A method for building a virtual network

By dividing the Ethernet data packet sorting stage of virtual network construction and management into multiple APN nodes and using monitoring modules and artificial neural network models to optimize cost control, the problem of monitoring and control exceeding the budget in virtual network construction and management is solved, and the accuracy and quality of management are improved.

CN116723112BActive Publication Date: 2025-09-09GUANGZHOU CHONGE INFORMATION TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310050497.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-01
Publication Date
2025-09-09
Estimated Expiration
2043-02-01

AI Technical Summary

Technical Problem

In the prior art, virtual network construction and management are prone to exceed budgets when monitoring and controlling network construction, resulting in increased management costs and difficulty in ensuring management quality.

Method used

The Ethernet data packet sorting stage of virtual network construction management is divided into several network construction operation process APN nodes. The operation progress parameters and dynamic interval values ​​are compared in real time through the monitoring module, and abnormal management messages are issued to control costs. The dynamic interval values ​​are calculated in combination with the artificial neural network model to optimize cost control.

Benefits of technology

It effectively avoids network construction monitoring and control exceeding the budget, improves the control effect and quality of virtual network construction management, realizes cost control of each APN node and implementation stage, and improves the accuracy and efficiency of management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116723112B_ABST
    Figure CN116723112B_ABST
Patent Text Reader

Abstract

The present invention discloses a virtual network construction method, which divides the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage into several network construction operation process APN nodes, and then compares its operation progress parameter with the corresponding APN node management dynamic interval value when each network construction APN node occurs, and sends a corresponding abnormal management message when the operation progress parameter of the network construction APN node exceeds the corresponding APN node management dynamic interval value; the present invention also discloses a corresponding management system, including a virtual network construction management division module, a virtual network construction management APN node monitoring module and a virtual network construction supervision module. The method proposed in the present invention can perform abnormal management messages on the Ethernet data packet sorting stage of each network construction headquarters switch before the network construction is implemented, thereby improving the network construction monitoring and control effect of the virtual network construction management implementation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of virtual network construction, and in particular to a virtual network construction method. Background Art

[0002] The Internet is a vast network of interconnected networks, connected by a common set of protocols, forming a single, logically vast international network. The global economy has entered the information age, and accelerating the development of informatization and networking has become a consensus among countries worldwide. The telecommunications industry is the carrier and foundation of information and networks, and domestic investors are competing to enter the sector.

[0003] Currently, most enterprise private networks require the allocation of static addresses, but static address access requires the allocation of fixed IP addresses to users in advance, which increases the cost of system design and maintenance. Summary of the Invention

[0004] In order to overcome the shortcomings and deficiencies of the prior art, the present invention provides a method for establishing a virtual network.

[0005] The technical solution adopted by the present invention is a virtual network construction method, which divides the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage into several network construction operation process APN nodes, and then compares its operation progress parameters with the corresponding APN node management dynamic interval value when each network construction APN node occurs, and issues a corresponding abnormal management message when the operation progress parameter of the network construction APN node exceeds the corresponding APN node management dynamic interval value.

[0006] Preferably, the method specifically includes the following steps:

[0007] T1: The Ethernet data packet sorting phase of the network construction headquarters switch in the virtual network construction management implementation phase is divided into several network construction operation process APN nodes; then, according to the network construction progress of the virtual network construction management, the APN node management dynamic interval value of each network construction APN node and the network construction implementation management dynamic interval value of the network construction implementation phase are generated;

[0008] T2: when a network APN node is established, the operation progress parameter of the network APN node is obtained, and then the operation progress parameter of the network APN node is compared with the corresponding APN node management dynamic interval value, and when the operation progress parameter is greater than the corresponding APN node management dynamic interval value, a corresponding abnormal management message is issued;

[0009] T3: Obtain the corresponding operation progress parameters during the network construction implementation phase, then compare the operation progress parameters during the network construction implementation phase with the corresponding network construction implementation management dynamic interval values, and issue a corresponding abnormal management message when the operation progress parameters are greater than the corresponding network construction implementation management dynamic interval values.

