A method for constructing external piping for a cooling tower water distributor

By installing independent support frames on both sides of the cooling tower body, the problem of unstable support structure during the construction of external pipelines was solved, thereby improving the stability and safety of the cooling tower and simplifying the construction process.

CN117308675BActive Publication Date: 2026-11-17SHAANXI CONSTR ENG GRP NO 7 BUILDING ENG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311271487.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-28
Publication Date
2026-11-17
Estimated Expiration
2043-09-28

AI Technical Summary

Technical Problem

In the construction of existing external pipelines for cooling towers, the welding between the supporting structure and the cooling tower body is not firm, which can easily lead to welding defects and deformation, affecting the stability and safety of the supporting structure. Furthermore, the cooling tower body is unable to withstand multiple loads, resulting in increased construction costs and safety hazards.

Method used

Two support frames are installed on the front and rear sides of the cooling tower body to form an independent support system. The support frames are connected by pre-embedded steel plate support bases and diagonal support rods to reduce the load on the cooling tower body. The support frames are installed using a modular assembly process.

Benefits of technology

It improves the stability and safety of the cooling tower body, enhances the positioning accuracy of the external pipes of the water distributor, simplifies the construction process, and shortens the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117308675B_ABST
    Figure CN117308675B_ABST
Patent Text Reader

Abstract

This invention discloses a construction method for external piping of a cooling tower water distributor. The method includes: 1. constructing the cooling tower installation foundation; 2. sequentially hoisting multiple cooling tower bodies onto at least two foundation walls; 3. installing two support frames on the front and rear sides of each cooling tower body to support the external piping of the water distributor; 4. constructing the external piping. This invention, by installing two support frames on the front and rear sides of each cooling tower body to support the external piping, forms a separate support system for the external piping, independent of the cooling tower body. The external piping does not need to be installed on the cooling tower body, reducing the load on the cooling tower body, improving its stability and safety, enhancing the positioning accuracy of the external piping, simplifying the construction process, and shortening the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of building construction technology, specifically relating to a method for constructing external pipelines for cooling tower water distributors. Background Technology

[0002] Currently, there are two methods for connecting cooling towers to external pipelines: internal connection and external connection. Internal connection involves pre-installing the interfaces of the water distributors within the cooling tower at the factory, with flanged access ports pre-installed on the side walls of the cooling tower. External connection involves directly connecting external pipelines to the water distributor interfaces of the cooling tower. External connection is implemented later when connecting external pipelines, without considering the supporting structure for the external pipelines. Typically, when installing external pipelines horizontally on the sides and top of the cooling tower, a welded support structure is used. This type of support structure has the following drawbacks during actual construction: 1. Due to the small weldable thickness between the support structure and the cooling tower body, the weld surface is often weak, and defects such as weld beads and pitting are prone to appear around the welded parts. After the external pipelines are installed, the support structure is easily deformed, directly affecting its stability and safety. 2. The load that the cooling tower body must bear includes the load of the cooling tower body itself, the load of the external pipelines, and the operating load. The cooling tower body is unable to withstand numerous loads, reducing its stability and service life, and is also detrimental to the operation and maintenance of the cooling tower body and external pipelines. Furthermore, the stress-bearing parts of the external frame and supporting structure of the cooling tower body are inconsistent, and their stress states also differ. Therefore, when constructing external pipelines on the sides and top of the cooling tower body, deviations often occur in the determined connection points of the supporting components and pipelines. This leads to repeated procedures during later pipeline installation, increasing construction costs. When using the main keel of the external frame of the cooling tower body to position the supporting structure, the keel thickness is only 3mm, while the diameter of the external pipelines is generally over 400mm. Therefore, when the cooling water system pipelines are connected to the cooling tower equipment, the cooling tower body cannot withstand the load of the external pipelines. During operation, the connection between the cooling tower body and the external pipelines is prone to safety hazards, affecting system operation. Therefore, a construction method for connecting external pipelines to the cooling tower water distributor should be provided that is easy to construct and reliably installed. Summary of the Invention

[0003] The technical problem to be solved by this invention is to address the shortcomings of the prior art by providing a construction method for the external pipeline of a cooling tower water distributor. This method is rationally designed and easy to construct. By installing two support frames on the front and rear sides of the cooling tower body to support the external pipeline of the water distributor, the two support frames form an independent support system for the external pipeline outside the cooling tower body. The external pipeline does not need to be installed on the cooling tower body, reducing the load on the cooling tower body, improving its stability and safety, enhancing the positioning accuracy of the external pipeline, simplifying the construction process, and helping to shorten the construction period.

