate marking and undesired liquid falling.
It adopts a construction system of support beams, bridge decks, brackets, rope rollers, roller frames, joints, guide ropes and traveling vehicles, combined with tanks, funnel modules, drive modules, pallets, drainage channels and semi-annular orifices. Realize effective liquid discharge and flow control to ensure marking accuracy.
It effectively prevents liquid accumulation and clogging, simplifies installation, enhances the structural function of the piston, and achieves precise control of liquid and marking accuracy.
Smart Images

Figure CN115874518B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to a bridge construction method. Background Art
[0002] Bridges are important transportation buildings for human life. In actual production practice, the following problems exist:
[0003] 1. In the existing technology, there is a problem that various types of vehicle guide lines need to be drawn on the bridge deck. In practice, the lines are sprayed by a spraying vehicle. During the spraying process, a funnel is used to drain the remaining liquid in the tank. Without a funnel, the remaining liquid on the bottom wall of the tank is not easy to drain;
[0004] However, there are the following problems in the use of the funnel: since the opening and closing device of the liquid needs to be set at the bottom of the tank, but cannot be set at the bottom of the funnel (the funnel is small in size and cannot reasonably support the opening and closing device), the opening and closing device is set above the funnel. When the spraying is stopped and the opening and closing device is closed, the residual liquid in the funnel will continue to remain, causing an unexpected pool of liquid to fall on the bridge deck when marking.
[0005] 2. Due to the shape and structure of the funnel in the prior art, such as thin walls and inclined extending walls, they are not as suitable for support and installation as platforms or thick walls, which determines that it is impossible to set a more complex structure on the funnel to control the flow rate; and because the funnel is large in size and light in weight, it is not easy to use it as a base installation or hanging equipment.
[0006] 3. If the funnel of the prior art has additional structures inside, it will cause liquid accumulation, especially when marking, the molten liquid material will easily cool and solidify after accumulation, resulting in unexpected blockage.
[0007] 4. It is difficult to set a shut-off valve on the bottom wall of the tank in the prior art because there is no complete valve body. If an additional valve body is set separately, the cost will increase. If only the valve core and the bottom wall are matched, at least a valve seat must be added.
[0008] 5. The piston cylinder in the prior art strives to seal the piston cavity as much as possible, but this approach limits the use of the piston cylinder.
[0009] 6. The funnel of the prior art has a small bottom diameter. Even if the diameter of the upper part is increased, the flow effect is mainly determined by the bottom part, and liquid is often easily accumulated inside the funnel.
[0010] 7. The spray marking vehicle of the prior art has uncertain and unexpected working conditions when marking, resulting in deviation from the marking reference. Summary of the invention
[0011] In order to overcome the above problems, the present invention proposes a solution to solve the above multiple problems at the same time.
[0012] The technical solution adopted by the present invention to solve its technical problems is: a bridge construction method, which uses a construction system for construction, the construction system includes a support beam, a bridge deck, a bracket, a rope drum, a drum frame, a joint, a joint bracket, a guide rope, and a traveling vehicle; the traveling vehicle includes a vehicle body, a marking module, wheels, a back plate, and ears; wherein the vehicle body is provided with a marking module and a back plate, the back plate is provided with the ears, and the ears are provided with ear holes; the support beam supports the bridge deck, the bracket is provided between every two support beams, the bracket supports the bridge deck, the drum frame and the joint bracket are arranged on the bridge deck, the drum frame supports the rope drum, the joint bracket is provided with the joint, the guide rope is led out from the rope drum, and the other end passes through the ear hole and is connected to the joint; the construction method includes: a marking method, a sensing method, and a preparatory construction method;
[0013] The marking method comprises: arranging the rope drum at one end of the bridge deck segment to be marked, leading the guide rope from the rope drum, the guide rope passing through the ear hole and then connected to the joint, the joint bracket is located at the other end of the segment to be marked, and the traveling vehicle moves in a direction from the joint bracket to the drum bracket to mark the line;
[0014] The sensing method comprises: a controller is provided in the vehicle body, a distance measuring sensor is provided on the side of the vehicle body, and a vibration sensor is provided on the ear to sense the vibration of the guide rope. When the guide rope vibrates, the vibration sensor sends a signal to the controller, and the controller controls the distance measuring sensor to work, detects the distance between the traveling vehicle and the side of the bridge, and feeds back the detected distance signal to the controller;
