An electrophoresis process and hoisting device for an energy storage tank
By polishing, cleaning, degreasing, phosphating, and oxidizing the energy storage box, and combining the flipping and directional rotation functions of the hoisting device, the problem of low electrophoretic efficiency of the energy storage box was solved, achieving high-efficiency electrophoretic processing and improved material properties.
Patent Information
- Application Number
- CN202311309101.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-10
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-10-10
AI Technical Summary
The existing electrophoresis hoisting device for energy storage boxes needs to be disassembled and reassembled after each electrophoresis, resulting in low efficiency of the electrophoresis process.
An electrophoresis process and hoisting device for energy storage boxes were designed, including polishing, cleaning, degreasing, phosphating and oxidation treatments. Combined with the flipping and directional rotation functions of the hoisting device, continuous electrophoresis processing of energy storage boxes can be achieved.
It improves the working efficiency of electrophoresis in energy storage tanks, enhances the structural strength and corrosion resistance of materials, and reduces the waste of electrophoresis solution.
Smart Images

Figure CN117364202B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of energy storage box processing technology, specifically to an electrophoresis process and hoisting device for energy storage boxes. Background Technology
[0002] Energy storage uses energy storage batteries, which are usually installed in battery storage boxes. Since multiple energy storage batteries are connected in series and parallel, it has high requirements for the structure and safety of the energy storage batteries.
[0003] To improve the safety performance of battery energy storage boxes, electrophoretic coating is often applied to them in existing technologies to enhance their overall corrosion resistance and thus extend the service life of the energy storage batteries.
[0004] Currently, during the electrophoresis process of energy storage boxes, a hoisting device is used to hoist the energy storage box and immerse it in the electrophoresis solution for electrophoresis processing. However, the existing hoisting device requires disassembly and reassembly of the workpiece after each electrophoresis, which greatly reduces the efficiency of electrophoresis work. For example, a hoisting device for electrophoretic paint treatment on the surface of automotive parts is described in patent application number CN201910201863.8. Summary of the Invention
[0005] The purpose of this invention is to provide an electrophoresis process and hoisting device for energy storage tanks to solve the technical problems mentioned in the background.
[0006] To achieve the above objectives, the first technical solution provided by this invention is as follows: An electrophoresis process for an energy storage tank includes the following steps: S1. Polish the energy storage box to remove burrs and surface scratches around the energy storage box; S2. The polished energy storage box is cleaned, dried, degreased, phosphated and dried to obtain a surface-treated energy storage box. S3. Place the surface-treated energy storage box into a concentrated sulfuric acid oxidation solution for oxidation treatment to obtain an oxidized workpiece; S4. The oxidized workpiece is placed into the electrophoresis tank filled with electrophoresis solution by a hoisting device for electrophoretic coating; S5. After electrophoresis, the workpiece is removed and placed in a drying oven for hot air drying to obtain the finished energy storage box.
[0007] Preferably, the raw materials of the electrophoretic solution are: 10-25 parts by weight of corrosion-resistant resin, 2-4 parts of dispersant, 1-5 parts of curing agent, and 150-250 parts of deionized water.
[0008] Preferably, the oxidation treatment in step S3 is carried out at a temperature of 20-23°C for 50-60 minutes.
[0009] Preferably, the concentration of the electrophoresis solution in the electrophoresis tank is 16-20%, the temperature is 30-35℃, the time is 60-70min, and the voltage is 150-220V.
[0010] The second technical solution provided by this invention is: A hoisting device for electrophoresis of energy storage tanks includes a portal frame spanning above the electrophoresis tank. Two columns of the portal frame are symmetrically connected to first screws along their height direction. A drive mechanism is mounted on the top of the portal frame's crossbeam, connected to the first screws. Hollow sliders are symmetrically threaded onto the outer walls of the two first screws. A rotating rod assembly with directional rotation is provided within the slider's inner cavity. A hoisting plate connects the two rotating rod assemblies. Upper and lower fixing components for fixing the energy storage tank are respectively provided on the upper and lower sides of the hoisting plate. A first rack that engages with the rotating rod assembly is provided on one of the two columns of the portal frame that is close to each other. During the upward sliding of the slider, the rotating rod assembly meshes with the first rack, causing the hoisting plate to rotate.
