Unit curtain wall construction method for super high-rise building renovation with limited roof construction space
By dividing vertical installation unit areas in super high-rise buildings and using the upper and lower support technology of embedded components and hoisting systems, the high cost and safety risks of the installation of unit curtain wall panels is solved, and the construction effect of firm and sealing is achieved .
Patent Information
- Application Number
- CN202311480260.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2043-11-08
AI Technical Summary
In super high-rise buildings, the installation of unit curtain wall panels has problems of high cost, poor quality and safety risks, especially due to the large weight of the panels, traditional vertical transportation tools are difficult to meet the construction requirements, and the angle of tower cranes is influencing the lifting accuracy. The elevator cannot enter the transport car, resulting in difficulty in installation.
The unit-body prefabricated curtain wall construction system is adopted, and multiple vertical installation unit areas are divided along the exterior wall of the building. The embedded components are fixed on the concrete beam. The hoisting system includes a tripod guide rail lifting device and a sling, which is passed through a U-shaped slot. It realizes the assembly technology of upper hanging and lower support with inverted U-shaped pendants, and uses sealing rubber strips to ensure sealing.
It realizes safe and efficient lifting and assembly of curtain wall unit blocks, ensures firmness and sealing after assembly, and reduces construction risks and costs.
Smart Images

Figure CN117328590B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of existing building reconstruction construction, and in particular to a unit body assembled curtain wall construction system and method for super high-rise building reconstruction. Background Art
[0002] With the development of super high-rise buildings, curtain wall structures are increasingly widely used in building exterior walls. The visual effect of curtain walls often depends on the way they are installed. There are open frames, concealed frames, suction cup fixation, and bracket fixation. However, in recent years, with the development of prefabricated structures, unit-body panel prefabricated curtain walls have also quietly emerged. How to install each unit curtain wall panel at a low cost while ensuring quality and quantity is a construction problem currently faced.
[0003] First, how to install the curtain wall unit blocks in the form of assembly, and how to solve the problem of firmness and sealing after installation. Second, the unit curtain wall blocks are heavy, and the usual vertical transportation tools basically cannot meet the construction requirements. If a tower crane is used for construction, due to the influence of the tower crane's vertical setting angle, the unit curtain wall blocks in each part cannot be well hoisted into place, and there are certain safety risks during installation. Safety and quality cannot be guaranteed during construction. If an outdoor elevator is used, the curtain wall unit blocks are large in size and cannot enter the transport cabin. Even if they enter the cabin, it is difficult to reach the installation surface, and the installation operation is very difficult. Summary of the invention
[0004] The object of the present invention is to provide a unit body assembled curtain wall construction system and method for super high-rise building reconstruction, so as to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides a unitized assembled curtain wall construction system for super high-rise building reconstruction, wherein the unitized assembled curtain wall construction system is divided into a plurality of vertical installation unit areas along the outer wall of the building with the width of the curtain wall unit module as a unit, and each vertical installation unit area includes:
[0006] A plurality of embedded components are arranged in the vertical direction at the installation position of the curtain wall unit module, and the embedded components include embedded plates, the inner ends of the embedded plates are fixed to the top of the concrete beams at the installation position of each curtain wall unit module, the outer ends of the embedded plates extend to the outside of the structural wall, and the outer ends of the embedded plates are provided with hanging parts;
[0007] The curtain wall unit module includes a main keel, an inverted U-shaped hanger is fixedly connected to the inner side of the upper part of the main keel, the inverted U-shaped hanger is hung on the hanging part of the embedded plate, a U-shaped slot is arranged at the upper end of the main keel, and a card block for plugging and connecting with the U-shaped slot is arranged at the lower end of the main keel;
[0008] The hoisting system includes a tripod rail lifting device and a hoisting tool. The tripod rail lifting device is fixedly arranged on the structural wall at the top of the vertical installation unit area. The hoisting tool is connected to the U-shaped slot of the curtain wall unit module, and the tripod rail lifting device is used to lift the curtain wall unit module to the installation working surface.
