A tightening system with upper and lower decoupling and control method thereof

By using a decoupled tightening system between the upper and lower levels, and utilizing the upper system with IOT and IOT-PLC cores and the lower system with tightening machine PLC and machine transport PLC cores, the JOB and VIN are sent and cached in advance, which solves the production line stoppage problem caused by upper system crashes and improves production efficiency and stability.

CN116736812BActive Publication Date: 2024-11-01ANHUI HAIXINGYUN IOT TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202310733465.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-20
Publication Date
2024-11-01
Estimated Expiration
2043-06-20

AI Technical Summary

Technical Problem

In existing technologies, the strong coupling between upper-level and lower-level systems in industrial production processes leads to data communication failures in the lower-level systems, causing production line stoppages and affecting production cycle time and efficiency.

Method used

The tightening system adopts a decoupled upper and lower level system. The upper level system is based on the IOT system and IOT-PLC, and the lower level system is based on the tightening machine PLC and the mechanical transport PLC. The correspondence between JOB and VIN is issued in advance, and the VIN queue is obtained in real time by the mechanical transport PLC. This realizes the automation of tightening operation and caches data, ensuring production continuity.

Benefits of technology

When problems occur in the upper-level system, the tightening operation can continue by caching data, reducing the workload of workers, improving production efficiency and workload per unit time, and ensuring the stability and efficiency of production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116736812B_ABST
    Figure CN116736812B_ABST
Patent Text Reader

Abstract

The present invention discloses a tightening system and control method thereof with upper and lower decoupling. The upper system is based on the IOT system as the core, and also includes an execution system page, an Andon page, and an MES; the lower system is based on the IOT-PLC as the core, and also includes a tightening machine PLC and a machine operation PLC; the tightening JOB+VIN is issued in advance; by virtue of the correspondence between the JOB issued in advance and the VIN, and the VIN queue obtained from the machine operation PLC in real time, the real-time VIN is obtained, and then the JOB of the current vehicle is obtained from the relationship of the JOB+VIN issued in advance cached in the tightening machine PLC, so as to continue the tightening operation. The above technical scheme is adopted to propose a stable and open tightening scheme, overcome the defects and problems caused by the tight coupling between the upper and lower positions, reduce the labor load of workers, increase the unit time workload of the factory, and improve labor productivity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of Internet of Things control technology for industrial production operation. More specifically, the present invention relates to a tightening system with upper and lower decoupling. The present invention also relates to a control method of the tightening system. Background Art

[0002] In the prior art, the tightening scheme in the industrial production process has complex coupling between the upper and lower levels. Since the upper system is generally deployed in the central computer room and all resources are shared, a problem at one point will cause the entire upper system to crash. This strong coupling will cause the lower level that is strongly related to production to have problems requesting data from the upper system, thereby causing production to stop, which will greatly affect the production rhythm and efficiency.

[0003] The keywords "production; tightening; upper position; lower position" and so on were used to search the literature of the prior art, and the search results related to the present invention are as follows:

[0004] Chinese patent document: "A tightening assembly production system", patent publication number is 108510023A, and its technical solution is as follows:

[0005] The system "includes a server and at least one workstation, the workstation includes a host computer, a slave computer and an electric tool, and also includes a background server program and a workstation client program; the electric tool is connected to the slave computer via a field bus, and the host computer controls the electric tool and obtains feedback data through the slave computer; the background server program provides a configuration module for users to configure to form workstation task information or product task information; the workstation client program is used to obtain the workstation task information of the current workpiece at the current workstation from the background server program according to the barcode information on the current workpiece, and then notify the slave computer of the workstation to control the electric tool to perform the task according to the workstation task information";

[0006] The technical effects recorded are as follows:

[0007] "It can be configured according to the different brands and models of electric tightening tools. It has high versatility and the production line switching efficiency is very high when the product changes. If the electric tool fails, it can be easily replaced."