[0010] Preferably, in step T1, an APN node monitoring classification value corresponding to each network construction APN node is generated based on the network construction progress of the virtual network construction management; in step T2, when the network construction APN node occurs, the operation progress parameter of the network construction APN node is compared with the corresponding APN node monitoring classification value, and a corresponding monitoring management message is issued when the operation progress parameter is less than the corresponding APN node monitoring classification value.

[0011] Preferably, in step T1, when the operation progress parameter of the previous network APN node is less than its corresponding APN node management dynamic interval value, the APN node management dynamic interval value of the next network APN node is adjusted according to the operation progress parameter and APN node management dynamic interval value of the previous network APN node.

[0012] Preferably, step T3 specifically includes the following steps:

[0013] T31: After the submitted information for the network construction and implementation phase is approved, obtain the preliminary monitoring level and progress monitoring level of the network construction and implementation phase;

[0014] T32: Compare the preliminary monitoring level with the corresponding network construction implementation management dynamic interval value. If the preliminary monitoring level is greater than the network construction implementation management dynamic interval value, issue a corresponding abnormal management message; otherwise, proceed to the next step;

[0015] T33: Compare the progress monitoring level with the corresponding network construction implementation management dynamic interval value. If the progress monitoring level is greater than the network construction implementation management dynamic interval value, issue a corresponding abnormal management message; otherwise, proceed to the next step;

[0016] T34: Enter the stage of organizing Ethernet data packets for the virtual network management headquarters switch.

[0017] Preferably, the dynamic interval value of the network construction implementation management is ninety-eight percent of the virtual network construction management progress.

[0018] Preferably, in step T1, the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into the network construction start APN node, the network construction mid-term APN node, the network construction modification APN node and the network construction completion APN node.

[0019] The present invention also discloses a virtual network construction method, which is based on the above-mentioned network construction implementation and control abnormal management message method, and specifically includes:

[0020] The virtual network construction management division module is used to divide the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage into several network construction operation process APN nodes;

[0021] A virtual network construction management APN node monitoring module is used to obtain the operation progress parameters of the network construction APN node and the network construction progress of the virtual network construction management when the network construction APN node occurs;

[0022] A virtual network construction supervision module is used to input the operation progress parameters of the network construction APN node into a pre-established network construction monitoring and management model and obtain the network construction monitoring and management results output by the network construction monitoring and management model; the network construction monitoring and management model generates an APN node management dynamic interval value for the corresponding network construction APN node according to the degree of network construction progress, and then compares the operation progress parameter of the network construction APN node with the corresponding APN node management dynamic interval value. When the operation progress parameter is greater than the corresponding APN node management dynamic interval value, the corresponding network construction monitoring amount is output and an abnormal management message is issued as the network construction monitoring and management result.

[0023] Preferably, the network construction monitoring and management model is established based on the parameters of various dimensions of network construction and historical network construction information; the parameters of various dimensions of network construction include network construction APN nodes, network construction APN node start and end time, network construction monitoring factors, network construction human work content and network construction progress; the network construction monitoring and management model calculates the corresponding APN node management dynamic interval value based on the artificial neural network model.

[0024] Compared with the existing technology, the network construction implementation control exception management message method and system of the present invention has the following advantages:

[0025] In the present invention, the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into several network construction operation process APN nodes, and the operation progress parameters of each network construction APN node are controlled, which can prevent the virtual network construction management from exceeding the budget in the network construction monitoring and control, and thus can avoid the problem of network construction monitoring calculation in the network construction implementation stage of the virtual network construction management to a certain extent, thereby improving the control effect of the virtual network construction management implementation, and can assist in improving the quality of virtual network construction management. Secondly, the present invention calculates and generates the APN node management dynamic interval value and the network construction implementation management dynamic interval value in advance according to the degree of network construction progress, as well as the Ethernet data packet or experience value of the historical headquarters switch, so that the cost control effect for each network construction APN node and the network construction implementation stage is better, thereby improving the control effect of the virtual network construction management implementation. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0027] Figure 1 This is a first flow chart of a method for establishing a virtual network in Embodiment 1 of the present invention;

[0028] Figure 2 This is a second flow chart of a method for establishing a virtual network in the first embodiment of the present invention;

