A reservoir sediment forecasting method, device, computer equipment and storage medium
By using an iterative correction algorithm of the one-dimensional reservoir area hydrodynamic model and sediment movement model in reservoir sediment forecasting, the problem of inaccurate model parameter values in the existing technology is solved, and the precision and accuracy of sediment forecasting are improved. , extending the service life of the reservoir.
Patent Information
- Application Number
- CN202310870860.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-07-14
AI Technical Summary
Existing reservoir sediment forecasting methods have large errors in empirical curve fitting and inaccurate values of model parameters, resulting in large errors in forecast results and the inability to accurately predict the amount of sediment entering the reservoir, affecting long-term reservoir management.
An iterative correction algorithm based on the one-dimensional hydrodynamic model and sediment movement model of the reservoir area is used to improve the accuracy of sediment forecasting by automatically and rollingly correcting model parameters, combined with incoming reservoir flow and measured sediment content data.
It reduces the empirical error and model simulation error of manual parameter adjustment, improves the accuracy and precision of sediment forecast, can more effectively predict the sediment situation in the reservoir, and extends the service life of the reservoir.
Smart Images

Figure CN116822416B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a reservoir sediment forecasting method, device, computer equipment and storage medium. Background Art
[0002] After the reservoir was built and water was stored, efficient utilization of water resources was achieved. However, the dam will inevitably block the sand from the natural river channel within the reservoir area. If the future sand inflow into the reservoir cannot be accurately understood, it will be impossible to take corresponding sand discharge measures in time to minimize reservoir siltation. In the long run, the life of the reservoir will be shortened and it will be detrimental to the long-term maintenance of the reservoir.
[0003] The focus of reservoir sediment forecasting is to forecast the sediment content process at representative stations in the reservoir area. In the existing technology, one method is to fit the data based on the measured data of the stations over the years to obtain the flow-sediment content experience curve. When the station completes the forecast flow process, the forecast sediment content process is calculated by inputting the flow process according to the experience curve; the other method is based on the mathematical model method, inputting the forecasted inflow and sediment process and the water level process in front of the dam, and calculating the sediment content movement process of the representative station in the reservoir area.
[0004] However, the predicted sediment content process error obtained based on the empirical curve method is large. Since the flow rate and sediment content are not one-to-one corresponding, the same flow level usually corresponds to a wide range of sediment content, resulting in a large error in the fitted empirical curve; at the same time, the mathematical model method also has a prediction error. The sediment mathematical model depends on the value of the model parameters, and since the forecast is a calculation of the unknown sediment situation, it is impossible to accurately determine the value of the model parameters in advance, which leads to errors. Summary of the invention
[0005] In view of this, the present invention provides a reservoir sediment forecasting method, device, computer equipment and storage medium to solve the problem that in the existing sediment forecasting process, the forecast result has large errors due to large errors in the fitted empirical curve or the inability to accurately determine the values of the model parameters in advance.
[0006] In a first aspect, the present invention provides a reservoir sediment forecasting method, the reservoir sediment forecasting method comprising:
[0007] An inflow data set, a first sediment content data set and a measured sediment content data set of a representative station in the reservoir within a forecast period are obtained; based on the inflow data set, a first section data set of the reservoir within the forecast period is obtained after being processed by a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir scheduling procedure; the first sediment content data set, the first section data set and the measured sediment content data set are input into a preset one-dimensional reservoir area sediment movement model, and the first model parameters of the preset one-dimensional reservoir area sediment movement model are iteratively corrected to obtain target model parameters corresponding to the representative station; based on the target model parameters, the first sediment content data set and the first section data set are input into a preset one-dimensional reservoir area sediment movement model to obtain a sediment forecast result of the reservoir within the forecast period.
[0008] The reservoir sediment forecasting method provided by the present invention proposes a new iterative correction algorithm based on the traditional water-sediment mathematical model. It can automatically and rollingly correct the model parameters of the preset one-dimensional reservoir area sediment movement model based on the inflow data set, the first sediment content data set, and the measured sediment content data set of the representative station during the reservoir forecast period, in combination with the preset one-dimensional reservoir area hydrodynamic model and the preset one-dimensional reservoir area sediment movement model, thereby overcoming the problem that the traditional model cannot accurately select model parameters, reducing the empirical error and model simulation error of manual parameter adjustment, and improving the sediment forecasting accuracy.
[0009] In an optional implementation, based on the inflow data set, after being processed by a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir dispatching procedure, a first section data set of the reservoir within the forecast period is obtained, including:
[0010] Based on the inflow data set, the reservoir water level data set within the forecast period is calculated through the preset reservoir scheduling regulations; the inflow data set and the reservoir water level data set are input into the preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period.
[0011] The present invention utilizes a preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period, providing data support for subsequent reservoir sediment forecasting.
[0012] In an optional implementation, the first sediment content data set, the first cross-section data set, and the measured sediment content data set are input into a preset one-dimensional reservoir sediment movement model, and the first model parameters of the preset one-dimensional reservoir sediment movement model are iteratively corrected to obtain target model parameters corresponding to the representative station, including:
[0013] Based on the first model parameters, the first sediment content data set, the first section data set and the preset one-dimensional reservoir sediment movement model, the target iterative correction relationship is determined; based on the measured sediment content data set and the target iterative correction relationship, the first model parameters are iteratively corrected to obtain the target model parameters.
[0014] The invention performs iterative correction on the basis of the obtained target iterative correction relational expression in combination with the measured sediment content data set to obtain target model parameters, thereby realizing automatic and rolling correction of model parameters of a preset one-dimensional reservoir sediment movement model and improving sediment forecasting accuracy.
