A split protection and anti-deformation structure of a transmission tower and a construction method thereof
By adopting split protection and anti-deformation structures in the infrastructure construction of transmission towers, including a combination of independent foundations for high tower legs, independent foundations for low tower legs, square and L-shaped protective panels, and reinforced beams, the problem of traditional towers on the mountain side has been solved. It solves the problem of large amounts of earth and stone excavation in infrastructure construction in slope areas, and achieves more efficient deformation resistance and environmental protection.
Patent Information
- Application Number
- CN202311181750.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-14
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-09-14
AI Technical Summary
The infrastructure construction of traditional transmission towers in mountainous slope areas has problems such as large amounts of earth and rock excavation and serious water and soil erosion. It is difficult to effectively resist surface deformation, affecting the ecological environment and the long-term safe and stable operation of the towers.
It adopts a split protection and anti-deformation structure, including three independent foundations for high tower legs, one independent foundation for low tower legs, square protective panels and L-shaped protective panels. Through the combination of horizontal sliding layers and reinforced beams, a composite anti-deformation structure is formed. structure, reduce the amount of rock and soil excavation for the tower's foundation construction, reduce water and soil loss, and improve the tower's anti-deformation performance.
It significantly reduces the amount of excavation for the tower's foundation construction, protects the ecological environment, improves the tower's anti-deformation performance, reduces the structural internal force under surface inclination and horizontal deformation, achieves the tower's composite anti-deformation capability in uneven areas, and reduces Construction cost and duration.
Smart Images

Figure CN117188512B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of power transmission iron tower foundation, and in particular is a split protection and anti-deformation structure of a power transmission iron tower and a construction method thereof. Background Art
[0002] Adhering to technological innovation throughout the entire process of line design and construction, reducing the use of natural resources, and reducing ecological damage are the inherent requirements of the dual-carbon strategy and green development thinking for the technical field of power transmission line construction. In recent years, with the rapid development of power construction, more and more transmission lines will be built in mountainous slope areas, and many of them will pass through coal mining areas, and will face the adverse effects of surface deformation caused by coal mining. If the traditional equal-height leg iron tower and its traditional integrated protective large plate are used, the slope site must be leveled and excavated as a whole, which will result in many disadvantages such as large earthwork excavation and serious soil erosion. In the existing technology, high-low leg iron towers are a better choice for adapting to mountainous slopes. However, its commonly used traditional original soil foundation is not conducive to resisting surface deformation. Therefore, for the transmission towers built in mountainous slope areas, it is very necessary to study new foundation forms to improve the existing protective large plate forms and design methods, achieve the safety and environmental protection of iron tower construction in mountainous slope areas, and ensure the long-term safe and stable operation of transmission lines. Summary of the invention
[0003] In view of the problems existing in the above-mentioned prior art, the present invention provides a split protection and anti-deformation structure of a transmission iron tower and a construction method thereof; the structure can significantly reduce the amount of rock and soil excavation for the iron tower foundation construction, reduce soil erosion, and protect the ecological environment. At the same time, it can play a good protective role on the upper iron tower structure, and significantly reduce the structural internal force under mining deformation such as surface inclination and surface horizontal deformation. The method has a simple implementation process, convenient operation process, and low implementation cost. It can effectively improve the anti-deformation performance of the iron tower and reduce the amount of excavated earthwork. It has good benefits in terms of project cost, construction period, and environmental protection indicators.
[0004] In order to achieve the above-mentioned object, the present invention provides a split protection and anti-deformation structure of a transmission iron tower, comprising three high tower leg independent foundations, one low tower leg independent foundation, a square protection plate and an L-shaped protection plate; the three high tower leg independent foundations and one low tower leg independent foundation are distributed at the four corners of the same rectangle;
[0005] The L-shaped protective plate and the square protective plate are arranged in parallel, and the heights of the two are different, wherein the L-shaped protective plate is formed by two perpendicular rectangular plates connected as one, and three high leg installation positions are formed at the two ends and the corners of its upper end surface; the square protective plate is a square plate, and a low leg installation position is formed on its upper end surface; the position of the square protective plate is lower than that of the L-shaped protective plate, and is located at the edge of the notch in the L-shaped protective plate, and the low leg installation position on the square protective plate and the three high leg installation positions on the L-shaped protective plate are located at the four corners of the same rectangle;
[0006] Three high tower leg independent foundations are respectively cast on three high leg installation positions on the upper end surface of the L-shaped protective plate, and their upper ends are arranged flush with each other, and a horizontal sliding layer is laid between each high tower leg independent foundation and each high leg installation position on the L-shaped protective plate; a low tower leg independent foundation is cast on a low leg installation position on the upper end surface of the square protective plate, and a horizontal sliding layer is laid between the low tower leg independent foundation and the low leg installation position on the square protective plate.
[0007] Furthermore, in order to better resist the surface deformation caused by underground mining and further reduce the additional internal force and deformation amplitude of the upper tower structure, two reinforcing beams 1 and two reinforcing beams 2 are also included;
[0008] One end of the two reinforcing beams that is close to each other is fixedly connected to the upper part of an independent foundation of a high tower leg located at the corner of the L-shaped protective plate, and one end of the two reinforcing beams that is far away from each other is fixedly connected to the upper part of two independent foundations of high tower legs located at both ends of the L-shaped protective plate;
[0009] The ends of the two reinforcing beams 2 that are close to each other are fixedly connected to a low tower leg independent foundation, and the ends of the two reinforcing beams 2 that are far away from each other are respectively fixedly connected to two high tower leg independent foundations located at the two ends of the L-shaped protective plate.
[0010] As a preferred embodiment, the two first reinforcing beams and the two second reinforcing beams are arranged horizontally, and the four reinforcing beams are located in the same horizontal plane.
[0011] As a further preferred embodiment, the adjacent ends of the two reinforcing beams 2 are fixedly connected to the upper end of an independent foundation of a low tower leg.
[0012] As another preferred embodiment, the two reinforcing beams 1 are arranged horizontally and at the same height, and the two reinforcing beams 2 are arranged obliquely, and the ends of the two reinforcing beams 2 that are farther away from each other are higher than the ends that are closer to each other.