[0009] In a preferred embodiment, the embedded plate includes three vertical ribs and two transverse steel plates. The three vertical ribs are evenly spaced, and the two transverse steel plates are arranged between the bottoms of the three vertical ribs. The two transverse steel plates are in contact with the tops of the concrete beams. Vertical bolt holes are arranged at the rear ends of the transverse steel plates for fixed connection with the embedded bolts of the concrete beams. Horizontal bolt holes are correspondingly opened at the front ends of the three vertical ribs, and stainless steel screws are passed through the horizontal bolt holes. The stainless steel screws are used to hang the curtain wall unit modules.
[0010] In a preferred embodiment, the height dimension of the part of the vertical rib extending outward from the structural wall is greater than the height dimension of the part of the vertical rib located at the top of the concrete beam, and the vertical bolt holes and the horizontal bolt holes are both long waist holes.
[0011] In a preferred embodiment, the U-shaped slot is located near the inner side of the top of the main keel, and a groove is provided at the lower end of the main keel, and a block is formed on one side of the groove. When the block of the curtain wall unit module located above is inserted into the U-shaped slot of the curtain wall unit module located below, the slot wall located on the outside is inserted into the groove, and a sealing rubber strip is filled between the slot wall located on the outside and the inner wall of the groove, and the rubber strip extends outward to between the contact surfaces of the upper and lower curtain wall unit modules.
[0012] In a preferred embodiment, the inverted U-shaped hanger includes a connecting portion and an inverted U-shaped hanging portion. The connecting portion is fixedly connected to the side of the main keel by mechanical bolts. A height adjustment screw is provided at the top of the inverted U-shaped hanging portion for adjusting the installation elevation of the curtain wall unit module.
[0013] In a preferred embodiment, glass is installed on the outside of the main keel, and the left and right sides of the main keel are the sub-opening end of the unit panel and the female end of the unit panel respectively. During installation, the sub-opening is inserted into the female opening groove, and a sealing rubber strip is provided at the outer edge of the female end of the unit panel.
[0014] In a preferred embodiment, the sling includes an inverted T-shaped hanger and an inverted U-shaped buckle cover. The tops of the two slot walls of the U-shaped slot have inwardly arranged U-shaped bending grooves, and convex parts are arranged at both ends of the horizontal part of the inverted T-shaped hanger. During lifting, the inverted T-shaped hanger is placed inside the slot, and the U-shaped bending groove is hung on the convex part. The inverted U-shaped buckle cover is buckled above the inverted T-shaped hanger, and the two vertical parts of the inverted T-shaped hanger are located on the outside of the slot. The inverted U-shaped buckle cover is fixed to the inverted T-shaped hanger by high-strength mechanical bolts, and the upper end of the vertical part of the inverted T-shaped hanger is connected to the wire rope through a lifting ring.
[0015] In a preferred embodiment, the tripod guide rail lifting device includes a tripod arranged vertically to the structural wall, the vertical angle steel of the tripod is fixedly connected to the structural wall by a through-wall screw, two groups of first steel plates are welded to the bottom of the horizontal angle steel at the bottom of the tripod guide rail lifting device, a second steel plate is arranged at the bottom of the first steel plate, the second steel plate is connected to the horizontal angle steel by a tension bolt, two full-length guide rails are welded to the bottom of the second steel plate, and electric hoist systems are respectively installed at the lower part of the two guide rails, one set of electric hoist systems close to the structural wall is connected to the sling, and one set of electric hoist systems away from the structural wall is connected to the hanging basket.