[0015] In an optional implementation, based on the first model parameter, the first sediment content data set, the first cross-section data set and the preset one-dimensional reservoir sediment movement model, a target iterative correction relationship is determined, including:
[0016] Based on the first model parameters, the first sediment content data set and the first section data set are input into a preset one-dimensional reservoir sediment movement model to obtain a second sediment content data set at a representative station in the reservoir within the forecast period; based on the second sediment content data set and the preset one-dimensional reservoir sediment movement model, the target iterative correction relationship is determined.
[0017] The present invention processes a preset one-dimensional reservoir sediment movement model through a first model parameter, a first sediment content data set, and a first section data set to obtain a target iterative correction relationship, thereby providing a basis for subsequent model parameter correction of the preset one-dimensional reservoir sediment movement model.
[0018] In an optional implementation, the first model parameter is iteratively corrected based on the measured sediment content data set and the target iterative correction relationship to obtain the target model parameter, including:
[0019] The measured sediment content data set is input into the target iterative correction relationship to obtain the second model parameters; based on the second model parameters, the first sediment content data set and the first section data set are input into the preset one-dimensional reservoir sediment movement model to obtain the third sediment content data set of the representative station in the reservoir within the forecast period; the error value between the third sediment content data set and the measured sediment content data set is calculated; when the error value meets the preset conditions, the second model parameters are determined as the target model parameters.
[0020] The present invention determines whether the iteration is finished by judging whether the error value meets the preset condition, and determines the target model parameters, thereby improving the accuracy of the target model parameters.
[0021] In an optional implementation, after calculating the error value between the third sediment content data set and the measured sediment content data set, the method further includes:
[0022] When the error value does not meet the preset conditions, repeat the step of inputting the measured sediment content data set into the target iterative correction relationship to obtain the second model parameters, and then calculate the error value of the third sediment content data set and the measured sediment content data set, until the error value meets the preset conditions, and the target model parameters are obtained.
[0023] The present invention determines whether the iteration is finished by judging whether the error value meets the preset condition, and determines the target model parameters, thereby improving the accuracy of the target model parameters.
[0024] In an optional embodiment, the method further includes:
[0025] When there are multiple representative stations in the reservoir, the target model parameters of each representative station are obtained; based on each target model parameter, the target model parameters of the reservoir section between every two representative stations are determined; based on the target model parameters of each reservoir section, the first sediment content data set and the first section data set are input into a preset one-dimensional reservoir sediment movement model to obtain the sediment forecast results of the reservoir within the forecast period.
[0026] When there are multiple representative stations in the reservoir, the present invention predicts the sediment in the reservoir within the forecast period according to the target model parameters corresponding to each representative station, thereby reducing the forecast error.
[0027] In an optional embodiment, the method further includes:
[0028] Get the preset one-dimensional reservoir hydrodynamic model:
[0029]
[0030] In the formula: x represents the longitudinal coordinate of the cross-section area in the river channel of the reservoir area; t represents time; Q represents the cross-section flow of the cross-section area; Z represents the cross-section water level of the cross-section area; B represents the water surface width of the cross-section area; q represents the lateral inflow per unit river length; β represents the dynamic correction coefficient; A represents the cross-section area of the cross-section area; g represents the gravitational acceleration; C represents the Xie Cai coefficient; and R represents the hydraulic radius of the cross-section area.
[0031] The preset one-dimensional reservoir area hydrodynamic model obtained by the present invention provides a basis for subsequent sediment forecasting.
[0032] In an optional embodiment, the method further includes:
[0033] Get the preset one-dimensional reservoir sediment movement model:
[0034]
[0035] Where: i represents the number of the current section to be calculated; i-1 represents the number of the section upstream of the section where the representative station is located; n represents the last known time; n+1 represents the current time to be calculated; Δx represents the distance between two sections; Δt represents the time interval; S represents the sediment content of the section; S * represents the cross-sectional sand-carrying force; ω represents the sediment settling velocity; α represents the first model parameter.
[0036] The preset one-dimensional reservoir area sediment movement model obtained by the present invention provides a basis for subsequent sediment forecasting.
[0037] In a second aspect, the present invention provides a reservoir sediment forecasting device, the reservoir sediment forecasting device comprising:
[0038] The acquisition module is used to obtain the inflow data set, the first sediment content data set and the measured sediment content data set of the representative station in the reservoir during the forecast period; the processing module is used to obtain the first section data set of the reservoir during the forecast period based on the inflow data set, through the preset one-dimensional reservoir area hydrodynamic model and the preset reservoir scheduling procedures; the input and correction module is used to input the first sediment content data set, the first section data set and the measured sediment content data set into the preset one-dimensional reservoir area sediment movement model, iteratively correct the first model parameters of the preset one-dimensional reservoir area sediment movement model, and obtain the target model parameters corresponding to the representative station; the input module is used to input the first sediment content data set and the first section data set into the preset one-dimensional reservoir area sediment movement model based on the target model parameters to obtain the sediment forecast result of the reservoir during the forecast period.
[0039] In an optional embodiment, the processing module includes:
[0040] The calculation unit is used to obtain the reservoir water level data set within the forecast period based on the inflow data set and the preset reservoir scheduling regulations; the input unit is used to input the inflow data set and the reservoir water level data set into the preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period.
[0041] In an optional implementation, the input and correction module includes:
[0042] The determination unit is used to determine the target iterative correction relationship based on the first model parameter, the first sediment content data set, the first section data set and the preset one-dimensional reservoir sediment movement model; the iterative correction unit is used to iteratively correct the first model parameter based on the measured sediment content data set and the target iterative correction relationship to obtain the target model parameter.
