A method and device for controlling steel packaging balance
By calculating and adjusting the expected total amount of molten iron and the taphole diameter of the blast furnace, the molten iron flow rate and taphole opening time in the steelmaking process are determined, which solves the problem of unbalanced steel packaging during the steelmaking process and achieves effective heat transfer of molten iron. Utilization and energy savings in the steelmaking process.
Patent Information
- Application Number
- CN202310962368.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-08-01
AI Technical Summary
In the existing steelmaking technology, the iron output of each blast furnace varies greatly, resulting in the amount of molten iron in the molten iron ladle not meeting the steelmaking demand, resulting in unbalanced steel packaging and large heat loss of the molten iron.
By calculating the expected total amount of molten iron and the actual total amount of molten iron for this blast furnace, the taphole diameter is adjusted to control the flow of molten iron, and the taphole opening time for the next batch is determined to ensure balanced steel packaging.
It reduces the heat loss of molten iron, achieves a balanced steel packaging, reduces the probability that the next batch of molten iron ladles cannot be filled, and improves the energy utilization efficiency of the steelmaking process.
Smart Images

Figure CN116987834B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of steelmaking, and in particular to a method and device for controlling the balance of steel packaging. Background Art
[0002] Iron-steel balance refers, on the one hand, to the stability between the amount of molten iron consumed in steelmaking and the amount of molten iron produced in ironmaking, and on the other hand, to the balance between the heat generated by the molten iron (generally expressed as temperature) and the heat required for steelmaking.
[0003] The temperature of molten iron is a key quality indicator of the steelmaking system and a core indicator of molten iron energy. When the temperature of molten iron is high, a large amount of energy consumption can be reduced in the steelmaking process. When the temperature of molten iron is low, supplementary heat is required in the steelmaking system to smelt qualified molten steel. The temperature loss during the molten iron bagging process refers to the temperature loss gradient of molten iron caused by the switching of molten iron loading between the main line and the secondary line during the blast furnace bagging process.
[0004] In the prior art, the amount of iron discharged from each blast furnace varies greatly, while the filling amount of the molten iron package is basically fixed, resulting in that at the end of each batch of iron discharge, the amount of molten iron in the secondary line ladle cannot meet the steelmaking demand, and it is necessary to wait for the next batch of molten iron to be replenished, which in turn causes unbalanced steel packaging and large heat loss of molten iron. Summary of the invention
[0005] The invention provides a method and device for controlling the balance of steel packaging, so as to reduce the heat damage of molten iron and realize the balance of steel packaging.
[0006] According to one aspect of the present invention, a method for controlling steel packaging balance is provided, the method comprising:
[0007] Calculate the first estimated total amount of molten iron in the blast furnace in this batch;
[0008] Calculate the remaining molten iron amount of the current batch according to the first estimated total amount of molten iron and the filling capacity of the molten iron package;
[0009] If the remaining molten iron amount is greater than the molten iron remaining standard, re-determine the iron opening aperture of the blast furnace and calculate the second estimated total amount of molten iron;
[0010] Fill the molten iron bag according to the re-determined blast furnace iron hole diameter and calculate the actual total amount of molten iron and the average flow rate of molten iron;
[0011] The tap opening time for the next heat is determined according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron to balance the steel packaging.
[0012] Optionally, the step of calculating the first estimated total amount of molten iron in the current batch of the blast furnace comprises:
[0013] Obtaining the first tapping time, the amount of molten iron remaining in the blast furnace, and the molten iron generation rate;
[0014] The first estimated total amount of molten iron is calculated according to the first tapping time, the amount of molten iron remaining in the blast furnace, the molten iron generation rate and a molten iron total amount calculation formula.
[0015] Optionally, the total amount of molten iron is calculated as follows:
[0016] M = ΔM + Mt × T;
[0017] Wherein, M is the total amount of molten iron; ΔM is the amount of molten iron remaining in the blast furnace; Mt is the molten iron generation rate; and T is the tapping time.
