A co-curing molding manufacturing method for composite material UAV fuselage

The composite UAV fuselage components are directly cured through co-curing molding and hot pressing processes, which solves the weight and strength problems caused by multiple assembly and connections in the existing technology, and achieves a lightweight and high-strength UAV fuselage. manufacture.

CN116118220BActive Publication Date: 2024-10-22JIANGXI CHANGXING AVIATION EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211463291.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-22
Publication Date
2024-10-22
Estimated Expiration
2042-11-22

AI Technical Summary

Technical Problem

In the existing composite UAV fuselage manufacturing method, the two assembly and connection of skins, beams, frames and other components increase the number of tooling, structural weight and strength loss.

Method used

The composite UAV fuselage co-curing manufacturing method is adopted. Through pre-laying and hot pressing processes, the upper skin, lower skin, reinforced stringers and reinforced partitions are directly co-cured and formed, using flipping tooling and multiple Point-type positioning baffles are used for positioning, combined with vacuum bag making and pressure transfer technology, to reduce assembly complexity and strength loss.

Benefits of technology

It reduces the workload of two assembly and connection operations, reduces the weight of the machine body, and improves the structural strength.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention discloses a composite material UAV fuselage co-curing molding manufacturing method, the UAV fuselage comprises an upper skin, a lower skin, a reinforcing stringer, and a reinforcing bulkhead, and is characterized in that: during molding, the upper skin, the lower skin, the reinforcing stringer, and the reinforcing bulkhead are pre-laid respectively; the pre-laid components are reassembled in sequence and co-cured together. The present invention reduces the workload of secondary assembly and connection, reduces the strength loss caused by the secondary connection, and reduces the weight of the fuselage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of UAV fuselage forming and manufacturing, and in particular to a composite material UAV fuselage co-curing forming and manufacturing method. Background Art

[0002] The fuselage of a composite aircraft generally includes skin, reinforcing beams / strung beams, and reinforced bulkheads. Currently, the mainstream manufacturing method is to form and manufacture the upper and lower skins, reinforcing beams (strung beams), reinforcing frames and other components separately, and then assemble them by secondary gluing, riveting, screwing and other methods. The following problems exist in the prior art: (1) The skin, beams, frames and other components are assembled twice, which increases the workload of secondary assembly and connection and the number of tooling; (2) The use of standard parts such as riveting and screwing increases, which increases the weight of the structure; (3) Secondary gluing requires tank entry, which increases the number of tank entries; (4) Secondary assembly fixation causes structural strength loss. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a composite material UAV fuselage co-curing molding manufacturing method. The UAV fuselage manufactured by this method has various components that are directly co-cured and molded, which reduces the workload of secondary assembly and connection, reduces the strength loss caused by the secondary connection, and reduces the weight of the fuselage.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] A method for co-curing and molding a composite material UAV fuselage, wherein the UAV fuselage comprises an upper skin, a lower skin, reinforced stringers and a reinforced bulkhead, and wherein the method is characterized in that during molding, the upper skin, the lower skin, the reinforced stringers and the reinforced bulkhead are pre-laid respectively; the pre-laid components are then combined together in sequence and co-cured together.

[0006] Furthermore, during assembly, the upper and lower UAV fuselages are assisted in mold closing by using a flip tool; the upper skin, lower skin, reinforced stringers, and reinforced bulkheads are pre-laid and then hot-pressed before being assembled; during positioning, a multi-point positioning baffle is used for positioning, and a force-transmitting positioner is added between the reinforced bulkheads; after the reinforced stringers and reinforced bulkheads are combined, they are assembled together, and the positioning is carried out by relying on the positioning of the reinforced bulkheads, and the tail position of the fuselage is randomly positioned in blocks by relying on the reinforced stringers; before the upper and lower skins are laid, an empty mold closing test is carried out to mark the correct mold closing position, and the mold closing is assembled by sliding with guide pins, and then the mold closing condition is checked by marking; the entire fuselage is vacuum bagged, and foam or silicone is filled in the area where the vacuum bag cannot be operated; the large surface position is filled with foam or silicone medium to the bag-making area, and the vacuum bag pressure is transferred to each part; small areas are pressured by using mold silicone or foam expandable materials.

