A method and device for direct reduction of iron ore step by step

Through the multi-stage gas-based vertical furnace design and pellet ore thermal installation, the problems of high energy consumption, high cost and low metallization rate in the direct gas-based reduction method are solved, and energy efficiency improvement, cost reduction and metallization rate improvement are achieved.

CN117344076BActive Publication Date: 2024-11-12PANGANG GRP XICHANG STEEL & VANADIUM CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311415213.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-27
Publication Date
2024-11-12
Estimated Expiration
2043-10-27

AI Technical Summary

Technical Problem

The existing direct gas-based reduction methods have problems such as high energy consumption, high cost, high investment, large gas flow, excessive requirements for pellet ore strength, and low reduction metallization rate of some ore types.

Method used

The multi-stage gas-based vertical furnace design is adopted to reduce the heating energy consumption of reduced gas through pellet ore thermal installation, reduce the average compressive strength requirements of the furnace charge, and improve the metallization rate of the furnace charge through heat exchange and gas recovery. It is suitable for low grade and low strength Ore smelting.

Benefits of technology

It has achieved energy efficiency improvement, cost reduction, investment reduction, gas flow reduction, improved metallization rate of difficult-to-reduce ore, extended reaction time, and reduced safety risks and carbon emissions of gas-based vertical furnace systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117344076B_ABST
    Figure CN117344076B_ABST
Patent Text Reader

Abstract

The present invention discloses a step-by-step direct reduction method and device for iron ore, which relates to the technical field of low-carbon metallurgy, including: gas-based vertical furnace charging operation, gas-based vertical furnace primary reduction operation, gas-based vertical furnace secondary reduction operation, gas-based vertical furnace tertiary reduction operation, gas-based vertical furnace cooling operation and gas-based vertical furnace discharging operation. The present invention uses the sensible heat of the ore generated in the pellet production process to provide heat for the furnace through hot charging of pellets; the top gas generated by the vertical furnace for the primary reduction operation is recycled as the reducing gas of the vertical furnace for the secondary reduction operation; and the cooling gas is recycled as the reducing gas. It can achieve no or less heating of the reducing gas, reduce the total gas flow rate, thereby reducing the energy consumption and cost of the production process, reducing the safety risks caused by high-temperature gas transportation, increasing the thickness of the material layer in the high-temperature zone, increasing the reaction speed and time, and can also achieve a metallization rate of more than 92% for difficult-to-reduce iron ore.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of low-carbon metallurgy, and in particular to a step-by-step direct reduction method and device for iron ore. Background Art

[0002] The direct reduction method is the process of smelting iron ore into iron through solid-state reduction at a temperature below the melting point of the ore. The iron produced in this way is called direct reduced iron (DRI). Depending on the reducing agent, it can be divided into two categories: gas-based direct reduction and coal-based direct reduction. Among them, the gas-based reduction process is the mainstream and occupies a dominant position worldwide. In 2022, the total output of direct reduced iron reached 110 million tons, of which the output of gas-based vertical furnaces accounted for 75.3% of the total output (MIDREX accounted for 60.0%, HYL accounted for 12.4%, and PERED accounted for 2.9%), direct reduction methods such as coal-based rotary kilns accounted for about 24.4% of the total output, and other methods accounted for 0.3%.

[0003] MIDREX: The American Surface Combustion Company began researching natural gas-based direct reduction production processes in 1936, and until 1966, two key technologies, natural gas reforming to produce reducing gas and gas-solid countercurrent heat exchange reduction vertical furnace, were successfully broken through, and the technology became mature. In 1971, a direct reduction iron production plant with an annual output of 400,000 tons was established, creating a new direct reduction-electric furnace-continuous casting process. At present, the production capacity of most MIDREX natural gas-based vertical furnaces DRI is around 800,000 to 1.6 million tons. In 2019, MIDREX built two vertical furnaces with a maximum annual production capacity of 2.5 million tons of DRI in Algeria.

[0004] HYL: Developed by Mexico's HYLSA company in the 1950s, it has gone through the HYL-I and HYL-II intermittent reactors and the HYL-III vertical furnace moving bed process. The current DRI monomer equipment has a designed annual production capacity of 2.5 million tons.

[0005] PERED: In the 1980s, Iran independently developed the PERED process based on the MIDREX process. This process has made many improvements and innovations in the aspect of the height-to-diameter ratio of the vertical furnace, the structure of the reducing gas inlet, the uniformity of the material distribution in the furnace, refractory materials, top gas washing and compression. The current annual design capacity of DRI monomer equipment is less than 1.5 million tons. The representative enterprise is MME GmbH.

[0006] The above existing process has the following shortcomings:

[0007] (1) High energy consumption and high cost:

[0008] The gas-based vertical furnace process uses pellets as raw materials to produce metallized pellets. In the pellet production process, iron ore concentrate is first made into balls, and then oxidative roasting is carried out at a high temperature of 1200-1300℃ to increase the strength of the pellets. The produced pellet products are then cooled from a high temperature of 1200℃ to a low temperature of 25-300℃ and loaded into a gas-based vertical furnace. In the gas-based vertical furnace, the pellets (main component Fe2O3) and the reducing agent H2 and / or CO are gradually reduced (Fe2O3→Fe3O4→FeO→Fe) to form metallized pellets. Due to the Fe x O y The reduction reaction can only proceed rapidly at a temperature above 600°C, and H2 reduction of iron oxide is an endothermic reaction. Therefore, the existing gas-based vertical furnace process heats the gaseous reducing agent H2 and / or CO to a high temperature of 850-1050°C (the higher the H2 content, the higher the required heating temperature) to meet the temperature requirements in the reactor.

[0009] The heat balance calculation shows that for a full hydrogen gas-based vertical furnace, the Fe x O y The heat required for reduction to generate Fe is 1.68GJ / t 铁素 Compared with 250℃ pellets, the physical heat energy contained in 1200℃ pellets is 1.76GJ / t. 铁素 >1.68GJ / t 铁素 Therefore, by hot-charging the pellets into the gas-based vertical furnace, zero heating of the gas-based vertical furnace reducing gas can be achieved, which can effectively reduce costs and energy consumption.

[0010] But at the same time, in order to ensure that the reduction reaction in the gas-based vertical furnace is fully carried out, the direction of material movement in the vertical furnace is that the gas is input from the bottom and output from the top. When 1200℃ high-temperature pellets are loaded from the top of the gas-based vertical furnace and normal temperature gas is introduced from the bottom of the vertical furnace, the charge at the bottom of the vertical furnace will be quickly cooled to below 600℃, and the temperature of the coal gas output from the top of the furnace will be as high as 1000℃, that is, the heat in the furnace is not effectively utilized but is carried away by the gas.

[0011] (2) Large gas flow and high power cost:

[0012] In order to reduce the temperature drop rate in the furnace, the existing gas-based vertical furnace process high-temperature reduction gas flow rate is as high as 2500Nm 3 / t 铁素 Cooling air and reducing air are independent circulation systems, with a total air flow rate of up to 3500Nm 3 / t 铁素 .

[0013] (3) High investment:

[0014] The existing gas-based vertical furnace process combines heat pipe heating and oxygen-controlled combustion (2CH4+O2=2CO+4H2), and the gas treatment process is complex and the investment is high.

[0015] (4) Too high requirements on pellet strength:

[0016] The existing gas-based vertical furnace process has a material layer height of about 8 to 9 meters. The compressive strength of the pellets entering the furnace is required to be greater than 2200N / piece to reduce charge pulverization and ensure the permeability of the material layer.

