A vegetation slope protection structure suitable for high and steep rock slopes and its construction method
By laying concrete layers and installing anchor components on high steep rocky slopes, the problems of low vegetation survival rate and reduced anchor strength are solved, the vegetation adhesion and slope stability are improved, and the anchor rods are extended Service life.
Patent Information
- Application Number
- CN202310992004.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-08
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-08-08
Smart Images

Figure CN116752555B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high-steep rock slopes, in particular to a vegetation slope protection structure suitable for high-steep rock slopes and a construction method thereof. Background Art
[0002] As a special product after mining, the existence of high and steep rock slopes will bring huge safety hazards to the lives, property and health of the surrounding people, such as rock slope collapse. For this reason, engineers have repaired high and steep rock slopes through a series of means, such as soil covering and greening, retaining wall slope greening, excavation platform greening, slope drilling greening, fish scale pit soil greening, hanging net spraying greening, ecological bag greening, ecological grass carpet greening, vegetation concrete greening, etc. However, a large number of engineering examples show that the traditional ecological restoration method has a poor repair effect on high and steep rock slopes, which is specifically manifested in the following aspects: 1) low vegetation survival rate; 2) poor adhesion, the surface of high and steep rock slopes is relatively smooth, and it is difficult for vegetation to adsorb on its surface; 3) low long-term stability of the slope, traditional repair mainly uses anchor rods to improve the stability of the slope, but as the service life of the anchor rods increases (usually decades), the strength will be reduced due to the stress pulling of the rock strata, and the reinforcement effect will gradually weaken, making it difficult to form long-term reinforcement for the slope. Summary of the invention
[0003] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0004] In view of the above and / or existing problems in the vegetation slope protection structure suitable for high and steep rock slopes and the construction method thereof, the present invention is proposed.
[0005] Therefore, the problem to be solved by the present invention is how to solve the problem of poor vegetation restoration effect on high and steep rock slopes.
[0006] To solve the above technical problems, the present invention provides the following technical solutions: a vegetation slope protection structure suitable for high and steep rock slopes, comprising: a slope protection component, including a rock slope body, a rock slope surface and a concrete layer, wherein the rock slope surface is located on the rock slope body, and the concrete layer is arranged on the rock slope surface; and an anchor rod component, which is arranged on the rock slope surface, and comprises a first part, a second part, a core member, a pressure-yielding member, a fastener and a connecting member, wherein the first part is arranged at the top of the second part, the core member is arranged above the first part, and the bottom end extends to the inside thereof, the pressure-yielding member is arranged in the first part, the fasteners are arranged on both sides of the second part, and the connecting member is arranged in the second part.
[0007] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, a groove is provided on the surface of the rock slope, which cooperates with the concrete layer.
[0008] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, a water guide trough and a water storage groove are also provided on the surface of the rock slope.
[0009] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, the first part includes a first tube, a side rod and a stabilizing ring, the side rod is fixed to the top of the first tube, the stabilizing ring is fixed to the surface of the side rod, and the stabilizing ring is fixed to the side rod.
[0010] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, the second part includes a second tube and a threaded column, the second tube is located at the bottom end of the first tube, the threaded column is fixed to the top end of the second tube and is threadedly connected to the first tube.
[0011] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, the core member includes a threaded rod, a threaded ring and a bottom block, the threaded rod is located in the first tube, and the top end extends above the stabilizing ring, the threaded ring slides in the first tube, and the bottom block is fixed to the bottom end of the threaded rod.
[0012] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, the pressure-releasing member includes a movable ring, a return spring, an inclined block and a top block. The movable ring slides in the first tube and is located above the threaded ring. The two ends of the return spring are respectively fixed to the movable ring and the threaded ring. A through hole is opened on the inner wall of the first tube. The inclined block slides in the through hole. The top block is fixed to the top of the movable ring and cooperates with the inclined block.
[0013] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, the fastener includes a flexible plate and a trigger block, installation grooves are opened on both sides of the inner wall of the second tube, the bottom of the flexible plate is fixed in the installation groove, and the trigger block is fixed on the inner side of the flexible plate and is located in the second tube.
[0014] As a preferred solution of the vegetation slope protection structure suitable for high and steep rock slopes described in the present invention, the connecting part includes a movable rod, a hook plate and a push block, the movable rod slides in the second tube, the hook plate is fixed to the top of the movable rod, the bottom of the bottom block is provided with an annular groove matching therewith, and the push block is fixed to the bottom of both sides of the movable rod, which cooperates with the trigger block.
