A centralized glue supply device
Through the centralized glue supply device, the problem of uneven glue output at the glue point is solved, efficient use of glue and production continuity are achieved, and glue waste and downtime are reduced.
Patent Information
- Application Number
- CN202211403586.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-10
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-11-10
AI Technical Summary
In workshops such as tobacco packaging, the glue dispensing at each glue point is uneven, resulting in a waste of glue liquid and a waste of time in replacing the glue dispensing pot, resulting in intermittent production shutdowns.
A centralized glue supply device is designed, including a glue bin, a glue delivery pipe, multiple glue points and a glue dispensing control component. Through flexible baffles, switch control devices and trigger devices, uniform supply and efficient control of glue are achieved. Ensure glue utilization and production continuity.
It improves the utilization efficiency of glue, reduces glue waste, simplifies the operation of glue points, facilitates monitoring and troubleshooting of clogging problems, and ensures the continuity and efficiency of production.
Smart Images

Figure CN116037413B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of glue supply, and in particular to centralized glue supply in a production workshop. Background Art
[0002] A large amount of glue liquid is used in workshops such as tobacco packaging, and is scattered at different glue application points. At present, glue pots are separately set at different glue application points, and the glue application at each glue application point is often uneven. After the glue pot is replaced, the glue liquid in the original glue pot cannot be fully used, resulting in a lot of waste. Replacing the glue pot causes a lot of time waste and intermittent production stoppage.
[0003] Application Contents
[0004] In order to solve the above-mentioned deficiencies in the prior art, the present application discloses a centralized glue supply device, which includes a glue bin, a glue delivery pipe, a plurality of glue application points, and a plurality of glue discharge control components. The plurality of glue application points are connected to the glue bin through the glue delivery pipe, a heat preservation device is wrapped around the glue delivery pipe, a heating and stirring device is arranged in the glue bin, the glue discharge control component is located between the glue delivery pipe and the glue application points, and the glue discharge control component is respectively connected to the glue delivery pipe and the glue application points, and the glue discharge control component is used to control the glue discharge process of the glue delivery pipe to the glue application points;
[0005] The glue output control component includes a glue inlet pipeline, a glue outlet pipeline, a flexible baffle, and a switch control device. The glue inlet pipeline is connected to the glue delivery pipe, the glue outlet pipeline is connected to the glue application point, and the glue outlet pipeline is connected to the glue inlet pipeline; the switch control device includes a switch plunger, and the switch plunger can reciprocate in the glue inlet pipeline, thereby driving the flexible baffle to block or open the glue inlet pipeline. When the switch plunger drives the
[0006] The flexible baffle includes a baffle fixing portion and a baffle movable portion, the glue outlet pipe is perpendicular to the glue inlet pipe, the baffle fixing portion is fixedly connected to the glue inlet pipe, the baffle movable portion is connected to the baffle fixing portion, and the baffle movable portion is partially located in the glue outlet pipe; when the reciprocating motion direction of the switch plunger is parallel to the glue inlet pipe, when the switch plunger drives the baffle movable portion to approach and block the glue outlet pipe, the baffle movable portion is squeezed and bent by the switch plunger, and the baffle movable portion is located between the switch plunger and the glue inlet pipe; when the switch plunger drives the baffle movable portion away from and opens the glue inlet pipe, the baffle movable portion is flushed open by the glue flowing out of the glue inlet pipe and extends to the lower end of the baffle movable portion against the side wall of the glue outlet pipe.
[0007] The switch control device also includes a switch sealing chamber, a switch piston, and a switch push rod. The switch piston is located in the switch sealing chamber and can slide in the switch sealing chamber. During the sliding process, the switch piston is sealed and connected to the side wall of the switch sealing chamber. The switch sealing chamber contains gas, and the gas pressure in the switch sealing chamber changes due to sliding, thereby forming thrusts F1 of different sizes on the switch piston; the switch push rod connects the switch piston and the switch plunger. Based on the change of gas pressure in the switch sealing chamber, the switch piston drives the switch plunger to move through the switch push rod.
