Kit for installing an elevator

By using prefabricated elevator installation structures, prefabricated components are manufactured in factories and quickly installed on-site, solving the problems of slow construction and high pollution in elevator installation in old residential areas, and achieving fast and low-cost elevator installation.

CN116044201BActive Publication Date: 2026-03-20HUAYUAN DEYI (SHANGHAI) TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-12
Publication Date
2026-03-20

AI Technical Summary

Technical Problem

Existing technologies for adding elevators to old residential communities suffer from problems such as long construction periods, significant pollution, and high costs, and prefabricated structures are rarely used in elevator installation projects.

Method used

The elevator adopts a prefabricated structure, including a prefabricated foundation, multiple prefabricated standard sections and a prefabricated top layer. It is quickly connected through connecting holes and connectors, and grouting is performed on site. The components are prefabricated in the factory and transported to the site for installation.

Benefits of technology

It shortened the construction period, reduced on-site pollution and construction noise, lowered construction costs, and improved construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116044201B_ABST
    Figure CN116044201B_ABST
Patent Text Reader

Abstract

The application provides a fabricated elevator adding structure and an adding method, wherein the elevator adding structure comprises a prefabricated base 1, a plurality of prefabricated standard sections 2 and a prefabricated top layer 3; the prefabricated base 1 is arranged at a position where an elevator needs to be added; the plurality of prefabricated standard sections 2 are arranged in layers on the prefabricated base 1; the prefabricated standard sections 2 are provided with connecting through holes 25; the connecting through holes 25 are provided with first connecting pieces 23; the first connecting pieces 23 between adjacent prefabricated standard sections 2 are connected in the connecting through holes 25; and the connecting through holes 25 between adjacent prefabricated standard sections 2 are connected by grouting; and the prefabricated top layer 3 is arranged on the uppermost layer of the plurality of prefabricated standard sections 2.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application belongs to the technical field of adding elevators to existing buildings, and particularly relates to a fabricated elevator adding structure and an adding method. BACKGROUND

[0002] Adding elevators to old communities is an important livelihood project, which can effectively promote the participation of the elderly and disabled in social life. At present, the structural system of adding elevators to old communities mainly adopts steel structure, and a small part is cast-in-place reinforced concrete structure. Steel structure has the advantages of light weight, fast construction and low cost, but the rigidity is relatively small, the corrosion resistance requirement is high, and the later maintenance cost is large; while the cast-in-place reinforced concrete structure has larger rigidity than the steel structure, higher use comfort and lower later maintenance cost, but has long construction period, large construction pollution, large occupation and large disturbance. Therefore, combining the advantages of reinforced concrete structure and steel structure, seeking a structure system that can meet the requirements of cost, safety and speed at the same time is an urgent problem to be solved in the development process of adding elevators to old communities.

[0003] In order to save energy and reduce emissions, the state and local governments are vigorously promoting the prefabricated building. However, due to technical and cost reasons, there are not many buildings using whole prefabricated structure, and even fewer using prefabricated structure in elevator adding projects. The commonly used prefabricated structure component is a composite beam slab, and the main feature of the elevator adding structure is to require frame beams and frame columns to bear the load. The whole prefabricated structure is to combine the advantages of steel structure, and is segmented and manufactured in the factory, and only a few hours of work are needed to complete the whole hoisting after reaching the site, which greatly shortens the construction period, reduces the influence on the life of the owner, and makes the elevator adding project "minimize the influence on people's life and maximize the benefits".

[0004] Therefore, in order to achieve the purpose of shortening the construction period, reducing the disturbance and lowering the cost of elevator adding, the application arises at the historic moment. SUMMARY

[0005] One of the purposes of the application is to provide a prefabricated elevator adding structure, which is simple and convenient to install and operate, green, and has small pollution compared with the traditional elevator adding structure.

[0006] Another purpose of the application is to provide an elevator adding method which is simple to install and operate and has a short construction period.

[0007] In order to achieve one of the above purposes, the application first provides a prefabricated elevator adding structure, characterized in that it comprises:

[0008] A prefabricated base is arranged at a position where an elevator needs to be added.

