Method, device and equipment for dividing soil layer interface based on static penetration test
Through the combination of static cone test data grouping and preset soil layer interface detection model, the optimal segmentation method is used to automatically divide the soil layer interface, which solves the problem of low accuracy and low efficiency of dividing the soil layer interface in the existing technology, and realizes Efficient and automated soil layer interface positioning.
Patent Information
- Application Number
- CN202310287307.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-03-22
AI Technical Summary
The existing method of dividing soil layer interfaces based on static cone penetration tests has low accuracy and efficiency. It is limited by engineer experience and drilling data and requires a lot of manual participation.
The static cone test data grouping and preset soil layer interface detection model are used to calculate the soil layer interface position through the optimal segmentation method, and machine learning technology is used to automatically divide the soil layer interface to reduce manual intervention.
It improves the accuracy and efficiency of soil layer interface division, realizes soil layer interface division with a high degree of automation, reduces manual participation, and improves the automation level of division.
Smart Images

Figure CN116289846B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of soil layer interface division, and in particular to a method, a device and equipment for dividing soil layer interfaces based on a static penetration test. Background Art
[0002] Static penetration is an in-situ testing method for geotechnical engineering. It is simple to operate, fast, accurate and low-cost. It can be used to divide soil layer interfaces, name soil types, determine foundation bearing capacity, determine foundation soil liquefaction and measure the physical and mechanical parameters of foundation soil. It has been widely used in geotechnical engineering surveys at home and abroad. Correctly identifying the mean soil layer interface is an important part of geotechnical engineering surveys. For geotechnical engineering design, it is extremely important to accurately identify the boundaries of the mean soil layer when determining the engineering properties and parameters of the foundation soil, such as the bearing layer of the pile, the foundation bearing capacity and the seismic liquefaction characteristics. Moreover, the statistical analysis of geotechnical parameters is only meaningful for the soil in the homogeneous soil layer.
[0003] At present, the methods for dividing soil interface based on static penetration test mainly include visual experience method, classification diagram method and statistical analysis method. The accuracy of division is greatly affected by the experience and empirical data of engineers, and is also limited by drilling data, and requires a lot of manual participation, resulting in low accuracy and efficiency in dividing soil interface. Summary of the invention
[0004] The main purpose of the present invention is to provide a method, device and equipment for dividing soil layer interfaces based on static penetration test, aiming to solve the technical problems of low accuracy and efficiency in dividing soil layer interfaces in the prior art.
[0005] To achieve the above object, the present invention provides a method for dividing soil layer interfaces based on a static penetration test, the method comprising the following steps:
[0006] Conduct static penetration test on soil layer to obtain static penetration test data;
[0007] Determine the data packet length;
[0008] Grouping the static penetration test data according to the data grouping length to obtain multiple groups of static penetration test data;
[0009] The plurality of groups of static penetration test data are tested by using a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data;
[0010] According to the number of soil layer interfaces of each group of data, the maximum number of soil layer interfaces in different grouping methods and the corresponding grouping methods are obtained;
[0011] The optimal segmentation method is used to calculate the optimal segmentation point through the maximum number of soil layer interfaces data and the grouping method, and the soil layer interface position is obtained to complete the division of the soil layer interface.
[0012] Optionally, grouping the static penetration test data by the data grouping length to obtain multiple groups of grouped static penetration test data includes:
[0013] Determining the amount of additional data according to the data packet length;
[0014] Obtaining the data length of the static penetration test data;
[0015] Adding the data length and the increased data quantity to obtain a target data length;
[0016] The target data length is divided from different positions of the static penetration test data according to the data grouping length to obtain a plurality of groups of static penetration test data.
[0017] Optionally, the step of calculating an optimal segmentation point using an optimal segmentation method according to the maximum number of soil layer interfaces and the grouping method to obtain the soil layer interface position includes:
[0018] Calling multiple fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method;
[0019] The maximum number of soil layer interfaces in the maximum number of soil layer interfaces data corresponding to the target grouping method is used as the target maximum number of soil layer interfaces;
[0020] Calculate the target segmentation value according to the target maximum number of soil layer interfaces;
[0021] Obtaining an optimal segmentation point according to the target segmentation value;
[0022] The position of the optimal segmentation point is taken as the position of the soil layer interface.
[0023] Optionally, calling a plurality of fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method includes:
[0024] Call multiple fitting functions from the preset fitting function library;
[0025] Fitting each grouping method using multiple fitting functions to obtain multiple fitting results;
[0026] Calculating the sum of squares of deviations of the plurality of fitting results;
[0027] The minimum sum of squares of deviations among the sum of squares of deviations data is taken as the segment diameter;
[0028] Calculate the segment diameter cumulative value according to the segment diameter;
[0029] The segmentation error is obtained according to the accumulated value of the segment diameter;
[0030] The grouping method corresponding to the minimum segmentation error among the segmentation errors is used as the target grouping method.
[0031] Optionally, obtaining an optimal segmentation point according to the target segmentation value includes:
[0032] Calculate the optimal number of segmentation points according to the target segmentation value;
[0033] Determine the segmentation point search range according to the optimal segmentation point number;
[0034] An optimal segmentation point is determined through the segmentation point search range.
[0035] Optionally, before detecting the plurality of groups of static penetration test data by using a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data, the method further includes:
[0036] Acquire static penetration test sample data, wherein the static penetration test sample data is sample data including the number of soil layer interfaces;
[0037] Normalizing the static penetration test sample data to obtain processed static penetration test sample data;
[0038] Dividing the processed static penetration test sample data to obtain training sample data and test sample data;
[0039] Construct the initial soil layer interface detection model;
[0040] Setting model parameters, training the initial soil layer interface detection model using the model parameters and the training sample data to obtain a reference soil layer interface detection model;
[0041] An evaluation index is obtained, and the reference soil layer interface detection model is evaluated by using the evaluation index and the test sample data to obtain a preset soil layer interface detection model.