[0017] (5) The reduction metallization rate of some minerals is low:

[0018] Due to the rapid temperature drop in the reduction section of the gas-based vertical furnace, although the material layer height is 8 to 9 meters, the height of the temperature zone above 600°C is only 3 to 4 meters. After the temperature is lower than 600°C, the ore reduction reaction rate decreases rapidly, resulting in incomplete reaction. Therefore, when smelting some iron ores that are difficult to reduce, the metallization rate of the charge is low. Summary of the invention

[0019] The purpose of the present invention is to provide a step-by-step direct reduction method and device for iron ore, which adopts a vertical furnace for direct reduction, and divides the ore reduction process into multiple vertical furnaces. The higher the number of stages, the higher the metallization rate of the charge in the furnace. The energy consumption of reducing gas heating is reduced by hot charging of the ore, and the average compressive strength requirement of the ore entering the furnace is reduced, which can be applied to the smelting of low-grade and low-strength ores. To achieve the above purpose, the present invention provides the following technical solutions:

[0020] The present invention provides a step-by-step direct reduction method for iron ore, the method comprising:

[0021] Step S1: The gas-based vertical furnace is charged: the bottom reducing gas injection port is closed, the outlet of the gas dust removal device on the top of the furnace is closed, the lower discharge hole is closed, and the top charging hole is opened. The pellets with a compressive strength of ≥800N / piece, a particle size of 5-20mm, and a temperature of 600-1200°C are charged from the top charging hole of the charging reduction vertical furnace; when the height of the charging material layer reaches the specified value of 3-5m, the charging is stopped, the top charging hole is closed, the charging operation is completed, and the next step is entered;

[0022] Step S2: the gas-based vertical furnace performs a primary reduction operation: the coal gas outlet of the dust removal device on the top of the primary reduction vertical furnace is connected to the reducing gas injection port at the bottom of the secondary reduction vertical furnace; a portion of the gas in the reducing gas buffer cabinet is directly or heated by the reducing gas heating device and then injected into the primary reduction vertical furnace from the reducing gas injection port at the bottom; the reducing gas undergoes a primary reduction reaction and heat exchange with the pelletized ore during its upward movement in the furnace; the reacted gas is discharged from the coal gas pipeline on the top of the furnace and enters the coal gas dust removal device; the coal gas after dust removal is injected into the secondary reduction vertical furnace from the reducing gas injection port at the bottom; when the secondary reduction of the secondary reduction vertical furnace is completed, the primary reduction operation of the vertical furnace is completed and the next step is entered;

[0023] Step S3: A gas-based vertical furnace performs a secondary reduction operation; comprising:

[0024] Step S31: Start the gas output from the coal gas dust removal device at the top of the shaft furnace to be input into the coal gas heat exchanger, and then input into the coal gas decarbonization and dehydration device after heat exchange in the heat exchanger, and the reduced gas obtained after decarbonization and dehydration enters the reducing gas main pipe; stop the gas output from the coal gas dust removal device at the top of the shaft furnace to be input into the original secondary reduction shaft furnace;

[0025] Step S32: Stop the reduction gas at the reduction gas buffer cabinet outlet from spraying into the vertical furnace from the reduction gas injection port at the bottom of the vertical furnace; spray the top gas of the current first-level vertical furnace into the vertical furnace through the reduction gas injection port at the bottom of the vertical furnace after passing through the dust removal device, and complete the switching of the vertical furnace from the first-level reduction vertical furnace to the second-level reduction vertical furnace;

[0026] Step S33: the reducing gas and the charge undergo a secondary reduction reaction and heat exchange, so that the metallization rate of the charge is further improved;

[0027] Step S34: when the third-level reduction of the third-level reduction shaft furnace is completed or the metallization rate of the charge of the second-level reduction shaft furnace is ≥ 92%, the second-level reduction operation is completed and the next step is entered;

[0028] Step S4: The gas-based vertical furnace performs a three-stage reduction operation; comprising:

[0029] Step S41: stop the gas output from the top gas dust removal device of the original first-level reduction shaft furnace from being input into the current shaft furnace; heat a portion of the gas in the reduction gas buffer cabinet through the reduction gas heating device, and then inject it into the third-level reduction shaft furnace from the bottom reduction gas injection port, thereby completing the switching of the current shaft furnace from the second-level reduction shaft furnace to the third-level reduction shaft furnace;

[0030] Step S42: During the upward movement of the high-temperature reducing gas at the bottom of the furnace, a three-stage reduction reaction and heat exchange occurs with the charge, thereby further improving the metallization rate of the charge;

[0031] Step S43: when the metallization rate of the charge is ≥92%, the third-level reduction is terminated and the next step is entered;

[0032] Step S5: Cooling the gas-based vertical furnace; comprising:

[0033] Step S51: Stop the reducing gas heating device or the first-level reducing shaft furnace top dust removal device from injecting the output gas into the shaft furnace through the reducing gas injection port at the bottom of the shaft furnace; stop the outlet gas of the shaft furnace top coal gas dust removal device from passing into the heat exchanger and the coal gas decarbonization and dehydration device;

[0034] Step S52: connecting the coal gas outlet pipe of the coal gas dust removal device at the top of the vertical furnace to the inlet of the reducing gas buffer cabinet; directly injecting the gas of the reducing gas main pipe into the vertical furnace from the reducing gas injection port at the bottom of the vertical furnace, completing the switching of the vertical furnace from the reducing vertical furnace to the cooling vertical furnace;

[0035] Step S53: The gas exchanges heat with the charge during its upward movement in the furnace, so that the charge cools and the gas temperature rises; a small amount of reduction reaction occurs between the gas and the charge, so that the metallization rate of the charge further increases by 0.1 to 3%;

[0036] Step S54: when the gas temperature at the top of the cooling shaft furnace is ≤150°C, the cooling operation of the shaft furnace is stopped and the next step is entered;

[0037] Step S6: the gas-based vertical furnace performs a discharging operation: stop the reducing gas main pipe from injecting gas into the reducing gas injection port at the bottom of the vertical furnace; close the reducing gas injection port at the bottom and close the coal gas outlet at the top; open the lower discharging hole to complete the switching of the vertical furnace from a cooling vertical furnace to a discharging and charging vertical furnace; discharge the charge in the furnace; when the charge in the furnace is emptied, stop the discharging operation and cycle into the charging operation step.

[0038] Furthermore, part of the gas in the reducing gas main pipe is the product gas generated by the secondary reduction operation and the tertiary reduction operation after dust removal, heat exchange, decarbonization and dehydration, and part is the external supplementary reducing gas;

[0039] The gas composition requirements of the reducing gas main pipe include: (CO+H2+CH4) content greater than 90%; (CO2+H2O) content less than 2%; N2 and other gases not participating in the reaction content less than 10%.

[0040] Furthermore, when the secondary reduction operation of the vertical furnace completes the secondary reduction operation and the metallization rate of the charge is ≥92%, the tertiary reduction operation is cancelled.

[0041] Furthermore, part of the gas in the reducing gas cache cabinet comes from the product gas generated by the cooling operation, and part of the gas comes from the reducing gas main pipe after being preheated by the heat exchanger;

[0042] The reducing gas injected into the bottom of the vertical furnace in the first-stage reduction operation and the third-stage reduction operation comes from the gas in the reducing gas buffer cabinet;

[0043] The cooling gas flow rate injected into the bottom of the vertical furnace during cooling operation ranges from 1250 to 1850 Nm 3 / t 铁素 , cooling gas temperature <100℃;

[0044] When the third-stage reduction operation is not cancelled, the reduction gas flow rate injected into the bottom of the vertical furnace for the first-stage reduction operation ranges from 1050 to 1950 Nm 3 / t 铁素 The flow rate of reducing gas injected into the bottom of the vertical furnace for the three-stage reduction operation is 450~850Nm 3 / t 铁素 ;

[0045] When the third-stage reduction operation is cancelled, the reduction gas flow rate injected into the bottom of the vertical furnace for the first-stage reduction operation ranges from 1900 to 2400 Nm 3 / t 铁素 .

[0046] Furthermore, the temperature range of the reducing gas injected into the bottom of the vertical furnace of the three-stage reduction operation is 800-1050°C;

[0047] When the pellet charging temperature is ≥980℃, the reducing gas in the reducing gas buffer cabinet can be directly supplied to the primary reduction shaft furnace without being heated;

[0048] When the pellet charge temperature is less than 980°C, the reducing gas in the reducing gas buffer cabinet needs to be heated by the reducing gas heating device before being supplied to the primary reduction vertical furnace; when the pellet charge temperature is 800-980°C, the reducing gas temperature range of the primary reduction vertical furnace is 600-1000°C; when the pellet charge temperature is 600-800°C, the reducing gas temperature range of the primary reduction vertical furnace is 700-1050°C.

[0049] Furthermore, the primary reduction operation time = the secondary reduction operation time = T, T = 2.5 to 3.5 hours; the tertiary reduction operation time + cooling operation time + discharging operation time + loading operation time ≤ 3T; wherein,

[0050] When (three-level reduction operation time + cooling operation time + discharging operation time + charging operation time) ≤ T, three sets of vertical furnaces are set for cyclic production;

[0051] When T≤(three-level reduction operation time+cooling operation time+discharging operation time+loading operation time)≤2T, four sets of vertical furnaces are set for cyclic production;

[0052] When 2T≤(tertiary reduction operation time+cooling operation time+discharging operation time+loading operation time)≤3T, five sets of vertical furnaces are set up for cyclic production.