[0009] A plurality of prefabricated standard sections, a plurality of said prefabricated standard sections are stacked on said prefabricated base, said prefabricated standard section is provided with a connecting through hole, said connecting through hole is provided with a first connecting piece, said first connecting pieces between adjacent said prefabricated standard sections are connected in said connecting through hole, and the connecting through holes between adjacent said prefabricated standard sections are connected by grouting;

[0010] A prefabricated top layer, said prefabricated top layer is provided on the uppermost layer of a plurality of prefabricated standard sections.

[0011] Preferably, said prefabricated standard section includes a prefabricated elevator shaft and a prefabricated corridor; said connecting through hole is provided in said prefabricated elevator shaft and / or said prefabricated corridor.

[0012] Preferably, said connecting through hole is vertically provided in said prefabricated standard section, said prefabricated standard section is also provided with a reserved operation hole, said reserved operation hole is communicated with said connecting through hole; the connecting point of the first connecting pieces of adjacent said prefabricated standard sections is located at said reserved operation hole.

[0013] Preferably, said first connecting piece is a connecting rod, both ends of said connecting rod are provided with threads; said connecting rods between adjacent said prefabricated standard sections are connected through a double-port threaded sleeve.

[0014] Preferably, said prefabricated base is provided with a second connecting piece, said second connecting piece is connected to said first connecting piece in said prefabricated standard section close to said prefabricated base.

[0015] Preferably, said prefabricated top layer is provided with a third connecting piece, said third connecting piece is connected to said first connecting piece in said prefabricated standard section close to said prefabricated top layer.

[0016] To solve another purpose of the above, the application also provides a method for installing a prefabricated elevator structure, characterized by comprising the following steps:

[0017] Standardized production of prefabricated base, a plurality of prefabricated standard sections and prefabricated top layer, and setting connecting through hole on said prefabricated standard section;

[0018] Installing prefabricated base at the place where the elevator needs to be installed;

[0019] Installing a plurality of prefabricated standard sections on said prefabricated base, and installing first connecting pieces in the connecting through holes of said prefabricated standard sections, connecting the first connecting pieces of adjacent said prefabricated standard sections, and installing said prefabricated top layer on the top of a plurality of prefabricated standard sections;

[0020] Grouting connection in the connecting through holes of said prefabricated standard sections.

[0021] Preferably, the connecting through hole is vertically arranged in the prefabricated standard section, and the prefabricated standard section is further provided with a reserved operation hole which is communicated with the connecting through hole; the first connecting member of the adjacent prefabricated standard section is connected at the reserved operation hole.

[0022] Preferably, during grouting connection, a formwork is used to seal the reserved operation hole to prevent grout leakage.

[0023] Preferably, the first connecting member is implemented as a first connecting rod with threads at both ends, and the first connecting rods of the adjacent prefabricated standard sections are connected through double-port threaded sleeves.

[0024] The technical effects of the above technical solutions of the present application are derived from one or a combination of the following:

[0025] The assembled structure of the present application is produced in a prefabrication factory, and then transported to the site for installation, which causes little dust and noise pollution to the site environment.

[0026] The prefabricated components are divided into three parts: a prefabricated base layer, an integrated prefabricated shaft and corridor standard layer, and a prefabricated equipment top layer, which are sequentially hoisted and installed on site.

[0027] The steel bars between the prefabricated components are connected through straight threaded sleeve through holes, positive and negative double sleeve connections, welding connections, binding connections, bolt connections, and grout anchor connections, and the concrete is connected by high-strength grouting material, which ensures the safety of the connection and effectively improves the efficiency of the site construction. BRIEF DESCRIPTION OF DRAWINGS

[0028] Figure 1 The structure of the assembled elevator structure of the present application is expressed.

[0029] Figure 2 The structure of the prefabricated base of the present application is expressed.

[0030] Figure 3 The structure of the prefabricated top layer of the present application is expressed.

[0031] Figure 4 The structure of the prefabricated standard section of the present application is expressed.

[0032] Figure 5 The connection of the prefabricated standard section of the present application is expressed.