[0042] Optionally, the performing a static penetration test on the soil layer to obtain static penetration test data includes:
[0043] Conduct static penetration test on soil layer to obtain static penetration test data to be processed;
[0044] The static penetration test data to be processed is normalized to obtain static penetration test data.
[0045] In addition, to achieve the above-mentioned purpose, the present invention also proposes a device for dividing soil layer interfaces based on a static penetration test, and the device for dividing soil layer interfaces based on a static penetration test comprises:
[0046] The test module is used to perform a static penetration test on the soil layer and obtain static penetration test data;
[0047] A determination module, used for determining the data packet length;
[0048] A grouping module, used for grouping the static penetration test data according to the data grouping length to obtain multiple groups of static penetration test data;
[0049] A detection module, used to detect the plurality of groups of static penetration test data by using a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data;
[0050] An acquisition module, used for obtaining the maximum number of soil layer interfaces in different grouping methods and the corresponding grouping methods according to the number of soil layer interfaces in each group of data;
[0051] The calculation module is used to calculate the optimal segmentation point by using the optimal segmentation method according to the maximum number of soil layer interfaces data and the grouping method, and obtain the soil layer interface position to complete the division of the soil layer interface.
[0052] In addition, to achieve the above-mentioned objectives, the present invention also proposes a device for dividing soil layer interfaces based on static penetration tests, and the device for dividing soil layer interfaces based on static penetration tests includes: a memory, a processor, and a program for dividing soil layer interfaces based on static penetration tests stored in the memory and executable on the processor, and the program for dividing soil layer interfaces based on static penetration tests is configured to implement the steps of the method for dividing soil layer interfaces based on static penetration tests as described above.
[0053] In addition, to achieve the above-mentioned purpose, the present invention also proposes a storage medium, on which is stored a program for dividing soil layer interfaces based on static penetration tests. When the program for dividing soil layer interfaces based on static penetration tests is executed by a processor, the steps of the method for dividing soil layer interfaces based on static penetration tests as described above are implemented.
[0054] The present invention performs a static penetration test on a soil layer to obtain static penetration test data; determines a data grouping length; groups the static penetration test data according to the data grouping length to obtain multiple groups of grouped static penetration test data; detects the multiple groups of grouped static penetration test data through a preset soil layer interface detection model to obtain the number of soil layer interfaces in each group of data; obtains data on the maximum number of soil layer interfaces in different grouping methods and corresponding grouping methods according to the number of soil layer interfaces in each group of data; calculates an optimal segmentation point using an optimal segmentation method based on the maximum number of soil layer interfaces and the grouping method to obtain a soil layer interface position to complete the division of the soil layer interface, which can be used for various static penetration test data to divide soil layer interfaces, uses a preset soil layer interface detection model based on machine learning technology to detect the number of soil layer interfaces in each group of data, uses an optimal segmentation method to calculate an accurate optimal segmentation point to obtain a final soil layer interface position, improves the accuracy of the division, and completes the division of soil layer interfaces by static penetration test data, and the entire process does not require manual intervention and has a high degree of automation. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a structural schematic diagram of a device for dividing soil layer interfaces based on a static penetration test in a hardware operating environment involved in an embodiment of the present invention;
[0056] Figure 2 It is a schematic flow chart of a first embodiment of a method for dividing soil layer interfaces based on a static penetration test according to the present invention;
[0057] Figure 3 It is a schematic diagram of a process of constructing a preset soil layer interface detection model in an embodiment of a method for dividing soil layer interfaces based on a static penetration test of the present invention;
[0058] Figure 4 It is a flow chart of a second embodiment of the method for dividing soil layer interfaces based on a static penetration test of the present invention;
[0059] Figure 5 It is a schematic flow chart of a third embodiment of the method for dividing soil layer interfaces based on a static penetration test of the present invention;
[0060] Figure 6 It is a structural block diagram of the first embodiment of the device for dividing soil layer interfaces based on static penetration test of the present invention.
[0061] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0062] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0063] Reference Figure 1 , Figure 1 It is a schematic diagram of the structure of a device for dividing soil layer interfaces based on a static penetration test in the hardware operating environment involved in an embodiment of the present invention.
[0064] like Figure 1 As shown, the device for dividing the soil layer interface based on the static penetration test may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (Wireless-Fidelity, Wi-Fi) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM), or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk storage. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.
[0065] Those skilled in the art will understand that Figure 1 The structure shown in the figure does not constitute a limitation on the equipment for dividing soil layer interfaces based on static penetration test, and may include more or less components than shown in the figure, or a combination of certain components, or a different arrangement of components.
[0066] like Figure 1 As shown, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and a program for dividing soil layer interfaces based on static penetration tests.
[0067] exist Figure 1 In the device for dividing soil layer interfaces based on static penetration test shown in the figure, the network interface 1004 is mainly used for data communication with the network server; the user interface 1003 is mainly used for data interaction with the user; the processor 1001 and the memory 1005 in the device for dividing soil layer interfaces based on static penetration test of the present invention can be set in the device for dividing soil layer interfaces based on static penetration test, and the device for dividing soil layer interfaces based on static penetration test calls the program for dividing soil layer interfaces based on static penetration test stored in the memory 1005 through the processor 1001, and executes the method for dividing soil layer interfaces based on static penetration test provided in the embodiment of the present invention.