[0008] However, after a detailed analysis of the document, it was found that the technical solution did not solve the problems and defects existing in the prior art: "strong coupling will cause the lower level that is strongly related to production to have problems requesting data from the upper level system, thereby causing production stoppage, which will greatly affect the production rhythm and efficiency." Summary of the invention

[0009] The invention provides a tightening system with upper and lower positions decoupled, the purpose of which is to reduce the labor load of workers and improve production efficiency.

[0010] In order to achieve the above object, the technical solution adopted by the present invention is:

[0011] The upper and lower decoupled tightening system of the present invention comprises an upper system and a lower system; the upper system is centered on the IOT system and also comprises an execution system page, an Andon page and an MES; the lower system is centered on the IOT-PLC and also comprises a tightening machine PLC and a machine operation PLC; the tightening JOB+VIN is issued in advance; the real-time VIN is obtained by virtue of the correspondence between the JOB issued in advance and the VIN, and the VIN queue obtained from the machine operation PLC in real time, and then the JOB of the current vehicle is obtained from the relationship between the JOB+VIN issued in advance cached in the tightening machine PLC, so as to continue the tightening operation.

[0012] The number of VIN+JOBs issued in advance depends on the number of slides or hangers between the painting offline point and the final assembly 10 online point.

[0013] In order to achieve the same invention purpose as the above technical solution, the present invention also provides a control method for the tightening system with upper and lower decoupling as described above, and the process is as follows:

[0014] 1) The IOT system sends the start position and stop position percentage of the execution system to the IOT-PLC;

[0015] 2) The percentage of machine PLC sliding into the workstation and the VIN queue for IOT-PLC;

[0016] 3) When the percentage of the sliding wheel entering the workstation reaches the starting position set for the workstation, the IOT-PLC takes out the vehicle VIN of the current workstation from the VIN queue of the machine PLC, and uses this VIN to request the corresponding job number of the workstation from the upper level;

[0017] 4) After IOT-PLC obtains VIN+JOB number, it transmits this information to the tightening machine PLC, and the tightening machine starts working;

[0018] 5) The tightening machine PLC works based on this JOB and uploads the tightening results to IOT-PLC;

[0019] 6) When the percentage of the slide entering the workstation does not reach the stop position, the tightening OK result has been obtained, and the IOT-PLC sends a direction signal to the machine PLC, otherwise no interaction will be performed.

[0020] In the above 1), the percentage of the start position and the stop position is stored in the DB block of the IOT-PLC; as permanent storage, after being sent once, if no adjustment is made, it does not need to be sent again.

[0021] In the above 2), the percentage of the workstation is from 1% to 100%; each increase of 1% is given to the IOT-PLC once; it reflects the percentage of the slip entering the workstation; among them, 50% represents that the slip center coincides with the workstation center;

[0022] In the above 2), the VIN queue is obtained through RFID; RFID is installed at the entry and exit of the final assembly position and the up and down line positions of each line; the VIN is identified through RFID, so as to update the VIN queue of the machine operation PLC in real time.

[0023] In the above 5), whether the tightening work is OK is transmitted to IOT-PCL.

[0024] When all tightening results of the workstation are OK, the tightening machine PLC will transmit the tightening result as OK to the IOT-PLC, otherwise no information will be transmitted.

[0025] When the upper system crashes due to a problem, step 3) in the process cannot be implemented, that is, the current JOB number cannot be obtained; at this time, the IOT-PLC detects that the upper system cannot be pinged or the information is severely squeezed, so it sends a flag to the tightening machine PLC, directly uses the VIN given by the machine operation PLC, and obtains the vehicle's JOB from the VIN+JOB relationship cached in the tightening machine PLC, and then performs subsequent steps 4), 5), and 6) without affecting production.

[0026] The cached data can buy more than 2-3 hours of time for repairing the upper position; if the upper position is still not restored at this time, the tightening machine will enter manual mode by swiping the card on site. At this time, no JOB is issued, and workers need to rely on experience to perform tightening operations. The tightening machine PLC will record the tightening process data of each vehicle and ultimately provide it to the quality department for review. Finally, the quality gate of the final assembly will confirm whether the vehicle has met the requirements for release to enter the subsequent process.