[0011] Preferably, the rotating rod assembly includes a rotating rod, one end of which is rotatably connected to the inner wall of the slider, and the other end of the rotating rod passes through the slider and is connected to the lifting plate. A rotating disk is fixedly connected to the outer wall of the rotating rod. A plurality of pawls are installed at equal angles on the outer wall of the rotating disk. An inner ratchet is rotatably connected to the outer wall of the rotating disk and cooperates with the pawls. The outer wall of the inner ratchet is provided with gear teeth that cooperate with the first rack. A through groove is opened on the side wall of the slider for the gear teeth of the inner ratchet to pass through.
[0012] Preferably, the upper fixing assembly includes a worm gear rotatably connected to opposite ends of the inner cavity of the hoisting plate. The opposite ends of the worm gear pass through opposite side walls of the hoisting plate and are connected to connecting rods. A rotating gear is fixedly connected to the outer wall of the connecting rod. A second rack that cooperates with the rotating gear is provided on the side of the two columns of the portal frame that are close to each other. The second rack is located below the first rack, and the sides of the second rack and the first rack with meshing teeth are set away from each other. A worm wheel is meshed with the outer wall of the worm gear at intervals. A second screw is fixedly connected to the inner wall of the worm wheel and is rotatably connected to the inner wall of the hoisting plate. A threaded sleeve is threadedly connected to the free end of the second screw. One end of the threaded sleeve passes through the hoisting plate and is fitted with a clamping element. The structure of the lower fixing component is the same as that of the upper fixing component. The rotating gears in the upper fixing component and the lower fixing component are located on opposite sides of the rotating rod assembly, and the second screws in the lower fixing component and the upper fixing component are arranged alternately.
[0013] Preferably, the outer wall of the threaded sleeve is provided with a limiting strip along the length direction, the lifting plate is provided with a through hole that cooperates with the threaded sleeve, and the inner wall of the through hole is provided with a limiting groove that cooperates with the limiting strip.
[0014] Preferably, the clamping member includes a concave fixing member, the concave fixing member having symmetrically formed grooves on opposite side walls, a nut block being symmetrically slidably connected to the inner cavity of the groove, a bolt rod being threadedly connected to the inner cavity of the nut block, and a fixing block being fixedly connected to one end of each of the two bolt rods that are close to each other.
[0015] Preferably, the driving mechanism includes a drive motor, which is installed in the middle of the crossbeam of the portal frame. The output end of the drive motor is fixedly connected to a drive sprocket, and the drive sprocket is connected to two driven sprockets through a transmission chain. The two driven sprockets are respectively sleeved on the outer wall of the first screw.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention pre-treats the surface of the energy storage tank by polishing, cleaning, degreasing, and phosphating before electrophoresis, making the surface of the energy storage tank cleaner and improving the adhesion between the electrophoretic solution and the surface of the energy storage tank. Then, the combination of anodizing treatment and electrophoretic deposition treatment in an electrophoretic pool improves the structural strength and corrosion resistance of the material. Attached Figure Description
[0017] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0018] Figure 1 This is a three-dimensional structural diagram of the hoisting device of the present invention; Figure 2 This is a front view structural schematic diagram of the hoisting device of the present invention; Figure 3 This is a structural schematic diagram of the lifting plate and its connecting components in the lifting device of the present invention; Figure 4 This is a schematic diagram of the upper fixing component in the hoisting device of the present invention; Figure 5 This is a three-dimensional structural diagram of the rotating rod assembly in the hoisting device of the present invention; Figure 6 This is a front view schematic diagram of the hoisting device in the hoisting device of the present invention.
