Adjustment Method of Fast Reactor Hoist

Through laser tracker measurement and fitting technology, a three-dimensional coordinate system was established and the position of the fast reactor reactor hoist was automatically adjusted, which solved the problems of high cost, low efficiency and large personnel investment in the existing technology, and achieved rapid and accurate installation Adjust to meet the technical requirements of high precision.

CN116564568BActive Publication Date: 2024-11-12CHINA NUCLEAR IND 23 CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310522439.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-12
Estimated Expiration
2043-05-10

AI Technical Summary

Technical Problem

The existing fast reactor reactor hoist adjustment method is costly, low efficiency, and has a large personnel investment.

Method used

The laser tracker is used to measure the three-dimensional coordinates of the hoist's oblique connection, and the actual angle deviation of the center of the flange surface and the central axis of the hoist's oblique connection is fitted through the laser tracker to adjust the position of the hoist's oblique connection, combining micro-nets and three-dimensional control To measure points, establish a three-dimensional coordinate system of the factory, and realize automatic adjustment.

Benefits of technology

It improves the degree of automation of adjustments, reduces manual investment, fast measurement speed and high accuracy, can quickly and accurately guide installation and adjustment, and meets the installation design requirements of the allowable spatial position deviation ≤1mm, saving labor time and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116564568B_ABST
    Figure CN116564568B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of nuclear island plant construction, and in particular to a method for adjusting a fast reactor reactor hoist. The adjustment method provided by the present invention comprises the following steps: establishing a three-dimensional coordinate system of a plant through a laser tracker; collecting the three-dimensional coordinates of the inner side of the upper flange surface of the hoist bevel tube and the wall of the hoist bevel tube through a laser tracker, and fitting the actual angle deviation of the flange surface center and the central axis of the hoist bevel tube, and adjusting the position of the hoist bevel tube according to the actual angle deviation and the preset angle deviation; fitting the final flange surface center and the final central axis of the hoist bevel tube through a laser tracker, and determining the central axis of the hoist guide rail. The adjustment method provided by the present invention obtains a three-dimensional solution by means of spatial data acquisition of a laser tracker, has strong pertinence, has a fast measurement speed and high precision under narrow construction conditions on site, can perform installation monitoring and adjustment in real time, and can quickly and accurately guide installation and adjustment implementation on site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear island plant construction, and in particular to a method for adjusting a fast reactor reactor hoist. Background Art

[0002] A fast reactor, also known as a fast neutron reactor, is a nuclear fission reactor without a neutron moderator.

[0003] The refueling system is of utmost importance in a nuclear power plant. The refueling system includes a hoist and a hoist inclined pipe. The hoist is installed in the hoist inclined pipe. In actual use, the installation of the hoist determines the normal operation of the refueling system.

[0004] During the installation of the elevator, the installation design requires adjustment to the preset angle. The existing elevator adjustment measurement method is to use a laser centering instrument, such as Figure 1 As shown, during installation, first, install the finely machined plug simulation part 1' to the upper and lower ports of the elevator bevel tube 2', the laser centering instrument 3' fixes the upper port of the elevator bevel tube through the sight, the laser centering instrument adjusts the laser aiming line 4' through the sight, the laser aiming line 4' is used to simulate the center line of the elevator guide rail, a support 5' is provided at the lower port of the elevator bevel tube 2', a target is provided on the support 5', the deviation data of the laser aiming line 4' is obtained by projecting the laser aiming line 4' onto the target, and the position of the elevator bevel tube 2' is adjusted according to the deviation data.

[0005] However, in actual application, on the one hand, the production cost of the plug simulation is high, and the work efficiency when adjusting by setting the plug simulation is low, and on the other hand, the adjustment and measurement process requires a lot of manpower. Summary of the invention

[0006] (I) The problem to be solved by the present invention is that the existing method for adjusting the hoist of a fast reactor reactor is relatively high in cost, relatively low in efficiency, and requires relatively large manpower input.