[0008] The glue discharging control assembly also includes an auxiliary pushing device, which includes an auxiliary sealing chamber, an auxiliary piston, and an auxiliary push rod. The auxiliary piston is located in the auxiliary sealing chamber, and the auxiliary piston can move in the auxiliary sealing chamber. During the movement, the auxiliary piston is sealed and connected to the side wall of the auxiliary sealing chamber. The auxiliary piston moves in the auxiliary sealing chamber, and the gas pressure in the auxiliary sealing chamber changes, thereby generating thrusts of different sizes on the auxiliary piston; the auxiliary push rod connects the auxiliary piston and the switch piston;
[0009] Wherein, the auxiliary pushing device is located at the upper part of the glue inlet pipeline and is detachably connected to the glue inlet pipeline.
[0010] The glue discharging control assembly further includes a trigger device, which includes an inflation pipe, an inflation plunger, a fixed shaft, a pressure relief pipe, a pressure relief plunger, and a trigger rod;
[0011] One end of the inflation pipe goes deep into the switch sealed cavity, the other end of the inflation pipe is located outside the switch sealed cavity, and the other end of the inflation pipe is connected to a pressure-stabilizing gas source, the inflation plunger is located inside the switch sealed cavity, the inflation plunger can approach and block the inflation pipe, or can be away from the inflation pipe, when the inflation plunger is away from the inflation pipe, the pressure-stabilizing gas source inflates the switch sealed cavity through the inflation pipe;
[0012] One end of the pressure relief pipe goes deep into the switch sealed cavity, and the other end of the pressure relief pipe is located outside the switch sealed cavity. The pressure relief plunger is located inside the switch sealed cavity, and the pressure relief plunger can approach and block the pressure relief pipe, or can be away from the pressure relief pipe. The trigger rod is located in the pressure relief pipe, and one end of the trigger rod is fixedly connected to the pressure relief plunger. The trigger rod can drive the pressure relief plunger to move up and down to open or block the pressure relief pipe. When the pressure relief plunger opens the pressure relief pipe, the gas pressure in the switch sealed cavity becomes smaller.
[0013] The fixed shaft is fixedly arranged in the switch sealing cavity, and the fixed shaft is respectively connected to the inflation plunger and the pressure relief plunger through a fixing rod. When the trigger rod drives the pressure relief plunger to open the pressure relief pipeline, the pressure relief plunger drives the inflation plunger to block the inflation pipeline through the fixing rod of the fixed shaft. When the trigger rod drives the pressure relief plunger to block the pressure relief pipeline, the pressure relief plunger drives the inflation plunger to open the inflation pipeline through the fixing rod of the fixed shaft.
[0014] Using the centralized glue supply device includes the following steps:
[0015] Before the glue injection starts, the switch plunger drives the movable part of the baffle to block the glue inlet pipe;
[0016] When glue injection is required, the trigger rod is activated to open the pressure relief pipe and close the inflation pipe at the same time, so that the gas pressure in the switch sealing chamber decreases, thereby reducing the thrust F1 of the gas in the switch sealing chamber on the switch piston; the glue in the glue inlet pipe generates a thrust on the movable part of the baffle, and then generates a thrust in the opposite direction of F1 on the switch piston through the switch plunger and the switch push rod; since there is compressed gas in the auxiliary sealing chamber, a thrust is generated on the auxiliary piston, and then a thrust in the opposite direction of F1 is generated on the switch piston through the auxiliary push rod; when the auxiliary push rod is pressed against the switch After the sum of the thrust of the piston and the thrust of the switch push rod on the switch piston is greater than the sum of the maximum static friction force on the switch piston and the thrust F1 of the gas in the switch sealing chamber on the switch piston, the switch piston moves, so that the movable part of the baffle opens the glue inlet pipe, and the glue in the glue inlet pipe flows into the glue outlet pipe through the glue flow path composed of the movable part of the baffle, the glue inlet pipe and the glue outlet pipe; due to the flow pressure of the glue, the lower end of the movable part of the baffle sticks to the inner wall of the glue outlet pipe, thereby preventing the glue from contacting the switch control device and affecting the sensitivity of the switch control device.
[0017] Using the centralized glue supply device also includes the following steps:
[0018] When the glue injection is finished, the trigger rod is started to close the pressure relief channel and at the same time the inflation channel is opened, so that the gas pressure in the switch sealing chamber increases, and the thrust F1 of the gas in the switch sealing chamber on the switch piston increases. Then, when the thrust of the auxiliary push rod on the switch piston, the thrust of the switch push rod on the switch piston, and the maximum static friction force on the switch piston are less than the thrust F1 of the gas in the switch sealing chamber on the switch piston, the switch piston moves, thereby driving the switch plunger to approach the glue inlet pipe, and driving the movable part of the baffle to block the glue inlet pipe.
