Grate load control method, device, equipment and storage medium for garbage incineration

By dynamically adjusting the output of the garbage incineration grate, the problem of jamming and clogging caused by long-term high load is solved, ensuring the safe and stable operation of the grate and the completion of garbage treatment.

CN117267725BActive Publication Date: 2024-10-18GUANGZHOU ENVIRONMENTAL INVESTMENT CONGHUA ENVIRONMENTAL PROTECTION ENERGY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202311476255.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-07
Publication Date
2024-10-18
Estimated Expiration
2043-11-07

AI Technical Summary

Technical Problem

When burning existing garbage, the grate operates at high load or overload for a long time, which can easily lead to jamming and blockage, affecting the safety and stability of the system.

Method used

By obtaining the grate load at each cycle, calculate the remaining amount of garbage to be processed and the predicted load for the day, determine whether it exceeds the preset value, and dynamically adjust the furnace discharge force to ensure that the output is updated at each cycle and avoid long-term high load operation.

Benefits of technology

Effectively maintain the safe and stable operation of the grate, prevent jamming and clogging, and ensure the completion of garbage processing capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117267725B_ABST
    Figure CN117267725B_ABST
Patent Text Reader

Abstract

The present application discloses a method, device, equipment and storage medium for controlling the load of a grate for incinerating garbage. The method includes: at each cycle moment, obtaining the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment, determining the current remaining amount of garbage to be processed based on the load of each grate, and calculating the grate output of the next cycle based on this, calculating the predicted load of the grate based on the grate output of each grate in the next cycle, and if the predicted load of each grate does not exceed the first preset load value, determining the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output. It can be seen that the grate output is updated once at each cycle moment, so that the grate does not need to be maintained at a fixed and close to rated output power for a long time, and the grate can be maintained in safe and stable operation while ensuring that the garbage processing volume of the day is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of garbage disposal, and more specifically, to a method, device, equipment and storage medium for controlling grate load for incinerating garbage. Background Art

[0002] As the pace of life accelerates, the amount of domestic waste generated by people also increases. In order to meet the needs of urban beautification and environmental protection, people's domestic waste needs to be buried in landfills. Over time, the capacity of landfills has gradually become insufficient to accommodate the continuously added domestic waste. The waste that has been buried in landfills for a long time has a certain number of years. The waste that has been dug out of these long-sealed domestic waste is called stock waste. At present, there is an urgent need to incinerate the stock waste in landfills.

[0003] Since the amount of domestic garbage is still huge, and the average calorific value of incinerating stock garbage is lower than that of incinerating domestic garbage, the domestic garbage and stock garbage are mixed and incinerated. In order to ensure the stability of the boiler heat load rate, the grate output needs to be increased, and the amount of garbage incineration increases accordingly. Based on this, engineers usually pre-set the garbage load of each grate in a day to make the grate output close to the rated output power, so as to ensure the completion of the processing volume on the day.

[0004] However, since the grate operates at a power close to the rated output for a long time, it is prone to getting stuck and blocked, resulting in abnormal operation of the grate.

[0005] How to control the grate pressure in the waste incineration system to avoid the grate running at high load or even overload for a long time and maintain the safe and stable operation of the grate is an issue that needs attention. Summary of the invention

[0006] In view of the above problems, the present application provides a method, device, equipment and storage medium for controlling the grate load for incinerating garbage to maintain the safe and stable operation of the grate.

[0007] In order to achieve the above objectives, the specific plan is proposed as follows:

[0008] A method for controlling grate load for burning garbage, comprising:

[0009] At each cycle moment, the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment is obtained, and the time interval between every two adjacent cycle moments is equal;

[0010] According to the load of each grate, determine the amount of garbage to be processed remaining on the grate at the current cycle time;

[0011] According to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day, calculate the grate discharge efficiency of the grate in the time period corresponding to the next cycle moment;

[0012] Based on the grate output of each grate in the time period corresponding to the next cycle moment, calculate the predicted load of the grate in the time period corresponding to the next cycle moment;

[0013] Determining whether the predicted load of each grate exceeds a first preset load value, wherein the first preset load value is a load value greater than a preset proportion of the design load for the day;

[0014] If not, determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0015] Optionally, the method further includes:

[0016] If the predicted load of each grate exceeds the first preset load value, the upper limit furnace discharge force is determined according to the first preset load value, and the upper limit furnace discharge force is used as the second target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the second target output in the time period corresponding to the next cycle moment.

