A method for transferring mining-induced stress by weakening the overburden depth in remote field of small coal pillar mining
By combining the composite technology of hydraulic fracturing and deep hole blasting in small coal pillar mining, the structural characteristics of the overlying rock are identified and dynamic construction is implemented to form a high-density fracture network, which solves the problem of poor mining stress transfer and significantly improves The stress transfer effect provides a more efficient guarantee of surrounding rock stability for small coal pillar mining.
Patent Information
- Application Number
- CN202211643012.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-20
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-12-20
AI Technical Summary
Existing hydraulic fracturing and deep hole blasting technologies have poor effect on the stress transfer of the overlying rock roof in the far field of small coal pillar mining, and cannot meet the needs of small coal pillar mining of extra-thick coal seams. There is an urgent need for more efficient, safe and economical weakening method.
The "hydraulic fracturing-deep hole blasting" composite depth weakening method of the overlying rock in the far-field mining of small coal pillars is adopted. By identifying the geometric structural characteristics of the "stress arch" and "fracture arch" in the overlying rock, combined with three-dimensional numerical simulation and dynamic construction, the implementation The spatially staggered hydraulic fracturing and deep hole blasting form a high-density fracture network to block the transmission path of mining stress.
It significantly enhances the weakening degree of the overlying rock roof and the mining stress transfer effect, forming a "dendritic" crack network, quickly and efficiently blocking the mining stress transmission path, and improving the stability of the surrounding rock along the gob roadway.
Smart Images

Figure CN116537783B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of surrounding rock control of coal mine tunnels, in particular to a method for transferring mining stress during deep weakening of overburden in remote field during small coal pillar mining along goaf excavation. Background Art
[0002] Most of the traditional working face layouts in coal mines use 20-40m large coal pillars to protect the roadway, which leads to a huge waste of coal resources. The use of small coal pillar mining technology can greatly improve the recovery rate of coal resources and is one of the important ways to achieve "fine mining and fine mining". However, unlike conventional working face mining, small coal pillar mining will be affected by "double force sources (type I force source + type II force source)" during mining, among which: type I force source is the rotational movement extrusion force of the key block of the large structure of the overburden lateral cantilever of the upper section working face and the overburden pressure transmitted from the upper "fracture arch", which directly acts on the side wall and roof of the small coal pillar along the goaf; type II force source is the superposition of the overburden inclination "stress arch" of the overburden inclination of the upper section working face and the overburden strike "stress arch" of the working face, which acts on the solid coal wall of the goaf. A large number of engineering practices have proved that the "Type I + Type II" strong force source caused by the remote overburden structure movement of this small coal pillar mining transmits ultra-high stress to the surrounding rock near the surface of the goaf-side tunnel through the intermediate rock layer, resulting in inevitable destruction of the surrounding rock and severe pressure. In order to ensure the normal use of goaf-side tunnels during the mining of this working face, how to regulate and transfer the strong mining force source of the surrounding rock of the goaf-side tunnels is a key issue.
[0003] At present, the use of artificial weakening of the hard roof of the overlying rock, such as hydraulic fracturing (such as Chinese patents CN202210801587.0, CN202010573165.3, CN201610522316.6, etc.) or deep hole blasting (such as Chinese patents CN201210230376.2, CN202210704185.9) in mining projects is one of the effective technical ways to block the mining stress path and mining stress transfer. However, relevant studies have shown that although hydraulic fracturing technology can form a simple fracture system with a large extension length in the hard roof of the overburden, it cannot form a high-density fracture network, and the fractures are easy to close again after fracturing, so the effect in blocking the stress transfer path and transferring mining stress is general; while deep hole blasting technology can produce a dense fracture network in the hard roof, the fractures are loose and will not close again, but the blasting fracture area is small, and dense blasting holes need to be arranged to achieve the ideal mining stress transfer effect. Obviously, the two existing conventional weakening technical means still have a lot of room for improvement in the mining stress transfer effect of the overburden roof of the mining field, and cannot meet the needs of "double force source" regulation of the overburden in the small coal pillar mining of the extra-thick coal seam and the small coal pillar mining along the goaf. It is urgent to invent a more efficient, safe and economical weakening method to achieve the purpose of quickly and efficiently blocking the mining stress transfer path and improving the stress transfer effect. Summary of the invention
[0004] The purpose of the present invention is to provide a composite deep weakening method of "hydraulic fracturing-deep hole blasting" for remote overburden in small coal pillar mining, which fully integrates the advantages of hydraulic fracturing and deep hole blasting weakening technology of existing working face overburden hard roof, can significantly increase the density and range of cracks in the overburden roof, effectively destroy the integrity and stress transfer properties of the overburden hard roof, and enhance the degree of roof weakening and the mining stress transfer effect.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] The method for transferring mining stress by weakening the overburden depth in the far field of small coal pillar mining includes the following steps:
[0007] S1. Identify the geometric structural characteristic parameters of the overburden "stress arch" and "fracture arch" of the working face and the position of the key layer within the "stress arch";
[0008] S2. Determine the location of the goaf-side tunneling and arrange the goaf-side tunneling as a whole in the "fracture arch". The size of the small coal pillar is selected according to the minimum requirements of meeting the water, fire and gas safety issues in the goaf area and the stability and anchoring reliability of the tunnel coal pillar. The sum of the coal pillar size (W) and the tunnel section width (B) should not exceed the distance D2 from the arch foot of the "fracture arch" to the coal wall, that is, W+B≤D2;
[0009] S3. After the tunnel is driven through, three-dimensional staggered hydraulic fracturing drilling holes and deep hole blasting drilling holes are dynamically arranged in the overburden in the tunnel within the range of the "stress arch" and "fracture arch" above the roof;
[0010] S4. The composite deep weakening construction of "hydraulic fracturing-deep hole blasting" in the key layer within the range of "stress arch" and "fracture arch" of the far-field overburden along the goaf roadway shall be implemented in two stages. The construction shall be completed before the working face is no less than 150m away from the construction borehole;
[0011] S5. Carry out real-time monitoring of the stress transfer effect of surrounding rock mining along the goaf, and dynamically adjust the construction parameters of the "hydraulic fracturing-deep hole blasting" composite deep weakening according to the monitoring results.
