A high temperature gas-cooled reactor power supply control circuit

By designing a high-temperature gas-cooled relay power supply control circuit and using the cooperation of circuit breakers and relays, the equipment safety and voltage stability during the switching between normal power supply to emergency power supply in the high-temperature gas-cooled relay emergency AC power system is solved, and the emergency power supply is realized Stable start and load load to ensure system safety.

CN117277538BActive Publication Date: 2024-11-15HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311229756.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-22
Publication Date
2024-11-15
Estimated Expiration
2043-09-22

AI Technical Summary

Technical Problem

In the high-temperature gas-cooled reactor emergency AC power system, how to ensure the safety of the system and equipment during the normal power supply switching process to the emergency power supply, and prevent the voltage fluctuations in the emergency power supply and the voltage instability during load loading.

Method used

A high-temperature air-cooled relay power supply control circuit is designed, including a first circuit breaker, a second circuit breaker and a sweep load circuit breaker. Through the cooperation of these circuit breakers, it is necessary to ensure that the high-voltage busbar and the emergency busbar are disconnected under normal power supply conditions. , start the emergency power supply under abnormal conditions and gradually carry loads to prevent the motor load from being started simultaneously, and realize the automatic load-carrying program to stabilize the voltage.

Benefits of technology

Ensure that the emergency busbar is disconnected from the normal power supply, prevent voltage fluctuations, achieve smooth load recovery and operation, and ensure the safety and stability of the system and equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117277538B_ABST
    Figure CN117277538B_ABST
Patent Text Reader

Abstract

The present application discloses a power supply control circuit for a high-temperature gas-cooled reactor, comprising: a first circuit breaker, used to connect the passage between the high-voltage bus and the emergency bus under normal power supply conditions, and disconnect the passage between the high-voltage bus and the emergency bus under abnormal power supply conditions; a second circuit breaker, used to connect the passage between the emergency power supply and the emergency bus after the emergency power supply is started and reaches a preset voltage, wherein the emergency power supply is used to standby under normal power supply conditions, and start to generate electricity under abnormal power supply conditions; a load sweeping circuit breaker, used to disconnect the passage between the emergency bus and the corresponding load under abnormal power supply conditions and execute a load sweeping procedure, and to connect the passage between the emergency bus and the corresponding load one by one after the emergency power supply generates electricity to complete the automatic load-carrying procedure. The above control circuit can realize automatic and smooth switching from normal power supply to emergency power supply, ensuring stable operation of the power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power supply technology, and in particular to a high-temperature gas-cooled reactor power supply control circuit and method. Background Art

[0002] The emergency AC power system of the high temperature gas-cooled reactor is a power system including its auxiliary equipment and energy storage devices that is put into use to supply electric energy when the normal power supply from the power grid is unavailable. It consists of an emergency power supply (consisting of a diesel emergency power supply group, an energy storage device and auxiliary equipment) and its emergency bus distribution equipment. After the normal power supply is lost, the emergency diesel emergency power supply group is started within the required time to supply power to the emergency bus, which is used to supply power to the AC load that allows power interruption within a certain period of time.

[0003] During the process of switching from normal power supply to emergency power supply, due to the large load, the switching process should be as smooth and efficient as possible. Therefore, how to ensure the safety of the system and equipment during the switching process is a problem that needs to be solved in this field. Summary of the invention

[0004] The embodiments of the present application provide a high temperature gas-cooled reactor power supply control circuit and method to at least solve the problem of ensuring the safety of the system and equipment during the switching process from normal power supply to emergency power supply of the high temperature gas-cooled reactor.

[0005] A high temperature gas-cooled reactor power supply control circuit provided in an embodiment of the present application includes:

[0006] a first circuit breaker connected between the high-voltage bus and the emergency bus, and a reactor transformer is connected between the first circuit breaker and the high-voltage bus; the first circuit breaker is used to connect the passage between the high-voltage bus and the emergency bus under normal power supply conditions, and to disconnect the passage between the high-voltage bus and the emergency bus under abnormal power supply conditions;

[0007] A second circuit breaker is connected between the emergency power supply and the emergency bus, and the second circuit breaker is used to connect the path between the emergency power supply and the emergency bus after the emergency power supply is started and reaches a preset voltage, wherein the emergency power supply is used to standby under normal power supply conditions, and start to generate electricity under abnormal power supply conditions;

[0008] A load sweeping circuit breaker is connected between the emergency bus and the corresponding load. The load sweeping circuit breaker is used to disconnect the path between the emergency bus and the corresponding load and execute the load sweeping program under abnormal power supply conditions, and to connect the paths between the emergency bus and the corresponding loads one by one after the emergency power supply generates electricity to complete the automatic loading program.