[0029] Figure 3 This is a first structural diagram of a method for establishing a virtual network in Embodiment 3 of the present invention;

[0030] Figure 4 This is a second structural diagram of a method for establishing a virtual network in Embodiment 3 of the present invention;

[0031] Figure 5 This is a third structural diagram of a method for establishing a virtual network in Embodiment 3 of the present invention;

[0032] Figure 6 This is the fourth structural diagram of a method for establishing a virtual network in embodiment three of the present invention. DETAILED DESCRIPTION

[0033] It should be noted that, unless there is a conflict, the embodiments in this application and the features in the embodiments can be combined with each other. The application is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0034] Example 1:

[0035] This embodiment discloses a method for establishing a virtual network.

[0036] A virtual network construction method divides the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage into several network construction operation process APN nodes, and then compares the operation progress parameter of each network construction APN node with the corresponding APN node management dynamic interval value when it occurs, and issues a corresponding abnormal management message when the operation progress parameter of the network construction APN node exceeds the corresponding APN node management dynamic interval value. Figure 1 As shown, the specific steps include:

[0037] T1: The Ethernet data packet sorting phase of the network construction headquarters switch in the virtual network construction management implementation phase is divided into several network construction operation process APN nodes; then, according to the network construction progress of the virtual network construction management, the APN node management dynamic interval value of each network construction APN node and the network construction implementation management dynamic interval value of the network construction implementation phase are generated;

[0038] T2: when a network APN node is established, the operation progress parameter of the network APN node is obtained, and then the operation progress parameter of the network APN node is compared with the corresponding APN node management dynamic interval value, and when the operation progress parameter is greater than the corresponding APN node management dynamic interval value, a corresponding abnormal management message is issued;

[0039] T3: Obtain the corresponding operation progress parameters during the network construction implementation phase, then compare the operation progress parameters during the network construction implementation phase with the corresponding network construction implementation management dynamic interval values, and issue a corresponding abnormal management message when the operation progress parameters are greater than the corresponding network construction implementation management dynamic interval values.

[0040] In the present invention, the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into several network construction operation process APN nodes, and the operation progress parameters of each network construction APN node are controlled, which can prevent the virtual network construction management from exceeding the budget in the network construction monitoring and control, and thus can avoid the problem of network construction monitoring calculation in the network construction implementation stage of the virtual network construction management to a certain extent, thereby improving the control effect of the virtual network construction management implementation, and can assist in improving the quality of virtual network construction management. Secondly, the present invention calculates and generates the APN node management dynamic interval value and the network construction implementation management dynamic interval value in advance according to the degree of network construction progress, as well as the Ethernet data packet or experience value of the historical headquarters switch, so that the cost control effect for each network construction APN node and the network construction implementation stage is better, thereby improving the control effect of the virtual network construction management implementation.

[0041] During the specific implementation process, in step T1, the APN node monitoring classification value corresponding to each network construction APN node is generated according to the network construction progress of the virtual network construction management; in step T2, when the network construction APN node occurs, the operation progress parameter of the network construction APN node is compared with the corresponding APN node monitoring classification value, and a corresponding monitoring management message is issued when the operation progress parameter is less than the corresponding APN node monitoring classification value.

[0042] In the actual management and control process, some network construction monitoring and control companies, in order to avoid network construction monitoring calculations, will purchase some cheap building materials whose specifications do not conform to the preset rules, making it difficult to ensure the quality of virtual network construction management. Therefore, the present invention also sets APN node monitoring classification values ​​and can issue corresponding monitoring management messages when the operation progress parameters are less than the corresponding APN node monitoring classification values. In other words, it can issue a monitoring management message when the operation progress parameters are significantly inconsistent with the budget amount to remind relevant personnel to check, thereby helping to improve the quality of virtual network construction management.