[0019] Using the centralized glue supply device also includes the following steps: by starting the trigger rod and adjusting the pressure of the stabilized air source, the distance between the switch plunger and the glue feed pipe is controlled to adjust the amount of glue flowing from the glue feed pipe to the glue outlet pipe.
[0020] The glue discharging control component also includes a pressure gauge, which is located outside the switch sealing cavity and is in gas communication with the switch sealing cavity. The pressure gauge is used to monitor the air pressure in the switch sealing cavity in real time.
[0021] The glue inlet pipeline, the auxiliary sealing chamber and the switch sealing chamber are arranged in parallel;
[0022] The glue discharge control component is provided at each glue application point. Since the pressure gauge is positively correlated with the glue pressure in the glue feed pipeline, the pressure in the glue feed pipeline at each glue application point is monitored by the pressure gauge of each glue discharge control component, thereby assisting in monitoring whether there is a blockage in the glue delivery pipe, the blockage position in the glue delivery pipe, and the pressure in the glue bin, and selectively closing the glue discharge control components at different glue application points to improve the utilization efficiency of the centralized glue supply device.
[0023] The present application improves the utilization efficiency of the glue liquid by setting a centralized glue supply device; and by setting a trigger device, a trigger rod can control the pressure relief and inflation channels at the same time, thereby improving the convenience of use;
[0024] By providing a flexible baffle, the glue liquid will not contact the switch control device, thereby improving the reliability of the switch control device;
[0025] By setting up a pressure gauge and an external pressure-stabilizing air source, not only can the glue output of the glue output pipe be controlled, but the glue pressure can also be detected, making it easier to check glue blockage points and isolate unavailable glue points. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following briefly introduces the drawings required for describing the embodiments.
[0027] Figure 1 This is a schematic diagram of the connection relationship of the centralized glue supply device of the present application.
[0028] Figure 2 It is a schematic diagram of the glue discharging control component of the present application in the glue discharging state.
[0029] Figure 3 This is a schematic diagram of the glue discharging control component of the present application in a closed state.
[0030] 1-glue inlet pipe, 2-glue outlet pipe, 3-flexible baffle, 31-baffle fixing part, 32-baffle movable part, 4-auxiliary pushing device, 41-auxiliary sealing chamber, 42-auxiliary piston, 43-auxiliary push rod, 5-switch control device, 51-switch sealing chamber, 52-switch piston, 53-switch push rod, 54-switch plunger, 6-pressure gauge, 7-trigger device, 71-inflating pipe, 72-inflating plunger, 73-fixed shaft, 74-pressure relief pipe, 75-pressure relief plunger, 76-trigger rod. DETAILED DESCRIPTION
[0031] The following will be clearly and completely described in conjunction with the technical solutions of the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments in the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0032] like Figure 1-3 As shown, in order to solve the above-mentioned deficiencies in the prior art, the present application discloses a centralized glue supply device, which includes a glue bin, a glue delivery pipe, a plurality of glue application points, and a plurality of glue discharge control components. The plurality of glue application points are connected to the glue bin through the glue delivery pipe, the glue delivery pipe is surrounded by a heat preservation device, a heating and stirring device is arranged in the glue bin, the glue discharge control component is located between the glue delivery pipe and the glue application points, and the glue discharge control component is respectively connected to the glue delivery pipe and the glue application points, and the glue discharge control component is used to control the glue discharge process of the glue delivery pipe to the glue application points;
[0033] The glue discharge control component includes a glue inlet pipeline 1, a glue outlet pipeline 2, a flexible baffle 3, and a switch control device 5. The glue inlet pipeline 1 is connected to the glue delivery pipe, the glue outlet pipeline 2 is connected to the glue application point, and the glue outlet pipeline 2 is connected to the glue inlet pipeline 1; the switch control device 5 includes a switch plunger 54, and the switch plunger 54 can reciprocate in the glue inlet pipeline 1, thereby driving the flexible baffle 3 to block or open the glue inlet pipeline 1. When the switch plunger 54 drives the
[0034] The flexible baffle 3 includes a baffle fixing portion 31 and a baffle movable portion 32. The glue outlet pipe 2 is perpendicular to the glue inlet pipe 1. The baffle fixing portion 31 is fixedly connected to the glue inlet pipe 1. The baffle movable portion 32 is connected to the baffle fixing portion 31, and part of the baffle movable portion 32 is located in the glue outlet pipe 2. When the reciprocating motion direction of the switch plunger 54 is parallel to the glue inlet pipe 1, when the switch plunger 54 drives the baffle movable portion 32 to approach and block the glue outlet pipe 2, the baffle movable portion 32 is squeezed and bent by the switch plunger 54, and the baffle movable portion 32 is located between the switch plunger 54 and the glue inlet pipe 1. When the switch plunger 54 drives the baffle movable portion 32 away from and opens the glue inlet pipe 1, the baffle movable portion 32 is flushed open by the glue flowing out of the glue inlet pipe 1 and extends to the lower end of the baffle movable portion 32 against the side wall of the glue outlet pipe 2.
