A pier column strengthening maintenance equipment
By designing pier columns to strengthen maintenance equipment, using water storage tanks, maintenance mechanisms, water supply mechanisms and clamping mechanisms, the problems of inconvenient maintenance operation and water flow marks on high pier columns are solved, and the rapid and convenient maintenance effect is achieved, and construction efficiency and practicality are improved.
Patent Information
- Application Number
- CN202310336695.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2025-05-13
- Estimated Expiration
- 2043-03-31
AI Technical Summary
The existing pier column maintenance methods are inconvenient to operate on high pier columns. If there is too much water, it is easy to cause water traces, affecting the appearance of pier columns, and requiring additional time to repair.
Design a pier column reinforced maintenance equipment, including water storage tank, maintenance mechanism, water supply mechanism and clamping mechanism. The maintenance mechanism is wound on the pier column through a plastic film, and water is poured into the cotton felt by a water-up mechanism. The clamping mechanism is used to fix the maintenance box, achieving rapid and convenient water-adding maintenance.
The rapid water-adding of the pier column is achieved, which avoids the occurrence of water flow traces and improves the maintenance efficiency. Through the design of water recycling and clamping mechanism, the operation is simplified and practicality is improved.
Smart Images

Figure CN116556196B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pier column maintenance, and in particular relates to a pier column strengthening maintenance device. Background Art
[0002] After the pier column concrete is poured, the reason why it can gradually solidify and harden is mainly due to the effect of cement hydration, and the hydration requires appropriate temperature and humidity conditions. Therefore, in order to ensure that the concrete has suitable hardening conditions and its strength continues to increase, the concrete must be cured. On the one hand, it can accelerate the hardening of the concrete, and on the other hand, it can prevent abnormal shrinkage, cracks and other damage caused by exposure to the sun, wind, cold and other conditions after the concrete is formed.
[0003] After the conventional piers are demoulded, they are wrapped with plastic films and watered on the top of the piers for maintenance. However, the piers are generally high, and watering maintenance is inconvenient. If too much water is used during maintenance, too many water flow marks will be left on the top of the piers, which will affect the appearance of the piers and require extra time for repair. Summary of the invention
[0004] In view of the defects and problems of the existing conventional pier column, after the pier column is demoulded, the pier column is wrapped with a plastic film and watered on the top of the pier column for maintenance. However, the pier column is generally high, and the watering maintenance operation is inconvenient. In addition, if there is too much water during maintenance, too many water flow marks will be caused on the top of the pier column, thereby affecting the appearance of the pier column. Extra time is required for repair. The present invention provides a pier column enhanced maintenance device.
[0005] The solution adopted by the present invention to solve its technical problems is: a pier column reinforcement maintenance device, including a water storage tank, and also including a maintenance mechanism, a water supply mechanism and a clamping mechanism. The water supply mechanism is fixedly installed on the maintenance mechanism through a support frame. The maintenance mechanism includes a maintenance box, and a plurality of water injection holes are evenly arranged on the top of the maintenance box. The water supply mechanism is connected to the water injection holes to drain water into the maintenance box. The maintenance box includes a base and a cover plate, and the cover plate is matched and fixed to the base by buckling. The interior of the maintenance box is matched and paved with cotton felt, and a plurality of exhaust holes are evenly arranged on the front and rear sides of the maintenance box. In a natural state, water is drained into the maintenance box through the water supply mechanism to moisten the cotton felt to achieve water replenishment maintenance of the pier column; fixed platforms are symmetrically arranged on the left and right sides of the maintenance box, and the clamping mechanism is symmetrically installed on the fixed platforms on the maintenance box.
[0006] As a preferred technical solution of the present invention, the water supply mechanism includes a water supply bucket, and the drainage pipes on the water supply bucket are respectively connected to the water injection holes on the maintenance box.
[0007] As a preferred technical solution of the present invention, the base and the cover plate on the maintenance box are fixed by means of latches.