[0018] Optionally, the step of re-determining the iron opening aperture of the blast furnace and calculating the second estimated total amount of molten iron comprises:
[0019] Changing the aperture of the blast furnace tap hole;
[0020] Obtaining a first molten iron flow rate corresponding to the blast furnace iron hole aperture;
[0021] Calculating a second tapping time according to the first molten iron flow rate and tapping time calculation formula;
[0022] Calculate the total amount of molten iron in the blast furnace at the current aperture according to the second tapping time;
[0023] Determine whether the remaining molten iron under the current total amount of molten iron in the blast furnace is greater than the molten iron remaining standard;
[0024] If yes, then change the blast furnace tap hole diameter again;
[0025] If not, the total amount of molten iron in the blast furnace under the current aperture is taken as the second estimated total amount of molten iron. Optionally, the calculation formula for the tapping time is:
[0026] T = (ΔM + Mt × T) / V;
[0027] Wherein, T is the tapping time; ΔM is the amount of molten iron remaining in the blast furnace; Mt is the molten iron generation rate; and V is the molten iron flow rate.
[0028] Optionally, the step of filling the molten iron bag according to the re-determined blast furnace tap hole diameter includes:
[0029] Calculating a predicted flow rate according to the first iron tapping time and the first estimated total amount of molten iron;
[0030] Filling the molten iron ladle and timing it; wherein the filling amount of the molten iron ladle includes: a lower limit capacity, a standard capacity and an upper limit capacity;
[0031] Calculate the current ladle flow rate according to the lower limit capacity and the lower limit capacity filling time;
[0032] The current filling capacity of the molten iron ladle is determined according to the current molten iron ladle flow rate and the predicted flow rate.
[0033] Optionally, the step of determining the filling capacity of the molten iron ladle according to the flow rate of the molten iron ladle and the predicted flow rate includes:
[0034] Determining whether the current ladle flow rate is greater than the predicted flow rate;
[0035] If yes, then fill the nth ladle; where n≥2;
[0036] If not, continue to fill the current ladle to the upper limit capacity.
[0037] Optionally, the step of calculating the actual total amount of molten iron and the average flow rate of molten iron includes:
[0038] Calculate the average molten iron flow rate according to the molten iron flow rate from the first molten iron ladle to the n-1th molten iron ladle;
[0039] Determining whether the average flow rate of the molten iron is greater than the predicted flow rate;
[0040] If so, fill the lower limit capacity of the nth molten iron package;
[0041] If not, the nth molten iron package is filled to the upper limit capacity;
[0042] The actual total amount of molten iron is calculated based on the filling capacity of each ladle.
[0043] Optionally, the step of determining the tap hole opening time of the next heat according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron includes:
[0044] Calculating a molten iron difference between the second estimated total molten iron amount and the actual total molten iron amount;
[0045] Calculating the molten iron difference discharge time according to the molten iron average flow rate and the molten iron difference;
[0046] The tap hole opening time for the next furnace is determined according to the molten iron difference discharge time.
[0047] According to another aspect of the present invention, a device for controlling the balance of steel packaging is provided, the device comprising:
[0048] A calculation module, the calculation module is used to calculate the first estimated total amount of molten iron in the blast furnace in this batch; calculate the remaining molten iron in this batch according to the first estimated total amount of molten iron and the filling capacity of the molten iron package; and calculate the actual total amount of molten iron and the average flow rate of molten iron;
[0049] A judgment module, the judgment module is used to judge whether the remaining molten iron amount is greater than the molten iron remaining standard;
[0050] A time determination module is used to determine the tapping time of the next furnace according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of the molten iron.
[0051] The embodiment of the present invention estimates the total amount of molten iron produced during blast furnace production and uses it as the first total amount of molten iron, and calculates the remaining molten iron of this furnace according to the filling capacity of the molten iron bag and the first total amount of molten iron. When the remaining molten iron of this furnace is greater than the remaining molten iron standard, the opening aperture of the blast furnace is changed and the total amount of molten iron produced during blast furnace production of this furnace is re-estimated and used as the second total amount of molten iron. It should be noted that the remaining molten iron under the second total amount of molten iron is less than the remaining molten iron standard. The molten iron ladle is filled under the changed opening aperture of the blast furnace, and the actual total amount of molten iron and the average flow rate of molten iron are calculated. The opening time of the next furnace is determined by the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron, so that the iron packaging is balanced. The embodiment of the present invention is conducive to reducing the remaining molten iron in the next furnace by estimating the total amount of molten iron produced by the blast furnace and calculating the remaining amount of molten iron in this furnace, thereby reducing the probability that the molten iron ladle cannot be filled in this furnace, thereby reducing the heat damage of the molten iron and achieving the balance of iron packaging.