[0009] Further, in the present application, the first circuit breaker is configured with a first relay and a second relay;

[0010] The first relay is a voltage relay, the first relay is connected to the high-voltage bus, and the normally closed contact of the first relay is connected in series with the second relay and then connected to the control circuit;

[0011] The second relay is a power-on delay relay and has a first power-on delay closing contact. The first power-on delay closing contact is connected in series with the opening coil of the first circuit breaker and then connected to the control circuit.

[0012] Furthermore, in the present application, the first circuit breaker is also configured with a third relay, the third relay is a voltage relay, and the third relay is connected to the emergency bus.

[0013] Furthermore, in the present application, the second relay has a second power-on delayed closing contact, and the second power-on delayed closing contact is connected to the distributed control system and / or the emergency power supply to transmit the on / off state of the second power-on delayed closing contact to the distributed control system and / or the emergency power supply so that the distributed control system can determine whether the incoming power supply has lost pressure and / or the emergency power supply can determine whether it needs to be started.

[0014] Further, in the present application, each of the load sweeping circuit breakers is configured with a fourth relay and a fifth relay;

[0015] The fourth relay is a voltage relay, the fourth relay is connected to the emergency bus, and the normally closed contact of the fourth relay is connected in series with the fifth relay and connected to the control circuit;

[0016] The fifth relay is a power-on delay relay and has a third power-on delayed closing contact. The third power-on delayed closing contact is connected in series with the normally open auxiliary contact of the load sweeping circuit breaker and the opening coil of the load sweeping circuit breaker and is connected to the control circuit.

[0017] Further, in the present application, the power-on delay time of the fifth relay is greater than the power-on delay time of the second relay.

[0018] Furthermore, in the present application, a sixth relay and a seventh relay are also included;

[0019] The normally closed contact of the first circuit breaker, the normally open contact of the second circuit breaker, the normally closed contact of the seventh relay and the sixth relay are connected in series and connected to a control circuit;

[0020] Each of the load sweeping circuit breakers is equipped with an eighth relay and a ninth relay, wherein the eighth relay is a time-delay relay, the energized time-delay closing contact of the eighth relay is connected in series with the ninth relay and then connected in the control circuit, and the normally open contact of the ninth relay is connected in series with the corresponding normally closed auxiliary contact inside the load sweeping circuit breaker and the closing coil of the load sweeping circuit breaker and then connected in the control circuit;

[0021] The eighth relay of the first load sweeping circuit breaker in the order of the automatic loading procedure is connected in series with the normally open contact 14-1 of the sixth relay and then connected in the control loop; except for the first load sweeping circuit breaker, the eighth relay of the load sweeping circuit breaker in the order of the automatic loading procedure is connected in parallel with the ninth relay of the previous load sweeping circuit breaker, and the energized delayed closing contact of the eighth relay of the load sweeping circuit breaker, the normally open auxiliary contact of the previous load sweeping circuit breaker and the ninth relay of the load sweeping circuit breaker are connected in series and then connected in the control loop;

[0022] All the normally open auxiliary contacts of the load sweeping circuit breakers and the seventh relay are connected in series to the emergency bus, and the normally open contact 15-1 of the seventh relay is connected to the distributed control system to transmit the on-off state of the normally open contact 15-1 of the seventh relay to the distributed control system so that the distributed control system can determine whether the automatic loading procedure is completed.

[0023] Further, in the present application, the normally open contact of the third relay is connected in series with the sixth relay.

[0024] Further, in the present application, the delay time of the eighth relay of the first load sweeping circuit breaker in the order of the automatic loading procedure is greater than the delay time of the eighth relay of the other load sweeping circuit breakers in the order of the automatic loading procedure.

[0025] Furthermore, in the present application, a local remote transfer switch is provided in the control circuit of the first circuit breaker and the load sweeping circuit breaker.

[0026] Beneficial effects:

[0027] The present application provides a control circuit, which is provided with a first circuit breaker, a second circuit breaker and a load sweeping circuit breaker, wherein the first circuit breaker is used to control the passage between the high-voltage bus and the emergency bus under normal power supply conditions, and to disconnect the passage between the high-voltage bus and the emergency bus under abnormal power supply conditions; the second circuit breaker is used to connect the passage between the emergency power supply and the emergency bus after the emergency power supply is started and reaches a preset voltage, wherein the emergency power supply is used to standby under normal power supply conditions, and to start and generate electricity under abnormal power supply conditions; the load sweeping circuit breaker is used to disconnect the passage between the emergency bus and the corresponding load and execute a load sweeping program under abnormal power supply conditions, and to connect the passages between the emergency bus and the corresponding loads one by one to complete the automatic load-carrying program after the emergency power supply generates electricity.