[0008] As a preferred technical solution of the present invention, a water tank is provided at the bottom of the maintenance box, one end of the water tank is connected to a water pump, a suction pipe is installed on the water pump, and the tail end of the suction pipe is connected to the water replenishment bucket.
[0009] As a preferred technical solution of the present invention, the clamping mechanism includes a connecting plate, an adapter seat, a sleeve and a splint. The connecting plate is an I-shaped structure, one end of which is rotatably installed in the inner cavity of the fixed platform, and the other end is hinged to the adapter seat. A sleeve is fixedly installed on the adapter seat, and a spring is matched inside the sleeve. One end of the spring is fixedly connected to the bottom of the sleeve, and the output end is fixedly connected to the splint.
[0010] As a preferred technical solution of the present invention, the connecting plate on the clamping mechanism is a telescopic structure, which can adaptively adjust the elongation of the connecting plate according to the different sizes of piers.
[0011] As a preferred technical solution of the present invention, the water tank is fixed to the bottom of the upper cover plate of the maintenance box, and the bottom of the inner cavity of the water tank is inclined downward and inclined left and right along its length extension direction.
[0012] Compared with the prior art, the beneficial effects of the present invention are as follows: the pier column strengthening maintenance equipment provided by the present invention can quickly carry out water-adding maintenance by matching and winding the present invention with the plastic film for the pier column, thereby improving the construction efficiency, further replenishing the water vapor in the pier column film, and realizing the maintenance of the pier column without causing water flow marks on the surface of the pier column; and a water supply mechanism is fixedly installed on the maintenance box of the present invention, which can replenish water in the maintenance box at any time to avoid excessive evaporation of water and untimely replenishment. In addition, in order to avoid excessive water on the cotton felt in the maintenance box and overflow from the exhaust hole, a water tank is provided to receive excessive water, and the water in the water tank is controlled to be injected into the water bucket through the water supply pipe, thereby realizing the recycling of water resources; by providing a clamping mechanism for matching and clamping with the pier column, only one person is needed to clamp the maintenance box on the pier column, which solves the problem that it is difficult to control the position of the maintenance box when the plastic film is wrapped around the pier column, and multiple people are required to control the position of the fixed maintenance box to affect the wrapping work of the plastic film on the pier column. The present invention is simple to operate and convenient to use, and has strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a front view structural schematic diagram of the water supply mechanism of the present invention;
[0014] Figure 2 It is a three-dimensional structural schematic diagram of the clamping mechanism of the present invention;
[0015] Figure 3 It is a schematic diagram of the three-dimensional structure of the maintenance box of the present invention;
[0016] Figure 4It is a schematic diagram of the structure of the curing box of the present invention when it is in an open state.
[0017] In the figure: maintenance box 1, water injection hole 2, latch 3, exhaust hole 4, water tank 5, support frame 6, water supply bucket 7, water supply pipe 8, water storage tank 9, three-way valve 10, suction pipe 11, water pump 12, cover plate 13, base 14, fixing platform 15, connecting plate 16, adapter 17, sleeve 18, clamping plate 19, drain pipe 20. Implementation
[0018] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0019] See also Figure 1-4 The present invention provides a pier column enhanced maintenance device, which solves the problem of excessive water flow marks on the pier columns due to excessive water volume during the existing water replenishment maintenance after the pier columns are demolded and wrapped with a film, thereby affecting the pier columns. The present invention can achieve the goal of quickly replenishing water for maintenance of the pier columns without causing water flow marks on the pier columns, thereby further improving the maintenance effect. Example
[0020] The present embodiment provides a pier column reinforcement maintenance device, including a water storage tank 9, and also including a maintenance mechanism, a water supply mechanism and a clamping mechanism, wherein the maintenance mechanism includes a maintenance box 1, which is a square box made of two 2mm thick thin-skinned stainless steel plates with a length and width of 1m and a height of 5cm, including a base 14 and a cover plate 13, and the two are matched and fixed by means of pins 3 arranged at intervals on the cover plate, and cotton felt is matched and laid in the internal cavity of the maintenance box 1, and exhaust holes 4 are evenly arranged on the base and the cover plate, and a plurality of water injection holes 2 are evenly welded on the top of the maintenance box 1. In the present embodiment, three water injection holes are evenly welded on the top of the maintenance box, and the water injection holes are respectively connected to the inner cavity of the maintenance box, and are used to connect with the water supply mechanism to inject water into the inner cavity of the maintenance box. A support frame 6 is also provided on the top of the maintenance box, and the water supply mechanism is fixedly mounted on the maintenance box through the support frame 6.
