Construction method of combining ALC board with concrete blocks
Through the construction method of combining ALC sheets with concrete blocks, the problems of high difficulty in construction at the holes and poor quality control effect of ALC sheets are solved, and the construction speed and quality are improved, material waste and repair costs are reduced, and construction efficiency and economy are improved.
Patent Information
- Application Number
- CN202310583221.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2043-05-23
AI Technical Summary
In construction, it is difficult to construct ALC sheets in parts with more holes, poor quality control effect, resulting in waste of materials and high repair costs, and the construction method combined with concrete blocks has problems of low efficiency.
The construction method is adopted to combine ALC plates with concrete blocks. By installing ALC plates in the middle and lower parts, installing planting ribs, C-shaped card and inverted U-shaped card, binding of waist beam steel bars, installation of hanging bars, pouring waist beam concrete, and masonry of autoclave aerated concrete blocks, and construction is carried out using prefabricated lintels at the reserved holes.
The construction speed and quality of filling walls are improved, material waste and repair costs are reduced, and the dual advantages of construction efficiency and economy are achieved.
Smart Images

Figure CN116357095B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to building construction, in particular to a construction method for combining an ALC plate with a concrete block. Background Art
[0002] At present, in the construction of building projects, autoclaved aerated concrete panels (ALC panels for short) have been widely promoted and applied due to their advantages of environmental protection, fire prevention, sound insulation, heat insulation, strong hanging force, light weight and economy, good integrity, strong assembly ability, and greatly reducing the number of construction personnel and time. However, since ALC panels are reinforced autoclaved aerated concrete slats with good integrity, their construction is difficult in areas with more openings and the quality control effect is poor. Pre-opening and post-opening openings will cause material waste, and a large number of metal accessories will be used, making construction quality control difficult, and easily causing damage to the panels, with high repair or replacement costs. Therefore, in areas with more pipelines, the practicality of ALC panels is not high. How to make improvements is the key to improving the construction quality of the filling wall.
[0003] Compared with ALC boards, autoclaved aerated concrete blocks are more flexible, with more mature construction hole retention and post-opening, and the construction quality is easy to control, but they do not have the advantages of ALC boards in terms of convenience and speed of construction and reducing the number of construction personnel. Therefore, how to combine the two types of infill wall construction materials and processes to form an efficient and high-quality construction method is the key to secondary structure construction. Summary of the invention
[0004] The present invention aims to solve the above technical problems, thereby providing a construction method combining ALC panels and concrete blocks, improving the construction speed of filling walls, and solving the problem of low construction efficiency of reserved openings.
[0005] The present invention solves the technical problem and adopts the following technical solution:
[0006] A construction method for combining an ALC plate with a concrete block comprises the following steps:
[0007] S1. ALC sheet installation
[0008] Install ALC panels in the middle and lower part of the wall to be filled and fix them temporarily;
[0009] S2, rebar planting, C-type clip and inverted U-type clip installation
[0010] Rebars are planted at the waist beam and tie bars of the main structure above the ALC plate, C-shaped clips corresponding to the planted bars are set on the inner side of the vertical structural beam plate above the ALC plate, and an inverted U-shaped clip is installed at the upper end of the ALC plate;
[0011] S3, C-type clamp and tie bar connection
[0012] The inner side of the C-type clamp is welded with connecting steel bars, and the two ends of the tie bars are connected to the embedded steel bars and the connecting steel bars respectively;
[0013] S4, U-shaped card and waist beam template installation
[0014] (1) Install the U-shaped card on the inverted U-shaped card, and support the bottom of the U-shaped card at the top of the door opening with square wood;
[0015] (2) Support the waist beam template, and install the waist beam template on both sides of the U-shaped card and the inverted U-shaped card;
[0016] S5. Tie up the waist beam reinforcement
[0017] One end of the waist beam reinforcement is connected to the embedded reinforcement of the main structure, and the other end is connected to the connecting reinforcement welded on the C-type clamp;
[0018] S6. Installation of suspension rods
[0019] Hanging bars are set on the bottom surface of the horizontal structural beam plate above the ALC plate, and the hanging bars are close to the vertical structural beam plate on one side of the C-type clamp, and the hanging bars are connected to the waist beam steel bars;
[0020] S7, waist beam concrete pouring
[0021] Concrete pouring of waist beam, removal of waist beam formwork;
[0022] S8, autoclaved aerated concrete block masonry construction, reserved openings are constructed using prefabricated lintels;
[0023] S9, inclined masonry or filling seams, hanging mesh
[0024] After the masonry is completed, the top of the autoclaved aerated concrete blocks are beveled or caulked, and the wall surface is meshed and plastered.