[0028] Through the above circuit, the following aspects are ensured during the switching process from normal power supply to emergency power supply: First, when the emergency power supply supplies power to the emergency bus, the emergency bus has been disconnected from the normal power supply to ensure that only one power supply is supplied. Second, before the emergency power supply supplies power to the bus, the emergency bus load first executes the load sweeping procedure to prevent a large number of motor loads on the emergency bus from self-starting at the same time, so as not to cause drastic fluctuations in the voltage of the emergency diesel emergency power supply group and affect the safe and stable operation of the emergency diesel emergency power supply group. Third, when the emergency bus is powered by the emergency power supply, in order to prevent voltage fluctuations during the load carrying process, the automatic loading procedure is executed under the premise of meeting the voltage stability, that is, after each group of loads is loaded, it is delayed before the next group of loads is allowed to load, ensuring that the downstream loads of the emergency bus can be smoothly loaded and resumed, ensuring the safety of the system and equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0030] Figure 1 is a structural diagram of an emergency AC power system according to an embodiment of the present application;

[0031] Figure 2 is a control principle diagram of a first circuit breaker according to an embodiment of the present application;

[0032] Figure 3 is a control principle diagram of a load sweeping circuit breaker according to an embodiment of the present application;

[0033] Figure 4 is a schematic diagram of automatic load control according to an embodiment of the present application;

[0034] In the figure, the meanings of the reference numerals are as follows:

[0035] High-voltage bus 1, emergency power supply 2, first circuit breaker 3, normally closed contact 3-1 of the first circuit breaker, opening coil 3-2 of the first circuit breaker, second circuit breaker 4, normally open contact 4-1 of the second circuit breaker, emergency bus 5, reactor transformer 6;

[0036] Sweep load circuit breaker 7, sweep load circuit breaker internal normally closed auxiliary contact 7-11, sweep load circuit breaker closing coil 7-12, sweep load circuit breaker internal normally open auxiliary contact 7-3, sweep load circuit breaker opening coil 7-14;

[0037] The first load sweeping circuit breaker 7-1, the normally open auxiliary contact 7-1-1 of the first load sweeping circuit breaker, the second load sweeping circuit breaker 7-2, the normally open auxiliary contact 7-2-1 of the second load sweeping circuit breaker, the third load sweeping circuit breaker 7-3, the normally open auxiliary contact 7-3-1 of the third load sweeping circuit breaker, the fourth load sweeping circuit breaker 7-4, the normally open auxiliary contact 7-4-1 of the fourth load sweeping circuit breaker, the fifth load sweeping circuit breaker 7-5, the fifth load sweeping circuit breaker Normally open auxiliary contact 7-5-1 of the load circuit breaker, the sixth load circuit breaker 7-6; the normally open contact 7-1-2 of the first load circuit breaker, the normally open contact 7-2-2 of the second load circuit breaker, the normally open contact 7-3-2 of the third load circuit breaker, the normally open contact 7-4-2 of the fourth load circuit breaker, the normally open contact 7-5-2 of the fifth load circuit breaker, the normally open contact 7-6-2 of the sixth load circuit breaker;

[0038] The first relay 8, the normally closed contact 8-1 of the first relay, the second relay 9, the first power-on delayed closing contact 9-1, the second power-on delayed closing contact 9-2, the undervoltage alarm indicator light 10, the third relay 11, the normally open contact 11-1 of the third relay, the fourth relay 12, the normally closed contact 12-1 of the fourth relay, the fifth relay 13, the third power-on delayed closing contact 13-1; the sixth relay 14, the normally open contact 14-1 of the sixth relay, the seventh relay 15, the normally closed contact 15-1 of the seventh relay;

[0039] The eighth relay 16 of the first load sweeping circuit breaker, the energized delayed closing contact 16-1 of the eighth relay of the first load sweeping circuit breaker, the ninth relay 17 of the first load sweeping circuit breaker, and the normally open contact 17-1 of the ninth relay of the first load sweeping circuit breaker;

[0040] The eighth relay 18 of the second load sweeping circuit breaker, the energized delayed closing contact 18-1 of the eighth relay of the second load sweeping circuit breaker, the ninth relay 19 of the second load sweeping circuit breaker, and the normally open contact 19-1 of the ninth relay of the second load sweeping circuit breaker;

[0041] The eighth relay 20 of the third load sweeping circuit breaker, the energized delayed closing contact 20-1 of the eighth relay of the third load sweeping circuit breaker, the ninth relay 21 of the third load sweeping circuit breaker, and the normally open contact 21-1 of the ninth relay of the third load sweeping circuit breaker;

[0042] The eighth relay 22 of the fourth load sweeping circuit breaker, the energized delayed closing contact 22-1 of the eighth relay of the fourth load sweeping circuit breaker, the ninth relay 23 of the fourth load sweeping circuit breaker, and the normally open contact 23-1 of the ninth relay of the fourth load sweeping circuit breaker;

