A charging device and blasting method for fracture development zone and water-containing blasthole

By using water injection pipes, sleeves and super absorbent devices in open-pit mines to seal cracks and blast holes, the problems of energy dissipation and explosive leakage during blasting under the special geological conditions of open-pit mines are solved, and the blasting effect is improved and reduced cost.

CN116123950BActive Publication Date: 2024-10-15XINJIANG UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310020642.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-06
Publication Date
2024-10-15
Estimated Expiration
2043-01-06

AI Technical Summary

Technical Problem

When blasting in open-pit mines under special geological conditions, construction problems arise due to energy dissipation and explosive leakage. In addition, the blasting effect of water-containing blastholes is poor and the cost is high, which cannot be effectively solved by existing technology.

Method used

A device including a water injection pipe, a sleeve, a super absorbent agent and a mining charging bag is used. The super absorbent agent forms a gel that combines with water to seal cracks and blast holes to achieve uniform charging and reduce the unit consumption of explosives.

Benefits of technology

It improves the blasting effect of water holes, reduces blasting costs, ensures construction quality, avoids loss of explosives and energy leakage, and solves the problem of hole collapse in water-containing blastholes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116123950B_ABST
    Figure CN116123950B_ABST
Patent Text Reader

Abstract

The invention discloses a charging device and a blasting method for a fracture development zone and a water-containing blasthole. The charging device comprises a water injection pipe, a sleeve, a super absorbent and a mining charge bag. The sleeve is a sleeve with openings at both ends. The mining charge bag is movably sleeved in the sleeve, and the sleeve is movably plugged in the blasthole. One end of the water injection pipe is arranged in the gap between the sleeve and the blasthole, and the other end is connected to a water source. The gap between the sleeve and the blasthole is filled with the super absorbent, and the mining charge bag is filled with explosives. The present invention applies a super absorbent to joints, fissures and water-containing blastholes, combines a sleeve and a mining charge bag to carry out charge blasting, and uses the super absorbent in the blastholes with joints and fissures in combination with the injected water in the blastholes to seal the fissure blastholes, thereby preventing the loss of explosives and the leakage of explosive energy; adding the super absorbent to the water-containing blastholes can achieve the purpose of charging powdered explosives into the water-containing blastholes for blasting, thereby greatly reducing the unit consumption of explosives.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine blasting, and in particular to a charging device and a blasting method for a fissure development zone and a water-containing blasthole. Background Art

[0002] During open-pit mining operations, there are often special geological conditions such as joints, developed fissures, and caves on the same step. Under such special geological conditions, the blasting resistance line is easily changed due to the loss of energy in the voids. At the same time, during the charging process, the mixed emulsion explosives are very easy to leak along the rock cracks. During on-site operations, the amount of explosives loaded is difficult to meet the design requirements. Excessive charging will lead to a significant increase in the unit consumption of explosives and excessive crushing of the rocks. Conversely, if the amount of charge is less than the design requirements, it will lead to the appearance of large pieces and roots. Because it is difficult to estimate the crack volume of each hole in the drill hole, the amount of charge is difficult to meet the design requirements, which causes huge construction difficulties on site.

[0003] Concave open-pit mines or areas with developed joints and fissures are prone to water in blastholes. If such blastholes are not treated, they can only be blasted with emulsion explosives. However, there are many problems with emulsion explosives water hole charging, such as discontinuous water hole charging, which is prone to problems such as foundation, large blocks, punching holes and irregular blast piles after blasting. Secondary excavation and transportation further increase costs, and water holes are difficult to maintain before blasting, and are prone to collapse, which also leads to cost increases on the other hand. In addition, there is also a method of draining water first and then charging, but it has the disadvantages of difficulty in draining water in the hole, difficulty in draining all water, and fast recovery of accumulated water, but it is rarely used.

[0004] At present, there is no effective method to improve the water hole blasting effect and reduce the blasting cost, which is the main problem of water-containing blasting. Therefore, it is urgent to study the charging structure of fracture development areas and water-containing blastholes to reduce construction costs. Summary of the invention

[0005] The purpose of the present invention is to provide a charging device and a blasting method for fracture development areas and water-containing blastholes to solve the problems existing in the above-mentioned prior art, thereby improving the blasting effect of water holes, reducing blasting costs, and ensuring construction quality.