[0053] The present invention also provides an iron ore step-by-step direct reduction device, the device comprising: n sets of gas-based vertical furnace equipment, a heat exchanger, a coal gas decarbonization and dehydration system, a reducing gas buffer cabinet, a reducing gas heating device, and a reducing gas main pipe; wherein n=3, 4, or 5;

[0054] The gas-based vertical furnace equipment is used for input of reducing gas, for charging of pellets, for reduction, cooling and discharging of pellets, and for dust removal and output of vertical furnace top gas;

[0055] The heat exchanger is used to absorb the heat of the gas products generated by the primary reduction and tertiary reduction operations, and preheat the gas from the reduction gas main pipe in the reduction gas cache cabinet;

[0056] The coal gas decarbonization and dehydration system is used to remove CO2 and H2O from the coal gas at the top of the shaft furnace;

[0057] The reducing gas buffer cabinet is used to temporarily store the product gas generated by the cooling operation and the gas preheated by the heat exchanger from the reducing gas main pipe, and to transport the reducing gas to the vertical furnace of the primary reducing operation or / and the tertiary reducing operation;

[0058] The reducing gas heating device is used to heat the reducing gas sprayed into the bottom of the vertical furnace of the primary reduction operation or / and the vertical furnace of the tertiary reduction operation;

[0059] The reducing gas main pipe is used to temporarily store the product gases generated by the secondary reduction operation and the tertiary reduction operation after dust removal, heat exchange, decarbonization and dehydration, to store externally supplemented reducing gas, and to provide reducing gas and cooling gas for the primary, secondary and tertiary reduction operations and cooling operations.

[0060] Furthermore, each set of the gas-based vertical furnace equipment includes: a vertical furnace body and a vertical furnace top gas dust removal device; wherein,

[0061] Each vertical furnace body is evenly provided with a plurality of reducing gas injection ports at the bottom, a plurality of discharge holes at the bottom, a charging hole and a plurality of furnace top gas output pipes at the top, the furnace top gas output pipes are connected to the inlet of the furnace top gas dust removal device, and a plurality of sampling holes with check valves are provided on the furnace body; the upper and lower temperature measuring thermocouples are provided at the positions where the furnace body lining is 1 / 3 and 2 / 3 of the furnace body height from the furnace bottom respectively; a temperature regulating valve is provided on the bottom reducing gas injection pipe;

[0062] The sampling hole is used to obtain samples of the charge in the furnace and monitor the metallization rate of the charge;

[0063] The thermocouple is used to monitor the temperature in the furnace;

[0064] The temperature regulating valve is used to adjust the temperature of the reducing gas at the inlet of the vertical furnace during the primary reduction and the tertiary reduction operations.

[0065] Furthermore, the internal space of each set of the gas-based vertical furnace equipment is a truncated cone, the bottom cross-sectional radius R2 is greater than the top cross-sectional radius R1, the vertical furnace height H is 4 to 6 m, and the thickness of the material layer in the furnace h is 3 to 5.5 m; wherein R1, R2 and H satisfy the following relationship:

[0066] ΔR=R2-R1;

[0067] H: ΔR = 6.5 ~ 9.5: 1.

[0068] Technical effects and advantages of the present invention:

[0069] (1) The present invention achieves the ultimate energy efficiency in terms of thermal energy utilization. The reducing gas of the primary vertical furnace absorbs the heat of the ore, and after being output from the furnace top, it is used as the reducing gas of the secondary vertical furnace to provide heat for the secondary vertical furnace. When the secondary reduction operation is completed, if the metallization rate of the charge in the vertical furnace does not meet the specified requirements, a third vertical furnace can be added to further reduce the charge. The heat of the coal gas at the top of the primary and third vertical furnaces is recovered through a heat exchanger to preheat the reducing gas at the inlet of the primary and third vertical furnaces. The reducing gas input from the cooling vertical furnace increases in temperature during the cooling of the metallized pellets, and after being output from the furnace top, it is input into the reducing gas buffer cabinet for recycling, providing heat and reducing agent for the primary, second, and third vertical furnaces.

[0070] The existing gas-based vertical furnace uses N2 to cool the hot metallized pellets, and the gas product produced by the cooling operation is then artificially refrigerated and reused as cooling gas. The heat is not recycled.

[0071] The existing gas-based vertical furnace cooling gas flow rate is about 1250~1850Nm 3 / t 铁素 , reducing gas flow rate is about 1900~2400Nm 3 / t 铁素 , the gas flow is large, and the energy consumed in gas transportation is high. The cooling gas of the present invention is also the reducing gas, and the total gas flow is greatly reduced.

[0072] (2) The present invention uses hot charging of pellets to utilize the sensible heat of the ore generated during the pellet production process to provide heat for the furnace, so that the reducing gas is not heated or heated less, thereby reducing the production process cost and the safety risks caused by high-temperature gas transportation;

[0073] (3) The present invention provides a multi-stage gas-based vertical furnace, and transmits the sensible heat of the primary reduction vertical furnace to the secondary reduction vertical furnace through the reducing gas, thereby increasing the thickness of the material layer in the high-temperature zone, prolonging the reaction time, and achieving a metallization rate of >92% for difficult-to-reduce iron ore;

[0074] (4) Through the multi-stage vertical furnace design, the height of the material layer in the furnace is reduced to 3 to 5 meters, which can be used for the smelting of low compressive strength charges. The process design investment is low, which reduces the investment in gas high-temperature heating treatment, reduces the energy consumption, cost, and carbon emissions of the gas-based vertical furnace, and improves the safety of the gas-based vertical furnace system.

[0075] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0077] Figure 1 It is a schematic diagram of an iron ore step-by-step direct reduction device of the present invention;

[0078] Figure 2 A top view of five gas-based vertical furnace devices of the present invention arranged in a circular symmetric pattern;

[0079] Figure 3a A schematic diagram of a gas-based vertical furnace device according to the present invention;

[0080] Figure 3b It is a cross-sectional view of the gas-based vertical furnace equipment of the present invention taken along the AA plane;

[0081] Figure 4 This is a schematic diagram of the three-stage vertical furnace reducing gas zero heating (n=3) of the present invention;

[0082] Figure 5 It is a schematic diagram of the four-stage vertical furnace reducing gas zero heating (n=4) of the present invention. DETAILED DESCRIPTION

[0083] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0084] The design concept of the present invention includes: the present invention adopts a two-stage or more vertical furnace design, and the high-temperature coal gas of the lower-stage reduction vertical furnace is introduced into the bottom injection port of the upper-stage reduction vertical furnace to provide heat for the upper-stage reduction vertical furnace. At the same time, technical measures such as recycling the heat energy of the final product (metallized pellets and top gas) are taken to effectively utilize the sensible heat of the pellet ore in the gas-based vertical furnace production, thereby reducing the heating cost and energy consumption of the gas-based vertical furnace.

[0085] The core inventions of the present invention include: hot charging of iron ore; multi-stage vertical furnace reduction, in which the first-stage reduction generates coal gas to provide heat energy for the second-stage reduction; lowering the height of a single furnace body to achieve direct reduction of low-intensity pellets; recycling cooling gas as reducing gas; and recovering heat energy from vertical furnace top gas and metallized pellets.

[0086] In order to solve the shortcomings of the prior art, the present invention discloses a step-by-step direct reduction device for iron ore, which mainly includes: n sets of gas-based vertical furnace equipment (n=3-5, each set of gas-based vertical furnace includes a vertical furnace top gas dust removal device, hereinafter referred to as "dust removal"), a heat exchanger, a gas decarbonization and dehydration system, a reducing gas buffer cabinet, a reducing gas heating device, a reducing gas main pipe, a thermostatic valve, etc., wherein the heat exchanger, the gas decarbonization and dehydration system, the gas buffer cabinet, the reducing gas heating device, the reducing gas main pipe, and the thermostatic valve are common devices of each gas-based vertical furnace. Figure 1 FIG. 1 is a schematic diagram of a step-by-step direct reduction device for iron ore according to the present invention, taking n=5 as an example. Figure 1 As shown in the figure, the gas dust removal device on the top of the vertical furnace is omitted, the same below. Each set of gas-based vertical furnace equipment has the same status, and can be distributed in a circular symmetrical manner or arranged in a row in terms of spatial layout. Figure 2 It is a top view of five gas-based vertical furnace equipments of the present invention arranged in a circular symmetric manner, for example Figure 2 This is an example of a circularly symmetric distribution.

