Mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies

By setting up interconnected mining tunnels and mining approaches in low-grade multi-layered gently sloping ore bodies, and using pre-waste disposal technology, the problems of high cost and low efficiency in traditional mining methods are solved, and the ore and waste are The comprehensive utilization of stone improves mining efficiency and economic benefits and reduces environmental impact.

CN116084941BActive Publication Date: 2024-10-22CHINA MINMETALS CHANGSHA MINING RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211531561.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-01
Publication Date
2024-10-22
Estimated Expiration
2042-12-01

AI Technical Summary

Technical Problem

Low-grade multi-layered gently sloping ore bodies result in high mining costs, low efficiency, and small scale in traditional mining methods, and the implementation of environmental protection policies limits mining methods, requiring a new comprehensive utilization method.

Method used

The separate mining method is used to set up interconnected mining tunnels, mining access roads and ore collecting ditches in the lower ore body, and use these spaces as mining passages for the upper ore body and waste rock layer, and improve the efficiency through pre-waste disposal technology. ore grade, processing waste rock into building materials to achieve comprehensive utilization of resources.

Benefits of technology

It improves the mining efficiency and reduces the cost, realizes the effective utilization of ore and waste rock, reduces the environmental impact of the post-mining empty area, ensures the stability of the post-mining empty area, and obtains additional economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116084941B_ABST
    Figure CN116084941B_ABST
Patent Text Reader

Abstract

The present invention provides a mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies, firstly, the lower ore body is mined, and interconnected mine tunnels, mine access roads and mine collection trenches are set in the lower ore body; then the upper ore body is mined by the room-and-pillar method, and a chute is set to slide the ore to the lower ore layer, and the interconnected space in the lower ore body is used as the bottom mine channel of the ore; then, the middle waste rock layer is comprehensively utilized by mining one pair at a time, the space after mining the upper ore layer is used as a rock drilling chamber, the chute is used as a cutting skylight, and a large-diameter deep hole lateral blasting is adopted, and the bottom mine method is the same as that of the upper ore body; finally, the pre-thrown waste rock and the mined waste rock are comprehensively utilized to make machine-made crushed stone and machine-made sand. The present invention sets interconnected spaces in the lower ore body, and while mining the lower ore body, the ore and waste rock of the upper ore body and the waste rock layer are transported out respectively; at the same time, both the ore and the waste rock are utilized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining, and in particular to a mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies. Background Art

[0002] Gently inclined ore bodies are difficult to mine because of their gentle inclination and the inability of the ore to flow by itself. For single-layer gently inclined ore bodies, the room-and-pillar mining method and the full-scale mining method are mainly used. These two methods can not only adapt to various changes in the occurrence of the ore body, but also have a relatively simple mining process. They are widely used in the mining of gently inclined thin ore bodies. For multi-layer gently inclined ore bodies, if the interlayer between the layers is thick (more than 20m), the upper and lower layers of the ore body can be mined separately, generally mining the upper layer first and then the lower layer. However, for low-grade multi-layer gently inclined ore bodies, due to the low grade of the ore body, if only the traditional room-and-pillar mining method or the full-scale mining method is used, not only will the mining cost be high, but the disadvantages of low mining efficiency and small scale will gradually become prominent. Therefore, it is urgent to find a new mining method.

[0003] At the same time, with the increasingly stringent national environmental protection policies, the state prohibits the mining of river sand, the market demand for aggregates is large, and the price is rising. This has brought prospects for the comprehensive utilization of low-grade ore bodies and waste rock resources, and at the same time provided a new way for the mining of low-grade multi-layer gently inclined ore bodies.

[0004] Furthermore, with the continuous promotion and application of artificial intelligence and intelligent photoelectric pre-waste disposal technology in the non-ferrous metal industry, ores can be identified and sorted before mineral processing, and early waste disposal can be achieved, and the ore can be pre-enriched to improve the grade of the ore, thereby improving economic benefits.

[0005] In view of this, it is necessary to design an improved mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies to solve the above problems. Summary of the invention

[0006] The object of the present invention is to provide a mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies. The multi-layer ore bodies are normally recovered by means of separate mining. A plurality of interconnected mining tunnels, mining access roads and mining trenches are arranged in the lower ore body. While the lower ore body is being mined, the interconnected spaces are used as the bottom mining channels of the upper ore body and the waste rock layer, which makes it more convenient to transport the ore and the waste rock, so as to realize the mining and transportation of the upper ore body and the waste rock layer; at the same time, both the ore and the waste rock are utilized to realize the comprehensive utilization of the low-grade multi-layer gently inclined ore body.