[0033] Figure 6 The structure of the reserved operation hole of the present application is expressed. DETAILED DESCRIPTION

[0034] The following description is presented to enable any person skilled in the art to practice the application and is provided in the context of particular embodiments. Various modifications to the embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein can be applied to other embodiments. Thus, the present application is not intended to be limited to the embodiments presented, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

[0035] In the following detailed description, numerous specific details are set forth in order to provide a more thorough understanding of the present application. However, it will be apparent to one skilled in the art that the present application can be practiced without these specific details. In other instances, well-known structures and devices are shown in block diagram form, rather than in detail, in order to avoid obscuring the present application.

[0036] The reader's attention is directed to all papers and documents which are filed concurrently with this specification and which are open to public inspection with this specification, and the contents of all such papers and documents are incorporated herein by reference. All the features disclosed in this specification, (including any accompanying claims, abstract, and drawings) can be replaced by alternative features which serve the same, equivalent or similar purpose, unless expressly stated otherwise. Thus, unless expressly stated otherwise, each feature disclosed in this specification is one example only of a generic series of equivalent or similar features.

[0037] Note that, where used, the terms left, right, front, back, top, bottom, over, under, clockwise and counterclockwise are used for convenience only, and do not imply any particular fixed direction. In fact, they are used to reflect the relative position and / or orientation between various parts of an object. In addition, the terms "first", "second" are used for description purposes only, and are not to be construed as indicating or implying relative importance.

[0038] In the description of the present application, it should be noted that the terms "mounting", "connected", "connecting" should be construed broadly, for example, can be fixed connection, can also be detachable connection, or integrally connected; can be mechanical connection; can be directly connected, can also be indirectly connected through intermediate medium; can be internal communication of two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0039] It is noted that, in the case of use, further, preferably, further and more preferably, the further, preferably, further or more preferably is a simple start of another embodiment described on the basis of the foregoing embodiment, and the content of the further, preferably, further or more preferably is combined with the foregoing embodiment as a complete structure of another embodiment. The combination of several further, preferably, further or more preferably settings after the same embodiment can constitute another embodiment.

[0040] The application will be described in detail below in conjunction with the accompanying drawings and specific embodiments. It is noted that the aspects described below in conjunction with the accompanying drawings and specific embodiments are only exemplary and should not be understood as limiting the scope of protection of the application in any way.

[0041] Embodiment 1:

[0042] Please refer to Figures 1-6 The embodiment describes a prefabricated elevator installation structure, which comprises a prefabricated base 1, a plurality of prefabricated standard sections 2 and a prefabricated top layer 3. The number of prefabricated standard sections 2 corresponds to the number of floors of the existing building where the elevator is to be installed, and each prefabricated standard section 2 corresponds to each floor.

[0043] Further, according to the different existing buildings, the prefabricated standard section 2 is divided into two types:

[0044] I. The existing building itself has a corridor structure connected with the elevator, and the prefabricated standard section 2 is a prefabricated elevator shaft 21;

[0045] II. The existing building itself has no corridor structure, and the prefabricated standard section 2 comprises a prefabricated elevator shaft 21 and a prefabricated corridor 22 integrally cast and formed. This embodiment is described in detail in this structure.

[0046] Further, the prefabricated base 1 is provided at the place where the elevator is to be installed; a plurality of prefabricated standard sections 2 are stacked on the prefabricated base 1, the prefabricated standard section 2 is provided with a connecting through hole 25, the first connecting piece 23 is arranged in the connecting through hole 25, the first connecting pieces 23 between adjacent prefabricated standard sections 2 are connected in the connecting through hole 25, and the connecting through holes 25 between adjacent prefabricated standard sections 2 are connected by grouting; the prefabricated top layer 3 is arranged on the uppermost layer of the plurality of prefabricated standard sections 2.

[0047] When the prefabricated standard section 2 comprises a prefabricated elevator shaft 21 and a prefabricated corridor 22 integrally cast and formed, there are three ways to set the connecting through hole 25:

[0048] I. The connecting through hole 25 is arranged in the prefabricated elevator shaft 21;

[0049] II. The connecting through hole 25 is arranged in the prefabricated corridor 22;

[0050] III. The connecting through hole 25 is arranged in the prefabricated elevator shaft 21 and the prefabricated corridor 22, that is, the prefabricated elevator shaft 21 of each floor is connected, and the prefabricated corridor 22 of each floor is also connected.

