Dynamic purification pile group

Through the self-expanding control of the dynamic purification pile group and ferrate technology, combined with nanofiber hydrogel-coated diatomite particles, the problem of removing heavy metals and refractory substances in sewage is solved, and efficient pollutant treatment and automatic Monitoring and control significantly improve the purification ability of polluted water.

CN116282563BActive Publication Date: 2024-10-22SHANDONG JIANZHU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310467734.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-27
Publication Date
2024-10-22
Estimated Expiration
2043-04-27

AI Technical Summary

Technical Problem

Existing sewage treatment technology is difficult to effectively remove heavy metals and refractory organic matter. Traditional ferrate technology concentrates heavy metals in sediments. The problem of pollutant accumulation in ecological ponds has not been solved. The processing capacity of a separate ecological floating island device is insufficient and difficult to meet standards.

Method used

Adopt a dynamic purification pile group, including a self-retractable control mechanism, purification piles and control system, use magnetic and transmission articulated link units to retract or unfold the purification pile group, combined with ferrate technology and nanofiber hydrogel-coated diatomaceous earth particles to achieve automatic monitoring and precise quantitative sewage treatment, improving heavy metal removal efficiency.

Benefits of technology

Significantly improves the removal efficiency of heavy metals, solves the problem of pollutant accumulation, has low power consumption, automatic monitoring and precise quantitative control. The nanofiber hydrogel coating of the matrix enhances the adsorption capacity and capacity, and realizes oxidative coagulation and filtration adsorption. process coupling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116282563B_ABST
    Figure CN116282563B_ABST
Patent Text Reader

Abstract

The present invention discloses a dynamic purification pile group, which belongs to the field of sewage treatment. The dynamic purification pile group is composed of a self-retractable control mechanism, at least two purification piles and a control system. The purification pile is composed of a single-pile sewage collection area and a single-pile water purification area, and the single-pile sewage collection area surrounds the outside of the single-pile water purification area. Compared with the prior art, the purification pile group of the present invention has a large treatment area and high efficiency, and can significantly improve the removal efficiency of heavy metals, solving the water quality problems that plague landscape water bodies or ecological pond water bodies, especially heavy metal element pollution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of sewage treatment, and specifically provides a dynamic purification pile group for sewage treatment. Background Art

[0002] Water bodies such as lakes, reservoirs or ecological ponds often have water quality problems such as heavy metals, accumulation of non-degradable organic matter or excessive algae content. It is difficult to remove or transfer such pollutants by relying solely on traditional coagulation, adsorption or biological oxidation processes. Ferrate, as a highly efficient oxidant and flocculant, can simultaneously precipitate pollutants such as heavy metals and algae. However, traditional ferrate technology often concentrates heavy metals and other pollutants in sediments, and the problem of pollutant accumulation in ecological ponds has not been solved.

[0003] The existing technology uses floating island plants to absorb heavy metal sediments and other pollutants and remove them from the water body through plant harvesting, which is an effective method. However, the flow direction of ordinary floating islands often moves with the water flow and wind direction, and cannot actively go to waters with severe pollution. If the water flow area does not overlap with the pollutant accumulation area, the purpose of removing heavy metals and other pollutants cannot be achieved. In addition, the treatment area of ​​a single ecological floating island and other devices in a large area with heavy pollution is small, the ability to treat polluted water is insufficient, the purification takes a long time and it is difficult to meet the standards. Summary of the invention

[0004] The present invention aims at overcoming the above-mentioned deficiencies of the prior art and provides a dynamic purification pile group with excellent heavy metal adsorption ability and capacity, which can significantly improve the removal efficiency of heavy metals.

[0005] The technical solution adopted by the present invention to solve the technical problem is: a dynamic purification pile group, which is composed of a self-retractable control mechanism, at least two purification piles and a control system. The purification pile is composed of a single-pile sewage collection area and a single-pile water purification area. The single-pile sewage collection area surrounds the outside of the single-pile water purification area:

[0006] The single-pile sewage collection area includes an annular water storage tank for collecting sewage to be treated.

[0007] The outer wall of the annular water storage tank is provided with a water inlet pipe and a water quality monitoring sensor. The water inlet pipe is provided with a sewage pump and an electric gate valve. The water quality monitoring sensor is used to monitor the concentration of water pollutants.

[0008] A solar power supply unit, a ferrate preparation unit and an intermediate water pump are arranged on the top of the annular water storage tank. The solar power supply unit is used to provide power for the control system, sewage pump and electric gate valve, water quality monitoring sensor, ferrate preparation unit and the intermediate water pump. The ferrate preparation unit is used to prepare ferrate and inject the prepared ferrate into the annular water storage tank. The intermediate water pump is used to transport the water in the annular water storage tank to the single pile water purification area.

[0009] The single pile water purification area comprises a purification area side wall, a drainage trough is arranged at the upper end of the purification area side wall, a water outlet of the middle water pump is arranged above the drainage trough, a water dispersion net is fixed at the bottom of the purification area side wall, a substrate is filled in the purification cavity formed by the purification area side wall and the water dispersion net, and crops for purifying water are planted on the substrate.

[0010] The self-retracting control mechanism is composed of a transmission articulated connecting rod unit and a magnetic attraction and repulsion unit.

[0011] The transmission hinge connecting rod unit is arranged between the purification piles.

[0012] The magnetic attraction and repulsion unit is composed of a first magnetic component and a second magnetic component that attract or repel each other. The first magnetic component and the second magnetic component are respectively fixed on the outer side walls of the annular water storage tanks of two adjacent purification piles. The first magnetic component and the second magnetic component attract or repel each other, driving the two adjacent purification piles to approach or move away from each other, and then driving the remaining purification piles to approach or move away from each other through the transmission hinge connecting rod unit.

[0013] The sewage pump and electric gate valve, water quality monitoring sensor, ferrate preparation unit, intermediate water pump and magnetic attraction and repulsion unit are all connected to the control system in communication.

[0014] Preferably, the self-retracting control mechanism further includes a sliding base to improve the stability of the purification pile group when it is expanded and retracted. An oblong hole is provided inside the sliding base, and two active purification piles are provided at the oblong hole of the sliding base and slide with the sliding base. The two active purification piles are two adjacent purification piles fixed with the first magnetic assembly and the second magnetic assembly.

[0015] Preferably, a base track is further provided at the oblong hole of the sliding base, and sliding buckles are provided on the two active purification piles, and the sliding buckles are slidably matched with the base track.

[0016] Preferably, the self-retracting control mechanism further comprises an air cushion, a blower and a pneumatic propeller.