[0007] (II) Technical solution

[0008] In order to solve the above technical problems, an embodiment of the present invention provides a method for adjusting a fast reactor reactor hoist, comprising the following steps:

[0009] S1, fixing a number of plane target seats as three-dimensional control points on the wall of the factory building around the installation position of the elevator inclined pipe;

[0010] S2, taking some of the three-dimensional control points in step S1 as reference points, measuring the absolute elevations of the reference points, measuring the relative elevations of all the other three-dimensional control points, and combining the absolute elevations of the reference points to obtain the absolute elevations of all the other three-dimensional control points;

[0011] S3, arranging micro-grid points on the ground of the factory building and measuring the plane coordinates of all the micro-grid points, and then using a laser tracker to measure the micro-grid points and the three-dimensional control points into a relative coordinate system, and combining the absolute elevations of all the three-dimensional control points to obtain the three-dimensional coordinate system of the factory building;

[0012] S4, pre-install the elevator inclined pipe at the installation position, set up a laser tracker on the upper port of the elevator inclined pipe, and collect the three-dimensional coordinates of the inner side of the upper flange surface of the elevator inclined pipe and the pipe wall of the elevator inclined pipe by the laser tracker, and fit the actual angle deviation between the center of the flange surface and the central axis of the elevator inclined pipe by the laser tracker, compare the actual angle deviation with the preset angle deviation, and adjust the position of the elevator inclined pipe;

[0013] S5, collect the three-dimensional coordinates of the inner side of the upper flange surface and the wall of the elevator bevel tube again, and fit the final flange surface center and the final elevator bevel tube center axis through the laser tracker, and determine the elevator guide rail center axis based on the final flange surface center and the final elevator bevel tube center axis.

[0014] Furthermore, in step S2, the reference point is 1.5m to 2.0m away from the ground of the factory building.

[0015] Furthermore, in step S2, there are at least two reference points.

[0016] Furthermore, in step S2, the relative elevation is the relative height difference between the three-dimensional control point and the reference point.

[0017] Furthermore, in step S2, the absolute altitude is measured by a precision level.

[0018] Furthermore, in step S2, measuring the relative elevations of all the remaining three-dimensional control points includes the following steps:

[0019] Level the laser tracker;

[0020] The relative elevations of all three-dimensional control points except the reference points are measured by a laser tracker.

[0021] Furthermore, the elevator also includes a support, and a pile pit surrounding barrel is arranged in the plant;

[0022] The fast reactor reactor hoist adjustment method further comprises the steps of:

[0023] S61, collecting the coordinates of the pile pit barrel and the support coordinates by using a laser tracker, and fitting the actual vertical surface of the pile pit barrel and the size of the support by using the laser tracker;

[0024] S62, determining the position of the support center according to the actual vertical position of the central axis of the elevator guide rail and the pile pit barrel in step S5.

[0025] Furthermore, in step S62, the following steps are also included:

[0026] Check whether the plane distance from the center of the support to the core is within the adjustment range of the core transporter transfer radius;

[0027] When the plane distance from the center position of the support to the core is not within the adjustment range of the core transporter transfer radius, adjust the actual vertical position of the pit enclosure or the vertical position of the center of the support until the plane distance from the center position of the support to the core is within the adjustment range of the core transporter transfer radius.

[0028] Further, in step S3, the steps are included;

[0029] S31, arrange micro-grid points on the floor of the factory;

[0030] S32, measuring the plane coordinates of all micro-grid points;

[0031] S33, using a laser tracker, measuring the microgrid points and all three-dimensional control points into a relative coordinate system, returning the measured elevations of all three-dimensional control points in the relative coordinate system to zero using the laser tracker, and then performing adjustment integration to obtain the plane coordinates of all three-dimensional control points;

[0032] S34, combining the plane coordinates of all three-dimensional control points with the absolute elevations through a laser tracker to obtain the three-dimensional coordinate system of the plant.

[0033] Furthermore, in step S32, the following steps are also included:

[0034] The plane coordinates of all micro-grid points are measured by the zenith-nadir instrument.