[0004] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows:

[0005] Compared with the prior art, the present invention has the following advantages:

[0006] 1. In the process of constructing the cooling tower foundation, the present invention embeds steel plate support bases on both the foundation base plate and the foundation wall. The steel plate support bases are equipped with pre-embedded bolts, and the bottom ends of the pre-embedded bolts are hook-shaped. This helps to improve the anchoring strength of the steel plate support bases in the foundation base plate or foundation wall. In actual installation, multiple steel plate support bases can provide a reliable connection platform for the first rectangular vertical frame and the second rectangular vertical frame, which helps to improve the convenience and firmness of the connection between the support frame and the cooling tower installation foundation.

[0007] 2. This invention installs two support frames on the front and rear sides of the cooling tower body to support the external pipes of the water distributor. The two support frames form an independent support system for the external pipes of the water distributor on the outside of the cooling tower body. The external pipes of the water distributor do not need to be installed on the cooling tower body, which reduces the load on the cooling tower body, helps to improve the stability and safety of the cooling tower body, and improves the positioning accuracy of the external pipes of the water distributor.

[0008] 3. The support frame of the present invention includes a first rectangular vertical frame, a second rectangular vertical frame, and diagonal support rods. In actual installation, the first rectangular vertical frame is installed on the foundation plate, and the second rectangular vertical frame is installed on at least two foundation walls. The first rectangular vertical frame and the second rectangular vertical frame are connected as one unit by the diagonal support rods. Since the height of the first rectangular vertical frame is lower than the height of the second rectangular vertical frame, the support frame has a staggered structure on the outside of the cooling tower body, which helps to enhance the stability of the support frame.

[0009] 4. This invention connects the bottom horizontal pipe to the first rectangular vertical frame, so that the first rectangular vertical frame supports the bottom horizontal pipe. The vertical riser is connected to the second rectangular vertical frame, so that the second rectangular vertical frame supports the vertical riser. The top horizontal pipe is erected at the top of the two second rectangular vertical frames. That is, the two support frames of the second rectangular vertical frame together support multiple top horizontal pipes. The support frame and the external pipe of the water distributor are easy to connect and the connection is reliable.

[0010] In summary, the present invention is reasonably designed. By installing two support frames on the front and rear sides of the cooling tower body to support the external pipes of the water distributor, the two support frames form an independent support system for the external pipes of the water distributor on the outside of the cooling tower body. The external pipes of the water distributor do not need to be installed on the cooling tower body, which reduces the load on the cooling tower body, helps to improve the stability and safety of the cooling tower body, improves the positioning accuracy of the external pipes of the water distributor, simplifies the construction process, and helps to shorten the construction period.

[0011] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. Attached Figure Description

[0012] Figure 1 This is a flowchart of the present invention.

[0013] Figure 2 This is a schematic diagram of the structure of the present invention.

[0014] Figure 3 This is a schematic diagram showing the connection relationship between the support frame and the cooling tower installation foundation of the present invention.

[0015] Figure 4 This is a schematic diagram of the steel plate support base of the present invention.

[0016] Figure 5 This is a schematic diagram of the connection assembly with a U-shaped pipe clamp according to the present invention.

[0017] Figure 6 This is a schematic diagram of the connection assembly with two U-shaped pipe clamps of the present invention.

