High-rise building construction garbage transfer equipment
By using a double-layer conveying pipe and support device made of flexible materials, the problem of inconvenient transportation of dust and debris in high-rise building construction has been solved, achieving efficient and convenient waste transportation and sound insulation, reducing construction costs, and conforming to the concept of green construction.
Patent Information
- Application Number
- CN202310203281.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-06
- Publication Date
- 2026-02-03
- Estimated Expiration
- 2043-03-06
AI Technical Summary
In the construction of high-rise buildings or the renovation of old houses, construction waste such as dust and debris is not easy to transport downwards. Existing transportation methods are inefficient and do not conform to the concept of green construction.
The double-layer conveying pipe, made of flexible material, includes an inner pipe and an outer pipe. The inner pipe is used to convey materials, while the outer pipe is used for sound insulation and to prevent dust from spilling out. It is fixed to the stairs by a support device, which includes a support column and a fixing clip. The support column and the fixing clip are adjustablely connected by a connecting rod. The support column and the fixing clip are detachably fixed to the stairs. The support device is easy to bend and bypass obstacles.
It achieves efficient and convenient waste transfer, reduces labor costs and construction costs, has good sound insulation, conforms to the concept of green construction, and the equipment is portable and modular.
Smart Images

Figure CN116084664B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the field of construction auxiliary cleaning equipment, in particular to a high-rise building construction garbage transfer equipment. BACKGROUND
[0002] A large amount of construction garbage is generated in the process of high-rise building construction or old building reconstruction, in order to reduce the interference to the construction, the construction garbage generated in the high-rise building needs to be transported out in time.
[0003] For the large construction garbage such as waste wood, it is generally transported by tower crane or construction elevator and then concentratedly treated. The dust and debris type construction garbage is generally put in a cart with a bucket and then transported by a construction elevator, but the transfer efficiency of this way is low, which does not conform to the concept of modern green construction. SUMMARY
[0004] The present application relates to the field of construction auxiliary cleaning equipment, in particular to a high-rise building construction garbage transfer equipment.
[0005] The technical problem to be solved is that the dust and debris type construction garbage is not convenient to transport downward in the process of high-rise building construction or old building reconstruction.
[0006] To solve the above technical problem, the present application provides a high-rise building construction garbage transfer equipment, which adopts the following scheme.
[0007] The high-rise building construction garbage transfer equipment comprises a vertical conveying pipe arranged in a building for transferring garbage, and the conveying pipe is fixed to a stair of the building through a supporting device; the supporting device comprises supporting columns arranged in parallel outside the conveying pipe and fixing clamps clamped and fixed on the stair, the conveying pipe is detachably fixed on the supporting columns, the supporting columns are connected to the fixing clamps, and a plurality of fixing clamps are arranged along the supporting columns; the conveying pipe comprises an inner pipe and an outer pipe sleeved outside the inner pipe, and the inner pipe and the outer pipe are made of flexible material; a plurality of annular supports are arranged along the conveying pipe for supporting the inner pipe and the outer pipe, the middle part of the support is provided with a material passing hole for the garbage to pass through, the inner edge of the material passing hole is fixed with the inner pipe, and the outer pipe is fixed outside the material passing hole of the support.
[0008] Preferably, the conveying pipe comprises a plurality of pipe sections spliced upward and downward; the upper and lower ends of the pipe section are provided with supports, and the upper and lower supports of adjacent pipe sections are detachably fixed.
[0009] Preferably, the support comprises an inner ring and an outer ring arranged concentrically, a plurality of radial spokes are arranged between the inner ring and the outer ring to connect and fix the inner ring and the outer ring; the inner pipe of the conveying pipe is fixed on the inner ring, and the outer pipe of the conveying pipe is fixed on the outer ring; the outer ring is reserved with a connecting hole, and the two supports are fixed with each other through the fasteners arranged in the connecting hole.
[0010] Preferably, the support column is divided into multiple sections connected end to end, and a plurality of fixing clamps are arranged on each section of the support column.
[0011] Preferably, the fixing clamp is fixed with a connection rod extending outward, the support column is detachably fixed with the connection rod, and the connection position of the support column and the connection rod is adjustable.
[0012] Preferably, the fixing clamp is C-shaped and includes an L-shaped support plate and a top plate, the top plate is formed with an upper clamping block, the upper clamping block is clamped at a groove on the upper surface of the staircase, the support plate includes a side arm and a bottom plate, the bottom plate is provided with a lower clamping block, the lower clamping block is arranged in close contact with the lower surface of the staircase, the top plate and the bottom plate clamp the staircase and are fixed, the top plate is slidingly arranged on the side wall of the support rod, a downward pressing lever is hingedly connected to the top of the support plate, when the downward pressing lever is rotated, the downward pressing lever drives the top plate to move downward, so that the distance between the top plate and the bottom plate is reduced.