[0012] As a further solution of the present invention: S1 comprises the following steps:
[0013] S101, three-dimensional refined numerical simulation: Based on the basic engineering information data of the working face, the discrete element software 3DEC is used to establish a three-dimensional refined numerical model of the working face mining; the block unit size of the numerical model does not exceed 0.5m, and the initial mechanical parameters of the block and the joint mechanical parameters are selected according to the laboratory test results; after the numerical model is calculated and balanced, the periodic collapse step distance S of the working face roof is extracted m , and compare this value with the periodic collapse step distance S0 measured on site; if 0.9S0 m <1.1S0, indicating that the numerical simulation results can be well consistent with the field measurement results; if S m >1.1S0, reduce the model block and joint mechanical parameters and recalculate; if S m <0.8S0, improve the model block and joint mechanical parameters and recalculate; until the numerical simulation of the top plate periodic collapse step S m Meet 0.9S0 m <1.1S0;
[0014] S102. Identify the spatial geometric structure of "stress arch" and "fracture arch": according to the results of three-dimensional numerical simulation, a series of horizontal survey lines are evenly set in the model, and the spacing and row spacing of the horizontal survey lines are not more than 1m; extract the vertical stress and joint surface relative displacement data on each horizontal survey line, determine the vertical stress peak position and the joint surface relative zero displacement point according to the numerical value, connect the vertical stress peak positions on all survey lines to obtain the geometric structure of "stress arch", and connect the joint surface relative zero displacement points on all survey lines to obtain the geometric structure of "fracture arch"; based on this, calculate the distance D1, D2 between the arch foot and the coal wall and the arch height H1, H2;
[0015] S103. Determine the key strata within the height range (H1) of the "stress arch": Based on the borehole data of the coal and rock strata in the working face, use the key stratum theory to determine and calculate the position of the overlying key strata within the height range of the "stress arch". From bottom to top, they are K1, K2... K n .
[0016] As a further solution of the present invention: In the step S101, the basic engineering information data based on the working face includes the coal and rock stratum structure, the strength mechanical properties of coal and rock samples, and the in-situ stress environment.
[0017] As a further solution of the present invention: The S3 includes the following steps:
[0018] S301. Drill holes in a timely and dynamic manner in stages: From the open-off cut of the working face to the end of the stoping line, divide the gob-side entry driving into n continuous sections, and the length L of each section satisfies 150m ≤ L ≤ 300m; during the coal mining process of the working face, drill holes in the roof of the roadway section by section. Among them: The roadway drilling in the first section should be completed within 15 - 30 days before the formal coal mining of the working face; The roadway drilling in the i-th section (2 < i < n) should be completed when the working face is not less than 150m away from the end position of the (i - 1)-th section of the roadway;
[0019] S302. Drill the hydraulic fracturing hole ZK1 on the roof of the small coal pillar side: The opening position of the hole is on the roof of the roadway, less than 0.3m away from the side of the small coal pillar; The end position of the hole is at the top of the uppermost key stratum K within the "fracture arch"; The included angle β1 between the hole and the roadway axis is taken as β1 = 70 - 90°, and the hole elevation angle α1 = atan(H2 / (S2 + W)), where S2 is the half-width of the upper section working face; The hole row spacing P1 is taken as 7m - 15m; i The hole row spacing P1 is taken as 7m - 15m;
[0020] S303. Drill the hydraulic fracturing hole ZK2 on the roof of the solid coal side: The opening position of the hole is on the roof of the roadway, less than 0.3m away from the side of the solid coal; The end position of the hole is at the top of the uppermost key stratum K within the "stress arch"; The included angle between the hole and the roadway axis is β2, β2 = 20 - 40°, the hole elevation angle is α2 = α1, and the hole row spacing P2 = P1; The hole ZK2 and ZK1 are arranged staggeredly, that is, the row spacing between ZK2 and ZK1 is P1 / 2; n The hole ZK2 and ZK1 are arranged staggeredly, that is, the row spacing between ZK2 and ZK1 is P1 / 2;
[0021] S304. Drill the deep hole blasting hole ZK3 on the roof: The opening position of the hole is at the center line of the roof of the roadway, and the end position of the hole is at the top of the uppermost key stratum K within the "stress arch"; The hole is arranged perpendicular to the roof of the roadway, and the hole ZK3 is evenly arranged between ZK1 and ZK2, and the row spacing is taken as P1 / 8 - P1 / 4; n The hole is arranged perpendicular to the roof of the roadway, and the hole ZK3 is evenly arranged between ZK1 and ZK2, and the row spacing is taken as P1 / 8 - P1 / 4;
[0022] S305. The construction bit diameter of the hydraulic fracturing borehole and deep-hole blasting borehole is 56 mm, and the drill pipe diameter is 42 mm.