[0035] The switch control device 5 also includes a switch sealing chamber 51, a switch piston 52, and a switch push rod 53. The switch piston 52 is located in the switch sealing chamber 51, and the switch piston 52 can slide in the switch sealing chamber 51. During the sliding process, the switch piston 52 is sealed and connected to the side wall of the switch sealing chamber 51. The switch sealing chamber 51 contains gas, and the gas pressure in the switch sealing chamber 51 changes due to sliding, thereby forming thrusts F1 of different sizes on the switch piston 52; the switch push rod 53 connects the switch piston 52 and the switch plunger 54. Based on the change in the gas pressure in the switch sealing chamber 51, the switch piston 52 drives the switch plunger 54 to move through the switch push rod 53.
[0036] The glue discharging control assembly further includes an auxiliary pushing device 4, which includes an auxiliary sealing chamber 41, an auxiliary piston 42, and an auxiliary push rod 43. The auxiliary piston 42 is located in the auxiliary sealing chamber 41, and the auxiliary piston 42 can move in the auxiliary sealing chamber 41. During the movement, the auxiliary piston 42 is sealed and connected to the side wall of the auxiliary sealing chamber 41. As the auxiliary piston 42 moves in the auxiliary sealing chamber 41, the gas pressure in the auxiliary sealing chamber 41 changes, thereby generating thrusts of different sizes on the auxiliary piston 42; the auxiliary push rod 43 connects the auxiliary piston 42 and the switch piston 52;
[0037] The auxiliary pushing device 4 is located at the upper part of the glue inlet pipeline 1 and is detachably connected to the glue inlet pipeline 1 .
[0038] The glue discharging control assembly further includes a trigger device 7, which includes an air-inflating pipe 71, an air-inflating plunger 72, a fixed shaft 73, a pressure-relief pipe 74, a pressure-relief plunger 75, and a trigger rod 76;
[0039] One end of the inflation pipe 71 penetrates into the switch sealed cavity 51, and the other end of the inflation pipe 71 is located outside the switch sealed cavity 51, and the other end of the inflation pipe 71 is connected to a pressure-stabilizing gas source. The inflation plunger 72 is located inside the switch sealed cavity 51, and the inflation plunger 72 can approach and block the inflation pipe 71, or can be away from the inflation pipe 71. When the inflation plunger 72 is away from the inflation pipe 71, the pressure-stabilizing gas source inflates the switch sealed cavity 51 through the inflation pipe 71.
[0040] One end of the pressure relief pipe 74 penetrates into the switch sealed cavity 51, and the other end of the pressure relief pipe 74 is located outside the switch sealed cavity 51. The pressure relief plunger 75 is located inside the switch sealed cavity 51, and the pressure relief plunger 75 can approach and block the pressure relief pipe 74, or can be away from the pressure relief pipe 74. The trigger rod is located in the pressure relief pipe 74, and one end of the trigger rod 76 is fixedly connected to the pressure relief plunger 75. The trigger rod 76 can drive the pressure relief plunger 75 to move up and down to open or block the pressure relief pipe 74. When the pressure relief plunger 75 opens the pressure relief pipe 74, the gas pressure in the switch sealed cavity 51 becomes smaller.
[0041] The fixed shaft 73 is fixedly arranged in the switch sealing cavity 51, and the fixed shaft 73 is respectively connected to the inflation plunger 72 and the pressure relief plunger 75 through a fixing rod. When the trigger rod 76 drives the pressure relief plunger 75 to open the pressure relief pipe 74, the pressure relief plunger 75 drives the inflation plunger 72 to block the inflation pipe 71 through the fixing rod of the fixed shaft 73. When the trigger rod 76 drives the pressure relief plunger 75 to block the pressure relief pipe 74, the pressure relief plunger 75 drives the inflation plunger 72 to open the inflation pipe 71 through the fixing rod of the fixed shaft 73.