[0043] In an optional implementation, the determining unit includes:
[0044] The first input subunit is used to input the first sediment content data set and the first cross-section data set into a preset one-dimensional reservoir sediment movement model based on the first model parameters to obtain a second sediment content data set at a representative station in the reservoir within the forecast period; the first determination subunit is used to determine a target iterative correction relationship based on the second sediment content data set and the preset one-dimensional reservoir sediment movement model.
[0045] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the reservoir sediment forecasting method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0046] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the reservoir sediment forecasting method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0048] Figure 1 is a schematic flow chart of a reservoir sediment forecasting method according to an embodiment of the present invention;
[0049] Figure 2 is a schematic flow chart of another reservoir sediment forecasting method according to an embodiment of the present invention;
[0050] Figure 3 is a flow chart of another reservoir sediment forecasting method according to an embodiment of the present invention;
[0051] Figure 4 It is a process of changes in the inflow and sediment content of a reservoir predicted for the next 7 days over time according to an embodiment of the present invention;
[0052] Figure 5 is a structural block diagram of a reservoir sediment forecasting device according to an embodiment of the present invention;
[0053] Figure 6 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0055] The embodiment of the present invention provides a reservoir sediment forecasting method, which reduces the empirical error of manual parameter adjustment and model simulation error by proposing a new iterative correction algorithm based on the traditional water-sediment mathematical model, thereby improving the sediment forecasting accuracy.
[0056] According to an embodiment of the present invention, an embodiment of a reservoir sediment forecasting method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0057] In this embodiment, a reservoir sediment forecasting method is provided. Figure 1 is a flow chart of a reservoir sediment forecasting method according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0058] Step S101, obtaining an inflow data set, a first sediment content data set, and a measured sediment content data set of a representative station in the reservoir within a reservoir forecast period.
[0059] Among them, the inflow data set reflects the change process of the inflow of the reservoir over time during the forecast period; the first sediment content data set reflects the change process of the sediment content of the reservoir over time during the forecast period; and the measured sediment content data set reflects the real-time sediment content of the representative station in the reservoir.
[0060] Step S102, based on the inflow data set, after being processed by a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir dispatching procedure, a first section data set of the reservoir within the forecast period is obtained.
[0061] Among them, the preset one-dimensional reservoir hydrodynamic model is used to represent the relevant data relationship between the reservoir and the cross-sectional area within the reservoir; the preset reservoir scheduling procedures can be obtained according to demand, but must meet the corresponding standards.
[0062] Specifically, after processing the inflow data set and the first sediment content data set within the reservoir forecast period using the preset one-dimensional reservoir area hydrodynamic model and the preset reservoir scheduling procedure, the first section data set of the reservoir within the corresponding forecast period can be output.
[0063] Step S103, inputting the first sediment content data set, the first cross-section data set and the measured sediment content data set into a preset one-dimensional reservoir sediment movement model, iteratively correcting the first model parameters of the preset one-dimensional reservoir sediment movement model, and obtaining the target model parameters corresponding to the representative station.
[0064] Among them, the preset one-dimensional reservoir sediment movement model is used to predict the sediment content in the reservoir during the forecast period.
[0065] Before using the preset one-dimensional reservoir sediment movement model to predict the sediment content in the reservoir during the forecast period, it is first necessary to determine the optimal model parameters of the preset one-dimensional reservoir sediment movement model, that is, the target model parameters.
[0066] Specifically, the initial model parameters of the preset one-dimensional reservoir sediment movement model, namely the first model parameters, are iteratively corrected using the first sediment content data set, the first cross-section data set and the measured sediment content data set to obtain target model parameters that meet the conditions.
[0067] Step S104, based on the target model parameters, the first sediment content data set and the first cross-section data set are input into a preset one-dimensional reservoir sediment movement model to obtain a sediment forecast result for the reservoir within the forecast period.
[0068] Specifically, the target model parameters corresponding to the representative station in the reservoir are applied to the entire reservoir section, that is, after the optimal model parameters of the preset one-dimensional reservoir sediment movement model are determined, the first sediment content data set and the first section data set are input into the preset one-dimensional reservoir sediment movement model for processing based on the optimal model parameters, and the sediment forecast results of the reservoir within the forecast period can be output.
[0069] The reservoir sediment forecasting method provided in this embodiment proposes a new iterative correction algorithm based on the traditional water-sediment mathematical model. It can automatically and rollingly correct the model parameters of the preset one-dimensional reservoir area sediment movement model based on the inflow data set, the first sediment content data set, and the measured sediment content data set of the representative station during the reservoir forecast period, combined with the preset one-dimensional reservoir area hydrodynamic model and the preset one-dimensional reservoir area sediment movement model. It overcomes the problem that the traditional model cannot accurately select model parameters, reduces the empirical error and model simulation error of manual parameter adjustment, and improves the sediment forecasting accuracy.
[0070] In this embodiment, a reservoir sediment forecasting method is provided. Figure 2 is a flow chart of a reservoir sediment forecasting method according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0071] Step S201, obtain the reservoir inflow data set, the first sediment content data set and the measured sediment content data set of the representative station in the reservoir within the reservoir forecast period. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0072] Step S202, based on the reservoir inflow data set, after being processed by a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir dispatching procedure, a first section data set of the reservoir within the forecast period is obtained.
[0073] Specifically, the above step S202 includes:
[0074] Step S2021, obtaining a preset one-dimensional reservoir area hydrodynamic model.