[0018] Explanation of reference numerals in the attached figures:

[0019] 1-1—Foundation slab; 1-2—Foundation walls; 1-3—Foundation beams;

[0020] 2-1—Cooling tower body; 2-2—Cooling tower cylinder; 3-1—Vertical riser;

[0021] 3-2—Top horizontal pipe; 3-3—Water distribution pipe; 3-4—Bottom horizontal pipe;

[0022] 4-1—First horizontal bar; 4-2—Second vertical bar; 4-3—First T-shaped connector;

[0023] 4-4—First cross connector; 5-1—Second horizontal bar; 5-2—Second vertical bar;

[0024] 5-3—Second T-shaped connector; 5-4—Second cross connector; 5-5—Right-angle connector;

[0025] 6—Diagonal bracing rod; 7—Steel plate support base; 7-1—Embedded bolts;

[0026] 8—Connecting components; 8-1—Channel steel fixing bracket; 8-2—U-shaped pipe clamp;

[0027] 8-3—T-shaped connector; 8-4—Fixing plate. Detailed Implementation

[0028] like Figure 1 , Figure 2 and Figure 3 The method shown is a construction method for external piping of a cooling tower water distributor, which includes the following steps:

[0029] Step 1: Construct the foundation for the cooling tower installation.

[0030] The cooling tower installation foundation includes a foundation base plate 1-1 and at least two foundation walls 1-2 that are equally spaced and vertically arranged on the foundation base plate 1-1, and a foundation beam 1-3 is provided between two adjacent foundation walls 1-2.

[0031] When constructing the cooling tower installation foundation, the site is positioned according to the BIM design, and the location of each support point is determined according to the direction of the external pipe of the water distributor. Steel plate support bases 7 are pre-embedded on the foundation base plate 1-1 and the foundation wall 1-2 according to each support point.

[0032] In this embodiment, during the construction of the cooling tower foundation, steel plate support bases 7 are pre-embedded on both the foundation base plate 1-1 and the foundation wall 1-2. The steel plate support bases 7 are equipped with pre-embedded bolts 7-1, and the bottom end of the pre-embedded bolts 7-1 is hook-shaped, which helps to improve the anchoring strength of the steel plate support bases 7 in the foundation base plate 1-1 or the foundation wall 1-2. In actual installation, multiple steel plate support bases 7 can provide a reliable connection platform for the first rectangular vertical frame and the second rectangular vertical frame, which helps to improve the convenience and firmness of the connection between the support frame and the cooling tower installation foundation.

[0033] Step 2: Hoist multiple cooling tower bodies 2-1 in sequence, so that the multiple cooling tower bodies 2-1 are installed on at least two of the foundation walls 1-2 in sequence;

[0034] Step 3: Install two support frames on the front and rear sides of the cooling tower body 2-1 to support the external pipes of the water distributor:

[0035] The support frame includes a first rectangular vertical frame installed on the foundation slab 1-1, a second rectangular vertical frame installed on at least two foundation walls 1-2, and a diagonal bracing rod 6 for connecting the first and second rectangular vertical frames; the specific construction process is as follows:

[0036] Step 301: Install the first rectangular vertical frame onto the foundation plate 1-1;

[0037] Step 302: Install the second rectangular vertical frame on at least two foundation walls 1-2;

[0038] Step 303: Install the diagonal support rod 6 between the first rectangular vertical frame and the second rectangular vertical frame;

[0039] In this embodiment, by installing two support frames on the front and rear sides of the cooling tower body 2-1 respectively to support the external pipes of the water distributor, the two support frames form a support system for the external pipes of the water distributor on the outside of the cooling tower body 2-1, which is independent of the cooling tower body 2-1. The external pipes of the water distributor do not need to be installed on the cooling tower body 2-1, which reduces the load borne by the cooling tower body 2-1, helps to improve the stability and safety of the cooling tower body 2-1, and improves the positioning accuracy of the external pipes of the water distributor.