[0068] The embodiment of the present invention provides a method for dividing soil layer interfaces based on a static penetration test, referring to Figure 2 , Figure 2 It is a schematic flow chart of the first embodiment of the method for dividing soil layer interfaces based on static penetration test of the present invention.
[0069] In this embodiment, the method for dividing the soil layer interface based on the static penetration test includes the following steps:
[0070] Step S10: Perform a static penetration test on the soil layer to obtain static penetration test data.
[0071] It should be noted that the executor of this embodiment is a device for dividing soil layer interfaces based on static penetration test, and may also be other devices that can achieve the same or similar functions. This embodiment does not limit this. This embodiment is explained using a device for dividing soil layer interfaces based on static penetration test as an example.
[0072] In a specific implementation, when it is necessary to divide the soil layer interface, a static penetration test is carried out on the soil layer at the interface position of the soil layer to be divided. The static penetration test may be a single-bridge static penetration test, a double-bridge static penetration test, a pore pressure static penetration test, or other types of static penetration tests, which are not limited in this embodiment.
[0073] The static penetration test data refers to the test data obtained after preprocessing the collected static penetration test data to be processed, and the preprocessing includes one or more of normalization processing, abnormal data elimination processing, and filtering processing.
[0074] Furthermore, the step of obtaining static penetration test data specifically includes: performing a static penetration test on the soil layer to obtain static penetration test data to be processed; and normalizing the static penetration test data to be processed to obtain static penetration test data.
[0075] It should be understood that the static penetration test data to be processed are data collected or expanded directly from static penetration tests on soil layers, including depth, penetration resistance, friction resistance, cone tip resistance, pore water pressure, etc.; they can also be obtained by calculating, transforming, combining, etc. the collected data, including but not limited to friction resistance ratio, total cone tip resistance, excess pore pressure ratio, etc. For example, if the static penetration test type is a double-bridge static penetration test, the data consisting of the three parameters of depth, cone tip resistance, and friction resistance ratio should be selected as the static penetration test data to be processed, and the unit and order of each parameter should also be consistent.
[0076] In a specific implementation, after obtaining the static penetration test data to be processed, the static penetration test data to be processed can be normalized, and the normalization processing includes one of the processing methods such as mean normalization, maximum and minimum value normalization, and Z value normalization (standardization). This embodiment does not limit this, and this embodiment uses mean normalization as an example for explanation. The mean of the static penetration test data to be processed can be calculated to obtain the maximum and minimum values in the static penetration test data to be processed, so that the mean-normalized data, i.e., the static penetration test data, can be obtained through each value, mean, maximum value, and minimum value in the static penetration test data to be processed. The calculation process is as follows:
[0077]
[0078] In formula 1, x' is the static penetration test data, x is each value in the static penetration test data to be processed, mean(x) is the mean of the static penetration test data to be processed, max(x) is the maximum value of the static penetration test data to be processed, and min(x) is the minimum value of the static penetration test data to be processed. The static penetration test data can be calculated by formula 1.
[0079] Step S20: Determine the data packet length.
[0080] It should be understood that the data packet length can be set according to the needs, for example, the data packet length is 3, 5, etc., and this embodiment does not limit this. The data packet length refers to the length of the static penetration test data packet.
[0081] Step S30: grouping the static penetration test data according to the data grouping length to obtain multiple groups of static penetration test data.
[0082] In a specific implementation, the static penetration test data can be grouped by data grouping length, so as to obtain multiple groups of grouped static penetration test data, and the grouped static penetration test data refers to the static penetration test data after grouping.
[0083] Step S40: Detect the plurality of groups of static penetration test data using a preset soil layer interface detection model to obtain the number of soil layer interfaces in each group of data.
[0084] It should be understood that the preset soil layer interface model can be trained based on the collected sample data, the preset soil layer interface detection model can detect the number of soil layer interfaces, and the preset soil layer interface detection model can be used to detect multiple groups of static penetration test data in turn to obtain the number of soil layer interfaces for each group of data.
[0085] In a specific implementation, the sample data is grouped using a data grouping length and the number of soil layer interfaces is detected. The data grouping lengths of different preset soil layer interface detection models may be different. Therefore, the data grouping length for grouping the static penetration test data can be obtained according to the corresponding preset soil layer interface detection model. The data grouping length can be obtained according to the static penetration test data length contained in each sample data of the preset soil layer interface detection model. When there are multiple preset soil layer interface detection models, the data grouping lengths are different and can be grouped separately to obtain multiple groups of static penetration test data after grouping with different data grouping lengths. The grouping method used for each group of data grouping lengths should include all static penetration test data. The number, unit and order of parameters in the static penetration test usage data are consistent with those in the static penetration test sample data.
[0086] Furthermore, before detecting the multiple groups of static penetration test data through a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data, it is necessary to establish a preset soil layer interface detection model. Therefore, before step S30, it also includes: obtaining static penetration test sample data, wherein the static penetration test sample data is sample data containing the number of soil layer interfaces; normalizing the static penetration test sample data to obtain processed static penetration test sample data; dividing the processed static penetration test sample data to obtain training sample data and test sample data; constructing an initial soil layer interface detection model; setting model parameters, training the initial soil layer interface detection model through the model parameters and the training sample data to obtain a reference soil layer interface detection model; obtaining evaluation indicators, and evaluating the reference soil layer interface detection model through the evaluation indicators and the test sample data to obtain a preset soil layer interface detection model.