[0015] As a preferred solution of the vegetation slope protection structure construction method applicable to high and steep rock slopes described in the present invention, the following construction steps are also included:
[0016] Site survey and design;
[0017] Irregular grooves, water channels and water storage trenches are chiseled out on the rock joints;
[0018] The slope is dusted, and then a special concrete layer is laid on the rock layer;
[0019] Install anchor rod assemblies and connect adjacent anchor rods with anchor cables;
[0020] The vegetation is sprayed, then an appropriate amount of rainwater is sprayed, and then covered with a water-soluble sunshade curtain.
[0021] The beneficial effects of the present invention are as follows: the present invention can effectively increase the survival rate and adhesion of slope vegetation through the slope protection component, greatly improve the safety of the slope protection, and then improve the overall stability of the slope protection through the anchor rod component, and the service life of the anchor rod is longer. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0023] Figure 1 It is an overall structural diagram of the vegetation slope protection structure and its construction method suitable for high and steep rock slopes.
[0024] Figure 2 The present invention is a cross-sectional view of a slope protection component of a vegetation slope protection structure and its construction method suitable for high and steep rock slopes.
[0025] Figure 3 The present invention is a structural diagram of an anchor rod assembly for a vegetation slope protection structure and its construction method suitable for high and steep rock slopes.
[0026] Figure 4 The present invention is a cross-sectional view of an anchor rod assembly of a vegetation slope protection structure and a construction method thereof suitable for high and steep rock slopes.
[0027] Figure 5 The cross-sectional view of the connectors of the vegetation slope protection structure and its construction method suitable for high and steep rock slopes.
[0028] Figure 6 The diagram is a cross-sectional view of a yielding member of a vegetation slope protection structure and its construction method suitable for high and steep rock slopes.
[0029] Figure 7 Another perspective view of the yielding piece of the vegetation slope protection structure and its construction method suitable for high and steep rock slopes. DETAILED DESCRIPTION
[0030] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0031] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0032] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0033] Example 1
[0034] Reference Figure 1 and Figure 3 , which is the first embodiment of the present invention, and provides a vegetation slope protection structure suitable for high and steep rock slopes and a construction method thereof. The vegetation slope protection structure suitable for high and steep rock slopes and a construction method thereof include a slope protection component 100 and an anchor component 200. The slope protection component 100 is constructed on the high and steep rock slope, which greatly improves the stability of the slope protection. At the same time, the service life of the anchor component 200 is increased by the setting of the anchor component 200, thereby further improving the stability of the slope protection.
[0035] Specifically, the slope protection assembly 100 includes a rock slope body 101 , a rock slope surface 102 and a concrete layer 103 . The rock slope surface 102 is located on the rock slope body 101 , and the concrete layer 103 is disposed on the rock slope surface 102 .
[0036] The concrete layer 103 is laid on the rock slope surface 102 to improve the convenience of laying vegetation and provide space for its growth.
[0037] The anchor assembly 200 is arranged on the rock slope surface 102, and includes a first part 201, a second part 202, a core member 203, a pressure member 204, a fastener 205 and a connecting member 206. The first part 201 is arranged at the top of the second part 202, the core member 203 is arranged above the first part 201, and the bottom end extends to the inside thereof, the pressure member 204 is arranged in the first part 201, the fasteners 205 are arranged on both sides of the second part 202, and the connecting member 206 is arranged in the second part 202.
[0038] The entire anchor rod is divided into three parts: a first part 201, a second part 202 and a core part 203, so as to improve the convenience of storage and installation. Then, the anchor rod is given a certain pressure-releasing performance by means of the pressure-releasing part 204. When the anchor rod is pulled due to the stress of the rock layer, the anchor rod can firstly yield to the stress. While yielding, the coordination between the fastener 205 and the connector 206 can further improve the stability of the anchor rod installation, thereby avoiding the deformation of the anchor rod due to the pulling of the stress of the rock layer during long-term use, thereby greatly improving the service life of the anchor rod.
[0039] Example 2
[0040] Reference Figure 1 to Figure 7 , which is the second embodiment of the present invention, and this embodiment is based on the previous embodiment.
[0041] Specifically, a groove S1 is provided on the surface of the rock slope surface 102 , which cooperates with the concrete layer 103 .
[0042] The groove S1 is artificially excavated and has no specific shape but is irregular. When the construction workers spray the concrete layer 103 on the surface of the rock layer, the groove S1 will be filled, thereby greatly increasing the contact area between the concrete layer 103 and the rock layer, and the stability is higher, avoiding the concrete layer 103 from falling off or shifting during long-term use.