[0075] Specifically, the preset one-dimensional reservoir hydrodynamic model is shown in the following equation (1):
[0076]
[0077] Where: x represents the longitudinal coordinate of the cross-section area in the river channel of the reservoir area; t represents time; Q represents the cross-section flow of the cross-section area; Z represents the cross-section water level of the cross-section area, which can be obtained from the reservoir water level data set; B represents the water surface width of the cross-section area; q represents the lateral inflow per unit river length, which can be obtained from the inflow data set; β represents the dynamic correction coefficient; A represents the cross-section area of the cross-section area; g represents the gravitational acceleration; C represents the Xie Cai coefficient; and R represents the hydraulic radius of the cross-section area.
[0078] Step S2022, based on the inflow data set, the reservoir water level data set within the forecast period is obtained through calculation according to the preset reservoir scheduling procedures.
[0079] Among them, the reservoir water level dataset reflects the change process of the reservoir water level over time during the forecast period.
[0080] Specifically, after obtaining the inflow flow data set, the change process of the reservoir water level over time during the forecast period can be calculated according to the reservoir scheduling regulations, that is, the reservoir water level data set during the forecast period.
[0081] Step S2023, inputting the inflow data set and the reservoir water level data set into a preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period.
[0082] Specifically, by inputting the inflow data set and the reservoir water level data set into the preset one-dimensional reservoir hydrodynamic model shown in the above relationship (1), the flow process Q, the water flow area A and the water surface width B of each section in the reservoir during the forecast period can be calculated as a function of time, i.e., the first section data set.
[0083] Step S203: Input the first sediment content data set, the first cross-section data set and the measured sediment content data set into the preset one-dimensional reservoir sediment movement model, iteratively correct the first model parameters of the preset one-dimensional reservoir sediment movement model, and obtain the target model parameters corresponding to the representative station. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.
[0084] Step S204: Based on the target model parameters, the first sediment content data set and the first cross-section data set are input into a preset one-dimensional reservoir sediment movement model to obtain the sediment forecast result of the reservoir within the forecast period. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0085] Step S205: when there are multiple representative stations in the reservoir, obtain the target model parameters of each representative station.
[0086] Specifically, when there are multiple representative stations in the reservoir that need to be forecasted, it is necessary to obtain the target model parameters corresponding to each representative station.
[0087] Step S206: based on each target model parameter, determine the target model parameter of the reservoir section between every two representative stations.
[0088] Specifically, the mean of the target model parameters of every two representative stations is taken as the target model parameter of the reservoir section between the two representative stations.
[0089] Step S207, based on the target model parameters of each reservoir section, the first sediment content data set and the first cross-section data set are input into a preset one-dimensional reservoir sediment movement model to obtain a sediment forecast result for the reservoir within the forecast period.
[0090] Specifically, based on the target model parameters of each reservoir section, the first sediment content data set and the first cross-section data set are input into a preset one-dimensional reservoir sediment movement model to obtain the sediment forecast results of each reservoir section within the forecast period.
[0091] Furthermore, the sediment forecast result of the reservoir during the forecast period can be obtained based on the sediment forecast result of each reservoir section during the forecast period.
[0092] Furthermore, when it is necessary to forecast the sediment content of representative stations of multiple reservoirs, the target model parameters of each representative station are obtained respectively, and the reservoir sediment forecasting method of steps S201 to S207 is used to determine the model parameters of each representative station from upstream to downstream in turn, and the sediment forecast results of multiple reservoirs within the forecast period are determined based on the obtained model parameters.
[0093] The reservoir sediment forecasting method provided in this embodiment can obtain the first section data set of the reservoir within the forecast period by using the preset one-dimensional reservoir hydrodynamic model, which provides data support for the subsequent reservoir sediment forecast. Furthermore, based on the reservoir inflow data set, the first sediment content data set, and the measured sediment content data set of the representative station within the reservoir forecast period, combined with the preset one-dimensional reservoir hydrodynamic model and the preset one-dimensional reservoir sediment movement model, the model parameters of the preset one-dimensional reservoir sediment movement model are automatically and rollingly corrected, which overcomes the problem that the traditional model cannot accurately select model parameters, reduces the empirical error of manual parameter adjustment and the model simulation error, and improves the sediment forecast accuracy.
[0094] In this embodiment, a reservoir sediment forecasting method is provided. Figure 3is a flow chart of a reservoir sediment forecasting method according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0095] Step S301, obtain the reservoir inflow data set, the first sediment content data set and the measured sediment content data set of the representative station in the reservoir within the reservoir forecast period. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0096] Step S302: Based on the inflow data set, the first section data set of the reservoir within the forecast period is obtained through processing by a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir operation procedure. Figure 2 Step S202 of the illustrated embodiment will not be described in detail here.
[0097] Step S303, obtaining a preset one-dimensional reservoir area sediment movement model.
[0098] Specifically, the preset one-dimensional reservoir sediment movement model is shown in the following equation (2):
[0099]
[0100] Where: i represents the number of the current section to be calculated; i-1 represents the number of the section upstream of the section where the representative station is located; n represents the last known time; n+1 represents the current time to be calculated; Δx represents the distance between two sections; Δt represents the time interval; S represents the sediment content of the section; S * represents the cross-sectional sediment entrainment; ω represents the sediment settling velocity; α represents the recovery saturation coefficient, which is the first model parameter.
[0101] Among them, the cross-section sand holding force S * It can be calculated using Zhang Ruijin's formula; the sediment settling velocity ω can be set as a fixed value according to the local reservoir conditions or calculated using the Stokes formula.