[0013] As a further preferred embodiment, the ends of the two reinforcing beams 2 that are close to each other are fixedly connected to the upper end of a low tower leg independent foundation, and the ends of the two reinforcing beams 2 that are far away are respectively fixedly connected to the upper ends of two high tower leg independent foundations located at the two ends of the L-shaped protective plate;
[0014] The ends of the two reinforcing beams that are close to each other are fixedly connected to the upper end of an independent foundation of a high tower leg located at the corner of the L-shaped protective plate, and the ends of the two reinforcing beams that are far away from each other are respectively fixedly connected to the upper ends of two independent foundations of high tower legs located at both ends of the L-shaped protective plate.
[0015] In the present invention, by placing the square protective plate and the L-shaped protective plate at different heights, the traditional integrated leveling excavation of the site can be transformed into the stepped excavation of the tower site, which can be effectively applied to valleys, or when there are other terrain conditions that make it advantageous to use a high-low leg iron tower with three highs and one low, the "1+3" split protective plate can be used. This "1+3" split protective plate structure can be effectively applied to the installation requirements of the "three highs and one low" high-low leg iron tower, which can significantly reduce the amount of rock and soil excavation during the construction of the iron tower foundation, thereby helping to reduce soil erosion in the later stage. In this way, it can not only better protect the local ecological environment, but also help to better protect the upper iron tower structure, and can significantly reduce the structural internal forces generated by mining deformation such as surface inclination and surface horizontal deformation, thereby significantly improving the anti-deformation performance of the iron tower. Compared with the scheme without protective plates and the scheme with traditional integrated protective plates, the composite anti-deformation structure has a completely different mechanism of action. It can be effectively applied to the layout scheme of the iron tower with two high and two low tower legs, and can significantly improve the composite anti-deformation ability of the transmission iron tower in uneven areas. By setting a horizontal sliding layer between each independent foundation and the protective plate, the friction between the protective plate and the independent foundation can be effectively reduced, so that the two can slide relatively freely, reducing the constraints on the structure, thereby avoiding the generation of stress cracks. In this technical scheme, a new composite anti-deformation structure is formed by using a split high-low square protective plate and an L-shaped protective plate, a horizontal sliding layer arranged between each independent foundation and the protective plate, a low tower leg independent foundation arranged on the L-shaped protective plate, and three high tower leg independent foundations arranged on the L-shaped protective plate, which significantly improves the composite anti-deformation ability of the transmission iron tower in uneven areas. This composite anti-deformation structure can significantly reduce the amount of rock and soil excavation for tower foundation construction, reduce soil erosion, and effectively protect the ecological environment. At the same time, it can play a good protective role for the upper tower structure and significantly reduce the structural internal force under mining deformation such as surface inclination and surface horizontal deformation.
[0016] The present invention also provides a method for constructing a split protection and anti-deformation structure of a power transmission tower, which adopts a split protection and anti-deformation structure of a power transmission tower and specifically comprises the following steps:
[0017] Step 1: Determine the parameters of the square protective plate and the L-shaped protective plate;
[0018] S11: Determination of the installation position of the square protection plate and the L-shaped protection plate;
[0019] When the construction terrain is a valley or there are other terrain conditions that make it advantageous to use a high-low leg iron tower with three highs and one low, determine the installation positions of the square protective plate and the L-shaped protective plate, where the installation position of the square protective plate is lower than the installation position of the L-shaped protective plate;
[0020] S12: Determination of the thickness of square protective plates and L-shaped protective plates;
[0021] The larger value between 1 / 25 of the opening at the base of the iron tower and 400mm is taken as the thickness of the square protection plate and the L-shaped protection plate. At the same time, ensure that the thickness of the square protection plate and the L-shaped protection plate does not exceed 600mm;
[0022] S13: Determination of the width of square guard plates and L-shaped guard plates;
[0023] First, ensure that the horizontal center line of the square protective plate coincides with the horizontal center line of the independent foundation of a low tower leg above it, and determine the width of the square protective plate according to formula (1); then make the width of the two ends of the L-shaped protective plate equal to the width of the square protective plate;
[0024] B=B dj +2a (1);
[0025] Where, B is the horizontal width of the square protective plate, unit: mm; B dj It is the bottom width of the low tower leg independent foundation above the square protective plate in the same direction, unit: mm; a is the horizontal distance from the edge of the horizontal end of the square protective plate to the corresponding edge of the low tower leg independent foundation above;
[0026] S14: Determination of the length of the L-shaped protective plate;
[0027] Ensure that the lengths of the outer edges of the two straight arm sections of the L-shaped protective plate are equal, and determine the length of one straight arm section of the L-shaped protective plate according to formula (2);
[0028] L=l0+B dj +2a (2);
[0029] Where, L is the length of a straight arm section of the L-shaped protective plate, unit: mm; l0 is the center distance between the two high tower leg independent foundations above a straight arm section of the L-shaped protective plate, unit: mm;
[0030] S15: Determination of reinforcement for square and L-shaped protective slabs;
[0031] First, the reinforcement parameters of the L-shaped protective plate are determined. Specifically, a quantitative analysis is performed based on the expected results of the type and size of the actual engineering surface deformation, and the cross-sectional design bending moment value M is calculated according to formulas (3), (4) and (5). On this basis, according to the double-layer bidirectional reinforcement scheme, the cross-sectional reinforcement area A is calculated according to formulas (6) and (7). s ; Then determine the reinforcement parameters of the square protection plate so that the reinforcement parameters of the square protection plate are consistent with the reinforcement parameters of the L-shaped protection plate;
[0032]
[0033]
[0034]
[0035]
[0036] f c Bx=f y A s -f′ y A′ S (7);