[0043] The surface of the rock slope surface 102 is also provided with a water guide trough S2 and a water storage trough S3. The water guide trough S2 can be set to a diamond shape to divert rainwater on the top of the rock slope surface 102 downward to avoid excessive rainwater from accumulating on the top of the rock slope surface 102 for a long time and reducing the stability of the concrete layer 103. There are multiple water storage grooves S3 located in the middle of the water guide trough S2. When rainwater flows downward from the water guide trough S2, part of the water will gather in the water storage groove S3 to supply water to vegetation, thereby improving the utilization rate of rainwater and further improving the survival rate of vegetation.
[0044] The first part 201 includes a first tube 201a, a side rod 201b and a stabilizing ring 201c. The side rod 201b is fixed to the top of the first tube 201a. The stabilizing ring 201c is fixed to the surface of the side rod 201b. The stabilizing ring 201c is fixed to the side rod 201b.
[0045] The first tube 201a is a hollow tube with threads welded on its surface to improve its stability. A plurality of side rods 201b are arranged evenly distributed on the outside of the top end of the first tube 201a. A plurality of stabilizing rings 201c are arranged and fixed equidistantly on the surface of the side rods 201b to improve the strength and stability of the overall anchor rod.
[0046] The second part 202 includes a second tube 202a and a threaded column 202b. The second tube 202a is located at the bottom end of the first tube 201a. The threaded column 202b is fixed to the top end of the second tube 202a and is threadedly connected in the first tube 201a.
[0047] The bottom end of the second tube 202a is arc-shaped, which is convenient for driving into the rock formation. A threaded groove is provided at the bottom of the inner wall of the first tube 201a. During installation, the second tube 202a is connected to the bottom end of the first tube 201a so that the threaded column 202b is threadedly connected in the threaded groove, thereby completing the connection and installation of the two.
[0048] The core member 203 includes a threaded rod 203a, a threaded ring 203b and a bottom block 203c. The threaded rod 203a is located in the first tube 201a, and the top end extends above the stabilizing ring 201c. The threaded ring 203b slides in the first tube 201a, and the bottom block 203c is fixed to the bottom end of the threaded rod 203a.
[0049] The top of the threaded rod 203a is located above the stabilizing ring 201c, and the threaded rod 203a can be positioned by the stabilizing ring 201c to prevent it from shifting during long-term use. The threaded ring 203b is threadedly connected to the surface of the threaded rod 203a, and a limiting strip is fixed on the inner wall of the first tube 201a. A limiting groove is provided on the outer side of the threaded ring 203b. The threaded ring 203b can be limited by the limiting strip and the limiting groove to prevent it from rotating with the threaded rod 203a. When installed, the threaded rod 203a is threadedly connected in the threaded ring 203b, and the threaded rod 203a is located at the bottom. Therefore, when the stress of the rock layer acts on the threaded rod 203a and the first tube 201a, the threaded rod 203a and the threaded rod 203a can move outward, which greatly reduces the damage to the anchor rod caused by stress pulling and increases its service life.
[0050] The pressing piece 204 includes a movable ring 204a, a return spring 204b, a bevel block 204c and a top block 204d. The movable ring 204a slides in the first tube 201a and is located above the threaded ring 203b. Both ends of the return spring 204b are respectively fixed to the movable ring 204a and the threaded ring 203b. A through hole K is opened on the inner wall of the first tube 201a. The bevel block 204c slides in the through hole K. The top block 204d is fixed to the top of the movable ring 204a and cooperates with the bevel block 204c.
[0051] A limiting groove is also provided on the surface of the movable ring 204a, which cooperates with the limiting bar to limit the movable ring 204a to prevent it from rotating or shifting during the up and down movement. The return spring 204b applies an upward thrust to the movable ring 204a. In the initial state, the force of the return spring 204b can only push the movable ring 204a away from the threaded ring 203b, and a balanced state is reached when the inclined block 204c contacts the top block 204d.
[0052] There are multiple through holes K, which are evenly distributed in a ring shape on the surface of the first tube 201a. The inclined block 204c is divided into two parts, one part is a triangular cone, located outside the through hole K, and the other part has an inclined bottom, located inside the first tube 201a. A thin iron sheet is fixed to the inner wall of the through hole K to prevent excessive impurities such as gravel from entering the interior when installing the anchor rod, affecting subsequent use. When the inclined block 204c moves outward, it will pierce the iron sheet. The top block 204d is rectangular, and a spur is fixed on its top. The top of the first tube 201a is also provided with evenly distributed holes, and a thin iron sheet is fixed on the top of the hole. When the top block 204d moves upward, its top will pierce the iron sheet and extend to the top of the hole.
