Multi-arch joint load-bearing structure system and technology of large-span arch steel structure system

By adopting a combination of inclined arch support steel frame, ring steel ring, moving parts, wiper blades and moving mechanisms in the multi-arch joint stress structure of a large span arch steel structure system, the corrosion problem of colored steel tiles during rainwater accumulation and dust accumulation is solved, and efficient automatic cleaning and strength improvement of the structure is achieved.

CN116791764BActive Publication Date: 2025-04-08TIANJIN SOUTHEAST STEEL STRUCTURE
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310990768.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-08
Publication Date
2025-04-08
Estimated Expiration
2043-08-08

AI Technical Summary

Technical Problem

The multi-arch combined stress structure of the existing large-span arch steel structure system is prone to corrosion of colored steel tiles when rainwater accumulates and dust accumulates, and the linear bearing capacity of the support structure is poor, affecting the stability and service life of the structure.

Method used

A multi-arch joint stress-bearing structure system including inclined arch support steel frame, ring ring ring, moving parts, wiper blades and moving mechanisms is adopted. The automated system of moving parts and wiper blades automatically scrapes off the accumulated water and dust on the color steel tiles after rainy weather, extends the service life of color steel tiles, and improves the strength of the structure through ring rings.

Benefits of technology

It effectively avoids corrosion of colored steel tiles, extends its service life, improves the strength and stability of the structure, and reduces the frequency of manual wiper replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116791764B_ABST
    Figure CN116791764B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-arch joint force-bearing structure system of a large-span arch steel structure system, and the present invention relates to the technical field of multi-arch joint force-bearing structures. The multi-arch joint force-bearing structure system of the large-span arch steel structure system is provided with a circular steel ring, which improves the strength of the structure compared with the use of a linear structure for support connection in the comparative document. By providing a moving part, a wiper blade and a moving mechanism, the accumulated water on the second color steel tile close to the arch support steel frame can be automatically scraped off after rainy weather, avoiding the accumulation of rainwater on the second color steel tile, thereby reducing the probability of corrosion of the color steel tile, increasing the service life of the color steel tile, and being able to automatically scrape off, and can also scrape off accumulated dust or leaf impurities, further avoiding the accumulation of dust and leaves.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of multi-arch combined load-bearing structures, in particular to a multi-arch combined load-bearing structure system and a process for a large-span arch steel structure system. Background Art

[0002] Large-span arched steel structure systems are used in factories, gymnasiums or large buildings. The large-span structure is used to build the entire building without using concrete or other brick-concrete structures. When the span is large, in order to ensure that there is no pillar support on the inside, a multi-joint force-bearing structure is used to support the arched steel structure on both sides, so there is no need to use multiple pillars for support, thus saving space.

[0003] According to the existing Chinese patent CN114482278A, a multi-arch joint force-bearing self-balancing large-span arch steel structure system includes a central arch and a large-span curved roof steel structure frame arranged on both sides of the central arch, and the large-span curved roof steel structure frames at the two wings. While achieving a large span in two-dimensional directions of the plane under the arch of the structure, in addition to setting a supporting side column at one end, the space under the roof no longer needs columns for support, thereby improving the freedom of planning and layout in the building space using the structure. In theory, as long as the height of the main arch frame is high enough, the large-span curved roof steel structure frames on the two wings of the structure can have a sufficiently high clearance height to meet the clearance height requirements of different large-span buildings;

[0004] The multi-arch joint force-bearing structure provided by the patent is connected and supported by multiple top trusses between the two upper arches, but the straight top trusses support the overall weight, and the linear structure has a poor bearing capacity. At the same time, the existing large-span steel structure will lay colored steel tiles on its top after laying. The setting of the multi-arch joint force-bearing structure makes the colored steel tiles on both sides concave toward the middle, and the colored steel tiles will inevitably form uneven parts when welded and fixed, resulting in unevenness and depressions on the side close to the upper arch. Therefore, water will accumulate in the depression on rainy days, increasing the probability of corrosion of the colored steel tiles and reducing their service life. It is very troublesome to replace the colored steel tiles each time. At the same time, the dust from leaves and dust floating in the air is also easy to accumulate on the colored steel tiles on the side close to the upper arch, further increasing the probability of corrosion of the colored steel tiles.