[0037] Where, q is the design value of the equivalent uniformly distributed line load above the L-shaped protective plate, unit: kN / m; L1 is the maximum suspended length of the L-shaped protective plate, unit: m; γ m The total equivalent density of the soil above the L-shaped protective plate and the independent foundation, unit: kN / m 3 ; d is the foundation burial depth, unit: m; q0 is the equivalent linear load of the deadweight of the L-shaped protective plate in the length direction, unit: kN / m; L0 is the total length of the L-shaped protective plate, unit: m; f c is the design value of the concrete axial compressive strength of the L-shaped protective plate, unit: MPa; h0 is the effective height of the L-shaped protective plate section, unit: mm; f y , f′ y are the strength design values of the tensile and compressive reinforcements in the section, in MPa; α′ s A is the distance from the longitudinal reinforcement axis of the compression zone to the compression edge of the cross section, unit: mm; s , A′ Sare the total cross-sectional areas of the tensile reinforcement and the compressive reinforcement, respectively; x is the height of the cross-sectional compression zone, in mm, which satisfies the requirements of formula (8) and formula (9) at the same time;
[0038]
[0039] x≥2α′ s (9);
[0040] Among them, E s is the elastic modulus of the steel bars of the L-shaped protective plate, unit: MPa; f cu,k It is the standard value of the cubic compressive strength of L-shaped protective slab concrete, unit: MPa;
[0041] Step 2: Cast the square protective slab and L-shaped protective slab on site according to the determined parameters;
[0042] Step 3: Laying of sliding layer;
[0043] After the square protective plate and the L-shaped protective plate are cast and the formwork is removed, a horizontal sliding layer is laid on the upper surface of the square protective plate where the independent foundation of the low tower leg is to be cast, and a horizontal sliding layer is laid on the upper surface of the L-shaped protective plate where the independent foundation of the three high tower legs is to be cast. The thickness of the horizontal sliding layer shall not be less than 100 mm, and sufficient leveling shall be performed after laying;
[0044] Step 4: Lay a disposable formwork on the sliding layer, and then pour the independent foundation on the disposable formwork;
[0045] Step 5: Determination of strengthening beam parameters;
[0046] S51: Determination of the arrangement type of the reinforcement beam;
[0047] S511: Determine the layout type of the reinforcement beam based on the height difference between the high and low legs of the tower and the predicted ground deformation at the location of the tower. The specific method is as follows:
[0048] (1) For the three high tower leg independent foundations above the L-shaped protective plate, when the expected horizontal deformation of the ground surface is less than 1.0 mm / m, no reinforcement beam is provided; when the expected horizontal deformation of the ground surface is greater than or equal to 1.0 mm / m and less than or equal to 2.0 mm / m, a reinforcement beam is provided between the two high tower leg independent foundations in the horizontal deformation direction within the limited period A; when the expected horizontal deformation of the ground surface is greater than 2.0 mm / m, a reinforcement beam is provided between the two independent foundations in the horizontal deformation direction within the limited period B, where the limited period B is less than the limited period A;
[0049] (2) For the high tower leg independent foundation and the low tower leg independent foundation under the high and low legs on the same side of the tower, when the expected horizontal deformation of the ground surface is less than 0.2 mm / m, no reinforcing beam 2 shall be provided; when the expected horizontal deformation of the ground surface is greater than or equal to 0.2 mm / m and less than or equal to 0.5 mm / m, a reinforcing beam 2 shall be provided between the high tower leg independent foundation and the low tower leg independent foundation in the horizontal deformation direction within a limited period C; when the expected horizontal deformation of the ground surface is greater than 0.5 mm / m, a reinforcing beam 2 shall be provided between the high tower leg independent foundation and the low tower leg independent foundation in the horizontal deformation direction within a limited period D, wherein the limited period D is less than the limited period C;
[0050] S512: judging whether the reinforcing beam adopts a horizontal beam arrangement scheme or an inclined beam arrangement scheme according to the calculation result of formula (10): when m is less than or equal to 0, a horizontal reinforcing beam is arranged; when m is greater than 0, an inclined reinforcing beam is arranged;
[0051] m = JC + h + 300 - H (10);
[0052] Among them, JC is the difference of the tower legs, unit: mm; h is the cross-sectional height of the reinforcement beam, unit: mm; H is the clear height of the independent foundation long column under the low tower leg, unit: mm;
[0053] S52: Determination of the cross-sectional dimensions of the strengthening beam;
[0054] The cross section of the reinforcement beam is a rectangular cross section, and its cross section width and height meet the following three requirements: (1) The cross section shear bearing capacity is not less than 1.2 times the maximum downward pressure of a single tower leg; (2) The cross section width of the reinforcement beam is not less than 200 mm and not greater than the cross section width of the main column of the independent foundation; (3) The cross section height of the reinforcement beam is not less than 400 mm and not less than 1 / 10 of the clear span of the beam itself;
[0055] S53: Determination of reinforcement of strengthening beams;
[0056] According to the stress analysis under the limit state, the longitudinal stress reinforcement and shear reinforcement are calculated to obtain the minimum cross-sectional area of the longitudinal stress main reinforcement and stirrups;
[0057] At the same time, ensure that the steel bar arrangement in the reinforced beam meets the following requirements: the longitudinal steel bars are arranged symmetrically, with a diameter of not less than 18mm, and the number of steel bars is not less than 4; the diameter of the stirrups is not less than 10mm, and the spacing is not greater than 100mm.
[0058] Step 6: Cast the reinforced beam on site according to the determined parameters.
[0059] In step 4, smooth pebbles and coarse sand are mixed to prepare the material required for laying the horizontal sliding layer, wherein the weight ratio of the smooth pebbles to the coarse sand is 1:2.
[0060] As another preferred embodiment, in step 4, a polytetrafluoroethylene plate is used as the material required for laying the horizontal sliding layer.
[0061] Furthermore, in order to effectively deal with the deformation of the tower caused by ground subsidence, in step 5, when the expected ground deformation is mainly uniform ground subsidence, the reinforcement of the square protective plate is arranged according to the following structural requirements:
[0062] The reinforcement is configured with double-layer bidirectional HRB 400 steel bars, and the spacing is not more than 200mm; when the tower root opening is less than or equal to 5m, the diameter of the longitudinal steel bar is not less than 16mm; when the tower root opening is greater than 5m, the diameter of the longitudinal steel bar is not less than 20mm; when the expected surface deformation has obvious uneven settlement, first analyze the direction of the surface subsidence gradient, and then according to the most unfavorable situation, take the unloading of the surface deformation resulting in 1 / 3 of the total length of the square protective plate being suspended as the limit state, and calculate the maximum reinforcement bending moment design value of the square protective plate section.