[0102] Step S304, input the first sediment content data set, the first cross-section data set and the measured sediment content data set into a preset one-dimensional reservoir sediment movement model, iteratively correct the first model parameters of the preset one-dimensional reservoir sediment movement model, and obtain the target model parameters corresponding to the representative station.
[0103] Specifically, the above step S304 includes:
[0104] Step S3041, determining a target iterative correction relationship based on the first model parameter, the first sediment content data set, the first cross-section data set and a preset one-dimensional reservoir sediment movement model.
[0105] The target iterative correction relation is used to iteratively correct the first model parameters.
[0106] Specifically, under the first model parameters, the target iterative correction relationship corresponding to the model parameters can be determined by combining the first sediment content data set, the first cross-section data set and the preset one-dimensional reservoir sediment movement model shown in the above relationship (2).
[0107] Step S3042, iteratively correcting the first model parameters based on the measured sediment content data set and the target iterative correction relationship to obtain the target model parameters.
[0108] Specifically, based on the obtained target iterative correction relationship, the first model parameters of the preset one-dimensional reservoir sediment movement model are iteratively corrected in combination with the measured sediment content data set, and the iteratively corrected target model parameters are output, thereby realizing automatic and rolling correction of the model parameters of the preset one-dimensional reservoir sediment movement model.
[0109] In some optional implementations, the above step S3041 includes:
[0110] Step a1: Based on the first model parameters, the first sediment content data set and the first cross-section data set are input into a preset one-dimensional reservoir sediment movement model to obtain a second sediment content data set at a representative station in the reservoir within a forecast period.
[0111] Step a2, determining a target iterative correction relationship based on the second sediment content data set and a preset one-dimensional reservoir sediment movement model.
[0112] Specifically, the first sediment content data set obtained and the flow process Q, water area A and water surface width B of each section calculated over time are input into the preset one-dimensional reservoir sediment movement model shown in the above relationship (2), and the predicted sediment content change process over time of the representative station can be calculated. That is, the second sediment content data set. Where t represents time, the current known time is n, t = n+1, n+2, ..., n+m, and m represents the end time of the entire forecast period.
[0113] Furthermore, based on the second sediment content data set and the preset one-dimensional reservoir sediment movement model shown in the above equation (2), a target iterative correction equation is established, as shown in the following equation (3):
[0114]
[0115] In some optional implementations, the above step S3042 includes:
[0116] Step b1, inputting the measured sediment content data set into the target iterative correction relationship to obtain the second model parameters.
[0117] Step b2: based on the second model parameters, input the first sediment content data set and the first cross-section data set into a preset one-dimensional reservoir sediment movement model to obtain a third sediment content data set at a representative station in the reservoir within the forecast period.
[0118] Step b3, calculating the error value between the third sediment content data set and the measured sediment content data set.
[0119] Step b4: when the error value meets the preset condition, the second model parameter is determined as the target model parameter.
[0120] Specifically, the measured sediment content dataset Enter the above relationship (3), and replace the above relationship (3) with Then we can get the new model parameter α′, that is, the second model parameter, as shown in the following equation (4):
[0121]
[0122] Furthermore, the second model parameter α′ is substituted into the preset one-dimensional reservoir sediment movement model shown in the above relationship (2) to replace the first model parameter α, and the first sediment content data set and the first cross-section data set are input into the preset one-dimensional reservoir sediment movement model, and the sediment content of the representative station in the reservoir during the forecast period can be obtained, that is, the third sediment content data set
[0123] Then, the third sediment content dataset Compared with the actual measured sediment content dataset Perform error calculation and get the error value:
[0124] When the error value δ<0.01, or the error value remains stable during five consecutive iterations, it means that the iteration has converged, and the second model parameters are used as the target model parameters.
[0125] In some optional implementations, the above step S3042 further includes:
[0126] Step b5, when the error value does not meet the preset conditions, repeat the step of inputting the measured sediment content data set into the target iterative correction relationship to obtain the second model parameters, and then calculate the error value of the third sediment content data set and the measured sediment content data set, until the error value meets the preset conditions, and obtain the target model parameters.
[0127] Specifically, when the error value δ≥0.01, or the error value changes significantly during five consecutive iterations, the above steps b1 to b3 are repeated until the error value δ meets the preset conditions, and the corresponding target model parameters are output.
[0128] Step S305: Based on the target model parameters, the first sediment content data set and the first cross-section data set are input into the preset one-dimensional reservoir sediment movement model to obtain the sediment forecast result of the reservoir within the forecast period. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0129] The reservoir sediment prediction method provided in the present embodiment processes a preset one-dimensional reservoir sediment movement model through a first model parameter, a first sediment content data set, and a first section data set to obtain a target iterative correction relationship. On the basis of the obtained target iterative correction relationship, it is iteratively corrected in combination with the measured sediment content data set to obtain target model parameters, thereby realizing automatic and rolling correction of model parameters of the preset one-dimensional reservoir sediment movement model. At the same time, by judging whether the error value meets the preset conditions, it is judged whether the iteration is ended and the target model parameters are determined, thereby improving the accuracy of the target model parameters and further improving the sediment prediction accuracy.
[0130] In one example, a reservoir sediment forecasting method based on iterative correction is provided, comprising:
[0131] (1) Obtain the predicted inflow process and sediment content process. The water level process in front of the dam during the forecast period is determined according to the reservoir dispatching regulations.
[0132] (2) Establish a one-dimensional reservoir hydrodynamic model, input the predicted inflow process and the water level process in front of the dam, and calculate the flow process Q, water flow area A and water surface width B of each section of the reservoir during the forecast period. The one-dimensional reservoir hydrodynamic model is shown in the above equation (1).