[0005] Therefore, it is necessary to provide a multi-arch joint force-bearing structure system and process for a large-span arch steel structure system to solve the above technical problems. Summary of the invention

[0006] 1. Technical issues to be resolved

[0007] In order to solve the above technical problems, the present invention provides a multi-arch joint force-bearing structure system and process of a large-span arch steel structure system.

[0008] (II) Technical solution

[0009] To achieve the above objectives, the present invention is implemented through the following technical solutions: a multi-arch joint force-bearing structure system of a large-span arch steel structure system, comprising:

[0010] The combined force-bearing structural component is composed of two obliquely symmetrically fixed arched support steel frames and a circular steel ring equidistantly fixed between the two arched support steel frames, and the first color steel tile is welded and laid between the two support steel frames;

[0011] The side arch structure components are symmetrically connected on both sides of the combined force-bearing structure component, and each side arch structure component is composed of a number of equidistantly arranged cross beams, a number of support ribs equidistantly fixed to the top of the cross beams, and a vertical beam equidistantly fixed to the bottom of a cross beam at the end, and a second color steel tile is fixed to the top of the several support ribs, the end of the cross beam is fixed to the outer wall of the arch support steel frame, and one side of the second color steel tile is welded and fixed to the outer wall of the arch support steel frame;

[0012] The moving member is slidably mounted on the outer wall of the arched support steel frame on one side close to a second color steel tile on the same side thereof, and two wiper blades staggered in upper and lower positions are slidably mounted on the moving member, and the wiper blade at the lower position contacts the surface of the second color steel tile;

[0013] The moving mechanism is installed on the outer wall of the first color steel tile and is used to drive the two moving parts to move synchronously.

[0014] Preferably, the movable part includes a synchronous driving mechanism for driving the two wiper blades to switch high and low positions when it moves to the side of the second color steel tile, and the movable part also includes a driving frame fixed on its outer wall close to one side of the arched supporting steel frame.

[0015] Preferably, the wiper blade is made of rubber material.

[0016] Preferably, the moving mechanism comprises:

[0017] A movable top plate is slidably mounted on the middle position of the upper end of the first color steel tile;

[0018] A driving rod is symmetrically mounted on the bottom of the movable top plate, and the end of the driving rod is inserted into the driving frame;

[0019] A rotating shaft, rotatably connected to the top surface of the movable top plate through a bearing;

[0020] A motor is fixed to one side of the top of the movable top plate, and one end of the rotating shaft is fixed to the output end of the motor;

[0021] A first gear is fixed to the middle of the rotating shaft, and the lower end of the first gear passes through the movable top plate and extends to the gap between the movable top plate and the first color steel tile;

[0022] The gear ring is fixed at the middle part of the top surface of the first color steel tile, and the first gear is meshed and connected with the gear ring.

[0023] Preferably, an arc-shaped slide rail is symmetrically fixed to the middle of the top surface of the first color steel tile, and an arc-shaped slide bar is slidably mounted on the outer wall of the arc-shaped slide rail and fixed to the outer wall of the movable top plate.

[0024] Preferably, the axis of the arc-shaped slide rail, the axis of the arc-shaped slide bar and the axis of the first color steel tile all coincide with each other.