[0063] The method can scientifically and reasonably determine the construction parameters of the protective plate and the reinforcement beam in combination with the on-site conditions and the conditions of the iron tower itself. At the same time, the friction between the protective plate and the independent foundation can be effectively reduced by laying the sliding layer, which is conducive to reducing the constraints on the structure and can effectively avoid the generation of stress cracks. The present invention has a simple implementation process, a convenient operation process, and a low implementation cost. It proposes a design method for a split plate, overcomes the limitations of the prior art, and can significantly improve the anti-deformation performance of the transmission iron tower. It has good benefits in terms of engineering cost, construction period, and environmental protection indicators. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 It is a structural schematic diagram of the first embodiment of the split protection and anti-deformation structure of the present invention;
[0065] Figure 2 It is a structural schematic diagram of a second embodiment of the split protection and anti-deformation structure of the present invention;
[0066] Figure 3 It is a structural schematic diagram of the third embodiment of the split protection and anti-deformation structure of the present invention;
[0067] Figure 4 It is a schematic diagram of reinforcement of the protective slab in the present invention;
[0068] Figure 5 It is a simplified calculation diagram of the reinforcement of the L-shaped protective slab in the present invention.
[0069] In the figure: 1. Independent foundation of high tower leg, 2. Independent foundation of low tower leg, 3. Square protective plate, 4. L-shaped protective plate, 5. Strengthening beam one, 6. Strengthening beam two. DETAILED DESCRIPTION
[0070] The present invention will be further described below in conjunction with the accompanying drawings.
[0071] like Figures 1 to 3 As shown, the present invention provides a split protection and anti-deformation structure of a transmission tower, comprising three high tower leg independent foundations 1, one low tower leg independent foundation 2, a square protection plate 3 and an L-shaped protection plate 4; the three high tower leg independent foundations 1 and one low tower leg independent foundation 2 are distributed at the four corners of the same rectangle,
[0072] The L-shaped protective plate 4 and the square protective plate 3 are arranged in parallel, and the heights of the two are different, wherein the L-shaped protective plate 4 is formed by two perpendicular rectangular plates connected as one, and three high leg installation positions are formed at the two ends and the corners of its upper end surface; the square protective plate 3 is a square plate, and a low leg installation position is formed on its upper end surface; the position of the square protective plate 3 is lower than that of the L-shaped protective plate 4, and is located at the edge of the notch in the L-shaped protective plate 4, and the low leg installation position on the square protective plate 3 and the three high leg installation positions on the L-shaped protective plate 4 are located at the four corners of the same rectangle;
[0073] As a preferred embodiment, the L-shaped protective plate 4 and the square protective plate 3 are both reinforced concrete plates.
[0074] Three high tower leg independent foundations 1 are respectively cast on three high leg installation positions on the upper end surface of the L-shaped protective plate 4, and their upper ends are arranged flush with each other, and a horizontal sliding layer is laid between each high tower leg independent foundation 1 and each high leg installation position on the L-shaped protective plate 4; a low tower leg independent foundation 2 is cast on a low leg installation position on the upper end surface of the square protective plate 3, and a horizontal sliding layer is laid between the low tower leg independent foundation 2 and the low leg installation position on the square protective plate 3.
[0075] In order to better resist the ground deformation caused by underground mining and further reduce the additional internal force and deformation amplitude of the upper tower structure, two reinforcing beams 1 5 and two reinforcing beams 2 6 are also included; as a preferred embodiment, the two reinforcing beams 1 5 and the two reinforcing beams 2 6 are reinforced concrete slabs. Through the arrangement of four reinforcing beams, the four independent foundations can be effectively connected into a whole, so that through the cooperation of the two split independent large slabs and the independent foundation with reinforcing beams, the ground deformation caused by underground mining can be better resisted, and the additional internal force and deformation of the upper tower structure can be reduced.
[0076] The ends of the two reinforcing beams 5 that are close to each other are respectively fixedly connected to the upper part of a high tower leg independent foundation 1 located at the corner of the L-shaped protective plate 4, and the ends of the two reinforcing beams 5 that are far away are respectively fixedly connected to the upper parts of two high tower leg independent foundations 1 located at both ends of the L-shaped protective plate 4;
[0077] The ends of the two reinforcing beams 6 that are close to each other are fixedly connected to a low tower leg independent foundation 2, and the ends of the two reinforcing beams 6 that are far away are fixedly connected to two high tower leg independent foundations 1 located at the two ends of the L-shaped protective plate 4.
[0078] As a preferred embodiment, the two reinforcing beams 1 5 and the two reinforcing beams 2 6 are arranged horizontally, and the four reinforcing beams are located in the same horizontal plane.
[0079] As a further preferred embodiment, the adjacent ends of the two reinforcing beams 6 are fixedly connected to the upper end of a low tower leg independent foundation 2.
[0080] As another preferred embodiment, the two reinforcing beams 5 are arranged horizontally and at the same height, and the two reinforcing beams 6 are arranged obliquely, and the ends of the two reinforcing beams 6 that are farther away are higher than the ends that are closer to each other.
[0081] As a further preferred embodiment, the ends of the two reinforcing beams 2 6 that are close to each other are fixedly connected to the upper end of a low tower leg independent foundation 2, and the ends of the two reinforcing beams 2 6 that are far away are respectively fixedly connected to the upper ends of two high tower leg independent foundations 1 located at the two ends of the L-shaped protective plate 4;
[0082] The ends of the two reinforcing beams 5 that are close to each other are fixedly connected to the upper end of an independent foundation 1 of a high tower leg located at the corner of the L-shaped protective plate 4, and the ends of the two reinforcing beams 5 that are far away from each other are respectively fixedly connected to the upper ends of two independent foundations 1 of high tower legs located at both ends of the L-shaped protective plate 4.