[0025] Compared with the prior art, the present invention using the above technical solution has the following beneficial effects:
[0026] Combining the advantages of ALC panels and autoclaved aerated concrete blocks, ALC panels are used for construction in areas without openings or pipelines penetrating the wall. Autoclaved aerated concrete blocks are used in advance for construction in areas with reserved openings and dense pipelines penetrating the wall. ALC panels and autoclaved aerated concrete blocks are divided by reinforced concrete beams to ensure construction quality, efficiency and economy.
[0027] Further, the optimization scheme of the present invention is:
[0028] The two side plates of the inverted U-shaped card are respectively connected to the ALC plate by bolts.
[0029] The waist beam template is connected to the inverted U-shaped clamp by bolts.
[0030] The upper ends of the waist beam templates on both sides are fixed by beam clamps.
[0031] The connecting steel bars are arranged vertically.
[0032] The hanger rod is connected with the horizontal structural beam plate through a metal expansion joint. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a schematic diagram of wall construction according to an embodiment of the present invention;
[0034] Figure 2 yes Figure 1 Schematic diagram of the waist beam template of the AA section;
[0035] Figure 3 yes Figure 1 Schematic diagram of the completion of the casting of the waist beam in the AA section;
[0036] Figure 4 yes Figure 1 Schematic diagram of waist beam template of BB section;
[0037] Figure 5 yes Figure 1 Schematic diagram of the completion of the casting of the waist beam of the BB section;
[0038] Figure 6 yes Figure 1 The D figure of
[0039] Figure 7 yes Figure 1 Figure E of
[0040] Figure 8 yes Figure 1 CC profile of ;
[0041] Fig. 9 It is a construction flow chart of an embodiment of the present invention.
[0042] In the figure: shear wall 1; door opening 1-1; vertical structural beam slab 2; horizontal structural beam slab 2-1; ALC board 3; autoclaved aerated concrete block 4; lime sand brick 5; waist beam 6; precast concrete lintel 7; inverted U-shaped clip 8; metal expansion head 9; hanger 10; U-shaped clip 11; beam clamp 12; wooden formwork 13; self-tapping screw 14; masonry mortar 15; waist beam steel bar 16; square timber 17; C-shaped clip 18; connecting steel bar 19; tie bar 20. DETAILED DESCRIPTION
[0043] The present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0044] See also Figure 1 , Fig. 9, the upper part of the filling wall is provided with reserved openings or through-wall pipelines, a construction method combining ALC panels and concrete blocks is carried out in the following steps:
[0045] S1. ALC sheet installation
[0046] Install the ALC panels 3 in the middle and lower part of the wall to be filled according to the construction layout sequence, and temporarily fix the ALC panels 3 that have not reached the top;
[0047] S2, rebar planting, C-type clip and inverted U-type clip installation
[0048] Rebars are planted at the waist beam 6 and the tie bars 20 of the shear wall 1 above the ALC plate 3, and the places where the rebars are planted are roughened. C-shaped clips 18 corresponding to the rebars are set on the inner side of the vertical structural beam 2 above the ALC plate 3, and the C-shaped clips 18 are welded to the steel bars in the vertical structural beam 2 ( Figure 7 As shown, an inverted U-shaped card 8 is installed at the upper end of the ALC plate 3, and the two side plates of the inverted U-shaped card 8 are respectively connected to the ALC plate 3 by self-tapping screws 14 ( Figure 2 shown);
[0049] S3, C-type clamp and tie bar connection
[0050] The inner side of the C-shaped clip 18 is welded with a vertically arranged connecting steel bar 19, and the two ends of the tie bar 20 are respectively connected to the implanted steel bar and the connecting steel bar 19;
[0051] S4, U-shaped card and waist beam template installation
[0052] (1) The opening of the U-shaped card 11 is upwardly welded to the inverted U-shaped card 8, and a group of square woods 17 are supported at the bottom of the U-shaped card 11 at the upper part of the door opening 1-1. Each group of square woods 17 consists of two and are arranged in parallel up and down, with a gap left between the two square woods 17;
[0053] (2) Support the waist beam template. The waist beam template adopts a wooden template 13, which is a multi-layer board. It is supported on both sides of the inverted U-shaped card 8 and the U-shaped card 11. The wooden templates 13 on both sides are connected to the inverted U-shaped card 8 and the square wood 17 by self-tapping screws 14. The upper ends of the wooden templates 13 on both sides are fixed by beam clamps 12 ( Figure 4 shown);
[0054] S5. Tie up the waist beam reinforcement
[0055] One end of the waist beam steel bar 16 is connected to the implanted steel bar of the shear wall 1, and the other end is connected to the connecting steel bar 19 welded on the C-shaped clamp 18 ( Figure 6 shown);
[0056] S6. Installation of suspension rods