[0042] Using the centralized glue supply device includes the following steps:
[0043] Before the glue injection starts, the switch plunger 54 drives the baffle movable part 32 to block the glue inlet pipe 1;
[0044] When glue injection is required, the trigger rod 76 is activated to open the pressure relief pipe 74, and the inflation pipe 71 is closed at the same time, so that the gas pressure in the switch sealing chamber 51 decreases, thereby reducing the thrust F1 of the gas in the switch sealing chamber 51 on the switch piston 52; the glue in the glue inlet pipe 1 generates a thrust on the baffle movable part 32, and then generates a thrust in the opposite direction of F1 on the switch piston 52 through the switch plunger 54 and the switch push rod 53; since there is compressed gas in the auxiliary sealing chamber 41, a thrust is generated on the auxiliary piston 42, and then a thrust in the opposite direction of F1 is generated on the switch piston 52 through the auxiliary push rod 43; when the auxiliary push rod 43 is pressed against the switch After the sum of the thrust of the closing piston 52 and the thrust of the switch push rod 53 on the switch piston 52 is greater than the sum of the maximum static friction force on the switch piston 52 and the thrust F1 of the gas in the switch sealing chamber 51 on the switch piston 52, the switch piston 52 moves, so that the baffle movable part 32 opens the glue inlet pipe 1, and the glue in the glue inlet pipe 1 flows into the glue outlet pipe 2 through the glue flow path composed of the baffle movable part 32, the glue inlet pipe 1 and the glue outlet pipe 2; due to the flow pressure of the glue, the lower end of the baffle movable part 32 is pressed against the inner wall of the glue outlet pipe 2, thereby preventing the glue from contacting the switch control device 5 and affecting the sensitivity of the switch control device 5.
[0045] Using the centralized glue supply device also includes the following steps:
[0046] When the glue injection is finished, the trigger rod 76 is started to close the pressure relief channel and open the inflation channel at the same time, so that the gas pressure in the switch sealing chamber 51 increases, and the thrust F1 of the gas in the switch sealing chamber 51 on the switch piston 52 increases. Then, when the thrust of the auxiliary push rod 43 on the switch piston 52, the thrust of the switch push rod 53 on the switch piston 52, and the maximum static friction force on the switch piston 52 are less than the thrust F1 of the gas in the switch sealing chamber 51 on the switch piston 52, the switch piston 52 moves, thereby driving the switch plunger 54 to approach the glue inlet pipe 1, and driving the movable part of the baffle 32 to block the glue inlet pipe 1.
[0047] Using the centralized glue supply device also includes the following steps: by starting the trigger rod 76 and adjusting the pressure of the stabilized air source, the distance between the switch plunger 54 and the glue inlet pipeline 1 is controlled to adjust the amount of glue flowing from the glue inlet pipeline 1 to the glue outlet pipeline 2.
[0048] The glue discharging control assembly further includes a pressure gauge 6 , which is located outside the switch sealing cavity 51 and is in gas communication with the switch sealing cavity 51 . The pressure gauge 6 is used to monitor the air pressure in the switch sealing cavity 51 in real time.
[0049] The glue inlet pipe 1, the auxiliary sealing chamber 41 and the switch sealing chamber 51 are arranged in parallel;
[0050] The glue discharge control component is provided at each glue application point. Since the pressure gauge 6 is positively correlated with the glue pressure in the glue feed pipeline 1, the pressure gauge 6 of each glue discharge control component is used to monitor the pressure in the glue feed pipeline 1 at each glue application point, thereby assisting in monitoring whether there is blockage in the glue delivery pipe, the blockage position in the glue delivery pipe, and the pressure in the glue bin, and selectively closing the glue discharge control components at different glue application points to improve the utilization efficiency of the centralized glue supply device.
[0051] The present application improves the utilization efficiency of the glue liquid by setting a centralized glue supply device; and by setting a trigger device 7, a trigger rod 76 can simultaneously control the pressure relief and inflation channels, thereby improving the convenience of use;
[0052] By providing the flexible baffle 3, the glue liquid will not contact the switch control device 5, thereby improving the reliability of the switch control device 5;
[0053] By providing the pressure gauge 6 and the external pressure-stabilizing gas source, not only the glue output of the glue output pipe 2 can be controlled, but also the glue pressure can be detected, which is convenient for checking the glue blockage points and isolating the unavailable glue points.
