A construction method for synchronously pouring the manhole body and step steel mold
By reserving semicircular holes and setting positioning grooves in the template unit inside the inspection well body, combined with bottom-up assembly and mortise-and-tenon connection, the complexity and quality problems of the installation of step components and steel formwork are solved, and efficient and safe well construction is achieved. The body structure construction and formwork are used multiple times.
Patent Information
- Application Number
- CN202310984295.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2043-08-05
AI Technical Summary
In the construction of existing inspection wells, the installation operation of step components and steel formwork is complicated, and quality problems such as looseness, insufficient burial depth, and spacing deviations are prone to occur, which leads to potential safety hazards in later maintenance, and high formwork loss and cost.
The construction method of simultaneous pouring of the inspection well body and step steel formwork is adopted. Semi-circular holes are reserved in the formwork unit inside the well body and formed into through holes for pre-embedded installation of step components. Positioning slots and latches are set on the steel formwork to ensure The components are fixed in position to simplify installation operations, and bottom-up spaced assembly and mortise-and-tenon connections are used to improve disassembly and assembly efficiency and structural strength.
It simplifies the installation operation of step components and steel formwork, improves installation quality and safety, reduces formwork loss, enables multiple recycling of steel formwork, and enhances the stability of the well structure and construction efficiency.
Smart Images

Figure CN117005465B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of inspection well construction, and in particular to a method for synchronously casting an inspection well body and a step steel mold. Background Art
[0002] When constructing deeper inspection wells in a project, step components need to be installed in the well to facilitate maintenance and use by personnel during operation.
[0003] There are two common situations for installing step components in cast-in-place (reinforced) concrete inspection wells. The first is that the well body is formed by wooden formwork, and holes are directly opened in the wooden formwork to bury the components. When the formwork is removed, the formwork at the component needs to be cut and destroyed, resulting in large formwork loss and high cost. The second is that the well body is formed by steel formwork, and the step components are implanted after the well body is formed. This method not only has high operating costs, but also the step installation often has quality problems such as looseness, insufficient burial depth and spacing deviation, which poses a safety hazard to the later maintenance personnel. Therefore, there is still room for improvement. Summary of the invention
[0004] In order to simplify the installation operation of step components and steel formwork, improve the installation quality of step components, and improve the efficiency of disassembly and assembly of steel formwork, the present application provides a construction method for synchronous casting of an inspection well body and a step steel formwork.
[0005] The present application provides a method for synchronously pouring a manhole body and a step steel mold, which adopts the following technical solution:
[0006] A construction method for synchronously pouring a manhole body and a step steel mold, comprising the following steps:
[0007] S1: Construction preparation: prefabricated step components and formwork units;
[0008] S2: foundation pit excavation;
[0009] S3: Setting up steel formwork and step components: the formwork units are assembled and enclosed inside and outside to form a concrete pouring cavity of the well body; in the embedded area of the step components inside the well body, semicircular holes are reserved on the upper and lower end faces of the formwork units inside the well body, and the semicircular holes of the upper and lower adjacent formwork units are assembled into a through hole, and the connecting section of the step components passes through the through hole horizontally and extends into the concrete pouring cavity of the well body;
[0010] S4: Well body concrete pouring construction: pour concrete into the concrete pouring cavity, and bury the connecting section of the step component in the well body;
[0011] S5: Dismantle the steel formwork: After the concrete reaches a certain strength, remove the formwork unit horizontally in the direction away from the well body, and separate the formwork unit from the step component.
[0012] By adopting the above technical scheme, when installing the step component, the step component is inserted into the through hole formed by the semicircular holes reserved by the template unit on the inner side of the well body for pre-embedded installation, which is simple to operate and simplifies the installation operation of the step component and the steel template; when the inner mold of the steel template is made, through holes with relatively fixed size spacing are set in the step installation area according to the design requirements to ensure that the installation position of the step component is relatively fixed with small deviation. After the well body is cast and formed, the step structure is tightly wrapped with the well body concrete, and the step component is firmly buried in the well body, which is beneficial to improving the installation quality of the step component; in addition, the steel template is assembled with template units, so that the template in the pre-embedded area of the step component is divided into two parts, upper and lower. When dismantling the template, the two template units can be horizontally pulled out on the step component, which improves the efficiency of disassembly and assembly of the steel template without damaging the template well body and step installation, and the template can be recycled many times.