[0015] The marking module includes a tank body, a funnel module, a driving module, a leg, a nozzle device, a conveying pipe, and a connecting frame. The tank body includes a bottom wall, and a semi-circular hole is provided on the bottom wall. The funnel module includes a funnel and an inner cylinder. The inner cylinder includes a main cylinder, a lower cylinder, a partition, an upper cavity, a lower cavity, a supporting plate, a supporting rod, an outlet, a horizontal drainage channel, an inclined drainage channel, a long hole, and a semi-ring. The partition is provided with a perforation. The driving module includes a driving structure, a connecting rod, and a valve core; a semi-ring groove is provided inside the valve core;
[0016] The preparatory construction method comprises: a heater and a temperature sensor are arranged in the tank body, the temperature sensor senses the temperature of the medium in the tank body, and the heater heats the medium in the tank body;
[0017] The funnel is provided below the bottom wall, the inner tube is provided inside the funnel, the inner tube passes through the bottom wall upwards, and the outer wall of the main tube is connected to the bottom wall, the lower tube is provided at the lower part of the main tube, a partition is provided in the main tube to divide the inside of the main tube into an upper chamber and a lower chamber, the support plate is accommodated in the upper chamber, the support rod is connected below the support plate and extends downward through the partition, a plurality of long holes are provided on the outer wall of the main tube corresponding to the position of the lower chamber, the semi-ring is provided on the main tube, and the position of the semi-ring is higher than the bottom wall;
[0018] The lower tube is located below the funnel, and is a cylindrical structure provided with an intermediate channel, the intermediate channel forming the outlet, and a horizontal drainage channel and an inclined drainage channel are provided in the cylindrical structure, the horizontal drainage channel and the inclined drainage channel are connected, the upper end of the inclined drainage channel is connected with the funnel, and the inner side of the horizontal drainage channel is connected with the intermediate channel; when the support rod moves downward, the intermediate channel and the horizontal drainage channel can be closed;
[0019] The delivery pipe is arranged below the lower cylinder, one end of the delivery pipe is connected to the outlet, the other end of the delivery pipe is connected to the nozzle device, the support leg is arranged below the tank body, the support leg is connected to one end of the connecting frame, and the other end of the connecting frame holds the delivery pipe;
[0020] The driving structure is arranged on the side wall of the tank body, the connecting rod extends from the driving structure and is connected to the valve core, the valve core is a valve core in the shape of a semi-circular ring, the semi-annular groove matches the shape of the semi-annular ring, the semi-annular hole is arranged on the bottom wall around the inner cylinder, the valve core can close the semi-annular hole, and the shape of the valve core is adapted to the outer wall of the main cylinder.
[0021] Furthermore, the driving structure is a hydraulic driving structure.
[0022] Furthermore, a connecting ear is provided on the outer side of the funnel.
[0023] Furthermore, the connecting ear is fastened below the bottom wall by screws.
[0024] Furthermore, the funnel is made of metal.
[0025] Furthermore, the inner cylinder is made of metal.
[0026] Furthermore, the installation position of the funnel is not located at the center of the bottom wall.
[0027] Furthermore, an opening is provided on the top of the tank body.
[0028] Furthermore, a top funnel is provided on the opening.
[0029] Furthermore, the bottom opening diameter of the top funnel is larger than the bottom opening diameter of the funnel.
[0030] The beneficial effects of the present invention are:
[0031] 1. In view of the first point of the background technology, a support plate is provided. When the liquid is lower than a certain level, the support plate falls down to block the funnel outlet to prevent the accumulated liquid from falling down;
[0032] As for how to ensure that the liquid is below a certain level, a semi-circular opening is adopted in the bottom wall of the tank only on one side of the funnel, so that the liquid can only fall into the funnel on one side. The liquid must first lift the support plate before it can enter the high place on the other side. After the support plate is lifted, the liquid is discharged and will not enter the high place on the other side, thereby effectively controlling the liquid level in the funnel.
[0033] 2. In response to the second point raised in the background technology, an inner cylinder is provided, the upper end of the inner cylinder is fixed by the bottom wall of the tank, and the lower end of the inner cylinder is connected to the funnel, thereby realizing two-point fixation, forming a firm fixed structure, and because there are only two structures during assembly: the funnel and the inner cylinder, the installation is simple, and there is no need to install a large number of components on the funnel.