[0017] Optionally, the method further includes:

[0018] Determine each assigned grate and each full-load grate in the garbage incineration grate system, the predicted load of each assigned grate does not exceed the first preset load value, and the predicted load of each full-load grate exceeds the first preset load value;

[0019] For each full-load grate, calculate the amount of garbage to be processed remaining on the full-load grate after the next cycle time on the same day;

[0020] The difference between the amount of garbage to be processed on the day after the next cycle moment of each full-load grate and the maximum amount of garbage processed by the full-load grate after the next cycle moment is used as the garbage processing allocation amount of the full-load grate;

[0021] For each assigned grate, the predicted load of the assigned grate is adjusted according to the garbage processing allocation of each full-load grate in the garbage incineration grate system to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment;

[0022] According to the latest predicted load of each assigned grate, the final target output of the assigned grate in the time period corresponding to the next cycle moment is calculated, so that the assigned grate operates at the final target output in the time period corresponding to the next cycle moment.

[0023] Optionally, for each allocated grate, the predicted load of the allocated grate is adjusted according to the garbage processing allocation of each full-load grate in the garbage incineration grate system to obtain the latest predicted load of the allocated grate in the time period corresponding to the next cycle moment, including:

[0024] For each assigned grate, the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment is calculated using the first formula, and the first formula is:

[0025]

[0026] Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle time, W max is the first preset load value, m is the number of grates assigned in the garbage incineration grate system, W T0_j is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0027] Optionally, for each allocated grate, the predicted load of the allocated grate is adjusted according to the garbage processing allocation of each full-load grate in the garbage incineration grate system to obtain the latest predicted load of the allocated grate in the time period corresponding to the next cycle moment, including:

[0028] Determine the weight ratio coefficient of each assigned grate according to the predicted load of each assigned grate in the garbage incineration grate system in the time period corresponding to the next cycle moment;

[0029] For each assigned grate, the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment is calculated using the second formula, and the second formula is:

[0030]

[0031] Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, m is the number of assigned grates in the garbage incineration grate system, α j is the weight ratio coefficient of the jth allocated grate, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0032] Optionally, the method further includes:

[0033] If the predicted load of each grate is less than the second preset load value, the lower limit furnace discharge force is determined according to the second preset load value, and the lower limit furnace discharge force is used as the third target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the third target output in the time period corresponding to the next cycle moment. The second preset load value is a load value that is less than the preset proportion of the design load for the day.

[0034] A grate load control device for burning garbage, comprising:

[0035] The load data acquisition unit is used to obtain the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment at each cycle moment, and the time interval between every two adjacent cycle moments is equal;

[0036] A unit for determining the amount of waste to be processed, used to determine the amount of waste to be processed remaining on the grate at the current cycle moment according to the load of each grate;

[0037] A grate discharge efficiency calculation unit, used to calculate the grate discharge efficiency of the grate in the time period corresponding to the next cycle moment according to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day;

[0038] A load prediction unit, used to calculate the predicted load of each grate in the time period corresponding to the next cycle moment based on the grate discharge force of the grate in the time period corresponding to the next cycle moment;

[0039] An overload judgment unit, used to judge whether the predicted load of each grate exceeds a first preset load value, the first preset load value being a load value greater than a preset proportion of the design load of the day, and if not, executing a first target output determination unit;

[0040] The first target output determination unit is used to determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0041] Optionally, the device further comprises:

[0042] The second target output determination unit is used to determine the upper limit furnace discharge power according to the first preset load value if the predicted load of each grate exceeds the first preset load value, and use the upper limit furnace discharge power as the second target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the second target output in the time period corresponding to the next cycle moment.

[0043] Optionally, the device further comprises:

[0044] a grate classification unit, for determining each assigned grate and each full-load grate in the garbage incineration grate system, wherein the predicted load of each assigned grate does not exceed the first preset load value, and the predicted load of each full-load grate exceeds the first preset load value;

[0045] A remaining garbage amount calculation unit is used to calculate, for each full-load grate, the amount of garbage to be processed remaining on the day after the next cycle moment of the full-load grate;

[0046] The allocation amount calculation unit is used to calculate the difference between the amount of garbage to be processed on the day after the next cycle moment of each full-load grate and the maximum amount of garbage processed by the full-load grate after the next cycle moment as the garbage processing allocation amount of the full-load grate;

[0047] The latest predicted load determination unit is used to adjust the predicted load of each assigned grate according to the garbage processing allocation of each full-load grate in the garbage incineration grate system, so as to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment;

[0048] The final target output determination unit is used to calculate the final target output of each assigned grate in the time period corresponding to the next cycle moment according to the latest predicted load of the assigned grate, so that the assigned grate operates at the final target output in the time period corresponding to the next cycle moment.