[0013] Preferably, in the step of erecting the steel formwork and stepping components of S3, the installation of one circle of formwork units is completed first, and then the connecting section of the stepping component is horizontally inserted into the concrete pouring cavity of the well body with the semicircular hole at the upper end of the formwork unit as a guide surface, and then the next circle of formwork units is assembled upward, and the semicircular holes of the upper and lower adjacent formwork units are assembled into a through hole, and the connecting section of the stepping component is passed through the through hole.
[0014] By adopting the above technical solution, the assembly of the template units and the step components is carried out at intervals from bottom to top, and the installation of the step components is completed in an orderly and stable manner, which is beneficial to improving the installation efficiency and installation quality of the step components.
[0015] Preferably, in the step of erecting the steel formwork and the stepping components in S3, after assembling each circle of the formwork units inside and outside the well body, steel bars are tied in the concrete pouring cavity of the well body, and the connecting section of the stepping components is tied and fixed to the steel bars.
[0016] By adopting the above technical solution, the steel bars not only improve the structural strength of the well body, but also fix the step components, which is beneficial to improving the connection stability between the step components and the well body.
[0017] Preferably, a limiting groove is vertically provided on the inner wall of the semicircular hole, and a positioning hole is passed through the step member; in the step of erecting the steel formwork and the step member of S3, the step member is in place in the semicircular hole, the positioning hole and the limiting groove are arranged opposite to each other, and a pin is provided between the step member and the template unit, and the pin realizes the positioning purpose of the step member by passing through the positioning hole and the limiting groove in sequence.
[0018] By adopting the above technical solution, the step components are positioned to ensure that the lengths of the step components extending out of the wellbore are equal, which is beneficial to improving the installation quality of the step components and further improving the safety of construction workers.
[0019] Preferably, the template unit is provided with transverse ribs and vertical ribs on the side facing away from the wellbore.
[0020] By adopting the above technical solution, the transverse ribs and the vertical ribs can improve the structural strength of the template unit, which is beneficial to the deformation probability of the template unit.
[0021] Preferably, the two transverse ribs and the two vertical ribs enclose a closed shape, and the two transverse ribs are respectively located at the edge positions of the upper and lower ends of the template unit; the upper and lower adjacent template units are connected by connecting pieces, and the transverse ribs are penetrated by connecting holes for the connecting pieces to pass through.
[0022] By adopting the above technical solution, while improving the structural strength of the template unit, it also provides connection points for the connecting parts, which is beneficial to improving the connection stability between the upper and lower template units.
[0023] Preferably, in the template unit prefabrication step of S1, except for the template unit at the pre-embedded area of the step member, the remaining two left and right adjacent template units are connected by mortise and tenon joints.
[0024] By adopting the above technical solution, the template units are assembled by mortise and tenon connection, which is beneficial to improving the connection tightness between the left and right adjacent template units. Due to the limitations of the disassembly method of the embedded area of the step component, it is necessary to cancel the mortise and tenon structure of the template unit so that the template unit can be pulled out horizontally during the template disassembly step.
[0025] Preferably, in the steel formwork and step component erecting step of S3, the pin is an iron component, and the pin is completely accommodated in the positioning hole and the limit groove; in the steel formwork disassembly step of S5, the formwork unit is disassembled in a top-down order, and before disassembling the formwork unit, the pin is sucked out by magnetic attraction to release the connection between the upper end of the formwork unit and the step component.
[0026] By adopting the above technical solution, the pin is completely accommodated in the positioning hole and the limiting groove, reducing the influence of the pin on the horizontal withdrawal of the template unit, and the pin is taken out by magnetic attraction, which is beneficial to improving the disassembly efficiency of the template unit.