[0052] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0054] Figure 1 is a flow chart of a method for controlling steel packaging balance provided by an embodiment of the present invention;
[0055] Figure 2 is a flow chart of another method for controlling steel packaging balance provided by an embodiment of the present invention;
[0056] Figure 3 is a flow chart for re-determining the iron hole diameter of a blast furnace and calculating a second estimated total amount of molten iron provided by an embodiment of the present invention;
[0057] Figure 4This is a flow chart of a molten iron bag filling provided by an embodiment of the present invention;
[0058] Figure 5 is another flow chart of filling a molten iron bag provided by an embodiment of the present invention;
[0059] Figure 6 is a flow chart for calculating the actual total amount of molten iron and the average flow rate of molten iron provided by an embodiment of the present invention;
[0060] Figure 7 This is a flow chart of another method for controlling steel packaging balance provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0061] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0062] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0063] The embodiment of the present invention provides a method for controlling the balance of steel packaging, which can be applied in steel production to reduce the remaining molten iron in each heat during the steel production process. Figure 1 1 is a flow chart of a method for controlling steel packaging balance provided by an embodiment of the present invention. Figure 1 , the method comprising:
[0064] S110, calculating the first estimated total amount of molten iron in the blast furnace in this batch.
[0065] Specifically, in the steel production process, iron ore needs to be smelted into liquid iron in an iron-making blast furnace, and then the molten iron is transferred to a steel-making blast furnace for steel smelting. During the smelting process, the production of molten iron is affected by many factors including blast furnace temperature, smelting method and time. In the actual production process, the amount of molten iron produced by the blast furnace is not fixed. Therefore, before performing the steel packaging balance operation, it is necessary to estimate the molten iron produced by the blast furnace according to the current production environment.
[0066] S120. Calculate the remaining molten iron amount of this batch according to the first estimated total molten iron amount and the filling capacity of the molten iron package.
[0067] Specifically, in the process of transferring molten iron from an iron-making blast furnace to a steel-making blast furnace, it is necessary to fill the molten iron produced in the iron-making blast furnace into a ladle, and then transfer the molten iron to the steel-making blast furnace by the ladle. It can be understood that in actual production, the filling capacity of the ladle is less than the capacity of the blast furnace, and the remaining molten iron amount of this furnace can be calculated by the first estimated total amount of molten iron and the filling capacity of the ladle. It should be noted that when the molten iron in the iron-making blast furnace is not enough to fill the minimum value of the filling capacity of the ladle, the molten iron in the iron-making blast furnace is no longer filled into the ladle. At this time, the molten iron remaining in the iron-making blast furnace is the remaining molten iron amount of this furnace. The molten iron remaining in the iron-making blast furnace is no longer transferred, and it participates in the production of molten iron in the next furnace as part of the residual molten iron in the blast furnace.
[0068] S130. If the remaining molten iron amount is greater than the molten iron remaining standard, the iron opening aperture of the blast furnace is re-determined and the second estimated total amount of molten iron is calculated.
[0069] Specifically, during the process of transferring molten iron from the ironmaking blast furnace to the steelmaking blast furnace, the ironmaking blast furnace does not stop smelting, and molten iron is still produced in the ironmaking blast furnace. It can be understood that when the molten iron is filled, the flow rate of the molten iron flowing into the ladle is related to the size of the opening aperture of the blast furnace. The larger the opening aperture of the blast furnace, the greater the flow rate of the molten iron flowing into the ladle; the smaller the opening aperture of the blast furnace, the smaller the flow rate of the molten iron flowing into the ladle. When the flow rate of the molten iron flowing into the ladle changes, the filling time of the ladle will also change. Since the blast furnace does not stop smelting during the molten iron filling process, the change in the filling time of the ladle means the change in the production time of the blast furnace, and the amount of molten iron produced by the blast furnace will also change accordingly. Therefore, when the opening aperture of the blast furnace changes, it is necessary to re-estimate the molten iron output of the blast furnace. It should be noted that the remaining molten iron under the second estimated total amount of molten iron is less than the molten iron remaining standard.