[0049] Optionally, the latest predicted load determination unit includes:

[0050] The first formula calculation unit is used to calculate the latest predicted load of each assigned grate in the time period corresponding to the next cycle moment by using the first formula, wherein the first formula is:

[0051]

[0052] Among them, W T_jis the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle time, W max is the first preset load value, m is the number of allocated grates in the garbage incineration grate system, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0053] Optionally, the latest predicted load determination unit includes:

[0054] A weight ratio coefficient determination unit, used to determine the weight ratio coefficient of each assigned grate according to the predicted load of each assigned grate in the garbage incineration grate system in the time period corresponding to the next cycle moment;

[0055] The second formula calculation unit is used to calculate the latest predicted load of each assigned grate in the time period corresponding to the next cycle moment by using the second formula, wherein the second formula is:

[0056]

[0057] Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, m is the number of assigned grates in the garbage incineration grate system, α j is the weight ratio coefficient of the jth allocated grate, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0058] Optionally, the device further comprises:

[0059] The third target output determination unit is used to determine the lower limit furnace output according to the second preset load value if the predicted load of each grate is less than the second preset load value, and use the lower limit furnace output as the third target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the third target output in the time period corresponding to the next cycle moment, and the second preset load value is a load value that is less than the preset proportion of the design load for the day.

[0060] A grate load control device for burning garbage, comprising a memory and a processor;

[0061] The memory is used to store programs;

[0062] The processor is used to execute the program to implement the various steps of the grate load control method for incinerating garbage as described above.

[0063] A storage medium stores a computer program, which, when executed by a processor, implements the various steps of the grate load control method for incinerating garbage as described above.

[0064] By means of the above technical scheme, the present application obtains the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment at each cycle moment, and the time interval between every two adjacent cycle moments is equal. According to the load of each grate, the amount of garbage to be processed remaining on the day of the grate at the current cycle moment is determined. According to the amount of garbage to be processed remaining on the day of each grate at the current cycle moment, the grate output of the grate in the time period corresponding to the next cycle moment is calculated. Based on the grate output of each grate in the time period corresponding to the next cycle moment, the predicted load of the grate in the time period corresponding to the next cycle moment is calculated, and it is determined whether the predicted load of each grate exceeds a first preset load value, the first preset load value being a load value greater than a preset proportion of the design load of the day. If not, the grate output of the grate in the time period corresponding to the next cycle moment is determined as the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment. It can be seen that the grate power is updated once at each cycle moment, so that the grate does not need to operate at a fixed and close to rated power for a long time, and the grate can maintain safe and stable operation while ensuring the completion of the garbage processing volume for the day. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0066] Figure 1 A schematic diagram of a flow chart for realizing grate load control for incinerating garbage provided in an embodiment of the present application;

[0067] Figure 2 Another schematic diagram of a flow chart for realizing grate load control for incinerating garbage provided in an embodiment of the present application;

[0068] Figure 3 A schematic diagram of the structure of a device for realizing grate load control for incinerating garbage provided in an embodiment of the present application;

[0069] Figure 4A schematic diagram of the structure of a device for realizing grate load control for incinerating garbage provided in an embodiment of the present application. DETAILED DESCRIPTION

[0070] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0071] The present application solution can be implemented based on a terminal with data processing capabilities, which can be a mobile phone, computer, cloud, etc.

[0072] Next, combine Figure 1 The grate load control method for incinerating garbage of the present application may include the following steps:

[0073] Step S110: at each cycle moment, obtain the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment.

[0074] The time interval between two adjacent periodic moments is equal. The time interval between two adjacent periodic moments may be 1 hour, and the periodic moment may be an hourly moment, such as 5:00, 6:00, 7:00, etc. every day.

[0075] Specifically, the garbage incineration grate system may include multiple grates, and each grate may be equipped with a load recording device to record the incineration status of the grate in real time. When each cycle moment is reached, the terminal may obtain the data in the load recording device of each grate to obtain the load of each grate in the period corresponding to the cycle moment.

[0076] Step S120: according to the load of each grate and the amount of garbage to be processed remaining on the grate at the current cycle time.

[0077] Specifically, the total processing capacity of the grate on that day can be combined, the load of each historical cycle moment temporarily stored can be subtracted, and then the load of the current cycle moment can be subtracted to calculate the remaining amount of garbage to be processed by the grate on that day at the current cycle moment.

[0078] Step S130, according to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day, calculate the grate discharge power of the grate in the time period corresponding to the next cycle moment.

[0079] Specifically, the amount of garbage to be processed remaining in the grate at the current cycle moment can be divided by the number of time periods remaining in the day to obtain the amount of garbage to be processed by the grate at the next cycle moment, and the grate discharge capacity can be determined based on the amount of garbage to be processed at the next cycle moment.

[0080] It can be understood that the more garbage to be processed the grate has at the current cycle moment, the more garbage to be processed in each remaining cycle moment, and the greater the discharge efficiency of the grate. Conversely, the less garbage to be processed the grate has at the current cycle moment, the less garbage to be processed in each remaining cycle moment, and the smaller the discharge efficiency of the grate.

[0081] Step S140: Calculate the predicted load of each grate in the time period corresponding to the next cycle moment based on the grate output of the grate in the time period corresponding to the next cycle moment.

[0082] The predicted load of each grate may represent the estimated amount of garbage that the grate can process in the next cycle period at the current moment.