[0021] The water supply mechanism includes a water replenishment bucket 7, which is connected to the water storage tank through a water supply pipe 8, and the water in the water storage tank is pumped into the water replenishment bucket by controlling the water pump; a drainage pipe 20 is provided on the water replenishment bucket 7, and the drainage pipes are respectively connected to the water injection holes 2 on the maintenance box, and water is injected into the inner cavity of the maintenance box through the water injection holes 2 by the drainage pipe 20 to moisten the cotton felt in the maintenance box; in addition, a water tank 5 is provided at the outer bottom of the maintenance box cover 13, and one end of the water tank is connected to the water replenishment bucket 7 through a suction pipe 11. Specifically, one end of the water tank is connected to a water pump, and a suction pipe is installed on the water pump. The tail end of the pipe is connected to the water supply bucket, and the suction pipe and the drainage pipe are connected to the water supply bucket through a three-way valve. The water supply mechanism is arranged in this way. On the one hand, by controlling the three-way valve 10, the water in the water supply bucket is injected into the inner cavity of the maintenance box through the drainage pipe 20 via the water injection hole 2 to achieve the maintenance of the pier column. On the other hand, in order to prevent too much water on the cotton felt in the maintenance box from overflowing from the exhaust hole 4, a water tank 5 is set to receive excessive water, and the water in the water tank 5 is controlled by the water pump 12 to be injected into the water supply bucket 7 through the suction pipe 6, thereby realizing the recycling of water resources.
[0022] See also Figure 2 , a fixing platform 15 is symmetrically installed on the left and right sides of the maintenance box, and the clamping mechanism is symmetrically installed on the fixing platform for clamping and fixing the pier column. The clamping mechanism includes a connecting plate 16, an adapter seat 17, a sleeve 18 and a clamping plate 19, wherein the connecting plate 16 is an I-shaped structure, one end of which is rotatably installed in the inner cavity of the fixing platform, and the other end is hinged to the adapter seat 17. A sleeve 18 is fixedly installed on the adapter seat 17 by bolts, and a spring is installed in the sleeve, wherein one end of the spring is fixedly connected to the bottom of the sleeve, and a clamping plate 19 is connected to the output end for matching with the pier column. The setting of the clamping mechanism, when in use, by rotating the position of the connecting plate, the distance between the two clamping plates is changed to adapt to piers of different sizes, and by connecting the two clamping plates to the spring in the sleeve, the clamping mechanism can achieve tight clamping with the pier column under the action of the spring, which is convenient for the difficult control of the position of the maintenance box when the plastic film is wrapped around the pier column, and multiple people are required to control the position of the fixed maintenance box, which affects the wrapping work of the plastic film on the pier column.