[0023] As a further solution of the present invention: The S4 includes the following steps:
[0024] S401. In the first stage, the hydraulic fracturing construction is carried out synchronously for the roof borehole ZK1 on the small coal pillar side and the roof borehole ZK2 on the solid coal side;
[0025] S402. When 2 to 4 groups of boreholes are subjected to hydraulic fracturing, the second-stage roof deep-hole blasting weakening construction is immediately carried out on the roadway area where the hydraulic fracturing has been implemented.
[0026] As a further solution of the present invention: The S401 includes the following steps:
[0027] S40101. Determine that the total thicknesses of the key strata within the "fracture arch" and "stress arch" are h i = h k1 + h k2 +…h ki and h n = h k1 + h k2 +…h kn , calculate that the single-hole hydraulic fracturing times of the boreholes ZK1 and ZK2 are m = h i / 3 and n = h n / 3 respectively, and fracture once every 3 m;
[0028] S40102. The hydraulic fracturing is carried out in a group-by-group, section-by-section, and double-hole synchronous manner, that is, starting from the cutting eye of the working face, the hydraulic fracturing is carried out successively in groups outward, the hydraulic fracturing is carried out section by section from the bottom of the hole to the hole mouth in each group of boreholes, and the borehole ZK1 on the small coal pillar side and the borehole ZK2 on the solid coal side are fractured simultaneously; during synchronous fracturing, the fluid output from the main high-pressure pipeline of the construction pump is divided into two by a diverter, and the two output branches are respectively used for the hydraulic fracturing of the borehole ZK1 on the small coal pillar side and the borehole ZK2 on the solid coal side. An independent electromagnetic flow sensor, pressure transmitter, and solenoid valve are respectively arranged on each branch; during the fracturing process, when water comes out from adjacent boreholes, it indicates that through fractures have been formed between the boreholes, and the solenoid valve is used to control the stop of fracturing of this branch; after the fracturing of the other branch is also completed, the fracturing position is transferred to the next layer in the boreholes ZK1 and ZK2 for fracturing, and the above steps are repeated until all the set fracturing layers of the boreholes are completed; the borehole ZK1 is fractured m times in total, and the borehole ZK2 is fractured n times in total. When m ≠ n (assuming m < n), first carry out m times of synchronous fracturing of the boreholes ZK1 and ZK2, and then carry out n - m times of fracturing of the borehole ZK2 alone;
[0029] S40103. Double sealers are used in each borehole during fracturing, and the length of the fracturing section and the sealing length shall not exceed 1m;
[0030] S40104. In order to prevent the cracks from closing again after fracturing and affecting the stress blocking effect of mining, a "water-ultrafine sand" mixture is used as the fracturing fluid during hydraulic fracturing. The ultrafine sand is quartz sand with a particle size of no more than 100μm; the volume ratio of water to ultrafine sand is 5:1 to 10:1;
[0031] As a further solution of the present invention: S402 includes the following steps:
[0032] S40201. Determine the blasting layer according to the key layer position in the "stress arch" and install detonators continuously at each blasting layer, the number of which is k = h n / l b , l b The length of the detonator tube, in which mining emulsion explosives are placed, can be replaced by CO2 blasting tubes in high-gas mines;
[0033] S40202. The detonators installed in each blasting hole are connected in series through a blasting busbar. After all the detonators are installed, high-water-density material is used to fill and seal the blasting hole;
[0034] S40203. Detonating pipes are installed in 3 to 5 groups of blasting holes in the tunnel area where hydraulic fracturing has been carried out. Each group of blasting holes is connected in parallel outside the holes and finally detonated simultaneously.