[0083] Specifically, the predicted load can be calculated based on the grate discharge force, the grate length, and the grate width.

[0084] Step S150, determine whether the predicted load of each grate exceeds the first preset load value, if not, execute step S160.

[0085] Specifically, the first preset load value may represent the upper limit of the garbage processing volume for stable and safe operation of the grate, wherein the first preset load value may be a load value that is greater than a preset proportion of the design load for the day.

[0086] For example, if the design load for the day is an hourly processing capacity of 20 tons, then the first preset load value may be a load value that is 10% greater than the design load for the day, that is, an hourly processing capacity of 22 tons.

[0087] It can be understood that when the predicted load of the grate exceeds the first preset load value, it can indicate that the grate continues to operate under the grate discharge pressure corresponding to the predicted load, and the risk of sticking and clogging is high. When the predicted load of the grate does not exceed the first preset load value, it can indicate that the grate continues to operate under the grate discharge pressure corresponding to the predicted load, and the risk of sticking and clogging is low.

[0088] Step S160, determining the grate output of the grate in the time period corresponding to the next cycle moment as the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0089] It can be understood that since the predicted load corresponding to the grate output in the time period corresponding to the next cycle moment does not exceed the first preset load value, the grate operates under the grate output power, and the risk of jamming and blockage is low, which is conducive to the safe and stable operation of the grate. It can be used as the first target output in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0090] The present embodiment provides a method for controlling the load of a grate for incinerating garbage, by obtaining the load of each grate in the garbage incinerating grate system in a time period corresponding to the cycle moment at each cycle moment, the time interval between every two adjacent cycle moments is equal, and according to the load of each grate, determining the amount of garbage to be processed remaining on the day of the grate at the current cycle moment, and calculating the grate output of the grate in the time period corresponding to the next cycle moment according to the amount of garbage to be processed remaining on the day of the grate at the current cycle moment, and calculating the predicted load of the grate in the time period corresponding to the next cycle moment based on the grate output of each grate in the time period corresponding to the next cycle moment, and judging whether the predicted load of each grate exceeds a first preset load value, the first preset load value is a load value greater than a preset proportion of the design load of the day, and if not, determining the grate output of the grate in the time period corresponding to the next cycle moment as the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment. It can be seen that the grate power is updated once at each cycle moment, so that the grate does not need to operate at a fixed and close to rated power for a long time, and the grate can maintain safe and stable operation while ensuring the completion of the garbage processing volume for the day.

[0091] In some embodiments of the present application, the grate load control method for incinerating garbage provided in the present application is further introduced, such as Figure 2 As shown, the implementation process of the method may include the following steps:

[0092] Step S210: at each cycle moment, obtain the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment.

[0093] Step S220: according to the load of each grate and the amount of garbage to be processed remaining on the grate at the current cycle time.

[0094] Step S230: Calculate the grate discharge capacity of the grate in the time period corresponding to the next cycle moment according to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day.

[0095] Step S240: Calculate the predicted load of each grate in the time period corresponding to the next cycle moment based on the grate output of the grate in the time period corresponding to the next cycle moment.

[0096] Step S250, determine whether the predicted load of each grate exceeds the first preset load value, if not, execute step S260, if yes, execute step S270.

[0097] Step S260, determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0098] The above steps S210 to S260 correspond one-to-one to steps S110 to S160 in the aforementioned embodiment, and please refer to the aforementioned introduction for details, which will not be repeated here.

[0099] Step S270, determine the upper limit furnace discharge force according to the first preset load value, and use the upper limit furnace discharge force as the second target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the second target output in the time period corresponding to the next cycle moment.

[0100] It can be understood that since the predicted load corresponding to the furnace discharge force of the grate in the time period corresponding to the next cycle moment exceeds the first preset load value, the grate will have a high risk of sticking and blocking when operating under this furnace discharge force, which is not conducive to the safe and stable operation of the grate. The maximum furnace discharge force is the furnace discharge force corresponding to the first preset load value, and it is used as the upper limit furnace discharge force. The upper limit furnace discharge force is then used as the second target output in the time period corresponding to the next cycle moment, so that the grate can maximize its output in the time period corresponding to the next cycle moment while also ensuring stable and safe operation of the grate.

[0101] Considering that the grate outputs at the second target because the grate has a larger amount of garbage accumulated and needs to be processed urgently, and even if it outputs at full load, it may not be able to complete the garbage processing volume of the day, based on this, the garbage processing volume of the grate can be allocated to the grate with a smaller load, and the grate output of the grate with a smaller load can be readjusted. In some embodiments of the present application, the provided grate load control method for incinerating garbage can also include:

[0102] S1. Determine each allocated grate and each full-load grate in the garbage incineration grate system.

[0103] Among them, the predicted load of each assigned grate does not exceed the first preset load value, and the predicted load of each full-load grate exceeds the first preset load value.