[0053] When the stress of the rock layer pulls the threaded rod 203a and the threaded ring 203b upward, the threaded ring 203b will squeeze the return spring 204b and the movable ring 204a, so that it drives the top block 204d to move upward. At this time, the top block 204d moves on the inclined surface of the inclined block 204c, pushing the inclined block 204c outward, so that it passes through the through hole K and extends to the outside. At the same time, the top block 204d will move upward and pass through the hole, and can be stuck in the rock layer and the concrete layer 103, thereby further improving the strength of the anchor rod after adapting to the stress, and avoiding the situation where the strength of the anchor rod is reduced after adapting to the stress pulling.
[0054] The fastener 205 includes a flexible plate 205a and a trigger block 205b. Both sides of the inner wall of the second tube 202a are provided with mounting grooves P. The bottom of the flexible plate 205a is fixed in the mounting groove P. The trigger block 205b is fixed on the inner side of the flexible plate 205a and is located in the second tube 202a.
[0055] The flexible plate 205a is a rectangular iron sheet, the top of which is open, and the bottom is fixed to the bottom wall of the mounting slot P, and can rotate outward. The bottom of the trigger block 205b is inclined, which can improve the strength of the flexible plate 205a after rotation.
[0056] The connecting member 206 includes a movable rod 206a, a hook plate 206b and a push block 206c. The movable rod 206a slides in the second tube 202a. The hook plate 206b is fixed to the top of the movable rod 206a. The bottom of the bottom block 203c is provided with an annular groove V that cooperates with it. The push block 206c is fixed to the bottom of both sides of the movable rod 206a, which cooperates with the trigger block 205b.
[0057] The top end of the movable rod 206a passes through the threaded column 202b and extends into the first tube 201a. There are at least four hook plates 206b, and hook blocks are fixed at the ends of the hook plates 206b. The hook plates 206b are tough and can be bent at the ends. When the threaded rod 203a moves downward, the bottom block 203c first squeezes the four hook plates 206b inward until the ends of the hook plates 206b are located in the annular groove V. At this time, the hook plates 206b will be stuck in the annular groove V to connect the threaded rod 203a with the movable rod 206a. The push block 206c is rectangular and is located at the inclined surface of the trigger block 205b.
[0058] When the threaded rod 203a is pulled upward by the stress of the rock layer, it will drive the movable rod 206a to move upward. At this time, the push block 206c pushes the trigger block 205b outward, causing the top of the flexible plate 205a to rotate outward. During the entire process of the anchor rod moving upward due to the stress of the rock layer, it can be buckled in the gap of the rock layer, thereby improving the overall tensile strength from the bottom end of the anchor rod, making the anchor rod more stable and having a longer service life.
[0059] Example 3
[0060] Refer to the figure Figure 1 to Figure 7 , which is the third embodiment of the present invention, and is based on the first two embodiments.
[0061] Specifically, the construction personnel will conduct on-site surveys at the construction site in the early stage and design the setting of the slope protection and the location of the anchor rods to facilitate the subsequent construction operations;
[0062] Irregular grooves S1, water guide grooves S2 and water storage grooves S3 are chiseled out on the rock joints. The grooves S1 are used to increase the contact area between the concrete layer 103 and the rock slope surface 102, thereby greatly reducing the loosening or damage of the concrete layer 103 caused by rainwater scouring or falling rocks. The water guide grooves S2 can be set to a diamond shape to guide the rainwater on the top of the rock slope surface 102 downward to avoid excessive rainwater from accumulating on the top of the rock slope surface 102 for a long time, thereby reducing the stability of the concrete layer 103. There are multiple water storage grooves S3 located in the middle of the water guide grooves S2. When rainwater flows downward from the water guide grooves S2, part of the water will gather in the water storage grooves S3 to supply water to vegetation, thereby improving the utilization rate of rainwater and further improving the survival rate of vegetation.
[0063] Slope dust removal: when the construction workers dig the groove S1, a lot of dust will be left on the surface of the rock layer. Therefore, it is necessary to remove the dust to avoid mixing it at the location where the concrete layer 103 and the rock slope surface 102 are connected, which will have a greater impact on the adhesion of the concrete layer 103. Then, a special concrete layer 103 is laid on the rock layer. The coconut peel net in the fiber concrete is integrated into the concrete layer 103 to supplement the strength in the early stage and serve as nutrition in the later stage. At the same time, the root path will assist the growth of vegetation. At the same time, the concrete layer 103 is mixed with fiber-containing sticky soil to prevent it from being washed away by rainwater. The concrete layer 103 is a porous sticky structure and is sprayed on site.