[0057] A metal expansion head 9 is installed on the bottom surface of the horizontal structural beam plate 2-1 above the ALC plate 3. The metal expansion head 9 is adjacent to the vertical structural beam plate 2 on one side of the vertical C-shaped clamp 18. The upper end of the hanging rod 10 is connected to the metal expansion head 9, and the lower end of the hanging rod 10 is connected to the waist beam steel bar 16. The hanging rod 10 is close to the ALC plate 3 and buried in the masonry mortar 15 of the autoclaved aerated concrete block 4. The hanging rod 10 makes the waist beam 6 more stable ( Figure 8 shown);
[0058] S7, waist beam concrete pouring
[0059] Concrete pouring of waist beam, removal of wooden formwork 13 ( Figure 3 , Figure 5 shown);
[0060] S8, according to the arrangement diagram of the autoclaved aerated concrete blocks 4, the tie bars 20 of each layer are connected to the embedded bars and the connecting steel bars 19 respectively, the tie bars 20 are located in the mortar joints, and the reserved openings are constructed using precast concrete lintels 7;
[0061] S9, inclined masonry or filling seams, hanging mesh
[0062] After the autoclaved aerated concrete blocks 4 are laid, lime sand bricks 5 are laid obliquely or filled on the top of the autoclaved aerated concrete blocks 4, wire meshes are hung at construction gaps between the masonry wall and ALC board 3, ALC board 3 and main structure, masonry wall and main structure, and glass fiber mesh is hung on the plaster layer to increase crack resistance.
[0063] The method of the present invention combines the advantages of ALC board and autoclaved aerated concrete blocks, adopts ALC board for construction in the parts without openings or through-wall pipelines, optimizes the use of autoclaved aerated concrete blocks in advance for construction in the parts with reserved openings and dense through-wall pipelines, and uses reinforced concrete waist beams to separate ALC board and blocks. The present invention can ensure both construction quality and construction efficiency and economy.
[0064] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent structural changes made using the contents of the present invention description and drawings are included in the scope of rights of the present invention.
Claims
1. A construction method for combining ALC panels with concrete blocks, comprising the following steps: S1. ALC sheet installation ALC panels are installed in the middle and lower part of the wall to be filled and temporarily fixed; S2, rebar planting, C-type clip and inverted U-type clip installation Rebars are planted at the waist beam and tie bars of the main structure above the ALC plate, C-shaped clips corresponding to the planted bars are set on the inner side of the vertical structural beam plate above the ALC plate, and an inverted U-shaped clip is installed at the upper end of the ALC plate; S3, C-type clamp and tie bar connection The inner side of the C-type clamp is welded with connecting steel bars, and the two ends of the tie bars are connected to the embedded bars and connecting steel bars respectively; S4, U-shaped card and waist beam template installation (1) Install the U-shaped card on the inverted U-shaped card, and support the bottom of the U-shaped card above the door opening with square wood; (2) Support the waist beam template, and install the waist beam template on both sides of the U-shaped card and the inverted U-shaped card; S5. Tie up the waist beam reinforcement One end of the waist beam reinforcement is connected to the embedded reinforcement of the main structure, and the other end is connected to the connecting reinforcement welded on the C-type clamp; S6. Installation of suspension rods Hanging bars are set on the bottom surface of the horizontal structural beam plate above the ALC plate, and the hanging bars are close to the vertical structural beam plate on one side of the C-type clamp, and the hanging bars are connected to the waist beam steel bars; S7, waist beam concrete pouring Concrete pouring of waist beam, removal of waist beam formwork; S8, autoclaved aerated concrete block masonry construction, reserved openings are constructed using prefabricated lintels; S9, inclined masonry or filling seams, hanging mesh After the masonry is completed, the top of the autoclaved aerated concrete blocks are beveled or caulked, and the wall surface is meshed and plastered.
2. The construction method of combining the ALC board with the concrete block according to claim 1, Features: The two side plates of the inverted U-shaped card are respectively connected to the ALC plate by bolts.
3. The construction method of combining the ALC board and the concrete block according to claim 1, Features: The waist beam template is connected to the inverted U-shaped clamp by bolts.
4. The construction method of combining the ALC board and the concrete block according to claim 1, Features: The upper ends of the waist beam templates on both sides are fixed by beam clamps.
5. The construction method of combining the ALC board and the concrete block according to claim 1, Features: The connecting steel bars are arranged vertically.
6. The construction method of combining ALC board and concrete block according to claim 1, Features: The hanger rod is connected with the horizontal structural beam plate through a metal expansion joint.