[0013] Preferably, the upper clamping block on the top plate includes two blocks, the two upper clamping blocks are perpendicular to each other and are in close contact with the nosing and the tread of the staircase respectively.
[0014] Preferably, the top plate is provided with a buckle, after the downward pressing lever drives the top plate to press the upper surface of the staircase, the outer end of the downward pressing lever is clamped in the buckle.
[0015] Compared with the prior art, the high-rise building construction waste transfer equipment has the following beneficial effects:
[0016] All the components involved in the present application are processed in the factory, and are finished products before leaving the factory, without the need for processing at the construction site. As a new type of equipment, it combines the advantages of green environment and social resource recycling, and realizes efficient transportation, maximum benefit and maximum value of high-rise building demolition and reconstruction waste.
[0017] In the old building reconstruction, the present application reduces the demand for labor cost by transporting high-rise building demolition and reconstruction waste, saves labor, greatly reduces construction cost and construction measure cost, saves project cost, and makes resources play a greater value.
[0018] Compared with other processes, the conveying pipe of the construction process adopts a double-layer structure, and the inner pipe and the outer pipe of the conveying pipe are made of flexible materials. On the one hand, it is convenient to bend the conveying pipe and install it in some small space, and it is convenient to bypass obstacles. At the same time, it is portable after folding, which is convenient for scene transfer. The convenience, usability and environmental protection of the equipment are improved, and the material is light.
[0019] The conveying pipe made of double-layer flexible material has a sound insulation space formed by the outer canvas. By reasonably dividing the space, the transmission of sound waves is weakened, the vibration of sound waves is reduced, and good sound insulation effect is achieved. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of a high-rise building construction waste transfer device after installation and positioning according to the present invention.
[0021] Figure 2 This is a schematic diagram of the overall structure of the transfer equipment;
[0022] Figure 3 This is a schematic diagram of the pipe section structure of the delivery pipe.
[0023] Figure 4 This is a structural diagram showing the connection between the transfer equipment and the staircase;
[0024] Figure 5 This is a structural diagram of the fixing clip;
[0025] Figure 6 yes Figure 5 A schematic diagram of the structure of the fixing card from another direction.
[0026] Explanation of reference numerals in the attached figures:
[0027] 1-Conveying pipe, 1a-Inner pipe, 1b-Outer pipe, 1c-Support, 1c1 Inner ring, 1c2-Outer ring;
[0028] 2-Supporting column;
[0029] 3-Fixing clip, 3a-Support plate, 3a1-Side wall, 3a2-Bottom plate, 3b-Top plate, 3c-Lower pressure lever, 3d-Upper clamping block, 3e-Lower clamping block;
[0030] 4-Connecting rod;
[0031] 5. Stairs. Detailed Implementation
[0032] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.
[0033] In this invention, unless otherwise stated, directional terms such as "up," "down," "left," and "right" generally refer to the reference appendix. Figure 1 The terms "up," "down," "left," and "right" are shown; "inner" and "outer" refer to the inner and outer contours relative to the individual components. The invention will now be described in detail with reference to the accompanying drawings and embodiments.
[0034] To address the problem of transporting dusty and debris-like construction waste downwards during high-rise building construction or old building renovation, this invention proposes a high-rise building construction waste transfer device, such as... Figures 1 to 6 As shown in the image.
[0035] The application relates to a high-rise building construction garbage transfer equipment, which comprises a vertical building inner conveying pipe 1 for transferring garbage, and the conveying pipe 1 is fixed to the stairs 5 of the building through a supporting device;
[0036] The supporting device comprises supporting columns 2 arranged in parallel outside the conveying pipe 1 and fixing clamps 3 fixed to the stairs 5, the conveying pipe 1 is detachably fixed to the supporting columns 2, the supporting columns 2 are connected to the fixing clamps 3, and a plurality of fixing clamps 3 are arranged along the supporting columns 2.
[0037] The conveying pipe 1 comprises an inner pipe 1a and an outer pipe 1b sleeved outside the inner pipe 1a, and the inner pipe 1a and the outer pipe 1b are made of flexible materials; a plurality of annular supports 1c are arranged along the conveying pipe 1 for supporting the inner pipe 1a and the outer pipe 1b, the middle part of the support 1c is provided with a material passing hole for the garbage to pass through, the inner edge of the material passing hole is fixed to the inner pipe 1a, and the outer pipe 1b is fixed to the outer side of the material passing hole of the support 1c.