[0087] Further, Figure 3a A schematic diagram of a gas-based vertical furnace device according to the present invention; Figure 3b AA plane cross-sectional view of the gas-based vertical furnace equipment of the present invention, as shown Figure 3a-3b As shown, each set of gas-based vertical furnace equipment includes: a vertical furnace body and a vertical furnace top gas dust removal device. A number of reducing gas injection ports are evenly arranged at the bottom of each vertical furnace body, a number of discharge holes are arranged at the bottom, a charging hole and a number of top gas output pipelines are arranged at the top, the top gas output pipeline is connected to the inlet of the vertical furnace top gas dust removal device, a number of sampling holes with check valves are arranged on the furnace body, and upper and lower temperature measuring thermocouples are arranged at the positions where the inner lining of the furnace body is 1 / 3 and 2 / 3 of the height of the furnace body respectively.

[0088] The design of each set of gas-based vertical furnace equipment is the same. The internal space of the vertical furnace is a truncated cone. The bottom cross-sectional radius R2 is larger than the top cross-sectional radius R1. The difference between the two radii is ΔR. The height of the vertical furnace is H = 4 to 6m, the thickness of the material layer in the furnace is h = 3 to 5.5m, and H: ΔR = 6.5 to 9.5:1.

[0089] Based on the above device, the present invention also discloses a step-by-step direct reduction method for iron ore, which includes the following reaction raw materials, process parameters and process flow:

[0090] 1. Main reaction materials:

[0091] (1) The iron ore raw material of the present invention is pellets, the compressive strength of the pellets is required to be ≥800N / piece, the particle size of the pellets is 5-20mm, and the charging temperature of the pellets is 600-1200°C.

[0092] (2) The reducing agent and coolant of the present invention are both gases, which are collectively referred to as "reducing gas". The composition requirements of the reducing gas include: (CO+H2+CH4) content greater than 90%, (CO2+H2O) content less than 2%, and N2 and other gases that do not participate in the reaction content less than 10%; the "reducing gas" is supplied by the reducing gas main pipe.

[0093] (3) The initial raw materials used in the present invention do not contain solid carbon materials.

[0094] 2. Process parameters:

[0095] A single set of gas-based vertical furnace carries out the discharging, charging, primary reduction, secondary reduction, tertiary reduction and cooling operations in a chronological order, and enters the next operation in sequence after completing one operation. When the vertical furnace is carrying out the discharging or charging operations, it is called a "charging vertical furnace"; when the vertical furnace is carrying out the primary reduction, secondary reduction and tertiary reduction operations, they are respectively called "primary reduction vertical furnace", "secondary reduction vertical furnace" and "tertiary reduction vertical furnace"; when the vertical furnace is carrying out the cooling operation, it is called a "cooling vertical furnace".

[0096] The coal gas output from the dust removal device on the top of the primary reduction shaft furnace is injected into the secondary reduction shaft furnace from the reducing gas injection port at the bottom of the secondary reduction shaft furnace, providing heat and reducing agent for the reaction in the secondary reduction shaft furnace. The reducing gas injected into the reducing gas injection port at the bottom of the tertiary reduction shaft furnace comes from the output gas of the reducing gas heating device. The cooling gas injected into the reducing gas injection port of the cooling shaft furnace comes from the reducing gas main pipe.

[0097] A heat exchanger is provided to recycle the sensible heat of the top gas of the secondary reduction shaft furnace and the tertiary reduction shaft furnace. The top gas of the secondary reduction shaft furnace and the tertiary reduction shaft furnace and part of the reduction gas from the reduction gas main pipe are input into the heat exchanger through independent pipelines, and heat exchange occurs in the heat exchanger. The top gas temperature of the secondary reduction shaft furnace and the tertiary reduction shaft furnace is reduced from 400-800°C to below 400°C, and the gas temperature input from the reduction gas main pipe is preheated from 0-100°C to above 200°C, and the heat energy of the top gas of the secondary reduction shaft furnace and the tertiary reduction shaft furnace is recycled.

[0098] The top gas of the secondary reduction shaft furnace and the tertiary reduction shaft furnace at the outlet of the heat exchanger is input into the gas decarbonization and dehydration system, and after removing CO2 and H2O, it becomes circulating gas, which is input into the reduction gas main pipe for recycling. The preheated reduction gas at the outlet of the heat exchanger is input into the reduction gas buffer cabinet.

[0099] The coal gas output from the coal gas dust removal device at the top of the cooling shaft furnace is input into the reduction gas buffer cabinet. In the reduction gas buffer cabinet, the two gases are mixed evenly, so that the temperature fluctuation of the gas at the outlet of the buffer cabinet is reduced.

[0100] The reducing gas of the primary reduction shaft furnace and the tertiary reduction shaft furnace comes from the reducing gas buffer cabinet. According to different charging temperatures, the gas in the reducing gas buffer cabinet can be supplied to the primary reduction shaft furnace and the tertiary reduction shaft furnace after being heated by the reducing gas heating device; or directly supplied to the primary reduction shaft furnace without passing through the reducing gas heating device.

[0101] The gas in the reducing gas main pipe comes from the system circulating gas and the reducing gas supplemented from the outside. The reducing gas supplemented from the outside can be coke oven gas, green hydrogen, other industrial gas, etc.

[0102] The product of the present invention is metallized pellets. Reducing gas is sprayed into the shaft furnace from the reducing gas injection port at the bottom of the primary reduction shaft furnace, the secondary reduction shaft furnace, the tertiary reduction shaft furnace and the cooling shaft furnace, and one or more of the following chemical reactions occur in the furnace: CH4=C+2H2, 3Fe2O3+C=2Fe3O4+CO, 3Fe2O3+CO=2Fe3O4+CO2, Fe3O4+CO=3FeO+CO2, FeO+CO=Fe+CO2, 3Fe2O3+H2=2Fe3O4+H2O, Fe3O4+H2=3FeO+H2O, FeO+H2=Fe+H2O, Fe3O4+C=3FeO+CO, FeO+C=Fe+CO, and the metallization rate of the product reaches more than 92%. The metallized pellet samples are taken through the sampling holes of the shaft furnace body, and the metallization rate of the samples is detected to monitor the progress of the metallization rate improvement of the furnace charge in the shaft furnace. The metallization rate of the metallized pellets discharged from the charging shaft furnace is greater than 92%.

[0103] The present invention selects whether to cancel the three-stage reduction operation according to the difficulty of ore reduction. When the reduction degree of the raw material pellet ore is less than 50%, the three-stage reduction operation cannot be cancelled in the process; when the reduction degree of the raw material pellet ore is ≥50%, the three-stage reduction operation can be cancelled; when the metallization rate of the furnace charge obtained by the secondary reduction shaft furnace after completing the secondary reduction operation is ≥92%, the three-stage reduction operation is cancelled.

[0104] When the pellet charge temperature is ≥980℃, the reducing gas in the reducing gas buffer cabinet can be directly supplied to the primary reduction shaft furnace; when the pellet charge temperature is <980℃, the reducing gas in the reducing gas buffer cabinet needs to be heated by the reducing gas heating device before being supplied to the primary reduction shaft furnace. In particular, when the pellet charge temperature = 800-980℃, the reducing gas temperature range of the reducing gas injected into the reducing gas injection port at the bottom of the primary reduction shaft furnace is 600-1000℃; when the pellet charge temperature = 600-800℃, the reducing gas temperature range of the reducing gas injected into the reducing gas injection port at the bottom of the primary reduction shaft furnace is 700-1050℃. The reducing gas temperature range of the reducing gas injected into the reducing gas injection port at the bottom of the tertiary reduction shaft furnace is 800-1050℃.

[0105] The cooling gas flow rate injected into the bottom of the vertical furnace during cooling operation ranges from 1250 to 1850 Nm 3 / t 铁素 , cooling gas temperature <100℃; the total flow rate of reducing gas injected into the reducing gas injection port at the bottom of the first-stage reduction shaft furnace and the third-stage reduction shaft furnace: 1900~2400Nm 3 / t 铁素 Among them: When the third-level reduction operation is not cancelled, the reduction gas flow rate injected into the bottom of the vertical furnace of the first-level reduction operation ranges from 1050 to 1950 Nm 3 / t 铁素 The flow rate of reducing gas injected into the bottom of the vertical furnace for the three-stage reduction operation is 450~850Nm 3 / t 铁素 When the third-stage reduction operation is cancelled, the reduction gas flow rate injected into the bottom of the vertical furnace for the first-stage reduction operation ranges from 1900 to 2400 Nm 3 / t 铁素 .