[0017] The air cushion is supported at the bottom of the purification pile or the bottom of the sliding base.

[0018] The pneumatic propeller is fixed on the bottom of the air cushion, and the blower is fixed on the sliding base to provide air power for the pneumatic propeller. The blower is powered by a solar power supply unit, and both the blower and the pneumatic propeller are connected to the control system.

[0019] Preferably, the transmission articulated link unit is composed of two outer links of the same length, two inner links of the same length, an outer hinge shaft and an inner hinge shaft, which can further improve the treatment area and stability of the purification pile group. The connecting ends of the two outer links and the connecting ends of the two inner links are respectively hinged to the outer side walls of the annular water storage tanks of two adjacent purification piles, the hinged ends of the two outer links are hinged through the outer hinge shaft, and the hinged ends of the two inner links are hinged through the inner hinge shaft, so that the two outer links and the two inner links form a quadrilateral that can be retracted or expanded.

[0020] Preferably, the number of purification piles is 3-12, particularly preferably 6-12.

[0021] Preferably, the matrix comprises diatomaceous earth particles provided with a nanofiber hydrogel coating, wherein the nanofiber hydrogel coating is loaded with a - Amylase and superoxide dismutase.

[0022] Preferably, the matrix is ​​composed of diatomaceous earth particles provided with a nanofiber hydrogel coating and ordinary ceramsite, and the volume ratio of the two is (5-7):1.

[0023] Preferably, the preparation process of the diatomaceous earth particles of the nanofiber hydrogel coating is:

[0024] (1) preparing a polyurethane solution using polyethylene glycol (PEG), hexamethylene diisocyanate trimer (HDIT), dopamine hydrochloride (DOPA) and water in a volume ratio of (20-30):(0.5-1.5):(4-6):70 as raw materials;

[0025] (2) Using an electrospinning device to spin the prepared polyurethane solution to prepare a nanofiber membrane, covering a roller wrapped with tin foil with glossy paper, using the glossy paper as a receiving substrate, and then placing the prepared polyurethane solution in a syringe, and then fixing the syringe on a propulsion pump for electrospinning. After spinning, the polyurethane nanofiber membrane is dried in an oven at 35-45°C to obtain a nanofiber membrane;

[0026] (3) using 95% ethanol aqueous solution as a crosslinking liquid to post-crosslink the nanofiber membrane obtained by electrospinning, the treatment time is (8-12) hours, and the volume ratio of 95% ethanol aqueous solution to polyurethane nanofiber membrane is (2-4):1;

[0027] (4) Add a to deionized water- amylase and superoxide dismutase, and then immerse the cross-linked fiber membrane in it to absorb water and swell to form a load - Nanofiber hydrogel coating materials for amylase and superoxide dismutase, a - The dosage of amylase and superoxide dismutase is 40-60 mg / ml;

[0028] (5) The nanofiber hydrogel coating material is uniformly wrapped around the diatomaceous earth particles, thereby obtaining diatomaceous earth particles provided with the nanofiber hydrogel coating.

[0029] Preferably, the ferrate preparation unit comprises a shell and a PLC automatic controller, wherein a water tank, a first reaction chamber, a second reaction chamber and a third reaction chamber are arranged from top to bottom in the shell, a downpipe is arranged between the water tank and the first reaction chamber, a ferric chloride solid storage feeding box is arranged in the first reaction chamber, a second tubular mixer, a sodium carbonate solution storage feeding tank and a sodium pyrophosphate solid storage feeding box are fixed in the second reaction chamber, two feed ports of the second tubular mixer are connected to the first reaction chamber and the sodium carbonate solution storage tank respectively, and a solid storage feeding box of sodium pyrophosphate is arranged in the third reaction chamber. A third tubular mixer and a sodium hypochlorite solution storage and feeding tank are provided. The two feed ports of the third tubular mixer are respectively connected with the second reaction chamber and the sodium hypochlorite solution storage and feeding tank. A ferrate discharge pipe is provided at the bottom of the third reaction chamber. Control valves are provided on the downpipe and the ferrate discharge pipe. The ferric chloride solid storage and feeding box, the sodium carbonate solution storage and feeding tank, the sodium pyrophosphate solid storage and feeding box, the sodium hypochlorite solution storage and feeding tank and the control valve are all connected to the PLC automatic controller for communication. The PLC automatic controller is connected to the control system for communication.

[0030] Preferably, the solar power supply unit comprises a solar panel and a battery, and the solar panel is placed at the top opening of the annular water storage tank.

[0031] Preferably, the drainage trough is provided with a plurality of evenly distributed drainage notches.

[0032] Preferably, the crop comprises Artemisia spatholobi, Artemisia argyi, Scolopendra subspinipes, Zizania latifolia and / or Sedum serrata plants.

[0033] Preferably, the first magnetic assembly and the second magnetic assembly may both be composed of magnets and magnet mechanical flip assemblies, and the positions and states of the two magnets may be adjusted by the magnet mechanical flip assemblies to make them attract or repel each other.

[0034] The first magnetic assembly and the second magnetic assembly may also be composed of an electromagnet and a control module, and the control module is used to change the polarity of the electromagnet so that the two electromagnets attract or repel each other.

[0035] The method for treating water using the dynamic purification pile group of the present invention comprises:

[0036] S01) Purification pile deployment:

[0037] When the water quality monitoring sensor detects that the turbidity, arsenic concentration, cadmium concentration, hexavalent chromium concentration, lead concentration or mercury concentration of the water body is higher than the design value, the first magnetic component and the second magnetic component of the two purification piles on the sliding base are magnetically repelled, and the repulsive force pushes the two purification piles to move back and forth along the base track at the bottom of the sliding base, changing from being close to each other to gradually separating to the two ends of the sliding base. Under the action of the transmission articulated connecting rod unit, the remaining purification piles also unfold along the hinge point to form a "star-shaped" self-retractable multi-point linkage purification pile group. The purification piles start working until the water quality meets the standard, and then move to other waters with higher pollution indicators;

[0038] S02) Ferrate is prepared and used on the purification pile:

[0039] The ferrate preparation process adopts the method of adding alkali to adjust, adding phosphate and then adding chlorine oxidant, and the whole process adopts PLC automatic controller for precise quantitative measurement. When the water quality monitoring sensor detects that the turbidity, arsenic concentration, cadmium concentration, hexavalent chromium concentration, lead concentration or mercury concentration of the water body is higher than the design value, the ferrate preparation unit receives the instruction and starts working;

[0040] S03) Contaminated water collection (synchronous with ferrate preparation unit):

[0041] When the water quality monitoring sensor detects that the water turbidity, arsenic concentration, cadmium concentration, hexavalent chromium concentration, lead concentration or mercury concentration is higher than the design value, the sewage pump and electric gate valve are opened, and the polluted water around the floating island enters the annular water storage tank. After it is filled, the sewage pump and electric gate valve are closed;

[0042] S04) Water purification:

[0043] The ferrate preparation unit injects the prepared ferrate into the annular water storage tank to purify the water quality. After reacting for 30 to 45 minutes, the mixed liquid in the annular water storage tank is pumped to the drainage tank through the intermediate water pump, dispersed to the matrix through the drainage gap of the drainage tank, and reaches the surface of the crop and the matrix. The flocs containing heavy metals and algae are intercepted by the matrix and crops, completing the adsorption of heavy metals and the absorption of organic matter. The treated water returns to the landscape water body or ecological pond through the water dispersion network at the bottom of the matrix.