[0016] The present invention also provides a method for constructing a unit-body assembled curtain wall for super high-rise building reconstruction, comprising the following steps:
[0017] S1. Divide the outer wall of the building into multiple vertical installation unit areas based on the width of the curtain wall unit module;
[0018] S2. Fix the tripod guide rail lifting device on the structural wall at the top of each vertical installation unit area;
[0019] S3, arranging a plurality of embedded components in the vertical direction at the installation position of the curtain wall unit module, fixing the inner end of the embedded plate to the top of the concrete beam at the installation position of each curtain wall unit module, and extending the hanging part of the outer end of the embedded plate to the outside of the structural wall;
[0020] S4, connecting the lifting device to the curtain wall unit module, using the tripod guide rail lifting device to lift the curtain wall unit module to the installation position, and then using the guide rail to transport it to the installation work surface for assembling the curtain wall unit module, wherein the inverted U-shaped hanging piece of the upper curtain wall unit module is hung on the hanging part at the outer end of the embedded plate, and the clamping block at the lower end of the main keel of the upper curtain wall unit module is inserted into the U-shaped clamping groove at the upper end of the main keel of the lower curtain wall unit module;
[0021] S5. After the lifting and assembly of each curtain wall unit module is completed from bottom to top in each vertical installation unit area, the lifting and assembly of the curtain wall unit modules in the adjacent vertical installation unit area are performed.
[0022] In a preferred embodiment, when the upper and lower curtain wall unit modules in each vertical installation unit area are assembled, the outer slot wall of the U-shaped slot of the lower curtain wall unit module is inserted into the groove of the upper curtain wall unit module, and a sealing rubber strip is filled between the outer slot wall and the inner wall of the groove, and the rubber strip extends outward to between the contact surfaces of the upper and lower curtain wall unit modules;
[0023] When assembling the curtain wall unit modules in adjacent vertical installation unit areas, the sub-mouth of the unit plate sub-mouth end is inserted into the female mouth groove of the unit plate female mouth end, and a sealing rubber strip is provided at the outer edge of the unit plate female mouth end;
[0024] When hoisting the curtain wall unit module, place the inverted T-shaped hanger of the hoist inside the U-shaped slot, the U-shaped bending groove on the top of the slot wall is hung on the convex parts at both ends of the horizontal part of the inverted T-shaped hanger, the inverted U-shaped buckle cover is buckled on the top of the inverted T-shaped hanger, and the two vertical parts of the inverted T-shaped hanger are located on the outside of the U-shaped slot, the inverted U-shaped buckle cover and the inverted T-shaped hanger are fixed by high-strength mechanical bolts, the upper end of the vertical part of the inverted T-shaped hanger is connected to the wire rope through a lifting ring, and the wire rope is connected to an electric hoist system close to the structural wall.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] According to the reconstruction of super high-rise buildings and the existing equipment on the roof that cannot provide a working surface and space for supporting the hanging basket, and the heavy characteristics of the curtain wall unit block, the curtain wall unit module is divided into multiple vertical installation unit areas along the outer wall of the building with the width of the curtain wall unit module as a unit, and the curtain wall unit module is assembled in sequence for each vertical installation unit area. The curtain wall unit block of the present invention adopts the upper hanging and lower supporting assembly technology, by installing the embedded components in the installation position of the curtain wall unit module in advance, setting the U-shaped card slot and the inverted U-shaped hanging piece on the main keel of the curtain wall unit block, the upper end of the curtain wall unit block is hung on the embedded components through the inverted U-shaped hanging piece, and the lower end of the upper curtain wall unit block is supported by the U-shaped card slot of the lower curtain wall unit block, thereby ensuring the firmness after assembly. At the same time, by filling a sealing rubber strip between the card slot wall located on the outside and the inner wall of the groove in the upper curtain wall unit module, and the rubber strip extends outward to the contact surface between the upper and lower curtain wall unit modules, the sealing problem of the upper and lower curtain wall unit modules is effectively solved.