[0070] S140, filling the molten iron bag according to the re-determined blast furnace iron hole diameter and calculating the actual total amount of molten iron and the average flow rate of the molten iron.
[0071] Specifically, when the ladle is filled, the filling time of the ladle is counted. The molten iron flow rate during the filling process of the ladle can be calculated based on the filling time of the ladle and the filling capacity of the ladle. The average molten iron flow rate can be calculated based on the molten iron flow rate during the filling process of each ladle. It can be understood that the actual total amount of molten iron can be calculated by the filling capacity of each ladle.
[0072] S150, determining the tapping time for the next heat according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron to balance the steel packaging.
[0073] Specifically, since the remaining molten iron of this heat is no longer transferred, but is used as part of the remaining molten iron in the blast furnace to participate in the production of the next heat, the remaining molten iron of this heat needs to be considered in the calculation of the total amount of molten iron for the next heat, thereby increasing or decreasing the production time of the next heat, reducing the amount of remaining molten iron in the production of the next heat, and thus balancing the steel packaging.
[0074] The embodiment of the present invention estimates the total amount of molten iron produced during blast furnace production and uses it as the first total amount of molten iron, and calculates the remaining molten iron of this furnace according to the filling capacity of the molten iron bag and the first total amount of molten iron. When the remaining molten iron of this furnace is greater than the remaining molten iron standard, the opening aperture of the blast furnace is changed and the total amount of molten iron produced during blast furnace production of this furnace is re-estimated and used as the second total amount of molten iron. It should be noted that the remaining molten iron under the second total amount of molten iron is less than the remaining molten iron standard. The molten iron ladle is filled under the changed opening aperture of the blast furnace, and the actual total amount of molten iron and the average flow rate of molten iron are calculated. The opening time of the next furnace is determined by the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron, so that the iron packaging is balanced. The embodiment of the present invention is conducive to reducing the remaining molten iron in the next furnace by estimating the total amount of molten iron produced by the blast furnace and calculating the remaining amount of molten iron in this furnace, thereby reducing the probability that the molten iron ladle cannot be filled in this furnace, thereby reducing the heat damage of the molten iron and achieving the balance of iron packaging.
[0075] Figure 2 is a flow chart of another method for controlling the balance of steel packaging provided by an embodiment of the present invention. Based on the above embodiment, optionally, referring to Figure 2 The steps of calculating the first estimated total amount of molten iron in the current batch of the blast furnace include:
[0076] S111, obtaining the first iron tapping time, the amount of molten iron remaining in the blast furnace, and the molten iron generation rate.
[0077] Specifically, the total amount of molten iron produced during blast furnace production is related to the tapping time, the amount of residual molten iron in the blast furnace, and the rate of molten iron generation. Among them, the amount of molten iron remaining in the blast furnace includes the amount of molten iron produced by smelting in the blast furnace from the plugging of the previous furnace to the opening of the current furnace and the amount of iron shortage in the previous furnace. It should be noted that the amount of iron shortage can be positive or negative; when the amount of iron shortage is positive, it means that there is residual molten iron in the previous furnace; when the amount of iron shortage is negative, it means that the actual output of the previous furnace is lower than the expected value.
[0078] S112, calculating a first estimated total amount of molten iron according to the first iron tapping time, the amount of molten iron remaining in the blast furnace, the molten iron generation rate and a calculation formula for the total amount of molten iron.
[0079] Specifically, the total amount of molten iron is calculated as follows:
[0080] M = ΔM + Mt × T;
[0081] Wherein, M is the total amount of molten iron; ΔM is the amount of molten iron remaining in the blast furnace; Mt is the molten iron generation rate; and T is the tapping time.
[0082] Figure 3 is a flow chart for re-determining the opening diameter of the blast furnace and calculating the second estimated total amount of molten iron provided by an embodiment of the present invention. Figure 3 The steps of re-determining the iron hole diameter of the blast furnace and calculating the second estimated total amount of molten iron include:
[0083] S131. Change the diameter of the iron mouth of the blast furnace.