[0106] The first-level reduction operation time = the second-level reduction operation time = T = 2.5-3.5h. The third-level reduction + cooling + discharging + charging operation time ≤ 3T. In addition, according to the equipment capacity and the iron ore reduction reaction speed, when (third-level reduction operation time + cooling operation time + discharging operation time + charging operation time) ≤ T, three sets of vertical furnaces are set for circular production, that is, n = 3; T ≤ (third-level reduction operation time + cooling operation time + discharging operation time + charging operation time) ≤ 2T, four sets of vertical furnaces are set for circular production, that is, n = 4; 2T ≤ (third-level reduction operation time + cooling operation time + discharging operation time + charging operation time) ≤ 3T, five sets of vertical furnaces are set for circular production, that is, n = 5.

[0107] 3. Process flow:

[0108] The operations of charging, primary reduction, secondary reduction, tertiary reduction, cooling, and discharging are cyclically replaced between each set of gas-based vertical furnaces. The vertical furnace operation process includes the following steps:

[0109] Step S1: The gas-based vertical furnace is charged. The bottom reducing gas injection port is closed, the outlet of the gas dust removal device on the top of the furnace is closed, the lower discharge hole is closed, the top charging hole is opened, and the pellets are charged from the top charging hole. When the height of the charging material layer reaches the specified value (3-5m), the charging is stopped, the top charging hole is closed, the charging operation is completed, and the next step is entered.

[0110] Step S2: The gas-based vertical furnace performs the primary reduction operation. Connect the coal gas outlet of the furnace top dust removal device to the reducing gas injection port at the bottom of the secondary reduction vertical furnace; open the reducing gas injection port at the bottom to spray the reducing gas in the reducing gas buffer cabinet, where the gas in the reducing gas buffer cabinet can be heated before spraying; the above reducing gas undergoes reduction reaction and heat exchange with the pelletized ore during the upward movement in the furnace, and the reacted gas is discharged from the coal gas pipeline at the furnace top and enters the coal gas dust removal device, and the coal gas after dust removal is sprayed into the secondary reduction vertical furnace. When the secondary reduction vertical furnace ends the secondary reduction, the primary reduction operation of this vertical furnace ends and enters the next step.

[0111] Step S3: The gas-based vertical furnace performs secondary reduction operation. First, the gas outputted from the coal gas dust removal device at the top of the vertical furnace is started and inputted into the coal gas heat exchanger. After heat exchange in the heat exchanger, the gas is inputted into the coal gas decarbonization and dehydration device. The reducing gas obtained after decarbonization and dehydration enters the reducing gas main pipe; then, the gas outputted from the coal gas dust removal device at the top of the vertical furnace is stopped from being inputted into the original secondary reduction vertical furnace (the original secondary reduction vertical furnace is the current three-stage reduction vertical furnace or cooling vertical furnace); then, the reducing gas at the outlet of the reducing gas buffer cabinet is stopped from being sprayed into the vertical furnace from the reducing gas injection port at the bottom of the vertical furnace; then, the outlet of the coal gas dust removal device at the top of the current first-stage reduction vertical furnace (the current first-stage reduction vertical furnace is the original loading vertical furnace) is connected to the reducing gas injection port at the bottom of the vertical furnace, and the switching of the vertical furnace from the first-stage reduction vertical furnace to the second-stage reduction vertical furnace is completed. The high-temperature reducing gas supplied from the reducing gas injection port of the vertical furnace undergoes secondary reduction reaction and heat exchange with the charge during the upward process in the furnace, so that the metallization rate of the charge is further improved. Take samples from the sampling hole of the secondary reduction shaft furnace and detect the metallization rate of the samples to monitor the progress of the metallization rate of the charge in the shaft furnace. When there is a tertiary reduction operation, when the tertiary reduction shaft furnace finishes the tertiary reduction operation, the shaft furnace ends the secondary reduction and enters the next step S4; when there is no tertiary reduction operation, when the metallization rate of the charge detected by the sampling hole of the shaft furnace is ≥92%, the shaft furnace ends the secondary reduction and enters the next step S5.

[0112] Step S4: The gas-based vertical furnace performs a three-stage reduction operation. First, stop the gas output from the gas dust removal device on the top of the original first-stage reduction vertical furnace to be input into this vertical furnace; then, the gas heated by the reducing gas heating device is sprayed into this vertical furnace from the reducing gas injection port at the bottom to complete the switching of this vertical furnace from the second-stage reduction vertical furnace to the third-stage reduction vertical furnace. During the upward movement of the high-temperature reducing gas at the bottom in the furnace, a secondary reduction reaction and heat exchange occur with the charge, so that the metallization rate of the charge is further improved. Samples are taken from the sampling holes of the three-stage reduction vertical furnace body and the metallization rate of the samples is tested to monitor the progress of the metallization rate of the charge in the vertical furnace. When the metallization rate of the charge is ≥92%, this vertical furnace ends the three-stage reduction and enters the next step.

[0113] Step S5: The gas-based vertical furnace is cooled. First, the reducing gas heating device or the first-level reducing vertical furnace top dust removal device is stopped from outputting gas to be sprayed into the vertical furnace through the reducing gas injection port at the bottom of the vertical furnace; then, the outlet gas of the coal gas dust removal device at the top of the vertical furnace is stopped from entering the heat exchanger and the coal gas decarbonization and dehydration device; then, the coal gas outlet pipeline of the coal gas dust removal device at the top of the vertical furnace is connected to the inlet of the reducing gas buffer cabinet; then, the gas of the reducing gas main pipe is directly sprayed into the vertical furnace from the reducing gas injection port at the bottom of the vertical furnace to complete the switching of the vertical furnace from the reducing vertical furnace to the cooling vertical furnace. The cooling reducing gas introduced into the bottom of the cooling vertical furnace exchanges heat with the charge during the upward process in the furnace, so that the charge is cooled and the gas temperature rises; at the same time, a small amount of reduction reaction occurs, so that the metallization rate of the charge is further increased by 1-3%. When the coal gas temperature at the top of the cooling vertical furnace is ≤150°C, the cooling operation of the vertical furnace is stopped and the next step is entered.

[0114] Step S6: The gas-based vertical furnace performs a discharge operation. First, stop the reduction gas main pipe from injecting gas into the reduction gas injection port at the bottom of the vertical furnace, then close the reduction gas injection port at the bottom and the gas outlet at the top, then open the lower discharge hole to complete the switching of the vertical furnace from a cooling vertical furnace to a discharge and charging vertical furnace. Perform a discharge operation and discharge the furnace charge in the vertical furnace. When the furnace charge is emptied, stop the discharge operation and cycle into the charging operation step.

[0115] In the above steps S3 and S4, the coal gas output from the vertical furnace top coal gas dust removal device, when its temperature is less than 200° C., can also directly enter the coal gas decarbonization and dehydration system without passing through the heat exchanger.

[0116] In order to more clearly illustrate the cyclic replacement process of various operation contents among various sets of gas-based vertical furnaces, the vertical furnaces are marked as A, B, C, D, and E vertical furnaces in order of position. When the A vertical furnace is performing the primary reduction operation, the B vertical furnace is simultaneously performing the secondary reduction operation, the C vertical furnace is simultaneously performing the tertiary reduction operation (or cooling operation, or cooling + discharging operation, or cooling + discharging + charging operation), the D vertical furnace is simultaneously performing the cooling operation (or discharging operation, or discharging + charging operation), and the E vertical furnace is simultaneously performing the discharging operation (or discharging + charging operation), as shown in Table 1 below.

[0117] Table 1

[0118]

[0119] At the same time, there are at least two vertical furnaces, which are respectively performing primary reduction and secondary reduction. When a vertical furnace (for example, the E vertical furnace) completes the cooling operation, the discharging operation, and the charging operation in sequence, or completes the tertiary reduction operation, the cooling operation, the discharging operation, and the charging operation in sequence, it is not necessary to wait for the vertical furnace (for example, the A vertical furnace) currently performing the primary reduction operation to complete the primary reduction operation, and the primary reduction operation can be directly entered according to step S2. The top coal gas is used as the reducing gas injected into the reducing gas injection port at the bottom of the A vertical furnace. At the same time, the gas from the reducing gas buffer cabinet is stopped and transported to the reducing gas injection port at the bottom of the A vertical furnace directly or through the reducing gas heating device.