[0035] As a further solution of the present invention: S5 comprises the following steps:
[0036] S501. Boring stress gauges are arranged on the solid coal side, small coal pillar side and roadway roof of goaf-side tunnel respectively, and the mining stress change curve in the surrounding rock of goaf-side tunnel after composite deep weakening by "hydraulic fracturing-deep hole blasting" is obtained by real-time dynamic monitoring;
[0037] S502. Compare the monitoring results with the monitoring data of the tunnels that have not implemented the "hydraulic fracturing-deep hole blasting" composite deep weakening transformation; if the reduction in mining stress after deep weakening of the roof is less than 20%, it indicates that the degree of roof weakening is poor and the mining stress transfer effect is not significant. In subsequent construction, the spacing of hydraulic fracturing drilling holes and deep hole blasting drilling holes needs to be reduced to 50% to 80% of the original; otherwise, continue to use the original construction technical parameters.
[0038] Compared with the prior art, the present invention has the following beneficial effects:
[0039] (1) By identifying the spatial geometric structural characteristic parameters of the overburden "stress arch" and "fracture arch" of the working face and the position of the key layers within their influence range, the problem of difficult selection and determination of the construction layer and drilling parameters of the "hydraulic fracturing-deep hole blasting" composite deep weakening was solved.
[0040] (2) Through the combined deep weakening construction of "hydraulic fracturing-deep hole blasting", the main cracks formed by hydraulic fracturing and the dense branch crack network formed by deep hole blasting are connected and interconnected. That is, the mutual superposition effect of the two crack networks forms a new type of "branch-like" crack network, which accelerates the fracture and collapse of the hard roof, quickly and efficiently blocks the stress transfer path caused by mining, significantly improves the stress transfer effect, and provides a good "stress environment" for the stability of the surrounding rock of the gob tunnel.
[0041] (3) By using a "water-ultrafine sand" mixture as the fracturing fluid, due to the supporting effect of the sand particles, the cracks in the roof rock mass remain open for a long time after hydraulic fracturing, thereby enhancing the weakening effect of the roof rock mass.
[0042] (4) Through the timely and dynamic construction of drilling holes in stages, real-time monitoring of the mining stress transfer effect, and dynamic adjustment of the technical parameters of the "hydraulic fracturing-deep hole blasting" composite deep weakening construction, the problem of premature construction being detrimental to the stability of the tunnel can be avoided on the one hand, and the roof weakening effect can be effectively guaranteed on the other hand.
[0043] (5) By adopting the dual-hole synchronous hydraulic fracturing method, on the one hand, the hydraulic fracturing construction efficiency is improved, and on the other hand, it promotes the rapid formation of penetrating main cracks between the boreholes.
[0044] The invention provides a new method for remote overburden weakening and mining stress transfer in small coal pillar mining. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 These are the geometric structural features of the "stress arch" and "fracture arch" of the overburden rock at the working face.
[0046] Figure 2 This is the cross-sectional arrangement diagram of drilling holes for the composite deep weakening construction of “hydraulic fracturing-deep hole blasting”.
[0047] Figure 3 This is the plan layout of drilling holes for the composite deep weakening construction of "hydraulic fracturing-deep hole blasting".
[0048] Figure 4 Schematic diagram of dual-hole synchronous hydraulic fracturing.
[0049] Notes on the accompanying drawings: 1-stress arch, 2-fracture arch, 3-vertical stress peak point, 4-relative zero displacement point of the joint surface, 5-road driving along the goaf, 6-key overburden layer, 7-solid coal on the working face, 8-hydraulic fracturing drilling hole on the roof of the small coal pillar side, 9-hydraulic fracturing drilling hole on the roof of the solid coal side, 10-deep hole blasting drilling hole on the roof, 11-construction pump, 12-diverter, 13-electromagnetic flow sensor, 14-pressure transmitter, 15-solenoid valve, 16-main high-pressure pipeline, 17-branch. DETAILED DESCRIPTION
[0050] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.
[0051] As an embodiment of the present invention, please refer to Figures 1 to 3 The method for transferring mining stress by weakening the overburden depth in the far field of small coal pillar mining includes the following steps:
[0052] (1) Analyze the geometric structural characteristic parameters of the overburden "stress arch" and "fracture arch" in the working face of a particularly thick coal seam in a certain mine, as well as the position of the key layers within the "stress arch".
[0053] (1-1) Based on the basic engineering information data such as the coal rock stratigraphic structure, strength mechanical properties of coal rock samples, and ground stress environment of a very thick coal seam working face in a certain mine, a three-dimensional refined numerical model of the mining of the very thick coal seam working face was established using the discrete element software 3DEC. The model size is 270m×300m×200m, the block unit size of the numerical model is 0.5m, and the initial mechanical parameters of the block and the mechanical parameters of the joint are selected according to the laboratory test results. By adjusting the model parameters, the periodic collapse step distance S obtained by numerical simulation is m Meet 0.9S0 m <1.1S0, S0 is the periodic collapse step distance measured on site, S0=25m.