Claims
1. A centralized glue supply device, It is characterized in that The centralized glue supply device includes a glue bin, a glue delivery pipe, a plurality of glue application points, and a plurality of glue discharge control components. The plurality of glue application points are connected to the glue bin through the glue delivery pipe. The glue delivery pipe is surrounded by a heat preservation device. A heating and stirring device is provided in the glue bin. The glue discharge control component is located between the glue delivery pipe and the glue application points, and the glue discharge control component is respectively connected to the glue delivery pipe and the glue application points. The glue discharge control component is used to control the glue discharge process of the glue delivery pipe to the glue application points. The glue discharge control assembly includes a glue inlet pipe, a glue outlet pipe, a flexible baffle, and a switch control device. The glue inlet pipe is connected to the glue delivery pipe, the glue outlet pipe is connected to the glue application point, and the glue outlet pipe is connected to the glue inlet pipe. The switch control device includes a switch plunger. The switch plunger can reciprocate in the glue inlet pipe, thereby driving the flexible baffle to block or open the glue inlet pipe. The flexible baffle comprises a baffle fixing part and a baffle movable part, the glue outlet pipe is perpendicular to the glue inlet pipe, the baffle fixing part is fixedly connected to the glue inlet pipe, the baffle movable part is connected to the baffle fixing part, and the baffle movable part is partially located in the glue outlet pipe; when the reciprocating motion direction of the switch plunger is parallel to the glue inlet pipe, when the switch plunger drives the baffle movable part to approach and block the glue outlet pipe, the baffle movable part is squeezed and bent by the switch plunger, and the baffle movable part is located between the switch plunger and the glue inlet pipe; when the switch plunger drives the baffle movable part away from and opens the glue inlet pipe, the baffle movable part is flushed open by the glue flowing out of the glue inlet pipe and extends to the lower end of the baffle movable part against the side wall of the glue outlet pipe; The switch control device further comprises a switch sealing chamber, a switch piston and a switch push rod. The switch piston is located in the switch sealing chamber and can slide in the switch sealing chamber. During the sliding process, the switch piston is sealed and connected to the side wall of the switch sealing chamber. The switch sealing chamber contains gas, and the gas pressure in the switch sealing chamber changes due to sliding, thereby forming thrusts F1 of different sizes on the switch piston. The switch push rod connects the switch piston and the switch plunger. Based on the change of gas pressure in the switch sealing chamber, the switch piston drives the switch plunger to move through the switch push rod. The glue discharging control assembly also includes an auxiliary pushing device, which includes an auxiliary sealing chamber, an auxiliary piston, and an auxiliary push rod. The auxiliary piston is located in the auxiliary sealing chamber, and the auxiliary piston can move in the auxiliary sealing chamber. During the movement, the auxiliary piston is sealed and connected to the side wall of the auxiliary sealing chamber. The auxiliary piston moves in the auxiliary sealing chamber, and the gas pressure in the auxiliary sealing chamber changes, thereby generating thrusts of different sizes on the auxiliary piston; the auxiliary push rod connects the auxiliary piston and the switch piston; Wherein, the auxiliary pushing device is located at the upper part of the glue inlet pipeline and is detachably connected to the glue inlet pipeline; The glue discharging control assembly further includes a trigger device, which includes an inflation pipe, an inflation plunger, a fixed shaft, a pressure relief pipe, a pressure relief plunger, and a trigger rod; One end of the inflation pipe goes deep into the switch sealed cavity, the other end of the inflation pipe is located outside the switch sealed cavity, and the other end of the inflation pipe is connected to a pressure-stabilizing gas source, the inflation plunger is located inside the switch sealed cavity, the inflation plunger can approach and block the inflation pipe, or can be away from the inflation pipe, when the inflation plunger is away from the inflation pipe, the pressure-stabilizing gas source inflates the switch sealed cavity through the inflation pipe; One end of the pressure relief pipe goes deep into the switch sealed cavity, and the other end of the pressure relief pipe is located outside the switch sealed cavity. The pressure relief plunger is located inside the switch sealed cavity, and the pressure relief plunger can approach and block the pressure relief pipe, or can be away from the pressure relief pipe. The trigger rod is located in the pressure relief pipe, and one end of the trigger rod is fixedly connected to the pressure relief plunger. The trigger rod can drive the pressure relief plunger to move up and down to open or block the pressure relief pipe. When the pressure relief plunger opens the pressure relief pipe, the gas pressure in the switch sealed cavity becomes smaller. The fixed shaft is fixedly arranged in the switch sealing cavity, and the fixed shaft is respectively connected to the inflation plunger and the pressure relief plunger through a fixing rod. When the trigger rod drives the pressure relief plunger to open the pressure relief pipeline, the pressure relief plunger drives the inflation plunger to block the inflation pipeline through the fixing rod of the fixed shaft. When the trigger rod drives the pressure relief plunger to block the pressure relief pipeline, the pressure relief plunger drives the inflation plunger to open the inflation pipeline through the fixing rod of the fixed shaft.