[0133] (3) A one-dimensional reservoir sediment movement model is established, as shown in the above equation (2). The model is recursively solved section by section from upstream to downstream.
[0134] (4) Set the model parameters to be α initially 0 The predicted sediment content in the reservoir and the time-varying process of Q, A, and B obtained in the above step (2) are input into the sediment movement model to calculate the time-varying process of the predicted sediment content at the representative station. t represents time, the current known time is n, t=n+1, n+2,…, n+m, and m represents the end time of the entire forecast period.
[0135] (5) An iterative correction equation is established based on the discrete form of the model control equation in step (3), as shown in the above relationship (3).
[0136] (6) Real-time sediment content of the representative station After the measurement, Substituting into the iterative correction equation of step (5) obtains the new model parameter α′, as shown in the above relationship (4).
[0137] (7) Substitute α′ into the sediment movement model in step (3) to replace α 0 , repeat the model calculation to obtain the predicted sediment content of the representative station Compare it with the measured sediment content of the representative station Perform error calculation: If δ<0.01 is satisfied, or the value remains stable for five consecutive times, it means that the iteration has converged, and the model parameters for simulating the sediment content process of the current representative station can be determined. If there is only one representative station in the reservoir area that needs to be predicted, then the α of this station f will be applied to the entire reservoir section; if there are multiple representative stations that need to be predicted, the reservoir section between the two representative stations will use the two-station α f The mean of .
[0138] (8) If sediment content forecasting is required for multiple representative stations in the reservoir area, the model parameters for each station need to be determined separately. The model coefficient α applicable to each representative station can be obtained by performing the above iteration steps for each representative station from upstream to downstream. f Based on α f The sediment movement model continues to carry out the sediment content process of the representative station in the future forecast period, and on the way, the model parameters are revised in the above steps based on the real-time measured sediment content, so as to achieve the purpose of real-time matching with the current water and sand characteristics and improve the accuracy of sediment forecasting.
[0139] The reservoir sediment forecasting method based on iterative correction proposed in this example, based on the traditional water-sediment mathematical model, proposes a new iterative algorithm that can automatically and rollingly correct model parameters as the forecast progresses, overcoming the problem that traditional models cannot accurately select model parameters, reducing the empirical error of manual parameter adjustment and model simulation error, and improving the accuracy of sediment forecasting.
[0140] Specifically, in a preferred embodiment, a reservoir area is selected as the research object, and the total length of the reservoir area is 10 km. According to the reservoir area sediment forecasting method based on iterative correction provided by the above example, the reservoir sediment forecasting steps and results of the reservoir can be obtained:
[0141] (1) Obtain the changes in the reservoir inflow and sediment content over time as predicted for the next 7 days, such as Figure 4 As shown;
[0142] (2) A one-dimensional reservoir hydrodynamic model was established, and the predicted inflow process and the water level process in front of the dam were input, where the water level in front of the dam was constant at 100 m. The flow process Q, water flow area A, and water surface width B of each section of the reservoir during the forecast period were calculated over time. The calculation results of the section where the representative station is located are shown in Table 1 below:
[0143] Table 1. Changes in the forecast flow, water area and water surface width at representative stations in the reservoir area
[0144] Forecast period (days) <![CDATA[Flow rate Q (m 3 / s)]]> <![CDATA[Flow area A (m 2 )]]> Water surface width B(m) 1 8000 85.50 562 2 10074 98.70 569 3 13845 106.40 581 4 23665 135.60 596 5 38938 149.20 612 6 28793 141.20 602 7 16377 120.80 584
[0145] (3) A one-dimensional sediment movement model for the reservoir area is established, and the sediment content of each section is solved recursively from upstream to downstream.
[0146] (4) Set the model parameters to be α initially 0 = 1.0, the predicted sediment content in the reservoir and the time-varying process of Q, A, and B obtained in the above step (2) are input into the sediment movement model to calculate the predicted sediment content variation process of the representative station t represents time, the current known time is n, t = n+1, n+2, ..., n+m, m represents the end time of the entire forecast period. Further, the sediment content of the first day at the representative station is 0.95 kg / m 3 .
[0147] (5) Establish an iterative correction equation based on the discrete form of the model control equation in step (3).
[0148] (6)Real-time sediment content of the first day at the station After the measurement, Substitute it into the iterative correction equation of step (5) to obtain the new model parameter α′.
[0149] (7) Calculate α′ = 2.68, substitute it into the sediment movement model in step (3) to replace α 0 , repeat the model calculation to obtain the predicted sediment content of the representative station Compare it with the measured sediment content of the representative station Perform error calculation: At this time, δ>0.01, continue to substitute the measured value into The sediment model calculation was repeated until the 10th to 14th iteration, and the predicted sediment content was constant at 0.58 kg / m 3 , and finally α f =0.67, the convergence condition is met and the iteration ends. 0 =1.0, the predicted sand content is 0.95kg / m 3 In comparison, the predicted sediment content after the iteration was 0.58 kg / m 3 , compared with the measured 0.36kg / m 3 Compared with the previous results, the accuracy is improved by 102%. The model parameter iteration process is shown in Table 2 below:
[0150] Table 2. Model parameter iteration process
[0151]
[0152]
[0153] (8) Continue to adopt the α-based f = 0.67, the sediment movement model continues to carry out the representative station sediment concentration process in the future forecast period, and on the way, the model parameter α is revised in the above steps based on the real-time measured sediment concentration. f , in order to achieve the purpose of real-time matching of current water and sand characteristics and improve the accuracy of sediment forecasting.