[0054] (1-2) According to the results of three-dimensional numerical simulation, a series of horizontal survey lines are evenly set in the model, and the spacing between the horizontal survey lines and the row spacing is 0.5m; the vertical stress peak point position and the relative zero displacement point position of the joint surface on each horizontal survey line are extracted, and the vertical stress peak point positions on all survey lines are connected to obtain the "stress arch", and the relative zero displacement point positions of all joint surfaces are connected to obtain the "fault arch". The heights of the overburden "stress arch" and "fault arch" of the working face are calculated to be H1=120m and H2=80m, respectively, and the distances between the arch foot and the coal wall are D1=15m and D2=12m, respectively.
[0055] (1-3) According to the drilling data of coal and rock strata at the working face, the key layer theory was used to calculate that there are four key layers (K1, K2, K3 and K4) within the height range of the roof "stress arch" (H1≤120m), with thicknesses of 12m, 9m, 9m and 14m respectively; there are three key layers of overburden (K1, K2 and K3) within the height range of the "fault arch" (H2≤80m), with thicknesses of 12m, 9m and 9m respectively.
[0056] (2) In order to meet the minimum requirements of water, fire, gas and other safety issues in the goaf and the stability and anchoring reliability of the coal pillar in the tunnel, the size of the small coal pillar W = 8m and the cross-sectional width of the tunnel B = 4m are selected. At this time, W + B ≤ D2, that is, the goaf-side tunneling is arranged as a whole in the "fracture arch".
[0057] (3) The total length of the tunnel excavation from the start of the working face cutting to the end of the stop line is 900m. After the tunnel is excavated, the overburden in the tunnel is dynamically constructed and arranged in a three-dimensional staggered manner in the hydraulic fracturing drilling and deep hole blasting drilling within the "stress arch" and "fracture arch" above the roof.
[0058] (3-1) The tunneling along the goaf is divided into three continuous sections, each with a length of L = 300m. During the mining process of the working face, starting from the first section, the tunnel roof holes are drilled section by section. The drilling of the first section of the tunnel is completed within 20 days before the formal mining of the working face. The drilling of the second and third sections of the tunnels is completed when the working face is 150m away from the end position of the first and second sections of the tunnels, respectively.
[0059] (3-2) A hydraulic fracturing drill hole (ZK1) is constructed on the side roof of the small coal pillar at a distance of 0.3 m from the side of the small coal pillar. The final position of the drill hole is located at the top of the K3 key layer. The angle between the drill hole and the axis of the roadway is β1 = 80°, the elevation angle of the drill hole is α1 = 52°, and the spacing between the drill holes is P1 = 10 m.
[0060] (3-3) A hydraulic fracturing borehole (ZK2) is constructed on the top of the solid coal side 0.3m away from the solid coal side. The final borehole position is located at the top of the K4 key layer; the angle between the borehole and the tunnel axis is β2 = 30°, the borehole elevation angle is α2 = α1, and the borehole spacing is P2 = P1; the boreholes ZK2 and ZK1 are staggered, and the spacing between ZK2 and ZK1 is P1 / 2.
[0061] (3-4) A deep hole blasting drilling (ZK3) is constructed at the center line of the tunnel roof, and the final hole position is located at the top of the K4 key layer; the drilling holes are arranged perpendicular to the tunnel roof. The drilling holes ZK3 are evenly arranged between ZK1 and ZK2, with a row spacing of P1 / 5.
[0062] (3-5) The construction drill bit diameter for hydraulic fracturing drilling and deep hole blasting drilling is 56mm and the drill rod diameter is 42mm.
[0063] (4) Carry out the composite deep weakening construction of the key layer within the range of the "stress arch" and "fracture arch" of the overburden in the far field of the goaf-side tunneling by "hydraulic fracturing-deep hole blasting". The construction is divided into two stages and is completed before the working face is 150m away from the construction borehole.
[0064] (4-1) First, hydraulic fracturing of the small coal pillar side roof drilling hole ZK1 and the solid coal side roof drilling hole ZK2 is carried out simultaneously. Hydraulic fracturing is carried out in groups from the cut-out of the working face outwards, and hydraulic fracturing is carried out section by section from the bottom of each group of drilling holes to the hole mouth. The small coal pillar side drilling hole ZK1 and the solid coal side drilling hole ZK2 are hydraulically fractured simultaneously. During synchronous fracturing, the flow divider 12 is used to divide the output fluid of the main high-pressure pipeline of the construction pump 11 into two, and the two output branches are used for hydraulic fracturing of the small coal pillar side drilling hole ZK1 and the solid coal side drilling hole ZK2 respectively. Each branch is provided with an independent electromagnetic flow sensor 14, a pressure transmitter 14 and an electromagnetic valve 15. During the fracturing process, when water comes out of adjacent boreholes, it indicates that a through crack has been formed between the boreholes, and the electromagnetic valve 15 is used to control the branch to stop fracturing. After the fracturing of the other branch is also completed, the fracturing position is transferred to the next layer in the ZK1 and ZK2 boreholes for fracturing, and the above steps are repeated until all the fracturing layers set in the boreholes are completed. Fracturing is performed once every 3m in the borehole, and the cumulative fracturing of the borehole ZK1 is m=10 times, and the cumulative fracturing of the borehole ZK2 is n=14 times. After the synchronous fracturing of ZK1 and ZK2 is performed 10 times, the borehole ZK2 is fractured 4 times separately. Double sealers are used in each borehole for fracturing, and the length of the fracturing section and the sealing length are both 1m. In order to prevent the cracks from closing again after fracturing and affecting the mining stress blocking effect, a "water-ultrafine sand" mixture is used as the fracturing fluid during the hydraulic fracturing process. The ultrafine sand is quartz sand with a particle size of 100μm, and the volume ratio of water to ultrafine sand is 5:1.