[0034] 3. In response to the third point raised in the background technology, a liquid discharge channel is provided in the lower part of the inner tube, and the liquid discharge channel cooperates with the long hole to discharge the liquid in the lower part of the funnel where liquid is easily accumulated.
[0035] 4. In response to the fourth point raised in the background technology, the upper part of the inner tube is cleverly used as the valve seat, thereby saving the processing, manufacturing and installation of a separate valve seat, and in order to seal more tightly, a labyrinth seal is achieved through the cooperation of the ring groove and the convex ring.
[0036] 5. In response to the fifth point raised in the background technology, a plurality of long holes are provided on the inner cylinder, and the long holes can realize the liquid in and out, thereby giving a new function to the piston structure and realizing the function of fully passive opening and closing.
[0037] 6. In response to the sixth point raised in the background technology, a double throttling hole mode of a semi-annular throttling hole and a long throttling hole is set up to control the liquid flow through the funnel so that a large amount of liquid will not enter the funnel. According to the previous analysis, there is no need to pass a large amount of liquid into the funnel, and a small amount of liquid will not affect the liquid output.
[0038] 7. In response to the seventh point raised in the background technology, a rope guiding structure is set on the bridge deck. The rope passes through the ear holes on the traveling vehicle for guidance, and assists in ensuring the marking accuracy on the basis of the traveling vehicle's own straight-line movement.
[0039] Note: The above designs are not listed in any particular order, and each one makes the present invention distinctive and significantly advanced compared to the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0041] Figure 1 It is a schematic diagram of the tank body in the present invention;
[0042] Figure 2 It is an enlarged view of the liquid outlet portion of the bottom wall of the tank body in the present invention;
[0043] Figure 3 It is a three-dimensional diagram of the inner cylinder in the present invention;
[0044] Figure 4 This is a working principle diagram of the opening and closing valve in the present invention.
[0045] Figure 5 It is an overall schematic diagram of the bridge traveling vehicle in the present invention;
[0046] Figure 6 It is an overall schematic diagram of the marking system in the present invention;
[0047] Figure 7 It is a rear view of the traveling vehicle in the present invention;
[0048] Figure 8 It is the construction process diagram in the present invention.
[0049] In the figure, the reference numerals are as follows:
[0050] 1. tank body 2. bottom wall 3. funnel module 4. drive module 5. funnel 6. inner tube 7. main tube 8. lower tube 9. partition 10. upper chamber 11. lower chamber 12. perforation 13. support plate 14. support rod 15. outlet 16. horizontal drainage channel 17. inclined drainage channel 18. drive structure 19. connecting rod 20. valve core 21. semi-annular groove 22. semi-annular hole 23. semi-ring 24. long hole 25. car body 26. connecting frame 27. marking module 28. outrigger 29. wheel 30. nozzle device 31. conveying pipe 32. support beam 33. bridge deck 34. bracket 35. rope drum 36. drum frame 37. joint 38. joint bracket 39. guide rope 40. ear 41. ear hole 42. back plate. DETAILED DESCRIPTION
[0051] As shown in the figure: a bridge construction method, using a construction system for construction, the construction system includes a support beam, a bridge deck, a bracket, a rope drum, a drum frame, a joint, a joint bracket, a guide rope, and a traveling vehicle; the traveling vehicle includes a vehicle body, a marking module, wheels, a back plate, and ears; wherein the vehicle body is provided with a marking module and a back plate, the back plate is provided with the ears, and the ears are provided with ear holes; the support beam supports the bridge deck, the bracket is provided between every two support beams, the bracket supports the bridge deck, the drum frame and the joint bracket are arranged on the bridge deck, the drum frame supports the rope drum, the joint bracket is provided with the joint, the guide rope is led out from the rope drum, and the other end passes through the ear hole and is connected to the joint; the construction method includes: a marking method, a sensing method, and a preparatory construction method;
[0052] The marking method comprises: arranging the rope drum at one end of the bridge deck segment to be marked, leading the guide rope from the rope drum, the guide rope passing through the ear hole and then connected to the joint, the joint bracket is located at the other end of the segment to be marked, and the traveling vehicle moves in a direction from the joint bracket to the drum bracket to mark the line;