[0007] Furthermore, in order to prevent the bag from exploding, it needs to be filled with foam. Foam is not easy to remove and is easy to damage. Uncured silicone is used to form and fill various places in the vacuum bag, and its installation position is marked so that it can be used continuously. For the areas where vacuum bagging cannot be achieved due to the combination of the reinforced bulkhead positioning assembly and the skin, special matching silicone pads are specially manufactured for pressure supply. At the contact position between the metal parts and the skin, additional adhesive film or foam is applied before the prepreg is combined. The metal parts are considered to be fine-tuned into an open-angle form, leaving a certain gap at the bottom. The bag pressure presses the metal parts downward, so that the inner wall of the skin is pressed tightly by the open-angle metal parts, and at the same time the gap is filled with foam.

[0008] Furthermore, the laying direction shall be based on the digital model regulations. For parts less than 1m, the unidirectional cloth laying angle deviation is ±3°, and the fabric laying angle deviation is ±5°; for parts greater than 1m, the unidirectional cloth laying angle deviation is ±1°, and the fabric laying direction tolerance is ±5°; the unidirectional tape / unidirectional cloth laid along the load-bearing direction / fiber direction has an allowable overlap size of 13~25mm; the unidirectional tape / unidirectional cloth laid along the load-bearing direction has an allowable butt joint width of 0~2mm in the width direction.

[0009] The present invention provides a composite material UAV fuselage co-curing molding manufacturing method. For the UAV fuselage manufactured by this method, each component is directly co-cured and molded, which reduces the workload of secondary assembly and connection, reduces the strength loss caused by the secondary connection, and reduces the weight of the fuselage. DETAILED DESCRIPTION

[0010] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention is clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0011] The present invention is further described in detail below with reference to specific embodiments.

[0012] A method for co-curing and molding a composite material UAV fuselage, wherein the UAV fuselage comprises an upper skin, a lower skin, reinforced stringers and a reinforced bulkhead, and wherein the method is characterized in that during molding, the upper skin, the lower skin, the reinforced stringers and the reinforced bulkhead are pre-laid respectively; the pre-laid components are then combined together in sequence and co-cured together.

[0013] There are many difficulties in fuselage molding and manufacturing:

[0014] Assembly difficulties: It is difficult to lay up and mold the upper and lower fuselage skins separately; the reinforced bulkhead and the upper and lower skins are all uncured prepregs, with more layers and thicker than theoretical thickness, resulting in extrusion when the mold is closed and local underpressure during curing; the internal frames of the fuselage are difficult to position using conventional positioning methods such as pallets and frames due to space issues.

[0015] Positioning difficulties: Due to the position of the reinforcement stringers, it is difficult to effectively position the long stringers; the positioning of the reinforcement bulkhead frame depends on the positioning accuracy of the upper and lower fuselage skin tooling, and it is difficult to adjust the position of the upper and lower skin tooling after the mold is closed and positioned; the frame is prone to movement during assembly and positioning, resulting in frame offset.

[0016] Difficulties in bag making and pressure transmission: After mold closing, the tooling is complex, making bags difficult; after the parts are assembled, there are many areas that cannot be handled by the vacuum bag and pressure cannot be transmitted; at the contact point between the fuselage and the internal metal parts, the skin in this area is sandwiched between the metal ribs and the tooling, making it difficult to transmit pressure.

[0017] Furthermore, during assembly, the upper and lower UAV fuselages are molded with the assistance of a flip tool; the upper skin, lower skin, reinforced stringers, and reinforced bulkheads are pre-laid and then hot-pressed before being assembled.

[0018] Furthermore, during positioning, a multi-point positioning baffle is used for positioning, and a force-transmitting positioner is added between the reinforced bulkheads. After the reinforced stringers and the reinforced bulkheads are combined, they are assembled together and positioned by relying on the positioning of the reinforced bulkheads. The tail position of the fuselage is positioned in blocks by relying on the reinforced stringers. Before the upper and lower skins are laid, an empty mold inspection is carried out to mark the correct mold position. The mold is assembled by sliding with guide pins, and the mold situation is then checked by marking.

[0019] Furthermore, the entire fuselage is vacuum bagged, and the areas where the vacuum bag cannot be operated are filled with foam or silicone; the large surface areas are filled with foam or silicone medium to the baggable areas, and the vacuum bag pressure is transferred to each part; small areas use mold silicone or foam expandable materials to apply pressure.

[0020] Furthermore, in order to prevent the bag from exploding, it needs to be filled with foam, which is difficult to remove and easy to be damaged; uncured silicone is used to form and fill various parts of the vacuum bag, and its installation position is marked to make it sustainable.