[0083] In the present invention, by placing the square protective plate and the L-shaped protective plate at different heights, the traditional integrated leveling excavation of the site can be transformed into the stepped excavation of the tower site, which can be effectively applied to valleys, or when there are other terrain conditions that make it advantageous to use a high-low leg iron tower with three highs and one low, the "1+3" split protective plate can be used (1+3 represents a low tower leg independent foundation 2 and three high tower leg independent foundations 1, which are respectively located on the square protective plate 3 and the L-shaped protective plate 4). This "1+3" split protective plate structure can be effectively applied to the installation requirements of the "three highs and one low" high-low leg iron tower, which can significantly reduce the amount of rock and soil excavation during the construction of the iron tower foundation, and thus help to reduce soil erosion in the later period. In this way, not only can the local ecological environment be better protected, but also the upper iron tower structure can be better protected, and the structural internal force generated by mining deformation such as surface inclination and surface horizontal deformation can be significantly reduced, thereby significantly improving the anti-deformation performance of the iron tower. Compared with the scheme without protective plates and the scheme with traditional integrated protective plates, the composite anti-deformation structure has a completely different mechanism of action. It can be effectively applied to the layout scheme of the iron tower with two high and two low tower legs, and can significantly improve the composite anti-deformation ability of the transmission iron tower in uneven areas. By setting a horizontal sliding layer between each independent foundation and the protective plate, the friction between the protective plate and the independent foundation can be effectively reduced, so that the two can slide relatively freely, reducing the constraints on the structure, thereby avoiding the generation of stress cracks. In this technical scheme, a new composite anti-deformation structure is formed by using a split high-low square protective plate and an L-shaped protective plate, a horizontal sliding layer arranged between each independent foundation and the protective plate, a low tower leg independent foundation arranged on the L-shaped protective plate, and three high tower leg independent foundations arranged on the L-shaped protective plate, which significantly improves the composite anti-deformation ability of the transmission iron tower in uneven areas. This composite anti-deformation structure can significantly reduce the amount of rock and soil excavation for tower foundation construction, reduce soil erosion, and effectively protect the ecological environment. At the same time, it can play a good protective role for the upper tower structure and significantly reduce the structural internal force under mining deformation such as surface inclination and surface horizontal deformation.
[0084] The present invention also provides a method for constructing a split protection and anti-deformation structure of a power transmission tower, which adopts a split protection and anti-deformation structure of a power transmission tower and specifically comprises the following steps:
[0085] Step 1: Determine the parameters of the square protective plate 3 and the L-shaped protective plate 4;
[0086] S11: Determine the installation positions of the square protection plate 3 and the L-shaped protection plate 4;
[0087] When the construction terrain is a valley or there are other terrain conditions that make it advantageous to use a high-low leg iron tower with three highs and one low, determine the installation positions of the square protective plate 3 and the L-shaped protective plate 4, wherein the installation position of the square protective plate 3 is lower than the installation position of the L-shaped protective plate 4;
[0088] S12: Determination of the thickness of the square protective plate 3 and the L-shaped protective plate 4;
[0089] The larger value between 1 / 25 of the opening at the base of the iron tower and 400 mm is taken as the thickness of the square protective plate 3 and the L-shaped protective plate 4. At the same time, ensure that the thickness of the square protective plate 3 and the L-shaped protective plate 4 does not exceed 600 mm.
[0090] S13: Determine the width of the square protective plate 3 and the L-shaped protective plate 4;
[0091] First, ensure that the transverse center line of the square protective plate 3 coincides with the transverse center line of the lower tower leg independent foundation 2 above it, and determine the width of the square protective plate 3 according to formula (1); then make the width of both ends of the L-shaped protective plate 4 equal to the width of the square protective plate 3;
[0092] B=B dj +2a (1);
[0093] Wherein, B is the horizontal width of the square protective plate 3, unit: mm; B dj is the bottom width of the low tower leg independent foundation 2 above the square protective plate 3 in the same direction, unit: mm; a is the horizontal distance from the edge of the transverse end of the square protective plate 3 to the corresponding edge of the low tower leg independent foundation 2 above;
[0094] S14: Determination of the length of the L-shaped protective plate 4;
[0095] Ensure that the lengths of the outer edges of the two straight arm sections of the L-shaped protective plate 4 are equal, and determine the length of one straight arm section of the L-shaped protective plate 4 according to formula (2);
[0096] L=l0+B dj +2a (2);
[0097] Wherein, L is the length of a straight arm section of the L-shaped protective plate 4, unit: mm; l0 is the center distance between the two high tower leg independent foundations 1 above a straight arm section of the L-shaped protective plate 4, unit: mm;
[0098] S15: Determination of reinforcement of square protection plate 3 and L-shaped protection plate 4;
[0099] First, the reinforcement parameters of the L-shaped protective plate 4 are determined. Specifically, a quantitative analysis is performed based on the expected results of the type and size of the actual engineering surface deformation, and the cross-sectional design bending moment value M is calculated according to formulas (3), (4) and (5). On this basis, according to the double-layer bidirectional reinforcement scheme, the cross-sectional reinforcement area A is calculated according to formulas (6) and (7). s ; Then determine the reinforcement parameters of the square protection plate 3 so that the reinforcement parameters of the square protection plate 3 are consistent with the reinforcement parameters of the L-shaped protection plate 4;
[0100]
[0101]
[0102]
[0103]
[0104] f c Bx=f y A s -f′ y A′ S (7);
[0105] Where, q is the design value of the equivalent uniformly distributed line load above the L-shaped protective plate 4, unit: kN / m; L1 is the maximum suspended length of the L-shaped protective plate 43, unit: m; γ m is the total equivalent density of the soil above the L-shaped protective plate 4 and the independent foundation, unit: kN / m 3 ; d is the foundation burial depth, unit: m; q0 is the equivalent linear load of the deadweight of the L-shaped protective plate 4 in the length direction, unit: kN / m; L0 is the total length of the L-shaped protective plate 4, unit: m; f c is the design value of the concrete axial compressive strength of the L-shaped protective plate 4, unit: MPa; h0 is the effective height of the cross section of the L-shaped protective plate 4, unit: mm; f y , f′ y are the strength design values of the tensile and compressive reinforcements in the section, in MPa; α′ s A is the distance from the longitudinal reinforcement axis of the compression zone to the compression edge of the cross section, unit: mm; s , A′ S are the total cross-sectional areas of the tensile reinforcement and the compressive reinforcement, respectively; x is the height of the cross-sectional compression zone, in mm, which satisfies the requirements of formula (8) and formula (9) at the same time;