[0038] In use, the conveying pipe 1 is first fixed to the stairs 5 of the building, and then the garbage is poured from the uppermost opening of the conveying pipe 1. The conveying pipe 1 itself is a double-layer structure comprising the inner pipe 1a and the outer pipe 1b, the inner pipe 1a is used for conveying materials, and the outer pipe 1b is sleeved outside the inner pipe 1a, which serves as double insurance and sound insulation, and can also avoid dust overflowing from the inner pipe 1a. Because the inner pipe 1a and the outer pipe 1b are made of flexible materials, the inner pipe 1a and the outer pipe 1b are not suitable for using rubber materials, and are more suitable for using fabric materials, preferably canvas, nylon cloth and other woven materials. On the one hand, the fabric material is wear-resistant, on the other hand, the fabric material has good toughness, high tensile strength and stable performance and is corrosion-resistant. However, when conveying powder garbage, the fabric material inevitably causes dust to overflow from the gaps of the fabric material. At this time, the outer pipe 1b arranged outside the inner pipe 1a can effectively avoid the problem. Figure 1 As shown in FIG. 1, the conveying pipe 1 is arranged in the stairs 5, and the conveying pipe 1 also needs to be bent when encountering obstacles. Therefore, the inner pipe 1a and the outer pipe 1b made of flexible materials can facilitate the arrangement of the conveying pipe 1.
[0039] The supporting device is a fixing structure for fixing the conveying pipe 1 to the stairs 5. The supporting device mainly comprises the supporting columns 2 arranged along the extension direction of the conveying pipe 1. In this way, the conveying pipe 1 only needs to be connected and fixed to the supporting columns 2, and then the supporting columns 2 are fixed to the stairs 5. The supporting columns 2 provide support for the flexible conveying pipe 1 and play the role of the keel of the conveying pipe 1.
[0040] As shown in FIG. 1, Figure 2 and Figure 3The conveying pipe 1 shown comprises multiple pipe sections joined vertically; each pipe section has a support 1c at both its upper and lower ends, and the upper and lower supports 1c of adjacent pipe sections are detachable and fixed. In use, after the waste on a higher floor is cleared, a portion of the pipe section can be removed and reused to convey waste from the next floor. Furthermore, the joint configuration of multiple pipe sections facilitates modularization and standardization of the equipment. Regardless of the floor height, only the number of pipe sections needs to be adjusted accordingly.
[0041] like Figure 3 and Figure 4 As shown. The bracket 1c includes a concentric inner ring 1c1 and an outer ring 1c2, with several radial spokes connecting and fixing the inner ring 1c1 and the outer ring 1c2. The inner tube 1a of the conveying pipe 1 is fixed on the inner ring 1c1, and the outer tube 1b of the conveying pipe 1 is fixed on the outer ring 1c2. The outer ring 1c2 has a pre-drilled connection hole, and the two brackets 1c are fixed to each other by fasteners set in the connection hole. Furthermore, an inner clamping plate is provided on the inner side of the inner tube 1a, which, together with the inner ring 1c1, clamps and fixes the wall of the inner tube 1a. The inner clamping plate and the inner ring 1c1 are then connected by rivets. Similarly, an outer clamping plate is also provided on the inner or outer side of the outer ring 1c2, and the outer clamping plate, together with the outer ring 1c2, clamps the wall of the outer tube 1b.
[0042] The support column 2 is divided into multiple sections connected end to end, and each section of the support column 2 is equipped with multiple fixing clips 3. At least two fixing clips 3 are required to position and fix the support column 2.
[0043] like Figure 6 As shown, a connecting rod 4 extending outward is fixed to the fixing clip 3. The support column 2 is detachably fixed to the connecting rod 4, and the connection position between the support column 2 and the connecting rod 4 is adjustable. Because the conveying pipe 1 is flexible, the support column 2 must follow the direction of the conveying pipe 1. In other words, the direction of the support column 2 determines the direction of the conveying pipe 1. However, the fixing clip 3 needs to be fixed to the staircase 5, so it is difficult to keep the distance between the fixing clip 3 and the support column 2 consistent. Therefore, the connecting rod 4 is used to connect the fixing clip 3 and the support column 2. Furthermore, the connection position between the support column 2 and the connecting rod 4 is adjustable.
[0044] like Figure 5 and Figure 6As shown, the fixing clip 3 is C-shaped and includes an L-shaped support plate 3a and a top plate 3b. An upper clamping block 3d is formed on the top plate 3b, which engages with a groove on the upper surface of the staircase 5. The support plate 3a includes a side arm 3a1 and a bottom plate 3a2. A lower clamping block 3e is provided on the bottom plate 3a2, and the lower clamping block 3e is positioned close to the lower surface of the staircase 5. The top plate 3b and the bottom plate 3a2 clamp and fix the staircase 5. The top plate 3b is slidably mounted on the side arm 3a1 of the support rod. A downward lever 3c is hinged to the top of the support plate 3a. When the downward lever 3c is rotated, it pushes the top plate 3b downward, reducing the distance between the top plate 3b and the bottom plate 3a2. The connecting rod 4 and the side arm 3a1 are detachably connected and fixed.