[0019] The attached diagram lists the components represented by each number as follows: 1. Portal frame; 2. First screw; 3. Drive mechanism; 31. Drive motor; 32. Drive sprocket; 33. Transmission chain; 34. Driven sprocket; 4. Slider; 5. Rotating rod assembly; 51. Rotating rod; 52. Rotating disk; 53. Pawl; 54. Internal ratchet; 55. Gear tooth; 6. Lifting plate; 7. Upper fixing assembly; 71. Worm gear; 72. Connecting rod; 73. Rotating gear; 74. Worm gear; 75. Second screw; 76. Threaded sleeve; 761. Limiting strip; 77. Clamping part; 771. Concave fixing part; 772. Slide groove; 773. Nut block; 774. Bolt rod; 775. Fixing block; 8. First rack; 9. Second rack; 10. Limiting assembly; 101. Limiting gear; 102. Snap-fit plate; 103. Fixing rod; 104. Pressing block; 105. Spring. Detailed Implementation
[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0021] The first technical solution provided by this invention is: An electrophoresis process for an energy storage tank includes the following steps: S1. Polish the energy storage box to remove burrs and surface scratches around the energy storage box; S2. The polished energy storage box is cleaned, dried, degreased, phosphated and dried to obtain a surface-treated energy storage box. S3. Place the surface-treated energy storage box into a concentrated sulfuric acid oxidation solution for oxidation treatment to obtain an oxidized workpiece; S4. The oxidized workpiece is placed into the electrophoresis tank filled with electrophoresis solution by a hoisting device for electrophoretic coating; S5. After electrophoresis, the workpiece is removed and placed in a drying oven for hot air drying to obtain the finished energy storage box.
[0022] Specifically, the raw materials of the electrophoretic solution are: 10-25 parts corrosion-resistant resin, 2-4 parts dispersant, 1-5 parts curing agent, and 150-250 parts deionized water by weight.
[0023] As can be seen from the above description, the electrophoretic paint film formed after electrophoresis has the advantages of good toughness, low-temperature curing and no discoloration, and excellent corrosion resistance.
[0024] Specifically, the oxidation treatment in step S3 is carried out at a temperature of 20-23°C for 50-60 minutes.
[0025] Specifically, the electrophoresis solution concentration in the electrophoresis tank is 16-20%, the temperature is 30-35℃, the time is 60-70min, and the voltage is 150-220V.
[0026] Please see Figure 1-6 As shown, the second technical solution provided by the present invention is: A hoisting device for electrophoresis of energy storage tanks includes a gantry frame 1 spanning above the electrophoresis tank. Two columns of the gantry frame 1 are symmetrically connected to first screws 2 along their height direction. A drive mechanism 3 is installed on the top of the crossbeam of the gantry frame 1, and the drive mechanism 3 is connected to the first screws 2. Hollow sliders 4 are symmetrically threaded onto the outer walls of the two first screws 2. A rotating rod assembly 5, capable of directional rotation, is provided inside the slider 4. A hoisting plate 6 is connected between the two rotating rod assemblies 5. Upper and lower fixing components 7 and lower fixing components for fixing the energy storage tank are respectively provided on the upper and lower sides of the hoisting plate 6. A first rack 8, which cooperates with the rotating rod assembly 5, is provided on the side of the two columns of the gantry frame 1 that is close to each other. During the upward sliding of the slider 4, the rotating rod assembly 5 meshes with the first rack 8, causing the hoisting plate 6 to rotate 180 degrees.
[0027] As described above, during the electrophoresis process of the energy storage box, the energy storage box can be installed on the upper and lower sides of the lifting plate. Then, the driving mechanism drives the energy storage box to descend and immerse it in the electrophoresis tank for electrophoresis. After the lower energy storage box has completed electrophoresis, the driving mechanism drives the lifting plate to rise. The directional rotating rod assembly and the first rack work together to rotate the lifting plate 180 degrees, thus flipping the electrophoretically finished energy storage box to the top and the energy storage box to be electrophoretized to the bottom. Then, it is lowered again for electrophoresis. During the electrophoresis process, the operator can remove the electrophoretically finished energy storage box for replacement, thereby realizing a workflow of electrophoresis and disassembly at the same time, improving the efficiency of electrophoresis.
