Assessment methods that isolate the impacts of human activities and climate change on flood peak timing
By using a dynamic von Mises model and linear regression, the uncertainty of the timing of flood peaks in existing technologies has been addressed, enabling quantitative assessment and separation of the impacts of climate change and human activities, and providing a reliable quantitative attribution method.
Patent Information
- Application Number
- CN202311373093.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-23
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-10-23
AI Technical Summary
Existing risk attribution methods have uncertainties in assessing the impact of flood peak timing, making it difficult to effectively separate the impacts of climate change and human activities, and failing to achieve quantitative attribution.
An assessment method based on a dynamic von Mises model was adopted. By processing the flood peak extreme value sequence through ringing, the peak shape characteristics were determined, a dynamic von Mises distribution model was constructed, and the slope comparison method of linear regression was used to attribute and decouple human activities from climate change.
It enables quantitative attribution and de-identification of the impact of flood peak timing, reduces the uncertainty of traditional methods, provides reliable model support, and can quantify the degree of influence of different factors.
Smart Images

Figure CN117314170B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of flood and drought disasters, and in particular to an assessment method that isolates the impact of human activities and climate change on the timing of flood peaks. Background Technology
[0002] Under the dual influence of climate change and human activities, global climate patterns and hydrological processes are undergoing subtle changes, significantly increasing the frequency and intensity of floods and droughts. Effectively understanding the trends in the timing of flood peaks, both earlier and later, is crucial for flood warning and disaster prevention and mitigation, enabling emergency management departments to take timely measures to address flood hazards. However, determining the quantitative extent to which human activities and climate change, as driving factors of floods, affect flood peak timing requires reliable data supported by robust quantitative techniques.
[0003] As a popular risk attribution method in the field of climate change, the fraction of attributable risk (FAR) method has been gradually applied to the risk attribution of extreme hydrological and meteorological events. However, this method relies heavily on global climate model (GCM) simulations, and considering the significant differences between different climate models, the final risk attribution results are subject to considerable uncertainty. Furthermore, risk attribution methods can only capture the impact of human activities on extreme hydrological and meteorological events and cannot separate the influence of multiple factors. Summary of the Invention
[0004] Purpose of the invention: This invention aims to propose a quantitative assessment method based on the dynamic von Mises model to separate the impact of human activities and climate change on flood peak time, thereby achieving quantitative attribution and separation of the impact of different influencing factors on flood peak time.
[0005] Technical solution: The assessment method for separating the impacts of human activities and climate change on flood peak timing as described in this invention includes the following steps:
[0006] (1) Perform circular processing on the sequence of extreme values of flood peaks;
[0007] (2) Determine the peak shape characteristics; obtain the empirical probability density fitting curve based on the ring-shaped peak sequence, and determine the peak shape characteristics through the visualization analysis of the empirical probability density curve;
[0008] (3) Construct a dynamic von Mises distribution model and determine the dynamic von Mises model with the highest station peak sequence matching degree;
[0009] (4) Attribution and separation of human activities and climate change based on the slope comparison method of linear regression.
[0010] Furthermore, the ring-shaped process is as follows:
[0011]
[0012] In the formula, o i x is the ordinal value corresponding to the date of the maximum daily runoff during the flood season of year i; i o i The data after ringing; L is the length of the flood season.
[0013] Furthermore, in step (3), the probability density function f of the dynamic von Mises distribution model is constructed. X (x):
[0014]
[0015] 0 ≤ x ≤ 2π; 0 ≤ μ i (t)≤2π;κ i (t)≥0;0≤α i (t)≤1
[0016] In the formula, M represents the number of von Mises distributions established based on peak shape characteristics; α i (t) represents the weighting coefficients for each von Mises distribution, α i (t) is a positive number and the sum is 1; μ i (t) is the direction parameter; κ i (t) are lumped parameters; I o t represents the modified zeroth-order Bessel function; t is time, in years.
[0017] Furthermore, based on the non-stationarity of trends caused by climate change and human activities, the directional parameter μ i (t), lumped parameter κ i (t), weighting coefficient α i (t) is as follows:
[0018]
[0019] In the formula, For the parameter to be estimated, COV t This represents a sequence of physical covariates related to climate change and human activities that change over time.