[0007] To achieve the above-mentioned object of the invention, the present invention provides a mining method for comprehensive utilization of a low-grade multi-layer gently inclined ore body, wherein the low-grade multi-layer gently inclined ore body comprises an upper ore body, a waste rock layer and a lower ore body arranged in sequence from top to bottom; the mining method for comprehensive utilization of a low-grade multi-layer gently inclined ore body comprises the following steps:

[0008] S1. Dig a vein transport lane in the lower ore body along the ore body direction; then dig a mine exit lane perpendicular to the vein transport lane in the same direction at intervals of 20-30m in the vein transport lane, and form a mining area between adjacent mine exit lanes; then dig a number of mine exit routes in the mining area in opposite directions on both sides of the mine exit lane, and the spacing between adjacent mine exit routes is 10-14m; then dig a ore collection trench between the opposite mine exit routes in each mining area, and connect all the mine exit routes in the mining area to complete the mining of the lower ore body;

[0009] S2. Divide the upper ore body into a plurality of panels along the ore body strike, divide each panel into a plurality of ore blocks, and adopt room-and-pillar mining to complete the mining of the upper ore body; excavate a chute in the waste rock layer to connect the upper ore body with the lower ore body, and the chute is connected with the ore collecting trench; and transport the ore of the upper ore body out through the interconnected space between the chute and the lower ore body;

[0010] S3. Using the post-mining space of the upper ore body as a rock drilling chamber for comprehensive utilization of the waste rock layer, using the chute as a cutting patio, using the cutting patio as a free surface to blast and expand to form a cutting groove of a preset width, leaving non-mining areas of a preset width on both sides of the cutting groove, so as to complete the mining of the waste rock layer;

[0011] S4. The ore mined from the upper ore body and the lower ore body is discarded in advance using pre-disposal technology to improve the grade of the ore being selected; the waste rock in the waste rock layer, the waste rock discarded from the ore, and the excavation waste rock are processed into construction machine-made gravel and machine-made sand for comprehensive resource utilization; the tailings generated in the ore dressing process and the tailings generated in the process of preparing machine-made gravel and machine-made sand are concentrated and then fully filled into the post-mining empty area or prepared into building materials for comprehensive utilization.

[0012] As a further improvement of the present invention, in step S3, the preset width of the cutting groove is 16m; the preset width of the non-mining area is 8m.

[0013] As a further improvement of the present invention, in step S3, the specific steps of forming the cutting groove are: setting a blasthole with the chute as the center, loading a preset amount of explosives into the blasthole, and forming the cutting groove by blasting; the diameter of the blasthole is 120 mm, and the hole depth depends on the thickness of the waste rock layer.

[0014] As a further improvement of the present invention, in step S1, the mine exit route and the mine exit tunnel form an angle of 50°-60°.

[0015] As a further improvement of the present invention, in step S1, the distance between adjacent mine exit tunnels is 24 m; the distance between adjacent mine exit access roads is 12 m.

[0016] As a further improvement of the present invention, in step S2, the room-and-pillar mining method is specifically: each of the ore blocks is divided into a room and a pillar, the room is mined, and the pillar is reserved.

[0017] As a further improvement of the present invention, the spacing between adjacent ore pillars along the strike direction of the ore body is 8m, and the spacing along the dip direction of the ore body is 5.8-11.2m.

[0018] As a further improvement of the present invention, the row spacing of the blast holes is 2.6-2.8 m, and the spacing between adjacent blast holes in each row is 3.0-3.75 m.

[0019] As a further improvement of the present invention, the ore pillar is a rectangular parallelepiped column, and the bottom surface of the rectangular parallelepiped column is 4m long and 2m wide.

[0020] As a further improvement of the present invention, the blasthole is drilled by a KQG-150 high-pressure down-the-hole drill.

[0021] The beneficial effects of the present invention are:

[0022] (1) The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies provided by the present invention normally adopts the method of separate mining to recover the multi-layer ore bodies:

[0023] First, the lower ore body is mined, and several mining tunnels, mining access roads and ore collection trenches are set up in the lower ore body. That is, most of the resources in the lower ore body are mined (the ore is low-grade, and part of the ore body can be left to support the post-mining void area). At the same time, several mining tunnels, mining access roads and ore collection trenches make the lower ore body form interconnected spaces. These interconnected spaces can serve as the bottom mining channels of the upper ore body and waste rock layer, which is more convenient for the transportation of ore and waste rock, so as to realize the mining and transportation of the upper ore body and waste rock layer. At the same time, the unmined part of the lower ore body can provide support for the post-mining void area.