[0025] Preferably, the synchronous drive mechanism comprises:

[0026] First racks are slidably mounted on two ends of the outer wall of the moving part away from the arched support steel frame, and the two first racks are arranged one high and one low, and the wiper blade is fixed to the bottom of the first racks;

[0027] A second gear is rotatably connected to the outer wall of the moving member on the side close to the first rack through an axle pin, and the two first racks are meshed with the gear;

[0028] A second rack is slidably mounted on the upper end of the outer wall of the moving member close to the first rack, and the second rack is arranged horizontally and is also meshed with the second gear;

[0029] A bending portion is formed at an end of the second rack, and one side of the bending portion abuts against an outer wall of the moving member;

[0030] A limiting assembly, installed between the second rack and the moving member, for limiting the position of the second rack;

[0031] A pulling block is fixed on the outer wall of the arched support steel frame on a side away from the bending portion;

[0032] The push bar is fixed on the side of the arched support steel frame away from the pulling block, and the push bar and the pulling block both correspond to the bent portion.

[0033] Preferably, the limiting component comprises:

[0034] An arched spring piece, fixed on the top of the second rack, and located between the second rack and the moving member;

[0035] There are two clamping slots, which are sequentially opened on the outer wall of the moving part, and one side of the arched protrusion of the arched spring is clamped with one of the clamping slots.

[0036] Preferably, a second slide rail is fixed to a side of the arched support steel frame close to the moving part, and the drive frame is slidably connected to the outer wall of the second slide rail through a first slide groove.

[0037] The present invention also provides a process for erecting a multi-arch joint load-bearing structure system of a large-span arch steel structure system, which is a process for erecting a multi-arch joint load-bearing structure system of the large-span arch steel structure system, and the specific steps are as follows:

[0038] S1. First, fix the vertical beams and the arched support steel frame on the ground by pre-embedded concrete pouring;

[0039] S2, sequentially completing the welding of the annular steel ring and the welding and fixing of the first color steel tile, and completing the assembly of the combined force-bearing structure components;

[0040] S3. Complete the welding and fixing of the crossbeam, supporting ribs and the second color steel tile in sequence, and complete the assembly of the combined force-bearing mechanism components.

[0041] (III) Beneficial effects

[0042] The invention provides a multi-arch joint force-bearing structure system and a process for a large-span arch steel structure system.

[0043] Compared with the prior art, it has the following beneficial effects:

[0044] 1. By setting the moving parts, wiper blades and moving mechanisms, the accumulated water on the second color steel tile near the arched support steel frame can be automatically scraped off after rainy weather, avoiding the accumulation of rainwater on the second color steel tile, thereby reducing the probability of corrosion of the color steel tile and extending the service life of the color steel tile. At the same time, it can automatically scrape off the accumulated dust or leaf impurities, further avoiding the accumulation of dust and leaves;

[0045] 2. Due to the circular steel ring, the strength of the structure is improved compared with the linear structure used in the reference document for support connection;

[0046] 3. Since two moving pieces are arranged on each moving part and a synchronous driving mechanism is arranged on the moving part, the wiper blades can be switched and used alternately, which prolongs the time interval for manual replacement of the wiper blades compared to the case where only one wiper blade is arranged. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is an overall schematic diagram of the present invention;

[0048] Figure 2 For the present invention Figure 1 A magnified image of point A;

[0049] Figure 3 It is a schematic diagram of the driving rod of the present invention;

[0050] Figure 4 It is a schematic diagram of a circular steel ring of the present invention;

[0051] Figure 5 This is one of the schematic diagrams of the synchronous drive mechanism of the present invention;

[0052] Figure 6 For the present invention Figure 5 A magnified view of point B;

[0053] Figure 7 For the present invention Figure 5 Enlarged view of point C;

[0054] Figure 8 For the present invention Figure 5 The D figure of

[0055] Fig. 9 This is the second schematic diagram of the synchronous drive mechanism of the present invention;

[0056] Fig.10 Schematic diagram of the driving rod of the present invention.