[0087] It should be noted that the static penetration test sample data is the data collected after the static penetration test. After the static penetration test sample data is collected, it can be tested by professionals to obtain the number of soil layer interfaces of each static penetration test sample data. The static penetration test sample data is normalized, and the normalization method can be one of the processing methods such as mean normalization, maximum and minimum value normalization, Z value normalization (standardization), etc. This embodiment does not limit this, and this embodiment is described by taking mean normalization as an example.
[0088] In a specific implementation, q consecutive data and the corresponding number of soil layer interfaces can be selected as a sample data, wherein the number of soil layer interfaces 0, 1, 2, etc. is used as the category label of the sample. M samples constitute a sample data set, wherein the number of samples of each category should be consistent, and the static penetration test sample data is normalized to obtain the processed static penetration test sample data. The processed static penetration test sample data is divided into training sample data and test sample data. The training sample data is used for training the machine model, accounting for about 80% to 90% of the processed static penetration test sample data. The test sample data is used to evaluate the accuracy and generalization ability of the established model, accounting for about 10% to 20% of the processed static penetration test sample data.
[0089] In a specific implementation, the initial soil layer interface detection model can be one or more machine learning models such as a logistic regression model, a Bayesian model, an artificial neural network model, a support vector machine model, etc., so as to construct an initial soil layer interface detection model. The model parameters can be set according to the needs. The model parameters are related to the constructed model. For example, the parameters of the support vector machine model include the penalty coefficient C, the coefficient γ of the RBF kernel function, etc. The initial soil layer interface detection model is trained according to the model parameters and the training sample data to obtain a reference soil layer interface detection model. Figure 3 As shown, Figure 3 A flow chart of constructing a preset soil layer interface detection model is provided. The initial soil layer interface detection model is constructed by acquiring static penetration test sample data. The initial soil layer interface detection model is trained by static penetration test sample data to obtain a reference soil layer interface detection model. The reference soil layer interface detection model is evaluated to obtain a preset soil layer interface detection model. The preset soil layer interface detection model is selected.
[0090] It can be understood that the evaluation indicators include overall accuracy and minimum accuracy. The overall accuracy is the percentage of the number of correct test sample data categories obtained by the reference soil layer interface detection model to the total number of test sample data, and the minimum accuracy is the minimum value of the percentage of the number of correct test sample data categories of each type obtained by the reference soil layer interface detection model to the number of test sample data of that type. Thus, the reference soil layer interface detection model is evaluated by the obtained evaluation indicators and test sample data, and a soil layer interface detection model that meets the requirements of accuracy and generalization ability is obtained, that is, the preset soil layer interface detection model.
[0091] If the soil layer interface detection model does not meet the accuracy and generalization requirements, the model construction, model training and model evaluation are performed again until one or more preset soil layer interface detection models that meet the requirements are obtained. One or more soil layer interface detection models with an overall accuracy of not less than 95% and a minimum accuracy of not less than 90% should be selected. Specifically, the search range of the model parameters can be set to obtain the optimal soil layer interface detection model, that is, the preset soil layer interface detection model, by using the search algorithm.
[0092] Step S50: obtaining the maximum number of soil layer interfaces in different grouping methods and the corresponding grouping methods according to the number of soil layer interfaces in each group of data.
[0093] It should be noted that since there may be multiple preset soil layer interface detection models, the data grouping lengths used by different preset soil layer interface detection models are not the same. Therefore, the data can be grouped according to different data grouping lengths and then detected to obtain the number of soil layer interfaces in each group of data. The cumulative number of soil layer interfaces corresponding to each grouping method can be calculated based on the number of soil layer interfaces in each group of data, thereby obtaining the maximum number of soil layer interfaces data for different grouping methods and their corresponding grouping methods.
[0094] For example, there are three grouping methods: A, B and C. The maximum number of soil layer interfaces corresponding to grouping method A is 10 layers, the maximum number of soil layer interfaces corresponding to grouping method B is 8 layers, and the maximum number of soil layer interfaces corresponding to grouping method C is 6 layers. Then the maximum number of soil layer interfaces for different grouping methods are 10 layers, 8 layers and 6 layers.
[0095] Step S60: Calculate the optimal segmentation point using the optimal segmentation method according to the maximum number of soil layer interfaces and the grouping method to obtain the soil layer interface position to complete the division of the soil layer interface.
[0096] It should be understood that after obtaining the data on the maximum number of soil layer interfaces and the grouping method, the optimal segmentation method can be used to calculate the optimal segmentation point based on the data on the maximum number of soil layer interfaces and the corresponding grouping method, so that the soil layer interface can be divided by the optimal segmentation point, thereby obtaining the soil layer interface position and completing the division of the soil layer interface.
[0097] The present embodiment performs a static penetration test on a soil layer to obtain static penetration test data; determines a data grouping length; groups the static penetration test data according to the data grouping length to obtain a plurality of grouped static penetration test data; detects the plurality of grouped static penetration test data through a preset soil layer interface detection model to obtain the number of soil layer interfaces in each group of data; obtains data on the maximum number of soil layer interfaces in different grouping methods and corresponding grouping methods according to the number of soil layer interfaces in each group of data; calculates an optimal segmentation point using an optimal segmentation method based on the data on the maximum number of soil layer interfaces and the grouping method to obtain the position of the soil layer interface to complete the division of the soil layer interface, which can be used for various static penetration test data to divide the soil layer interface, uses a preset soil layer interface detection model based on machine learning technology to detect the number of soil layer interfaces in each group of data, and uses an optimal segmentation method to calculate an accurate optimal segmentation point to obtain the final soil layer interface position, thereby improving the accuracy of the division and completing the division of the soil layer interface by the static penetration test data. The entire process does not require manual intervention and has a high degree of automation.