[0104] It is understandable that the full-load grate is fully loaded and cannot further increase the grate discharge capacity of the full-load grate, and cannot handle more garbage. However, the allocated grate is not fully loaded and can increase the grate discharge capacity of the allocated grate, thereby sharing the garbage that cannot be handled by the full-load grate.

[0105] S2. For each full-load grate, calculate the amount of garbage to be processed remaining on the day after the next cycle moment of the full-load grate.

[0106] Specifically, the amount of garbage to be processed remaining on the day after the next cycle time of the full-load grate can represent the amount of garbage that still needs to be planned to be incinerated on the day by the end of the next cycle time of the full-load grate.

[0107] S3. The difference between the amount of garbage to be processed remaining on the day of each full-load grate after the next cycle moment and the maximum amount of garbage processed by the full-load grate after the next cycle moment is used as the garbage processing allocation amount of the full-load grate.

[0108] Specifically, the maximum amount of waste to be processed can be represented by the amount of waste to be incinerated by the full-load grate according to the upper limit of the grate capacity in the remaining time of the day after the next cycle moment. The amount of waste to be processed by the full-load grate can be represented by the amount of waste that the full-load grate cannot continue to process on the day, and the amount of waste to be processed by the full-load grate needs to be allocated to the allocated grate for processing.

[0109] S4. For each assigned grate, the predicted load of the assigned grate is adjusted according to the garbage processing allocation of each full-load grate in the garbage incineration grate system to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment.

[0110] Specifically, for each assigned grate, according to the garbage processing allocation amount of each full-load grate in the garbage incineration grate system, the predicted load amount of the assigned grate is adjusted to obtain the latest predicted load amount of the assigned grate in the time period corresponding to the next cycle moment, which may include the following two cases:

[0111] The first one is to take into account the adjustment margin of each assigned grate so that each assigned grate can obtain more adjustment space when adjusting the predicted load each time. The first formula can be used to calculate the latest predicted load of each assigned grate in the time period corresponding to the next cycle moment.

[0112] The first formula can be:

[0113]

[0114] Among them, W T_jis the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle time, W max is the first preset load value, m is the number of allocated grates in the garbage incineration grate system, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0115] Understandably, The total adjustable space for all assigned grates, The overflow load of all fully loaded grates needs to occupy the total adjustable space of all allocated grates, so the adjustable space of each allocated grate can be averaged to ensure that each allocated grate has a wider readjustment range.

[0116] The second method is to allocate the corresponding garbage processing amount to each allocated grate according to the predicted load of each allocated grate, so that the allocated grate with a larger load pressure receives less garbage processing amount, and the allocated grate with a smaller load pressure receives more garbage processing amount. Specifically, the following steps may be included:

[0117] S41. Determine the allocated weight ratio coefficient of each allocated grate according to the predicted load of each allocated grate in the garbage incineration grate system in the time period corresponding to the next cycle moment.

[0118] Specifically, the predicted load of each assigned grate in the time period corresponding to the next cycle moment is negatively correlated with the assigned weight ratio coefficient of the assigned grate. The larger the predicted load of the assigned grate in the time period corresponding to the next cycle moment, the smaller the assigned weight ratio coefficient; the smaller the predicted load of the assigned grate in the time period corresponding to the next cycle moment, the larger the assigned weight ratio coefficient.

[0119] S42. For each assigned grate, use the second formula to calculate the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment.

[0120] The second formula can be:

[0121]

[0122] Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, m is the number of assigned grates in the garbage incineration grate system, α j is the weight ratio coefficient of the jth allocated grate, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0123] Understandably, W T0_j is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, and is also the basic load in the latest predicted load. is the newly added load in the latest predicted load. j When α is larger, the new load of the jth assigned grate is larger, and the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle is larger. j The smaller the time is, the smaller the newly added load of the j-th assigned grate is, and the smaller the latest predicted load of the j-th assigned grate in the time period corresponding to the next cycle moment is.

[0124] S5. Calculate the final target output of each assigned grate in the time period corresponding to the next cycle moment according to the latest predicted load of the assigned grate, so that the assigned grate operates at the final target output in the time period corresponding to the next cycle moment.

[0125] It can be understood that when each assigned grate operates at the final target output corresponding to its latest predicted load, it can ensure the safe and stable operation of the grate, and optimize the distribution of the day's garbage processing volume to ensure that the day's garbage processing volume can be completed on time.

[0126] Considering that the garbage processing volume of the day needs to be completed on time, the output and load of the grate cannot be too low. Based on this, in some embodiments of the present application, the provided grate load control method for incinerating garbage can also limit the grate load downward. Specifically, the process may include:

[0127] If the predicted load of each grate is less than the second preset load value, the lower limit furnace discharge force is determined according to the second preset load value, and the lower limit furnace discharge force is used as the third target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the third target output in the time period corresponding to the next cycle moment.