[0043] In the specific implementation process, combined with Figure 2 As shown, step T3 specifically includes the following steps:

[0044] T31: After the submitted information for the network construction implementation phase is approved, the preliminary monitoring level and progress monitoring level of the network construction implementation phase are obtained; the dynamic interval value of the network construction implementation management is 98% of the network construction progress level;

[0045] T32: Compare the preliminary monitoring level with the corresponding network construction implementation management dynamic interval value. If the preliminary monitoring level is greater than the network construction implementation management dynamic interval value, issue a corresponding abnormal management message; otherwise, proceed to the next step;

[0046] T33: Compare the progress monitoring level with the corresponding network construction implementation management dynamic interval value. If the progress monitoring level is greater than the network construction implementation management dynamic interval value, issue a corresponding abnormal management message; otherwise, proceed to the next step;

[0047] T34: Enter the stage of organizing Ethernet data packets for the virtual network management headquarters switch.

[0048] During the network construction implementation phase, the present invention first verifies the submitted information for network construction implementation, and after the submitted information is approved, it controls the amount of money in the network construction implementation phase and can issue corresponding exception management messages, thereby improving the management and control effect of the virtual network construction management implementation. Secondly, the present invention performs two different monitoring and control on the operational progress parameters of the network construction implementation phase, which is conducive to improving the management and control effect of the virtual network construction management implementation.

[0049] During the specific implementation process, in step T1, the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into the network construction start APN node, the network construction mid-term APN node, the network construction modification APN node and the network construction completion APN node.

[0050] In the present invention, each network construction APN node is divided according to the Ethernet data packet sorting stage of the network construction headquarters switch of the virtual network construction management, so that the divided network construction APN nodes can be adapted to the actual network construction monitoring and control process of the virtual network construction management, thereby facilitating the improvement of the management and control effect of each network construction APN node, and can improve the management and control effect of the virtual network construction management implementation.

[0051] In the present invention, by setting the APN node management dynamic interval value and APN node monitoring classification value of each network construction APN node, the cost control effect of each network construction APN node and the network construction implementation stage is better, and monitoring management can be issued when the operation progress parameters are obviously inconsistent with the budget amount to remind relevant personnel to check the materials and cost information, thereby improving the control effect of the virtual network construction management implementation, and assisting in improving the quality of virtual network construction management.

[0052] Example 2:

[0053] This embodiment, based on the first embodiment, discloses a method for updating a dynamic interval value of an APN node management.

[0054] In step T1 of this embodiment, when the operation progress parameter of the previous network construction APN node is less than its corresponding APN node management dynamic interval value, the APN node management dynamic interval value of the next network construction APN node is adjusted according to the operation progress parameter of the previous network construction APN node and the corresponding APN node management dynamic interval value.

[0055] In the present invention, the APN node management dynamic interval value of the subsequent network construction APN node can be adjusted according to the difference between the operation progress parameter of the previous network construction APN node and the APN node management dynamic interval value, so that the final network construction implementation amount of the virtual network construction management can be more consistent with the degree of network construction progress, thereby better controlling the costs of each network construction APN node, which is conducive to improving the control effect of the implementation of virtual network construction management.

[0056] For example, the preset APN node management dynamic interval value for the network construction start APN node is 30% of the network construction progress; the APN node management dynamic interval value for the network construction mid-term APN node and the network construction modification APN node is 60% of the network construction progress; and the APN node management dynamic interval value for the network construction completion APN node is 80% of the network construction progress. Therefore, when the operation progress parameter of the network construction start APN node is 15% of the network construction progress, the difference between it and the APN node management dynamic interval value is 15%. Therefore, in this embodiment, the APN node management dynamic interval value for the network construction APN node next to the network construction start APN node, the network construction mid-term APN node, and the network construction modification APN node is adjusted to 65% of the network construction progress. When the operation progress parameter of the network construction start APN node is 38% of the network construction progress, the difference between it and the APN node management dynamic interval value is 2%. Therefore, this embodiment adjusts the APN node management dynamic interval value of the next network construction APN node of the network construction start APN node, the network construction mid-term APN node and the network construction modification APN node to 69% of the network construction progress.

[0057] Specifically, if the difference between the operational progress parameter of the current APN node and the APN node management dynamic interval value is greater than 10%, the APN node management dynamic interval value of the subsequent APN node will be adjusted upwards. If the difference between the operational progress parameter of the current APN node and the APN node management dynamic interval value is less than 5%, the APN node management dynamic interval value of the subsequent APN node will be adjusted downwards. The specific adjustment value is determined by the Ethernet data packets of the historical headquarters switch or the corresponding virtual network management. This ensures that the final network implementation amount of the virtual network management is more consistent with the progress of the network construction.