[0043] The eighth relay 24 of the fifth load sweeping circuit breaker, the energized delayed closing contact 24-1 of the eighth relay of the fifth load sweeping circuit breaker, the ninth relay 25 of the fifth load sweeping circuit breaker, and the normally open contact 25-1 of the ninth relay of the fifth load sweeping circuit breaker;

[0044] the eighth relay 26 of the sixth load sweeping circuit breaker, the energized delayed closing contact 26-1 of the eighth relay of the sixth load sweeping circuit breaker, the ninth relay 27 of the sixth load sweeping circuit breaker, and the normally open contact 27-1 of the ninth relay of the fifth load sweeping circuit breaker;

[0045] Load indicator light 28. DETAILED DESCRIPTION

[0046] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0047] The present application embodiment provides a power system structure diagram of a high temperature gas-cooled reactor power supply control circuit, such as Figure 1 As shown, the power system of the high temperature gas-cooled reactor power supply control circuit is set to be powered by two power supplies, one is the normal power supply, that is, the 6kV high voltage bus 1 in the figure, and the other is the emergency power supply 2, that is, the diesel generator in the figure. In the embodiment, there are 6 groups of loads, and an emergency bus 5 is set between the power supply and the load. The power supply supplies power to each load by supplying power to the emergency bus 5. In the above power system structure, a variety of circuit breakers are also set. Specifically, the system structure diagram includes:

[0048] The first circuit breaker 3 is connected between the high-voltage bus 1 and the emergency bus 5, and a reactor transformer 6 is connected between the first circuit breaker 3 and the high-voltage bus 1; the first circuit breaker 3 is used to connect the passage between the high-voltage bus 1 and the emergency bus 5 under normal power supply conditions, and to disconnect the passage between the high-voltage bus 1 and the emergency bus 5 under abnormal power supply conditions.

[0049] The second circuit breaker 4 is connected between the emergency power supply 2 and the emergency bus 5. The second circuit breaker 4 is used to connect the path between the emergency power supply 2 and the emergency bus 5 after the emergency power supply 2 is started and reaches a preset voltage, wherein the emergency power supply 2 is used to standby under normal power supply conditions and start to generate electricity under abnormal power supply conditions.

[0050] The load sweeping circuit breaker 7 is connected between the emergency bus 5 and the corresponding load. The load sweeping circuit breaker 7 is used to disconnect the path between the emergency bus 5 and the corresponding load and execute the load sweeping program under abnormal power supply conditions, and to connect the paths between the emergency bus 5 and the corresponding loads one by one after the emergency power supply 2 generates electricity to complete the automatic loading program.

[0051] Under normal power supply conditions, the high-voltage bus 1 supplies power to the emergency bus 5 through the reactor transformer 6, and the emergency bus 5 supplies power to the six downstream load groups through six groups of load-sweeping circuit breakers 7. When the reactor transformer 6 fails, the high-voltage bus 1 loses power, or other abnormal conditions occur, the first circuit breaker 3 automatically trips, and the six downstream load-sweeping circuit breakers 7 automatically disconnect to cut off the six groups of loads. The emergency power supply 2, i.e., the emergency diesel generator set, automatically starts after receiving the disconnection signal of the first circuit breaker 3 and the pressure loss signal of the emergency bus 5, and supplies power to the emergency bus 5 through the second circuit breaker 4. When the voltage of the emergency bus 5 meets the requirements, the automatic loading procedure is executed, and the six groups of load-sweeping circuit breakers 7 are automatically loaded in turn, and the operation is restored to meet the safe operation requirements of the power plant.

[0052] The embodiment of the present application mainly cooperates with the above three circuit breakers to realize that when the emergency power supply 2 supplies power to the emergency bus 5, the emergency bus 5 has been disconnected from the normal power supply to ensure that only one power supply is supplied. And before the emergency power supply 2 supplies power to the emergency bus 5, the emergency bus 5 first executes the load sweeping procedure to prevent a large number of motor loads on the emergency bus 5 from self-starting at the same time, so as not to cause drastic fluctuations in the voltage of the emergency power supply 2 and affect the safe and stable operation of the emergency power supply 2. And when the emergency bus 5 is powered by the emergency power supply 2, the automatic loading procedure is executed under the premise of meeting the voltage stability, that is, after each group of loads is loaded, it is delayed before the next group of loads is allowed to load, ensuring that the downstream loads of the emergency bus 5 can be smoothly loaded and resumed, ensuring the safety of the system and equipment.

[0053] The above process is specifically implemented by setting a secondary control circuit. In some specific embodiments, the following are provided respectively: Figures 2 to 4 The control circuit shown specifically relates to the control principle diagram of the first circuit breaker, the control principle diagram of the load sweeping circuit breaker and the automatic load control principle diagram of the load sweeping circuit breaker.