[0027] A tripod rail lifting device is installed on the roof to lift the curtain wall unit blocks to the installation position, and then the guide rails are used to transport them horizontally to the installation work surface, so that the prefabricated curtain wall construction can be completed very safely and efficiently. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the embedded component of the present invention;
[0029] Figure 2 A plan view of the embedded parts of the present invention after installation;
[0030] Figure 3 It is a vertical cross-sectional view of the embedded part of the present invention after installation;
[0031] Figure 4It is a vertical cross-sectional view of a curtain wall unit module of the present invention;
[0032] Figure 5 for Figure 4 The enlarged schematic diagram of point A in the middle;
[0033] Figure 6 A top view of a curtain wall unit module of the present invention;
[0034] Figure 7 It is a schematic diagram of the connection between the hanger and the curtain wall unit module of the present invention;
[0035] Figure 8 It is a schematic diagram of the structure of the sling of the present invention;
[0036] Fig. 9 It is a schematic diagram of the hanging connection between the curtain wall unit module and the embedded component of the present invention;
[0037] Fig.10 This is a schematic diagram of two upper and lower adjacent curtain wall unit modules after installation of the present invention;
[0038] Fig.11 for Fig.10 The enlarged schematic diagram of point B in the middle;
[0039] Fig.12 It is a schematic diagram of assembling two adjacent curtain wall unit modules on the left and right of the present invention;
[0040] Fig.13 It is a schematic diagram of the overall structure of the hoisting system of the present invention;
[0041] Fig.14 It is a schematic diagram of the tripod guide rail lifting device of the present invention (the electric hoist system is not shown). DETAILED DESCRIPTION
[0042] The technical solutions in the embodiments of the present invention are described clearly and completely below. The embodiments of the present invention and all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0043] Example 1
[0044] According to the reconstruction of super high-rise buildings, the roof has existing equipment and cannot provide a working surface and space for supporting a hanging basket. In addition, the curtain wall unit block is heavy. The outer wall of the building is divided into a plurality of vertical installation unit areas by taking the width of the curtain wall unit module as a unit, and the curtain wall unit module is assembled in turn for each vertical installation unit area.
[0045] like Figure 1-14As shown, each vertical installation unit area of the unit body assembled curtain wall construction system for super high-rise building reconstruction of the present invention includes: a plurality of embedded components 1, a curtain wall unit body module 2 and a hoisting system.
[0046] A plurality of embedded components 1 are arranged in the vertical direction at the installation position of the curtain wall unit module. The embedded components include an embedded plate 11. The inner end of the embedded plate 11 is fixed to the top of the concrete beam 10 at each installation position of the curtain wall unit module. The outer end of the embedded plate 11 extends to the outside of the structural wall, and a hanging portion is provided at the outer end of the embedded plate 11.
[0047] Furthermore, the embedded plate 11 includes three vertical ribs 111 and two transverse steel plates 112. The three vertical ribs 111 are evenly spaced, and the two transverse steel plates 112 are arranged between the bottoms of the three vertical ribs 111, connected by assembly welding, and the steel materials are all galvanized steel. The two transverse steel plates 112 fit the top of the concrete beam 10, and the rear end of the transverse steel plate 112 is provided with a vertical bolt hole 113, which is used to fix the embedded bolts 101 of the concrete beam 10, and the position can be adjusted through the vertical bolt hole 113. The front ends of the three vertical ribs 111 are correspondingly provided with horizontal bolt holes 114, and the horizontal bolt holes 114 are penetrated with φ16 stainless steel screws 115, and the stainless steel screws 115 are used to hang the curtain wall unit module 2.
[0048] Furthermore, the height dimension of the vertical rib 111 extending outward from the structural wall is greater than the height dimension of the vertical rib 111 located at the top of the concrete beam, and the vertical bolt holes 113 and the horizontal bolt holes 114 are both long waist holes for easy position adjustment.
[0049] In this embodiment, the number of curtain wall unit modules 2 corresponds to the number of embedded components 1. In order to ensure that the curtain wall unit modules are safe, firm and leak-free after assembly, detailed node design is required at the upper and lower ends and left and right sides of the curtain wall unit modules:
[0050] Specifically, the curtain wall unit module 2 includes a main keel 21, and an inverted U-shaped hanger 22 is fixedly connected to the inner side of the upper part of the main keel 21. The inverted U-shaped hanger 22 is hung on the hanging part of the embedded plate 11. A U-shaped slot 211 is provided at the upper end of the main keel 21, and a card block 212 for plugging and connecting with the U-shaped slot 211 is provided at the lower end of the main keel 21.