[0084] Specifically, the flow rate of molten iron flowing into the ladle is related to the size of the iron hole of the blast furnace. The larger the iron hole diameter of the blast furnace, the greater the flow rate of molten iron flowing into the ladle; the smaller the iron hole diameter of the blast furnace, the smaller the flow rate of molten iron flowing into the ladle.
[0085] S132, obtaining a first molten iron flow rate corresponding to the aperture of the blast furnace iron hole.
[0086] Specifically, different blast furnace iron mouth apertures correspond to different molten iron flow rates. There are various ways to obtain the molten iron flow rate under different apertures. This embodiment only exemplifies the acquisition method and does not limit it. Exemplarily, the flow rate of molten iron under different apertures is calculated by the filling capacity and filling time of the molten iron bag, and the relationship between the aperture size and the flow rate is determined according to the flow rate of the molten iron under different apertures, and the molten iron flow rate corresponding to the aperture size is calculated according to the relationship between the aperture size and the flow rate.
[0087] S133, calculating the second iron tapping time according to the first molten iron flow rate and the iron tapping time calculation formula.
[0088] Specifically, the calculation formula for tapping time is:
[0089] T = (ΔM + Mt × T) / V;
[0090] Wherein, T is the tapping time; ΔM is the amount of molten iron remaining in the blast furnace; Mt is the molten iron generation rate; and V is the molten iron flow rate.
[0091] S134. Calculate the total amount of molten iron in the blast furnace at the current aperture according to the second iron tapping time.
[0092] Specifically, since the amount of molten iron produced during blast furnace production is related to the tapping time, the amount of molten iron remaining in the blast furnace, and the molten iron generation rate, when the tapping time of the blast furnace changes, the total amount of molten iron produced by the blast furnace will also change accordingly.
[0093] S135. Determine whether the remaining molten iron under the current total amount of molten iron in the blast furnace is greater than the molten iron remaining standard; if so, execute S136; if not, execute S137.
[0094] Specifically, the molten iron surplus standard represents the maximum limit of the impact of the remaining molten iron on the next batch of production. The molten iron surplus standard can be set according to the capacity and demand of the blast furnace during actual production, and this embodiment does not limit this.
[0095] S136, changing the blast furnace tap hole diameter again.
[0096] For example, taking the molten iron surplus standard of 30 tons, the molten iron generation rate of 6 tons / minute and the iron shortage of 60 tons as an example, when the blast furnace tap hole diameter is changed from 50 mm to 52 mm, the molten iron flow rate corresponding to the 52 mm hole diameter is 7.2 tons / minute.
[0097] According to the formula T = (ΔM + Mt × T) / V, we get: T = (120 + 6 * T) / 7.2, and the predicted iron-tapping time for this furnace is 100 minutes. Then the total amount of molten iron is calculated = 120 + 6 * 100 = 720 tons. Each bag is full of molten iron, and 6 bags can be filled with 110 tons of molten iron, and 60 tons can be left after filling; each bag is full of molten iron, and 6 bags can be filled with 109 tons of molten iron, and 6 bags can be filled with 66 tons; each bag is full of molten iron, and 6 bags can be filled with 108 tons of molten iron, and 6 bags can be filled with 72 tons; each bag is full of molten iron, and 6 bags can be filled with 111 tons of molten iron, and 6 bags can be filled with 54 tons; each bag is full of molten iron, and 6 bags can be filled with 112 tons of molten iron, and 6 bags can be filled with 48 tons. Increase the drill diameter from 50mm to 55mm, and the molten iron flow rate increases to 7.5 tons / minute. According to the formula T=(ΔM+Mt×T) / V, we get: T=(120+6*T) / 7.5, and calculate that the predicted iron-making time of this furnace is 80 minutes. Then calculate the total amount of molten iron=120+6*80=600 tons. Each bag is filled with 110 tons of molten iron, and 5 bags can be filled with 50 tons; each bag is filled with 109 tons of molten iron, and 5 bags can be filled with 55 tons; each bag is filled with 108 tons of molten iron, and 5 bags can be filled with 60 tons; each bag is filled with 111 tons of molten iron, and 5 bags can be filled with 45 tons; each bag is filled with 112 tons of molten iron, and 5 bags can be filled with 40 tons. At this time, the remaining molten iron is greater than the molten iron remaining standard, and the blast furnace opening aperture needs to be changed again.