[0040] In this embodiment, the support frame includes a first rectangular vertical frame, a second rectangular vertical frame, and a diagonal support rod 6. During actual installation, the first rectangular vertical frame is installed on the foundation plate 1-1, and the second rectangular vertical frame is installed on at least two foundation walls 1-2. The first rectangular vertical frame and the second rectangular vertical frame are connected as one unit by the diagonal support rod 6. Since the height of the first rectangular vertical frame is lower than the height of the second rectangular vertical frame, the support frame has a staggered structure on the outside of the cooling tower body 2-1, which helps to enhance the stability of the support frame.

[0041] Step 4: Connect the external pipes to the water distributor:

[0042] The external piping of the water distributor includes a vertical riser 3-1 vertically installed on the front side of the cooling tower body 2-1, a top horizontal pipe 3-2 connected to the top of the vertical riser 3-1, and a water distribution pipe 3-3 connected to the top horizontal pipe 3-2. The bottom end of the vertical riser 3-1 is connected to the bottom horizontal pipe 3-4. The specific construction process is as follows:

[0043] Step 401: Connect the bottom horizontal pipe 3-4 to the first rectangular vertical frame, connect the bottom end of the vertical riser 3-1 to the bottom horizontal pipe 3-4, and connect the vertical riser 3-1 to the second rectangular vertical frame;

[0044] Step 402: Connect the top horizontal pipe 3-2 to the top of the vertical riser 3-1, and erect the top horizontal pipe 3-2 on the top of the two second rectangular vertical frames;

[0045] Step 403: Connect multiple water distribution pipes 3-3 to the top horizontal pipe 3-2.

[0046] In this embodiment, by connecting the bottom horizontal pipe 3-4 to the first rectangular vertical frame, the first rectangular vertical frame serves to support the bottom horizontal pipe 3-4. The vertical riser 3-1 is connected to the second rectangular vertical frame, so that the second rectangular vertical frame serves to support the vertical riser 3-1. The top horizontal pipe 3-2 is erected at the top of the two second rectangular vertical frames. That is, the two support frames of the second rectangular vertical frame together serve to support multiple top horizontal pipes 3-2. The support frame and the external pipe of the water distributor are easy to connect and the connection is reliable.

[0047] In this embodiment, a cooling tower cylinder 2-2 is provided on the top of the cooling tower body 2-1, and the top horizontal pipe 3-2 and multiple water distribution pipes 3-3 are located on the periphery of the cooling tower cylinder 2-2.

[0048] like Figure 2 and Figure 3 As shown, in this embodiment, the first rectangular vertical frame includes a bottom horizontal bar and a top horizontal bar arranged in parallel, and a plurality of first vertical bars 4-2 vertically connected between the bottom horizontal bar and the top horizontal bar. The bottom horizontal bar and the top horizontal bar are both composed of a plurality of first horizontal bars 4-1 connected in sequence. The first horizontal bars 4-1 connected in a right angle or T-shape are connected to the first vertical bars 4-2 by a first T-shaped connector 4-3. The first horizontal bars 4-1 connected in a cross shape are connected to the first vertical bars 4-2 by a first cross connector 4-4.

[0049] In this embodiment, compared with the traditional welding process for the support structure of the external pipe of the water distributor, the first rectangular vertical frame adopts a modular assembly process, which avoids the welding construction of the support structure of the external pipe of the water distributor on the construction site.

[0050] like Figure 2 and Figure 3 As shown, in this embodiment, in step 301, when the first rectangular vertical frame is installed on the foundation plate 1-1, the sum of the number of the first T-shaped connectors 4-3 and the first cross connectors 4-4 located on the bottom horizontal bar is equal to the number of steel plate support bases 7 pre-embedded on the foundation plate 1-1, and they are connected one-to-one.

[0051] like Figure 2 and Figure 3 As shown, in this embodiment, the second rectangular vertical frame includes parallel bottom support rods, top support rods, and at least two middle support rods. The bottom support rods, the middle support rods, and the top support rods are connected by multiple vertical support rods arranged at intervals. The bottom support rods, the middle support rods, and the top support rods are all composed of multiple second horizontal rods 5-1 connected in sequence. The vertical support rods are composed of multiple second vertical rods 5-2 connected in sequence. The second horizontal rods 5-1 and the second vertical rods 5-2 are connected by right-angle connectors 5-5, second T-shaped connectors 5-3, or second cross connectors 5-4. The number of vertical support rods is equal to the number of the foundation walls 1-2.