[0064] Anchor rod assemblies 200 are installed at cracks in the rock formation, and adjacent anchor rods are connected with anchor cables to improve the stability between the anchor rods;
[0065] The vegetation is sprayed, then sprayed with an appropriate amount of rainwater, and then covered with a water-soluble sunshade curtain, which is pollution-free and can prevent the sun from exposing the vegetation in the early stage. When washed by rainwater, the sunshade curtain will dissolve by itself, thereby further improving the survival rate of the vegetation.
[0066] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A vegetation slope protection structure suitable for high and steep rock slopes, characterized by: include, A slope protection component (100) comprises a rock slope body (101), a rock slope surface (102) and a concrete layer (103), wherein the rock slope surface (102) is located on the rock slope body (101), and the concrete layer (103) is arranged on the rock slope surface (102); and, An anchor assembly (200) is arranged on the rock slope surface (102), comprising a first part (201), a second part (202), a core member (203), a pressure-releasing member (204), a fastener (205) and a connecting member (206), wherein the first part (201) is arranged at the top of the second part (202), the core member (203) is arranged above the first part (201), and the bottom end extends into the inside of the first part (201), the pressure-releasing member (204) is arranged in the first part (201), the fastener (205) is arranged on both sides of the second part (202), and the connecting member (206) is arranged in the second part (202); The first part (201) comprises a first tube (201a), a side rod (201b) and a stabilizing ring (201c), wherein the side rod (201b) is fixed to the top end of the first tube (201a), the stabilizing ring (201c) is fixed to the surface of the side rod (201b), and the stabilizing ring (201c) is fixed to the side rod (201b); The second part (202) comprises a second tube (202a) and a threaded column (202b), the second tube (202a) is located at the bottom end of the first tube (201a), the threaded column (202b) is fixed to the top end of the second tube (202a) and is threadedly connected to the inside of the first tube (201a); The core member (203) comprises a threaded rod (203a), a threaded ring (203b) and a bottom block (203c); the threaded rod (203a) is located in the first tube (201a), and the top end extends above the stabilizing ring (201c); the threaded ring (203b) slides in the first tube (201a); and the bottom block (203c) is fixed to the bottom end of the threaded rod (203a); The pressure-releasing member (204) comprises a movable ring (204a), a return spring (204b), an inclined block (204c) and a top block (204d); the movable ring (204a) slides in the first tube (201a) and is located above the threaded ring (203b); two ends of the return spring (204b) are respectively fixed to the movable ring (204a) and the threaded ring (203b); a through hole (K) is provided on the inner wall of the first tube (201a); the inclined block (204c) slides in the through hole (K); and the top block (204d) is fixed to the top of the movable ring (204a) and cooperates with the inclined block (204c).
2. The vegetation slope protection structure suitable for high and steep rock slopes as claimed in claim 1 is characterized by: The surface of the rock slope surface (102) is provided with a groove (S1) which cooperates with the concrete layer (103).
3. The vegetation slope protection structure suitable for high and steep rock slopes as claimed in claim 2 is characterized by: The surface of the rock slope surface (102) is also provided with a water guide groove (S2) and a water storage groove (S3).
4. The vegetation slope protection structure suitable for high and steep rock slopes as claimed in claim 3, characterized in that: The fastener (205) comprises a flexible plate (205a) and a trigger block (205b); mounting grooves (P) are provided on both sides of the inner wall of the second tube (202a); the bottom of the flexible plate (205a) is fixed in the mounting groove (P); the trigger block (205b) is fixed on the inner side of the flexible plate (205a) and is located in the second tube (202a).
5. The vegetation slope protection structure suitable for high and steep rock slopes as claimed in claim 4 is characterized by: The connecting member (206) comprises a movable rod (206a), a hook plate (206b) and a push block (206c); the movable rod (206a) slides in the second tube (202a); the hook plate (206b) is fixed to the top of the movable rod (206a); a matching annular groove (V) is provided at the bottom of the bottom block (203c); the push block (206c) is fixed to the bottom of both sides of the movable rod (206a) and matches with the trigger block (205b).
6. A vegetation slope protection construction method suitable for high and steep rock slopes, characterized by: The slope protection structure according to any one of claims 1 to 5 further comprises the following construction steps: Site survey and design; Irregular grooves (S1), water diversion channels (S2) and water storage trenches (S3) are chiseled out on the rock joints; The slope surface is dusted and then a special concrete layer (103) is laid on the rock layer; Installing the anchor rod assembly (200) and connecting adjacent anchor rods with anchor cables; The vegetation is sprayed, then an appropriate amount of rainwater is sprayed, and then covered with a water-soluble sunshade curtain.
Citation Information
Patent Citations
High and steep rock slope greening protection and construction method
CN109853593A
Building pile foundation and earth excavation construction process