[0053] The sensing method comprises: a controller is provided in the vehicle body, a distance measuring sensor is provided on the side of the vehicle body, and a vibration sensor is provided on the ear to sense the vibration of the guide rope. When the guide rope vibrates, the vibration sensor sends a signal to the controller, and the controller controls the distance measuring sensor to work, detects the distance between the traveling vehicle and the side of the bridge, and feeds back the detected distance signal to the controller;
[0054] The marking module includes a tank body, a funnel module, a driving module, a leg, a nozzle device, a conveying pipe, and a connecting frame. The tank body includes a bottom wall, and a semi-circular hole is provided on the bottom wall. The funnel module includes a funnel and an inner cylinder. The inner cylinder includes a main cylinder, a lower cylinder, a partition, an upper cavity, a lower cavity, a supporting plate, a supporting rod, an outlet, a horizontal drainage channel, an inclined drainage channel, a long hole, and a semi-ring. The partition is provided with a perforation. The driving module includes a driving structure, a connecting rod, and a valve core; a semi-ring groove is provided inside the valve core;
[0055] As shown in the figure: the preparatory construction method includes: a heater and a temperature sensor are arranged in the tank body, the temperature sensor senses the temperature of the medium in the tank body, and the heater heats the medium in the tank body;
[0056] The funnel is provided below the bottom wall, the inner tube is provided inside the funnel, the inner tube passes through the bottom wall upwards, and the outer wall of the main tube is connected to the bottom wall, the lower tube is provided at the lower part of the main tube, a partition is provided in the main tube to divide the inside of the main tube into an upper chamber and a lower chamber, the support plate is accommodated in the upper chamber, the support rod is connected below the support plate and extends downward through the partition, a plurality of long holes are provided on the outer wall of the main tube corresponding to the position of the lower chamber, the semi-ring is provided on the main tube, and the position of the semi-ring is higher than the bottom wall;
[0057] The lower tube is located below the funnel, and is a cylindrical structure provided with an intermediate channel, the intermediate channel forming the outlet, and a horizontal drainage channel and an inclined drainage channel are provided in the cylindrical structure, the horizontal drainage channel and the inclined drainage channel are connected, the upper end of the inclined drainage channel is connected with the funnel, and the inner side of the horizontal drainage channel is connected with the intermediate channel; when the support rod moves downward, the intermediate channel and the horizontal drainage channel can be closed;
[0058] The delivery pipe is arranged below the lower cylinder, one end of the delivery pipe is connected to the outlet, the other end of the delivery pipe is connected to the nozzle device, the support leg is arranged below the tank body, the support leg is connected to one end of the connecting frame, and the other end of the connecting frame holds the delivery pipe;
[0059] The driving structure is arranged on the side wall of the tank body, the connecting rod extends from the driving structure and is connected to the valve core, the valve core is a valve core in the shape of a semi-circular ring, the semi-annular groove matches the shape of the semi-annular ring, the semi-annular hole is arranged on the bottom wall around the inner cylinder, the valve core can close the semi-annular hole, and the shape of the valve core is adapted to the outer wall of the main cylinder.
[0060] As shown in the figure: the driving structure is a hydraulic driving structure. A connecting ear is provided on the outside of the funnel. The connecting ear is fastened below the bottom wall by screws. The funnel is made of metal. The inner cylinder is made of metal. The installation position of the funnel is not located at the center of the bottom wall. An opening is provided above the tank body. A top funnel is provided on the opening. The bottom opening diameter of the top funnel is larger than the bottom opening diameter of the funnel.
[0061] The above detailed description is a specific description of a feasible embodiment of the present invention. The embodiment is not intended to limit the patent scope of the present invention. Any equivalent implementation or modification that does not deviate from the present invention should be included in the patent scope of this case.