[0027] In summary, the present application includes at least one of the following beneficial technical effects:
[0028] 1. Semicircular holes are reserved at the upper and lower ends of the template unit inside the well body, and through holes are formed to facilitate insertion and pre-embedded installation of the step components during installation, thereby simplifying the installation operation of the step components and the steel template; and through holes with relatively fixed size spacing are set in the step installation area to ensure that the installation position of the step components is relatively fixed with small deviation, which is conducive to improving the installation quality of the step components; when removing the template, the two template units can be horizontally pulled out on the step components, which improves the efficiency of steel template disassembly and assembly, and will not damage the template well body and step installation, and the template can be recycled many times;
[0029] 2. By assembling the template units and step components from bottom to top, the step component installation can be completed in an orderly and stable manner, which is conducive to improving the installation efficiency and quality of the step component;
[0030] 3. The mortise and tenon joint method is used to assemble the template units, which is conducive to improving the connection tightness between the left and right adjacent template units. Due to the limitation of the disassembly method of the embedded area of the step component, the mortise and tenon structure of the template unit needs to be cancelled so that the template unit can be horizontally pulled out during the template disassembly step;
[0031] 4. By setting a pin between the step component and the template unit, the pin is passed through the positioning hole and the limit groove in sequence to achieve the positioning purpose of the step component, which can ensure that the length of each step component extending out of the well body is equal, which is beneficial to improve the installation quality of the step component and further improve the safety of construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the overall structure of a method for synchronously casting a manhole body and a step steel mold in an embodiment of the present application.
[0033] Figure 2 It is an exploded schematic diagram of the template unit and the step component in a method for synchronously casting a manhole body and a step steel mold in an embodiment of the present application.
[0034] Figure 3 yes Figure 2 A magnified schematic diagram of center A.
[0035] Figure 4 yes Figure 2 A magnified schematic diagram of point B in the middle.
[0036] Explanation of the reference numerals: 1. template unit; 11. semicircular hole; 111. limiting groove; 12. transverse rib; 13. vertical rib; 2. step member; 21. connecting section; 22. positioning hole; 3. well body; 4. connecting hole; 5. latch; 6. connecting piece. DETAILED DESCRIPTION
[0037] The following is combined with Figure 1-4 This application is described in further detail.
[0038] The present application embodiment discloses a method for synchronously casting a manhole body and a step steel mold. The method comprises the following steps:
[0039] S1: Construction preparation: refer to Figure 1 and Figure 2, prefabricated step member 2 and formwork unit 1. Both formwork unit 1 and step member 2 are steel members. Among them, formwork unit 1 is an arc-shaped plate, and step member 2 is a U-shaped rod. Two transverse ribs 12 and two vertical ribs 13 are arranged on the back of formwork unit 1, and the two transverse ribs 12 and the two vertical ribs 13 enclose a closed rectangular frame, and the two transverse ribs 12 are respectively located at the edge positions of the upper and lower ends of the formwork unit 1, and the two vertical ribs 13 are respectively located at the edges of the left and right ends of the formwork unit 1. The transverse ribs 12 and the vertical ribs 13 can improve the structural strength of the formwork unit 1, which is beneficial to the deformation probability of the formwork unit 1.
[0040] S2: Foundation pit excavation: The foundation pit is excavated by open excavation using an excavator and manually trimmed. When encountering rocks, loosening blasting and manual chiseling are used. The width of the working surface on both sides of the foundation pit is 0.4 meters each, and the slope is set at 1:0.5 during excavation.
[0041] During the excavation of the foundation pit, when the excavator digs to 20-30cm close to the design elevation, the position and size of the foundation pit are tested. If all indicators meet the requirements, manual excavation is then carried out to the design elevation. Then the cushion layer is constructed at the bottom of the foundation pit.
[0042] S3: Erection of steel formwork and stepping components 2: Reference Figure 2 and Figure 3 The template unit 1 is divided into inner and outer sides for enclosing and assembling to form a concrete pouring cavity of the well body 3. The outer template unit 1 is fixed and assembled by means of supporting formwork. In the pre-embedded area of the step member 2 inside the well body 3, the upper end face of the template unit 1 inside the well body 3 is provided with two semicircular holes 11 along the thickness direction of the template, and the spacing between the two semicircular holes 11 is equal to the spacing between the two connecting sections 21 of the step member 2. The two connecting sections 21 of the step member 2 correspond to the two semicircular holes 11 one by one.
[0043] In addition, a limiting groove 111 is vertically provided at the middle of the inner wall of the semicircular hole 11 at the upper end of the template unit 1, and the stepping member 2 is penetrated with a positioning hole 22. In the step of setting up the steel template and the stepping member 2, the installation of a circle of the template unit 1 is completed first, and then the connecting section 21 of the stepping member 2 is horizontally inserted into the concrete pouring cavity of the well body 3 with the semicircular hole 11 corresponding to the upper end of the template unit 1 as the guide surface. When the positioning hole 22 is aligned with the limiting groove 111, the stepping member 2 is completely in place. Then, a latch 5 is arranged between the connecting section 21 of the stepping member 2 and the corresponding semicircular hole 11, and the latch 5 realizes the positioning purpose of the stepping member 2 by successively penetrating the positioning hole 22 and the limiting groove 111. This ensures that the length of each stepping member 2 extending out of the well body 3 is equal, which is conducive to improving the installation quality of the stepping member 2, and then improving the safety of the construction personnel. At the same time, the stepping member 2 is also pre-fixed to reduce the position displacement of the stepping member 2 in the subsequent steel bar binding and fixing step.