[0035] Beneficial effects of the present invention:

[0036] The present invention provides a method for adjusting a fast reactor reactor hoist, comprising the following steps:

[0037] S1, fixing a number of plane target seats as three-dimensional control points on the wall of the factory building around the installation position of the elevator inclined pipe;

[0038] S2, taking some of the three-dimensional control points in step S1 as reference points, measuring the absolute elevations of the reference points, measuring the relative elevations of all the other three-dimensional control points, and combining the absolute elevations of the reference points to obtain the absolute elevations of all the other three-dimensional control points;

[0039] S3, arranging micro-grid points on the ground of the factory building and measuring the plane coordinates of all the micro-grid points, and then using a laser tracker to measure the micro-grid points and the three-dimensional control points into a relative coordinate system, and combining the absolute elevations of all the three-dimensional control points to obtain the three-dimensional coordinate system of the factory building;

[0040] S4, pre-install the elevator inclined pipe at the installation position, set up a laser tracker on the upper port of the elevator inclined pipe, and collect the three-dimensional coordinates of the inner side of the upper flange surface of the elevator inclined pipe and the pipe wall of the elevator inclined pipe by the laser tracker, and fit the actual angle deviation between the center of the flange surface and the central axis of the elevator inclined pipe by the laser tracker, compare the actual angle deviation with the preset angle deviation, and adjust the position of the elevator inclined pipe;

[0041] S5, collect the three-dimensional coordinates of the inner side of the upper flange surface and the wall of the elevator bevel tube again, and fit the final flange surface center and the final elevator bevel tube center axis through the laser tracker, and determine the elevator guide rail center axis based on the final flange surface center and the final elevator bevel tube center axis.

[0042] The adjustment method provided in this embodiment has a high degree of automation, and the automatic data collection has little effect on the results. It uses the spatial data collection of the laser tracker to obtain a three-dimensional solution, which is highly targeted. It has a fast measurement speed and high accuracy under narrow construction conditions on site, and can perform installation monitoring and adjustment in real time, and can quickly and accurately guide the installation and adjustment implementation on site. At the same time, its effect is reflected in high speed and high accuracy, and the results meet the technical requirements of the spatial position allowable deviation of ≤1mm required by the installation design. Compared with the traditional adjustment method, only 2 people are required. In comparison, it greatly saves labor input, takes less time, and has good results. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1 This is a structural diagram of the installation of the existing elevator oblique pipe;

[0045] Figure 2 A structural schematic diagram of a fast reactor reactor hoist adjustment method provided by an embodiment of the present invention;

[0046] Figure 3 A flow chart of a fast reactor reactor hoist adjustment method provided in an embodiment of the present invention.

[0047] Icons: 1- elevator inclined pipe; 2- support; 3- elevator guide rail centerline; 4- final elevator inclined pipe centerline; 5- pit enclosure barrel. DETAILED DESCRIPTION

[0048] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] like Figure 2 and Figure 3 As shown, one embodiment of the present invention provides a method for adjusting a fast reactor reactor hoist, comprising the following steps:

[0050] S1, fixing a number of plane target seats as three-dimensional control points on the wall of the factory building around the installation position of the elevator inclined pipe 1;

[0051] S2, taking some of the three-dimensional control points in step S1 as reference points, measuring the absolute elevations of the reference points, measuring the relative elevations of all the other three-dimensional control points, and combining the absolute elevations of the reference points to obtain the absolute elevations of all the other three-dimensional control points;

[0052] S3, arranging micro-grid points on the ground of the factory building and measuring the plane coordinates of all the micro-grid points, and then using a laser tracker to measure the micro-grid points and the three-dimensional control points into a relative coordinate system, and combining the absolute elevations of all the three-dimensional control points to obtain the three-dimensional coordinate system of the factory building;

[0053] S4, pre-install the elevator inclined pipe 1 at the installation position, set up a laser tracker on the upper port of the elevator inclined pipe 1, and collect the three-dimensional coordinates of the inner side of the upper flange surface of the elevator inclined pipe 1 and the pipe wall of the elevator inclined pipe 1 through the laser tracker, and fit the actual angle deviation between the center of the flange surface and the central axis of the elevator inclined pipe through the laser tracker, compare the actual angle deviation with the preset angle deviation, and adjust the position of the elevator inclined pipe 1;

[0054] S5, collect the three-dimensional coordinates of the inner side of the upper flange surface and the wall of the elevator bevel tube 1 again, and fit the final flange surface center and the final elevator bevel tube center axis 4 through the laser tracker, and determine the elevator guide rail center axis 3 based on the final flange surface center and the final elevator bevel tube center axis 4.