[0023] The present embodiment provides a pier column strengthening maintenance equipment. When it is used, the maintenance box is first matched and fitted on the pier column, and then the clamps on the left and right sides of the maintenance box are clamped and fixed to the pier column. Under the action of the spring, the maintenance box is matched and clamped on the pier column, and then the pier column is matched and wrapped with a plastic film, and the maintenance box is also wrapped on the pier column. After the water in the water storage tank is input into the water replenishment bucket, the water in the water replenishment bucket is driven through the drainage pipe into the inner cavity of the maintenance box to wet the cotton felt in the maintenance box. When there is too much water in the maintenance box, it will flow directly into the water tank. At this time, the water in the water tank is controlled by the water pump to flow into the water bucket through the suction pipe to realize the recycling of water flow. Such a setting of the present invention is simple to operate and easy to use. It can not only quickly realize the water maintenance of the pier column, but also further replenish the water vapor in the pier column film, and will not cause water flow marks on the surface of the pier column, thereby improving the maintenance effect. Example
[0024] On the basis of Example 1, the similarities between this embodiment and Example 1 are not repeated here. The difference is that the connecting plate on the clamping mechanism is a telescopic structure, so that the elongation of the connecting plate can be adaptively adjusted according to the different sizes of piers, thereby facilitating the matching clamping and fixing of piers with different circumferences. Example
[0025] Based on the first embodiment, the similarities between this embodiment and the first embodiment are not repeated here, and the structure of the water tank is introduced. The water tank is fixed to the bottom of the upper cover plate of the maintenance box, and the bottom of the inner cavity of the water tank is tilted downward and tilted left and right along its length extension direction, so that the water flow in the water tank is gathered on one side of the inside, so as to facilitate the control of the water flow in the water tank into the water bucket through the water pump, thereby avoiding the waste of water resources and realizing recycling.
[0026] The above description is only a preferred embodiment of the present invention and does not limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A pier column strengthening maintenance device, comprising a water storage tank, characterized in that: It also includes a maintenance mechanism, a water supply mechanism and a clamping mechanism, the water supply mechanism is fixedly installed on the maintenance mechanism through a support frame, the maintenance mechanism includes a maintenance box, a plurality of water injection holes are evenly arranged on the top of the maintenance box, the water supply mechanism is connected to the water injection holes to drain water into the maintenance box, the maintenance box includes a base and a cover plate, the cover plate is matched and buckled and fixed to the base, the interior of the maintenance box is matched and paved with cotton felt, and a plurality of exhaust holes are evenly arranged on the front and rear sides of the maintenance box. In a natural state, water is drained into the maintenance box through the water supply mechanism to make the cotton felt moist to achieve water replenishment maintenance of the pier column; fixed platforms are symmetrically arranged on the left and right sides of the maintenance box, and the clamping mechanism is symmetrically installed on the fixed platforms on the maintenance box; The clamping mechanism includes a connecting plate, an adapter seat, a sleeve and a clamping plate. The connecting plate is an I-shaped structure, one end of which is rotatably installed in the inner cavity of the fixed platform, and the other end is hinged to the adapter seat. The adapter seat is fixedly installed with a sleeve, and a spring is matched in the sleeve. One end of the spring is fixedly connected to the bottom of the sleeve, and the output end is fixedly connected to the clamping plate.
2. The pier column strengthening and maintenance equipment according to claim 1 is characterized in that: The water supply mechanism comprises a water supply bucket, and the drainage pipes on the water supply bucket are respectively connected to the water injection holes on the maintenance box.
3. The pier column strengthening and maintenance equipment according to claim 1, characterized in that: The base and the cover plate on the maintenance box are fixed by latches.
4. The pier column strengthening and maintenance equipment according to claim 2, characterized in that: A water tank is provided at the bottom of the maintenance box, one end of the water tank is connected to a water pump, a suction pipe is installed on the water pump, and the tail end of the suction pipe is connected to the water replenishment bucket.
5. The pier column strengthening and maintenance equipment according to claim 1, characterized in that: The connecting plate on the clamping mechanism is a telescopic structure, and the elongation of the connecting plate can be adaptively adjusted according to the different sizes of piers.
6. The pier column strengthening and maintenance equipment according to claim 4, characterized in that: The water tank is fixed at the bottom of the upper cover plate of the curing box, and the bottom of the inner cavity of the water tank is inclined downward and inclined left and right along the length extension direction thereof.
Citation Information
Patent Citations
Maintenance device for reinforced concrete drainage pipe production
CN216992435U
Concrete form
JP2017048609A