[0054] like Figure 2The control principle diagram of the first circuit breaker is shown in the figure. The dotted frame in the figure shows the internal components of the first circuit breaker 3, including the normally closed contact 3-1 of the first circuit breaker and the opening coil 3-2 of the first circuit breaker. When the opening coil 3-2 of the first circuit breaker is energized, the first circuit breaker 3 will be opened. When the power supply is normal, the first circuit breaker 3 is closed, and the normally closed contact 3-1 of the first circuit breaker in the dotted frame is closed.

[0055] The first circuit breaker 3 is equipped with a first relay 8 and a second relay 9. The first relay 8 is a voltage relay, which is connected to the upstream of the first circuit breaker 3 through a fuse, that is, connected to the ABC three-phase of the high-voltage bus 1, and the normally closed contact 8-1 of the first relay is connected in series with the second relay 9 and then connected to the control circuit of the first circuit breaker 3.

[0056] The second relay 9 is a power-on delay relay and has a first power-on delay closing contact 9 - 1 . The first power-on delay closing contact 9 - 1 is connected in series with the opening coil 3 - 2 of the first circuit breaker and then connected to the control circuit of the first circuit breaker 3 .

[0057] Figure 2 In the embodiment, when the first relay 8 is energized, the normally closed contact 8-1 of the first relay is disconnected, the second relay 9 is de-energized, the first power-on delay closing contact 9-1 is disconnected, and the first circuit breaker 3 remains in the closed state. When the normal power supply fails and causes the first relay 8 to lose power, the normally closed contact 8-1 of the first relay is closed, so that the second relay 9 is energized, and the delay time of the second relay 9 is 2s, that is, after the second relay 9 is energized for 2s, its corresponding first power-on delay closing contact 9-1 is closed, thereby turning on the first circuit breaker 3, and the opening coil 3-2 of the first circuit breaker is energized to open the first circuit breaker 3, thereby disconnecting the normal power supply and the emergency bus 5.

[0058] In some preferred embodiments, the second relay 9 is also connected in parallel with the underpressure alarm indicator light 10, that is, when the second relay 9 is energized, the underpressure alarm indicator light 10 lights up to indicate that an abnormality occurs in the normal power supply.

[0059] In some preferred embodiments, the second relay 9 has a second power-on delay closing contact 9-2, and the second power-on delay closing contact 9-2 is connected to the distributed control system and / or the emergency power supply 2, that is, to transmit the on-off state of the second power-on delay closing contact 9-2 to the distributed control system and / or the emergency power supply 2 so that the distributed control system determines whether the incoming power supply is depressurized and / or the emergency power supply 2 determines whether it needs to be started. The closing of the second power-on delay closing contact 9-2 indicates that the incoming power supply is depressurized, and the depressurization signal is transmitted to the distributed control system to issue a depressurization alarm, so the depressurization signal is transmitted to the emergency power supply 2 to start the emergency power supply 2. When the voltage of the emergency power supply 2 is stable, the second circuit breaker 4 is closed to connect the emergency power supply 2 with the emergency bus 5.

[0060] In addition to the above components, the first circuit breaker 3 is also connected in series with other control components (including 6kV switch and local remote transfer switch in the figure) on the high-voltage bus 1 to meet different control requirements for the first circuit breaker 3.

[0061] In addition to the above Figure 2 In addition to the control components shown in , when the switching demand occurs at the beginning, in order to prevent the emergency power supply 2 from supplying power to a large number of other large-capacity loads connected to the normal power distribution system, in some embodiments, a hard contact signal interlock is preferably set between the first circuit breaker 3 and the second circuit breaker 4, that is, at the same time, one and only one of the first circuit breaker 3 and the second circuit breaker 4 is in the closed position, which can be specifically achieved through the auxiliary contacts of the circuit breaker, for example, the opening and closing auxiliary contacts of the second circuit breaker 4 are connected to the closing circuit of the first circuit breaker 3, and the closing auxiliary contacts of the second circuit breaker 4 are connected to the closing circuit of the first circuit breaker 3, thereby ensuring that when the emergency power supply 2 supplies power to the emergency bus 5, the emergency bus 5 has been disconnected from the normal power supply.

[0062] In particular, Figure 2 As shown, the first circuit breaker 3 is also equipped with a third relay 11, and the third relay 11 is a voltage relay. Figure 2 As shown in , the third relay 11 and the first relay 8 are respectively located on both sides of the switch QAB, and the switch QAB represents the first circuit breaker 3, which means that the third relay 11 is connected to the emergency bus 5, and the first relay 8 is connected to the high-voltage bus 1. Therefore, the third relay 11 can sense whether the voltage of the emergency bus 5 is normal, which can be used as a trigger condition for the subsequent automatic loading procedure.

[0063] The automatic loading procedure is a procedure executed by the load sweeping circuit breaker 7, such as Figure 3 As shown, the control principle diagram of each load sweeping circuit breaker 7 and Figure 4 Shown is a schematic diagram of automatic load control of all six groups of load sweeping circuit breakers 7 of this embodiment.