[0055] The fast reactor reactor hoist adjustment method provided in the embodiment of the present invention is used for adjusting the position of the fast reactor reactor hoist during installation. The hoist includes a hoist inclined pipe 1, a hoist guide rail, a support 2 and other structures.

[0056] In this embodiment, first, several plane target seats are arranged on the wall of the factory building. The plane target seats are used as three-dimensional control points. The three-dimensional coordinate system of the entire factory building is obtained by subsequently measuring the three-dimensional coordinates of the plane target seats. It should be noted that the wall for arranging the plane target seats should be the wall around the installation position of the elevator inclined pipe 1, and it should be ensured that the elevator inclined pipe 1 can be projected onto the wall.

[0057] In this embodiment, the plane target base is used as a three-dimensional control point, and some of the three-dimensional control points are taken as reference points. The reference points are used to subsequently obtain the absolute elevations of the remaining three-dimensional control points. After the plane target base is arranged and the reference points are selected, the absolute elevation of the reference points is measured, and the relative elevations of the remaining three-dimensional control points relative to the reference points are measured. According to the absolute elevation of the reference points and the relative elevations of the remaining three-dimensional control points, the absolute elevations of all three-dimensional control points are finally calculated. The calculation of the absolute elevation is described below.

[0058] In this embodiment, after the absolute elevation is calculated, the Z coordinates of all three-dimensional control points are obtained.

[0059] In this embodiment, micro-grid points are arranged on the ground of the factory building to establish a plane coordinate system. Specifically, a laser tracker is arranged on the micro-grid points, and the plane coordinates of all three-dimensional control points (including the above-mentioned reference points) can be obtained through the laser tracker, that is, the X coordinate and the Y coordinate. Combined with the absolute elevation (Z coordinate) of all three-dimensional control points measured in the previous step, the three-dimensional coordinate system of the factory building is obtained.

[0060] In this embodiment, the measurement of plane coordinates and the generation of the three-dimensional coordinate system of the factory are all performed by a laser tracker, which has a built-in control system. The three-dimensional coordinate system of the factory can be obtained by calculation through the control system. This is a well-known technology in the field, and therefore, the control program, algorithm, etc. of the control system are not described in detail here.

[0061] In this embodiment, the laser tracker is an API (American Automatic Precision Engineering, Inc.) laser tracker.

[0062] In this embodiment, the API laser tracker integrates laser interferometry ranging technology, photoelectric detection technology, precision machinery technology, computer and control technology, modern numerical calculation theory and SA (Spatial Analyze / spatial analysis) software and other technologies, and can track spatial moving targets and measure the spatial three-dimensional coordinates of the target in real time.

[0063] In this embodiment, after the three-dimensional coordinate system of the factory building is established, the coordinates and other data of the elevator inclined pipe 1 are measured, and compared with the preset data, the position deviation of the elevator inclined pipe 1 is adjusted.

[0064] Specifically, in this embodiment, the elevator inclined pipe 1 is first pre-installed at the installation position of the elevator inclined pipe 1, and then the above-mentioned laser tracker is set up at the upper port of the elevator inclined pipe 1 to facilitate subsequent measurements. After the laser tracker is set up, the three-dimensional coordinates of the inner side of the upper flange surface of the inclined pipe and the pipe wall of the elevator inclined pipe 1 are collected by the laser tracker. After that, the center of the flange surface and the actual angle deviation of the elevator inclined pipe 1 are fitted by the laser tracker. The center of the flange surface and the actual angle deviation of the elevator inclined pipe 1 fitted by the laser tracker are compared with the preset angle deviation in the elevator design description, and the elevator inclined pipe 1 is adjusted to the preset position. At this point, the installation of the elevator inclined pipe 1 is completed.