[0044] In addition, the latch 5 is an iron component, and the latch 5 is completely accommodated in the positioning hole 22 and the limiting groove 111 .
[0045] In this embodiment, after assembling each circle of the template units 1 inside and outside the well body 3, the steel bar operation is performed in the concrete pouring cavity of the well body 3, and the connecting section 21 of the step member 2 is tied and fixed to the steel bar. The steel bar not only improves the structural strength of the well body 3, but also fixes the step member 2, which is beneficial to improve the connection stability between the step member 2 and the well body 3. It should be emphasized that, except for the template unit 1 at the embedded area of the step member 2, the remaining two adjacent template units 1 on the left and right are connected by mortise and tenon joints. The template units 1 are assembled by mortise and tenon joints, which is beneficial to improve the connection tightness between the adjacent template units 1 on the left and right.
[0046] Then, the next circle of template units 1 is assembled upwards, wherein two semicircular holes 11 are also provided on the lower end face of the template unit 1. The semicircular holes 11 of the upper and lower adjacent template units 1 are assembled into a through hole, and the connecting section 21 of the step component 2 is horizontally penetrated through the through hole. By assembling the template units 1 and the step components 2 from bottom to top, the installation of the step components 2 is completed in an orderly and stable manner, which is beneficial to improving the installation efficiency and installation quality of the step components 2.
[0047] In addition, refer to Figure 2 and Figure 4 , the template units 1 adjacent to each other in the upper and lower parts and the template units 1 adjacent to each other in the left and right parts are connected by connecting members 6. In this embodiment, the connecting members 6 can be iron wires, and in other embodiments, bolts can be selected. The transverse ribs 12 are vertically penetrated with connecting holes 4 for the connecting members 6 to pass through. The transverse ribs 12 of the template units 1 adjacent to each other in the upper and lower parts fit each other, and the connecting holes 4 of the transverse ribs 12 are arranged oppositely. The iron wire passes through the connecting holes 4 between the two transverse ribs 12 and is tied and fixed.
[0048] Similarly, the left and right adjacent formwork units 1 are also tied and fixed at the connection holes 4 on the vertical ribs 13 through the connecting members 6, which is beneficial to improve the stability between the adjacent formwork units 1.
[0049] S4: Concrete pouring construction of shaft 3: After the sealing and firmness of the formwork are inspected and qualified, concrete pouring is carried out. The concrete is mixed by a 350 forced mixer on site and poured by an excavator bucket. The material measurement is strictly controlled during mixing, and the slump of the mixed concrete is measured. Among them, the concrete is poured into the concrete pouring cavity by an excavator bucket. The pouring thickness of each layer needs to be controlled and vibrated. The phenomenon of vibration leakage and over-vibration needs to be reduced to ensure the density of the concrete. In addition, the concrete pouring needs to be carried out continuously, and the interruption time due to some reason cannot exceed the initial setting time of the previous layer of concrete. After the concrete is initially set, the connecting section 21 of the step member 2 is buried in the shaft 3.
[0050] S5: Dismantle the steel formwork: After the concrete reaches a certain strength, the formwork unit 1 is horizontally dismantled in a direction away from the well body 3, and the formwork unit 1 is separated from the step member 2. The left and right side walls of the formwork unit 1 at the embedded area of the step member 2 are parallel to each other, so that the formwork unit 1 can be horizontally pulled out.
[0051] The template unit 1 is removed in a top-down disassembly sequence. Before removing the template unit 1, the latch 5 is sucked out by magnetic attraction to release the connection between the upper end of the template unit 1 and the step member 2, and then the wire between adjacent template units 1 is cut to complete the unlocking between the template units 1 and between the template unit 1 and the step member 2.