[0027] The present invention adopts the above technical solution and proposes a stable and open tightening solution, which overcomes the defects and problems caused by the tight coupling between the upper and lower positions, reduces the labor load of workers, increases the factory's workload per unit time, and improves labor productivity. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The contents shown in the attached drawings are briefly described as follows:

[0029] Figure 1 It is a schematic diagram of the composition of the upper and lower systems and basic data flow of the present invention;

[0030] Figure 2 It is a transmission protocol and interface schematic diagram of the present invention;

[0031] Figure 3It is a basic principle diagram of cache data of the present invention (the concept of the location of the workshop);

[0032] Figure 4 It is the tightening control diagram of the coating offline line;

[0033] Figure 5 This is a schematic diagram of the tightening process under normal conditions. DETAILED DESCRIPTION

[0034] The specific implementation modes of the present invention are further explained in detail below by describing the embodiments with reference to the accompanying drawings, so as to help those skilled in the art to have a more complete, accurate and in-depth understanding of the inventive concept and technical solution of the present invention.

[0035] The technical terms involved in the present invention include:

[0036] VIN: Vehicle Identification Number (vehicle identification number);

[0037] JPH: JPH: work per unit time;

[0038] PLC: is a programmable controller;

[0039] IOT system: Internet Of Things, Internet of Things operating system;

[0040] Andon: Also known as "dark light", the Andon system is an audio-visual multimedia multi-automatic control system;

[0041] RESTFUL: is a design style and development method for web applications;

[0042] MES: A production information management system for the executive level of the workshop of manufacturing enterprises;

[0043] OTT: The abbreviation of "Over The Top" refers to Internet companies bypassing operators to develop various video and data service businesses based on the open Internet;

[0044] RFID: abbreviation of Radio Frequency Identification, which is wireless radio frequency identification technology;

[0045] Ping: A network diagnostic tool.

[0046] like Figure 1 , Figure 2 The structure of the present invention is a stable and open tightening system in which the upper position and the lower position are decoupled, and comprises an upper system and a lower system.

[0047] In order to solve the problems existing in the prior art and overcome its defects, and to achieve the invention purpose of reducing the labor load of workers and improving production efficiency, the technical solution adopted by the present invention is:

[0048] like Figure 1 , Figure 2 As shown, the upper and lower decoupled tightening system of the present invention, the upper system is based on the IOT system as the core, and also includes the execution system page, Andon page, MES; the lower system is based on the IOT-PLC as the core, and also includes the tightening machine PLC and the machine operation PLC; the tightening JOB+VIN is issued in advance; relying on the correspondence between the JOB issued in advance and the VIN, and the VIN queue obtained from the machine operation PLC in real time, the real-time VIN is obtained, and then the JOB of the current vehicle is obtained from the relationship of the JOB+VIN issued in advance cached in the tightening machine PLC, so as to continue the tightening operation.

[0049] The present invention proposes a stable and open solution for tightening, the most complex core business of final assembly in automobile manufacturing, which can reduce the workload of workers and improve the JPH of the factory.

[0050] The present invention adopts a solution of decoupling the upper and lower levels. Since the tightening JOB+VIN is issued in advance, when a problem occurs in the upper level, although the interface for requesting the JOB in real time fails, the real-time VIN can be obtained by relying on the correspondence between the JOB issued in advance and the VIN, and the VIN queue obtained from the machine operation PLC in real time, and then the JOB of the current vehicle can be obtained from the relationship of the JOB+VIN issued in advance cached in the tightening machine PLC, so as to continue the tightening operation.

[0051] The number of VIN+JOBs issued in advance depends on the number of skids (also known as "sleds", production line conveying equipment) or hangers between the painting offline point and the final assembly 10 online point.

[0052] Generally speaking, there are dozens or even hundreds of sliders or hangers on the production line. If calculated based on JPH=40, this part of the cached data is available for 2-3 hours. During this period, the tightening is still run in efficient automatic mode, which provides enough time for repairing the upper system.

[0053] After this period of time, if the upper position is still not repaired, the manual tightening operation is performed.