[0052] In actual construction, both the first and second rectangular vertical frames were prefabricated and assembled. After prefabrication and assembly, they were transported to the construction site for on-site installation. The construction process is simple and helps to shorten the construction period.

[0053] like Figure 2 and Figure 3 As shown, in this embodiment, the vertical riser 3-1 and the second vertical rod 5-2 are fixedly connected by a connecting assembly 8. The connecting assembly includes a channel steel fixing frame 8-1 horizontally installed on the second vertical rod 5-2 and a U-shaped pipe clamp 8-2 installed on the channel steel fixing frame 8-1 for clamping the vertical riser 3-1.

[0054] like Figure 2 and Figure 5 As shown, during actual construction, when there is one vertical riser 3-1 that needs to be connected to the second vertical rod 5-2, the number of U-shaped pipe clamps 8-2 of the connecting assembly is one.

[0055] like Figure 2 and Figure 6As shown, during actual construction, when two adjacent vertical risers 3-1 need to be installed on the same second vertical rod 5-2 at the same time, it is necessary to extend the length of the channel steel fixing frame 8-1 and install two U-shaped pipe clamps 8-2 on the channel steel fixing frame 8-1. The distance between the two U-shaped pipe clamps 8-2 is equal to the distance between the two adjacent vertical risers 3-1.

[0056] In this embodiment, the opening of the channel steel fixing frame 8-1 faces downward, the channel steel fixing frame 8-1 is welded to the fixing plate 8-4, the fixing plate 8-4 is installed on the T-shaped connector 8-3, and the T-shaped connector 8-3 is installed on the second vertical rod 5-2.

[0057] like Figure 2 and Figure 3 As shown, in this embodiment, in step 302, when the second rectangular vertical frame is installed on at least two foundation walls 1-2, the second T-shaped connector 5-3 and the second cross connector 5-4 located on the bottom support rod are respectively connected to the multiple steel plate support bases 7 pre-embedded on the foundation walls 1-2.

[0058] The above description is merely a preferred embodiment of the present invention and does not constitute any limitation on the present invention. Any simple modifications, alterations, or equivalent structural changes made to the above embodiments based on the technical essence of the present invention shall still fall within the protection scope of the present invention.

Claims

1. A cooling tower distributor external piping construction method, characterized by: The construction method includes the following steps: Step 1: Construct the foundation for the cooling tower installation. The cooling tower installation foundation includes a foundation base plate (1-1) and at least two foundation walls (1-2) that are equally spaced and vertically arranged on the foundation base plate (1-1), and a foundation beam (1-3) is provided between two adjacent foundation walls (1-2); When constructing the cooling tower installation foundation, the site is positioned according to the BIM design, and the location of each support point is determined according to the direction of the external pipe of the water distributor. Steel plate support bases (7) are pre-embedded on the foundation base plate (1-1) and the foundation wall (1-2) according to each support point. Step 2: Hoist multiple cooling tower bodies (2-1) in sequence, so that the multiple cooling tower bodies (2-1) are installed on at least two of the foundation walls (1-2); Step 3: Install two support frames on the front and rear sides of the cooling tower body (2-1) respectively to support the external pipes of the water distributor: The support frame includes a first rectangular vertical frame installed on the foundation slab (1-1), a second rectangular vertical frame installed on at least two foundation walls (1-2), and a diagonal bracing rod (6) for connecting the first rectangular vertical frame and the second rectangular vertical frame; the specific construction process is as follows: Step 301: Install the first rectangular vertical frame on the foundation plate (1-1); Step 302: Install the second rectangular vertical frame on at least two foundation walls (1-2); Step 303: Install a diagonal bracing rod (6) between the first rectangular vertical frame and the second rectangular vertical frame; Step 4: Connect the external pipes to the water distributor: The external piping of the water distributor includes a vertical riser (3-1) vertically installed on the front side of the cooling tower body (2-1), a top horizontal pipe (3-2) connected to the top of the vertical riser (3-1), and a water distribution pipe (3-3) connected to the top horizontal pipe (3-2). The bottom end of the vertical riser (3-1) is connected to the bottom horizontal pipe (3-4). The specific construction process is as follows: Step 401: Connect the bottom horizontal pipe (3-4) to the first rectangular vertical frame, connect the bottom end of the vertical riser (3-1) to the bottom horizontal pipe (3-4), and connect the vertical riser (3-1) to the second rectangular vertical frame; Step 402: Connect the top horizontal pipe (3-2) to the top of the vertical riser (3-1), and erect the top horizontal pipe (3-2) on the top of the two second rectangular vertical frames; Step 403: Connect multiple water distribution pipes (3-3) to the top horizontal pipe (3-2).