[0098] S137. The total amount of molten iron in the blast furnace at the current aperture is taken as the second estimated total amount of molten iron.
[0099] For example, taking the molten iron surplus standard of 30 tons, the molten iron generation rate of 6 tons / minute and the iron shortage of 60 tons as an example, when the blast furnace tap hole diameter is changed from 50 mm to 48 mm, the molten iron flow rate corresponding to the 48 mm aperture is 6.8 tons / minute.
[0100] According to the formula T = (ΔM + Mt × T) / V, we get: T = (120 + 6 × T) / 6.8, and the predicted iron-making time of this furnace is calculated to be 150 minutes, and the total amount of molten iron is calculated to be 120 + 6 × 150 = 1020 tons. Each bag is filled with molten iron of 110 tons, and 9 bags can be filled with 30 tons; each bag is filled with molten iron of 109 tons, and 9 bags can be filled with 39 tons; each bag is filled with molten iron of 108 tons, and 9 bags can be filled with 48 tons; each bag is filled with molten iron of 111 tons, and 9 bags can be filled with 21 tons; each bag is filled with molten iron of 112 tons, and 9 bags can be filled with 12 tons. At this time, the remaining molten iron is less than the remaining molten iron standard.
[0101] Figure 4 This is a flow chart of a molten iron bag filling provided by an embodiment of the present invention. Based on the above embodiments, optionally, refer to Figure 4 The steps of filling the molten iron bag according to the re-determined blast furnace iron hole diameter include:
[0102] S141, calculating the predicted flow rate according to the first iron tapping time and the first estimated total amount of molten iron.
[0103] Specifically, the first estimated total amount of molten iron is related to the first iron-out time and the predicted flow rate. Therefore, the predicted flow rate can be calculated based on the first iron-out time and the first estimated total amount of molten iron.
[0104] S142, filling the molten iron ladle and timing it; wherein the filling amount of the molten iron ladle includes: lower limit capacity, standard capacity and upper limit capacity.
[0105] Specifically, the molten iron smelted in the iron-making blast furnace is poured into the ladle, and the pouring is stopped when the molten iron in the ladle reaches the lower limit capacity of the ladle. For example, the standard capacity of the ladle is 110 tons; the lower limit capacity is 108 tons; and the upper limit capacity is 112 tons.
[0106] S143. Calculate the current ladle flow rate according to the lower limit capacity and the lower limit capacity filling time.
[0107] S144. Determine the current filling capacity of the molten iron ladle according to the current flow rate of the molten iron ladle and the predicted flow rate.
[0108] Specifically, the filling capacity of the current ladle is determined according to the magnitude of the current ladle flow rate relative to the predicted flow rate. Exemplarily, when the current ladle flow rate is greater than the predicted flow rate, the molten iron is filled to the lower limit capacity of the ladle; when the current ladle flow rate is less than the predicted flow rate, the molten iron is filled to the upper limit capacity of the ladle; when the current ladle flow rate is equal to the predicted flow rate, the molten iron is filled to the standard capacity of the ladle.
[0109] Figure 5 is another flow chart of filling a molten iron bag provided by an embodiment of the present invention. Based on the above embodiments, optionally, refer to Figure 5 The steps of determining the filling capacity of the molten iron bag according to the ladle flow rate and the predicted flow rate include:
[0110] S1441. Determine whether the current ladle flow rate is greater than the predicted flow rate; if so, execute S1442; if not, execute S1443.
[0111] Specifically, when the current flow rate of the molten iron ladle is greater than the predicted flow rate, the molten iron is filled to the lower limit capacity of the molten iron ladle; when the current flow rate of the molten iron ladle is less than the predicted flow rate, the molten iron is filled to the upper limit capacity of the molten iron ladle.
[0112] S1442. Fill the nth molten iron ladle; wherein n≥2.
[0113] S1443. Continue filling the current molten iron ladle to the upper limit capacity.
[0114] Figure 6is a flow chart for calculating the actual total amount of molten iron and the average flow rate of molten iron provided by an embodiment of the present invention. Figure 6 , the steps for calculating the actual total amount of molten iron and the average flow rate of molten iron include:
[0115] S145. Calculate the average molten iron flow rate according to the molten iron flow rates from the first molten iron ladle to the (n-1)th molten iron ladle.