[0054] The upper system is centered on the IOT system, including the IOT system, Andon page, MES (production information management for the execution layer of the workshop of manufacturing enterprises) system, execution system page, etc.; the lower system is centered on the IOT-PLC, including IOT-PLC, tightening machine PLC, machine operation PLC, etc.

[0055] The upper system mainly provides data source and control, while the lower system mainly executes.

[0056] Andon is also called "dark light". The Andon system is only a light, an audio-visual multimedia multi-automatic control system. It is a set of information management and control systems designed specifically for automobile production and assembly lines. It has become an indispensable part of the complete automobile production line. The Andon system can collect relevant equipment and quality management information on the production line, and after processing, control the lights and sound alarm systems distributed throughout the workshop.

[0057] The execution system is mainly responsible for configuring the entire system, such as configuring basic information, issuing instructions, etc. The more important thing here is the configuration and issuance of important parameters. The start and stop positions of each workstation can be configured in the execution system and issued to the IOT-PLC.

[0058] The MES system mainly provides data sources for IOT, such as JOB+VIN information, material information, etc. The IOT system provides it with vehicle passing information in the final assembly, which facilitates MES to conduct continuous monitoring and archiving; the Andon screen mainly receives alarm and line stop information from the IOT system, and displays it in real time on the large screen in the workshop, so that on-site leaders and process personnel can coordinate resources and solve on-site problems in a timely manner.

[0059] IOT-PLC is the lower execution core. All cache information and control information from the upper level are gathered in IOT-PLC. The control lines that are critical to the site are determined by this logic.

[0060] The machine operation PLC mainly calculates the beat data in real time (the data is obtained through the relationship between the number of rotations of the motor and the length of the slide) and provides it to the IOT-PLC to obtain the signal of line control or release, and control whether to stop the line;

[0061] The tightening machine PLC is the core component of the tightening gun. It mainly caches the JOB+VIN information, obtains the JOB information in real time, passes the JOB to the tightening gun for work, and then feeds back the tightening results of the tightening gun to the IOT-PLC.

[0062] like Figure 2 As shown;

[0063] The upper system transmits data through the RESTful interface. The OPC UA protocol is used between the upper and lower systems. Since the lower systems are all Siemens PLCs, the S7 protocol is used (as shown in the figure).

[0064] RESTFUL is a design style and development method for network applications based on HTTP, which can be defined in XML format or JSON format.

[0065] OTT, short for "Over The Top", refers to Internet companies bypassing operators to develop various video and data service businesses based on the open Internet.

[0066] RESTFUL is suitable for scenarios where mobile Internet vendors use it as a business interface to enable third-party OTTs to call mobile network resources. The action types are adding, changing, and deleting the called resources.

[0067] like Figure 3 FIG. 1 is a conceptual diagram of a location in a workshop, mainly used to illustrate the basic principle of caching data.

[0068] The painting shop and the final assembly shop are divided by the painting offline point, and then after a distance, they enter the final assembly shop. When entering the final assembly shop at 10 o'clock, they report to work, and then start the final assembly related operations at each workstation.

[0069] like Figure 4 As shown:

[0070] When a vehicle rolls off the painting line on a skid or a sling, the VIN of the vehicle is obtained through the VIN queue of the painting MES system. At this time, the IOT system will use this VIN as a basis to request the MES system for the job of all subsequent tightening machines, and send the VIN+JOB to the PLC points of all tightening machines after going online at 10 o'clock, thereby achieving the purpose of caching.

[0071] like Figure 5 As shown:

[0072] In order to achieve the same invention purpose as the above technical solution, the present invention also provides a control method for the tightening system with upper and lower decoupling as described above, and the process is as follows:

[0073] 1) The IOT system sends the start position and stop position percentage of the execution system to the IOT-PLC;

[0074] 2) The percentage of machine PLC sliding into the workstation and the VIN queue for IOT-PLC;

[0075] 3) When the percentage of the slide entering the workstation reaches the start position set for the workstation, the IOT-PLC takes out the vehicle VIN of the current workstation from the VIN queue of the machine PLC, and uses this VIN to request the upper level to know the job number corresponding to the workstation;

[0076] 4) After IOT-PLC obtains VIN+JOB number, it transmits this information to the tightening machine PLC, and the tightening machine starts working;

[0077] 5) The tightening machine PLC works based on this JOB and uploads the tightening results to IOT-PLC;

[0078] 6) When the percentage of the slide entering the workstation does not reach the stop position, the tightening OK result has been obtained, and the IOT-PLC sends a direction signal to the machine PLC, otherwise no interaction will be performed.