2. The construction method for the external pipeline of a cooling tower water distributor according to claim 1, characterized in that: The first rectangular vertical frame includes a bottom horizontal bar and a top horizontal bar arranged in parallel, and a plurality of first vertical bars (4-2) vertically connected between the bottom horizontal bar and the top horizontal bar. The bottom horizontal bar and the top horizontal bar are both composed of a plurality of first horizontal bars (4-1) connected in sequence. The first horizontal bars (4-1) connected in a right angle or T-shape are connected to the first vertical bars (4-2) by a first T-shaped connector (4-3). The first horizontal bars (4-1) connected in a cross shape are connected to the first vertical bars (4-2) by a first cross connector (4-4).

3. The construction method for the external pipeline of a cooling tower water distributor according to claim 2, characterized in that: In step 301, when the first rectangular vertical frame is installed on the foundation plate (1-1), the sum of the number of the first T-shaped connectors (4-3) and the first cross connectors (4-4) located on the bottom horizontal bar is equal to the number of the steel plate support bases (7) pre-embedded on the foundation plate (1-1), and they are connected one by one.

4. The construction method for the external pipeline of a cooling tower water distributor according to claim 1, characterized in that: The second rectangular vertical frame includes parallel bottom support rods, top support rods, and at least two middle support rods. The bottom support rods, the middle support rods, and the top support rods are connected by multiple vertical support rods arranged at intervals. The bottom support rods, the middle support rods, and the top support rods are all composed of multiple second horizontal rods (5-1) connected in sequence. The vertical support rods are composed of multiple second vertical rods (5-2) connected in sequence. The second horizontal rods (5-1) and the second vertical rods (5-2) are connected by right-angle connectors (5-5), second T-shaped connectors (5-3), or second cross connectors (5-4). The number of vertical support rods is equal to the number of foundation walls (1-2).

5. A method for constructing an external pipeline for a cooling tower water distributor according to claim 4, characterized in that: The vertical riser (3-1) and the second vertical rod (5-2) are fixedly connected by a connecting assembly (8). The connecting assembly includes a channel steel fixing frame (8-1) horizontally installed on the second vertical rod (5-2) and a U-shaped pipe clamp (8-2) installed on the channel steel fixing frame (8-1) for clamping the vertical riser (3-1).

6. A method for constructing an external pipeline for a cooling tower water distributor according to claim 5, characterized in that: The number of the U-shaped pipe clamps (8-2) is one or two.

7. A method for constructing external pipelines for a cooling tower water distributor according to claim 4, characterized in that: Step 302: When the second rectangular vertical frame is installed on at least two foundation walls (1-2), the second T-shaped connector (5-3) and the second cross connector (5-4) located on the bottom support rod are respectively connected to the multiple steel plate support bases (7) pre-embedded on the foundation wall (1-2).

Citation Information

Patent Citations

  • Installation mechanism and installation method for roof cooling tower section steel foundation

    CN109184229A

  • Integral lifting construction method for cooling tower system and steel gallery

    CN109208915A