[0064] Depend on Figure 3 It can be seen that QAB in the figure represents any load sweeping circuit breaker 7, Figure 3 The dotted box in the figure represents the internal structure of the load sweeping circuit breaker 7, including the load sweeping circuit breaker opening coil 7-12 and the load sweeping circuit breaker closing coil 7-14 connected in parallel. The load sweeping circuit breaker opening coil 7-12 is connected in series with the normally open auxiliary contact 7-3 inside the load sweeping circuit breaker, and the load sweeping circuit breaker closing coil 7-14 is connected in series with the normally closed auxiliary contact 7-11 inside the load sweeping circuit breaker.

[0065] Each of the load sweeping circuit breakers 7 is equipped with a fourth relay 12 and a fifth relay 13. The fourth relay 12 is a voltage relay, and the fourth relay 12 is connected to the A / B / C three-phase of the emergency bus 5 through a fuse. The normally closed contact 12-1 of the fourth relay is connected in series with the fifth relay 13 and connected to the control circuit of the load sweeping circuit breaker 7. The fifth relay 13 is a power-on delay relay and has a third power-on delayed closing contact 13-1, and the third power-on delayed closing contact 13-1 is connected in series with the normally open auxiliary contact 7-3 inside the load sweeping circuit breaker and the load sweeping circuit breaker opening coil 7-12 and connected to the control circuit of the load sweeping circuit breaker 7.

[0066] During normal power supply, the load sweeping circuit breaker 7 is closed, the normally open auxiliary contact 7-3 inside the load sweeping circuit breaker is closed, the normally closed auxiliary contact 7-11 inside the load sweeping circuit breaker is disconnected, the fourth relay 12 is energized, the normally closed contact 12-1 of the fourth relay is disconnected, the fifth relay 13 is de-energized, the third power-on delayed closing contact 13-1 of the fifth relay is disconnected, and the system operates normally.

[0067] When the power supply of the emergency bus 5 is lost, the fourth relay 12 loses power, the normally closed contact 12-1 of the fourth relay closes, and the fifth relay 13 is energized. The power-on delay time of the fifth relay 13 is 5s, that is, the third power-on delay closing contact 13-1 of the fifth relay is closed 5s after the fifth relay 13 is energized, causing the load sweeping circuit breaker trip coil 7-14 to be energized, so that the load sweeping circuit breaker 7 is disconnected to perform the load sweeping function, so that the normally open auxiliary contact 7-3 inside the load sweeping circuit breaker is disconnected, and the normally closed auxiliary contact 7-11 inside the load sweeping circuit breaker is closed. Subsequently, when the emergency bus 5 is powered by the emergency diesel generator, the automatic load-carrying program is started, and the automatic load-carrying control circuit ( Figure 4 ) in the automatic loading instruction acts on Figure 3The load sweeping circuit breaker 7 is closed in the circuit where the load sweeping circuit breaker closing coil 7-12 is located, thereby completing the load carrying process.

[0068] Figure 3 In the control circuit of the first circuit breaker 3 , similarly to the above-mentioned control device, each of the control circuits of the load sweeping circuit breaker 7 is also provided with a local remote transfer switch in order to meet different control requirements for the load sweeping circuit breaker 7 .

[0069] like Figure 4 As shown, in order to realize the automatic load control of the load sweeping circuit breaker 7, the sixth relay 14 and the seventh relay 15 are also included in this embodiment. The normally closed contact 3-1 of the first circuit breaker, the normally open contact 4-1 of the second circuit breaker, the normally closed contact 15-1 of the seventh relay and the sixth relay 14 are connected in series and connected to the automatic load control circuit of the load sweeping control. Preferably, the normally open contact 11-1 of the third relay is also connected in series in the above circuit. Each of the load sweeping circuit breakers 7 is configured with an eighth relay and a ninth relay, the eighth relay is a time delay relay, the energized delayed closing contact of the eighth relay is connected in series with the ninth relay and then connected in the automatic load control circuit of the load sweeping controller, and the normally open contact of the ninth relay is connected in series with the corresponding normally closed auxiliary contact inside the load sweeping circuit breaker and the closing coil 7-12 of the load sweeping circuit breaker and then connected in the automatic load control circuit of the load sweeping controller 7. The eighth relay 16 of the first load sweeping circuit breaker in the order of the automatic loading procedure is connected in series with the normally open contact 14-1 of the sixth relay and then connected in the automatic loading control circuit of the load sweeping controller; except for the first load sweeping circuit breaker 7-1, the eighth relay of the load sweeping circuit breaker in the order of the automatic loading procedure is connected in parallel with the ninth relay of the previous load sweeping circuit breaker, and the energized delayed closing contact of the eighth relay of the load sweeping circuit breaker, the normally open auxiliary contact of the previous load sweeping circuit breaker and the ninth relay of the load sweeping circuit breaker are connected in series in the control circuit. The normally open auxiliary contacts of all the load sweeping circuit breakers and the seventh relay 15 are connected in series in the automatic loading control circuit of the load sweeping controller, and the normally open contact 15-1 of the seventh relay is connected to the distributed control system to transmit the on-off state of the normally open contact 15-1 of the seventh relay to the distributed control system so that the distributed control system can determine whether the automatic loading procedure is completed.