[0051] Furthermore, the U-shaped slot 211 is located near the inner side of the top of the main keel 21, and a groove 213 is provided at the lower end of the main keel 21, and a block 212 is formed on one side of the groove 213. When the block 212 of the upper curtain wall unit module 2 is inserted into the U-shaped slot 211 of the lower curtain wall unit module 2, the outer slot wall is inserted into the groove 213, and a sealing rubber strip 214 is filled between the outer slot wall and the inner wall of the groove 213. The sealing rubber strip extends outward to between the contact surfaces of the upper and lower curtain wall unit modules 2, and is directly pressed by the main keel of the upper curtain wall unit module, thereby effectively ensuring the sealing of the curtain wall.
[0052] Furthermore, a water trough is provided at the junction of the main keels of the upper and lower adjacent curtain wall unit modules, and the water trough and the main keel are glued to prevent water from flowing into the room through the gap between the two keels.
[0053] Furthermore, the inverted U-shaped hanging part 22 includes a connecting part 221 and an inverted U-shaped hanging part 220. The connecting part 221 is fixedly connected to the side of the main keel 21 by three mechanical bolts 222. The mechanical bolts 222 are spaced 60 mm apart and 40 mm away from the edge of the main keel. A height adjustment screw 223 is provided at the top of the inverted U-shaped hanging part 220 to adjust the installation elevation of the curtain wall unit module 2.
[0054] Furthermore, glass 23 is installed on the outside of the main keel 21. The left and right sides of the main keel 21 are the sub-opening end 224 of the unit panel and the female opening end 225 of the unit panel respectively. During installation, the sub-opening is inserted into the female opening groove, and a 25mm wide sealing rubber strip 214 is provided at the outer edge of the female opening end 225 of the unit panel. After the two curtain wall unit modules are installed in place, the sealing rubber strip 214 achieves a sealing effect through extrusion.
[0055] In this embodiment, the lifting system includes a tripod rail lifting device and a lifting device 4. The tripod rail lifting device is fixedly arranged on the structural wall 6 at the top of the vertical installation unit area. The lifting device 4 is connected to the U-shaped slot 211 of the curtain wall unit module 2, and the tripod rail lifting device is used to lift the curtain wall unit module 2 to the installation working surface.
[0056] Example 2
[0057] During the assembly process of the curtain wall unit module, ensuring the safety of the hoisting is the key point of control during the construction process. Since each curtain wall unit module weighs 1-2 tons, it is an important control link to ensure safety when such a heavy component is moved and hoisted in the air, and the hook does not slip. Based on this, combined with the actual engineering situation, the sling 4 of this embodiment includes an inverted T-shaped hanger 41 and an inverted U-shaped buckle cover 42, and the tops of the two slot walls of the U-shaped slot 211 have inwardly arranged U-shaped bending grooves 231. The horizontal ends of the inverted T-shaped hanger 41 are provided with convex parts 411. During hoisting, the inverted T-shaped hanger 41 is inserted from the U-shaped slot 211 of the curtain wall unit block, and the U-shaped bending slot 231 is hung on the convex part 411, the inverted U-shaped buckle cover 42 is buckled on the top of the inverted T-shaped hanger 41, and the two vertical parts of the inverted T-shaped hanger 41 are located outside the U-shaped slot 211. The inverted U-shaped buckle cover 42 and the inverted T-shaped hanger 41 are connected as a whole with two φ20 high-strength mechanical bolts 45 to ensure that the hanger does not slip. A φ35 bolt hole is provided at the end of the hanger, and a lifting ring 43 can be installed in the bolt hole. The upper end of the vertical part of the inverted T-shaped hanger 41 is connected to a wire rope 44 through the lifting ring 43.
[0058] Furthermore, the tripod guide rail lifting device includes a tripod 31 vertically arranged with the structural wall 6, the vertical angle steel 311 of the tripod 31 is fixedly connected with the structural wall 6 through the through-wall screw 7, and two groups of first steel plates 313 are welded at the bottom of the horizontal angle steel 312 at the bottom of the tripod guide rail lifting device, and a second steel plate 315 is arranged at the bottom of the first steel plate 313, and the second steel plate 315 is connected with the horizontal angle steel 312 through the tension bolt 314. Two through-length guide rails 316 are welded at the bottom of the second steel plate 315, and electric hoist systems 317 are respectively installed at the lower parts of the two guide rails 316, one set of electric hoist systems close to the structural wall 6 is connected to the sling 4, and one set of electric hoist systems far from the structural wall 6 is connected to the hanging basket 8.