[0065] In this embodiment, the preset angle deviation is manually input into the laser tracker by an operator, and the laser tracker automatically performs comparison.

[0066] In this embodiment, after the adjustment of the elevator bevel tube 1 is completed, the three-dimensional coordinates of the inner side of the upper flange surface and the tube wall of the elevator bevel tube 1 are collected again by the laser tracker, and the final flange surface center and the final elevator bevel tube center axis 4 are fitted by the laser tracker. Based on the final flange surface center and the final elevator bevel tube center axis 4, the elevator guide rail center axis 3 is determined. After the elevator guide rail center axis 3 is determined, the elevator guide rail can be installed.

[0067] In this embodiment, the positional relationship between the central axis 3 of the elevator guide rail and the center of the flange surface and the central axis of the elevator bevel pipe is provided by the elevator designer and is known data.

[0068] According to the fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, a laser tracker is used to track a moving target in space and measure the target's three-dimensional coordinates in real time, which has the characteristics of high precision, high efficiency, real-time tracking and measurement, quick installation, and easy operation.

[0069] The adjustment method provided in this embodiment has a high degree of automation, and the automatic data collection has little effect on the results. It uses the spatial data collection of the laser tracker to obtain a three-dimensional solution, which is highly targeted. It has a fast measurement speed and high accuracy under narrow construction conditions on site, and can perform installation monitoring and adjustment in real time, and can quickly and accurately guide the installation and adjustment implementation on site. At the same time, its effect is reflected in high speed and high accuracy, and the results meet the technical requirements of the spatial position allowable deviation of ≤1mm required by the installation design. Compared with the traditional adjustment method, only 2 people are required. In comparison, it greatly saves labor input, takes less time, and has good results.

[0070] In the fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, the reference point is 1.5m to 2.0m away from the ground of the plant.

[0071] In this embodiment, in order to facilitate the level instrument to measure the absolute elevation of the reference point, it is necessary to ensure that the distance between the selected reference point and the ground of the factory building is greater than or equal to 1.5m and less than or equal to 2.0m.

[0072] For example, three reference points are selected, and the three reference points are 1.5m, 1.51m and 1.6m away from the ground of the factory respectively.

[0073] In the fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, there are at least two reference points.

[0074] In this embodiment, in order to ensure the accuracy of subsequent absolute elevation calculation of all remaining three-dimensional control points, at least two of all three-dimensional control points are selected as reference points.

[0075] For example, two three-dimensional control points 1.5m to 2.0m away from the ground of the factory building may be selected as reference points from all the three-dimensional control points, or three three-dimensional control points 1.5m to 2.0m away from the ground of the factory building may be selected as reference points.

[0076] In the fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, the relative elevation is the relative height difference between the three-dimensional control point and the reference point.

[0077] In this embodiment, after the reference point is selected, the absolute elevation of the reference point is measured, and the relative elevations of the remaining three-dimensional control points relative to the reference point are measured at the same time. The absolute elevations of the remaining three-dimensional control points are calculated by addition or subtraction.

[0078] For example, the absolute elevation of the benchmark point is 1.6m, and a certain 3D control point is 0.4m away from the benchmark point. When the 3D control point is lower than the benchmark point, the absolute elevation of the 3D control point is 2.0m. When the 3D control point is higher than the benchmark point, the absolute elevation of the 3D control point is 1.2m.

[0079] In this embodiment, multiple reference points are set in order to improve the accuracy of three-dimensional control point calculation. For example, three reference points are selected, and the absolute elevation of a three-dimensional control point is calculated based on the three reference points respectively, and the absolute height is finally averaged.

[0080] In the fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, in step S2, the absolute elevation is measured by a precision level.

[0081] In this embodiment, the absolute elevation is measured by a precision level, which has high precision and high accuracy of the measurement result.

[0082] The fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, in step S2, measuring the relative elevations of all the remaining three-dimensional control points includes the following steps:

[0083] Level the laser tracker;

[0084] The relative elevations of all three-dimensional control points except the reference points are measured by a laser tracker.