[0154] In the present embodiment, a reservoir sediment forecasting device is also provided, which is used to implement the above-mentioned embodiments and preferred embodiments, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware is also possible and conceived.
[0155] This embodiment provides a reservoir sediment forecasting device, such as Figure 5 As shown, including:
[0156] The acquisition module 501 is used to acquire the reservoir inflow data set, the first sediment content data set and the measured sediment content data set of the representative station in the reservoir within the reservoir forecast period.
[0157] The processing module 502 is used to obtain the first section data set of the reservoir within the forecast period based on the inflow data set through processing with a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir dispatching procedure.
[0158] The input and correction module 503 is used to input the first sediment content data set, the first cross-section data set and the measured sediment content data set into the preset one-dimensional reservoir sediment movement model, iteratively correct the first model parameters of the preset one-dimensional reservoir sediment movement model, and obtain the target model parameters corresponding to the representative station.
[0159] The input module 504 is used to input the first sediment content data set and the first cross-section data set into a preset one-dimensional reservoir sediment movement model based on the target model parameters to obtain the sediment forecast result of the reservoir within the forecast period.
[0160] In some optional implementations, the processing module 502 includes:
[0161] The calculation unit is used to obtain the reservoir water level data set within the forecast period based on the inflow flow data set and through the preset reservoir scheduling regulations.
[0162] The input unit is used to input the inflow data set and the reservoir water level data set into a preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period.
[0163] In some optional implementations, the input and correction module 503 includes:
[0164] The determination unit is used to determine the target iterative correction relationship based on the first model parameter, the first sediment content data set, the first cross-section data set and the preset one-dimensional reservoir area sediment movement model.
[0165] The iterative correction unit is used to iteratively correct the first model parameters based on the measured sediment content data set and the target iterative correction relationship to obtain the target model parameters.
[0166] In some optional implementations, the determining unit includes:
[0167] The first input subunit is used to input the first sediment content data set and the first cross-section data set into a preset one-dimensional reservoir sediment movement model based on the first model parameters to obtain a second sediment content data set at a representative station in the reservoir within a forecast period.
[0168] The first determination subunit is used to determine a target iterative correction relationship based on a second sediment content data set and a preset one-dimensional reservoir sediment movement model.
[0169] In some optional implementations, the iterative correction unit includes:
[0170] The second input subunit is used to input the measured sediment content data set into the target iterative correction relationship to obtain the second model parameters.
[0171] The third input subunit is used to input the first sediment content data set and the first cross-section data set into a preset one-dimensional reservoir sediment movement model based on the second model parameters to obtain a third sediment content data set at a representative station in the reservoir within a forecast period.
[0172] The calculation subunit is used to calculate the error value between the third sediment content data set and the measured sediment content data set.
[0173] The second determining subunit is used to determine the second model parameter as the target model parameter when the error value meets a preset condition.
[0174] In some optional implementations, the iterative correction unit further includes:
[0175] The repeating subunit is used to repeat the step of inputting the measured sediment content data set into the target iterative correction relationship to obtain the second model parameter, and then calculate the error value of the third sediment content data set and the measured sediment content data set when the error value does not meet the preset conditions, until the error value meets the preset conditions, and the target model parameters are obtained.
[0176] In some optional implementations, the reservoir sediment forecasting device further includes:
[0177] The first acquisition module is used to acquire the target model parameters of each representative station when there are multiple representative stations in the reservoir.
[0178] The determination module is used to determine the target model parameters of the reservoir section between every two representative stations based on each target model parameter.
[0179] The first input module is used to input the first sediment content data set and the first section data set into a preset one-dimensional reservoir sediment movement model based on the target model parameters of each reservoir section to obtain the sediment forecast result of the reservoir within the forecast period.
[0180] In some optional implementations, the processing module 502 further includes:
[0181] The acquisition unit is used to obtain the preset one-dimensional reservoir hydrodynamic model:
[0182]
[0183] In the formula: x represents the longitudinal coordinate of the cross-section area in the river channel of the reservoir area; t represents time; Q represents the cross-section flow of the cross-section area; Z represents the cross-section water level of the cross-section area; B represents the water surface width of the cross-section area; q represents the lateral inflow per unit river length; β represents the dynamic correction coefficient; A represents the cross-section area of the cross-section area; g represents the gravitational acceleration; C represents the Xie Cai coefficient; and R represents the hydraulic radius of the cross-section area.
[0184] In some optional implementations, the reservoir sediment forecasting device further includes:
[0185] The second acquisition module is used to obtain a preset one-dimensional reservoir sediment movement model:
[0186]
[0187] Where: i represents the number of the current section to be calculated; i-1 represents the number of the section upstream of the section where the representative station is located; n represents the last known time; n+1 represents the current time to be calculated; Δx represents the distance between two sections; Δt represents the time interval; S represents the sediment content of the section; S * represents the cross-sectional sand-carrying force; ω represents the sediment settling velocity; α represents the first model parameter.
[0188] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0189] The reservoir sediment forecasting device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0190] The embodiment of the present invention also provides a computer device having the above Figure 5 The reservoir sediment forecasting device shown.
[0191] See also Figure 6 , Figure 6 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 6 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 10 is taken as an example.