[0057] Numbers in the figure: 1. Combined force-bearing structure component; 101. Arched support steel frame; 102. Circular steel ring; 103. First color steel tile; 2. Side arched structure component; 201. Crossbeam; 202. Support ribs; 203. Vertical beam; 204. Second color steel tile; 4. Moving part; 41. Drive frame; 5. Wiper blade; 6. Moving mechanism; 61. Moving top plate; 62. Drive rod; 63. Rotating shaft; 64. Motor; 65. Gear; 66. Gear ring; 7. Synchronous drive mechanism; 71. First rack; 72. Second gear; 73. Second rack; 731. Bending part; 74. Limiting component; 741. Arched spring piece; 742. Slot; 75. Pull block; 76. Push bar; 8. Arc slide rail; 9. Arc slide bar; 10. Second slide rail; 11. Third slide rail; 12. Fourth slide rail. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] Embodiment 1

[0060] See also Figures 1 to 10The embodiment of the present invention provides a technical solution: a multi-arch combined force-bearing structure system of a large-span arch steel structure system, comprising a combined force-bearing structure component 1, the combined force-bearing structure component 1 is composed of two arch support steel frames 101 that are obliquely symmetrically fixed and a circular steel ring 102 that is equidistantly fixed between the two arch support steel frames 101, and a first color steel tile 103 is welded and laid between the two support steel frames, and a side arch structure component 2 is symmetrically connected to the two sides of the combined force-bearing structure component 1, each side arch structure component 2 is composed of a plurality of equidistantly arranged cross beams 201, support ribs 202 that are equidistantly fixed to the tops of a plurality of cross beams 201, and vertical beams 203 that are equidistantly fixed to the bottom of a cross beam 201 at the end, and a second color steel tile 204 is fixed to the tops of the plurality of support ribs 202, the ends of the cross beams 201 are fixed to the outer wall of the arch support steel frame 101, and one side of the second color steel tile 204 is fixed to the arch support The outer wall of the support steel frame 101 is welded and fixed, and the moving part 4 is slidably installed on the outer wall of the arched support steel frame 101 on one side close to a second color steel tile 204 on the same side as the arched support steel frame 101, and two wiper blades 5 arranged alternately in upper and lower positions are slidably installed on the moving part 4. The moving part 4 includes a synchronous driving mechanism 7 for driving the two wiper blades 5 to switch high and low positions when it moves to the side of the second color steel tile 204. The moving part 4 also includes a driving frame 41 fixed on its outer wall close to one side of the arched support steel frame 101. A second slide rail 10 is fixed on the side of the arched support steel frame 101 close to the moving part 4. The driving frame 41 is slidably connected to the outer wall of the second slide rail 10 through a first slide groove. The wiper blade 5 is made of rubber material, and a wiper blade 5 at the bottom contacts the surface of the second color steel tile 204. The moving mechanism 6 is installed on the outer wall of the first color steel tile 103, and is used to drive the two moving parts 4 to move synchronously;

[0061] After rainy weather or after dust has accumulated for a certain period of time, the moving mechanism 6 is driven to make the moving part 4 slide left and right on the arched support steel frame 101, thereby driving the wiper blade 5 to slide from the top of the second color steel tile 204. The wiper blade 5 allows rainwater or dust impurities on the second color steel tile 204 to be scraped off to both sides of the second color steel tile 204, thereby achieving the effect of water removal, extending the service life of the color steel tile, and reducing the probability of its corrosion.