[0098] refer to Figure 4 , Figure 4 It is a flow chart of the second embodiment of the method for dividing soil layer interfaces based on static penetration test of the present invention.
[0099] Based on the first embodiment described above, step S30 of the method for dividing soil layer interfaces based on a static penetration test in this embodiment specifically includes:
[0100] Step S301: Determine the amount of additional data according to the data packet length.
[0101] It should be noted that after obtaining the data packet length, the amount of data to be added can be determined according to the data packet length. The data packet length is k, and the amount of data to be added is k-1. For example, if the data packet length is k=3, the amount of data to be added is k-1=2. The values of the added data are all 0 or -1.
[0102] Step S302: Obtain the data length of the static penetration test data.
[0103] It should be understood that the data length of the static penetration test data is the number of static penetration test data. For example, if the number of static penetration test data of a test point is n=10, then the data length of the static penetration test data is 10.
[0104] Step S303: Add the data length and the increased data quantity to obtain the target data length.
[0105] In a specific implementation, the data length and the number of increased data are added to obtain the target data length, the target data length = n + (k-1), for example, the data length is 10, the data packet length k = 3, the number of increased data = k-1 = 2, then the target data length = 10 + 2 = 12.
[0106] Step S304: dividing the target data length from different positions of the static penetration test data by the data grouping length to obtain a plurality of groups of static penetration test data.
[0107] In a specific implementation, data of a target data length can be grouped by data grouping length, and different positions of the static penetration test data can be divided, thereby obtaining multiple groups of static penetration test data with different division methods. For example, k=3, and the target data length is 12. If grouping starts from the first data, the obtained grouped static penetration test data is: S1=[(n1, n2, n3), (n4, n5, n6), (n7, n8, n9), (n10, n11, n12)], and if grouping starts from the second data, the obtained grouped static penetration test data is: S2=[(n2, n3, n4), (n5, n6, n7), (n8, n9, n10), (n11, n12, n13)], and the group length of the last (n11, n12, n13) is insufficient, that is, one n13 is missing, and it is filled with data of all 0s, so n13=0. If the grouping starts from the third data, the obtained grouped static penetration test data is: S3 = [(n3, n4, n5), (n6, n7, n8), (n9, n10, n11), (n12, n13, n14)], the last group (n12, n13, n14) is not long enough, that is, n13 and n14 are missing, n13 and n14 are filled with 0 data, so that multiple groups of grouped static penetration test data with different grouping methods are obtained, which are recorded as {S 1 ,S 2 ,S 3 ......S k}, respectively, represent the static penetration test data of different grouping methods starting from the 1st, 2nd, 3rd ... kth data with k as the data grouping length. When the k value is different, the groups should be grouped separately. If a single form of grouping is used, when the stratification interface coincides with the grouping position, it is not possible to effectively determine whether there is a stratification interface, thereby missing the stratification interface and reducing the accuracy of stratification.
[0108] This embodiment determines the amount of increased data according to the data group length; obtains the data length of the static penetration test data; adds the data length and the amount of increased data to obtain a target data length; divides the target data length from different positions of the static penetration test data according to the data group length to obtain multiple groups of grouped static penetration test data. The static penetration test data can be divided in different ways according to the data group length to obtain multiple groups of grouped static penetration test data, which can include all stratification interfaces to improve stratification accuracy.
[0109] refer to Figure 5 , Figure 5 It is a flow chart of a third embodiment of the method for dividing soil layer interfaces based on static penetration test of the present invention.
[0110] Based on the first embodiment described above, step S60 of the method for dividing soil layer interfaces based on a static penetration test in this embodiment specifically includes:
[0111] Step S601: calling multiple fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method.
[0112] It should be understood that different fitting functions can be selected according to different soil layer types in different regions, and different types of fitting functions can be made into a preset fitting function library. When the grouping method needs to be fitted, multiple fitting functions can be called. The fitting functions may include linear functions, polynomial functions, exponential functions, and trigonometric functions, etc., which are fitted separately, so as to select the fitting function with the best effect as the target fitting function, and the grouping method processed by the target fitting function is used as the target grouping method.
[0113] Furthermore, the step of calling multiple fitting functions to fit the grouping method to obtain the target grouping method specifically includes: calling multiple fitting functions from a preset fitting function library; fitting each grouping method through multiple fitting functions to obtain multiple fitting results; calculating the sum of square deviations of the multiple fitting results; taking the minimum sum of square deviations in each sum of square deviations data as the segment diameter; calculating the cumulative value of the segment diameter according to the segment diameter; obtaining the segment error according to the cumulative value of the segment diameter; and taking the grouping method corresponding to the minimum segment error in the segment errors as the target grouping method.
[0114] It should be understood that the type of function can be selected according to the fitting of the static penetration test data, and multiple fitting functions can be called to fit each grouping method, thereby obtaining multiple fitting results. ij , using a variety of fitting functions {F 1 , F 2 , F 3 ......Fm} fitting, and obtain multiple fitting results Q(F t , S ij ), and calculate the sum of squares of deviations of multiple fitting results. The calculation process is as follows:
[0115] A1=∑(Q(F m ,S ij )-S ij ) 2 (Formula 2)
[0116] In formula 2, A1 is the sum of squares of deviations of multiple fitting results, Q(F t , S ij ) are multiple fitting results, S ij For each grouping method, the sum of squares of deviations of multiple fitting results is calculated by the above formula 2.