[0044] Compared with the prior art, the dynamic purification pile group of the present invention has the following outstanding beneficial effects:

[0045] (I) Using magnetic force, the transmission articulated connecting rod unit can be used to fold or unfold the purification pile group, which consumes little power. The expanded purification pile group solves the problem of insufficient capacity of a single purification pile to treat polluted water from point to surface, greatly improving the purification capacity of polluted water;

[0046] (ii) By coupling ferrate technology with purification piles, heavy metals and non-degradable substances accumulated in landscape water or ecological ponds are transferred out; the whole process uses automatic monitoring sensors for precise quantification, and the use time point is controlled by turbidity and heavy metal automatic online monitoring sensors to ensure that the production of ferrate begins at the same time as the polluted water is collected, which not only solves the error problem of artificial preparation of ferrate, but also solves the storage problem of ferrate;

[0047] (III) The matrix uses diatomaceous earth particles with nanofiber hydrogel coating loaded with a-amylase and superoxide dismutase, which overcomes the technical problem that ordinary hydrogels have weak adhesion to the substrate underwater and are easily destroyed by water molecules, thus falling off the surface of the substrate. This matrix greatly improves the adsorption capacity and capacity of heavy metals, and acts as a link to connect the oxidation coagulation of ferrate and the absorption and passivation process of crops, realizing the dual coupling process of oxidation coagulation and filtration adsorption process coupling and adsorption precipitation and plant passivation / absorption process coupling; the ferrate oxidation product components can also assist in the formation of "iron carriers" on the surface of the matrix, so it has the effect of promoting the secretion of extracellular enzymes of plant root symbiotic bacteria and regulating the structure of the bacterial community, significantly improving the removal efficiency of heavy metals, and solving the water quality problems that plague the accumulation of heavy metals and other pollutants in landscape water bodies or ecological ponds. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Attached Figure 1 1 is a schematic structural diagram of a dynamic purification pile group according to Embodiment 1 (contracted state);

[0049] Attached Figure 2 It is a structural schematic diagram of a dynamic purification pile group in Example 1 (expanded state);

[0050] Attached Figure 3 It is a position relationship diagram of two active purification piles and a sliding base in Example 1 (expanded state);

[0051] Attached Figure 4 This is a schematic diagram of the structure of a common purification pile in Example 1;

[0052] Attached Figure 5 This is a cross-sectional schematic diagram of a common purification pile in Example 1;

[0053] Attached Figure 6 This is a schematic diagram of the structure of the ferrate preparation unit in Example 1;

[0054] Attached Figure 7 Example 1 Schematic cross-sectional view of an active purification pile.

[0055] The symbols in the accompanying drawings represent:

[0056] 111. outer connecting rod, 112. inner connecting rod, 113. outer hinge shaft, 114. inner hinge shaft, 12. first magnetic assembly, 121. first magnet, 122. first magnet mechanical flip assembly, 13. second magnetic assembly, 131. second magnet, 132. second magnet mechanical flip assembly, 14. sliding base, 141. base track, 15a. oblong air cushion, 15b. circular air cushion, 16. blower, 17. pneumatic propeller,

[0057] 2a, active purification pile, 2b, ordinary purification pile,

[0058] 3. Single pile sewage collection area, 31. Annular water storage tank, 32. Water inlet pipe, 33. Water quality monitoring sensor, 34. Solar panel, 35. Battery, 36. Ferrate preparation unit, 361. Shell, 3611. Downpipe, 3612. Ferrate discharge pipe, 362. PLC automatic controller, 363. Ferric chloride solid storage feeding box, 364. Second tubular mixer, 365. Sodium carbonate solution storage feeding tank, 366. Sodium pyrophosphate solid storage feeding box, 367. Third tubular mixer, 368. Sodium hypochlorite solution storage feeding tank, 37. Intermediate water pump, 38. Articulated ring, 39. Sliding buckle,

[0059] 4. Single pile water purification area, 41. Side wall of purification area, 411. Drainage trough, 42. Diffuser net, 43. Matrix, 44. Crops,

[0060] 5. Control system. DETAILED DESCRIPTION

[0061] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.

[0062] Embodiment 1

[0063] like Figure 1 , 2 As shown in FIG. 3 , the dynamic purification pile group of this embodiment is composed of a self-expanding control mechanism, nine purification piles (including two active purification piles 2a and seven common purification piles 2b) and a control system 5. The nine purification piles are all located at nine nodes of the self-expanding control mechanism.

[0064] The self-retractable control mechanism is mainly composed of a transmission articulated link unit, a first magnetic assembly 12, a second magnetic assembly 13, a sliding base 14, an air cushion (including an oblong air cushion 15a and a circular air cushion 15b), a blower 16 and an air propeller 17.

[0065] The transmission articulated link unit is composed of two outer links 111 of the same length, two inner links 112 of the same length, an outer hinge shaft 113 and an inner hinge shaft 114. The connecting ends of the two outer links 111 and the connecting ends of the two inner links 112 are both hinged to the outer walls of two adjacent purification piles. The hinged ends of the two outer links 111 are hinged through the outer hinge shaft 113, and the hinged ends of the two inner links 112 are hinged through the inner hinge shaft 114, so that the two outer links 111 and the two inner links 112 form a quadrilateral that can be retracted or expanded.

[0066] The first magnetic assembly 12 and the second magnetic assembly 13 are respectively fixed to the outer side walls of the two active purification piles 2a, and are used to drive the active purification piles 2a to approach or move away from each other.

[0067] The inner side of the sliding base 14 is provided with an oblong hole, and a base track 141 is installed. Two active purification piles 2a are arranged at the oblong hole of the sliding base 14, and are slidably matched with the base track 141.