[0062] The moving mechanism 6 includes a moving top plate 61, a driving rod 62, a rotating shaft 63, a motor 64, a first gear 65 and a gear ring 66. The moving top plate 61 is slidably mounted on the middle position of the upper end of the first color steel tile 103. The middle part of the top surface of the first color steel tile 103 is symmetrically fixed with an arc-shaped slide rail 8. The outer wall of the arc-shaped slide rail 8 is slidably mounted with an arc-shaped slide bar 9 fixed to the outer wall of the moving top plate 61. The driving rod 62 is symmetrically fixed to the bottom of the moving top plate 61, and the end of the driving rod 62 is inserted into the driving frame 41. The rotating shaft 63 is rotatably connected to the moving top plate 61 through a bearing. The top surface of the top plate 61, the motor 64 is fixed on one side of the top of the movable top plate 61, and one end of the rotating shaft 63 is fixed to the output end of the motor 64, the first gear 65 is fixed to the middle of the rotating shaft 63, and the lower end of the first gear 65 passes through the movable top plate 61 and extends to the gap between the movable top plate 61 and the first color steel tile 103, the ring gear 66 is fixed to the middle of the top surface of the first color steel tile 103, and the first gear 65 is meshed and connected with the ring gear 66, and the axis of the arc slide rail 8, the axis of the arc slide bar 9 and the axis of the first color steel tile 103 are all coincident;

[0063] When movement is required, the rotating shaft 63 is driven to rotate by the driving motor 64, so that the first gear 65 rotates, and the first gear 65 shifts the gear ring 66, so that the movable top plate 61 slides on the outer wall of the arc-shaped slide rail 8, until it slides to the end of the arc-shaped slide rail 8, the motor 64 stops and reverses, so that the movable top plate 61 slides to the other end of the arc-shaped slide rail 8, until it slides to the other end, the motor 64 switches the rotation direction again, so that the movable top plate 61 reciprocates between the two ends of the arc-shaped slide rail 8, and the driving rod 62 is driven to move while the movable top plate 61 slides, pushing the driving frame 41 to slide, thereby driving the wiper blade 5 to slide back and forth to wipe water and dust;

[0064] The synchronous drive mechanism 7 includes a first rack 71, a first rack 71 and a push bar 76. The first racks 71 are respectively slidably mounted on the two ends of the outer wall of the moving member 4 away from the arched support steel frame 101, and the two first racks 71 are arranged one high and one low. The outer wall of the moving member 4 is symmetrically fixed with two fourth slide rails 12. The first rack 71 is slidably connected to the fourth slide rail 12 through the second slide groove. The wiper blade 5 is fixed to the bottom of the first rack 71. The second gear 7265 is rotatably connected to the outer wall of the moving member 4 close to the first rack 71 through an axle pin, and the two first racks 71 are meshed with the gear 65. The second rack 73 is slidably mounted on the upper end of the outer wall of the moving member 4 close to the first rack 71. The outer wall of the moving member 4 is fixed with a third slide rail 11. The second rack 73 is slidably connected to the outer wall of the third slide rail 11 through the third slide groove, and the second rack 73 is arranged horizontally. The second gear 7265 is also meshed and connected with the second gear 7265. The bent portion 731 is formed at the end of the second rack 73, and one side of the bent portion 731 abuts against the outer wall of the moving member 4. The limiting assembly 74 is installed between the second rack 73 and the moving member 4 and is used to limit the position of the second rack 73. The pulling block 75 is fixed to the outer wall of the arched support steel frame 101 away from the bent portion 731. The pushing bar 76 is fixed to the side of the arched support steel frame 101 away from the pulling fast, and the pushing bar 76 and the pulling block 75 both correspond to the bent portion 731. The limiting assembly 74 includes an arched spring piece 741, which is fixed to the top of the second rack 73 and is located between the second rack 73 and the moving member 4. Two slots 742 are provided, which are sequentially opened on the outer wall of the moving member 4, and one side of the arched protrusion of the arched spring piece 741 is engaged with one of the slots 742.