[0006] To achieve the above object, the present invention provides the following solutions:

[0007] The present invention provides a charging device for a fracture development zone and a water-containing blasthole, comprising a water injection pipe, a sleeve, a super absorbent and a mining charge bag, wherein the sleeve is a sleeve with openings at both ends, the mining charge bag is movably sleeved in the sleeve, the sleeve is movably plugged into the blasthole, one end of the water injection pipe is arranged in the gap between the sleeve and the blasthole, and the other end is connected to a water source, the gap between the sleeve and the blasthole is filled with the super absorbent, and the mining charge bag is filled with explosives.

[0008] Preferably, the sleeve is a PVC sleeve, and the length of the sleeve is greater than the depth of the blasthole.

[0009] Preferably, the sleeve is coaxially arranged with the blasthole, and one end of the water injection pipe is located at the bottom of the blasthole.

[0010] Preferably, one end of the mining charge bag is flush with the bottom of the sleeve, and the other end extends out of the outer end of the sleeve.

[0011] Preferably, the diameter of the sleeve is 2 cm larger than the commonly used standard charge diameter.

[0012] Preferably, the diameter of the mining charge bag is smaller than the commonly used standard charge diameter of 2 cm.

[0013] Preferably, a conical energy focusing hole is provided at the bottom of the mining charge bag, and the conical energy focusing hole is made of metal.

[0014] The present invention also relates to a blasting method for a charging device in a fracture development zone and a water-containing blasthole, based on the charging device in a fracture development zone and a water-containing blasthole, comprising the following steps:

[0015] For the condition of blastholes with developed joints and fissures, if there is no water in the blasthole, first insert the sleeve into the bottom of the blasthole, and ensure that the sleeve is located in the center of the blasthole and is higher than the upper opening of the blasthole. Insert one end of the water injection pipe into the bottom of the gap between the blasthole and the sleeve, and connect the other end to the water source. During the process of water injection through the water injection pipe, slowly add super absorbent to the water injection area to form a gel until the water surface is 0-2 cm lower than the upper opening of the blasthole.

[0016] The mining charge bag is lowered to the bottom of the blasthole through the pipe mouth of the sleeve, an electronic detonator is lowered to the bottom of the blasthole, the detonator leg line is led out along the orifice of the blasthole, and then powdered explosives are loaded into the charge bag. After the loading is completed, the mouth of the mining charge bag is tightly sealed and stuffed into the blasthole. The mining charge bag with completed loading forms a charging section, and then the sleeve is slowly pulled out of the blasthole. After the sleeve is pulled out, the orifice of the blasthole is blocked to form an empty area, and the gel-like super absorbent naturally collapses and blocks the orifice of the blasthole to form a water-sealed blocking state, and the construction of a single blasthole is completed; after all the blastholes are fully loaded, the detonation network is connected to carry out blasting warning and detonation.

[0017] Preferably, in the case where the length of the gel-like super absorbent after natural collapse is less than the set length for blocking, drill cuttings are used or an appropriate amount of water and super absorbent are injected to block again, so as to achieve water seal blocking of the entire length of the blocking section.

[0018] Preferably, for the working condition of water-containing blastholes, the operating procedure is different from that of the blastholes with developed joints and fissures in that when the drilling of the blasthole is completed, the sleeve needs to be installed in time to avoid water seepage in the blasthole resulting in excessive residual water after the sleeve is installed; the blasthole with a smaller amount of water inflow needs to be subjected to a blasthole water injection process, and an appropriate amount of super absorbent needs to be added before water injection.

[0019] Compared with the prior art, the present invention has achieved the following technical effects:

[0020] The present invention applies a super absorbent to joints, fissure development areas and water-containing blastholes, combines a sleeve and a mining charge bag to carry out charge blasting, and uses the super absorbent in combination with the injected water in the blastholes in the joints and fissure development blastholes to seal the fissure blastholes, thereby preventing the loss of explosives and the leakage of explosive energy; adds a super absorbent to the water-containing blastholes to convert the water in the blastholes into a gel state, and combines the mining charge bag and the sleeve to achieve the purpose of charging powdered explosives into the water-containing blastholes for blasting, thereby greatly reducing the unit consumption of explosives. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 It is a schematic diagram of the structure of the charging device for the fracture development zone and the water-containing blasthole of the present invention;

[0023] Among them: 1-blast hole, 2-sleeve, 3-mining charge bag, 4-water injection pipe, 5-super absorbent, 6-conical energy-gathering hole, 7-charge section. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] The purpose of the present invention is to provide a charging device and a blasting method for fracture development areas and water-containing blastholes to solve the problems existing in the prior art, thereby improving the blasting effect of water holes, reducing the blasting cost, and ensuring the construction quality.