[0065] (4-2) After two groups of drilling holes have been drilled for hydraulic fracturing, the second stage of deep hole blasting weakening construction of the roof is immediately carried out in the tunnel area where hydraulic fracturing has been implemented. 20 detonators are installed in succession in each blasting hole, and mining emulsion explosives are placed in the detonators. The detonators are connected in series through the blasting busbar. After all the detonators are installed, high-water material grouting is used to fill and seal the blasting holes. Detonators are installed in each of the five groups of blasting holes in the tunnel area where hydraulic fracturing has been implemented. Each group of blasting holes is connected in parallel outside the hole, and finally detonated simultaneously.
[0066] (5) Borehole stress gauges are arranged on the solid coal side, small coal pillar side and roadway roof of the gob-side tunnel, with an installation depth of 5m. Real-time dynamic monitoring is used to obtain the mining stress change curve in the surrounding rock of the gob-side tunnel after the composite deep weakening of "hydraulic fracturing-deep hole blasting". The monitoring results are compared with the monitoring data of the adjacent working face of the roadway where the composite deep weakening transformation of "hydraulic fracturing-deep hole blasting" has not been implemented; if the mining stress reduction after the deep weakening of the roof is less than 20%, it indicates that the weakening degree of the roof is poor and the mining stress transfer effect is not significant. In the subsequent construction, the spacing of hydraulic fracturing boreholes and deep hole blasting boreholes needs to be reduced to 50% to 80% of the original; otherwise, the original construction technical parameters will continue to be used.
[0067] In summary: The present invention provides a new method for the weakening of overburden in the far field of small coal pillar mining and the transfer of mining stress. By identifying and ascertaining the spatial geometric structural characteristic parameters of the overburden "stress arch" and "fracture arch" of the working face and the key layer position within the influence range, the problem of difficulty in selecting and determining the construction layer and drilling parameters of the "hydraulic fracturing-deep hole blasting" composite deep weakening construction is solved. Through the "hydraulic fracturing-deep hole blasting" composite deep weakening construction, the main cracks formed by hydraulic fracturing and the dense branch crack network formed by deep hole blasting are interconnected and connected, that is, the mutual superposition effect of the two crack networks forms a new type of "branch-like" crack network, which accelerates the fracture and collapse of the hard roof, quickly and efficiently blocks the mining stress transfer path, significantly improves the stress transfer effect, and provides a good "stress environment" for the stability of the surrounding rock along the goaf. By using a "water-ultrafine sand" mixture as a fracturing fluid, due to the supporting effect of the sand particles, the cracks in the roof rock mass remain open for a long time after the hydraulic fracturing is completed, which enhances the weakening effect of the roof rock mass. Through the timely and dynamic construction of drilling holes in stages, real-time monitoring of the mining stress transfer effect, and dynamic adjustment of the technical parameters of the "hydraulic fracturing-deep hole blasting" composite deep weakening construction, we can avoid the problem of early construction being detrimental to the stability of the tunnel, and on the other hand, we can effectively ensure the weakening effect of the roof. By adopting the dual-hole synchronous hydraulic fracturing method, on the one hand, the efficiency of hydraulic fracturing construction is improved, and on the other hand, it promotes the rapid formation of through-trunk cracks between the boreholes.