[0051] In this embodiment, in order to simplify the operation and installation, the first method can be used.

[0052] Specifically, the connecting through hole 25 is vertically arranged in the prefabricated elevator shaft 21, and the prefabricated elevator shaft 21 is also provided with a reserved operation hole 24 to facilitate the connection between the first connecting piece 23 of adjacent prefabricated elevator shafts 21. Therefore, the reserved operation hole 24 is connected to the connecting through hole 25, and the connecting point of the first connecting piece 23 of the adjacent prefabricated standard section 2 is located at the reserved operation hole 24.

[0053] The first connecting piece 23 is a connecting member for connecting adjacent prefabricated standard sections 2, which is arranged in the connecting through hole 25. Therefore, the positions of the connecting through holes 25 of adjacent prefabricated standard sections 2, and even all the connecting through holes 25 of the prefabricated standard sections 2, are opposite.

[0054] In order to realize the quick connection of the first connecting piece 23, the first connecting piece 23 is a connecting rod, and the two ends of the connecting rod are provided with threads, that is, the connecting rods of adjacent prefabricated standard sections 2 are connected through a double-port threaded sleeve 25. Preferably, the connecting rod is a threaded rod or a reinforcing bar with threads at both ends, and the double-port threaded sleeve 25 has openings at both ends and is internally provided with internal threads matched with the threads at the ends of the connecting rod.

[0055] It should be noted that the connection method of the double-port threaded sleeve 25 is only one connection method of the first connecting piece 23, and other connection methods such as welding connection, binding connection, bolt connection, and grouting anchor connection can also be used as the implementation means of this embodiment.

[0056] Specific installation method: the connecting node of the connecting rod in the adjacent prefabricated standard section 2 is defined at the reserved operation hole 24, because the reserved operation hole 24 is connected to the connecting through hole 25, so the connection operation can be performed at the reserved operation hole 24, and after the connection of the connecting rod is completed, there is no connecting structure between the connecting rod and the prefabricated standard section 2 for connection, so subsequent grouting connection of the connecting through hole 25 is needed to form a whole with the connecting rod and the prefabricated standard section 2. At this time, the connecting through hole 25 of the topmost prefabricated standard section 2 can also be used as a grouting hole for grouting.

[0057] The above has described the connection method between the prefabricated standard sections 2, and the connection method between the prefabricated base 1 and the prefabricated standard section 2 can also be completed by means of the connecting through hole 25. Specifically, the prefabricated base 1 is provided with a second connecting piece 11 connected to the first connecting piece 23 in the prefabricated standard section 2 close to the prefabricated base 1. Preferably, please refer to Figure 2The second connecting member 11 is a connecting steel bar or a connecting screw rod, one end of which is embedded in the prefabricated base 1 vertically during prefabrication, and the other end is threaded and inserted into the connecting through hole 25 of the prefabricated standard section 2, and is connected to the first connecting member 23 through the double-port threaded sleeve 25.

[0058] Similarly, please refer to Figure 3 , the prefabricated top layer 3 is provided with a third connecting member 31 connected to the first connecting member 23 in the prefabricated standard section 2 close to the prefabricated top layer 3. Preferably, the third connecting member 31 is a connecting steel bar or a connecting screw rod, one end of which is embedded in the prefabricated top layer 3 vertically during prefabrication, and the other end is threaded and inserted into the connecting through hole 25 of the prefabricated standard section 2, and is connected to the first connecting member 23 through the double-port threaded sleeve 25.

[0059] Further, the connecting through holes 25 at each corresponding position of adjacent prefabricated standard sections 2 are defined as a group, at least three groups are provided in this embodiment, which are provided at the locations described in Figure 5 and Figure 6 , one group is provided at the external corner of the prefabricated elevator shaft 21, and one group is provided on each side of the side surface. Of course, the position and number thereof are not limited during implementation and construction, and can be flexibly changed according to actual construction.