[0028] Specifically, the rotating rod assembly 5 includes a rotating rod 51. One end of the rotating rod 51 is rotatably connected to the inner wall of the slider 4. The other end of the rotating rod 51 passes through the slider 4 and is connected to the lifting plate 6. The outer wall of the rotating rod 51 is fixedly connected to a rotating disk 52. Several pawls 53 are installed at equal angles on the outer wall of the rotating disk 52. An inner ratchet 54 is rotatably connected to the outer wall of the rotating disk 52 and cooperates with the pawls 53. The outer wall of the inner ratchet 54 is provided with gear teeth 55 that cooperate with the first rack 8. The side wall of the slider 4 is provided with a through groove for the gear teeth 55 of the inner ratchet 54 to pass through.
[0029] As described above, during the upward sliding of the slider, the outer teeth of the inner ratchet mesh with the first rack, causing the inner ratchet to rotate. The inner ratchet, through the pawl, drives the rotating disk to rotate, thereby causing the rotating rod and the lifting plate to rotate, achieving a 180-degree rotation of the lifting plate. During the downward sliding of the slider, due to the interaction between the pawl and the inner ratchet, the inner ratchet will spin freely, thus preventing the lifting plate from rotating and achieving directional rotation of the lifting plate.
[0030] Specifically, the upper fixing component 7 includes a worm gear 71 rotatably connected to opposite ends of the inner cavity of the hoisting plate 6. The opposite ends of the worm gear 71 pass through opposite side walls of the hoisting plate 6 and are connected to connecting rods 72. A rotating gear 73 is fixedly connected to the outer wall of the connecting rod 72. The two columns of the portal frame 1 are provided with a second rack 9 that cooperates with the rotating gear 73 on their side that are close to each other. The second rack 9 is located below the first rack 8, and the sides of the second rack 9 and the first rack 8 with meshing teeth are set away from each other. A worm wheel 74 is meshed with the outer wall of the worm gear 71 at intervals. A second screw 75 is fixedly connected to the inner wall of the worm wheel 74 and is rotatably connected to the inner wall of the hoisting plate 6. A threaded sleeve 76 is threadedly connected to the free end of the second screw 75. One end of the threaded sleeve 76 passes through the hoisting plate 6 and is fitted with a clamping piece 77. The structure of the lower fixing component is the same as that of the upper fixing component 7. The rotating gears 73 in the upper fixing component 7 and the lower fixing component are located on opposite sides of the rotating rod assembly 5, and the second screws 75 in the lower fixing component and the upper fixing component 7 are arranged alternately.
[0031] As described above, when the energy storage box located below slides upward after electrophoresis, the rotating gear in the lower fixed assembly meshes with the second rack and drives the second screw to rotate in the opposite direction through the worm gear, thereby retracting the second threaded sleeve and clamping parts. This avoids the problem of excessively large flipping radius during the flipping of the lifting plate, which would necessitate increasing the height of the gantry frame. After flipping, the energy storage box to be electrophoresed flips to the bottom and slides downward, causing the corresponding rotating gear to mesh with the second rack, thereby driving the second screw located below to rotate in the forward direction. This extends the second threaded sleeve and clamping parts, allowing the energy storage box to be fully immersed in the electrophoresis solution for electrophoresis while still in the electrophoresis solution, thus avoiding waste of the electrophoresis solution.
[0032] Specifically, the outer wall of the threaded sleeve 76 is provided with a limiting strip 761 along the length direction, and the lifting plate 6 is provided with a through hole that cooperates with the threaded sleeve 76. The inner wall of the through hole is provided with a limiting groove that cooperates with the limiting strip 761.
[0033] As can be seen from the above description, by setting a limiting strip on the outer wall of the threaded sleeve, the threaded sleeve will only slide up and down under the drive of the second screw and will not rotate.
[0034] Specifically, the clamping member 77 includes a concave fixing member 771. The concave fixing member 771 has symmetrically opened sliding grooves 772 on its opposite side walls. Nut blocks 773 are symmetrically slidably connected to the inner cavity of the sliding grooves 772. Bolt rods 774 are threadedly connected to the inner cavity of the nut blocks 773. Fixing blocks 775 are fixedly connected to the ends of the two bolt rods 774 that are close to each other.