[0085] In this embodiment, when measuring the relative elevations of all three-dimensional control points except the reference points, first, the laser tracker is leveled to ensure the accuracy of the measurement results of the laser tracker, and then the relative elevations of all three-dimensional control points except the reference points are measured by the laser tracker.

[0086] In the method for adjusting the fast reactor reactor hoist provided by the embodiment of the present invention, a pile pit enclosure 5 is arranged in the plant, and the pile pit enclosure 5 is used to install a support 2. The support 2 is a support 2 of the hoist guide rail.

[0087] In this embodiment, the steps are also included:

[0088] The installation position of the support 2 is measured by a laser tracker.

[0089] Specifically, the steps include:

[0090] S61, collecting the coordinates of the pile pit barrel 5 and the coordinates of the support 2 by using a laser tracker, and fitting the actual vertical surface of the pile pit barrel 5 and the size of the support 2 by using the laser tracker;

[0091] S62, determining the position of the center of the support 2 according to the central axis 3 of the elevator guide rail and the actual vertical position of the surrounding barrel in step S5.

[0092] In this embodiment, the above-mentioned laser tracker is also used to collect the coordinates of the pit enclosure 5 and the coordinates of the support 2, and the actual vertical surface of the enclosure and the size of the support 2 are fitted by the laser tracker.

[0093] As mentioned above, a three-dimensional coordinate system of the factory building is established. In this embodiment, the position of the center of the support 2 is determined based on the center axis 3 of the elevator guide rail and the actual vertical position of the surrounding barrel in step S5.

[0094] That is, in the three-dimensional coordinate system of the factory building, the intersection of the central axis 3 of the elevator guide rail and the vertical surface of the barrel, that is, the center point of the support 2, can be determined based on the center point of the support 2 and the size of the support 2, and the installation coordinates of the support 2 can be determined.

[0095] The fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, in step S62, further includes the following steps:

[0096] Check whether the plane distance from the center position of support 2 to the core is within the adjustment range of the core transporter transfer radius;

[0097] When the plane distance from the center position of the support 2 to the core is not within the adjustment range of the core transporter transfer radius, adjust the actual vertical position of the pit enclosure 5 or the position of the vertical plane of the center of the support 2 until the plane distance from the center position of the support 2 to the core is within the adjustment range of the core transporter transfer radius.

[0098] In this embodiment, after the center position of the support 2 is determined, it is also necessary to determine whether the plane distance from the center position to the core is within the transfer radius adjustment range of the core transfer machine to avoid affecting the normal operation of the core transfer machine.

[0099] The fast reactor reactor hoist adjustment method provided by the embodiment of the present invention comprises the steps of:

[0100] S31, arrange micro-grid points on the floor of the factory;

[0101] S32, measuring the plane coordinates of all micro-grid points;

[0102] S33, using a laser tracker, measuring the microgrid points and all three-dimensional control points into a relative coordinate system, returning the measured elevations of all three-dimensional control points to zero using the laser tracker, and then performing adjustment integration to obtain the plane coordinates of all three-dimensional control points;

[0103] S34, combining the plane coordinates of all three-dimensional control points with the absolute elevations through a laser tracker to obtain the three-dimensional coordinate system of the plant.

[0104] In this embodiment, in the process of establishing the three-dimensional coordinate system of the factory building, the absolute elevations of the three-dimensional control points need to be measured as Z coordinates, and then the plane coordinates of the three-dimensional control points, namely X coordinates and Y coordinates, are measured to obtain the three-dimensional coordinate system of the factory building.

[0105] In this embodiment, after obtaining the absolute elevations of all three-dimensional control points, it is necessary to establish a plane coordinate system to obtain the plane coordinates of all three-dimensional control points in the plane coordinate system. Then, the plane coordinates are combined with the absolute elevations to obtain the three-dimensional coordinate system of the factory. The above operations are all implemented through a laser tracker.