[0059] In a specific implementation, the tripod is first welded and assembled on the ground before installation. The tripod is welded by L200*10 vertical angle steel 311, L180*10 horizontal angle steel 312 and bevel angle steel 318. The horizontal angle steel 312 and bevel angle steel 318 are welded and connected by multiple L140*10 oblique thin angle steels 319. After the tripod is welded, a 280*280*12mm first steel plate 313 is welded at the bottom of the tripod, and a second steel plate 315 is fixed to the horizontal angle steel 312 at the bottom of the tripod using φ18 tension bolts. A full-length 18# I-beam is welded on the second steel plate 315 as a guide rail 316.
[0060] Example 3
[0061] The present invention also provides a method for constructing a unit-body assembled curtain wall for super high-rise building reconstruction, comprising the following steps:
[0062] Step S1, dividing the outer wall of the building into a plurality of vertical installation unit areas based on the width of the curtain wall unit module.
[0063] Step S2: fix the tripod guide rail lifting device on the structural wall 6 at the top of each vertical installation unit area.
[0064] Step S3, arrange multiple embedded components 1 in the vertical direction at the installation position of the curtain wall unit module, fix the inner end of the embedded plate 11 to the top of the concrete beam 10 at each curtain wall unit module installation position, and the hanging part of the outer end of the embedded plate 11 extends to the outside of the structural wall.
[0065] Step S4, connect the lifting device 4 to the curtain wall unit module 2, use the tripod guide rail lifting device to lift the curtain wall unit module 2 to the installation position, and then use the guide rail 316 to transport it to the installation work surface for assembling the curtain wall unit module, wherein the inverted U-shaped hanger 22 of the upper curtain wall unit module 2 is hung on the hanging part at the outer end of the embedded plate 11, and the clamping block 212 at the lower end of the main keel of the upper curtain wall unit module 2 is inserted into the U-shaped clamping groove 211 at the upper end of the main keel of the lower curtain wall unit module 2.
[0066] Step S5, after completing the hoisting and assembly of each curtain wall unit module 2 from bottom to top in each vertical installation unit area, the curtain wall unit modules in the adjacent vertical installation unit area are hoisted and assembled.
[0067] Furthermore, when the upper and lower curtain wall unit modules 2 in each vertical installation unit area are assembled, the outer slot wall in the U-shaped slot 211 of the lower curtain wall unit module is inserted into the groove 213 of the upper curtain wall unit module, and a sealing rubber strip is filled between the outer slot wall and the inner wall of the groove 213, and the rubber strip extends outward to between the contact surfaces of the upper and lower curtain wall unit modules 2.
[0068] When assembling the curtain wall unit modules in adjacent vertical installation unit areas, the sub-mouth of the unit plate sub-mouth end 224 is inserted into the female mouth groove of the unit plate female mouth end 225, and a 25mm wide sealing rubber strip 214 is set at the outer edge of the unit plate female mouth end 225.
[0069] When hoisting the curtain wall unit module, the inverted T-shaped hanger 41 of the hoist 4 is placed inside the U-shaped slot 211, and the U-shaped bending groove 231 on the top of the slot wall is hung on the convex parts 411 at both ends of the horizontal part of the inverted T-shaped hanger 41. The inverted U-shaped buckle cover 42 is buckled on the top of the inverted T-shaped hanger 41, and the two vertical parts of the inverted T-shaped hanger 41 are located on the outside of the U-shaped slot 211. The inverted U-shaped buckle cover 42 and the inverted T-shaped hanger 41 are fixed by high-strength mechanical bolts 45. A bolt hole 412 is opened at the upper end of the vertical part of the inverted T-shaped hanger 41, and a steel wire rope 44 is connected through a lifting ring 43. The steel wire rope 44 is connected to an electric hoist system close to the structural wall 6.