[0035] As described above, during installation, the energy storage box can be clamped and fixed by the bolts on both sides, which can drive the fixing blocks to slide. When the energy storage box is installed on the concave fixing part above the lifting plate, the energy storage box can contact the crossbeam of the concave fixing part, providing support. This eliminates the need for the installer to hold the energy storage box at all times. After locking and fixing, as the lifting plate is rotated, the nut block and the energy storage box can slide along the slide groove, thus sliding to the bottom of the concave fixing part. This allows the energy storage box to detach from the crossbeam of the concave fixing part and be in a suspended state, enabling the energy storage box to fully contact the electrophoresis liquid.
[0036] Specifically, the drive mechanism 3 includes a drive motor 31, which is installed in the middle of the crossbeam of the portal frame 1. The output end of the drive motor 31 is fixedly connected to a drive sprocket 32. The drive sprocket 32 is connected to two driven sprockets 34 through a transmission chain 33, and the two driven sprockets 34 are respectively sleeved on the outer wall of the first screw 2.
[0037] As can be seen from the above description, using sprocket transmission for power transmission has the advantages of large transmission torque, high precision, and long service life.
[0038] Please see Figure 1-6 Embodiment 1 of the present invention is as follows: An electrophoresis process for an energy storage tank includes the following steps: S1. Polish the energy storage box to remove burrs and surface scratches around the energy storage box; S2. The polished energy storage box is cleaned, dried, degreased, phosphated and dried to obtain a surface-treated energy storage box. S3. Place the surface treatment energy storage box into concentrated sulfuric acid oxidation solution for oxidation treatment to obtain an oxidized workpiece. The oxidation treatment temperature is 21℃ and the time is 55 min. S4. The oxidized workpiece is placed into the electrophoresis tank filled with electrophoresis solution by a hoisting device for electrophoretic coating. The raw materials of the electrophoresis solution are: 15 parts corrosion-resistant resin, 3 parts dispersant, 3 parts curing agent and 200 parts deionized water by weight. The concentration of the electrophoresis solution is 18%, the temperature is 33℃, the time is 65min and the voltage is 185V. S5. After electrophoresis, the workpiece is removed and placed in a drying oven for hot air drying to obtain the finished energy storage box.
[0039] In the above process, to improve electrophoresis efficiency, the following hoisting device is used to place the energy storage tank into the electrophoresis tank: like Figure 1 and 2 The hoisting device includes a gantry frame 1 spanning above the electrophoresis tank. The inner cavities of the two columns of the gantry frame 1 are symmetrically connected to first screws 2 along the height direction. A drive mechanism 3 is installed on the top of the crossbeam of the gantry frame 1. The drive mechanism 3 is connected to the first screws 2. The outer walls of the two first screws 2 are symmetrically threaded to hollow sliders 4. The inner cavity of the sliders 4 is provided with a rotating rod assembly 5 that can be oriented to rotate. A hoisting plate 6 is connected between the two rotating rod assemblies 5. The upper and lower sides of the hoisting plate 6 are respectively provided with an upper fixing assembly 7 and a lower fixing assembly for fixing the energy storage box. The side of the two columns of the gantry frame 1 that is close to each other is provided with a first rack 8 that cooperates with the rotating rod assembly 5. When the slider 4 slides upward, the rotating rod assembly 5 meshes with the first rack 8 and drives the hoisting plate 6 to rotate 180 degrees. like Figure 5 and 6 As shown, in this embodiment, the directional rotatable rotating rod assembly 5 includes a rotating rod 51. One end of the rotating rod 51 is rotatably connected to the inner wall of the slider 4. One end of the rotating rod 51 passes through the slider 4 and is connected to the lifting plate 6. The outer wall of the rotating rod 51 is fixedly connected to a rotating disk 52. Several pawls 53 are installed at equal angles on the outer wall of the rotating disk 52. An inner ratchet 54 is rotatably connected to the outer wall of the rotating disk 52 and cooperates with the pawls 53. The outer wall of the inner ratchet 54 is provided with gear teeth 55 that cooperate