[0116] Specifically, the flow rates of the molten iron when filling each ladle are accumulated, and the accumulated result is divided by the number of ladles to obtain the average flow rate of the molten iron.
[0117] S146. Determine whether the average flow rate of the molten iron is greater than the predicted flow rate; if so, execute S147; if not, execute S148.
[0118] Specifically, when the average flow rate of the molten iron is greater than the predicted flow rate, the nth molten iron ladle is filled to the lower limit capacity; when the average flow rate of the molten iron is less than the predicted flow rate, the nth molten iron ladle is filled to the upper limit capacity.
[0119] S147, fill the lower limit capacity of the nth molten iron package.
[0120] S148. The nth molten iron package is filled to the upper limit capacity.
[0121] S149. Calculate the actual total amount of molten iron based on the filling capacity of each ladle.
[0122] Specifically, the actual total amount of molten iron can be obtained by accumulating the filling capacity of each ladle.
[0123] Figure 7 is a flow chart of another method for controlling the balance of steel packaging provided by an embodiment of the present invention. Based on the above embodiments, optionally, refer to Figure 7 The step of determining the tap hole opening time of the next heat according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron comprises:
[0124] S151, calculating the difference between the second estimated total amount of molten iron and the actual total amount of molten iron.
[0125] Specifically, in actual production, since the remaining molten iron is no longer transferred, there is a difference between the actual total amount of molten iron and the second estimated total amount of molten iron.
[0126] S152. Calculate the molten iron difference discharge time according to the average molten iron flow rate and the molten iron difference.
[0127] Specifically, the molten iron difference discharge time refers to the time required for the remaining molten iron to be completely discharged at the average flow rate of molten iron.
[0128] S153, determining the tap hole opening time for the next furnace according to the difference in molten iron discharge time.
[0129] Specifically, the taphole opening time refers to the start time of the blast furnace to transfer molten iron, which refers to a specific moment. In actual production, the taphole opening time of the next furnace can be adjusted according to the molten iron difference discharge time and the production plan.
[0130] The embodiment of the present invention further provides a device for controlling the balance of steel packaging, which includes: a calculation module, a judgment module and a time determination module.
[0131] The calculation module is used to calculate the first estimated total amount of molten iron in the blast furnace in this batch; calculate the remaining molten iron in this batch according to the first estimated total amount of molten iron and the filling capacity of the molten iron package; and calculate the actual total amount of molten iron and the average flow rate of molten iron. The judgment module is used to judge whether the remaining molten iron is greater than the molten iron remaining standard. The time determination module is used to determine the tapping time of the next batch according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron.
[0132] It should be noted that the device for controlling the balance of steel packaging provided in the embodiment of the present invention has the beneficial effects of the method for controlling the balance of steel packaging provided in any of the above embodiments, which will not be described in detail here.
[0133] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0134] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for controlling the balance of steel packaging, characterized in that: include: Calculate the first estimated total amount of molten iron in the blast furnace in this batch; Calculate the remaining molten iron amount of the current batch according to the first estimated total amount of molten iron and the filling capacity of the molten iron package; If the remaining molten iron amount is greater than the molten iron remaining standard, re-determine the iron opening aperture of the blast furnace and calculate the second estimated total amount of molten iron; Fill the molten iron bag according to the re-determined blast furnace iron hole diameter and calculate the actual total amount of molten iron and the average flow rate of molten iron; Determining the tapping time for the next heat according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron, so as to balance the steel packaging; The step of calculating the first estimated total amount of molten iron in the current batch of the blast furnace comprises: Obtaining the first tapping time, the amount of molten iron remaining in the blast furnace, and the molten iron generation rate; Calculate the first estimated total amount of molten iron according to the first tapping time, the amount of molten iron remaining in the blast furnace, the molten iron generation rate and a molten iron total amount calculation formula; The total amount of molten iron is calculated as follows: M = ΔM + Mt × T; Wherein, M is the total amount of molten iron, unit: ton; ΔM is the amount of molten iron remaining in the blast furnace, unit: ton; Mt is the molten iron generation rate, unit: ton / minute; T is the tapping time, unit: minute; The steps of re-determining the iron opening aperture of the blast furnace and calculating the second estimated total amount of molten iron include: Changing the aperture of the blast furnace tap hole; Obtaining a first molten iron flow rate corresponding to the blast furnace iron hole aperture; Calculating a second tapping time according to the first molten iron flow rate and tapping time calculation formula; Calculate the total amount of molten iron in the blast furnace at the current aperture according to the second tapping time; Determine whether the remaining molten iron under the current total amount of molten iron in the blast furnace is greater than the molten iron remaining standard; If yes, then change the blast furnace tap hole diameter again; If not, the total amount of molten iron in the blast furnace under the current aperture is taken as the second estimated total amount of molten iron.