[0060] The prefabricated base 1 is generally provided on the foundation, and if there is a pile foundation, the prefabricated base 1 is connected to the pile foundation.

[0061] Embodiment 2:

[0062] Combined with Figures 1-6 , the embodiment provides a method for adding a prefabricated elevator structure, which comprises the following steps:

[0063] S1: Standardized production of a prefabricated base 1, a plurality of prefabricated standard sections 2 and a prefabricated top layer 3, and a connecting through hole 25 is provided on the prefabricated standard section 2.

[0064] Specifically, this step is a factory standardized production step, wherein, when the prefabricated base 1 is produced, the connecting method of the prefabricated base 1 and the prefabricated standard section 2 is also completed by means of the connecting through hole 25. Specifically, the prefabricated base 1 is provided with a second connecting member 11 in advance, and the second connecting member 11 is connected to the first connecting member 23 in the prefabricated standard section 2 close to the prefabricated base 1. Preferably, the second connecting member 11 is a connecting steel bar or a connecting screw rod, one end of which is embedded in the prefabricated base 1 vertically during prefabrication, and the other end is threaded and inserted into the connecting through hole 25 of the prefabricated standard section 2, and is connected to the first connecting member 23 through the double-port threaded sleeve 25. The second connecting member 11 is provided in advance during production, and the number thereof corresponds to the number of connecting through holes 25 in each prefabricated standard section 2.

[0065] Similarly, the prefabricated top layer 3 is provided with a third connecting member 31, which is connected to the first connecting member 23 in the prefabricated standard section 2 close to the prefabricated top layer 3. Preferably, the third connecting member 31 is a connecting steel bar or a connecting screw rod, one end of which is embedded in the prefabricated top layer 3 during prefabrication and is vertically arranged, and the other end is threaded and inserted into the connecting through hole 25 of the prefabricated standard section 2, and is connected to the first connecting member 23 through the double-port threaded sleeve 25. The third connecting member 31 is set in advance in production, and the number thereof corresponds to the number of connecting through holes 25 in each prefabricated standard section 2.

[0066] Further, the prefabricated standard section 2 is provided with a connecting through hole 25, and a reserved operation hole 24 is arranged on the side of the prefabricated standard section 2 to facilitate subsequent connection of the prefabricated standard section 2.

[0067] S2: installing the prefabricated base 1 at a place where an elevator is to be installed.

[0068] Specifically, the prefabricated base 1 is arranged at a place where an elevator is to be installed in an existing building, and the prefabricated base 1 is generally arranged on the foundation, and if there is a pile foundation, the prefabricated base 1 is connected to the pile foundation.

[0069] S3: installing a plurality of prefabricated standard sections 2 on the prefabricated base 1, installing first connecting members 23 in the connecting through holes 25 of the prefabricated standard sections 2, connecting the first connecting members 23 of adjacent prefabricated standard sections 2, and installing the prefabricated top layer 3 on the top of the plurality of prefabricated standard sections 2.

[0070] Specifically, the connecting through hole 25 of the prefabricated standard section 2 is aligned with the second connecting member 11, the second connecting member 11 and the first connecting member 23 are connected in the reserved operation hole 24 of the prefabricated standard section 2, the connecting through hole 25 is vertically arranged in the prefabricated standard section 2, and then the prefabricated standard sections 2 are installed in sequence, and the first connecting members 23 of adjacent prefabricated standard sections 2 are connected at the reserved operation hole 24 of each prefabricated standard section 2.

[0071] As described above, the third connecting member 31 of the prefabricated top layer 3 is aligned with the connecting through hole 25 of the prefabricated standard section 2, the third connecting member and the first connecting member 23 are connected in the reserved operation hole 24 of the prefabricated standard section 2, and the connecting through hole 25 is vertically arranged in the prefabricated standard section 2.

[0072] S4: grouting connection in the connecting through hole 25 of the prefabricated standard section 2.

[0073] Specifically, after the prefabricated base 1, the plurality of prefabricated standard sections 2 and the prefabricated top layer 3 are installed, the formwork is sealed at the reserved operation hole 24 to prevent slurry leakage, and grouting is carried out in the reserved operation hole 24 in the uppermost prefabricated standard section 2. After grouting is completed, the prefabricated base 1, the prefabricated standard section 2 and the prefabricated top layer 3 are integrally connected.