[0128] Specifically, the second preset load value may represent the lower limit of the garbage processing volume for stable and safe operation of the grate, wherein the second preset load value may be a load value that is less than a preset proportion of the design load for the day.

[0129] For example, if the design load for the day is 20 tons of hourly processing capacity, then the second preset load value may be a load value that is 10% less than the design load for the day, that is, 18 tons of hourly processing capacity.

[0130] It can be understood that when the predicted load of the grate exceeds the second preset load value, it can indicate that the grate continues to operate at the grate output corresponding to the predicted load, and can achieve the expected speed of garbage incineration treatment on the day. When the predicted load of the grate does not exceed the second preset load value, it can indicate that the grate continues to operate at the grate output corresponding to the predicted load, and cannot achieve the expected speed of garbage incineration treatment on the day, and therefore needs to operate at least at the third target output.

[0131] The following is a description of the device for implementing grate load control for garbage incineration provided in an embodiment of the present application. The device for implementing grate load control for garbage incineration described below and the method for implementing grate load control for garbage incineration described above can be referenced to each other.

[0132] See also Figure 3 , Figure 3 This is a schematic diagram of the structure of a device for realizing grate load control for incinerating garbage disclosed in an embodiment of the present application.

[0133] like Figure 3 As shown, the device may include:

[0134] The load data acquisition unit 11 is used to acquire the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment at each cycle moment, and the time interval between every two adjacent cycle moments is equal;

[0135] The waste amount determination unit 12 is used to determine the amount of waste to be processed remaining on the grate at the current cycle time according to the load of each grate;

[0136] The grate discharge capacity calculation unit 13 is used to calculate the grate discharge capacity of the grate in the time period corresponding to the next cycle moment according to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day;

[0137] The load prediction unit 14 is used to calculate the predicted load of each grate in the time period corresponding to the next cycle moment based on the grate discharge force of each grate in the time period corresponding to the next cycle moment;

[0138] An overload judgment unit 15 is used to judge whether the predicted load of each grate exceeds a first preset load value, wherein the first preset load value is a load value greater than a preset proportion of the design load of the day. If not, the first target output determination unit 16 is executed;

[0139] The first target output determination unit 16 is used to determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0140] Optionally, the device further comprises:

[0141] The second target output determination unit is used to determine the upper limit furnace discharge power according to the first preset load value if the predicted load of each grate exceeds the first preset load value, and use the upper limit furnace discharge power as the second target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the second target output in the time period corresponding to the next cycle moment.

[0142] Optionally, the device further comprises:

[0143] a grate classification unit, for determining each assigned grate and each full-load grate in the garbage incineration grate system, wherein the predicted load of each assigned grate does not exceed the first preset load value, and the predicted load of each full-load grate exceeds the first preset load value;

[0144] A remaining garbage amount calculation unit is used to calculate, for each full-load grate, the amount of garbage to be processed remaining on the day after the next cycle moment of the full-load grate;

[0145] The allocation amount calculation unit is used to calculate the difference between the amount of garbage to be processed on the day after the next cycle moment of each full-load grate and the maximum amount of garbage processed by the full-load grate after the next cycle moment as the garbage processing allocation amount of the full-load grate;

[0146] The latest predicted load determination unit is used to adjust the predicted load of each assigned grate according to the garbage processing allocation of each full-load grate in the garbage incineration grate system, so as to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment;

[0147] The final target output determination unit is used to calculate the final target output of each assigned grate in the time period corresponding to the next cycle moment according to the latest predicted load of the assigned grate, so that the assigned grate operates at the final target output in the time period corresponding to the next cycle moment.

[0148] Optionally, the latest predicted load determination unit includes:

[0149] The first formula calculation unit is used to calculate the latest predicted load of each assigned grate in the time period corresponding to the next cycle moment by using the first formula, wherein the first formula is:

[0150]

[0151] Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle time, W max is the first preset load value, m is the number of allocated grates in the garbage incineration grate system, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0152] Optionally, the latest predicted load determination unit includes:

[0153] A weight ratio coefficient determination unit, used to determine the weight ratio coefficient of each assigned grate according to the predicted load of each assigned grate in the garbage incineration grate system in the time period corresponding to the next cycle moment;

[0154] The second formula calculation unit is used to calculate the latest predicted load of each assigned grate in the time period corresponding to the next cycle moment by using the second formula, wherein the second formula is:

[0155]

[0156] Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, m is the number of assigned grates in the garbage incineration grate system, α j is the weight ratio coefficient of the jth allocated grate, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

[0157] Optionally, the device further comprises:

[0158] The third target output determination unit is used to determine the lower limit furnace output according to the second preset load value if the predicted load of each grate is less than the second preset load value, and use the lower limit furnace output as the third target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the third target output in the time period corresponding to the next cycle moment, and the second preset load value is a load value that is less than the preset proportion of the design load for the day.