[0068] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0069] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. The method of transferring mining stress by weakening the overburden depth in the far field of small coal pillar mining. It is characterized in that The following steps are involved: S1. Identify the geometric structural characteristic parameters of the overburden "stress arch" and "fracture arch" of the working face and the position of the key layer within the "stress arch"; S2. Determine the location of the goaf-side tunneling and arrange the goaf-side tunneling as a whole in the "fracture arch". The size of the small coal pillar is selected according to the minimum requirements of meeting the water, fire and gas safety issues in the goaf area and the stability and anchoring reliability of the tunnel coal pillar. The size of the coal pillar is W Width of tunnel section B The sum should not exceed the distance from the arch foot of the "fracture arch" to the coal wall D 2 ,Right now W + B ≤ D 2 ; S3. After the tunnel is driven through, three-dimensional staggered hydraulic fracturing drilling holes and deep hole blasting drilling holes are dynamically arranged in the overburden in the tunnel within the range of the "stress arch" and "fracture arch" above the roof; S4. The composite deep weakening construction of "hydraulic fracturing-deep hole blasting" in the key layer within the range of "stress arch" and "fracture arch" of the far-field overburden along the goaf roadway shall be implemented in two stages. The construction shall be completed before the working face is no less than 150m away from the construction borehole; S5. Real-time monitoring of the stress transfer effect of surrounding rock mining in gob-side tunneling, and dynamic adjustment of the "hydraulic fracturing-deep hole blasting" composite deep weakening construction parameters according to the monitoring results; The S1 comprises the following steps: S101, three-dimensional refined numerical simulation: Based on the basic engineering information data of the working face, the discrete element software 3DEC is used to establish a three-dimensional refined numerical model of the working face mining; the block unit size of the numerical model does not exceed 0.5m, and the initial mechanical parameters of the block and the joint mechanical parameters are selected according to the laboratory test results; after the numerical model is calculated and balanced, the periodic collapse step distance of the working face roof is extracted S m , and compare this value with the periodic collapse step distance measured on site S 0 For comparison; if 0.9 S 0 < S m <1.1 S 0 , indicating that the numerical simulation results can be well consistent with the field measurement results; if S m >1.1 S 0 , reduce the model block and joint mechanical parameters and recalculate; if S m <0.8 S 0 , improve the model block and joint mechanical parameters and recalculate; until the numerical simulation of the roof periodic collapse step S m Satisfy 0.9 S 0 < S m <1.1 S 0 ; S102. Identify the spatial geometric structure of "stress arch" and "fracture arch": According to the results of three-dimensional numerical simulation, a series of horizontal survey lines are evenly set in the model, and the spacing and row spacing of the horizontal survey lines are not more than 1m; extract the vertical stress and joint surface relative displacement data on each horizontal survey line, determine the vertical stress peak position and the joint surface relative zero displacement point according to the numerical value, connect the vertical stress peak positions on all survey lines to obtain the geometric structure of "stress arch", and connect the joint surface relative zero displacement points on all survey lines to obtain the geometric structure of "fracture arch"; based on this, calculate the distance between the arch foot of "stress arch" and "fracture arch" and the coal wall D 1 , D 2 and arch height H 1 , H 2 ; S103. Determine the key layer positions within the height range of the "stress arch": Based on the drilling data of the coal and rock formations at the working face, use the key layer theory to determine and calculate the positions of the key layers of the overburden within the height range of the "stress arch", from bottom to top, K 1 , K 2 …K n .
2. According to the method for transferring mining stress by weakening the overburden depth in remote field of small coal pillar mining in claim 1, It is characterized in that In the step S101, the basic engineering information data based on the working face includes coal rock stratum structure, strength mechanical properties of coal rock samples, and ground stress environment.
3. The method for transferring mining stress by weakening the overburden depth in remote field of small coal pillar mining according to claim 1, It is characterized in that The S3 comprises the following steps: S301, dynamic construction drilling in stages: from the beginning of the cutting of the working face to the end of the stop mining line, the goaf-side tunneling is divided into n consecutive segments, each segment length L Meet 150m≤ L ≤300m; During the mining process of the working face, the tunnel roof drilling construction is carried out section by section, among which: the first section of tunnel drilling should be completed within 15~30 days before the formal mining of the working face; i Section (2< i < n ) The tunnel drilling construction should be carried out at a distance of 10 meters from the working surface. i -1 section of tunnel is completed when the end position is not less than 150m; S302, construction of hydraulic fracturing drilling hole ZK1 on the side roof of small coal pillar: the drilling hole opening position is located on the roadway roof, less than 0.3m away from the side of the small coal pillar; the final hole position is located in the topmost key layer K in the "fracture arch" i Top; Angle between the borehole and the tunnel axis β 1 Pick β 1 =70~90°, drilling elevation angle α 1 =atan( H 2 / ( S 2 + W )), S 2 The half width of the upper section working surface; the drilling spacing P 1 Take 7m~15m; S303, construction of hydraulic fracturing drilling hole ZK2 on the side roof of solid coal: the drilling hole opening position is located on the roadway roof, less than 0.3m away from the side wall of solid coal; the final hole position is located on the topmost key layer K in the "stress arch" n Top; the angle between the borehole and the tunnel axis is β 2 , β 2 =20~40°, drilling elevation angle is α 2 = α 1 , drilling spacing P 2 = P 1 ; The drilling holes ZK2 and ZK1 are arranged alternately, that is, the row spacing between ZK2 and ZK1 is P 1 / 2; S304, construction roof deep hole blasting drilling ZK3: the drilling opening position is located at the center line of the tunnel roof, and the final hole position is located at the top key layer K in the "stress arch" n Top; the holes are arranged perpendicular to the tunnel roof, and the holes ZK3 are evenly arranged between ZK1 and ZK2. P 1 / 8~ P 1 / 4; S305, hydraulic fracturing drilling and deep hole blasting drilling construction drill bit diameter 56mm, drill rod diameter 42mm.