[0070] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A unit curtain wall construction method for super high-rise building reconstruction with limited roof construction space, characterized in that: The roof of a super high-rise building has existing equipment and cannot provide a working surface and space for supporting a hanging basket. The embedded structural system omits the longitudinal main keel system set throughout the length, and adopts a main keel-free frame structure. The inverted U-shaped hanger is fixedly connected to the inner side of the upper part of the main keel of the curtain wall unit module. During installation, the inverted U-shaped hanger is directly connected to the hanging part at the outer end of the embedded plate. The construction method includes the following steps: S1. Divide the outer wall of the building into multiple vertical installation unit areas based on the width of the curtain wall unit module; S2, fixing the tripod guide rail lifting device on the structural wall (6) at the top of each vertical installation unit area; S3, arranging a plurality of embedded components (1) in the vertical direction at the installation position of the curtain wall unit module, fixing the inner end of the embedded plate (11) to the top of the concrete beam (10) at each installation position of the curtain wall unit module, and the hanging part of the outer end of the embedded plate (11) extends to the outside of the structural wall; S4, connecting the lifting device (4) to the curtain wall unit module (2), using the tripod guide rail lifting device to lift the curtain wall unit module (2) to the installation position, and then using the guide rail (316) to transport it to the installation work surface for assembling the curtain wall unit module, during which the inverted U-shaped hanging piece (22) of the upper curtain wall unit module (2) is hung on the hanging part at the outer end of the embedded plate (11), and the clamping block (212) at the lower end of the main keel of the upper curtain wall unit module (2) is inserted into the U-shaped clamping groove (211) at the upper end of the main keel of the lower curtain wall unit module (2); S5, after completing the hoisting and assembly of each curtain wall unit module (2) from bottom to top in each vertical installation unit area, the hoisting and assembly of the curtain wall unit modules in the adjacent vertical installation unit area are then performed; When assembling the upper and lower curtain wall unit modules (2) in each vertical installation unit area, the outer slot wall of the U-shaped slot (211) of the lower curtain wall unit module is inserted into the groove (213) of the upper curtain wall unit module, so that the lower end of the upper curtain wall unit module is supported by the U-shaped slot (211) of the lower curtain wall unit module, and a sealing rubber strip is filled between the outer slot wall and the inner wall of the groove (213), and the sealing rubber strip extends outward to between the contact surfaces of the upper and lower curtain wall unit modules (2); When assembling the curtain wall unit body modules in adjacent vertical installation unit areas, the sub-mouth of the unit plate sub-mouth end (224) is inserted into the female mouth groove of the unit plate female mouth end (225), and a sealing rubber strip (214) is provided at the outer edge of the unit plate female mouth end (225); When hoisting the curtain wall unit module, the inverted T-shaped hanger (41) of the hoist (4) is placed inside the U-shaped slot (211), the U-shaped bending groove (231) at the top of the slot wall is hung on the convex parts (411) at both ends of the horizontal part of the inverted T-shaped hanger (41), the inverted U-shaped buckle cover (42) is buckled above the inverted T-shaped hanger (41), and the two vertical parts of the inverted T-shaped hanger (41) are located outside the U-shaped slot (211), the inverted U-shaped buckle cover (42) and the inverted T-shaped hanger (41) are fixed by high-strength mechanical bolts (45), and the upper end of the vertical part of the inverted T-shaped hanger (41) is connected to the wire rope (44) through the lifting ring (43), and the wire rope (44) is connected to a set of electric hoist system close to the structural wall (6); The curtain wall unit module (2) comprises a main keel (21), an inverted U-shaped hanger (22) is fixedly connected to the inner side of the upper part of the main keel (21), and the inverted U-shaped hanger (22) is hung on the hanging part of the embedded plate (11). The upper end of the main keel (21) is provided with a U-shaped groove (211), and the lower end of the main keel (21) is provided with a block (212) for plugging and connecting with the U-shaped groove (211), and the U-shaped groove (211) is located at a position close to the inner side of the top of the main keel (21), and the lower end of