[0159] The device for controlling the load of a grate for incinerating garbage provided in the embodiment of the present application can be applied to equipment for controlling the load of a grate for incinerating garbage, such as terminals: mobile phones, computers, etc. Optionally, Figure 4 The hardware structure diagram of the equipment for controlling the grate load of garbage incineration is shown in FIG. Figure 4 , the hardware structure of the device for controlling the grate load of incinerating garbage may include: at least one processor 1, at least one communication interface 2, at least one memory 3 and at least one communication bus 4;

[0160] In the embodiment of the present application, the number of the processor 1, the communication interface 2, the memory 3, and the communication bus 4 is at least one, and the processor 1, the communication interface 2, and the memory 3 communicate with each other through the communication bus 4;

[0161] The processor 1 may be a central processing unit CPU, or an application-specific integrated circuit ASIC (Application Specific Integrated Circuit), or one or more integrated circuits configured to implement the embodiments of the present invention, etc.;

[0162] The memory 3 may include a high-speed RAM memory, and may also include a non-volatile memory, such as at least one disk memory;

[0163] The memory stores a program, and the processor can call the program stored in the memory, wherein the program is used to:

[0164] At each cycle moment, the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment is obtained, and the time interval between every two adjacent cycle moments is equal;

[0165] According to the load of each grate, determine the amount of garbage to be processed remaining on the grate at the current cycle time;

[0166] According to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day, calculate the grate discharge efficiency of the grate in the time period corresponding to the next cycle moment;

[0167] Based on the grate output of each grate in the time period corresponding to the next cycle moment, calculate the predicted load of the grate in the time period corresponding to the next cycle moment;

[0168] Determining whether the predicted load of each grate exceeds a first preset load value, wherein the first preset load value is a load value greater than a preset proportion of the design load for the day;

[0169] If not, determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0170] Optionally, the detailed functions and extended functions of the program may refer to the above description.

[0171] The embodiment of the present application further provides a storage medium, which may store a program suitable for execution by a processor, wherein the program is used to:

[0172] At each cycle moment, the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment is obtained, and the time interval between every two adjacent cycle moments is equal;

[0173] According to the load of each grate, determine the amount of garbage to be processed remaining on the grate at the current cycle time;

[0174] According to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day, calculate the grate discharge efficiency of the grate in the time period corresponding to the next cycle moment;

[0175] Based on the grate output of each grate in the time period corresponding to the next cycle moment, calculate the predicted load of the grate in the time period corresponding to the next cycle moment;

[0176] Determining whether the predicted load of each grate exceeds a first preset load value, wherein the first preset load value is a load value greater than a preset proportion of the design load for the day;

[0177] If not, determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment.

[0178] Optionally, the detailed functions and extended functions of the program may refer to the above description.

[0179] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0180] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can refer to each other.

[0181] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for controlling grate load for incinerating garbage, characterized in that: include: At each cycle moment, the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment is obtained, and the time interval between every two adjacent cycle moments is equal; According to the load of each grate, determine the amount of garbage to be processed remaining on the grate at the current cycle time; According to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day, calculate the grate discharge efficiency of the grate in the time period corresponding to the next cycle moment; Based on the grate output of each grate in the time period corresponding to the next cycle moment, calculate the predicted load of the grate in the time period corresponding to the next cycle moment; Determine whether the predicted load of each grate exceeds a first preset load value, wherein the first preset load value represents an upper limit of the garbage processing capacity for stable and safe operation of the grate, and the first preset load value is a load value greater than a preset proportion of the design load for the day; If not, then determine the grate output of the grate in the time period corresponding to the next cycle moment as the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment; If the predicted load of each grate exceeds the first preset load value, an upper limit furnace discharge force is determined according to the first preset load value, and the upper limit furnace discharge force is used as the second target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the second target output in the time period corresponding to the next cycle moment; Determine each assigned grate and each full-load grate in the garbage incineration grate system, the predicted load of each assigned grate does not exceed the first preset load value, and the predicted load of each full-load grate exceeds the first preset load value; For each full-load grate, calculate the amount of garbage to be processed remaining on the full-load grate after the next cycle time on the same day; The difference between the amount of garbage to be processed on the day after the next cycle moment of each full-load grate and the maximum amount of garbage processed by the full-load grate after the next cycle moment is used as the garbage processing allocation amount of the full-load grate; For each assigned grate, the predicted load of the assigned grate is adjusted according to the garbage processing allocation of each full-load grate in the garbage incineration grate system to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment; According to the latest predicted load of each assigned grate, calculate the final target output of the assigned grate in the time period corresponding to the next cycle moment, so that the assigned grate operates at the final target output in the time period corresponding to the next cycle moment; The method of adjusting the predicted load of each assigned grate according to the garbage processing allocation of each full-load grate in the garbage incineration grate system to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment includes: Determine the weight ratio coefficient of each assigned grate according to the predicted load of each assigned grate in the garbage incineration grate system in the time period corresponding to the next cycle moment; For each assigned grate, the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment is calculated using the second formula, and the second formula is: Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, m is the number of assigned grates in the garbage incineration grate system, α j is the weight ratio coefficient of the jth allocated grate, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