[0106]
[0107] x≥2α′ s (9);
[0108] Among them, E s is the elastic modulus of the 4-stressed steel bars of the L-shaped protective plate, unit: MPa; f cu,k It is the standard value of the cubic compressive strength of the concrete of the L-shaped protective plate 4, unit: MPa;
[0109] Step 2: Casting the square protective plate 3 and the L-shaped protective plate 4 on site according to the determined parameters;
[0110] Step 3: Laying of sliding layer;
[0111] After the square protective plate 3 and the L-shaped protective plate 4 are cast and the molds are removed, a horizontal sliding layer is laid on the upper surface of the square protective plate 3 where the low tower leg independent foundation 2 is to be cast, and a horizontal sliding layer is laid on the upper surface of the L-shaped protective plate 4 where the three high tower leg independent foundations 1 are to be cast. The thickness of the horizontal sliding layer is not less than 100 mm, and it is fully leveled after laying;
[0112] Step 4: Lay a disposable formwork on top of the sliding layer, and then pour an independent foundation on the disposable formwork;
[0113] Step 5: Determination of strengthening beam parameters;
[0114] S51: Determination of the arrangement type of the reinforcement beam;
[0115] S511: Determine the layout type of the reinforcement beam based on the height difference between the high and low legs of the tower and the predicted ground deformation at the location of the tower. The specific method is as follows:
[0116] (1) For the three high tower leg independent foundations 1 above the L-shaped protective plate 4, when the expected horizontal deformation of the ground surface is less than 1.0 mm / m, no reinforcing beam is provided; when the expected horizontal deformation of the ground surface is greater than or equal to 1.0 mm / m and less than or equal to 2.0 mm / m, a reinforcing beam 5 is provided between the two high tower leg independent foundations 1 in the horizontal deformation direction within a limited period A; when the expected horizontal deformation of the ground surface is greater than 2.0 mm / m, a reinforcing beam 5 is provided between the two independent foundations in the horizontal deformation direction within a limited period B, wherein the limited period B is less than the limited period A;
[0117] (2) For the high tower leg independent foundation 1 and the low tower leg independent foundation 2 under the high and low legs on the same side of the iron tower, when the expected horizontal deformation of the ground surface is less than 0.2 mm / m, no reinforcing beam 2 6 is provided; when the expected horizontal deformation of the ground surface is greater than or equal to 0.2 mm / m and less than or equal to 0.5 mm / m, a reinforcing beam 2 6 is provided between the high tower leg independent foundation 1 and the low tower leg independent foundation 2 in the horizontal deformation direction within a limited period C; when the expected horizontal deformation of the ground surface is greater than 0.5 mm / m, a reinforcing beam 2 6 is provided between the high tower leg independent foundation 1 and the low tower leg independent foundation 2 in the horizontal deformation direction within a limited period D, wherein the limited period D is less than the limited period C;
[0118] S512: judging whether the reinforcing beam adopts a horizontal beam arrangement scheme or an inclined beam arrangement scheme according to the calculation result of formula (10): when m is less than or equal to 0, a horizontal reinforcing beam is arranged; when m is greater than 0, an inclined reinforcing beam is arranged;
[0119] m = JC + h + 300 - H (10);
[0120] Among them, JC is the difference of the tower legs, unit: mm; h is the cross-sectional height of the reinforcement beam, unit: mm; H is the clear height of the independent foundation long column under the low tower leg, unit: mm;
[0121] S52: Determination of the cross-sectional dimensions of the strengthening beam;
[0122] The cross section of the reinforcement beam is a rectangular cross section, and its cross section width and height meet the following three requirements: (1) The cross section shear bearing capacity is not less than 1.2 times the maximum downward pressure of a single tower leg; (2) The cross section width of the reinforcement beam is not less than 200 mm and not greater than the cross section width of the main column of the independent foundation; (3) The cross section height of the reinforcement beam is not less than 400 mm and not less than 1 / 10 of the clear span of the beam itself;
[0123] S53: Determination of reinforcement of strengthening beams;
[0124] According to the stress analysis under the limit state, the longitudinal stress reinforcement and shear reinforcement are calculated to obtain the minimum cross-sectional area of the longitudinal stress main reinforcement and stirrups;
[0125] At the same time, ensure that the steel bar arrangement in the reinforced beam meets the following requirements: the longitudinal steel bars are arranged symmetrically, with a diameter of not less than 18mm, and the number of steel bars is not less than 4; the diameter of the stirrups is not less than 10mm, and the spacing is not greater than 100mm.
[0126] Step 6: Cast the reinforced beam on site according to the determined parameters.
[0127] In step 4, smooth pebbles and coarse sand are mixed to prepare the material required for laying the horizontal sliding layer, wherein the weight ratio of the smooth pebbles to the coarse sand is 1:2.
[0128] In step 4, a polytetrafluoroethylene sheet is used as the material required for laying the horizontal sliding layer.
[0129] In step 5, when the expected surface deformation is mainly uniform sinking of the surface as a whole, the reinforcement of the square protective plate 3 is arranged according to the following structural requirements:
[0130] The reinforcement is configured with double-layer bidirectional HRB 400 steel bars, and the spacing is not greater than 200mm; when the tower root opening is less than or equal to 5m, the diameter of the longitudinal steel bar is not less than 16mm; when the tower root opening is greater than 5m, the diameter of the longitudinal steel bar is not less than 20mm; when the expected surface deformation has obvious uneven settlement, first analyze the direction of the surface subsidence gradient, and then according to the most unfavorable situation, take the unloading of the surface deformation resulting in 1 / 3 of the total length of the square protective plate 3 being suspended as the limit state, and calculate the maximum reinforcement bending moment design value of the cross section of the square protective plate 3.
[0131] The method can scientifically and reasonably determine the construction parameters of the protective plate and the reinforcement beam in combination with the on-site conditions and the conditions of the iron tower itself. At the same time, the friction between the protective plate and the independent foundation can be effectively reduced by laying the sliding layer, which is conducive to reducing the constraints on the structure and can effectively avoid the generation of stress cracks. The present invention has a simple implementation process, a convenient operation process, and a low implementation cost. It proposes a design method for a split plate, overcomes the limitations of the prior art, and can significantly improve the anti-deformation performance of the transmission iron tower. It has good benefits in terms of engineering cost, construction period, and environmental protection indicators.