[0065] When the moving part 4 moves to one side of the arc slide rail 8, the bending portion 731 is blocked by the pulling block 75, and the moving part 4 continues to move toward the end, pulling the quick-pulling bending portion 731 causes the second rack 73 to slide and drive the second gear 7265 to rotate, and at the same time, the two first racks 71 are moved at the same time, one first rack 71 rises and the other first rack 71 falls, and the arched spring piece 741 moves out of one slot 742 and then pushes into the other slot 742. At this time, the moving part 4 reaches the end, and the two wiper blades 5 are completely and switch positions. Then the moving part 4 moves in the opposite direction and uses the other wiper blade 5 to wipe the water until it reaches the other end. The bending portion 731 is pushed by the pushing bar 76 to slide in the opposite direction relative to the moving part 4, and the second gear 7265 is rotated again. The two first racks 71 slide again to switch the position of the wiper blade 5. Compared with only a single wiper blade 5, the time interval for manual replacement of the wiper blade 5 is extended.

[0066] Embodiment 2

[0067] The structure of the second embodiment is the same as that of the first embodiment, except that the driving rod 62 is symmetrically connected to the bottom of the movable top plate 61 through a bearing, and the end of the driving rod 62 is rollingly connected to the inner wall of the driving frame 41. Compared with the fixed connection, the driving rod 62 can also roll on the inner wall of the driving frame 41 when moving, so as to reduce friction by rolling instead of sliding.

[0068] Embodiment 3

[0069] The present invention also provides a process for erecting a multi-arch joint load-bearing structure system of a large-span arch steel structure system, which is a process for erecting a multi-arch joint load-bearing structure system of the large-span arch steel structure system, and the specific steps are as follows:

[0070] S1. First, fix the vertical beam 203 and the arched support steel frame 101 on the ground by pre-embedded concrete pouring;

[0071] S2, sequentially completing the welding of the annular steel ring and the welding and fixing of the first color steel tile 103, and completing the assembly of the combined force-bearing structure component 1;

[0072] S3. Complete the welding and fixing work of the cross beam 201, the supporting rib 202 and the second color steel tile 204 in sequence, and complete the assembly work of the combined force-bearing mechanism components.

[0073] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0074] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0075] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The multi-arch joint load-bearing structure system of the large-span arch steel structure system is characterized by: include: The combined force-bearing structure component (1) is composed of two obliquely symmetrically fixed arched support steel frames (101) and a circular steel ring (102) equidistantly fixed between the two arched support steel frames (101), and a first colored steel tile (103) is welded and laid between the two support steel frames; The side arch structure components (2) are symmetrically connected to the two sides of the combined force-bearing structure component (1), and each side arch structure component (2) is composed of a plurality of equidistantly arranged cross beams (201), support ribs (202) equidistantly fixed to the tops of the plurality of cross beams (201), and vertical beams (203) equidistantly fixed to the bottom of a cross beam (201) at the end, and a second color steel tile (204) is fixed to the tops of the plurality of support ribs (202), the ends of the cross beams (201) are fixed to the outer wall of the arch support steel frame (101), and one side of the second color steel tile (204) is welded and fixed to the outer wall of the arch support steel frame (101); The movable member (4) is slidably mounted on the outer wall of one side of the arched support steel frame (101) close to a second color steel tile (204) on the same side thereof, and two wiper blades (5) staggered in upper and lower positions are slidably mounted on the movable member (4), and the wiper blade (5) at the lower position contacts the surface of the second color steel tile (204); The moving mechanism (6) is installed on the outer wall of the first color steel tile (103) and is used to drive the two moving parts (4) to move synchronously.

2. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 1 is characterized by: The moving part (4) comprises a synchronous driving mechanism (7) for driving the two wiper blades (5) to switch between high and low positions when the moving part (4) moves to the side of the second color steel tile (204). The moving part (4) also comprises a driving frame (41) fixed on its outer wall near the side of the arched supporting steel frame (101).

3. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 2 is characterized by: The wiper blade (5) is made of rubber material.

4. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 2 is characterized by: The moving mechanism (6) comprises: A movable top plate (61) is slidably mounted on the middle position of the upper end of the first color steel tile (103); A driving rod (62) is symmetrically mounted on the bottom of the movable top plate (61), and an end of the driving rod (62) is inserted into the driving frame (41); A rotating shaft (63) is rotatably connected to the top surface of the movable top plate (61) via a bearing; A motor (64) is fixed to one side of the top of the movable top plate (61), and one end of the rotating shaft (63) is fixed to the output end of the motor (64); A first gear (65) is fixed to the middle of the rotating shaft (63), and the lower end of the first gear (65) passes through the movable top plate (61) and extends to the gap between the movable top plate (61) and the first color steel tile (103); The gear ring (66) is fixed at the middle part of the top surface of the first color steel tile (103), and the first gear (65) is meshingly connected with the gear ring (66).

5. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 4 is characterized by: An arc-shaped slide rail (8) is symmetrically fixed in the middle of the top surface of the first color steel tile (103), and an arc-shaped slide bar (9) is slidably mounted on the outer wall of the arc-shaped slide rail (8) and fixed to the outer wall of the movable top plate (61).

6. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 5 is characterized by: The axis of the arc-shaped slide rail (8), the axis of the arc-shaped slide bar (9) and the axis of the first color steel tile (103) all coincide with each other.

7. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 4 is characterized by: The synchronous drive mechanism (7) comprises: The first racks (71) are slidably mounted on the two ends of the outer wall of the moving member (4) on the side away from the arched support steel frame (101), and the two first racks (71) are arranged one high and one low, and the wiper blade (5) is fixed to the bottom of the first racks (71); The second gear (72) is rotatably connected to the outer wall of the moving member (4) on the side close to the first rack (71) through an axle pin, and the two first racks (71) are meshed and connected with the gear (65); A second rack (73) is slidably mounted on the upper end of the outer wall of the moving member (4) close to the first rack (71), and the second rack (73) is arranged horizontally, and the second rack (73) is also meshed and connected with the second gear (72); A bending portion (731) is formed at the end of the second rack (73), and one side of the bending portion (731) abuts against the outer wall of the moving member (4); A limiting assembly (74) is installed between the second rack (73) and the moving member (4) and is used to limit the position of the second rack (73); A pulling block (75) is fixed on the outer wall of the arched support steel frame (101) on a side away from the bent portion (731); The push bar (76) is fixed on the side of the arched support steel frame (101) away from the pulling block, and the push bar (76) and the pulling block (75) both correspond to the bent portion (731).

8. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 7 is characterized by: The limiting component (74) comprises: An arched spring piece (741) is fixed on the top of the second rack (73), and the arched spring piece (741) is located between the second rack (73) and the moving member (4); There are two clamping grooves (742) which are sequentially opened on the outer wall of the moving member (4), and one side of the arched protrusion of the arched spring sheet (741) is clamped with one of the clamping grooves (742).

9. The multi-arch joint force-bearing structure system of the large-span arch steel structure system according to claim 2 is characterized by: A second slide rail (10) is fixed to one side of the arched support steel frame (101) close to the moving member (4), and the driving frame (41) is slidably connected to the outer wall of the second slide rail (10) via a first slide groove.

10. The process of multi-arch joint load-bearing structure system of large-span arch steel structure system is characterized by: The process for erecting a multi-arch joint force-bearing structure system of a large-span arched steel structure system as described in any one of claims 1 to 9 above comprises the following specific steps: S1. First, the vertical beam (203) and the arched support steel frame (101) are fixed on the ground by pre-embedded concrete pouring; S2, sequentially completing the welding of the annular steel ring and the welding and fixing of the first color steel tile (103), and completing the assembly of the combined force-bearing structure component (1); S3, sequentially completing the welding and fixing work of the crossbeam (201), the supporting ribs (202) and the second color steel tile (204), and completing the assembly work of the combined force-bearing mechanism component.

Citation Information

Patent Citations

  • Large-span arched venue structure system

    CN114000588A

  • Multi-arch combined stress self-balancing large-span arched steel structure system

    CN114482278A