[0120] Embodiment 1:

[0121] 1. Implementation method of zero heating of reducing gas in three-stage vertical furnace

[0122] The solution of implementation 1 of the present invention is suitable for process sites with high pelletizing temperature, good ore reducibility (easy to reduce iron ore), and small production capacity (able to quickly complete the charging). Figure 4 Schematic diagram of zero heating (n=3) of three-stage vertical furnace reducing gas according to the present invention, as shown in FIG. Figure 4 As shown, the process equipment of implementation 1 of the present invention mainly includes: a primary reduction vertical furnace, a secondary reduction vertical furnace, a cooling and charging vertical furnace, a coal gas decarbonization and dehydration system, a heat exchanger, a reduction gas main pipe, a reduction gas buffer cabinet, etc.

[0123] The specific process parameters of a production site are as follows:

[0124] Annual production capacity of the production line = 300,000 tons of metallized pellets. Main pipe reducing gas composition: H2 content 98%, N2 content 1.5%, (H2O+CO2) content 0.5% (volume ratio, the same below), pellet charging temperature = 1200℃, pellet ore reduction degree 70%.

[0125] Primary reduction shaft furnace reduction time = secondary reduction shaft furnace reduction time = (cooling operation + discharging operation + charging operation) time = T, cooling operation time = 3T / 7, discharging operation = 2T / 7, charging operation = 2T / 7. Smelting cycle = primary reduction time + secondary reduction time + cooling time + discharging time + charging time = 3T. The above T = 3.5 hours.

[0126] The reducing gas flow rate injected from the reducing gas injection port at the bottom of the cooling shaft furnace = the reducing gas flow rate output by the dust removal device at the top of the cooling shaft furnace = 1550Nm 3 / t 铁素 The total flow rate of reducing gas injected from the reducing gas injection port at the bottom of the primary reduction shaft furnace = 1963Nm 3 / t 铁素 Among them, the cooling shaft furnace top dust removal device outlet supplies the first-level reduction shaft furnace reduction gas volume = 1550Nm 3 / t 铁素The average temperature of this part of gas is 272℃; the reducing gas supply from the reducing gas main pipe to the first-stage reducing shaft furnace is 413Nm 3 / t 铁素 The average temperature of this part of gas after preheating by the heat exchanger is 395°C, and the average gas temperature output from the reduction gas buffer cabinet is 297°C. The gas temperature of each unit is shown in the table below.

[0127] At a certain time from 0 to T, the gas temperature of each unit is shown in Table 2 below:

[0128] Table 2

[0129]

[0130] At a certain time from 0 to T, the temperature in each vertical furnace measured by the thermocouple is shown in Table 3 below:

[0131] Table 3

[0132]

[0133]

[0134] At a certain time 0-T, the metallization rate of the charge in each vertical furnace is detected by sampling through the furnace body sampling hole as shown in Table 4 below:

[0135] Table 4

[0136] time Primary reduction shaft furnace Secondary reduction shaft furnace Cooling shaft furnace 0 0.0% 52.3% 94.2% T / 7 8.3% 58.8% 94.7% 2T / 7 16.4% 65.3% 95.1% 3T / 7 24.3% 71.6% 95.4% 4T / 7 31.9% 77.7% 95.7% 5T / 7 39.2% 83.4% 95.7% 6T / 7 46.0% 88.9% 95.7% T 52.3% 94.2% 95.7%

[0137] The total gas input in the production process is 1963Nm 3 / t 铁素 (including cooling gas), the total gas output is 1963Nm 3 / t 铁素 , among which, the (CO2+H2O) content is 561Nm 3 / t 铁素 After decarbonization and dehydration, the gas is recycled 1403Nm 3 / t 铁素 The net consumption of reducing gas and cooling gas is 561Nm 3 / t 铁素 .

[0138] 2. Effect of zero heating of reducing gas in three-stage vertical furnace:

[0139] (1) Energy consumption: Under the same reducing gas composition of HYL / MIDREX method, the gas temperature needs to be heated to 1050°C. This implementation case cancels the reducing gas heating. The total flow rate of reducing gas + cooling gas under the same reducing gas composition of HYL / MIDREX method is about 3500Nm 3 / t 铁素 In this implementation, the total flow rate of reducing gas + cooling gas is 1963Nm3 / t 铁素 , which is 43% lower than the existing process. The total energy consumption of this implementation system is 275kgce / t 铁素 , compared with the average energy consumption of the existing process of 435kgce / t 铁素 , a decrease of 37%.

[0140] (2) Carbon emissions: The physical emission of CO2 gas in the production process is 0. After converting the energy consumption of pellet production, electricity consumption in the reduction process and other energy media consumption according to the corresponding carbon emission factor, the total carbon emissions are 174kg CO2 / t 铁素 , 1797kg in the long process of the higher furnace CO2 / t 铁素 , reduced by 90.3%, compared with 449kg of the existing gas-based vertical furnace process under the same reducing gas composition conditions CO2 / t 铁素 , a decrease of 61.2%.

[0141] (3) Cost: Under the same reducing gas composition, the average reducing gas flow rate of HYL and MIDREX gas-based vertical furnaces is 2500Nm 3 / t 铁素 The reduction gas temperature is 1050℃. Under the domestic energy price system, the average cost of gas heating is 0.045 yuan / KNm 3 / ℃. Under this condition, the present invention has no gas heating device, and compared with HYL and MIDREX gas-based vertical furnaces, the heating cost is reduced by 115 yuan / t 铁素 .

[0142] (4) Investment: HYL and MIDREX gas-based vertical furnaces require heating H2 and / or CO to For safety reasons, the equipment investment is high. The total investment of the gas-based vertical furnace with an annual output of 300,000 tons of metallized pellets by HYL and MIDREX methods is about 600 to 1 billion yuan. The materials required for the manufacture of the equipment of the present invention are all general metallurgical materials. The high temperature resistance of the refractory materials of the lining of the vertical furnaces at all levels is the same as that of the refractory materials of the blast furnace body. The total investment of the present invention is 390 million yuan (including 3*0.4=120 million yuan for the vertical furnace investment, 80 million yuan for the gas treatment (pressurized decarbonization and dehydration) investment, 40 million yuan for the heat exchanger, 50 million yuan for the reduction gas cache cabinet, and 100 million yuan for the reduction gas pipeline network and other facilities).

[0143] Embodiment 2:

[0144] 1. Implementation method of four-stage vertical furnace reducing gas heating:

[0145] In the above embodiment 1, "zero heating of the three-stage vertical furnace reducing gas" is the most economical and low-carbon production organization mode of the present invention. However, the following four situations may occur in actual production.

[0146] First, when the production line capacity is expanded to a certain extent, the cooling and loading time will be longer than the first and second level reduction time T (T = 2.5 ~ 3.5h). The cooling and loading combined in the first level reduction vertical furnace cannot complete the relevant operations within T hours. It is necessary to add a first level reduction vertical furnace to meet the cooling, unloading and loading operation time.

[0147] Second, when the ore charge temperature is lower than 980°C, there will be insufficient heat in the furnace and the reaction cannot be fully carried out. At this time, it is necessary to add a reducing gas heating device to increase the inlet reducing gas temperature and supplement the temperature in the reducing shaft furnace (first and second level reducing shaft furnace) so that the reaction in the furnace can be fully carried out.

[0148] Third, when the iron ore used in production has poor reducibility and the reduction reaction time in the first and second reduction shaft furnaces is too slow, affecting the output of the production line, it is necessary to increase the reaction speed in the first and second reduction shaft furnaces by increasing the inlet reducing gas temperature and supplementing the temperature in the reduction shaft furnace (first and second reduction shaft furnace) so that the reaction in the furnace can proceed quickly.

[0149] Fourth, under rare conditions, when the iron ore used in production has extremely poor reducibility (for example, the degree of reduction is less than 50%), the reduction reaction time in the first and second reduction shaft furnaces is too slow, affecting the production line output, by increasing the temperature of the inlet reducing gas and supplementing the temperature in the reduction shaft furnace (first and second reduction shaft furnace), the reaction speed still cannot meet the requirements, that is, the product metallization rate is less than 92%. At this time, it is necessary to add a third-level reduction shaft furnace, that is, to increase the reduction time of the charge from the original 2T to 3T, in order to increase the metallization rate of the charge (see Figure 1 ).

[0150] In view of the simultaneous occurrence of the first, second and third situations mentioned above, the following takes the four-stage vertical furnace and reducing gas heating method as an example to introduce the implementation method and effect.