with the first rack 8. The side wall of the slider 4 is provided with a through groove for the gear teeth 55 of the inner ratchet 54 to pass through. like Figure 3 and 4 As shown, in this embodiment, to avoid an excessively large turning radius when the lifting plate is flipped, the upper fixing component 7 includes a worm gear 71 rotatably connected to opposite ends of the inner cavity of the lifting plate 6. The opposite ends of the worm gear 71 pass through opposite side walls of the lifting plate 6 and are connected to connecting rods 72. A rotating gear 73 is fixedly connected to the outer wall of the connecting rod 72. On the side of the two columns of the portal frame 1 that are close to each other, a second rack 9 is provided that meshes with the rotating gear 73. The second rack 9 is located below the first rack 8, and the second rack 9 and the first rack 8 have meshing teeth. The surfaces are set far apart from each other. The outer wall of the worm 71 is connected to the worm wheel 74 at intervals. The inner wall of the worm wheel 74 is fixedly connected to the second screw 75, and the second screw 75 is rotatably connected to the inner wall of the lifting plate 6. The free end of the second screw 75 is threadedly connected to the threaded sleeve 76. One end of the threaded sleeve 76 passes through the lifting plate 6 and is equipped with a clamping piece 77. The outer wall of the threaded sleeve 76 is provided with a limit strip 761 along the length direction. The lifting plate 6 is provided with a through hole that cooperates with the threaded sleeve 76. The inner wall of the through hole is provided with a limit groove that cooperates with the limit strip 761. The structure of the lower fixing component is the same as that of the upper fixing component 7. The rotating gears 73 in the upper fixing component 7 and the lower fixing component are located on opposite sides of the rotating rod assembly 5, and the second screws 75 in the lower fixing component and the upper fixing component 7 are arranged alternately.
[0040] like Figure 3 As shown, in this embodiment, in order to facilitate the clamping and fixing of the energy storage box, the clamping member 77 includes a concave fixing member 771. The concave fixing member 771 has symmetrically opened sliding grooves 772 on its opposite side walls. Nut blocks 773 are symmetrically slidably connected to the inner cavity of the sliding grooves 772. Bolt rods 774 are threadedly connected to the inner cavity of the nut blocks 773. Fixing blocks 775 are fixed to the ends of the two bolt rods 774 that are close to each other.
[0041] like Figure 2 As shown, in order to ensure the transmission torque and service life of the drive mechanism, the drive mechanism 3 includes a drive motor 31. The drive motor 31 is installed in the middle part of the crossbeam of the portal frame 1. The output end of the drive motor 31 is fixedly connected to a drive sprocket 32. The drive sprocket 32 is connected to two driven sprockets 34 through a transmission chain 33, and the two driven sprockets 34 are respectively sleeved on the outer wall of the first screw 2.
[0042] like Figure 5 and 6 As shown, in this embodiment, to ensure the stability of the hoisting plate 6 during the extension and retraction process of the upper fixing component 7 / lower fixing component, a limiting component 10 is provided on the outer wall of the rotating rod component 5. The structure is as follows: The limiting component 10 includes a limiting gear 101 sleeved on the outer wall of the rotating rod 51 and a locking plate 102 locked on the outer wall of the limiting gear 101. The side of the locking plate 102 near the limiting gear 101 is an arc-shaped surface and is provided with locking teeth that cooperate with the limiting gear 101. The side of the locking plate 102 away from the limiting gear 101 is connected to a fixing rod 103, and is fixed... Rod 103 is slidably connected to slider 4. The free end of fixed rod 103 passes through the side wall of slider 4 and is connected to a pressing block 104 that cooperates with the second rack 9. A spring 105 is sleeved on the outer wall of fixed block 103. When pressing block 104 is pressed against the back side (the side without meshing teeth) of the second rack 9, spring 105 is in a compressed state and locking plate 102 is engaged with limiting gear 101. At the same time, in order to facilitate the contact between pressing block 104 and second rack 9, mutually cooperating inclined surfaces are provided on the top of the back side of second rack 9 and the bottom of the back side of pressing block 104.