2. The method according to claim 1, characterized in that Also includes: If the predicted load of each grate is less than the second preset load value, the lower limit furnace discharge force is determined according to the second preset load value, and the lower limit furnace discharge force is used as the third target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the third target output in the time period corresponding to the next cycle moment. The second preset load value represents the lower limit of the garbage processing volume for stable and safe operation of the grate. The second preset load value is a load value that is less than the preset proportion of the design load for the day.

3. A grate load control device for burning garbage, characterized in that: include: The load data acquisition unit is used to obtain the load of each grate in the garbage incineration grate system in the time period corresponding to the cycle moment at each cycle moment, and the time interval between every two adjacent cycle moments is equal; A unit for determining the amount of waste to be processed, used to determine the amount of waste to be processed remaining on the grate at the current cycle moment according to the load of each grate; A grate discharge efficiency calculation unit, used to calculate the grate discharge efficiency of the grate in the time period corresponding to the next cycle moment according to the amount of garbage to be processed remaining on each grate at the current cycle moment of the day; A load prediction unit, used to calculate the predicted load of each grate in the time period corresponding to the next cycle moment based on the grate discharge force of the grate in the time period corresponding to the next cycle moment; An overload judgment unit, used to judge whether the predicted load of each grate exceeds a first preset load value, wherein the first preset load value represents an upper limit of the garbage processing capacity for stable and safe operation of the grate, and the first preset load value is a load value greater than a preset proportion of the design load of the day, and if not, the first target output determination unit is executed; The first target output determination unit is used to determine the grate output of the grate in the time period corresponding to the next cycle moment, which is the first target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the first target output in the time period corresponding to the next cycle moment; a second target output determination unit, configured to determine an upper limit furnace discharge power according to the first preset load value if the predicted load of each grate exceeds the first preset load value, and use the upper limit furnace discharge power as the second target output of the grate in the time period corresponding to the next cycle moment, so that the grate operates at the second target output in the time period corresponding to the next cycle moment; a grate classification unit, used for determining each assigned grate and each full-load grate in the garbage incineration grate system, wherein the predicted load of each assigned grate does not exceed the first preset load value, and the predicted load of each full-load grate exceeds the first preset load value; A remaining garbage amount calculation unit is used to calculate, for each full-load grate, the amount of garbage to be processed remaining on the day after the next cycle moment of the full-load grate; The allocation amount calculation unit is used to calculate the difference between the amount of garbage to be processed on the day after the next cycle moment of each full-load grate and the maximum amount of garbage processed by the full-load grate after the next cycle moment as the garbage processing allocation amount of the full-load grate; The latest predicted load determination unit is used to adjust the predicted load of each assigned grate according to the garbage processing allocation of each full-load grate in the garbage incineration grate system, so as to obtain the latest predicted load of the assigned grate in the time period corresponding to the next cycle moment; A final target output determination unit, for calculating the final target output of each assigned grate in a time period corresponding to the next cycle moment according to the latest predicted load of the assigned grate, so that the assigned grate operates at the final target output in the time period corresponding to the next cycle moment; The latest predicted load determination unit comprises: A weight ratio coefficient determination unit, used to determine the allocated weight ratio coefficient of each allocated grate according to the predicted load of each allocated grate in the garbage incineration grate system in the time period corresponding to the next cycle moment; The second formula calculation unit is used to calculate the latest predicted load of each assigned grate in the time period corresponding to the next cycle moment by using the second formula, wherein the second formula is: Among them, W T_j is the latest predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, is the predicted load of the jth assigned grate in the time period corresponding to the next cycle moment, m is the number of assigned grates in the garbage incineration grate system, α j is the weight ratio coefficient of the jth allocated grate, n is the number of full-load grates in the garbage incineration grate system, W F_i The garbage disposal allocation for the i-th fully loaded grate.

4. A grate load control device for burning garbage, characterized in that: including memory and processor; The memory is used to store programs; The processor is used to execute the program to implement the various steps of the grate load control method for incinerating garbage as described in claim 1 or 2.

5. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, each step of the grate load control method for incinerating garbage as claimed in claim 1 or 2 is implemented.

Citation Information

Patent Citations

  • Method and system for coordinating header system boilers

    CN105276562A

  • Power generation load deviation distribution method, device and system and computer equipment

    CN113554251A

  • Photovoltaic power station active power control method and system based on adjustable capacity margin

    CN114977316A

  • Interoperative load balancing method, device and equipment and storage medium

    CN116386813A

  • Waste disposal facility

    JP1995208718A