[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0027] like Figure 1 As shown: This embodiment provides a charging device for fracture development areas and water-containing blastholes, including a water injection pipe 4, a sleeve 2, a super absorbent 5 and a mining charge bag 3, the sleeve 2 is a sleeve 2 with openings at both ends, the mining charge bag 3 is movably sleeved in the sleeve 2, the sleeve 2 is movably inserted in the blasthole 1, one end of the water injection pipe 4 is arranged in the gap between the sleeve 2 and the blasthole 1, and the other end is connected to the water source, the gap between the sleeve 2 and the blasthole 1 is filled with the super absorbent 5, and the mining charge bag 3 is filled with explosives.

[0028] Specifically, in this embodiment, the sleeve 2 is a PVC sleeve, and the length of the sleeve 2 is greater than the depth of the blasthole 1. The sleeve 2 is coaxially arranged with the blasthole 1 to ensure the uniformity of the later charging, and one end of the water injection pipe 4 is located at the bottom of the blasthole 1 to facilitate water injection and avoid spillage.

[0029] One end of the mining charge bag 3 is flush with the bottom of the sleeve 2, and the other end extends about 10 cm from the outer end of the sleeve 2, so that the charge belt can be sealed after the charge is completed. The diameter of the sleeve 2 is 2 cm larger than the commonly used standard charge diameter. Among them, the mining charge bag 3 is an improved customized charge bag, and the diameter of the mining charge bag 3 is 2 cm smaller than the commonly used standard charge diameter. A conical energy focusing hole 6 is provided at the bottom of the mining charge bag 3. The conical energy focusing hole 6 is made of metal and has a certain counterweight, so it can ensure that the charge bag is smoothly lowered to the bottom of the blasthole 1. The conical energy focusing hole 6 can also greatly reduce the blasting foundation.

[0030] This embodiment utilizes the properties of PVC sleeves, special charge bags and other devices and super absorbent 5 to absorb liquid water and turn it into solid hydrogel, and realizes the technical requirements of sealing the surface cracks of the blasthole 1, water coupling charge in the hole, flexible plugging, water blasthole 1 being loaded with non-waterproof explosives, and water blasthole 1 maintenance and anti-collapse hole for the blasthole 1 with developed joints and fissures, and realizes the purpose of improving the blasting effect of the blasthole 1 with developed joints and fissures and the water blasthole 1 and reducing the blasting cost through a single consumable and technical means. For the blasthole without water with developed joints and fissures, after injecting a small amount of water, the water is distributed around the wall of the blasthole 1 by a specific means, and mixed with the super absorbent 5 to form a water absorbent gel, and the super absorbent 5 gel has a certain viscosity and adheres to the inner wall of the blasthole 1, which can achieve complete sealing of the joints and fissures, thereby solving the purpose of the loss of slurry emulsion explosive along the joints and fissures in the blasthole 1 and the dissipation of blasting energy through the joints and fissures, greatly improving the blasting effect and reducing the difficulty of blasting design and on-site construction. For water-containing blastholes, the present invention uses super absorbent 5 and related supporting devices to isolate water from explosives, so that the water blasthole 1 can be filled with powdered non-waterproof explosives for blasting, which greatly reduces the unit consumption of explosives. Compared with the traditional mining charging bag 3 for blasting, this embodiment can avoid the problem of explosives floating because the density of powdered explosives is lower than the density of water, and at the same time solve the problem of deformation of the charging belt under the action of water pressure, which affects the on-site construction operation. The present invention can also solve the problem of difficult maintenance of water holes and easy collapse of holes.

[0031] This embodiment also relates to a blasting method for a charge device in a fracture development zone and a water-containing blasthole, based on the charge device in a fracture development zone and a water-containing blasthole, comprising the following steps:

[0032] For the condition of blastholes with developed joints and fissures, the blasthole 1 does not contain water. First, insert the sleeve 2 into the bottom of the blasthole 1, and ensure that the sleeve 2 is located in the center of the blasthole 1 and the sleeve 2 is higher than the upper mouth of the blasthole 1. Insert one end of the water injection pipe 4 into the bottom of the gap between the blasthole 1 and the sleeve 2, and connect the other end to the water source (pumping water in this embodiment). During the water injection process of the water injection pipe 4, slowly add the super absorbent 5 to the water injection area to form a gel until the water surface is 0-2 cm lower than the upper mouth of the blasthole 1. In this embodiment, it is preferred to wait until the injected water fills the gap between the inner wall of the blasthole and the sleeve 2, and the water surface is approximately flush with the blasthole mouth. The PVC sleeve is in close contact with the bottom of the blasthole 1, and is operated by ground workers so that the PVC sleeve is located in the center of the blasthole 1 to the greatest extent, which can ensure the uniformity of the later charging. The PVC sleeve is higher than the mouth of the blasthole 1 by a certain distance, so that it can be pulled out smoothly after the charging is completed for reuse. It should be noted during water injection that during the water pumping process, super absorbent 5 is slowly added to the water pumping area, and the water pumping process ends when the water surface is slightly lower than the borehole 1. During this process, a proper amount of super absorbent 5 is continuously added and mixed. The purpose is to use the downward impact of the water column to fully mix and stir the water and the super absorbent 5, so that the super absorbent 5 gel is formed more evenly. On the other hand, the injected water can be quickly gelled. Compared with adding the super absorbent 5 after the water pumping is completed, it can prevent the injected water from being lost along the joints and fissures and failing to reach the designed water injection height.

[0033] The mining charge bag 3 is lowered to the bottom of the blast hole 1 through the pipe mouth of the sleeve 2, and an electronic detonator is lowered to the bottom of the blast hole 1. The detonator leg line is led out along the mouth of the blast hole 1, and then powdered explosives are loaded into the charge bag. After the loading is completed, the mouth of the mining charge bag 3 is tightly sealed and stuffed into the blast hole 1. The mining charge bag 3 with completed loading forms a charging section 7, and then the sleeve 2 is slowly pulled out of the blast hole 1. After the sleeve 2 is pulled out, the designed blocking section of the mouth of the blast hole 1 forms an empty area, and the gel-like super absorbent 5 naturally collapses and blocks the designed blocking section of the mouth of the blast hole 1, forming a water-sealed blocking state, and the construction of a single blast hole is completed; after all the blast holes 1 are fully loaded, the detonation network is connected to carry out blasting warning and detonation. Because the PVC sleeve is almost tightly fitted with the mining charge bag 3 and the super absorbent 5 gel, after the PVC sleeve is pulled out, the super absorbent 5 gel will not collapse downward due to gravity. For the blocked part of the blasthole 1, after the PVC sleeve is pulled out, an empty area is formed in the hole, and the super absorbent 5 gel naturally collapses in the blocked section, forming a water-sealed blocked state. For the working condition where the length of the gel-like super absorbent 5 after natural collapse is less than the set length of the blockage, drill cuttings or an appropriate amount of water and super absorbent 5 are used to block again to achieve water-sealed blockage of the entire length of the blocked section. The set length of the blockage is generally determined according to the on-site conditions. Different hole network parameters, rock properties, and explosive types correspond to different blockage lengths. The set length of the blockage in this embodiment is 3.5-4.5m.

[0034] For the working condition of water-containing blastholes, the operation process is different from that of blastholes with developed joints and fissures. When the drilling of blasthole 1 is completed, sleeve 2 needs to be installed in time to avoid excessive residual water after installation of sleeve 2 due to water seepage in blasthole 1 for too long, thereby affecting the charging blasting effect. For blasthole 1 with a small amount of water inflow, blasthole 1 water injection process is required, and an appropriate amount of super absorbent 5 needs to be added before water injection; in order not to affect the construction period, blasthole 1 with a small amount of water inflow still needs to be injected with blasthole 1, and part of the super absorbent 5 solution is poured into the naturally gushing water before water injection, and then the operation of working condition 1 is repeated during the water injection process, and the operation of simultaneous water injection and addition of super absorbent 5 is performed.

[0035] Based on the above two working conditions, the charging device and method of this embodiment can achieve the purpose of water-coupled charging of the entire length of the blasthole 1 and the purpose of flexibly blocking the orifice of the blasthole 1 by the hydrogel. In addition, the dynamic mechanical properties of the aqueous solution of the super absorbent 5 after consolidation are close to those of water but the fluidity is lost, so as to ensure the quality of the water-coupled charging, and the water-proof powdered non-waterproof explosive is loaded, which solves the problem of discontinuous slurry emulsion explosives in water-containing blastholes and poor blasting effect. By inserting a PVC sleeve into the blasting blasthole 1 and charging the premise of water storage in the entire length of the blasthole 1 in advance, the impact of the explosive roll on the water surface in the blasting blasthole 1 and the friction with the hole wall of the blasting blasthole 1 are avoided, ensuring that the explosive roll is packaged intact and not deformed, thereby achieving safe and efficient charging.