[0020] Furthermore, the method for determining the dynamic von Mises model with the highest station peak sequence matching degree is as follows: first, the trend non-stationary features of the model are identified by the maximum likelihood ratio method, and then the optimal non-stationary model is determined based on the Akaike information criterion.
[0021] Furthermore, the maximum likelihood ratio method is used to identify the trend-related non-stationary characteristics of the model, and the corresponding log-likelihood ratio statistic D is obtained through the log-likelihood ratio test (LR). LR :
[0022]
[0023] In the formula, and represent the log-likelihood values obtained by the maximum likelihood method based on non-stationary and stationary models, respectively; DvM0 represents a stationary DvM model, while DvM... phy This represents a time-varying, non-stationary von Mises model; while the statistic D LR Follows a chi-square distribution with 1 degree of freedom; if D LR If the threshold of the chi-square distribution is greater than or equal to the threshold, then the non-stationary model DvM... phy The model outperforms the stationary DvM0 model; if the non-stationary model DvM... phy The LR test was passed, confirming the existence of trend-type non-stationary characteristics.
[0024] Furthermore, the method for determining the optimal non-stationary model based on the Akaike information criterion, for non-stationary DvM models that pass the LR test... phy The optimal model is determined based on the AIC minimization criterion.
[0025] AIC=2k-2ln(LL) (5)
[0026] In the formula, k represents the number of parameters in the model; LL represents the likelihood function value of the model.
[0027] Furthermore, in step (4), in order to quantify and separate the impacts of human activities and climate change on the timing of flood peaks, three dynamic von Mises distribution models are used: the DvM model considering human activities. hac Models that consider climate change (DvM) cli And a model that takes both into account, DvM hac+cli .
[0028] Furthermore, the attribution and decoupling of human activities and climate change based on the slope comparison method of linear regression includes the following steps:
[0029] (41) Based on the intensity of human activities in different historical development periods, the high-speed development period and the low-speed development period are divided. The three dynamic von Mises distribution models for the high / low-speed development periods are solved to obtain the theoretical quantile values of 50%, 65% and 85%.
[0030] (42) Quantify the impact of human activities on the timing of flood peaks, based on the DvM of each year. cli and DvMhac+cli The quantile values were used to fit the first linear regression line; similarly, the impact of climate change factors on the flood peak time was quantified to fit the DvM. hac and DvM hac+cli The quantile values yield the second linear regression line;
[0031] (43) Calculate the impact of human activities and climate change on the timing of flood peaks based on the slope values of the first / second linear regression lines.
[0032] Furthermore, the impacts of human activities and climate change on the timing of flood peaks:
[0033]
[0034]
[0035] In the formula, IFT hac IFT cli To study the impact of climate change on the timing of flood peaks, SL hac SL is the slope of the first linear regression line. cli The slope of the second linear regression line; if IFT hac or IFT cli A value greater than 0 indicates that human activities or climate change have caused a delay in the timing of the flood peak, i.e., a delay effect; if IFT hac or IFT cli A value less than 0 indicates that human activities or climate change have led to an earlier occurrence of the flood peak, i.e., an earlier peak effect.
[0036] Beneficial Effects: Compared with existing technologies, the significant advantages of this invention are: 1. This invention proposes a quantitative assessment method based on a dynamic von Mises model to isolate the impacts of climate change and human activities on flood peak time. This method effectively solves the uncertainty problem of traditional risk attribution methods (FAR) in attributing flood and drought disaster risks, and can also construct the synergistic relationship between flood peak time and climate change and human activity factors into the dynamic von Mises model, providing reliable model support for subsequent quantitative attribution based on the slope comparison method of linear regression; 2. This invention proposes for the first time a slope comparison method based on linear regression, comparing and analyzing the quantile differences among various dynamic models, and realizing the quantitative attribution and isolation of the impacts of different human activities and climate change on flood peak time; 3. This invention uses historical observation data for attribution analysis, effectively overcoming the large uncertainty problem caused by traditional risk attribution methods based on model prediction data. Attached Figure Description
[0037] Figure 1 This is a schematic diagram of the process in this invention;
[0038] Figure 2 Empirical probability density maps for each hydrological station;
[0039] Figure 3 The results of quantitative attribution analysis for Bengbu Station;
[0040] Figure 4 The results of quantitative attribution analysis for Wangjiaba Station;
[0041] Figure 5 The results of quantitative attribution analysis for the Lutai substation. Detailed Implementation
[0042] The invention will now be further described with reference to the accompanying drawings.