[0117] It can be understood that after obtaining A1, the minimum sum of squares of the deviations can be used as the segment diameter, as shown in the following formula 3:
[0118] D(S ij )=min(∑Q(F t ,S ij )-S ij ) 2 ) (Formula 3)
[0119] In formula 3, D(S ij ) is the segment diameter, and the segment diameter is obtained according to Formula 3.
[0120] It should be noted that, after the segment diameter is obtained, the cumulative value of the segment diameter can be used as the error function of the grouping method, calculated as follows:
[0121] e Si =∑D(S ij ) (Formula 4)
[0122] In formula 4, the left side of the equation is the error function of the corresponding group, and the right side of the equation is the cumulative value of the diameter of each segment. The error function of different grouping methods is obtained by calculating the cumulative value of the diameter of each segment. The segmentation error of different grouping methods is calculated by the error function, as shown in formula 5:
[0123]
[0124] In Formula 5, the segmentation errors of different grouping methods are compared, and the grouping method with the minimum segmentation error is used as the target grouping method.
[0125] Step S602: taking the maximum number of soil layer interfaces corresponding to the target grouping method in the maximum number of soil layer interfaces data as the target maximum number of soil layer interfaces.
[0126] In a specific implementation, the target grouping method is the optimal grouping method, and the maximum number of soil layer interfaces in the data of the maximum number of soil layer interfaces corresponding to the target grouping method can be used as the target maximum number of soil layer interfaces. For example, the data of the maximum number of soil layer interfaces is 10 layers for grouping method A, 8 layers for grouping method B, and 4 layers for grouping method C. The calculated target grouping method is grouping method B. Then the maximum number of soil layer interfaces of 8 layers corresponding to the target grouping method B in the data of the maximum number of soil layer interfaces can be used as the target maximum number of soil layer interfaces.
[0127] Step S603: Calculate the target segmentation value according to the target maximum number of soil layer interfaces.
[0128] It should be understood that the target segmentation value refers to the value of segmenting the segmentation point in the optimal segmentation method. The traditional optimal segmentation method calculates the target segmentation value by calculating the mean and the sum of square deviations of each segment among all possible segmentation values, and finding the target segmentation value with the smallest sum of square deviations. The calculation is recursive, and the calculation workload is large. The target segmentation value in this embodiment can be calculated by the maximum number of soil layer interfaces in the target grouping method, that is, the target maximum number of soil layer interfaces, and is calculated as follows:
[0129] W=N imax -1 (Formula 6)
[0130] In formula 6, W is the target segment value, N imax is the target maximum number of soil layer interfaces. The target segmentation value can be calculated by the above formula 6. There is no need to calculate all the segmentation values, which greatly reduces the calculation workload.
[0131] Step S604: Obtaining an optimal segmentation point according to the target segmentation value.
[0132] In a specific implementation, after the target segmentation value is calculated, the optimal segmentation point can be calculated according to the target segmentation value, so that the soil layer interface can be divided by the optimal segmentation point.
[0133] Furthermore, the step of obtaining the optimal segmentation point according to the target segmentation value specifically includes: calculating the number of optimal segmentation points according to the target segmentation value; determining a segmentation point search range according to the optimal segmentation point number; and determining the optimal segmentation point according to the segmentation point search range.
[0134] It can be understood that the optimal segmentation point is the target segmentation value W-1, excluding the two end points. After the optimal number of segmentation points is obtained, the segmentation point search range can be determined according to the optimal number of segmentation points, and the target grouping method S' ij And the corresponding number n of each set of soil layer interfacesij And the optimal number of segmentation points to obtain the search range of each segmentation point, each n ij Corresponding to an S' ij , when n ij =0, indicating the corresponding S ij The range does not contain the split point; when n ij =1, corresponding to S' ij The range contains 1 split point, and the search range of the split point is S' ij , so the optimal segmentation point can be obtained as {P 1 ,P 2 ,P 3 ......P W-1}.
[0135] Step S605: taking the position of the optimal segmentation point as the soil layer interface position.
[0136] In a specific implementation, after the optimal segmentation point is obtained, the position of the optimal segmentation point is the position of the soil layer interface, so that the soil layer interface can be divided. The soil layer interface can be quickly and accurately divided according to the optimal segmentation point, thereby improving the accuracy of the division.
[0137] This embodiment calls multiple fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method; the maximum number of soil layer interfaces corresponding to the target grouping method in the maximum number of soil layer interfaces data is used as the target maximum number of soil layer interfaces; the target segmentation value is calculated according to the target maximum number of soil layer interfaces; the optimal segmentation point is obtained according to the target segmentation value; and the position of the optimal segmentation point is used as the soil layer interface position. The target segmentation value can be conveniently and accurately calculated, so as to determine the optimal segmentation point according to the target segmentation value, and the soil layer interface can be quickly and accurately divided according to the optimal segmentation point, thereby improving the accuracy of the division.
[0138] Reference Figure 6 , Figure 6 It is a structural block diagram of the first embodiment of the device for dividing soil layer interfaces based on static penetration test of the present invention.
[0139] like Figure 6 As shown, the device for dividing soil layer interfaces based on static penetration test proposed in an embodiment of the present invention includes:
[0140] The test module 10 is used to perform a static penetration test on the soil layer to obtain static penetration test data.
[0141] The determination module 20 is used to determine the data packet length.
[0142] The grouping module 30 is used to group the static penetration test data according to the data grouping length to obtain multiple groups of grouped static penetration test data.
[0143] The detection module 40 is used to detect the plurality of groups of static penetration test data using a preset soil layer interface detection model to obtain the number of soil layer interfaces in each group of data.