[0070] like Figure 4The automatic load control circuit shown has a certain regularity for the control structure of the load sweeping circuit breaker. The leftmost and rightmost parts of the circuit are overall control devices used to control the start and end of the automatic load-bearing program. The middle part is the local control circuit of the specific 6 load sweeping circuit breakers. The overall structure of the local control circuit is similar. In the automatic load-bearing sequence, the closing of the previous load sweeping circuit breaker triggers the closing of the next load sweeping circuit breaker, thereby completing the automatic load-bearing process.

[0071] The leftmost loop in the automatic load control circuit connects the normally closed contact 3-1 of the first circuit breaker, the normally open contact 4-1 of the second circuit breaker, the normally open contact 11-1 of the third relay and the sixth relay 14 in series, and the next left loop connects the eighth relay 16 of the first load sweeping circuit breaker and the normally open contact 14-1 of the sixth relay in series and then connects to the emergency bus 5. When the first circuit breaker 3 is disconnected and the voltage of the emergency bus 5 is normal, the sixth relay 14 is energized, the normally open contact 14-1 of the sixth relay is closed, the eighth relay 16 of the first load sweeping circuit breaker is energized, and the energized delayed closing contact 16-1 of the eighth relay of the first load sweeping circuit breaker is closed after 80s delay, the ninth relay 17 of the first load sweeping circuit breaker and the eighth relay 18 of the second load sweeping circuit breaker are energized, and the normally open contact 17-1 of the ninth relay of the first load sweeping circuit breaker drives the first load sweeping circuit breaker 7-1 to close. The energized delayed closing contact 18-1 of the eighth relay of the second load sweeping circuit breaker is closed after a delay of 20 seconds. After the first load sweeping circuit breaker 7-1 is closed, the normally open auxiliary contact 7-1-1 of the first load sweeping circuit breaker is closed, so that the ninth relay 19 of the second load sweeping circuit breaker and the eighth relay 20 of the third load sweeping circuit breaker are energized, and the normally open contact 19-1 of the ninth relay of the second load sweeping circuit breaker is driven to close after a delay of 20 seconds, thereby driving the second load sweeping circuit breaker to close. By analogy, a group of load sweeping circuit breakers are driven to close every 20 seconds until all 6 groups of load sweeping circuit breakers are successfully closed. At this time, the normally open contacts of the 6 groups of load sweeping circuit breakers connected in series on the far right of the above-mentioned control circuit are closed, that is, the normally open contacts 7-1-2 of the first load sweeping circuit breaker, the normally open contacts 7-2-2 of the second load sweeping circuit breaker, the normally open contacts 7-3-2 of the third load sweeping circuit breaker, the normally open contacts 7-4-2 of the fourth load sweeping circuit breaker, the normally open contacts 7-5-2 of the fifth load sweeping circuit breaker, and the normally open contacts 7-6-2 of the sixth load sweeping circuit breaker are all closed after the corresponding load sweeping circuit breaker 7 is loaded, so that the seventh relay 15 is energized, and the load indicator light 28 connected in parallel with the seventh relay 15 lights up to remind the operating personnel that the automatic loading of the load sweeping circuit breaker 7 is completed, the normally closed contact 15-1 of the seventh relay is disconnected, the load control circuit is disconnected, and the normally open contact 15-1 of the seventh relay is closed and sent to the distributed control system to issue a load completion indication.

[0072] In this embodiment, in the above process, the delay time of the eighth relay 16 of the first load sweeping circuit breaker in the order of the automatic loading procedure is 80s, which is greater than the delay time of the eighth relay of the other load sweeping circuit breakers in the order of the automatic loading procedure, which is 20s. In this way, the voltage on the emergency bus 5 can have sufficient time to maintain stability through the longer first delay time, and the loading process can be completed quickly and smoothly thereafter.

[0073] The high-temperature gas-cooled reactor of this embodiment adopts this power supply structure and control circuit to control the emergency AC power system. When the incoming line pressure loss signal is actually issued, the load sweeping circuit breaker is normally disconnected, the load sweeping function is executed, and the emergency diesel generator is automatically started smoothly and the manual load is correct. This invention optimizes the load sweeping control circuit, adds an automatic load function, and can better realize the automatic load logic after the diesel generator is started, reducing the workload of the operator in an emergency situation.