2. The method for controlling the balance of steel packaging according to claim 1, characterized in that: The calculation formula for the tapping time is: T = (ΔM + Mt × T) / V; Wherein, T is the tapping time, unit: minute; ΔM is the amount of molten iron remaining in the blast furnace, unit: ton; Mt is the molten iron generation rate, unit: ton / minute; V is the molten iron flow rate, unit: ton / minute.
3. The method for controlling the balance of steel packaging according to claim 1, characterized in that: The steps of filling the molten iron bag according to the re-determined blast furnace taphole aperture include: Calculating a predicted flow rate according to the first iron tapping time and the first estimated total amount of molten iron; Filling the molten iron ladle and timing it; wherein the filling amount of the molten iron ladle includes: a lower limit capacity, a standard capacity and an upper limit capacity; Calculate the current ladle flow rate according to the lower limit capacity and the lower limit capacity filling time; The current filling capacity of the molten iron ladle is determined according to the current molten iron ladle flow rate and the predicted flow rate.
4. The method for controlling the balance of steel packaging according to claim 3, characterized in that: The step of determining the filling capacity of the molten iron ladle according to the ladle flow rate and the predicted flow rate comprises: Determining whether the current ladle flow rate is greater than the predicted flow rate; If yes, then fill the nth ladle; where n≥2; If not, continue to fill the current ladle to the upper limit capacity.
5. The method for controlling the balance of steel packaging according to claim 3, characterized in that: The steps for calculating the actual total amount of molten iron and the average molten iron flow rate include: Calculate the average molten iron flow rate according to the molten iron flow rate from the first molten iron ladle to the n-1th molten iron ladle; Determining whether the average flow rate of the molten iron is greater than the predicted flow rate; If so, fill the lower limit capacity of the nth molten iron package; If not, the nth molten iron package is filled to the upper limit capacity; The actual total amount of molten iron is calculated based on the filling capacity of each ladle.
6. The method for controlling the balance of steel packaging according to claim 1, characterized in that: The step of determining the tap hole opening time of the next heat according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of molten iron comprises: Calculating a molten iron difference between the second estimated total molten iron amount and the actual total molten iron amount; Calculating the molten iron difference discharge time according to the molten iron average flow rate and the molten iron difference; The tap hole opening time for the next furnace is determined according to the molten iron difference discharge time.
7. A control device for steel packaging balance, characterized in that: The steel package balance control device executes the steel package balance control method according to any one of claims 1 to 6, and the steel package balance control device comprises: A calculation module, the calculation module is used to calculate the first estimated total amount of molten iron in the blast furnace in this batch; calculate the remaining molten iron in this batch according to the first estimated total amount of molten iron and the filling capacity of the molten iron package; and calculate the actual total amount of molten iron and the average flow rate of molten iron; A judgment module, the judgment module is used to judge whether the remaining molten iron amount is greater than the molten iron remaining standard; A time determination module is used to determine the tapping time of the next furnace according to the second estimated total amount of molten iron, the actual total amount of molten iron and the average flow rate of the molten iron.
Citation Information
Patent Citations
Blast furnace tapping method for reducing circulating flow of molten iron in hearth
CN102719581A
Method, system and equipment for continuous tapping of blast furnace and medium
CN116103453A
Method for deciding lap iron tapping of blast furnace and its instrument
JP1997003512A
Method and device for verifying balance in hot metal storage between blast furnace and steel-making shop
JP2003082407A