[0192] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0193] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0194] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0195] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0196] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0197] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0198] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A reservoir sediment forecasting method, characterized in that: The method comprises: Obtaining an inflow data set, a first sediment content data set, and a measured sediment content data set of a representative station in the reservoir within a reservoir forecast period; Based on the inflow data set, a first section data set of the reservoir within the forecast period is obtained by processing the preset one-dimensional reservoir area hydrodynamic model and the preset reservoir dispatching procedures; Inputting the first sediment content data set, the first cross-section data set and the measured sediment content data set into a preset one-dimensional reservoir sediment movement model, iteratively correcting the first model parameter of the preset one-dimensional reservoir sediment movement model, and obtaining the target model parameter corresponding to the representative station; Based on the target model parameters, the first sediment content data set and the first cross-section data set are input into the preset one-dimensional reservoir sediment movement model to obtain a sediment forecast result of the reservoir within the forecast period; The first sediment content data set, the first cross-section data set and the measured sediment content data set are input into a preset one-dimensional reservoir sediment movement model, and the first model parameters of the preset one-dimensional reservoir sediment movement model are iteratively corrected to obtain the target model parameters corresponding to the representative station, including: Based on the first model parameters, the first sediment content data set and the first cross-section data set are input into the preset one-dimensional reservoir sediment movement model to obtain a second sediment content data set at the representative station in the reservoir within the forecast period; Determining the target iterative correction relationship based on the second sediment content data set and the preset one-dimensional reservoir area sediment movement model; Inputting the measured sediment content data set into the target iterative correction relationship to obtain a second model parameter; Based on the second model parameters, the first sediment content data set and the first cross-section data set are input into the preset one-dimensional reservoir sediment movement model to obtain a third sediment content data set at the representative station in the reservoir within the forecast period; Calculating an error value between the third sediment content data set and the measured sediment content data set; When the error value satisfies a preset condition, determining the second model parameter as the target model parameter; When the error value does not meet the preset conditions, repeat the step of inputting the measured sediment content data set into the target iterative correction relationship to obtain the second model parameters, and then calculate the error value between the third sediment content data set and the measured sediment content data set, until the error value meets the preset conditions, and obtain the target model parameters.
2. The method according to claim 1, characterized in that Based on the inflow data set, after being processed by a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir dispatching procedure, a first section data set of the reservoir within the forecast period is obtained, including: Based on the inflow data set, the reservoir water level data set within the forecast period is obtained by calculation according to the preset reservoir dispatching regulations; The inflow data set and the reservoir water level data set are input into the preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period.
3. The method according to claim 1, characterized in that The method further comprises: When there are multiple representative stations in the reservoir, obtaining the target model parameters of each representative station; Based on each of the target model parameters, determining the target model parameter of the reservoir section between every two of the representative stations; Based on the target model parameters of each reservoir section, the first sediment content data set and the first cross-section data set are input into the preset one-dimensional reservoir sediment movement model to obtain the sediment forecast result of the reservoir within the forecast period.
4. The method according to claim 2, characterized in that: The method further comprises: Obtain the preset one-dimensional reservoir hydrodynamic model: In the formula: x represents the longitudinal coordinate of the cross-section area in the river channel of the reservoir area; t represents time; Q represents the cross-section flow of the cross-section area; Z represents the cross-section water level of the cross-section area; B represents the water surface width of the cross-section area; q represents the lateral inflow per unit river length; β represents the dynamic correction coefficient; A represents the cross-section area of the cross-section area; g represents the gravitational acceleration; C represents the Xie Cai coefficient; and R represents the hydraulic radius of the cross-section area.
5. The method according to claim 4, characterized in that The method further comprises: Obtain the preset one-dimensional reservoir sediment movement model: Where: i represents the number of the current section to be calculated; i-1 represents the number of the section upstream of the section where the representative station is located; n represents the last known time; n+1 represents the current time to be calculated; Δx represents the distance between two sections; Δt represents the time interval; S represents the sediment content of the section; S * represents the cross-sectional sand-carrying force; ω represents the sediment settling velocity; α represents the first model parameter.
6. A reservoir sediment forecasting device, characterized in that: Used to execute the reservoir sediment forecasting method according to any one of claims 1 to 5; the device comprises: An acquisition module, used to acquire an inflow data set, a first sediment content data set, and a measured sediment content data set of a representative station in the reservoir within a reservoir forecast period; A processing module, used for obtaining a first section data set of the reservoir within the forecast period based on the inflow data set through a preset one-dimensional reservoir area hydrodynamic model and a preset reservoir dispatching procedure; An input and correction module, used for inputting the first sediment content data set, the first cross-section data set and the measured sediment content data set into a preset one-dimensional reservoir sediment movement model, iteratively correcting the first model parameters of the preset one-dimensional reservoir sediment movement model, and obtaining the target model parameters corresponding to the representative station; An input module is used to input the first sediment content data set and the first cross-section data set into the preset one-dimensional reservoir sediment movement model based on the target model parameters to obtain the sediment forecast result of the reservoir within the forecast period.
7. The device according to claim 6, characterized in that The processing module comprises: A calculation unit, configured to obtain a reservoir water level data set within the forecast period based on the reservoir inflow data set and through calculation according to the preset reservoir dispatching procedure; The input unit is used to input the inflow data set and the reservoir water level data set into the preset one-dimensional reservoir area hydrodynamic model to obtain the first section data set of the reservoir within the forecast period.
8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the reservoir sediment forecasting method according to any one of claims 1 to 5 by executing the computer instructions.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the reservoir sediment forecasting method according to any one of claims 1 to 5.
Citation Information
Patent Citations
High / low concentration-adaptive sediment movement numerical simulation method
CN107798176A
Reservoir sediment deposition predicting and forecasting method
CN113591411A
Reservoir water and sediment prediction model training method and device, and reservoir water and sediment prediction method and device
CN114091359A
Reservoir water flow-sediment-water quality-water temperature-scheduling coupling simulation method and system and storage medium
CN115935634A
