Energy storage power station status assessment method, device, equipment and storage medium
By obtaining the current status data of the energy storage power station, calculating the state estimate vector and correlation degree, and drawing the state vector diagram, the problem that the existing technology cannot dynamically evaluate the state changes of the energy storage power station, and realizing the trend of the state changes of the energy storage power station Global evaluation and intuitive understanding.
Patent Information
- Application Number
- CN202311478577.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-07
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-11-07
AI Technical Summary
The prior art cannot evaluate the state changes of energy storage power stations from a dynamic perspective, and lacks a global assessment method for real-time changes in the state of energy storage power stations.
By obtaining the current state data of the energy storage power station at least two moments, calculate the state estimate vector corresponding to the current state data, and calculate the correlation degree using the positive and negative control sets, draw the state vector diagram, and evaluate the state of the energy storage power station change.
It has achieved a global assessment of the state change trend of energy storage power stations from a time dimension, and can intuitively understand the state changes of energy storage power stations, solving the problem that existing methods cannot dynamically evaluate state changes.
Smart Images

Figure CN117408834B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and in particular to a state assessment method, device, equipment and storage medium for an energy storage power station. Background Art
[0002] As a core component of the power system, the energy storage power station has good static characteristics. It can weaken the peak-to-valley difference through low storage and high generation, effectively alleviating the peak-shaving pressure of the power grid. At the same time, the energy storage power station has an extremely fast response speed and can quickly respond to changes in the power grid frequency. The good active regulation capability can comprehensively enhance the peak-shaving and frequency regulation capabilities of the power grid in large-scale new energy-rich areas, thereby improving the level of renewable energy consumption.
[0003] The existing technology for evaluating energy storage power stations mainly focuses on evaluating the status of energy storage power stations based on static evaluation indicators such as discharge capacity, energy efficiency level and equipment operating status. However, the status of energy storage power stations changes in real time, and there is currently no way to evaluate the status changes of energy storage power stations from a dynamic perspective. Summary of the invention
[0004] The present invention provides a state assessment method, device, equipment and storage medium for an energy storage power station, which globally assess the state change trend of the energy storage power station from a time dimension to solve the problem that the existing method cannot assess the state change of a pure power station from a dynamic perspective.
[0005] According to one aspect of the present invention, a method for evaluating a state of an energy storage power station is provided, comprising:
[0006] Obtaining current state data of the energy storage power station at at least two moments, and calculating a current state estimation value vector corresponding to the current state data at each moment;
[0007] Obtaining a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set;
[0008] Calculating the degree of association between the current state estimation value vector and the control set; wherein the degree of association includes: a first degree of association between the current state estimation value vector and the positive control set, and a second degree of association between the current state estimation value vector and the negative control set;
[0009] Draw a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment;
[0010] The state change of the energy storage power station is evaluated according to the vector displacement between the state vectors at each moment on the state vector diagram.
[0011] According to another aspect of the present invention, a state assessment device for an energy storage power station is provided, comprising:
[0012] A data acquisition module, used to acquire current state data of the energy storage power station at at least two moments, and calculate a current state estimation value vector corresponding to the current state data at each moment;
[0013] A control set acquisition module is used to acquire a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set;
[0014] A correlation calculation module, used to calculate the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set;
[0015] A vector diagram drawing module, used for drawing a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment;
[0016] The state evaluation module is used to evaluate the state change of the energy storage power station according to the vector displacement between the state vectors at each moment on the state vector diagram.
[0017] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0018] at least one processor; and
[0019] a memory communicatively connected to the at least one processor; wherein,
[0020] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the state assessment method of the energy storage power station described in any embodiment of the present invention.
[0021] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the state assessment method of an energy storage power station described in any embodiment of the present invention when executed.
[0022] The technical solution of the embodiment of the present invention obtains the current state data of the energy storage power station at at least two moments, and calculates the current state estimation value vector corresponding to the current state data at each moment; obtains a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set; calculates the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set; draws a state vector diagram of the energy storage power station according to the first correlation and the second correlation corresponding to the current state data at each moment; evaluates the state change of the energy storage power station according to the vector displacement between the state vectors at each moment on the state vector diagram, thereby realizing a global evaluation of the state change trend of the energy storage power station from the time dimension, solving the problem that the existing method cannot evaluate the state change of the pure power station from a dynamic perspective, and achieving the beneficial effect of being able to intuitively understand the state change trend of the energy storage power station.