[0043] To facilitate understanding of this invention, the traditional risk attribution method (FAR) in the field of climate change will first be explained as follows:
[0044] First, we assume that the circular peak-time series follows a von Mises distribution. To determine the contribution of human activity to the risk of peak occurrence, we compare the probability of the observed maximum peak occurring in the ALL forced-pattern dataset with its probability of occurring in the NAT forced-pattern dataset. The specific formula is as follows:
[0045]
[0046]
[0047] In the formula, F ALL and F NAT , respectively, represent the probabilities of the events observed in the ALL-forced and NAT-forced simulations. The FAR calculated in equations (1) and (2) FT and RI FT These methods can all serve as quantitative representations of the impact of human activities on peak timing. However, the impact of climate change on peak timing cannot be obtained. Furthermore, significant differences exist among various global climate model (GCM) datasets, greatly exacerbating the uncertainty of results obtained using risk attribution methods.
[0048] like Figure 1 As shown, the assessment method for separating the impacts of human activities and climate change on flood peak timing according to the present invention includes the following steps:
[0049] (1) Ringing of flood peak extreme value sequence
[0050] Suppose that the time series of flood peaks over N years is defined as: O = {o1, o2, ..., o} N Next, a circular transformation is performed on the flood peak time series:
[0051]
[0052] In the formula o i This is the ordinal value corresponding to the date of the maximum daily runoff during the flood season of year i; L is the length of the flood season; for example, the flood season in the Huai River basin is generally from June to September, so for the Huai River basin, L = 122. The original sequence O = {o1, o2, ..., o...} N Transform the data into circular data X = {x1, x2, ..., x} N}
[0053] (2) Determine the peak shape of the observed flood peak sequence.
[0054] Histograms and empirical probability density curves were plotted on the circular peak sequence, and the peak shape characteristics were determined through visualization analysis of the empirical probability density curves. The peak shape characteristics can be used to determine the number (M) of mixed von Mises distributions in subsequent steps.
[0055] (3) Construction of dynamic von Mises model
[0056] Consider the following dynamic von Mises distribution model with variable parameters as the basis for quantitative attribution analysis. The probability density function of the dynamic von Mises distribution model is as follows:
[0057]
[0058] 0 ≤ x ≤ 2π; 0 ≤ μ i (t)≤2π;κ i (t)≥0;0≤α i (t)≤1
[0059] In the formula, M represents the number of von Mises distributions that can be determined through the empirical density plot of the peak time series in step (2); α i (t) represents the weight coefficients for each von Mises distribution, with the weight parameter α. i (t) is positive for all i and the sum is 1; μ i (t) represents the direction parameter, while κ i (t) is then used as a lumped parameter; I o The function is the modified zero-order Bessel function; t is time, and this scheme is based on years, so the unit is years.
[0060] To find the dynamic von Mises model that best matches the peak sequence obtained for each site, the following three steps are required for model optimization:
[0061] (31) In order to consider the non-stationarity of trends caused by climate change and human activities, it is assumed that the three model parameters involved in formula (2) are linearly correlated with climate change and human activities. Therefore, the parameter structure of the dynamic von Mises distribution model needs to be assumed:
[0062]
[0063] In the formula, For the new parameter to be estimated. COV t This represents a time-varying sequence of physical covariates related to climate change and human activities. Considering μ... i (t), κ i (t) and α i (t) The parameter ranges of the three parameters are respectively, so in formula (3) they are respectively in Different constraint functions were added previously so that the linear relationship introduced into the parameter structure would not change the interval requirements of the parameters. Based on formula (3), various dynamic von Mises model structures can be considered.