[0074] The beneficial effects of the present application are:

[0075] All components of the assembled structure of the present application are produced in a prefabrication factory and then transported to the site for installation, which causes less dust and noise pollution to the site environment.

[0076] The prefabricated components of the entire main body are divided into three parts: a prefabricated base layer, an integrated prefabricated shaft and corridor standard section, and a prefabricated top layer, which are sequentially hoisted and installed on site. Such component splitting greatly reduces the workload of hoisting and installation on site.

[0077] The steel bars between the prefabricated components are connected by straight threaded sleeve through-hole grouting connection, double-port threaded sleeve connection, welding connection, binding connection, bolt connection and grout anchor connection, and the concrete is connected by high-strength grouting material, which ensures the safety of the connection and effectively improves the efficiency of on-site construction.

[0078] Further, the present application is described in detail above in combination with the embodiments of the drawings, and those of ordinary skill in the art can make various changes to the present application according to the above description. Therefore, some details in the embodiments should not constitute a limitation on the present application, and the scope of protection of the present application will be defined by the appended claims.

Claims

1. A prefabricated elevator retrofit structure, characterized in that, include: A prefabricated foundation base, located at the site where an elevator needs to be installed; Multiple prefabricated standard sections are stacked on a prefabricated foundation. Each prefabricated standard section has a connecting through hole, and a first connector is installed in the connecting through hole. The first connectors between adjacent prefabricated standard sections are connected in the connecting through hole, and the connecting through holes between adjacent prefabricated standard sections are subsequently connected by grouting. The connecting through hole is vertically located in the prefabricated standard section. Each prefabricated standard section also has a reserved operating hole, which communicates with the connecting through hole. The connection point of the first connectors of adjacent prefabricated standard sections is located at the reserved operating hole. The first connector is a connecting rod, and both ends of the connecting rod are threaded. The connecting rods of adjacent prefabricated standard sections are connected by a double-threaded sleeve. The prefabricated top layer is located on the top layer of multiple prefabricated standard sections; The precast foundation is provided with a second connector, which is connected to the first connector in the precast standard section near the precast foundation; the precast top layer is provided with a third connector, which is connected to the first connector in the precast standard section near the precast top layer.

2. The prefabricated elevator retrofit structure as described in claim 1, characterized in that: The prefabricated standard section includes a prefabricated elevator shaft and a prefabricated connecting corridor; the connecting through hole is provided in the prefabricated elevator shaft and / or the prefabricated connecting corridor.

3. The method for adding a prefabricated elevator structure as described in claim 1 or 2, characterized in that, Includes the following steps: Standardized production of prefabricated foundation bases, multiple prefabricated standard sections, and a prefabricated top layer, with connecting through holes provided on the prefabricated standard sections; Install prefabricated foundations at locations where elevators need to be installed; Multiple prefabricated standard sections are installed on the prefabricated foundation base, and first connectors are installed in the connecting through holes of the prefabricated standard sections. The first connectors of adjacent prefabricated standard sections are connected, and the prefabricated top layer is installed on the top of the multiple prefabricated standard sections. Grouting is performed in the connecting through holes of the prefabricated standard section.

4. The installation method as described in claim 3, characterized in that, The connecting through hole is vertically provided in the prefabricated standard section, and the prefabricated standard section is also provided with a reserved operation hole, which is connected to the connecting through hole; the first connecting member of the adjacent prefabricated standard section is connected at the reserved operation hole.

5. The installation method as described in claim 3, characterized in that: During grouting connection, a template is used to seal the pre-reserved operation hole to prevent grout leakage.

6. The installation method as described in claim 3, characterized in that: The first connector is implemented as a first connecting rod with threads at both ends, and the first connecting rods of adjacent prefabricated standard sections are connected by a double-threaded sleeve.

Citation Information

Patent Citations

  • Assembled elevator shaft

    CN218024833U

  • Assembly type added elevator structure

    CN219034151U