2. A centralized glue supply device according to claim 1, It is characterized in that Using the centralized glue supply device includes the following steps: Before the glue injection starts, the switch plunger drives the movable part of the baffle to block the glue inlet pipe; When glue injection is required, the trigger rod is activated to open the pressure relief pipe and close the inflation pipe at the same time, so that the gas pressure in the switch sealing chamber decreases, thereby reducing the thrust F1 of the gas in the switch sealing chamber on the switch piston; the glue in the glue inlet pipe generates a thrust on the movable part of the baffle, and then generates a thrust in the opposite direction of F1 on the switch piston through the switch plunger and the switch push rod; since there is compressed gas in the auxiliary sealing chamber, a thrust is generated on the auxiliary piston, and then a thrust in the opposite direction of F1 is generated on the switch piston through the auxiliary push rod; when the auxiliary push rod is pressed against the switch After the sum of the thrust of the piston and the thrust of the switch push rod on the switch piston is greater than the sum of the maximum static friction force on the switch piston and the thrust F1 of the gas in the switch sealing chamber on the switch piston, the switch piston moves, so that the movable part of the baffle opens the glue inlet pipe, and the glue in the glue inlet pipe flows into the glue outlet pipe through the glue flow path composed of the movable part of the baffle, the glue inlet pipe and the glue outlet pipe; due to the flow pressure of the glue, the lower end of the movable part of the baffle sticks to the inner wall of the glue outlet pipe, thereby preventing the glue from contacting the switch control device and affecting the sensitivity of the switch control device.
3. A centralized glue supply device according to claim 2, It is characterized in that Using the centralized glue supply device also includes the following steps: When the glue injection is finished, the trigger rod is started to close the pressure relief channel and at the same time the inflation channel is opened, so that the gas pressure in the switch sealing chamber increases, and the thrust F1 of the gas in the switch sealing chamber on the switch piston increases. Then, when the thrust of the auxiliary push rod on the switch piston, the thrust of the switch push rod on the switch piston, and the maximum static friction force on the switch piston are less than the thrust F1 of the gas in the switch sealing chamber on the switch piston, the switch piston moves, thereby driving the switch plunger to approach the glue inlet pipe, and driving the movable part of the baffle to block the glue inlet pipe.
4. A centralized glue supply device according to claim 3, It is characterized in that Using the centralized glue supply device also includes the following steps: by starting the trigger rod and adjusting the pressure of the stabilized air source, the distance between the switch plunger and the glue feed pipe is controlled to adjust the amount of glue flowing from the glue feed pipe to the glue outlet pipe.
5. A centralized glue supply device according to claim 4, It is characterized in that The glue discharging control component also includes a pressure gauge, which is located outside the switch sealing cavity and is in gas communication with the switch sealing cavity. The pressure gauge is used to monitor the air pressure in the switch sealing cavity in real time.
6. A centralized glue supply device according to claim 5, It is characterized in that The glue inlet pipeline, the auxiliary sealing chamber and the switch sealing chamber are arranged in parallel; The glue discharge control component is provided at each glue application point. Since the pressure gauge is positively correlated with the glue pressure in the glue feed pipeline, the pressure in the glue feed pipeline at each glue application point is monitored by the pressure gauge of each glue discharge control component, thereby assisting in monitoring whether there is a blockage in the glue delivery pipe, the blockage position in the glue delivery pipe, and the pressure in the glue bin, and selectively closing the glue discharge control components at different glue application points to improve the utilization efficiency of the centralized glue supply device.
Citation Information
Patent Citations
Novel gluing gun
CN201841099U
Central glue feeder
CN2741381Y