[0064] (32) Identifying trend and nonstationary features of the model using the maximum likelihood ratio method
[0065] Assume that DvM0 represents a stationary DvM model, while DvM phy This represents a time-varying, non-stationary von Mises model. The log-likelihood ratio test (LR) yields the corresponding log-likelihood ratio statistic D. LR It can be calculated as follows:
[0066]
[0067] in and These are the log-likelihood values obtained using the maximum likelihood method based on non-stationary and stationary models, respectively. The statistic D... LR It follows a chi-square distribution with 1 degree of freedom. At a significance level of 5%, the threshold for the chi-square distribution is 3.84. If D... LR ≥3.84 indicates a potential DVM phy The model outperforms the stationary DvM0 model. On the other hand, if the non-stationary DvM0 model... phy The LR test was passed, confirming the existence of trend-type non-stationary characteristics.
[0068] (33) Optimization of nonstationary models based on Akaike information criterion
[0069] For the non-stationary DvM that passes the LR test in step (32) phy The optimal model will ultimately be determined based on the AIC minimization criterion.
[0070] AIC=2k-2ln(LL) (7)
[0071] In the formula, k represents the number of parameters in the model; LL represents the likelihood function value of the model.
[0072] (4) Attribution and stripping of potential factors based on the slope comparison method of linear regression.
[0073] To quantify and separate the impacts of human activities and climate change on flood peak timing, we consider three dynamic von Mises models in this section (defined as DvM considering human activities). hac The definition considering climate change is DvM cli Taking both into account, DvM is the best choice. hac+cli ).
[0074] (41) Considering the different intensities of human activity in different historical development periods, a high-speed development period and a low-speed development period are divided. Then, the theoretical quantile sequences of 50%, 65%, and 85% obtained from the above three models are solved for different historical development periods;
[0075] (42) To quantify the impact of human activities on flood peak time, DvM cli The 50%, 65%, and 85% quantiles for each year are used as the x-axis, while DvM hac+cli The 50%, 65%, and 85% quantiles for each year are used as the y-axis. A linear regression line can then be fitted between the two models based on the scatter plots of their quantile sequences. Similarly, to obtain the impact of climate change factors on the timing of flood peaks, DvM... hac The 50%, 65%, and 85% quantiles for each year are used as the x-axis, while DvM hac+cli The 50%, 65%, and 85% quantiles for each year are used as the y-axis. A linear regression line can then be fitted between the two models based on the scatter plots of their quantile sequences.
[0076] (43) Based on the two linear regression models above, the corresponding slope values (SL) can be obtained. hac and SL cli Therefore, the impact of human activities and climate change on flood peak time (IFT) can be calculated using the following methods. hac and IFT cli ):
[0077]
[0078]
[0079] If human activity or climate change has no impact on the timing of flood peaks, the slope values obtained for both should be equal to 1.
[0080] In reality, due to the effects of human activities and climate change, the slope is not equal to 1. Therefore, we can quantify the impact of human activities and climate change on peak timing using formulas (6) and (7). If IFT hac or IFT cli A value greater than 0 indicates that human activities or climate change have caused a delay in the timing of the flood peak (i.e., a delay effect). If IFT hac or LFT cli A value less than 0 indicates that human activities or climate change have led to an earlier occurrence of the flood peak (i.e., the earlier effect).
[0081] To effectively verify the effectiveness of the quantitative attribution and decoupling method for the impact of flood peak time proposed in this paper, the following examples are needed to provide evidence.
[0082] This study focuses on the daily flood peak sequence at four hydrological stations in the Huai River Basin. Based on daily runoff observed at these stations, the date sequence of the annual maximum daily runoff was obtained using the annual maximum extraction method. The sample length covers 58 years, from 1959 to 2016. Urbanized impervious area (PISA) within the sub-basin controlled by each station was used as an anthropogenic factor; while large-scale climatic oscillation factors (NAO, PDO, SOI, NINO3.4), regional mean surface precipitation (MPRE), and temperature (MTEM) were used as climate change factors.