[0144] The acquisition module 50 is used to obtain the maximum number of soil layer interfaces in different grouping methods and the corresponding grouping methods according to the number of soil layer interfaces in each group of data.
[0145] The calculation module 60 is used to calculate the optimal segmentation point by using the optimal segmentation method according to the maximum number of soil layer interfaces data and the grouping method, and obtain the soil layer interface position to complete the division of the soil layer interface.
[0146] The present embodiment performs a static penetration test on a soil layer to obtain static penetration test data; determines a data grouping length; groups the static penetration test data according to the data grouping length to obtain a plurality of grouped static penetration test data; detects the plurality of grouped static penetration test data through a preset soil layer interface detection model to obtain the number of soil layer interfaces in each group of data; obtains data on the maximum number of soil layer interfaces in different grouping methods and corresponding grouping methods according to the number of soil layer interfaces in each group of data; calculates an optimal segmentation point using an optimal segmentation method based on the data on the maximum number of soil layer interfaces and the grouping method to obtain the position of the soil layer interface to complete the division of the soil layer interface, which can be used for various static penetration test data to divide the soil layer interface, uses a preset soil layer interface detection model based on machine learning technology to detect the number of soil layer interfaces in each group of data, and uses an optimal segmentation method to calculate an accurate optimal segmentation point to obtain the final soil layer interface position, thereby improving the accuracy of the division and completing the division of the soil layer interface by the static penetration test data. The entire process does not require manual intervention and has a high degree of automation.
[0147] In one embodiment, the grouping module 30 is also used to determine the amount of increased data based on the data group length; obtain the data length of the static penetration test data; add the data length and the amount of increased data to obtain the target data length; divide the target data length from different positions of the static penetration test data according to the data group length to obtain multiple groups of grouped static penetration test data.
[0148] In one embodiment, the detection module 40 is also used to call multiple fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method; use the maximum number of soil layer interfaces in the maximum number of soil layer interfaces data corresponding to the target grouping method as the target maximum number of soil layer interfaces; calculate the target segmentation value according to the target maximum number of soil layer interfaces; obtain the optimal segmentation point according to the target segmentation value; and use the position of the optimal segmentation point as the soil layer interface position.
[0149] In one embodiment, the detection module 40 is also used to call multiple fitting functions from a preset fitting function library; fit each grouping method through the multiple fitting functions to obtain multiple fitting results; calculate the sum of square deviations of the multiple fitting results; use the minimum sum of square deviations in each sum of square deviations data as the segment diameter; calculate the cumulative value of the segment diameter according to the segment diameter; obtain the segment error according to the cumulative value of the segment diameter; and use the grouping method corresponding to the minimum segment error in the segment errors as the target grouping method.
[0150] In one embodiment, the detection module 40 is further configured to calculate the optimal number of segmentation points according to the target segmentation value; determine a segmentation point search range according to the optimal number of segmentation points; and determine the optimal segmentation point according to the segmentation point search range.
[0151] In one embodiment, the detection module 40 is also used to obtain static penetration test sample data, wherein the static penetration test sample data is sample data containing the number of soil layer interfaces; normalize the static penetration test sample data to obtain processed static penetration test sample data; divide the processed static penetration test sample data to obtain training sample data and test sample data; construct an initial soil layer interface detection model; set model parameters, train the initial soil layer interface detection model through the model parameters and the training sample data, and obtain a reference soil layer interface detection model; obtain evaluation indicators, and evaluate the reference soil layer interface detection model through the evaluation indicators and the test sample data to obtain a preset soil layer interface detection model.
[0152] In one embodiment, the test module 10 is further used to perform a static penetration test on the soil layer to obtain static penetration test data to be processed; and to perform normalization processing on the static penetration test data to be processed to obtain static penetration test data.
[0153] In addition, to achieve the above-mentioned objectives, the present invention also proposes a device for dividing soil layer interfaces based on static penetration tests, and the device for dividing soil layer interfaces based on static penetration tests includes: a memory, a processor, and a program for dividing soil layer interfaces based on static penetration tests stored in the memory and executable on the processor, and the program for dividing soil layer interfaces based on static penetration tests is configured to implement the steps of the method for dividing soil layer interfaces based on static penetration tests as described above.
[0154] Since the device for dividing soil layer interfaces based on static penetration test adopts all the technical solutions of all the above-mentioned embodiments, it has at least all the beneficial effects brought by the technical solutions of the above-mentioned embodiments, which will not be described one by one here.
[0155] In addition, an embodiment of the present invention also proposes a storage medium, on which is stored a program for dividing soil layer interfaces based on static penetration tests. When the program for dividing soil layer interfaces based on static penetration tests is executed by a processor, the steps of the method for dividing soil layer interfaces based on static penetration tests as described above are implemented.
[0156] Since the storage medium adopts all the technical solutions of all the above embodiments, it has at least all the beneficial effects brought by the technical solutions of the above embodiments, which will not be described one by one here.
[0157] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.
[0158] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.
[0159] In addition, for technical details not fully described in this embodiment, reference can be made to the method for dividing soil layer interfaces based on static penetration tests provided in any embodiment of the present invention, and will not be repeated here.