[0021] For the areas where vacuum bagging is not possible due to the combination of the reinforced bulkhead positioning components and the skin, special matching silicone pads are specially manufactured to provide pressure; at the contact position between the metal parts and the skin, additional adhesive film or foam is applied before the prepreg is combined, and the metal parts are considered to be fine-tuned into an open-angle form, leaving a certain gap underneath. The bag pressure presses the metal parts downward, so that the inner wall of the skin is pressed tightly by the open-angle metal parts, and at the same time the gap is filled with foam.

[0022] Through the above-mentioned design, the present invention can well solve the above-mentioned difficulties and meet the requirements of the molding and manufacturing method of the co-cured fuselage, thereby reducing the workload of the second assembly and connection, reducing the strength loss caused by the second connection, and reducing the weight of the fuselage.

[0023] The laying direction is subject to the digital model. For parts less than 1m, the unidirectional fabric laying angle deviation is ±3°, and the fabric laying angle deviation is ±5°; for parts greater than 1m, the unidirectional fabric laying angle deviation is ±1°, and the fabric laying direction tolerance is ±5°. The unidirectional tape / unidirectional fabric laid along the load-bearing direction / fiber direction is allowed to overlap with a size of 13~25mm; the unidirectional tape / unidirectional fabric laid along the load-bearing direction is allowed to have a width of 0~2mm for the butt joint in the width direction.

[0024] The present invention provides a composite material UAV fuselage co-curing molding manufacturing method. For the UAV fuselage manufactured by this method, each component is directly co-cured and molded, which reduces the workload of secondary assembly and connection, reduces the strength loss caused by the secondary connection, and reduces the weight of the fuselage.

[0025] The above-mentioned implementation modes are for explanation of the present invention rather than limitation of the present invention. It can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for manufacturing a composite material UAV fuselage by co-curing molding, wherein the UAV fuselage comprises an upper skin, a lower skin, a reinforced stringer, and a reinforced bulkhead, characterized in that: During molding, the upper skin, lower skin, reinforcement girders and reinforcement bulkheads are pre-laid separately; The pre-laid parts are then assembled together in sequence and co-cured together; During assembly, the upper and lower UAV fuselages are assisted by flip tooling for mold closing; the upper skin, lower skin, reinforced stringers, and reinforced bulkheads are pre-laid and then hot-pressed before being assembled; during positioning, multi-point positioning baffles are used for positioning, and force-transmitting positioners are added between the reinforced bulkheads; after the reinforced stringers and reinforced bulkheads are combined, they are assembled together, and are positioned by the positioning of the reinforced bulkheads, and the tail position of the fuselage is randomly positioned in blocks by the reinforced stringers; before the upper and lower skins are laid, an empty mold closing test is carried out to mark the correct mold closing position, and the mold closing is assembled by sliding with guide pins, and then the mold closing is checked by marking; the entire fuselage is vacuum bagged, and the areas where the vacuum bag cannot be operated are filled with foam or silicone; the large surface position is filled with foam or silicone medium to the bag-making area, and the vacuum bag pressure is transferred to each part; small areas are pressured by mold silicone or foam expandable materials; In order to prevent the bag from exploding, it needs to be filled with foam. The foam is not easy to remove and is easy to damage. Uncured silicone is used to form and fill various places in the vacuum bag, and its installation position is marked to make it sustainable. For the area where vacuum bagging is not possible due to the combination of the reinforcement frame positioning component and the skin, a special matching silicone pad is specially manufactured for pressure supply. At the contact position between the metal parts and the skin, an additional film or foam is laid before the prepreg is combined. The metal parts are considered to be fine-tuned into an open-angle form, leaving a certain gap at the bottom. The bag pressure presses the metal parts downward, so that the inner wall of the skin is pressed by the open-angle metal parts, and the gap is filled with foam at the same time. The laying direction shall be based on the digital model regulations. For parts less than 1m, the unidirectional cloth laying angle deviation is ±3°, and the fabric laying angle deviation is ±5°; for parts greater than 1m, the unidirectional cloth laying angle deviation is ±1°, and the fabric laying direction tolerance is ±5°; for unidirectional tapes / unidirectional fabrics laid along the load-bearing direction / fiber direction, the allowable overlap size is 13-25mm; for unidirectional tapes / unidirectional fabrics laid along the load-bearing direction, the allowable butt joint width in the width direction is 0-2mm.