[0083] (1) Visualization analysis based on empirical probability density maps
[0084] To account for the multimodal characteristics of the flood occurrence date series, we plotted... Figure 2 The empirical probability density (PDF) of the peak-occurrence time series is used to determine the value of M in equation (4). Clearly, through equation (3), the daily-scale peak-occurrence time series has been transformed into a circular peak-occurrence series. Figure 2 As shown, the peak time series of the four selected stations in the Huai River Basin exhibit a relatively obvious unimodal characteristic in the empirical probability density function (PDF) plot. Therefore, the value of M is set to 1.
[0085] (2) Fitting results based on dynamic von Mises model
[0086] To save space and analyze the impacts of climate change and human activities (primarily urbanization) on the timing of flood peaks, three DvM models are presented here: DvM PISA DvM climate drivers and DvM PISA+climate drivers The relevant data are shown in Table 1. Table 1(a) shows that for Bengbu station, climate-related factors NAO and MTEM, and human activity factor PISA are significant driving factors for the optimal model. Meanwhile, its D... LR A value greater than 3.84 indicates a trend of non-stationarity at the 5% significance level. For Wangjiaba station, the significant driving factors are climate-related MTEM and human-activity-related PISA factors, both of which pass the LR test, indicating a significant trend of non-stationarity. For Lutai sub-station, the significant driving factors are climate-related MTEM and NAO factors, while human-activity factors cannot be considered significant driving factors. For Bantai station, only the climate-related MTEM factor is considered as a DvM. MTEM Covariates. The bold text in the table below indicates the best-fit DvM model.
[0087] Table 1(a). Optimization results of the optimal dynamic von Mises (DvM) model at Bengbu Station
[0088]
[0089] Table 1(b). Optimization results of the optimal dynamic von Mises (DvM) model at Wangjiaba Station
[0090]
[0091]
[0092] Table 1(c). Optimization results of the optimal dynamic von Mises (DvM) model for Lutai substation.
[0093]
[0094] Table 1(d). Optimization results of the optimal dynamic von Mises (DvM) model for Bantai Station.
[0095]
[0096] (3) Trend test results based on parameterization
[0097] Considering that the Huai River Basin has experienced two stages of urbanization, two different levels of urbanization were defined: (1) the period of rapid urbanization from 1990 to 2013, and (2) the period of slow urbanization from 1966 to 1989. Based on the above two periods, the following quantitative analysis was conducted to consider the impact of human activities (mainly urbanization) and climate change on the flood peak time series. In order to quantify and separate the impact of human activities and climate change (large-scale climate factors, MTEM, and MPRE) on the flood peak time, we compared the three dynamic von Mises models (DvM) involved in Table 1 in this section. PISA DvM climate drivers DvM PISA+climate drivers The theoretical quantiles corresponding to 65% and 85% were obtained. Regarding the impacts caused by human activities (urbanization), the corresponding results from two monitoring stations (Bengbu and Wangjiaba) in the Huai River Basin (…) Figure 3 and Figure 4 The data shows that during the period of 1966–1989, the timing of peak flood flow at monitoring stations in the Huai River basin occurred 4%–8% earlier, while during the period of 1990–2013, the timing of peak flood flow occurred 3%–13% later. Regarding the impact of climate change, the timing of peak flood flow at monitoring stations in the Huai River basin occurred 25.2%–44% earlier during the period of 1966–1989, and 5.3%–18.6% earlier during the period of 1990–2013. In general, the impact of human activities, represented by urbanization, on the timing of peak flood flow in the Huai River basin can be summarized as a transition from an earlier effect during periods of low development to a delayed effect during periods of high development. On the other hand, the impact of climate change on the timing of peak flood flow can be summarized as producing a higher earlier effect during periods of low development, and a lower earlier effect during periods of high development.