[0151] Figure 5 Schematic diagram of zero heating (n=4) of reducing gas in a four-stage vertical furnace according to the present invention, Figure 5 As shown, the process equipment of implementation 2 of the present invention mainly includes: a primary reduction vertical furnace, a secondary reduction vertical furnace, a cooling vertical furnace, a charging vertical furnace, a coal gas decarbonization and dehydration system, a heat exchanger, a reducing gas heating device, a reducing gas main pipe, a reducing gas buffer cabinet, etc.

[0152] The specific process parameters of a production site are as follows:

[0153] The equipment has an annual production capacity of 1 million tons of metallized pellets. The main pipe reducing gas composition: H2 content 98%, N2 content 1.5%, (H2O+CO2) content 0.5%, pellet charging temperature = 800℃, pellet ore reduction degree 55%.

[0154] The reduction time of the primary reduction shaft furnace = the reduction time of the secondary reduction shaft furnace = T, the cooling operation time = 4T / 7, the discharge operation = 5T / 7, the charging operation = 5T / 7. The smelting cycle = the primary reduction time + the secondary reduction time + the cooling time + the discharge time + the charging time = 4T, T = 3.5 hours.

[0155] The reducing gas flow rate injected from the reducing gas injection port at the bottom of the cooling shaft furnace = the reducing gas flow rate output by the dust removal device at the top of the cooling shaft furnace = 1550Nm 3 / t 铁素 The total flow rate of reducing gas injected into the reducing gas injection port at the bottom of the primary reduction shaft furnace is 1963Nm 3 / t 铁素 , the temperature is 986℃, and the gas source is the output gas of the reducing gas heating device. The input gas of the reducing gas heating device comes from the reducing gas buffer cabinet. The gas sources of the reducing gas buffer cabinet are: First, it comes from the gas supplied by the gas dust removal device on the top of the cooling shaft furnace, and the flow rate = 1550Nm 3 / t, average temperature = 468℃; secondly, the gas preheated by the heat exchanger in the reducing gas main pipe, flow rate = 413Nm 3 / t, average temperature = 487℃, average temperature of input gas to reducing gas heating device = 472℃.

[0156] At a certain time 0~T, the gas temperature of each unit is shown in Table 5 below:

[0157] Table 5

[0158]

[0159] At a certain time from 0 to T, the temperature in each vertical furnace measured by the thermocouple is shown in Table 6 below:

[0160] Table 6

[0161]

[0162]

[0163] At a certain time 0-T, the metallization rate of the charge in each vertical furnace is detected by sampling through the furnace body sampling hole as shown in Table 7 below:

[0164] Table 7

[0165] time Primary reduction shaft furnace Secondary reduction shaft furnace Cooling shaft furnace 0 0.0% 48.5% 93.6% T / 7 6.9% 54.9% 94.0% 2T / 7 13.8% 61.4% 94.3% 3T / 7 20.8% 67.8% 94.7% 4T / 7 27.7% 74.3% 95.0% 5T / 7 34.6% 80.7% 95.4% 6T / 7 41.5% 87.2% 95.7% T 48.5% 93.6% 96.1%

[0166] The total gas input in the production process is 1963Nm 3 / t 铁素 (including cooling gas), the total gas output is 1963Nm 3 / t 铁素 , among which, the (CO2+H2O) content is 561Nm 3 / t 铁素 After decarbonization and dehydration, the gas is recycled 1403Nm 3 / t 铁素 , the net consumption of reducing gas is 561Nm 3 / t 铁素 .

[0167] 2. The effect of four-stage vertical furnace reducing gas heating:

[0168] (1) Energy consumption: In Example 2 of the present invention, the heated gas flow rate is 1963 Nm 3 / t 铁素 In the heating device, the temperature is heated from 472℃ to 986℃. Under the same reducing gas composition conditions, HYL / MIDREX requires a heating gas flow rate of 2500Nm 3 / t 铁素 , the temperature is heated from 25℃ to 1050℃. Implementation case: total flow rate of reducing gas + cooling gas 1963Nm 3 / t 铁素 , which is 43% lower than the existing process. The energy consumption of this implementation is 360kgce / t 铁素 , compared with the average energy consumption of 435kgce / t of the existing process 铁素 , a decrease of 17%.

[0169] (2) Carbon emissions: The physical emission of CO2 gas during the production process is 0. After converting the energy consumption and electricity consumption of the production process such as pelletizing and gas heating according to the corresponding carbon emission factors, the total carbon emissions are 405kg CO2 / t 铁素 , 1797kg in the long process of the higher furnace CO2 / t 铁素 , reduced by 77.5%, compared with 449kg of the existing gas-based vertical furnace process under the same reducing gas composition conditions CO2 / t 铁素 , reduced by 10%.

[0170] (3) Cost: Under the same reducing gas composition, the gas heating cost is reduced by 67.5 yuan / t compared with the existing gas-based vertical furnace. 铁素 .

[0171] (4) Investment: The total investment of the gas-based vertical furnace with an annual output of 1 million tons of metallized pellets by the HYL and MIDREX methods is about RMB 1.5-1.8 billion. The materials required for the manufacture of the equipment of the present invention are all general metallurgical materials. The reducing gas heating device adopts a regenerative hot blast furnace. The high temperature resistance of the lining refractory materials of each level of the vertical furnace is the same as that of the refractory materials of the blast furnace body. The total investment of the present invention is RMB 850 million (including the investment of the vertical furnace 3*1.1=330 million, the investment of coal gas treatment (pressurized decarbonization and dehydration) 160 million, the investment of the heat exchanger 50 million, the investment of the reducing gas cache cabinet 60 million, the reducing gas heating device 150 million, and the reducing gas pipeline network and other facilities 100 million).

[0172] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A step-by-step direct reduction method for iron ore, characterized in that: The method comprises: Step S1: The gas-based vertical furnace is charged: the bottom reducing gas injection port is closed, the outlet of the gas dust removal device on the top of the furnace is closed, the lower discharge hole is closed, and the top charging hole is opened. The pellets with a compressive strength of ≥800N / piece, a particle size of 5-20mm, and a temperature of 600-1200°C are charged from the top charging hole of the charging reduction vertical furnace; when the height of the charging material layer reaches the specified value of 3-5m, the charging is stopped, the top charging hole is closed, the charging operation is completed, and the next step is entered; Step S2: the gas-based vertical furnace performs a primary reduction operation: the coal gas outlet of the dust removal device on the top of the primary reduction vertical furnace is connected to the reducing gas injection port at the bottom of the secondary reduction vertical furnace; a portion of the gas in the reducing gas buffer cabinet is directly or heated by the reducing gas heating device and then injected into the primary reduction vertical furnace from the reducing gas injection port at the bottom; the reducing gas undergoes a primary reduction reaction and heat exchange with the pelletized ore during its upward movement in the furnace; the reacted gas is discharged from the coal gas pipeline on the top of the furnace and enters the coal gas dust removal device; the coal gas after dust removal is injected into the secondary reduction vertical furnace from the reducing gas injection port at the bottom; when the secondary reduction of the secondary reduction vertical furnace is completed, the primary reduction operation of the vertical furnace is completed and the next step is entered; Step S3: A gas-based vertical furnace performs a secondary reduction operation; comprising: Step S31: Start the gas output from the coal gas dust removal device at the top of the shaft furnace to be input into the coal gas heat exchanger, and then input into the coal gas decarbonization and dehydration device after heat exchange in the heat exchanger, and the reduced gas obtained after decarbonization and dehydration enters the reducing gas main pipe; stop the gas output from the coal gas dust removal device at the top of the shaft furnace to be input into the original secondary reduction shaft furnace; Step S32: Stop the reduction gas at the reduction gas buffer cabinet outlet from spraying into the vertical furnace from the reduction gas injection port at the bottom of the vertical furnace; spray the top gas of the current first-level vertical furnace into the vertical furnace through the reduction gas injection port at the bottom of the vertical furnace after passing through the dust removal device, and complete the switching of the vertical furnace from the first-level reduction vertical furnace to the second-level reduction vertical furnace; Step S33: the reducing gas and the charge undergo a secondary reduction reaction and heat exchange, so that the metallization rate of the charge is further improved; Step S34: when the third-level reduction of the third-level reduction shaft furnace is completed or the metallization rate of the charge of the second-level reduction shaft furnace is ≥ 92%, the second-level reduction operation is completed and the next step is entered; Step S4: The gas-based vertical furnace performs a three-stage reduction operation; comprising: Step S41: stop the gas output from the top gas dust removal device of the original first-level reduction shaft furnace from being input into the current shaft furnace; heat a portion of the gas in the reduction gas buffer cabinet through the reduction gas heating device, and then inject it into the third-level reduction shaft furnace from the bottom reduction gas injection port, thereby completing the switching of the current shaft furnace from the second-level reduction shaft furnace to the third-level reduction shaft furnace; Step S42: During the upward movement of the high-temperature reducing gas at the bottom of the furnace, a three-stage reduction reaction and heat exchange occurs with the charge, thereby further improving the metallization rate of the charge; Step S43: When the metallization rate of the charge is ≥92%, the three-stage reduction is terminated and the next step is entered; Step S5: Cooling the gas-based vertical furnace; comprising: Step S51: Stop the reducing gas heating device or the first-level reducing shaft furnace top dust removal device from injecting the output gas into the shaft furnace through the reducing gas injection port at the bottom of the shaft furnace; stop the outlet gas of the shaft furnace top coal gas dust removal device from passing into the heat exchanger and the coal gas decarbonization and dehydration device; Step S52: connecting the coal gas outlet pipe of the coal gas dust removal device at the top of the vertical furnace to the inlet of the reducing gas buffer cabinet; directly injecting the gas of the reducing gas main pipe into the vertical furnace from the reducing gas injection port at the bottom of the vertical furnace, completing the switching of the vertical furnace from the reducing vertical furnace to the cooling vertical furnace; Step S53: The gas exchanges heat with the charge during its upward movement in the furnace, so that the charge cools and the gas temperature rises; a small amount of reduction reaction occurs between the gas and the charge, so that the metallization rate of the charge further increases by 0.1 to 3%; Step S54: when the gas temperature at the top of the cooling shaft furnace is ≤150°C, the cooling operation of the shaft furnace is stopped and the next step is entered; Step S6: the gas-based vertical furnace performs a discharging operation: stop the reducing gas main pipe from injecting gas into the reducing gas injection port at the bottom of the vertical furnace; close the reducing gas injection port at the bottom and close the coal gas outlet at the top; open the lower discharging hole to complete the switching of the vertical furnace from a cooling vertical furnace to a discharging and charging vertical furnace; discharge the charge in the furnace; when the charge in the furnace is emptied, stop the discharging operation and cycle into the charging operation step.