Claims
1. A method for constructing a split protection and anti-deformation structure of a power transmission tower, using a split protection and anti-deformation structure of a power transmission tower, wherein the split protection and anti-deformation structure of the power transmission tower comprises three high tower leg independent foundations (1) and one low tower leg independent foundation (2), wherein the three high tower leg independent foundations (1) and the one low tower leg independent foundation (2) are distributed at the four corners of the same rectangle, and wherein: It also includes a square protective plate (3) and an L-shaped protective plate (4); The L-shaped protective plate (4) and the square protective plate (3) are arranged in parallel, and the heights of the two are different, wherein the L-shaped protective plate (4) is formed by two perpendicular rectangular plates connected as one, and three high leg installation positions are formed at the two ends and the corners of the upper end surface; the square protective plate (3) is a square plate, and a low leg installation position is formed on the upper end surface; the position of the square protective plate (3) is lower than that of the L-shaped protective plate (4), and is located at the edge of the notch in the L-shaped protective plate (4), and the low leg installation position on the square protective plate (3) and the three high leg installation positions on the L-shaped protective plate (4) are located at the four corners of the same rectangle; Three high tower leg independent foundations (1) are cast respectively on three high leg installation positions on the upper end surface of the L-shaped protective plate (4), and their upper ends are arranged flush with each other, and a horizontal sliding layer is laid between each high tower leg independent foundation (1) and each high leg installation position on the L-shaped protective plate (4); a low tower leg independent foundation (2) is cast on a low leg installation position on the upper end surface of the square protective plate (3), and a horizontal sliding layer is laid between the low tower leg independent foundation (2) and the low leg installation position on the square protective plate (3); The method is characterized in that it specifically comprises the following steps: Step 1: Determine the parameters of the square protective plate (3) and the L-shaped protective plate (4); S11: Determining the installation positions of the square protective plate (3) and the L-shaped protective plate (4); When the construction terrain is a valley or other terrain conditions make it advantageous to use a high-low leg iron tower with three highs and one low, the installation positions of the square protective plate (3) and the L-shaped protective plate (4) are determined, wherein the installation position of the square protective plate (3) is lower than the installation position of the L-shaped protective plate (4); S12: Determination of the thickness of the square protective plate (3) and the L-shaped protective plate (4); The larger value between 1 / 25 of the opening at the base of the iron tower and 400 mm is taken as the thickness of the square protective plate (3) and the L-shaped protective plate (4). At the same time, the thickness of the square protective plate (3) and the L-shaped protective plate (4) is ensured not to exceed 600 mm. S13: Determination of the width of the square protective plate (3) and the L-shaped protective plate (4); First, ensure that the transverse center line of the square protective plate (3) coincides with the transverse center line of a low tower leg independent foundation (2) above it, and determine the width of the square protective plate (3) according to formula (1); then make the width of both ends of the L-shaped protective plate (4) equal to the width of the square protective plate (3); B=B dj +2a (1); Wherein, B is the transverse width of the square protective plate (3), unit: mm; B dj is the bottom width of the low tower leg independent foundation (2) above the square protective plate (3) in the same direction, in mm; a is the horizontal distance from the edge of the transverse end of the square protective plate (3) to the corresponding edge of the low tower leg independent foundation (2) above; S14: Determine the length of the L-shaped protective plate (4); Ensure that the lengths of the outer edges of the two straight arm sections of the L-shaped protective plate (4) are equal, and determine the length of one straight arm section of the L-shaped protective plate (4) according to formula (2); <h2 style=";text-align:left;direction:ltr">L = l0 + B<h2 style=";text-align:left;direction:ltr"> dj <h2 style=";text-align:left;direction:ltr"> +2a (2); Wherein, L is the length of a straight arm section of the L-shaped protective plate (4), unit: mm; l0 is the center distance between the two high tower leg independent foundations (1) above a straight arm section of the L-shaped protective plate (4), unit: mm; S15: Determination of reinforcement of square protective slab (3) and L-shaped protective slab (4); First, the reinforcement parameters of the L-shaped protective plate (4) are determined. Specifically, a quantitative analysis is performed based on the type and magnitude of the actual engineering surface deformation, and the cross-sectional design bending moment value M is calculated according to formulas (3), (4) and (5). On this basis, according to the double-layer bidirectional reinforcement scheme, the cross-sectional reinforcement area A is calculated according to formulas (6) and (7). s ; Then determine the reinforcement parameters of the square protective plate (3) so that the reinforcement parameters of the square protective plate (3) are consistent with the reinforcement parameters of the L-shaped protective plate (4); f c Bx=f y A s - f y 'A' S (7); Where, q is the design value of the equivalent uniformly distributed line load above the L-shaped protective plate (4), unit: kN / m; L1 is the maximum suspended length of the L-shaped protective plate (4), unit: m; γ m is the total equivalent density of the soil above the L-shaped protective plate (4) and the independent foundation, unit: kN / m 3 ; is the foundation burial depth, unit: m; q0 is the equivalent linear load of the deadweight of the L-shaped protective plate (4) in the length direction, unit: kN / m; L0 is the total length of the L-shaped protective plate (4), unit: m; f c is the design value of the concrete axial compressive strength of the L-shaped protective plate (4), unit: MPa; h0 is the effective height of the cross section of the L-shaped protective plate (4), unit: mm; f y 、f y ' are the strength design values of the tensile and compressive reinforcements in the section, unit: MPa; α s ' is the distance from the longitudinal reinforcement axis of the compression zone to the compression edge of the cross section, unit: mm; A s , A' S are the total cross-sectional areas of the tensile reinforcement and the compressive reinforcement, respectively; x is the height of the cross-sectional compression zone, in mm, which satisfies the requirements of formula (8) and formula (9) at the same time; x≥2α′ s (9); Among them, E s is the elastic modulus of the stress-bearing steel bars of the L-shaped protective plate (4), unit: MPa; f cu,k is the standard value of the cubic compressive strength of the concrete of the L-shaped protective plate (4), unit: MPa; Step 2: Casting the square protective plate (3) and the L-shaped protective plate (4) on site according to the determined parameters; Step 3: Laying of sliding layer; After the square protective plate (3) and the L-shaped protective plate (4) are cast and the molds are removed, a horizontal sliding layer is laid on the upper surface of the square protective plate (3) where the lower tower leg independent foundation (2) is to be cast, and a horizontal sliding layer is laid on the upper surface of the L-shaped protective plate (4) where the three high tower leg independent foundations (1) are to be cast, wherein the thickness of the horizontal sliding layer is not less than 100 mm, and after laying, sufficient leveling is performed; Step 4: Lay a disposable formwork on top of the sliding layer, and then pour an independent foundation on the disposable formwork; Step 5: Determination of strengthening beam parameters; S51: Determination of the arrangement type of the reinforcement beam; S511: Determine