[0045] like Figure 5 As shown in the diagram. The upper clamping block 3d on the top plate 3b includes two blocks, left and right, which are perpendicular to each other and respectively attached to the riser and tread of the stair 5. The top plate 3b is provided with a buckle. After the downward lever 3c drives the top plate 3b to press against the upper surface of the stair 5, the outer end of the downward lever 3c is locked in the buckle.
[0046] To clamp the top plate 3b onto the stair 5, the hinge shaft at the connection point between the pressure bar and the side arm 3a1 can be eccentrically set. Alternatively, the top of the side arm 3a1 can be threaded, and then a nut for pressing the top plate 3b can be screwed in. Tightening the nut will press the top plate 3b down.
[0047] The embodiments described above are merely preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Various modifications and improvements made by those skilled in the art to the technical solutions of the present invention without departing from the spirit of the present invention should fall within the protection scope defined by the claims of the present invention.
Claims
1. A high-rise building construction waste transfer device, characterized in that, Includes a vertically installed conveyor pipe (1) for transferring garbage inside the building, which is fixed to the building's staircase (5) by a support device; The support device includes a support column (2) arranged parallel to the outside of the conveying pipe (1) and a fixing clip (3) clamped and fixed on the staircase (5). The conveying pipe (1) is detachably fixed on the support column (2), the support column (2) is connected to the fixing clip (3), and multiple fixing clips (3) are arranged along the support column (2). The conveying pipe (1) includes an inner pipe (1a) and an outer pipe (1b) sleeved outside the inner pipe (1a). The inner pipe (1a) and the outer pipe (1b) are made of flexible material. Several annular supports (1c) are provided along the conveying pipe (1) to support the inner pipe (1a) and the outer pipe (1b). The support (1c) has a material passage hole in the middle for garbage to pass through. The inner edge of the material passage hole is fixed to the inner pipe (1a), and the outer pipe (1b) is fixed to the outside of the material passage hole of the support (1c). The fixing clip (3) is C-shaped and includes an L-shaped support plate (3a) and a top plate (3b). An upper clamping block (3d) is formed on the top plate (3b) and is clamped in the groove on the upper surface of the staircase (5). The support plate (3a) includes a side arm (3a1) and a bottom plate (3a2). A lower clamping block (3e) is provided on the bottom plate (3a2) and is set close to the lower surface of the staircase (5). The top plate (3b) and the bottom plate (3a2) clamp the staircase (5) and fix it. The top plate (3b) is slidably mounted on the side arm (3a1) of the support rod. The top of the support plate (3a) is hinged to a downward lever (3c). When the downward lever (3c) is rotated, the downward lever (3c) pushes the top plate (3b) downward, thereby reducing the distance between the top plate (3b) and the bottom plate (3a2). The upper clamping block (3d) on the top plate (3b) includes two blocks, left and right. The two upper clamping blocks (3d) are perpendicular to each other and are respectively attached to the riser and tread of the staircase (5).
2. The high-rise building construction waste transfer equipment according to claim 1, characterized in that, The conveying pipe (1) includes multiple pipe sections that are spliced together vertically; Both the upper and lower ends of the pipe section are equipped with supports (1c), and the upper and lower supports (1c) of adjacent pipe sections can be detached and fixed.
3. The high-rise building construction waste transfer equipment according to claim 2, characterized in that, The bracket (1c) includes an inner ring (1c1) and an outer ring (1c2) arranged concentrically, and a number of radial spokes are arranged between the inner ring (1c1) and the outer ring (1c2) to connect and fix the inner ring (1c1) and the outer ring (1c2); The inner tube (1a) of the conveying pipe (1) is fixed on the inner ring (1c1), and the outer tube (1b) of the conveying pipe (1) is fixed on the outer ring (1c2); The outer ring (1c2) has a pre-drilled connection hole, and the two brackets (1c) are fixed to each other by fasteners set in the connection hole.
4. The high-rise building construction waste transfer equipment according to claim 1, characterized in that, The support column (2) is divided into multiple sections connected end to end, and each section of the support column (2) is provided with multiple fixing clips (3).
5. A high-rise building construction waste transfer device according to claim 1, characterized in that, The fixing clip (3) is fixed with an outwardly extending connecting rod (4). The support column (2) and the connecting rod (4) are detachably fixed, and the connection position of the support column (2) and the connecting rod (4) is adjustable.
6. A high-rise building construction waste transfer device according to claim 1, characterized in that, The top plate (3b) is provided with a buckle. After the downward lever (3c) drives the top plate (3b) to press against the upper surface of the staircase (5), the outer end of the downward lever (3c) is locked in the buckle.
Citation Information
Patent Citations
Movable rubbish channel of high-rise building
CN105625690A
High-rise building garbage recovery system
CN115095107A
Construction waste discharge device for building construction
CN211257687U