[0043] The working process of the above-mentioned hoisting device is as follows: When the hoisting device starts working, the drive mechanism 3 drives the hoisting plate 6 to descend and cover the electrophoresis tank, thereby reducing the height of the hoisting plate 6 to facilitate the installation of the energy storage box by the staff. The workers place the oxidized energy storage box into the groove of the concave fixing component 771 located above the hoisting plate 6, and one end of the energy storage box can contact the bottom of the groove of the concave fixing component 771. This allows the workers to fix the energy storage box without constantly holding it. Then, they rotate the bolt rods 774 on both sides. The bolt rods 774 slide and drive the fixing block 775 to clamp and fix the side wall of the energy storage box through the mutual cooperation with the nut block 773, thus completing the fixation of the energy storage box. In this way, the energy storage boxes are installed on the fixing components above. Then, the drive motor 31 (a bidirectional motor) is started in reverse. The drive motor 31 drives the driven sprocket 34 and the first screw 2 to rotate via the transmission chain 33, thereby causing the slider 4 and the lifting plate 6 to slide upward. After the slider 4 slides upward to the height of the first rack 8, the teeth 55 of the inner ratchet 54 mesh with the first rack 8, thereby causing the first rack 8 to drive the inner ratchet 54 to rotate. The inner ratchet 54 drives the rotating disk 52 and the rotating rod 51 to rotate via the pawl 53, thus causing the slider 4 to continue to move upward. During the upward sliding process, the lifting plate 6 can be rotated 180 degrees, flipping the upper fixed component 7, which has been installed with the energy storage box, to the bottom. After the rotation is completed, the forward start drive motor 31 drives the slider 4 and the lifting plate 6 to descend. At this time, the first rack 8 drives the inner ratchet 54 to rotate in the opposite direction. Through the cooperation of the inner ratchet 54 and the pawl 53, the inner ratchet 54 will rotate freely and will not drive the rotating rod 51 and the lifting plate 6 to rotate, so that the lifting plate 6 maintains the original angle and descends to the top of the electrophoresis tank and covers the electrophoresis tank. As the lifting plate 6 slides downward, the bottom of the extrusion block 104 contacts the back of the end of the second rack 9 and continues to slide downward. Thus, the second rack 9 can squeeze the extrusion block 104 and the fixing rod 103 to slide, causing the locking plate 102 to engage the limiting gear 101, thereby keeping the rotating rod 51 at a fixed angle. At the same time, the second rack 9 contacts and meshes with the rotating gear 73 corresponding to the fixed component located below, driving the rotating gear 73, connecting rod 72 and worm 71 to rotate, thereby driving the worm wheel 74 and the second screw 75 located below to rotate. The second screw 75 drives the threaded sleeve 76 to slide downward under the limiting action of the limiting strip 761, thereby extending the fixed component containing the energy storage box so that it can be better immersed in the electrophoresis solution for electrophoresis. During the electrophoresis process, the staff installs the energy storage box to be electrophoresed on the fixed component located above. After electrophoresis is completed, the fixed assembly after electrophoresis retracts under the drive of the second rack 9, thereby reducing the flipping radius of the lifting plate 6. The energy storage box after electrophoresis flips to the top for disassembly, and the energy storage box waiting for electrophoresis flips to the bottom for electrophoresis. This continuous electrophoresis process improves the electrophoresis efficiency.