[0106] Specifically, in this embodiment, first, micro-grid points are arranged on the ground of the factory building, and then the plane coordinates of all micro-grid points are measured. Then, the micro-grid points and the three-dimensional control points on the factory building wall are measured to a relative coordinate system by a laser tracker, and then the measured elevations of all three-dimensional control points are reset to zero by the laser tracker, and then the SA software in the laser tracker is used for adjustment fitting, and the plane coordinates of all three-dimensional control points, i.e., X coordinates and Y coordinates, are obtained. Then, the SA software in the laser tracker is used to combine the plane coordinates corresponding to each point with the absolute elevation, and the three-dimensional coordinate system of the entire factory building can be obtained.

[0107] Among them, the measured elevation is the elevation of each three-dimensional control point in the relative coordinate system.

[0108] Among them, the process of confirming the center of the micro-network point is achieved through the zenith-nadir instrument, and the zenith-nadir instrument used is the FG-L30 zenith-nadir instrument.

[0109] When using the fast reactor reactor hoist adjustment method provided by the embodiment of the present invention, first, select the factory wall around the installation position of the hoist inclined pipe 1, and arrange a number of plane target seats on the factory wall, and the plane target seats are used as three-dimensional control points. Take three of the three-dimensional control points with a height of 1.5m to 2.0m from the ground as reference points, measure the absolute elevations of these three reference points with a precision level, and then measure the relative elevations of the remaining three-dimensional control points with an AIP laser tracker, and according to the relationship between the relative elevation and the absolute elevation, obtain the absolute elevations of all the remaining three-dimensional control points. At this point, the elevation system is established.

[0110] After that, micro-grid points were arranged on the ground of the factory building, and the center of the micro-grid points was determined by the GF-L30 zenith-nadir instrument. Then, the AIP laser tracker was arranged at the center of the micro-grid points, and the micro-grid points and the three-dimensional control points on the wall were measured to a relative coordinate system by the AIP laser tracker. Then, the elevation values ​​of the measured data were uniformly reset to zero, and then the SA software in the AIP laser tracker was used for adjustment and fitting to obtain the plane coordinates of all three-dimensional control points. At this point, the plane coordinate system was established.

[0111] Afterwards, the absolute elevations of the above-mentioned three-dimensional control points are combined with the plane coordinates to obtain the three-dimensional coordinate system of the factory building.

[0112] After the three-dimensional coordinate system of the plant is established, the elevator bevel tube 1 is pre-installed at the installation position, and the AIP laser tracker is set up on the upper port of the elevator bevel tube 1. The three-dimensional coordinates of the inner side of the upper flange surface of the bevel tube and the pipe wall of the elevator bevel tube 1 are collected by the AIP laser tracker. The actual angular deviation of the center of the flange surface and the central axis of the elevator bevel tube is fitted by the AIP laser tracker, and the actual angular deviation is compared with the preset angular deviation in the design description to adjust the position of the elevator bevel tube 1.

[0113] After the position adjustment of the elevator bevel tube 1 is completed, the three-dimensional coordinates of the inner side of the upper flange surface and the pipe wall of the elevator bevel tube 1 are collected again by the AIP laser tracker, and the final flange surface center and the final elevator bevel tube center axis 4 are fitted by the AIP laser tracker, and the elevator guide rail center axis 3 is determined based on the final flange surface center and the elevator bevel tube 1 center axis.

[0114] After the installation of the elevator rail is completed, the coordinates of the pile pit barrel 5 and the support 2 are collected by the AIP laser tracker, and the actual vertical surface of the pile pit barrel 5 and the size of the support 2 are fitted by the AIP laser tracker. After that, the position of the center of the support 2 is determined according to the central axis 3 of the elevator rail and the actual vertical surface position of the barrel.

[0115] After the center position of support 2 is confirmed, check whether the plane distance from the center position of support 2 to the core is within the adjustment range of the core transporter transfer radius; when the plane distance from the center position of support 2 to the core is not within the adjustment range of the core transporter transfer radius, adjust the actual vertical position of the pit enclosure 5 or the position of the vertical plane of the center of support 2 until the plane distance from the center position of support 2 to the core is within the adjustment range of the core transporter transfer radius.