4. The method for transferring mining stress by weakening the overburden depth in remote field of small coal pillar mining according to claim 1, It is characterized in that The S4 comprises the following steps: S401, in the first stage, hydraulic fracturing construction is carried out simultaneously with the small coal pillar side roof drilling hole ZK1 and the solid coal side roof drilling hole ZK2; S402. After 2 to 4 groups of drilling holes have been carried out for hydraulic fracturing, the second stage of roof deep hole blasting weakening construction shall be immediately carried out in the tunnel area where hydraulic fracturing has been carried out.
5. According to claim 4, the method for transferring mining stress by weakening the overburden depth in remote field of small coal pillar mining, It is characterized in that The S401 includes the following steps: S40101. Determine the total thickness of the key layers within the "fracture arch" and "stress arch" ranges. h i = h k1 + h k2 +… h ki and h n = h k1 + h k2 +… h kn , the single-hole hydraulic fracturing times of boreholes ZK1 and ZK2 are calculated as m = h i / 3 and n = h n / 3, fracturing once every 3m; S40102. Hydraulic fracturing is carried out in a group-by-segment-by-dual-hole synchronous manner, that is, hydraulic fracturing is carried out group by group from the cut-eye of the working face outwards, hydraulic fracturing is carried out segment by segment from the bottom of each group of boreholes to the orifice, and small coal pillar side borehole ZK1 and solid coal side borehole ZK2 are fractured simultaneously; during synchronous fracturing, the output fluid of the main high-pressure pipeline of the construction pump is divided into two by a diverter, and the two output branches are used for hydraulic fracturing of small coal pillar side borehole ZK1 and solid coal side borehole ZK2 respectively, and each branch is provided with an independent electromagnetic flow sensor, pressure transmitter and electromagnetic valve; during the fracturing process, when water comes out of adjacent boreholes, it indicates that a through crack has been formed between the boreholes, and the electromagnetic valve is used to control the branch to stop fracturing; after the fracturing of the other branch is completed, the fracturing position is transferred to the next layer in the ZK1 and ZK2 boreholes for fracturing, and the above steps are repeated until all the fracturing layers set in the boreholes are completed; cumulative fracturing of borehole ZK1 m times, cumulative fracturing of borehole ZK2 n times, when m ≠ n When the drilling holes ZK1 and ZK2 are firstly subjected to simultaneous fracturing m times, then the drilling hole ZK2 is subjected to n - m Secondary fracturing; S40103. Double sealers are used in each borehole during fracturing, and the length of the fracturing section and the sealing length shall not exceed 1m; S40104. In order to prevent the cracks from closing again after fracturing and affecting the stress-breaking effect of mining, a "water-ultrafine sand" mixture is used as the fracturing fluid during hydraulic fracturing. The ultrafine sand is quartz sand with a particle size not exceeding 100μm; the volume ratio of water to ultrafine sand is 5:1~10:
1.
6. The method for transferring mining stress by weakening the overburden depth in remote field of small coal pillar mining according to claim 4, It is characterized in that The S402 includes the following steps: S40201. Determine the blasting layer according to the key layer position in the "stress arch" and install detonators in succession at each blasting layer. k = h n / l b , l b is the length of the detonator tube, in which mining emulsion explosives are placed. In high-gas mines, CO 2 blasting tube replacement; S40202. The detonators installed in each blasting hole are connected in series through a blasting busbar. After all the detonators are installed, high-water-density material is used to fill and seal the blasting hole; S40203. Detonating pipes are installed in 3 to 5 groups of blasting holes in the tunnel area where hydraulic fracturing has been carried out. Each group of blasting holes is connected in parallel outside the holes and finally detonated simultaneously.
7. The method for transferring mining stress by weakening the overburden depth in remote field of small coal pillar mining according to claim 1, It is characterized in that The S5 comprises the following steps: S501. Boring stress gauges are arranged on the solid coal side, small coal pillar side and roadway roof of goaf-side tunnel respectively, and the mining stress change curve in the surrounding rock of goaf-side tunnel after the composite deep weakening of "hydraulic fracturing-deep hole blasting" is obtained by real-time dynamic monitoring; S502. Compare the monitoring results with the monitoring data of the tunnels that have not implemented the "hydraulic fracturing-deep hole blasting" composite deep weakening transformation; if the reduction in mining stress after deep weakening of the roof is less than 20%, it indicates that the degree of roof weakening is poor and the mining stress transfer effect is not significant. In subsequent construction, the spacing of hydraulic fracturing drilling holes and deep hole blasting drilling holes needs to be reduced to 50%~80% of the original; otherwise, continue to use the original construction technical parameters.