[0068] The oblong air cushion 15a is supported on the bottom of the sliding base 14, and the circular air cushion 15b is supported on the bottom of the common purification pile 2b.

[0069] An air propeller 17 is installed at the bottom of the oblong air cushion 15 a , and the air power of the air propeller 17 is supplied by a blower 16 at the upper edge of the sliding base 14 .

[0070] As attached Figure 4 , 5 As shown, the common purification pile 2 b consists of a single-pile sewage collection area 3 and a single-pile water purification area 4 , and the single-pile sewage collection area 3 surrounds the outer side of the single-pile water purification area 4 .

[0071] The single-pile sewage collection area 3 is mainly composed of an annular water storage tank 31, a water inlet pipe 32, a water quality monitoring sensor 33, a solar cell panel 34, a battery 35, a ferrate preparation unit 36 ​​and an intermediate water pump 37.

[0072] The annular water storage tank 31 is used to collect sewage to be treated.

[0073] A water inlet pipe 32, a water quality monitoring sensor 33 and a hinge ring 38 are installed on the side of the annular water storage tank 31. The water inlet pipe 32 is installed with a sewage pump and an electric gate valve for injecting polluted water into the annular water storage tank 31. The water quality monitoring sensor 33 is used to monitor the concentration of pollutants in the water (including turbidity and heavy metal concentration). The hinge ring 38 is fixed at the lower end of the annular water storage tank 31 and is used to connect with the outer connecting rod 111 and the inner connecting rod 112 of the transmission hinge connecting rod unit.

[0074] A solar panel 34, a battery 35, a ferrate preparation unit 36 ​​and an intermediate water pump 37 are installed on the top of the annular water storage tank 31. The solar panel 34 is located on the top of the annular water storage tank 31 and almost completely covers it. The control system 5, the battery 35, the ferrate preparation unit 36 ​​and the intermediate water pump 37 are all fixed above the solar panel 34.

[0075] The battery 35 and the solar panel 34 constitute a solar power supply unit, which provides power for the sewage pump and electric gate valve, the water quality monitoring sensor 33, the ferrate preparation unit 36, the intermediate water pump 37, the first magnetic component 12, the second magnetic component 13, the blower 16 and the pneumatic propeller 17 and the control system 5.

[0076] As attached Figure 6 As shown, the ferrate preparation unit 36 ​​includes a shell 361 and a PLC controller 362 .

[0077] The interior of the shell 361 is divided into a water tank, a first reaction chamber, a second reaction chamber, and a third reaction chamber by partitions from top to bottom.

[0078] The water tank is used to store synthetic water.

[0079] A downpipe 3611 is installed between the first reaction chamber and the water tank, and a ferric chloride solid storage feeding box 363 is installed in the first reaction chamber.

[0080] The second reaction chamber is fixed with a second tubular mixer 364, a sodium carbonate solution storage feed tank 365 and a sodium pyrophosphate solid storage feed box 366. The two feed ports of the second tubular mixer 364 are connected to the first reaction chamber and the sodium carbonate solution storage feed tank 365 respectively.

[0081] The third reaction chamber is fixed with a third tubular mixer 367 and a sodium hypochlorite solution storage and feeding tank 368. The two feed ports of the third tubular mixer 367 are respectively connected to the second reaction chamber and the sodium hypochlorite solution storage and feeding tank 368. A ferrate discharge pipe 3612 is installed at the bottom of the third reaction chamber.

[0082] Control valves are installed on the downpipe 3611 and the ferrate discharge pipe 3612. The ferric chloride solid storage feeding box 363, the sodium carbonate solution storage feeding tank 365, the sodium pyrophosphate solid storage feeding box 366, the sodium hypochlorite solution storage feeding tank 368 and the control valve are all connected to the PLC automatic controller 362 for communication.

[0083] The intermediate water pump 37 is used to transport the water in the annular water storage tank to the single pile water purification area.

[0084] The single pile water purification area 4 is mainly composed of a purification area side wall 41 , a water dispersion network 42 , a matrix 43 , and crops 44 .

[0085] The side wall 41 of the purification area can be the inner wall of the segment of the annular water storage tank 31, or an independent annular side wall can be set inside the annular water storage tank 31. A drainage trough 411 is processed at the top of the side wall 41 of the purification area. The outlet of the intermediate water pump 37 is located above the drainage trough 411. Three evenly distributed drainage gaps are provided on the inner side of the drainage trough 411 to evenly introduce the water entering the drainage trough 411 into the single pile water purification area 4. The water dispersion net 42 is fixed at the lower end of the side wall 41 of the purification area. The purification cavity formed by the side wall 41 of the purification area and the water dispersion net 42 is filled with a matrix 43. The matrix 43 is planted with crops 44 (artemisia spatholobi, mugwort, centipede grass, sedge and sedum sedum plants) for purifying water quality.

[0086] The matrix 43 is a mixture of diatomaceous earth particles with nanofiber hydrogel coating and ordinary ceramsite, the volume ratio of diatomaceous earth particles to ordinary ceramsite is 6:1, and the nanofiber hydrogel coating is loaded with a - The preparation steps of amylase and superoxide dismutase are as follows:

[0087] (1) A polyurethane solution was prepared using polyethylene glycol (PEG), hexamethylene diisocyanate trimer (HDIT), dopamine hydrochloride (DOPA) and water in a volume ratio of 25:1:5:70;

[0088] (2) Using an electrospinning device to spin the prepared polyurethane solution to prepare a nanofiber membrane, covering a roller wrapped with tin foil with glossy paper, using the glossy paper as a receiving substrate, and then placing the prepared polyurethane solution in a 10 mL syringe, and then fixing the syringe on a propulsion pump for electrospinning. After spinning, the polyurethane nanofiber membrane was dried in an oven at 40°C for 2 hours;

[0089] (3) using 95% ethanol aqueous solution as a crosslinking solution to post-crosslink the nanofiber membrane obtained by electrospinning, the treatment time is 10 hours, and the volume ratio of 95% ethanol aqueous solution to polyurethane nanofiber membrane is 3:1;

[0090] (4) Add a to deionized water - amylase and superoxide dismutase, and then immerse the cross-linked fiber membrane in it to absorb water and swell to form a load - Nanofiber hydrogel coating materials for amylase and superoxide dismutase; a - The dosage of amylase and superoxide dismutase was 50 mg / ml;

[0091] (5) The nanofiber hydrogel coating material is uniformly wrapped around the diatomaceous earth particles, thereby obtaining diatomaceous earth particles with the nanofiber hydrogel coating.