2. The method for direct reduction of iron ore according to claim 1, characterized in that: The gas in the reducing gas main pipe is partly the product gas generated by the secondary reduction operation and the tertiary reduction operation after dust removal, heat exchange, decarbonization and dehydration, and partly the external supplementary reducing gas; The gas composition requirements of the reducing gas main pipe include: (CO+H2+CH4) content greater than 90%; (CO2+H2O) content less than 2%; N2 and other gases not participating in the reaction content less than 10%.

3. The method for direct reduction of iron ore according to claim 1, characterized in that: When the secondary reduction operation of the vertical furnace completes the secondary reduction operation and the metallization rate of the charge obtained is ≥92%, the tertiary reduction operation is cancelled.

4. The method for direct reduction of iron ore according to claim 1, characterized in that: The gas in the reducing gas cache cabinet is partly derived from the product gas generated by the cooling operation, and partly derived from the gas in the reducing gas main pipe preheated by the heat exchanger; The reducing gas injected into the bottom of the vertical furnace in the first-stage reduction operation and the third-stage reduction operation comes from the gas in the reducing gas buffer cabinet; The cooling gas flow rate injected into the bottom of the vertical furnace during cooling operation ranges from 1250 to 1850 Nm 3 / t 铁素 , cooling gas temperature <100℃; When the third-stage reduction operation is not cancelled, the reduction gas flow rate injected into the bottom of the vertical furnace for the first-stage reduction operation ranges from 1050 to 1950 Nm 3 / t 铁素 The flow rate of reducing gas injected into the bottom of the vertical furnace for the three-stage reduction operation is 450~850Nm 3 / t 铁素 ; When the third-stage reduction operation is cancelled, the reduction gas flow rate injected into the bottom of the vertical furnace for the first-stage reduction operation ranges from 1900 to 2400 Nm 3 / t 铁素 .

5. The method for direct reduction of iron ore according to claim 4, characterized in that: The temperature range of the reducing gas injected into the bottom of the vertical furnace of the three-stage reduction operation is 800-1050°C; When the pellet charging temperature is ≥980℃, the reducing gas in the reducing gas buffer cabinet can be directly supplied to the primary reduction shaft furnace without being heated; When the pellet charge temperature is less than 980°C, the reducing gas in the reducing gas buffer cabinet needs to be heated by the reducing gas heating device before being supplied to the primary reduction vertical furnace; when the pellet charge temperature is 800-980°C, the reducing gas temperature range of the primary reduction vertical furnace is 600-1000°C; when the pellet charge temperature is 600-800°C, the reducing gas temperature range of the primary reduction vertical furnace is 700-1050°C.

6. The method for direct reduction of iron ore according to claim 1, characterized in that: First-level reduction operation time = second-level reduction operation time = T, T = 2.5 ~ 3.5h; third-level reduction operation time + cooling operation time + discharge operation time + loading operation time ≤ 3T; where, When (three-level reduction operation time + cooling operation time + discharging operation time + charging operation time) ≤ T, three sets of vertical furnaces are set for cyclic production; When T≤(three-level reduction operation time+cooling operation time+discharging operation time+loading operation time)≤2T, four sets of vertical furnaces are set for cyclic production; When 2T≤(tertiary reduction operation time+cooling operation time+discharging operation time+loading operation time)≤3T, five sets of vertical furnaces are set up for cyclic production.

7. An iron ore step-by-step direct reduction device, characterized in that: The device performs step-by-step direct reduction of iron ore based on the method described in any one of claims 1 to 6, and the device comprises: n sets of gas-based vertical furnace equipment, a heat exchanger, a coal gas decarbonization and dehydration system, a reducing gas buffer cabinet, a reducing gas heating device, and a reducing gas main pipe; wherein n=3, 4, or 5; The gas-based vertical furnace equipment is used for input of reducing gas, for charging of pellets, for reduction, cooling and discharging of pellets, and for dust removal and output of vertical furnace top gas; The heat exchanger is used to absorb the heat of the gas products generated by the primary reduction and tertiary reduction operations, and preheat the gas from the reduction gas main pipe in the reduction gas cache cabinet; The coal gas decarbonization and dehydration system is used to remove CO2 and H2O from the coal gas at the top of the shaft furnace; The reducing gas buffer cabinet is used to temporarily store the product gas generated by the cooling operation and the gas preheated by the heat exchanger from the reducing gas main pipe, and to transport the reducing gas to the vertical furnace of the primary reducing operation or / and the tertiary reducing operation; The reducing gas heating device is used to heat the reducing gas sprayed into the bottom of the vertical furnace of the primary reduction operation or / and the vertical furnace of the tertiary reduction operation; The reducing gas main pipe is used to temporarily store the product gases generated by the secondary reduction operation and the tertiary reduction operation after dust removal, heat exchange, decarbonization and dehydration, to store externally supplemented reducing gas, and to provide reducing gas and cooling gas for the primary, secondary and tertiary reduction operations and cooling operations.

8. The iron ore step-by-step direct reduction device according to claim 7, characterized in that: Each set of the gas-based vertical furnace equipment includes: a vertical furnace body and a vertical furnace top gas dust removal device; wherein, Each vertical furnace body is evenly provided with a plurality of reducing gas injection ports at the bottom, a plurality of discharge holes at the bottom, a charging hole and a plurality of furnace top gas output pipes at the top, the furnace top gas output pipes are connected to the inlet of the furnace top gas dust removal device, and a plurality of sampling holes with check valves are provided on the furnace body; the upper and lower temperature measuring thermocouples are provided at the positions where the furnace body lining is 1 / 3 and 2 / 3 of the furnace body height from the furnace bottom respectively; a temperature regulating valve is provided on the bottom reducing gas injection pipe; The sampling hole is used to obtain samples of the charge in the furnace and monitor the metallization rate of the charge; The thermocouple is used to monitor the temperature in the furnace; The temperature regulating valve is used to adjust the temperature of the reducing gas at the inlet of the vertical furnace during the primary reduction and the tertiary reduction operations.

9. The iron ore step-by-step direct reduction device according to claim 8, characterized in that: The internal space of each set of the gas-based vertical furnace equipment is a truncated cone, the bottom cross-sectional radius R2 is greater than the top cross-sectional radius R1, the vertical furnace height H is 4 to 6 m, and the thickness of the material layer in the furnace h is 3 to 5.5 m; wherein R1, R2 and H satisfy the following relationship: ΔR=R2-R1; H:ΔR=6.5~9.5:1。