the main keel (21) is provided with a groove (213), and one side of the groove (213) forms the A clamping block (212), when the clamping block (212) of the upper curtain wall unit module (2) is inserted into the U-shaped clamping groove (211) of the lower curtain wall unit module (2), the clamping groove wall located on the outside is inserted into the groove (213), so that the lower end of the upper curtain wall unit module is supported by the U-shaped clamping groove (211) of the lower curtain wall unit module, and a sealing rubber strip (214) is filled between the clamping groove wall located on the outside and the inner wall of the groove (213), and the sealing rubber strip extends outward to between the contact surfaces of the upper and lower curtain wall unit modules (2), and is directly pressed by the main keel of the upper curtain wall unit module; The tripod guide rail lifting device comprises a tripod (31) vertically arranged with respect to the structural wall (6); the vertical angle steel (311) of the tripod (31) is fixedly connected with the structural wall (6) via a through-wall screw (7); two through-length guide rails (316) are arranged at the bottom of the tripod guide rail lifting device; electric hoist systems (317) are respectively installed at the lower parts of the two guide rails (316); a set of electric hoist systems close to the structural wall (6) is connected to the sling (4), and a set of electric hoist systems far from the structural wall is connected to the hanging basket; The sling (4) comprises an inverted T-shaped hanger (41) and an inverted U-shaped buckle cover (42); the tops of the two slot walls of the U-shaped slot (211) are provided with inwardly arranged U-shaped bending grooves (231); and convex portions (411) are provided at both ends of the horizontal portion of the inverted T-shaped hanger (41); the inverted U-shaped buckle cover (42) and the inverted T-shaped hanger (41) are fixed by high-strength mechanical bolts (45); and the upper end of the vertical portion of the inverted T-shaped hanger (41) is connected to a steel wire rope (44) by a lifting ring (43).
2. The unit curtain wall construction method for super high-rise building reconstruction with limited roof construction space as claimed in claim 1, characterized in that: The embedded plate (11) comprises three vertical ribs (111) and two transverse steel plates (112). The three vertical ribs (111) are evenly spaced. The two transverse steel plates (112) are arranged between the bottoms of the three vertical ribs (111). The two transverse steel plates (112) are in contact with the top of the concrete beam (10). The rear ends of the transverse steel plates (112) are provided with vertical bolt holes (113) for fixed connection with the embedded bolts (101) of the concrete beam (10). The front ends of the three vertical ribs (111) are correspondingly provided with horizontal bolt holes (114). A stainless steel screw (115) is passed through the hole (114), and the stainless steel screw (115) is used to hang the curtain wall unit module (2). The height dimension of the part of the vertical rib (111) extending out of the outer side of the structural wall is greater than the height dimension of the part of the vertical rib (111) located at the top of the concrete beam. The vertical bolt hole (113) and the horizontal bolt hole (114) are both long waist holes. The inverted U-shaped hanging part (222) comprises a connecting part (221) and an inverted U-shaped hanging part (220). The connecting part (221) is fixedly connected to the side of the main keel (21) by a mechanical bolt (222).
3. The unit curtain wall construction method for super high-rise building reconstruction with limited roof construction space as claimed in claim 1, characterized in that: Glass (23) is installed on the outside of the main keel (21), and the left and right sides of the main keel (21) are a sub-opening end (224) of a unit plate and a female opening end (225) of a unit plate, respectively. During installation, the sub-opening is inserted into the female opening groove, and a sealing rubber strip (214) is provided at the outer edge of the female opening end (225) of the unit plate.
4. The unit curtain wall construction method for super high-rise building reconstruction with limited roof construction space as claimed in claim 3, characterized in that: Two groups of first steel plates (313) are welded to the bottom of the horizontal angle steel (312) at the bottom of the tripod guide rail lifting device, a second steel plate (315) is arranged at the bottom of the first steel plate (313), the second steel plate (315) is connected to the horizontal angle steel (312) via tension bolts (314), two through-length guide rails (316) are welded to the bottom of the second steel plate (315), and a set of electric hoist system away from the structural wall (6) is connected to the hanging basket (8).