[0058] Example 3:

[0059] Based on the first embodiment, this embodiment further discloses a network construction and implementation control and abnormality management message system.

[0060] Combine Figures 3 to 6 As shown, a virtual network construction method specifically includes: a virtual network construction management division module, which is used to divide the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage into several network construction operation process APN nodes;

[0061] A virtual network construction management APN node monitoring module is used to obtain the operation progress parameters of the network construction APN node and the network construction progress of the virtual network construction management when the network construction APN node occurs;

[0062] A virtual network construction supervision module is used to input the operation progress parameters of the network construction APN node into a pre-established network construction monitoring and management model and obtain the network construction monitoring and management results output by the network construction monitoring and management model;

[0063] The network construction monitoring and management model generates an APN node management dynamic interval value for the corresponding network construction APN node based on the progress of the network construction, and then compares the operation progress parameter of the network construction APN node with the corresponding APN node management dynamic interval value. When the operation progress parameter is greater than the corresponding APN node management dynamic interval value, the model outputs the corresponding network construction monitoring amount and issues an abnormal management message as the network construction monitoring and management result. In this embodiment, the network construction monitoring and management model is established based on various dimensional parameters of network construction and historical network construction information; the various dimensional parameters of network construction include network construction APN node, network construction APN node start and end time, network construction monitoring factors, network construction manual work content, and network construction progress; the network construction monitoring and management model calculates the corresponding APN node management dynamic interval value based on an artificial neural network model.

[0064] In the present invention, the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into several network construction operation process APN nodes through the virtual network construction management division module, and the operation progress parameters of each network construction APN node are controlled in combination with the virtual network construction management APN node monitoring module and the virtual network construction supervision module, which can avoid the virtual network construction management from exceeding the budget in the network construction monitoring control, and thus can avoid the problem of network construction monitoring calculation in the network construction implementation stage of the virtual network construction management to a certain extent, thereby improving the control effect of the implementation of virtual network construction management, and can assist in improving the quality of virtual network construction management. Secondly, the network construction monitoring management model in the present invention calculates and generates the corresponding APN node management dynamic interval value and network construction implementation management dynamic interval value in advance according to the degree of network construction progress and the Ethernet data packet or experience value of the historical headquarters switch, so that the cost control effect of each network construction APN node and the network construction implementation stage is better, thereby improving the control effect of the implementation of virtual network construction management.

[0065] In the description of the present invention, it should be noted that, unless otherwise expressly specified or limited, the terms "disposed," "installed," "connected," "connected," and "fixed" should be understood in a broad sense. For example, they may refer to fixed connections, detachable connections, or integral connections; they may refer to mechanical connections or electrical connections; they may refer to direct connections or indirect connections through an intermediate medium; and they may refer to internal communication between two components. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on specific circumstances.