[0079] In the above 1), the percentage of the start position and the stop position is stored in the DB block (data block) of the IOT-PLC; as permanent storage, after the sending is completed once, if no adjustment is made, it does not need to be sent again.

[0080] In the above 2), the percentage of the workstation is from 1% to 100%; every 1% increase is given to the IOT-PLC once; it reflects the percentage of the slide (with the car on top) entering the workstation; among them, 50% represents that the slide center coincides with the workstation center;

[0081] In the above 2), the VIN queue is obtained through RFID; RFID is installed at the entry and exit of the final assembly position and the up and down line positions of each line; the VIN is identified through RFID, so as to update the VIN queue of the machine operation PLC in real time.

[0082] It should be noted that so many RFIDs are deployed because vehicles may be pulled in and out when changing lanes. (RFID is the abbreviation of Radio Frequency Identification.)

[0083] In the above 5), whether the tightening work is OK is transmitted to IOT-PCL.

[0084] It should be noted here that the manufacturer of the tightening machine PLC needs to cache the corresponding data of each JOB in advance: the number of tightening points, the upper and lower limits of torque, and the upper and lower limits of angles; whether the worker succeeds in each tightening will be displayed on the tightening screen, and the tightening gun will also have a light on.

[0085] When the green light is on, it means that the angle and torque of this tightening have met the requirements. This tightening is OK, and the next position can be tightened according to the process requirements.

[0086] When tightening NOK, you need to rework immediately and retighten it until it is tightened OK before proceeding to subsequent tasks.

[0087] When all tightening results of the workstation are OK, the tightening machine PLC will transmit the tightening result as OK to the IOT-PLC, otherwise no transmission will be performed.

[0088] It should be emphasized that the machine operation PLC is line control by default. If no release signal is received, the machine operation PLC will control the line and display the relevant line control reasons, work station information, etc. on the ANDON screen for relevant personnel to quickly resolve.

[0089] When the upper system crashes due to a problem, step 3) in the process cannot be implemented, that is, the current JOB number cannot be obtained; at this time, the IOT-PLC detects that the upper system cannot be pinged or the information is severely squeezed, so it sends a flag to the tightening machine PLC, directly uses the VIN given by the machine operation PLC, and obtains the vehicle's JOB from the VIN+JOB relationship cached in the tightening machine PLC, and then performs subsequent steps 4), 5), and 6) without affecting production.

[0090] The cached data can buy more than 2-3 hours for repairing the upper position; if the upper position is still not restored at this time, the tightening machine will enter manual mode by swiping the card on site. At this time, no JOB is issued, and workers need to rely on experience to perform tightening operations. The tightening machine PLC will record the tightening process data of each vehicle and ultimately provide it to the quality department for review. Finally, the quality gate of the final assembly will confirm whether the vehicle has met the requirements for release to enter the subsequent process.

[0091] Test example of the present invention:

[0092] The present invention is applied in the final assembly workshops of many automobile manufacturing enterprises, and the JPH is increased from less than 30 to more than 60. With the application of this set of automation system, the workload of workers is greatly reduced, and the labor cost can be saved by about 20%.