[0024] The upper ore body is then mined to the maximum extent possible, and there is no need to set up a transportation tunnel in the upper ore body to transport the ore out. Instead, the ore is transported through chutes and ore collection trenches.

[0025] Finally, the waste rock layer is mined in the middle of every other pair to achieve comprehensive utilization, and the waste rock is transported through the interconnected spaces of the lower ore body. No additional excavation and cutting projects are required, and large-diameter deep-hole blasting is used for mining. The comprehensive utilization cost of waste rock is low, generating additional economic benefits.

[0026] The entire mining process is highly efficient, low-cost, and can also generate added value; moreover, the pillars left in the upper and lower ore bodies and the interlayers of unmined waste rock are used to support the post-mining void area and ensure the stability of the void area.

[0027] (2) The mining method for comprehensive utilization of low-grade, multi-layer, gently inclined ore bodies provided by the present invention realizes early disposal of ore by using ore pre-disposal technology, thereby improving the grade of the ore entering the selected area; the waste rock is processed into machine-made crushed stone and machine-made sand for comprehensive resource utilization; the tailings generated in the ore dressing process and the tailings generated in the process of preparing machine-made crushed stone and machine-made sand are concentrated and then all filled into the post-mining empty area or prepared into building materials for comprehensive utilization. There is no need to set up tailings ponds and spoil dumps on the surface, which is beneficial to protecting the surface environment and the construction of green mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the cross-sectional structure of the low-grade multi-layer gently inclined ore body of the present invention.

[0029] Figure 2 for Figure 1 Schematic diagram of the cross-sectional structure of AA.

[0030] Figure 3 for Figure 1 Schematic diagram of the cross-sectional structure of BB.

[0031] Figure 4 for Figure 1 Schematic diagram of the cross-sectional structure of CC.

[0032] Reference numerals

[0033] 1-upper ore body; 2-waste rock layer; 3-lower ore body; 4-transportation tunnel along the vein; 5-exit tunnel; 6-mining area; 7-exit access road; 8-ore collection trench; 9-chute; 10-ore pillar; 11-cutting groove; 12-blast hole. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0035] It should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only structures and / or processing steps closely related to the scheme of the present invention are shown in the drawings, while other details that are not closely related to the present invention are omitted.

[0036] In addition, it should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0037] See also Figures 1 to 4 As shown, the present invention provides a mining method for comprehensive utilization of a low-grade multi-layer gently inclined ore body, wherein the low-grade multi-layer gently inclined ore body comprises an upper ore body 1, a waste rock layer 2 and a lower ore body 3 arranged in sequence from top to bottom; the mining method for comprehensive utilization of a low-grade multi-layer gently inclined ore body comprises the following steps:

[0038] S1. Mining the lower ore body 3:

[0039] like Figure 1 and Figure 2 As shown, first, a vein transport tunnel 4 is excavated along the direction of the ore body in the lower ore body 3 to transport the ore mined in the lower ore body 3.

[0040] Next, a mine-exit tunnel 5 perpendicular to the vein-exit tunnel 4 is excavated in the same direction at intervals of 20-30 m in the vein-exit tunnel 4 at one end of the ore block (the mine-exit tunnel 5 is along the inclined direction of the ore body), and a mining area 6 is formed between adjacent mine-exit tunnels 5. The spacing between adjacent mine-exit tunnels 5 is preferably 24 m.

[0041] Then, several mining access roads 7 are excavated in opposite directions on both sides of the mining tunnel 5 in the mining area 6, and the distance between adjacent mining access roads 7 on the same side is 10-14m, preferably 12m. The opposite set of mining access roads 7 in the same mining area 6 are not yet connected.

[0042] Finally, a collection trench 8 is excavated between the corresponding ore-exiting routes 7 in each mining area 6 to connect all the ore-exiting routes 7 in the mining area 6, so as to complete the mining of the lower ore body 3 and transport the mined ore out at the same time. The unmined part of the mining area 6 is used as the supporting part of the post-mining empty area to support the lower ore body 3. The ore-exiting route 7 forms an angle of 50°-60° with the ore-exiting roadway 5, rather than an angle of 90°, so that it is convenient for the transport vehicles to transport the ore out.

[0043] Several mining tunnels 5, mining access roads 7 and mining trenches 8 have been mined in the lower ore body 3. That is, while most of the resources in the lower ore body 3 are mined (the ore is low-grade, and part of the ore body can be left to support the post-mining void area), the interconnected space of the lower ore body 3 can serve as the bottom mining channel of the upper ore body 1 and the waste rock layer 2, so as to realize the mining and transportation of the upper ore body 1 and the waste rock layer 2.