[0092] As attached Figure 7As shown, the structure of the two active purification piles 2a is basically the same as that of the above-mentioned common purification piles 2b, except that:

[0093] (1) The side walls of the annular water storage tank 31 of the two active purification piles 2a are respectively installed with the first magnetic assembly 12 and the second magnetic assembly 13. The first magnetic assembly 12 is composed of a first magnet 121 and a first magnet mechanical flip assembly 122; the second magnetic assembly 13 is composed of a second magnet 131 and a second magnet mechanical flip assembly 132. The first magnet 121 and the second magnet 131 are respectively flipably fixed in the side walls of the two active purification piles 2a, and the first magnet mechanical flip assembly 122 and the second magnet mechanical flip assembly 132 are respectively fixed on the top of the two active purification piles 2a, and are used to drive the first magnet 121 and the second magnet 131 to flip;

[0094] (2) The bottom of the annular water storage tank 31 of the two active purification piles 2a is equipped with a sliding buckle 39. The active purification piles 2a are slidably matched with the base rail 141 through the sliding buckle 39.

[0095] The sewage pump and electric gate valve, water quality monitoring sensor 33 , PLC automatic controller 362 , intermediate water pump 37 , first magnet mechanical flip assembly 122 , second magnet mechanical flip assembly 132 , blower 16 , and pneumatic propeller 17 are all connected to the control system 5 for communication.

[0096] The process of water purification using the above-mentioned dynamic purification pile group includes:

[0097] 1. Air cushion movement:

[0098] The dynamic purification pile group conducts daily patrols on the surface of lakes, reservoirs or ecological ponds. Specifically, the battery 35 provides power for the blower 16 to drive the pneumatic propeller 17 to work. In this way, the air cushion 15 makes the purification pile group completely or partially detach from the support surface with minimal resistance, and sail at a speed of 0.5 to 1 m / s. When the water quality monitoring sensor 33 detects that the turbidity concentration of the water source is higher than 5NTU, the arsenic concentration is higher than 0.01mg / L, the cadmium concentration is higher than 0.005mg / L, the hexavalent chromium concentration is higher than 0.05mg / L, the lead concentration is higher than 0.01mg / L or the mercury concentration is higher than 0.001mg / L (one of the six items reaches the limit value) during navigation, the control system 5 controls the blower 16 and the pneumatic propeller 17 to stop working, and the purification pile group is stationary. The two purification piles 2a on the sliding base 14 start working, and the purification pile 2a enters the three-stage operation of step three "preparation and use of ferrate", step four "polluted water collection" and step five "water quality purification";

[0099] 2. Purification pile development:

[0100] When the water quality monitoring sensor 33 detects that the turbidity concentration of the water source is higher than 10NTU, the arsenic concentration is higher than 0.02mg / L, the cadmium concentration is higher than 0.01mg / L, the hexavalent chromium concentration is higher than 0.1mg / L, the lead concentration is higher than 0.02mg / L or the mercury concentration is higher than 0.003mg / L (one of the six items reaches the limit value), the control system 5 controls the first magnet mechanical flipping assembly 122 (or the second magnet mechanical flipping assembly 132) to drive the first magnet 121 (or the second magnet 131) to flip, so that its magnetism repels the magnet of the other purification pile, and the repulsive force pushes the two purification piles 2a to move back to back along the base track 141 of the sliding base 14, and changes from approaching each other to gradually separating to the two ends of the sliding base 14. In this way, since the remaining 7 purification piles (2b) also unfold along the hinge point, a "star-shaped" self-retractable multi-point linkage purification pile group is formed, among which 5 purification piles are in operation; when the water quality monitoring sensor 33 detects that the turbidity concentration of the water source is higher than 30NTU, the cadmium concentration is higher than 0.05mg / L or the hexavalent chromium concentration is higher than 0.2mg / L (one of the three items reaches the limit value), all purification piles are started and enter the three stages of operation of step 3 "preparation and use of ferrate", step 4 "contaminated water collection" and step 5 "water quality purification", and operate until the water quality meets the standard; after meeting the standard, the first magnet mechanical flip assembly 122 (or the second magnet mechanical flip assembly 132) is controlled to flip the first magnet 121 (or the second magnet 131), and the blower 16 is controlled to move to other waters with higher pollution indicators;

[0101] 3. Ferrate is prepared and used immediately:

[0102] Ferrate is prepared and used on the purification pile. The preparation process adopts the method of adding alkali for adjustment, adding phosphate and then adding chlorine oxidant, and the whole process adopts PLC automatic controller 362 for precise quantitative measurement. PLC automatic controller 362 starts working after receiving the command, and the ferric chloride solid storage feeding box 363 is added with ferric chloride solid from the water tank, and the reaction liquid enters the second tubular mixer 364, and the sodium carbonate solution storage feeding tank 365 injects sodium carbonate solution into the second tubular mixer 364. Sodium pyrophosphate solid is added to the sodium pyrophosphate solid storage feeding box 366, and the reaction liquid enters the third tubular mixer 367, and the sodium hypochlorite solution storage feeding tank 368 injects sodium hypochlorite solution into the third tubular mixer 367, and finally the sodium ferrate water treatment agent is obtained. The use time point is controlled by the water quality monitoring sensor 33, that is, when the turbidity concentration is higher than 5NTU, the arsenic concentration is higher than 0.01mg / L, the cadmium concentration is higher than 0.005mg / L, the hexavalent chromium concentration is higher than 0.05mg / L, the lead concentration is higher than 0.01mg / L or the mercury concentration is higher than 0.001mg / L (one of the six items reaches the limit value), the ferrate preparation unit 36 ​​receives the instruction and starts working;

[0103] 4. Collection of polluted water (when the preparation system receives the instruction):

[0104] When the water quality monitoring sensor 33 detects that the turbidity concentration is higher than 5NTU, the arsenic concentration is higher than 0.01mg / L, the cadmium concentration is higher than 0.005mg / L, the hexavalent chromium concentration is higher than 0.05mg / L, the lead concentration is higher than 0.01mg / L or the mercury concentration is higher than 0.001mg / L (one of the six items reaches the limit value), the sewage pump and the electric gate valve are opened, and the polluted water around the purification pile group enters the annular water storage tank 31. After it is filled, the sewage pump and the electric gate valve are closed;

[0105] 5. Water purification:

[0106] The ferrate preparation unit 36 ​​injects the prepared ferrate into the annular water storage tank 31 to purify the water quality. After reacting for 35 minutes, the mixed liquid in the annular water storage tank 31 is sent to the drainage tank 411 through the intermediate water pump 37, and dispersed into the single pile water purification area 4 through the gap of the drainage tank 411, reaching the surface of the crop 44 and the matrix 43, and the flocs containing heavy metals and algae are intercepted by the matrix and crops, completing the adsorption of heavy metals and the absorption of organic matter. The treated water returns to the landscape water body or ecological pond through the water dispersion net 42 at the bottom of the matrix;

[0107] Sixth, during the treatment process, all electrical equipment is powered by the battery 35. The battery 35 is charged by the solar panel 34.