[0023] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 is a flow chart of a state assessment method for an energy storage power station provided in Embodiment 1 of the present invention;
[0026] Figure 2 is a flow chart of a state assessment method for an energy storage power station provided in Embodiment 2 of the present invention;
[0027] Figure 3 It is a state vector diagram of an energy storage power station;
[0028] Figure 4 It is another state vector diagram of an energy storage power station;
[0029] Figure 5 It is a structural schematic diagram of a state assessment device for an energy storage power station provided in Embodiment 3 of the present invention;
[0030] Figure 6 It is a structural schematic diagram of an electronic device for implementing the state assessment method of an energy storage power station according to an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0032] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0033] Embodiment 1
[0034] Figure 1 The first embodiment of the present invention provides a flow chart of a method for evaluating the state of an energy storage power station. This embodiment is applicable to the situation where the state change of an energy storage power station is evaluated from the time dimension. The method can be executed by a state evaluation device of an energy storage power station. The state evaluation device of the energy storage power station can be implemented in the form of hardware and / or software. The state evaluation device of the energy storage power station can be configured in an electronic device. Figure 1 As shown, the method includes:
[0035] S110, obtaining current state data of the energy storage power station at at least two moments, and calculating a current state estimation value vector corresponding to the current state data at each moment.
[0036] The current state data refers to the state data of the energy storage power station during the period to be evaluated. The period to be evaluated includes at least two moments and can be set according to actual needs, such as a period of one day, one week, or one month. The current state estimate value refers to the estimated value of the current state data on the state evaluation index. The current state estimate value vector is the estimated value of the current state data on the state evaluation index in multiple dimensions.
[0037] In this embodiment, current state data of the energy storage power station at at least two moments are obtained, and for the current state data at each moment, state estimation values of the current state data on state evaluation indicators in multiple dimensions are calculated, and a current state estimation value vector is constructed based on the state estimation values in multiple dimensions, thereby obtaining the current state estimation value vector of the energy storage power station at each moment.
[0038] In an optional embodiment of the present invention, the method for obtaining the current status data of the energy storage power station at at least two moments can be to obtain the current status data of the energy storage power station at at least two moments during operation based on sensors or log files, etc.; or it can be to obtain the current status data of the energy storage power station obtained by simulation based on simulation modeling of the energy storage power station.
[0039] S120, obtaining a control set of state assessment indicators of the energy storage power station; the control set includes: a positive control set and a negative control set.
[0040] Among them, the control set is a state assessment data set used for comparison. In this embodiment, the control set includes: a positive control set and a negative control set. The positive control set refers to a control set that performs positively on the state assessment indicators; the negative control set refers to a control set that performs negatively on the state assessment indicators. The set elements in the positive control set and the negative control set can be calculated based on the historical data of the energy storage power station, or can be determined in combination with expert experience, etc.
[0041] In this embodiment, the method of obtaining the control set of the energy storage power station on the state evaluation index can be: calculate the state evaluation value of the historical data of the energy storage power station on each state evaluation index, and divide the state evaluation value to obtain a positive control set and a negative control set.
[0042] S130, calculating the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set.
[0043] Among them, the first correlation degree can reflect the correlation degree between the current state estimation value and the state estimation value of each dimension in the positive control set. The larger the first correlation degree is, the more positive the current state data presents in the multi-dimensional evaluation index. The first correlation degree can reflect the correlation degree between the current state estimation value and the state estimation value of each dimension in the negative control set. The larger the second correlation degree is, the more negative the current state data presents in the multi-dimensional evaluation index.
[0044] In this embodiment, calculating the correlation between the current state estimation value vector and the control set includes: calculating a first correlation between the current state estimation value vector and the positive control set, and calculating a second correlation between the current state estimation value vector and the negative control set.
[0045] S140 , drawing a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment.
[0046] The state vector diagram is a two-dimensional vector diagram, and the horizontal axis and the vertical axis may be the first correlation degree and the second correlation degree respectively.
[0047] In this embodiment, the first correlation degree and the second correlation degree are used as correlation degree data pairs of current state data, and the correlation degree data pairs corresponding to the current state data at each moment are plotted in a two-dimensional vector diagram to obtain a state vector diagram of the energy storage power station.
[0048] S150. Evaluate the state change of the energy storage power station according to the state displacement vector between the state vectors at each moment on the state vector diagram.
[0049] Among them, on the state vector diagram of the energy storage power station, the state displacement vector between the state vectors at each moment is calculated, and the state displacement vector can reflect the changing trend of the state of the energy storage power station over time. If the state displacement vector is more inclined to the direction of positive correlation, it means that the state change of the energy storage power station presents a positive trend; if the state displacement vector is more inclined to the direction of positive correlation, it means that the state change of the energy storage power station presents a negative trend.