[0093] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention, or the concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A control method for a tightening system with decoupling between upper and lower levels, the tightening system comprising an upper system and a lower system; the upper system is centered on the IOT system and also comprises an execution system page, an Andon page, and an MES; the lower system is centered on the IOT-PLC and also comprises a tightening machine PLC and a machine operation PLC; the tightening JOB+VIN is issued in advance; the real-time VIN is obtained by virtue of the correspondence between the JOB issued in advance and the VIN, and the VIN queue obtained from the machine operation PLC in real time, and then the JOB of the current vehicle is obtained from the relationship between the JOB+VIN issued in advance cached in the tightening machine PLC, so as to continue the tightening operation; It is characterized in that The process of the control method is: 1) The IOT system sends the start position and stop position percentage of the execution system to the IOT-PLC; 2) The percentage of machine PLC sliding into the workstation and the VIN queue for IOT-PLC; 3) When the percentage of the sliding wheel entering the workstation reaches the starting position set for the workstation, the IOT-PLC takes out the vehicle VIN of the current workstation from the VIN queue of the machine PLC, and uses this VIN to request the JOB number corresponding to the workstation from the upper system; 4) After IOT-PLC obtains VIN+JOB number, it transmits this information to the tightening machine PLC, and the tightening machine starts working; 5) The tightening machine PLC works based on this JOB and uploads the tightening results to IOT-PLC; 6) When the percentage of the slide entering the workstation does not reach the stop position, the tightening OK result has been obtained, and the IOT-PLC sends a direction signal to the machine PLC, otherwise no interaction will be performed.

2. The control method of the tightening system with upper and lower decoupling according to claim 1, Features: The number of VIN+JOBs issued in advance depends on the number of slides or hangers between the paint off-line point and each point on the assembly line.

3. The control method of the tightening system with upper and lower decoupling according to claim 1, Features: In the above 1), the percentage of the start position and the stop position is stored in the DB block of the IOT-PLC; as permanent storage, after being sent once, if no adjustment is made, it does not need to be sent again.

4. The control method of the tightening system with upper and lower decoupling according to claim 1, Features: In the above 2), the percentage of the workstation is from 1% to 100%; each increase of 1% is given to the IOT-PLC once; it reflects the percentage of the slip entering the workstation; among them, 50% represents that the slip center coincides with the workstation center.

5. The control method of the tightening system with upper and lower decoupling according to claim 4, Features: In the above 2), the VIN queue is obtained through RFID; RFID is installed at the entry and exit of the final assembly position and the up and down line positions of each line; the VIN is identified through RFID, so as to update the VIN queue of the machine operation PLC in real time.

6. The control method of the tightening system with upper and lower decoupling according to claim 1, Features: In the above 5), whether the tightening work is OK is transmitted to the IOT-PLC.

7. The control method of the tightening system with upper and lower decoupling according to claim 6, Features: The tightening machine PLC needs to cache the corresponding information of each JOB in advance: the number of tightening points, the upper and lower limits of torque, and the upper and lower limits of angles; whether the worker succeeds in each tightening will be displayed on the tightening screen, and the tightening gun will also have a light on.

8. The control method of the tightening system with upper and lower decoupling according to claim 1, Features: When the upper system crashes due to a problem, step 3) in the process cannot be implemented, that is, the current JOB number cannot be obtained; at this time, the IOT-PLC detects that the upper system cannot be pinged or the information is severely squeezed, so it sends a flag to the tightening machine PLC, directly uses the VIN given by the machine operation PLC, and obtains the vehicle's JOB from the VIN+JOB relationship cached in the tightening machine PLC, and then performs subsequent steps 4), 5), and 6) without affecting production.

9. The control method of the tightening system with upper and lower decoupling according to claim 8, Features: The cached data buys more than 3 hours to repair the upper system; if the upper system still has not recovered at this time, the tightening machine will enter manual mode by swiping the card on site. At this time, no JOB is issued, and workers need to rely on experience to perform tightening operations. The tightening machine PLC will record the tightening process data of each vehicle and ultimately provide it to the quality department for review. Finally, the quality gate of the final assembly will confirm whether the vehicle has met the requirements for release to enter the subsequent process.

Citation Information

Patent Citations

  • Wireless intelligent torque management system

    CN102622002A

  • Tightening assembly production system

    CN108510023A

  • Tightening control management system and tightening control method

    CN108608200A

  • Electric control torque system

    CN113741573A

  • Production control method and system therefor

    US5321619A