[0074] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A high temperature gas-cooled reactor power supply control circuit, It is characterized in that include: a first circuit breaker connected between the high-voltage bus and the emergency bus, and a reactor transformer is connected between the first circuit breaker and the high-voltage bus; the first circuit breaker is used to connect the passage between the high-voltage bus and the emergency bus under normal power supply conditions, and to disconnect the passage between the high-voltage bus and the emergency bus under abnormal power supply conditions; A second circuit breaker is connected between the emergency power supply and the emergency bus, and the second circuit breaker is used to connect the path between the emergency power supply and the emergency bus after the emergency power supply is started and reaches a preset voltage, wherein the emergency power supply is used to standby under normal power supply conditions, and start to generate electricity under abnormal power supply conditions; A load sweeping circuit breaker is connected between the emergency bus and the corresponding load, and is used to disconnect the path between the emergency bus and the corresponding load and execute the load sweeping procedure in the case of abnormal power supply, and to connect the paths between the emergency bus and the corresponding load one by one to complete the automatic load carrying procedure after the emergency power supply generates electricity; The first circuit breaker is configured with a first relay and a second relay; The first relay is a voltage relay, the first relay is connected to the high-voltage bus, and the normally closed contact of the first relay is connected in series with the second relay and then connected to the control circuit; The second relay is a power-on delay relay and has a first power-on delay closing contact. The first power-on delay closing contact is connected in series with the opening coil of the first circuit breaker and then connected to the control circuit.

2. The control circuit according to claim 1, It is characterized in that The first circuit breaker is further configured with a third relay, which is a voltage relay and is connected to the emergency bus.

3. The control circuit according to claim 2, It is characterized in that The second relay has a second power-on delayed closing contact, which is connected to the distributed control system and / or the emergency power supply to transmit the on / off state of the second power-on delayed closing contact to the distributed control system and / or the emergency power supply so that the distributed control system can determine whether the incoming power supply has lost voltage and / or the emergency power supply can determine whether it needs to be started.

4. The control circuit according to claim 3, It is characterized in that Each of the load sweeping circuit breakers is provided with a fourth relay and a fifth relay; The fourth relay is a voltage relay, the fourth relay is connected to the emergency bus, and the normally closed contact of the fourth relay is connected in series with the fifth relay and connected to the control circuit; The fifth relay is a power-on delay relay and has a third power-on delayed closing contact. The third power-on delayed closing contact is connected in series with the normally open auxiliary contact of the load sweeping circuit breaker and the opening coil of the load sweeping circuit breaker and is connected to the control circuit.

5. The control circuit according to claim 4, It is characterized in that The power-on delay time of the fifth relay is greater than the power-on delay time of the second relay.

6. The control circuit according to claim 4, It is characterized in that Also included is a sixth relay and a seventh relay; The normally closed contact of the first circuit breaker, the normally open contact of the second circuit breaker, the normally closed contact of the seventh relay and the sixth relay are connected in series and connected to a control circuit; Each of the load sweeping circuit breakers is equipped with an eighth relay and a ninth relay, wherein the eighth relay is a time-delay relay, the energized time-delay closing contact of the eighth relay is connected in series with the ninth relay and then connected in the control circuit, and the normally open contact of the ninth relay is connected in series with the corresponding normally closed auxiliary contact inside the load sweeping circuit breaker and the closing coil of the load sweeping circuit breaker and then connected in the control circuit; The eighth relay of the first load sweeping circuit breaker in the order of the automatic loading procedure is connected in series with the normally open contact of the sixth relay and then connected in the control loop; except for the first load sweeping circuit breaker, the eighth relay of the load sweeping circuit breaker in the order of the automatic loading procedure is connected in parallel with the ninth relay of the previous load sweeping circuit breaker, and the energized delayed closing contact of the eighth relay of the load sweeping circuit breaker, the normally open auxiliary contact of the previous load sweeping circuit breaker and the ninth relay of the load sweeping circuit breaker are connected in series and then connected in the control loop; All the normally open auxiliary contacts of the load sweeping circuit breakers and the seventh relay are connected in series to the emergency bus, and the normally open contacts of the seventh relay are connected to the distributed control system to transmit the on-off state of the normally open contacts of the seventh relay to the distributed control system so that the distributed control system can determine whether the automatic loading procedure is completed.

7. The control circuit according to claim 6, It is characterized in that The normally open contact of the third relay is connected in series with the sixth relay.

8. The control circuit according to claim 6, It is characterized in that The delay time of the eighth relay of the first load sweeping circuit breaker in the order of the automatic loading procedure is greater than the delay time of the eighth relays of other load sweeping circuit breakers in the order of the automatic loading procedure.

9. The control circuit according to any one of claims 1 to 8, It is characterized in that The control circuits of the first circuit breaker and the load sweeping circuit breaker are both provided with local remote transfer switches.