[0052] It should be emphasized that, since the diameter of the through hole is slightly larger than the diameter of the step member 2, it is necessary to use rubber to seal the gap between the through hole and the connecting section 21 of the step member 2 during the concrete pouring construction. Then, when removing the template unit 1 inside the well body 3, it is necessary to pull out the template unit 1 horizontally to complete the purpose of separating adjacent template units 1. Then, since the diameter of the through hole is slightly larger than the diameter of the step member 2, after the template unit 1 is pulled out horizontally, the template unit 1 can be slightly tilted forward away from the well body 3 so that the template unit 1 and the step member 2 can be separated.
[0053] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for synchronously casting a manhole body and a step steel mold, characterized in that: The following steps are involved: S1: Construction preparation: prefabricated step components (2) and formwork units (1); S2: foundation pit excavation; S3: erecting steel formwork and stepping components (2): the formwork unit (1) is assembled and enclosed inside and outside to form a concrete pouring cavity of the well body (3); in the pre-embedded area of the stepping component (2) inside the well body (3), semicircular holes (11) are reserved on the upper and lower end faces of the formwork unit (1) inside the well body (3); the semicircular holes (11) of the upper and lower adjacent formwork units (1) are assembled into a through hole, and the connecting section (21) of the stepping component (2) passes through the through hole horizontally and extends into the concrete pouring cavity of the well body (3); S4: Concrete pouring construction of the well body (3): concrete is poured into the concrete pouring cavity, and the connecting section (21) of the step member (2) is buried in the well body (3); S5: Dismantling the steel formwork: After the concrete reaches a certain strength, the formwork unit (1) is horizontally dismantled in a direction away from the well body (3), and the formwork unit (1) is separated from the step member (2); the left and right side walls of the formwork unit (1) at the embedded area of the step member (2) are parallel to each other, so that the formwork unit (1) can be horizontally pulled out; In the step of erecting the steel formwork and the stepping member (2) of S3, the installation of a circle of formwork units (1) is first completed, and then the connecting section (21) of the stepping member (2) is horizontally inserted into the concrete pouring cavity of the well body (3) using the semicircular hole (11) at the upper end of the formwork unit (1) as a guide surface, and then the next circle of formwork units (1) are assembled upwards, and the semicircular holes (11) of the upper and lower adjacent formwork units (1) are assembled into a through hole, and the connecting section (21) of the stepping member (2) is inserted into the through hole; In the step of setting up the steel formwork and the stepping member (2) in S3, after assembling each circle of the formwork units (1) inside and outside the well body (3), steel bars are tied in the concrete pouring cavity of the well body (3), and the connecting section (21) of the stepping member (2) is tied and fixed to the steel bars; A limiting groove (111) is vertically provided on the inner wall of the semicircular hole (11), and a positioning hole (22) is passed through the step member (2); in the step of erecting the steel template and the step member (2) of S3, the step member (2) is positioned in the semicircular hole (11), the positioning hole (22) and the limiting groove (111) are arranged opposite to each other, and a latch (5) is arranged between the step member (2) and the template unit (1), and the latch (5) is sequentially passed through the positioning hole (22) and the limiting groove (111) to achieve the purpose of positioning the step member (2).
2. The method for synchronously casting the manhole body and the step steel mold according to claim 1 is characterized in that: The side of the template unit (1) facing away from the wellbore (3) is provided with a transverse rib (12) and a vertical rib (13).
3. The method for synchronously casting the manhole body and the step steel mold according to claim 2 is characterized in that: The two transverse ribs (12) and the two vertical ribs (13) enclose a closed shape, and the two transverse ribs (12) are respectively located at the edge positions of the upper and lower ends of the template unit (1); the upper and lower adjacent template units (1) are connected by connecting pieces (6), and the transverse ribs (12) are penetrated by connecting holes (4) for the connecting pieces (6) to pass through.
4. The method for synchronously casting the manhole body and the step steel mold according to claim 1 is characterized in that: In the prefabrication step of the template unit (1) in S1, except for the template unit (1) at the pre-embedded area of the step member (2), the remaining two adjacent template units (1) on the left and right are connected by mortise and tenon joints.
5. The method for synchronously casting the manhole body and the step steel mold according to claim 1 is characterized in that: In the step of erecting the steel formwork and the step member (2) of S3, the latch (5) is an iron member, and the latch (5) is completely accommodated in the positioning hole (22) and the limiting groove (111); in the step of disassembling the steel formwork of S5, the formwork unit (1) is disassembled in a top-down order, and before disassembling the formwork unit (1), the latch (5) is sucked out by magnetic attraction to release the connection between the upper end of the formwork unit (1) and the step member (2).