[0044] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "setting," "connection," "fixing," "screw connection," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal connection of two components or the interaction between two components. Unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0045] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that variations may be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A hoisting device for the electrophoresis process of energy storage tanks, characterized in that: The system includes a portal frame (1) spanning above the electrophoresis tank. The inner cavities of the two columns of the portal frame (1) are symmetrically connected to the first screw (2) along the height direction. A drive mechanism (3) is installed on the top of the crossbeam of the portal frame (1). The drive mechanism (3) is connected to the first screw (2). The outer walls of the two first screws (2) are symmetrically threaded with hollow sliders (4). The inner cavity of the slider (4) is provided with a rotating rod assembly (5) that can be oriented to rotate. A lifting plate (6) is connected between the two rotating rod assemblies (5). The upper and lower sides of the lifting plate (6) are respectively provided with an upper fixing assembly (7) and a lower fixing assembly for fixing the energy storage box. The side of the two columns of the portal frame (1) that are close to each other is provided with a first rack (8) that cooperates with the rotating rod assembly (5). When the slider (4) slides upward, the rotating rod assembly (5) meshes with the first rack (8) and drives the lifting plate (6) to rotate 180 degrees. The rotating rod assembly (5) includes a rotating rod (51), one end of which is rotatably connected to the inner wall of the slider (4), and the other end of the rotating rod (51) passes through the slider (4) and is connected to the lifting plate (6). The outer wall of the rotating rod (51) is fixedly connected to a rotating disk (52). The outer wall of the rotating disk (52) is equipped with several pawls (53) at equal angles. The outer wall of the rotating disk (52) is rotatably connected to an inner ratchet (54) that cooperates with the pawls (53). The outer wall of the inner ratchet (54) is provided with teeth (55) that cooperate with the first rack (8). The side wall of the slider (4) is provided with a through groove for the teeth (55) of the inner ratchet (54) to pass through. The upper fixing assembly (7) includes a worm gear (71) rotatably connected to opposite ends of the inner cavity of the hoisting plate (6). The opposite ends of the worm gear (71) pass through opposite side walls of the hoisting plate (6) and are connected to connecting rods (72). A rotating gear (73) is fixed to the outer wall of the connecting rod (72). The two columns of the portal frame (1) are provided with a second rack (9) on their side that is close to each other, which cooperates with the rotating gear (73). The second rack (9) is located on the side of the first rack (8). Below, and the sides of the second rack (9) and the first rack (8) with meshing teeth are set away from each other, the outer wall of the worm (71) is connected to a worm wheel (74) with a gap meshing connection, the inner wall of the worm wheel (74) is fixedly connected to a second screw (75), and the second screw (75) is rotatably connected to the inner wall of the lifting plate (6), the free end of the second screw (75) is threadedly connected to a threaded sleeve (76), one end of the threaded sleeve (76) passes through the lifting plate (6) and is equipped with a clamping piece (77); The structure of the lower fixing component is the same as that of the upper fixing component (7). The rotating gears (73) in the upper fixing component (7) and the lower fixing component are located on opposite sides of the rotating rod assembly (5). The second screws (75) in the lower fixing component and the upper fixing component (7) are arranged alternately. The outer wall of the threaded sleeve (76) is provided with a limiting strip (761) along the length direction. The lifting plate (6) is provided with a through hole that cooperates with the threaded sleeve (76). The inner wall of the through hole is provided with a limiting groove that cooperates with the limiting strip (761).
2. The hoisting device for electrophoresis process of energy storage tank according to claim 1, characterized in that: The clamping member (77) includes a concave fixing member (771). The concave fixing member (771) has symmetrically provided sliding grooves (772) on its opposite side walls. Nut blocks (773) are symmetrically slidably connected to the inner cavity of the sliding grooves (772). Bolt rods (774) are threadedly connected to the inner cavity of the nut blocks (773). Fixing blocks (775) are fixed to the ends of the two bolt rods (774) that are close to each other.
3. The hoisting device for electrophoresis process of energy storage tank according to claim 1, characterized in that: The drive mechanism (3) includes a drive motor (31), which is installed in the middle of the crossbeam of the portal frame (1). The output end of the drive motor (31) is fixedly connected to a drive sprocket (32). The drive sprocket (32) is connected to two driven sprockets (34) through a transmission chain (33), and the two driven sprockets (34) are respectively sleeved on the outer wall of the first screw (2).
Citation Information
Patent Citations
Lifting device for treating electrophoretic paint on surfaces of automobile accessories
CN109881240A
Electrophoresis process of battery energy storage box
CN114197016A
Electrophoresis process for production of automobile rear top cover
CN114262924A