[0160] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0161] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0162] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0163] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for dividing soil interface based on static penetration test, It is characterized in that The method for dividing the soil layer interface based on the static penetration test includes: Conduct static penetration test on soil layer to obtain static penetration test data; Determine the data packet length; Grouping the static penetration test data according to the data grouping length to obtain multiple groups of static penetration test data; The plurality of groups of static penetration test data are tested by using a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data; According to the number of soil layer interfaces of each group of data, the maximum number of soil layer interfaces in different grouping methods and the corresponding grouping methods are obtained; Calculating the optimal segmentation point by using the optimal segmentation method according to the maximum number of soil layer interfaces and the grouping method, and obtaining the position of the soil layer interface to complete the division of the soil layer interface; The step of grouping the static penetration test data by the data grouping length to obtain a plurality of groups of static penetration test data comprises: Determining the amount of additional data according to the data packet length; Obtaining the data length of the static penetration test data; Adding the data length and the increased data quantity to obtain a target data length; Dividing the target data length from different positions of the static penetration test data by the data group length to obtain a plurality of groups of static penetration test data; The method of calculating the optimal segmentation point by using the data of the maximum number of soil layer interfaces and the grouping method to obtain the position of the soil layer interface includes: Calling multiple fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method; The maximum number of soil layer interfaces in the maximum number of soil layer interfaces data corresponding to the target grouping method is used as the target maximum number of soil layer interfaces; Calculate the target segmentation value according to the target maximum number of soil layer interfaces; Obtaining an optimal segmentation point according to the target segmentation value; The position of the optimal segmentation point is used as the position of the soil layer interface; Obtaining the optimal segmentation point according to the target segmentation value includes: Calculate the optimal number of segmentation points according to the target segmentation value; Determine the segmentation point search range according to the optimal segmentation point number; An optimal segmentation point is determined through the segmentation point search range.
2. The method for dividing soil layer interfaces based on static penetration test according to claim 1, It is characterized in that The step of calling a plurality of fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method includes: Call multiple fitting functions from the preset fitting function library; Fitting each grouping method using multiple fitting functions to obtain multiple fitting results; Calculating the sum of squares of deviations of the plurality of fitting results; The minimum sum of squares of deviations among the sum of squares of deviations data is taken as the segment diameter; Calculate the segment diameter cumulative value according to the segment diameter; The segmentation error is obtained according to the accumulated value of the segment diameter; The grouping method corresponding to the minimum segmentation error among the segmentation errors is used as the target grouping method.
3. The method for dividing soil layer interfaces based on static penetration test according to claim 1, It is characterized in that Before detecting the plurality of groups of static penetration test data by using a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data, the method further includes: Acquire static penetration test sample data, wherein the static penetration test sample data is sample data including the number of soil layer interfaces; Normalizing the static penetration test sample data to obtain processed static penetration test sample data; Dividing the processed static penetration test sample data to obtain training sample data and test sample data; Construct the initial soil layer interface detection model; Setting model parameters, training the initial soil layer interface detection model using the model parameters and the training sample data to obtain a reference soil layer interface detection model; An evaluation index is obtained, and the reference soil layer interface detection model is evaluated by using the evaluation index and the test sample data to obtain a preset soil layer interface detection model.
4. The method for dividing soil layer interfaces based on static penetration test according to any one of claims 1 to 3, It is characterized in that The static penetration test is performed on the soil layer to obtain static penetration test data, including: Conduct static penetration test on soil layer to obtain static penetration test data to be processed; The static penetration test data to be processed is normalized to obtain static penetration test data.
5. A device for dividing soil layer interfaces based on static penetration test, It is characterized in that The device for dividing the soil layer interface based on the static penetration test comprises: The test module is used to perform a static penetration test on the soil layer and obtain static penetration test data; A determination module, used for determining the data packet length; A grouping module, used for grouping the static penetration test data according to the data grouping length to obtain multiple groups of static penetration test data; A detection module, used to detect the plurality of groups of static penetration test data by using a preset soil layer interface detection model to obtain the number of soil layer interfaces of each group of data; An acquisition module, used for obtaining the maximum number of soil layer interfaces in different grouping methods and the corresponding grouping methods according to the number of soil layer interfaces in each group of data; A calculation module, used to calculate the optimal segmentation point by using the maximum number of soil layer interfaces data and the grouping method, and obtain the soil layer interface position to complete the division of the soil layer interface; The grouping module is further used to determine the amount of additional data according to the data group length; obtain the data length of the static penetration test data; add the data length and the amount of additional data to obtain a target data length; divide the target data length from different positions of the static penetration test data according to the data group length to obtain multiple groups of grouped static penetration test data; The grouping module is further used to call multiple fitting functions from a preset fitting function library to fit the grouping method to obtain a target grouping method; use the maximum number of soil layer interfaces in the maximum number of soil layer interfaces data corresponding to the target grouping method as the target maximum number of soil layer interfaces; calculate the target segmentation value according to the target maximum number of soil layer interfaces; obtain the optimal segmentation point according to the target segmentation value; and use the position of the optimal segmentation point as the soil layer interface position; The grouping module is further used to calculate the optimal number of segmentation points according to the target segmentation value; determine the segmentation point search range according to the optimal number of segmentation points; and determine the optimal segmentation point according to the segmentation point search range.
6. A device for dividing soil interface based on static penetration test, It is characterized in that The device for dividing soil layer interfaces based on static penetration test comprises: a memory, a processor and a program for dividing soil layer interfaces based on static penetration test stored in the memory and executable on the processor, wherein the program for dividing soil layer interfaces based on static penetration test is configured to implement the method for dividing soil layer interfaces based on static penetration test as described in any one of claims 1 to 4.
7. A storage medium, It is characterized in that The storage medium stores a program for dividing soil layer interfaces based on static penetration tests, and when the program for dividing soil layer interfaces based on static penetration tests is executed by a processor, the method for dividing soil layer interfaces based on static penetration tests as described in any one of claims 1 to 4 is implemented.
Citation Information
Patent Citations
Static penetration test rock stratum intelligent identification method and system, computer equipment and medium
CN112396130A