[0108] Embodiment 2

[0109] The difference between this embodiment and the first embodiment is that when the water quality monitoring sensor 33 detects that the turbidity concentration of the polluted water is higher than 3NTU, only 4 purification piles are deployed, and when the turbidity concentration is higher than 10NTU, all purification piles are deployed. The rest is the same as the first embodiment.

[0110] Embodiment 3

[0111] The difference between this embodiment and the first embodiment is that when the water quality monitoring sensor 33 detects that the turbidity concentration of the water source is higher than 5NTU, the arsenic concentration is higher than 0.01mg / L, the cadmium concentration is higher than 0.005mg / L, the hexavalent chromium concentration is higher than 0.05mg / L, the lead concentration is higher than 0.01mg / L or the mercury concentration is higher than 0.001mg / L (one of the six items reaches the limit value), only three purification piles are started, when two of the six items are reached, only six purification piles are started, and when three of the six items are reached, all purification piles are started. The rest is the same as the first embodiment.

[0112] Embodiment 4

[0113] The difference between this embodiment and the first embodiment is that when the water quality monitoring sensor 33 detects that the turbidity concentration of the polluted water is higher than 3NTU, it sends a command to the ferrate preparation system (all purification piles are working). The rest is the same as the first embodiment.

[0114] Embodiment 5

[0115] The present embodiment is different from the first embodiment in that the crops are water bamboo, reed and water plantain. The rest is the same as the first embodiment.

[0116] Embodiment 6

[0117] The present embodiment is different from the first embodiment in that the self-retracting control mechanism does not include a blower and a pneumatic propeller, and the rest is the same as the first embodiment.

[0118] Embodiment 7

[0119] The difference between this embodiment and the first embodiment is that during the preparation of the matrix (diatomaceous earth particles with nanofiber hydrogel coating), the cross-linked fiber membrane is directly placed in deionized water (the deionized water does not contain a - amylase and superoxide dismutase). Others are the same as those in the first embodiment.

[0120] Embodiment 8

[0121] The difference between this embodiment and the first embodiment is that the matrix in step 4 is a mixture of common diatomaceous earth particles and common ceramsite, and the volume ratio of the two is 6:1. The rest is the same as the first embodiment.

[0122] Test example 1:

[0123] (1) The water in the test pool was treated with the dynamic purification pile group of Example 1. The water depth was 1.5 m and the area was 150 m2. The turbidity concentration of the polluted water was 15 NTU, the cadmium concentration was 0.015 mg / L, the hexavalent chromium concentration was 0.02 mg / L, the arsenic concentration was 0.04 mg / L, the lead concentration was 0.05 mg / L, and the mercury concentration was 0.003 mg / L.

[0124] It only takes 4 hours to activate 6 purification piles to purify the effluent water to meet the "Water Quality for Urban Wastewater Recycling, Landscape and Environmental Use" and "Sanitary Standards for Drinking Water". After purification, the turbidity of the water is 4NTU, the cadmium concentration is 0.04mg / L, the hexavalent chromium concentration is 0.03mg / L, the arsenic concentration is 0.009mg / L, the lead concentration is 0.008mg / L, and the mercury concentration is 0.0008mg / L.

[0125] When 9 purification piles are started to form a polluted water treatment surface, it only takes 2 hours to purify the effluent water quality to meet the "Water Quality for Urban Wastewater Recycling and Landscape Environment" and "Sanitary Standards for Drinking Water". After purification, the turbidity of the water is 3NTU, the cadmium concentration is 0.03mg / L, the hexavalent chromium concentration is 0.03mg / L, the arsenic concentration is 0.008mg / L, the lead concentration is 0.006mg / L, and the mercury concentration is 0.0007mg / L.

[0126] (2) The water in the water pool to be tested was treated with the dynamic purification pile group of Example 7. The water depth was 1.5 m and the area was 150 m2. The turbidity concentration of the polluted water was 15 NTU, the cadmium concentration was 0.015 mg / L, the hexavalent chromium concentration was 0.02 mg / L, the arsenic concentration was 0.04 mg / L, the lead concentration was 0.05 mg / L, and the mercury concentration was 0.003 mg / L.

[0127] After starting 6 purification piles for 4 hours, the water turbidity was measured to be 9NTU, the cadmium concentration was 0.008mg / L, the hexavalent chromium concentration was 0.07mg / L, the arsenic concentration was 0.03mg / L, the lead concentration was 0.03mg / L, and the mercury concentration was 0.0016mg / L;

[0128] After starting 9 purification piles for 2 hours, the water turbidity was measured to be 7NTU, the cadmium concentration was 0.007mg / L, the hexavalent chromium concentration was 0.06mg / L, the arsenic concentration was 0.01mg / L, the lead concentration was 0.02mg / L, and the mercury concentration was 0.001mg / L.

[0129] (3) The water in the water pool to be tested was treated with the dynamic purification pile group of Example 8. The water depth was 1.5 m and the area was 150 m2. The turbidity concentration of the polluted water was 15 NTU, the cadmium concentration was 0.015 mg / L, the hexavalent chromium concentration was 0.02 mg / L, the arsenic concentration was 0.04 mg / L, the lead concentration was 0.05 mg / L, and the mercury concentration was 0.003 mg / L.

[0130] After starting 6 purification piles for 4 hours, the water turbidity was measured to be 13 NTU, the cadmium concentration was 0.012 mg / L, the hexavalent chromium concentration was 0.014 mg / L, the arsenic concentration was 0.03 mg / L, the lead concentration was 0.03 mg / L, and the mercury concentration was 0.002 mg / L;

[0131] After starting 9 purification piles for 2 hours, the water turbidity was measured to be 9NTU, the cadmium concentration was 0.01mg / L, the hexavalent chromium concentration was 0.01mg / L, the arsenic concentration was 0.03mg / L, the lead concentration was 0.03mg / L, and the mercury concentration was 0.002mg / L.