[0066] The above is only an embodiment of the present invention. Common knowledge such as the known specific structures and characteristics in the scheme is not described in detail here. Ordinary technicians in the field are aware of all common technical knowledge in the technical field of the invention on the application date or priority date, can obtain all existing technologies in the field, and have the ability to apply conventional experimental means on that date. Ordinary technicians in the field can improve and implement this scheme in combination with their own abilities under the inspiration given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the field to implement this application. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several variations and improvements can be made, which should also be regarded as the scope of protection of the present invention. These will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A method for building a virtual network, characterized in that: The Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into several network construction operation process APN nodes. Then, when each network construction APN node occurs, its operation progress parameter is compared with the corresponding APN node management dynamic interval value, and when the operation progress parameter of the network construction APN node exceeds the corresponding APN node management dynamic interval value, a corresponding abnormal management message is issued; The specific steps include: T1: The Ethernet data packet sorting phase of the network construction headquarters switch in the virtual network construction management implementation phase is divided into several network construction operation process APN nodes; then, according to the network construction progress of the virtual network construction management, the APN node management dynamic interval value of each network construction APN node and the network construction implementation management dynamic interval value of the network construction implementation phase are generated; T2: when a network APN node is established, the operation progress parameter of the network APN node is obtained, and then the operation progress parameter of the network APN node is compared with the corresponding APN node management dynamic interval value, and when the operation progress parameter is greater than the corresponding APN node management dynamic interval value, a corresponding abnormal management message is issued; T3: obtaining corresponding operation progress parameters during the network construction implementation phase, then comparing the operation progress parameters during the network construction implementation phase with the corresponding network construction implementation management dynamic interval value, and issuing a corresponding abnormal management message when the operation progress parameters are greater than the corresponding network construction implementation management dynamic interval value; Step T3 specifically includes the following steps: T31: After the submitted information for the network construction and implementation phase is approved, obtain the preliminary monitoring level and progress monitoring level of the network construction and implementation phase; T32: Compare the preliminary monitoring level with the corresponding network construction implementation management dynamic interval value. If the preliminary monitoring level is greater than the network construction implementation management dynamic interval value, issue a corresponding abnormal management message; otherwise, proceed to the next step; T33: Compare the progress monitoring level with the corresponding network construction implementation management dynamic interval value. If the progress monitoring level is greater than the network construction implementation management dynamic interval value, issue a corresponding abnormal management message; otherwise, proceed to the next step; T34: Enter the stage of organizing Ethernet data packets for the virtual network management headquarters switch.

2. A method for establishing a virtual network according to claim 1, characterized in that: In step T1, an APN node monitoring classification value corresponding to each network construction APN node is also generated according to the network construction progress of the virtual network construction management; In step T2, when the network APN node is established, the operation progress parameter of the network APN node is compared with the corresponding APN node monitoring classification value, and a corresponding monitoring management message is issued when the operation progress parameter is less than the corresponding APN node monitoring classification value.

3. A method for establishing a virtual network according to claim 1, characterized in that: In step T1, when the operation progress parameter of the previous network construction APN node is less than its corresponding APN node management dynamic interval value, the APN node management dynamic interval value of the next network construction APN node is adjusted according to the operation progress parameter and APN node management dynamic interval value of the previous network construction APN node.

4. A method for establishing a virtual network according to claim 3, characterized in that: The dynamic interval value of network construction implementation management is ninety-eight percent of the progress of virtual network construction management.

5. A method for establishing a virtual network according to claim 4, characterized in that: In step T1, the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage is divided into the network construction start APN node, the network construction mid-term APN node, the network construction modification APN node and the network construction completion APN node.

6. A method for establishing a virtual network according to any one of claims 1 to 5, characterized in that: This method is implemented through the following modules: The virtual network construction management division module is used to divide the Ethernet data packet sorting stage of the network construction headquarters switch in the virtual network construction management implementation stage into several network construction operation process APN nodes; A virtual network construction management APN node monitoring module is used to obtain the operation progress parameters of the network construction APN node and the network construction progress of the virtual network construction management when the network construction APN node occurs; The virtual network construction supervision module is used to input the operation progress parameters of the network construction APN node into the pre-established network construction monitoring and management model and obtain the network construction monitoring and management results output by the network construction monitoring and management model.

7. A method for building a virtual network according to claim 6, characterized in that: The network construction monitoring and management model generates an APN node management dynamic interval value of the corresponding network construction APN node according to the progress of the network construction, and then compares the operation progress parameter of the network construction APN node with the corresponding APN node management dynamic interval value. When the operation progress parameter is greater than the corresponding APN node management dynamic interval value, the corresponding network construction monitoring amount is output and an abnormal management message is issued as the network construction monitoring and management result.

8. A method for establishing a virtual network according to claim 7, characterized in that: The network construction monitoring and management model is established based on various network construction dimensional parameters and historical network construction information; the various network construction dimensional parameters include network construction APN node, network construction APN node start and end time, network construction monitoring factors, network construction manual work content and network construction progress; The network construction monitoring and management model calculates the corresponding APN node management dynamic interval value according to the artificial neural network model.

Citation Information

Patent Citations

  • Method for constructing virtual mobile private network

    CN109361589A

  • Project risk monitoring method and device, computer equipment and storage medium

    CN114429297A