Claims
1. An assessment method that isolates the impacts of human activities and climate change on flood peak timing, characterized in that, Includes the following steps: (1) The peak value sequence of floods is processed into a circular shape; (2) Determine the peak shape characteristics; obtain the empirical probability density fitting curve based on the ring-shaped peak sequence, and determine the peak shape characteristics through the visualization analysis of the empirical probability density curve; (3) Construct a dynamic von Mises distribution model and determine the dynamic von Mises model with the highest station peak sequence matching degree; (4) Attribution and separation of human activities and climate change based on the slope comparison method of linear regression; In step (3), the probability density function of the dynamic von Mises distribution model is constructed. : In the formula, The number of von Mises distributions established based on peak shape characteristics; The weighting coefficients for each von Mises distribution. The numbers are positive and their sum is 1; For direction parameters; For lumped parameters; For the modified zeroth-order Bessel function; For time periods, the unit is years; Based on the non-stationarity of trends caused by climate change and human activities, the directional parameter lumped parameters (t), weighting coefficient as follows: In the formula, , , , , , For the parameter to be estimated, This represents a sequence of physical covariates related to climate change and human activities that change over time.
2. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 1, characterized in that, The ring-shaped process is as follows: In the formula, This is the ordinal value corresponding to the date of the maximum daily runoff during the flood season of year i; for The data after circularization; This refers to the length of the flood season.
3. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 1, characterized in that, The method for determining the dynamic von Mises model with the highest station peak sequence matching degree is as follows: first, the trend non-stationary features of the model are identified by the maximum likelihood ratio method, and then the optimal non-stationary model is determined based on the Akaike information criterion.
4. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 3, characterized in that, The maximum likelihood ratio method is used to identify the trend and non-stationary characteristics of the model, and the corresponding log-likelihood ratio statistic is obtained through the log-likelihood ratio test (LR). : In the formula, and represent the log-likelihood values obtained by the maximum likelihood method based on nonstationary and stationary models, respectively; This indicates a stationary DvM model, while This represents a time-varying, non-stationary von Mises model; while the statistic... Follows a chi-square distribution with 1 degree of freedom; if If the value is greater than or equal to the threshold of the chi-square distribution, then it is a non-stationary model. The model outperforms the stationary model. Model; if the model is non-stationary The LR test was passed, confirming the existence of trend-type non-stationary characteristics.
5. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 4, characterized in that, The method for determining the optimal nonstationary model based on the Akaike information criterion, for nonstationary models that pass the LR test... The optimal model is determined based on the AIC minimization criterion: In the formula, k represents the number of parameters in the model; This represents the likelihood function value of the model.
6. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 5, characterized in that, In step (4), in order to quantify and separate the impacts of human activities and climate change on the timing of flood peaks, three dynamic von Mises distribution models are used, which are models considering human activities. Models that consider climate change and a model that takes both into account .
7. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 6, characterized in that, The attribution and separation of human activities and climate change based on the slope comparison method of linear regression includes the following steps: (41) Based on the intensity of human activities in different historical development periods, divide the period into high-speed development period and low-speed development period, solve the three dynamic von Mises distribution models for the high / low-speed development period, and obtain the theoretical quantile value sequences of 50%, 65% and 85%; (42) Quantify the impact of human activities on the timing of flood peaks, based on the data from each year. and The quantile values were used to fit the first linear regression line; similarly, the impact of climate change factors on the timing of flood peaks was quantified, and the following was fitted: and The quantile values yield the second linear regression line; (43) Calculate the impact of human activities and climate change on the timing of flood peaks based on the slope values of the first / second linear regression lines.
8. The assessment method for separating the impacts of human activities and climate change on flood peak timing according to claim 7, characterized in that, The impacts of human activities and climate change on the timing of flood peaks: In the formula, The impact of human activities on the timing of flood peaks. The impact of climate change on the timing of flood peaks, The slope of the first linear regression line is given. The slope of the second linear regression line; if or A value greater than 0 indicates that human activities or climate change have caused a delay in the occurrence of the flood peak, i.e., a delay effect; if... or A value less than 0 indicates that human activities or climate change have led to an earlier occurrence of the flood peak, i.e., an earlier peak effect.
Citation Information
Patent Citations
Basin flood type identification and influence factor analysis method
CN114580171A
Trend detection method for parameterized hydrometeorological extreme value sequence
CN114707689A