[0132] (4) From the above test data, it can be seen that the present invention can deploy purification piles according to the degree of water pollution, flexibly and economically support up to 9 purification piles to work at the same time, and the water purification efficiency is stronger when deployed at the same time, which is suitable for water bodies with more serious pollution; the matrix in the present invention is loaded with a - The nanofiber hydrogel-coated diatomaceous earth particles are mainly composed of amylase and superoxide dismutase, which have a strong adsorption capacity for heavy metal sediments. Sewage containing the same concentration of heavy metal sediments enters the purification pile filled with ordinary diatomaceous earth particles and the purification pile filled with nanofiber hydrogel-coated diatomaceous earth particles and the purification pile filled with a load a - The purification piles with nanofiber hydrogel coated diatomaceous earth particles loaded with a-amylase and superoxide dismutase have different effects; among them, the purification piles filled with nanofiber hydrogel coated diatomaceous earth particles loaded with a-amylase and superoxide dismutase can purify the water quality to meet the "Water Quality for Urban Wastewater Recycling and Landscape Environment Water" and "Sanitary Standards for Drinking Water" in the same time, that is, water turbidity <5NTU, cadmium concentration <0.005mg / L, hexavalent chromium concentration <0.05mg / L, arsenic concentration <0.01mg / L, lead concentration <0.01mg / L, mercury concentration <0.001mg / L.

[0133] Test Example 2:

[0134] (1) The water in the test pool was treated with the dynamic purification pile group of Example 1. The water depth was 1m and the area was 200㎡. The cadmium concentration of the polluted water was 0.05mg / L, the hexavalent chromium concentration was 0.4mg / L, the arsenic concentration was 0.12mg / L, the lead concentration was 0.1mg / L, and the mercury concentration was 0.004mg / L.

[0135] After 9 purification piles were started for 24 hours, the cadmium concentration in the water was measured to be 0.004 mg / L, the hexavalent chromium concentration was 0.028 mg / L, the arsenic concentration was 0.0084 mg / L, the lead concentration was 0.009 mg / L, and the mercury concentration was 0.0004 mg / L.

[0136] (2) The water in the water pool to be tested was treated with the dynamic purification pile group of Example 7. The water depth was 1m and the area was 200㎡. The cadmium concentration of the polluted water was 0.05mg / L, the hexavalent chromium concentration was 0.4mg / L, the arsenic concentration was 0.12mg / L, the lead concentration was 0.1mg / L, and the mercury concentration was 0.004mg / L.

[0137] After 9 purification piles were started for 24 hours, the cadmium concentration in the water was measured to be 0.011 mg / L, the hexavalent chromium concentration was 0.12 mg / L, the arsenic concentration was 0.028 mg / L, the lead concentration was 0.024 mg / L, and the mercury concentration was 0.00088 mg / L.

[0138] (3) The water in the water pool to be tested was treated with the dynamic purification pile group of Example 8. The water depth was 1m and the area was 200㎡. The cadmium concentration of the polluted water was 0.05mg / L, the hexavalent chromium concentration was 0.4mg / L, the arsenic concentration was 0.12mg / L, the lead concentration was 0.1mg / L, and the mercury concentration was 0.004mg / L.

[0139] After 9 purification piles were started for 24 hours, the cadmium concentration in the water was measured to be 0.019 mg / L, the hexavalent chromium concentration was 0.184 mg / L, the arsenic concentration was 0.043 mg / L, the lead concentration was 0.038 mg / L, and the mercury concentration was 0.002 mg / L.

[0140] (4) It can be seen that the matrix in the present invention is loaded with a - The nanofiber hydrogel coating of amylase and superoxide dismutase is mainly composed of diatomaceous earth particles, which overcomes the technical problem that ordinary hydrogels have weak adhesion to the substrate underwater and are easily destroyed by water molecules, thus falling off from the surface of the substrate. The bionic effect of the enzyme strengthens the affinity between the substrate and heavy metals. After the sewage containing heavy metal sediments enters the purification pile filled with ordinary ceramsite and diatomaceous earth particles, the loss rate within 24 hours reaches 30-50%; after the sewage containing heavy metal sediments enters the purification pile filled with nanofiber hydrogel coated diatomaceous earth particles, the loss rate within 24 hours is 20-30%; after the sewage containing heavy metal sediments enters the purification pile filled with a load a - After the purification pile of nanofiber hydrogel coated diatomaceous earth particles with amylase and superoxide dismutase, the loss rate was less than 10% within 24 hours. - Amylase and superoxide dismutase strengthen the affinity between the diatomaceous earth particles of the nanofiber hydrogel coating and heavy metals, ensuring that the heavy metal sediments are fully retained in the purification pile, strengthening the absorption of heavy metal crops, purifying pollutants, and solving the water quality problems that plague the accumulation of pollutants in landscape water bodies or ecological pond water bodies.

[0141] The embodiments described above are only preferred specific implementations of the present invention. Common changes and substitutions made by those skilled in the art within the scope of the technical solution of the present invention should be included in the protection scope of the present invention.

Claims

1. Dynamic purification pile group, characterized in that: The invention is composed of a self-retractable control mechanism, at least two purification piles and a control system (5), wherein the purification pile is composed of a single-pile sewage collection area (3) and a single-pile water purification area (4), and the single-pile sewage collection area (3) surrounds the outside of the single-pile water purification area (4): The single-pile sewage collection area (3) comprises an annular water storage tank (31) for collecting sewage to be treated. The outer wall of the annular water storage tank (31) is provided with a water inlet pipe (32) and a water quality monitoring sensor (33). A sewage pump and an electric gate valve are provided at the water inlet pipe (32). The water quality monitoring sensor (33) is used to monitor the concentration of pollutants in the water body. A solar power supply unit, a ferrate preparation unit (36) and an intermediate water pump (37) are arranged on the top of the annular water storage tank (31); the solar power supply unit is used to provide power to the control system (5), the sewage pump and the electric gate valve, the water quality monitoring sensor (33), the ferrate preparation unit (36) and the intermediate water pump (37); the ferrate preparation unit (36) is used to prepare ferrate and inject the prepared ferrate into the annular water storage tank (31); the intermediate water pump (37) is used to transport the water in the annular water storage tank (31) to the single pile water purification area (4); The single pile water purification area (4) comprises a purification area side wall (41), a drainage trough (411) is provided at the upper end of the purification area side wall (41), a water outlet of the intermediate water pump (37) is arranged above the drainage trough (411), a water dispersion net (42) is fixed at the bottom of the purification area side wall (41), a substrate (43) is filled in the purification cavity formed by the purification area side wall (41) and the water dispersion net (42), and crops (44) for purifying water are planted on the substrate (43), The self-retracting control mechanism is composed of a transmission articulated connecting rod unit and a magnetic attraction and repulsion unit. The transmission hinged connecting rod unit is arranged between each purification pile, and is composed of two outer connecting rods (111) of the same length, two inner connecting rods (112) of the same length, an outer hinge shaft (113) and an inner hinge shaft (114). The connecting ends of the two outer connecting rods (111) and the connecting ends of the two inner connecting rods (112) are respectively hinged to the outer side walls of the annular water storage tanks (31) of two adjacent purification piles (2). The hinged ends of the two outer connecting rods (111) are hinged through the outer hinge shaft (113), and the hinged ends of the two inner connecting rods (112) are hinged through the inner hinge shaft (114), so that the two outer connecting rods (111) and the two inner connecting rods (112) form a quadrilateral that can be contracted or expanded. The magnetic attraction and repulsion unit is composed of a first magnetic component (12) and a second magnetic component (13) that attract or repel each other. The first magnetic component (12) and the second magnetic component (13) are respectively fixed on the outer side walls of the annular water storage tanks (31) of two adjacent purification piles. The first magnetic component (12) and the second magnetic component (13) attract or repel each other, driving the two adjacent purification piles to approach or move away from each other, and then driving the remaining purification piles to approach or move away from each other through the transmission hinge connecting rod unit. The sewage pump and the electric gate valve, the water quality monitoring sensor (33), the ferrate preparation unit (36), the intermediate water pump (37) and the magnetic attraction and repulsion unit are all connected to the control system (5) for communication.