Claims
1. A bridge construction method, using a construction system for construction, characterized in that: The construction system includes a support beam, a bridge deck, a bracket, a rope drum, a drum frame, a joint, a joint bracket, a guide rope, and a traveling vehicle; the traveling vehicle includes a vehicle body, a marking module, wheels, a back plate, and ears; the vehicle body is provided with a marking module and a back plate, the back plate is provided with the ears, and the ears are provided with ear holes; the support beam supports the bridge deck, the bracket is provided between every two support beams, the bracket supports the bridge deck, the drum frame and the joint bracket are arranged on the bridge deck, the drum frame supports the rope drum, the joint bracket is provided with the joint, the guide rope is led out from the rope drum, and the other end passes through the ear hole and is connected to the joint; the construction method includes: a marking method, a sensing method, and a preparatory construction method; The marking method comprises: arranging the rope drum at one end of the bridge deck segment to be marked, leading the guide rope from the rope drum, the guide rope passing through the ear hole and then connected to the joint, the joint bracket is located at the other end of the segment to be marked, and the traveling vehicle moves in a direction from the joint bracket to the drum bracket to mark the line; The sensing method comprises: a controller is provided in the vehicle body, a distance measuring sensor is provided on the side of the vehicle body, and a vibration sensor is provided on the ear to sense the vibration of the guide rope. When the guide rope vibrates, the vibration sensor sends a signal to the controller, and the controller controls the distance measuring sensor to work, detects the distance between the traveling vehicle and the side of the bridge, and feeds back the detected distance signal to the controller; The marking module includes a tank body, a funnel module, a driving module, a leg, a nozzle device, a conveying pipe, and a connecting frame. The tank body includes a bottom wall, and a semi-circular hole is provided on the bottom wall. The funnel module includes a funnel and an inner cylinder. The inner cylinder includes a main cylinder, a lower cylinder, a partition, an upper cavity, a lower cavity, a supporting plate, a supporting rod, an outlet, a horizontal drainage channel, an inclined drainage channel, a long hole, and a semi-ring. The partition is provided with a perforation. The driving module includes a driving structure, a connecting rod, and a valve core; a semi-ring groove is provided inside the valve core; The preparatory construction method comprises: a heater and a temperature sensor are arranged in the tank body, the temperature sensor senses the temperature of the medium in the tank body, and the heater heats the medium in the tank body; The funnel is provided below the bottom wall, the inner tube is provided inside the funnel, the inner tube passes through the bottom wall upwards, and the outer wall of the main tube is connected to the bottom wall, the lower tube is provided at the lower part of the main tube, a partition is provided in the main tube to divide the inside of the main tube into an upper chamber and a lower chamber, the support plate is accommodated in the upper chamber, the support rod is connected below the support plate and extends downward through the partition, a plurality of long holes are provided on the outer wall of the main tube corresponding to the position of the lower chamber, the semi-ring is provided on the main tube, and the position of the semi-ring is higher than the bottom wall; The lower tube is located below the funnel, and is a cylindrical structure provided with an intermediate channel, the intermediate channel forming the outlet, and a horizontal drainage channel and an inclined drainage channel are provided in the cylindrical structure, the horizontal drainage channel and the inclined drainage channel are connected, the upper end of the inclined drainage channel is connected with the funnel, and the inner side of the horizontal drainage channel is connected with the intermediate channel; when the support rod moves downward, the intermediate channel and the horizontal drainage channel can be closed; The delivery pipe is arranged below the lower cylinder, one end of the delivery pipe is connected to the outlet, the other end of the delivery pipe is connected to the nozzle device, the support leg is arranged below the tank body, the support leg is connected to one end of the connecting frame, and the other end of the connecting frame holds the delivery pipe; The driving structure is arranged on the side wall of the tank body, the connecting rod extends from the driving structure and is connected to the valve core, the valve core is a valve core in the shape of a semi-circular ring, the semi-annular groove matches the shape of the semi-annular ring, the semi-annular hole is arranged on the bottom wall around the inner cylinder, the valve core can close the semi-annular hole, and the shape of the valve core is adapted to the outer wall of the main cylinder.
2. A bridge construction method according to claim 1, characterized in that: The driving structure is a hydraulic driving structure.
3. A bridge construction method according to claim 1, characterized in that: A connecting ear is arranged on the outer side of the funnel.
4. A bridge construction method according to claim 3, characterized in that: The connecting ear is fastened below the bottom wall by screws.
5. A bridge construction method according to claim 1, characterized in that: The funnel is made of metal.
6. A bridge construction method according to claim 1, characterized in that: The inner cylinder is made of metal.
7. A bridge construction method according to claim 1, characterized in that: The installation position of the funnel is not located at the center of the bottom wall.
8. A bridge construction method according to claim 1, characterized in that: An opening is arranged on the top of the tank body.
9. A bridge construction method according to claim 8, characterized in that: A top funnel is provided on the opening.
10. A bridge construction method according to claim 9, characterized in that: The bottom opening diameter of the top funnel is larger than the bottom opening diameter of the funnel.
Citation Information
Patent Citations
Crossing box girder construction method
CN110528398A
Finger-lifting intelligent bridge lifting device and construction method consisting of double-armed channel type ALC jack module, 10-channel hydraulic module, and intelligent control unit
KR102399922B1