[0116] In the description of the present invention, it should be noted that the terms "upper", "lower", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0117] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the inside of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0118] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for adjusting a fast reactor hoist, characterized in that: The steps include: S1, fixing a number of plane target seats as three-dimensional control points on the wall of the factory building around the installation position of the elevator inclined pipe (1); S2, taking some of the three-dimensional control points in step S1 as reference points, measuring the absolute elevations of the reference points, measuring the relative elevations of all the other three-dimensional control points, and combining the absolute elevations of the reference points to obtain the absolute elevations of all the other three-dimensional control points; S3, arranging micro-grid points on the ground of the factory building and measuring the plane coordinates of all the micro-grid points, and then using a laser tracker to measure the micro-grid points and the three-dimensional control points into a relative coordinate system, and combining the absolute elevations of all the three-dimensional control points to obtain the three-dimensional coordinate system of the factory building; S4, pre-installing the elevator inclined pipe (1) at the installation position, setting up a laser tracker on the upper port of the elevator inclined pipe (1), and collecting the three-dimensional coordinates of the inner side of the upper flange surface of the elevator inclined pipe (1) and the pipe wall of the elevator inclined pipe (1) through the laser tracker, and fitting the actual angle deviation between the center of the flange surface and the central axis of the elevator inclined pipe through the laser tracker, comparing the actual angle deviation with the preset angle deviation, and adjusting the position of the elevator inclined pipe (1); S5, again collect the three-dimensional coordinates of the inner side of the upper flange surface and the wall of the elevator bevel tube (1), and fit the final flange surface center and the final elevator bevel tube center axis (4) through a laser tracker, and determine the elevator guide rail center axis (3) based on the final flange surface center and the final elevator bevel tube center axis (4).

2. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: In step S2, the reference point is 1.5m to 2.0m away from the ground of the factory building.

3. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: In step S2, there are at least two reference points.

4. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: In step S2, the relative elevation is the relative height difference between the three-dimensional control point and the reference point.

5. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: In step S2, the absolute altitude is measured by a precision level.

6. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: In step S2, measuring the relative elevations of all the remaining three-dimensional control points includes the following steps: Level the laser tracker; The relative elevations of all three-dimensional control points except the reference points are measured by a laser tracker.

7. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: The elevator also includes a support (2), and a pile pit barrel (5) is arranged in the factory building; The fast reactor reactor hoist adjustment method further comprises the steps of: S61, collecting the coordinates of the pile pit barrel (5) and the coordinates of the support (2) by means of a laser tracker, and fitting the actual vertical surface of the pile pit barrel (5) and the size of the support (2) by means of the laser tracker; S62, determining the position of the center of the support (2) according to the actual vertical position of the central axis (3) of the elevator guide rail and the pile pit barrel (5) in step S5.

8. The fast reactor reactor hoist adjustment method according to claim 7, characterized in that: In step S62, the following steps are also included: Check whether the plane distance from the center position of the support (2) to the core is within the transfer radius adjustment range of the core transfer machine; When the plane distance from the center position of the support (2) to the core is not within the adjustment range of the core transfer machine's transfer radius, the actual vertical position of the pit enclosure barrel (5) or the position of the vertical plane of the center of the support (2) is adjusted until the plane distance from the center position of the support (2) to the core is within the adjustment range of the core transfer machine's transfer radius.

9. The fast reactor reactor hoist adjustment method according to claim 1, characterized in that: In step S3, the steps are included; S31, arrange micro-grid points on the floor of the factory; S32, measuring the plane coordinates of all micro-grid points; S33, using a laser tracker, measuring the microgrid points and all three-dimensional control points into a relative coordinate system, returning the measured elevations of all three-dimensional control points in the relative coordinate system to zero using the laser tracker, and then performing adjustment integration to obtain the plane coordinates of all three-dimensional control points; S34, combining the plane coordinates of all three-dimensional control points with the absolute elevations through a laser tracker to obtain the three-dimensional coordinate system of the plant.

10. The fast reactor reactor hoist adjustment method according to claim 9, characterized in that: In step S32, the following steps are also included: The plane coordinates of all micro-grid points are measured by the zenith-nadir instrument.