2. The dynamic purification pile group according to claim 1, characterized in that: The self-retracting control mechanism also includes a sliding base (14), an air cushion, a blower (16) and a pneumatic propeller (17). An oblong hole is provided inside the sliding base (14), two active purification piles (2a) are provided at the oblong hole of the sliding base (14) and are slidably matched with the sliding base (14), and the two active purification piles (2a) are two adjacent purification piles to which the first magnetic component (12) and the second magnetic component (13) are fixed. The air cushion is supported on the bottom of the purification pile or the bottom of the sliding base (14). The pneumatic propeller (17) is fixed to the bottom of the air cushion, and the blower (16) is fixed to the sliding base (14) and is used to provide air power for the pneumatic propeller (17). The blower (16) is powered by a solar power supply unit, and both the blower (16) and the pneumatic propeller (17) are connected to the control system (5) in communication.

3. The dynamic purification pile group according to claim 2, characterized in that: A base track (141) is arranged at the oblong hole of the sliding base (14), and sliding buckles (39) are arranged on the two active purification piles (2a), and the sliding buckles (39) are slidably matched with the base track (141).

4. The dynamic purification pile group according to claim 1, 2 or 3, characterized in that: The number of purification piles (2) is 3-12.

5. The dynamic purification pile group according to claim 4, characterized in that: The matrix (43) comprises diatomaceous earth particles provided with a nanofiber hydrogel coating, wherein the nanofiber hydrogel coating is loaded with a - Amylase and superoxide dismutase.

6. The dynamic purification pile group according to claim 5, characterized in that: The preparation process of diatomaceous earth particles provided with nanofiber hydrogel coating is: (1) preparing a polyurethane solution using polyethylene glycol, hexamethylene diisocyanate trimer, dopamine hydrochloride and water in a volume ratio of (20-30):(0.5-1.5):(4-6):70 as raw materials; (2) using an electrospinning device to spin the prepared polyurethane solution to prepare a nanofiber membrane, covering a roller wrapped with tin foil with glossy paper, using the glossy paper as a receiving substrate, then placing the prepared polyurethane solution in a syringe, and then fixing the syringe on a propulsion pump for electrospinning, and after the spinning is completed, drying the polyurethane nanofiber membrane in an oven at 35-45° C. to obtain a nanofiber membrane; (3) using 95% ethanol aqueous solution as a crosslinking liquid to post-crosslink the nanofiber membrane obtained by electrospinning, the treatment time is (8-12) hours, and the volume ratio of 95% ethanol aqueous solution to polyurethane nanofiber membrane is (2-4):1; (4) Add a to deionized water - amylase and superoxide dismutase, and then immerse the cross-linked fiber membrane in it to absorb water and swell to form a load - Nanofiber hydrogel coating materials for amylase and superoxide dismutase, a - The dosage of amylase and superoxide dismutase is 40-60 mg / ml; (5) The nanofiber hydrogel coating material is uniformly wrapped around the diatomaceous earth particles, thereby obtaining diatomaceous earth particles provided with the nanofiber hydrogel coating.

7. The dynamic purification pile group according to claim 4, characterized in that: The ferrate preparation unit (36) comprises a shell (361) and a PLC automatic controller (362). A water tank, a first reaction chamber, a second reaction chamber, and a third reaction chamber are arranged in the shell (361) from top to bottom. A downpipe (3611) is arranged between the water tank and the first reaction chamber. A ferric chloride solid storage feeding box (363) is arranged in the first reaction chamber. A second tubular mixer (364), a sodium carbonate solution storage feeding tank (365), and a sodium pyrophosphate solid storage feeding box (366) are fixed in the second reaction chamber. Two feed ports of the second tubular mixer (364) are respectively connected to the first reaction chamber and the sodium carbonate solution storage feeding tank (365). A third tubular mixer (366) is fixed in the third reaction chamber. (367) and a sodium hypochlorite solution storage and feeding tank (368), the two feed ports of the third tubular mixer (367) are respectively connected to the second reaction chamber and the sodium hypochlorite solution storage and feeding tank (368), a ferrate discharge pipe (3612) is arranged at the bottom of the third reaction chamber, and a control valve is arranged on the downpipe (3611) and the ferrate discharge pipe (3612), the ferric chloride solid storage and feeding box (363), the sodium carbonate solution storage and feeding tank (365), the sodium pyrophosphate solid storage and feeding box (366), the sodium hypochlorite solution storage and feeding tank (368) and the control valve are all connected to the PLC automatic controller (362), and the PLC automatic controller (362) is connected to the control system (5).

8. The dynamic purification pile group according to claim 4, characterized in that: The solar power supply unit comprises a solar panel (34) and a storage battery (35), wherein the solar panel (34) is placed at the top open portion of the annular water storage tank (31); The drainage trough (411) is provided with a plurality of evenly distributed drainage notches.

9. The dynamic purification pile group according to claim 4, characterized in that: The first magnetic component (12) and the second magnetic component (13) are both composed of a magnet and a magnet mechanical flip component, and the magnet mechanical flip component is used to adjust the position and state of the two magnets so that they attract or repel each other.

10. The dynamic purification pile group according to claim 4, characterized in that: The first magnetic component (12) and the second magnetic component (13) are both composed of an electromagnet and a control module. The control module is used to change the polarity of the electromagnet so that the two electromagnets attract or repel each other.