[0044] S2. Mining the upper ore body 1:

[0045] like Figure 1 and Figure 3 As shown, the upper ore body 1 is divided into multiple panels along the ore body direction, and each panel is divided into multiple ore blocks (the size of the ore blocks is determined according to the maximum exposure area of ​​the roof, and support is provided according to the roof conditions), and the room-pillar mining method is used to complete the mining of the upper ore body 1. At the same time, a chute 9 is excavated in the waste rock layer 2 to connect the upper ore body 1 and the lower ore body 3, and the chute 9 is connected to the ore collection trench 8. In this way, the ore mined from the upper ore body 1 can be placed in the interconnected post-mining space (mainly the ore collection trench 8) of the lower ore body 3 through the chute 9, and then the ore mined from the upper ore body 1 is transported out by vehicles.

[0046] The room-and-pillar mining method specifically includes: dividing each ore block into a room and a pillar 10, mining the room, and reserving the pillar 10, which is used to support the back area of ​​the goaf. The pillar 10 is preferably a rectangular column, and the bottom surface of the rectangular column is 4m long and 2m wide.

[0047] The spacing between adjacent pillars 10 along the strike direction of the ore body is 8m (i.e. Figure 3 The spacing between rows in the vertical direction is 5.8-11.2 m, and in some embodiments, the spacing along the inclination direction of the ore body can be set at intervals of 5.8 m and 11.2 m.

[0048] In this process, not only the upper ore body 1 is mined to the maximum extent, but also there is no need to set up a transportation tunnel for transporting ore out of the upper ore body 1. The ore only needs to be transported to the ore collecting trench 8 of the lower ore body 3 through the chute 9. In addition, the tunnels of the lower ore body 3 are interconnected, which is more conducive to the output of ore. 3 The ore is loaded by an electric shovel and directly loaded onto trucks for transportation via the mine access road 7, the mine tunnel 5 and the vein transport tunnel 4.

[0049] S3. Mining waste rock layer 2:

[0050] like Figure 1 , Figure 3 and Figure 4As shown, the post-mining space of the upper ore body 1 is used as a rock drilling chamber for comprehensive utilization of the waste rock layer 2, the chute 9 is used as a cutting shaft, and the cutting shaft is used as a free surface to form a cutting groove 11 of a preset width. A non-mining area of ​​a preset width is left on both sides of the cutting groove 11 to complete the mining of the waste rock layer 2. At the same time, the non-mining area serves as a supporting part to support the post-mining area. The preset width of the cutting groove 11 is 16m; the preset width of the non-mining area is 8m.

[0051] The specific steps of forming the cutting groove 11 (i.e. the specific steps of mining the waste rock layer 2) are as follows: using the chute 9 as the cutting shaft, setting blast holes 12 around the chute 9, loading a preset amount of explosives into the blast holes 12, and forming the cutting groove 11 by blasting, thereby completing the mining of the waste rock layer 2. Figure 4 As shown, the ore collecting trench 8 is located directly below the cutting groove 11, and is used to carry the waste rock that falls from the cutting groove 11 and transport it out. 3 The ore is loaded by an electric shovel and directly loaded onto trucks for transportation via the mine access road 7, the mine tunnel 5 and the vein transport tunnel 4.

[0052] Specifically, a KQG-150 high-pressure down-the-hole drill is used to drill blast holes 12 in the rock drilling chamber. The diameter of the blast holes 12 is 120 mm, and the hole depth depends on the thickness of the waste rock layer 2 (the hole depth does not exceed 60 m). The row spacing of the blast holes 12 is 2.6-2.8 m, and the spacing between adjacent blast holes 12 in each row is 3.0-3.75 m.

[0053] S4. Comprehensive utilization of ore and waste rock:

[0054] Since the ore grade is relatively low, the ore mined from the upper ore body 1 and the lower ore body 3 is first discarded in advance using the pre-disposal technology, thereby improving the ore grade.

[0055] The waste rock mined from the waste rock layer 2, the waste rock discarded from the ore mined from the upper ore body 1 and the lower ore body 3, and the excavation waste rock generated during the excavation of the upper ore body 1 and the lower ore body 3 are processed into construction machine-made crushed stone and machine-made sand for comprehensive resource utilization.