[0036] This embodiment aims to solve the problem that emulsion explosives are easily leaked and explosive energy is easily dissipated when loading blastholes with developed joints and fissures in open-pit mines, and that water-containing blastholes are prone to collapse, and water-containing blastholes can only be loaded with waterproof emulsion explosives, and the loading is discontinuous, which leads to poor blasting effect, increased unit consumption of explosives, and the problem that ordinary mining charge bags 3 are easy to float in water-containing blastholes. This embodiment combines the technical advantages of plugging the surface cracks of the blasthole 1, water-coupled charging in the hole, flexible plugging, loading non-waterproof explosives in the water-containing blasthole, and maintaining the water blasthole 1 to prevent collapse, and achieves the purpose of simultaneously improving the blasting effect of the blasthole 1 with developed joints and fissures and the water blasthole 1 and reducing the blasting cost through a single consumable and technical means.

[0037] The present specification uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A blasting method for a charging device in a fracture development zone and a water-containing blasthole, characterized in that: A charging device based on a fracture development zone and a water-containing blasthole comprises a water injection pipe, a sleeve, a super absorbent and a mining charge bag, wherein the sleeve is a sleeve with openings at both ends, the mining charge bag is movably sleeved in the sleeve, the sleeve is movably plugged into the blasthole, one end of the water injection pipe is arranged in the gap between the sleeve and the blasthole, and the other end is connected to a water source, the gap between the sleeve and the blasthole is filled with the super absorbent, the mining charge bag is filled with explosives, the sleeve is a PVC sleeve, the length of the sleeve is greater than the depth of the blasthole, the sleeve and the blasthole are coaxially arranged, one end of the water injection pipe is located at the bottom of the blasthole, one end of the mining charge bag is flush with the bottom of the sleeve, and the other end extends out of the outer end of the sleeve, and comprises the following steps: For the condition of blastholes with developed joints and fissures, if there is no water in the blasthole, first insert the sleeve into the bottom of the blasthole, and ensure that the sleeve is located in the center of the blasthole and is higher than the upper opening of the blasthole, insert one end of the water injection pipe into the bottom of the gap between the blasthole and the sleeve, and connect the other end to the water source. During the water injection process of the water injection pipe, slowly add super absorbent to the water injection area to form a gel until the water surface is 0-2 cm lower than the upper opening of the blasthole, and the height of the super absorbent is higher than the height of the charging section; The mining charge bag is lowered to the bottom of the blasthole through the pipe mouth of the sleeve, an electronic detonator is lowered to the bottom of the blasthole, the detonator leg line is led out along the orifice of the blasthole, and then powdered explosives are loaded into the charge bag. After the loading is completed, the mouth of the mining charge bag is tightly sealed and stuffed into the blasthole. The mining charge bag with completed loading forms a charging section, and then the sleeve is slowly pulled out of the blasthole. After the sleeve is pulled out, the orifice of the blasthole is blocked to form an empty area, and the gel-like super absorbent naturally collapses and blocks the orifice of the blasthole to form a water-sealed blocking state, and the construction of a single blasthole is completed; after all the blastholes are fully loaded, the detonation network is connected to carry out blasting warning and detonation.

2. The blasting method of the charging device for fracture development zone and water-containing blasthole according to claim 1 is characterized in that: The diameter of the sleeve is 2 cm larger than the commonly used standard charge diameter.

3. The blasting method of the charging device for fracture development zone and water-containing blasthole according to claim 1, characterized in that: The diameter of the mining charge bag is 2 cm smaller than the commonly used standard charge diameter.

4. The blasting method of the charging device for fracture development zone and water-containing blasthole according to claim 1, characterized in that: A conical energy-gathering hole is arranged at the bottom of the mining charge bag, and the conical energy-gathering hole is made of metal.

5. The blasting method of the charging device for fracture development zone and water-containing blasthole according to claim 1, characterized in that: If the length of the gel-like super absorbent after natural collapse is not enough to meet the set length for blocking, drill cuttings or an appropriate amount of water and super absorbent are injected to block the blockage again, so as to achieve water seal blocking of the entire length of the blocking section.

6. The blasting method of the charging device for fracture development zone and water-containing blasthole according to claim 1, characterized in that: For the working condition of water-containing blastholes, the operating process is different from that of the blasthole working condition with developed joints and fissures. When the drilling of the blasthole is completed, the sleeve needs to be installed in time to avoid water seepage in the blasthole, which may cause excessive residual water after the sleeve is installed.