the layout type of the reinforcement beam based on the height difference between the high and low legs of the tower and the predicted ground deformation at the location of the tower. The specific method is as follows: (1) For the three high tower leg independent foundations (1) above the L-shaped protective plate (4), when the expected horizontal deformation of the ground surface is less than 1.0 mm / m, no reinforcing beam is provided; when the expected horizontal deformation of the ground surface is greater than or equal to 1.0 mm / m and less than or equal to 2.0 mm / m, a reinforcing beam (5) is provided between the two high tower leg independent foundations (1) in the horizontal deformation direction within a limited period A; when the expected horizontal deformation of the ground surface is greater than 2.0 mm / m, a reinforcing beam (5) is provided between the two independent foundations in the horizontal deformation direction within a limited period B, wherein the limited period B is less than the limited period A; (2) For the high tower leg independent foundation (1) and the low tower leg independent foundation (2) under the high and low legs on the same side of the iron tower, when the expected horizontal deformation of the ground surface is less than 0.2 mm / m, the second reinforcing beam (6) is not provided; when the expected horizontal deformation of the ground surface is greater than or equal to 0.2 mm / m and less than or equal to 0.5 mm / m, the second reinforcing beam (6) is provided between the high tower leg independent foundation (1) and the low tower leg independent foundation (2) in the horizontal deformation direction within a limited period C; when the expected horizontal deformation of the ground surface is greater than 0.5 mm / m, the second reinforcing beam (6) is provided between the high tower leg independent foundation (1) and the low tower leg independent foundation (2) in the horizontal deformation direction within a limited period D, wherein the limited period D is less than the limited period C; S512: judging whether the reinforcing beam adopts a horizontal beam arrangement scheme or an inclined beam arrangement scheme according to the calculation result of formula (10): when m is less than or equal to 0, a horizontal reinforcing beam is arranged; when m is greater than 0, an inclined reinforcing beam is arranged; m = JC + h + 300 - H (10); Among them, JC is the difference of the tower legs, unit: mm; h is the cross-sectional height of the reinforcement beam, unit: mm; H is the clear height of the independent foundation long column under the low tower leg, unit: mm; S52: Determination of the cross-sectional dimensions of the strengthening beam; The cross section of the reinforcement beam is a rectangular cross section, and its cross section width and height meet the following three requirements: (1) The cross section shear bearing capacity is not less than 1.2 times the maximum downward pressure of a single tower leg; (2) The cross section width of the reinforcement beam is not less than 200 mm and not greater than the cross section width of the main column of the independent foundation; (3) The cross section height of the reinforcement beam is not less than 400 mm and not less than 1 / 10 of the clear span of the beam itself; S53: Determination of reinforcement of strengthening beams; According to the stress analysis under the limit state, the longitudinal stress reinforcement and shear reinforcement are calculated to obtain the minimum cross-sectional area of the longitudinal stress main reinforcement and stirrups; At the same time, ensure that the steel bar arrangement in the reinforced beam meets the following requirements: the longitudinal steel bars are arranged symmetrically, with a diameter of not less than 18mm, and the number of steel bars is not less than 4; the diameter of the stirrups is not less than 10mm, and the spacing is not greater than 100mm; Step 6: Cast the reinforced beam on site according to the determined parameters.
2. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 1, characterized in that: In step 4, smooth pebbles and coarse sand are mixed to prepare the material required for laying the horizontal sliding layer, wherein the weight ratio of the smooth pebbles to the coarse sand is 1:
2.
3. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 2, characterized in that: In step 4, a polytetrafluoroethylene sheet is used as the material required for laying the horizontal sliding layer.
4. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 3, characterized in that: In step 5, when the predicted ground deformation is mainly uniform sinking of the ground as a whole, the reinforcement of the square protective plate (3) is arranged according to the following structural requirements: The reinforcement is configured with double-layer bidirectional HRB 400 steel bars, and the spacing is not greater than 200mm; when the tower root opening is less than or equal to 5m, the diameter of the longitudinal steel bars is not less than 16mm; when the tower root opening is greater than 5m, the diameter of the longitudinal steel bars is not less than 20mm; when the expected surface deformation has obvious uneven settlement, the direction of the surface subsidence gradient is first analyzed, and then according to the most unfavorable situation, the square protection plate (3) is suspended in the state of 1 / 3 of the total length due to the unloading of the surface deformation as the limit state, and the maximum reinforcement bending moment design value of the square protection plate (3) section is calculated.
5. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 1, characterized in that: Also includes two reinforcing beams 1 (5) and two reinforcing beams 2 (6); The ends of the two reinforcing beams (5) that are close to each other are respectively fixedly connected to the upper part of a high tower leg independent foundation (1) located at the corner of the L-shaped protective plate (4), and the ends of the two reinforcing beams (5) that are far away are respectively fixedly connected to the upper parts of two high tower leg independent foundations (1) located at both ends of the L-shaped protective plate (4); The ends of the two reinforcing beams (6) that are close to each other are fixedly connected to a low tower leg independent foundation (2), and the ends of the two reinforcing beams (6) that are far away from each other are respectively fixedly connected to two high tower leg independent foundations (1) located at the two ends of the L-shaped protective plate (4).
6. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 5, characterized in that: The two reinforcing beams 1 (5) and the two reinforcing beams 2 (6) are all arranged horizontally, and the four reinforcing beams are located in the same horizontal plane.
7. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 6, characterized in that: The adjacent ends of the two reinforcing beams 2 (6) are fixedly connected to the upper end of a low tower leg independent foundation (2).
8. The method for constructing a split protection and anti-deformation structure of a transmission tower according to claim 5, characterized in that: The two reinforcing beams (5) are arranged horizontally and at the same height, and the two reinforcing beams (6) are arranged obliquely, and the ends of the two reinforcing beams (6) that are farther away from each other are higher than the ends that are closer to each other.
9. The method for constructing a split protection and anti-deformation structure of a power transmission tower according to claim 8, characterized in that: The ends of the two reinforcing beams (6) that are close to each other are fixedly connected to the upper end of a low tower leg independent foundation (2), and the ends of the two reinforcing beams (6) that are far away are respectively fixedly connected to the upper ends of two high tower leg independent foundations (1) located at the two ends of the L-shaped protective plate (4); The ends of the two reinforcing beams (5) that are close to each other are fixedly connected to the upper end of a high tower leg independent foundation (1) located at the corner of the L-shaped protective plate (4), and the ends of the two reinforcing beams (5) that are far away from each other are respectively fixedly connected to the upper ends of two high tower leg independent foundations (1) located at both ends of the L-shaped protective plate (4).