[0056] The post-mining void area serves as a space for the disposal of tailings and mud. The tailings produced in the ore beneficiation process and the tailings produced in the process of preparing machine-made gravel and machine-made sand are all concentrated (without adding cement) and filled into the post-mining void area. This not only fills the post-mining void area, but also makes use of the tailings and mud, eliminating the need to set up tailings ponds and spoil dumps on the surface.

[0057] In summary, the mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies provided by the present invention normally adopts the method of separate mining to recover the multi-layer ore bodies, and a number of interconnected mining tunnels, mining access roads and mining trenches are set in the lower ore body. While the lower ore body is being mined, the interconnected spaces are used as the bottom mining channels of the upper ore body and the waste rock layer, which is more convenient for the transportation of ore and waste rock, so as to realize the mining and transportation of the upper ore body and the waste rock layer; at the same time, both ore and waste rock are utilized to realize the comprehensive utilization of low-grade multi-layer gently inclined ore bodies, and the entire mining process is efficient, low-cost, and can also obtain added value.

[0058] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A mining method for comprehensive utilization of a low-grade multi-layer gently inclined ore body, wherein the low-grade multi-layer gently inclined ore body comprises an upper ore body, a waste rock layer and a lower ore body arranged in sequence from top to bottom; characterized in that: The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies comprises the following steps: S1. Excavate a vein transport lane in the lower ore body along the ore body direction; then excavate a mine exit lane perpendicular to the vein transport lane in the vein transport lane at intervals of 20-30m in the same direction, and form a mining area between adjacent mine exit lanes; then excavate several mine exit routes in the mining area in opposite directions on both sides of the mine exit lane, and the spacing between adjacent mine exit routes is 10-14m; Then, a ore collecting trench is excavated between the ore exiting routes corresponding to each of the mining areas to connect all the ore exiting routes of the mining area, so as to complete the mining of the lower ore body; S2. Divide the upper ore body into a plurality of panels along the ore body strike, divide each panel into a plurality of ore blocks, and adopt room-and-pillar mining to complete the mining of the upper ore body; excavate a chute in the waste rock layer to connect the upper ore body with the lower ore body, and the chute is connected with the ore collecting trench; and transport the ore of the upper ore body out through the interconnected space between the chute and the lower ore body; S3. Using the post-mining space of the upper ore body as a rock drilling chamber for comprehensive utilization of the waste rock layer, using the chute as a cutting patio, using the cutting patio as a free surface to blast and expand to form a cutting groove of a preset width, leaving non-mining areas of a preset width on both sides of the cutting groove, so as to complete the mining of the waste rock layer; S4. The ore mined from the upper ore body and the lower ore body is discarded in advance using pre-disposal technology to improve the grade of the ore being selected; the waste rock in the waste rock layer, the waste rock discarded from the ore, and the excavation waste rock are processed into construction machine-made gravel and machine-made sand for comprehensive resource utilization; the tailings generated in the ore dressing process and the tailings generated in the process of preparing machine-made gravel and machine-made sand are concentrated and then fully filled into the post-mining empty area or prepared into building materials for comprehensive utilization.

2. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 1, characterized in that: In step S3, the preset width of the cutting groove is 16m; the preset width of the non-mining area is 8m.

3. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 2 is characterized in that: In step S3, the specific steps of forming the cutting groove are: setting a blast hole with the chute as the center, loading a preset amount of explosives into the blast hole, and forming the cutting groove by blasting; the diameter of the blast hole is 120 mm, and the hole depth depends on the thickness of the waste rock layer.

4. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 1, characterized in that: In step S1, the mine exit route forms an angle of 50°-60° with the mine exit tunnel.

5. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 1, characterized in that: In step S1, the distance between adjacent mine exit tunnels is 24m; the distance between adjacent mine exit access roads is 12m.

6. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 1, characterized in that: In step S2, the room-and-pillar mining method specifically includes: dividing each ore block into a room and a pillar, mining the room, and reserving the pillar.

7. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 6, characterized in that: The spacing between adjacent pillars along the strike direction of the ore body is 8m, and the spacing along the dip direction of the ore body is 5.8-11.2m.

8. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 3, characterized in that: The row spacing of the blast holes is 2.6-2.8 m, and the spacing between adjacent blast holes in each row is 3.0-3.75 m.

9. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 6, characterized in that: The ore pillar is a rectangular parallelepiped column, and the bottom surface of the rectangular parallelepiped column is 4m long and 2m wide.

10. The mining method for comprehensive utilization of low-grade multi-layer gently inclined ore bodies according to claim 3, characterized in that: The blastholes are drilled using a KQG-150 high-pressure down-the-hole drill.