[0050] The technical solution of the embodiment of the present invention obtains the current state data of the energy storage power station at at least two moments, and calculates the current state estimation value vector corresponding to the current state data at each moment; obtains a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set; calculates the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set; draws a state vector diagram of the energy storage power station according to the first correlation and the second correlation corresponding to the current state data at each moment; evaluates the state change of the energy storage power station according to the vector displacement between the state vectors at each moment on the state vector diagram, thereby realizing a global evaluation of the state change trend of the energy storage power station from the time dimension, and being able to intuitively understand the state change trend of the energy storage power station.
[0051] In an optional embodiment of this embodiment, obtaining current status data of the energy storage power station at at least two moments includes:
[0052] Establish a simulation model of the energy storage power station under charging and discharging conditions;
[0053] Acquiring current state data of the energy storage power station at at least two moments through the simulation model;
[0054] The simulation model is as follows: when the energy storage power station is in a charging state, when Soc u,t ≥P E,t When Soc t+△t =Soc t +ηP E,t △t; when Soc u,t <P E,t When Soc t+△t =Soc max ;
[0055] Among them, Soc u,t =Soc max -Soc t ,
[0056] When the energy storage power station is in a discharging state, when Soc u,t ≥P E,t hour, When Soc u,t <P E,t When Soc t+△t =Soc min ;
[0057] Among them, Soc u,t =Soc t -Soc min ,
[0058] When the energy storage power station is in an idle state, Soc t+△t =Soc t , P E,t =0;
[0059] When Soc t (1-Y D )≥Soc min When Soc t+△t =Soc t (1-Y D ); when Soc t (1-Y D ) <Soc min When Soc t+△t =Soc min ;
[0060] Among them, P E,t is the real-time power of the energy storage power station at time t; △P t is the power demand of the energy storage power station, Soc t is the real-time capacity of the energy storage power station at time t, Soc t+△t is the real-time capacity of the energy storage power station at time t, Soc u,tis the available capacity of the energy storage power station at time t, Soc max is the upper limit of the capacity of the energy storage power station, Soc min is the lower capacity limit of the energy storage power station, P charge,max is the maximum charging power of the energy storage station, P discharge,max is the maximum discharge power of the energy storage station; η is the charging and discharging efficiency of the energy storage station; Y D is the self-discharge rate of the energy storage power station.
[0061] In this embodiment, a simulation model of the energy storage power station in the charging and discharging state is established, and the current state data of the energy storage power station at at least two moments is calculated based on the simulation model. The charging and discharging action of the energy storage power station is closely related to the acceptance capacity of the power grid at time t. At time t, the power demand of the energy storage power station is defined as △P t , △P t =P G,t -P N,t ;P G,t is the theoretical power that the power station can generate at time t, P N,t represents the acceptable power of the power grid at time t; ΔP t ≥0 means that the grid has excess power at time t and needs to be charged by the energy storage station. ΔP t ≤0 means that there is a power shortage in the grid at time t and the energy storage power station needs to discharge, and "0" means that the energy storage power station does not need to operate.
[0062] Assume P E,t is the real-time power of the energy storage power station at time t; Soc t is the real-time capacity of the energy storage power station at time t, Soc t+△t is the real-time capacity of the energy storage power station at time t, Soc u,t is the available capacity of the energy storage power station at time t, Soc max is the upper limit of the capacity of the energy storage power station, Soc min is the lower capacity limit of the energy storage power station, P charge,max is the maximum charging power of the energy storage station, P discharge,max is the maximum discharge power of the energy storage station; η is the charging and discharging efficiency of the energy storage station; Y D is the self-discharge rate of the energy storage power station.
[0063] When the energy storage station is in the charging state, that is, when ΔP t When ≥0, Soc u,t =Soc max -Soc t ;Soc u,t is the available capacity of the energy storage power station at time t, Soc t is the real-time capacity of the energy storage power station at time t, Soc max It is the upper limit of the capacity of the energy storage power station.
[0064] When Soc u,t ≥P E,t When
[0065] When Soc u,t <P E,t When
[0066] When the energy storage station is in the discharge state, that is, when ΔP t When ≤0, Soc u,t =Soc t -Soc min ;Soc min It is the lower capacity limit of the energy storage power station.
[0067] When Soc u,t ≥P E,t When
[0068] When Soc u,t <P E,t When
[0069] When the energy storage power station is idle, that is, when △P t =0, Soc u,t =Soc t ;
[0070] exist
[0071] Since the energy storage battery is in an idle state, it will self-discharge. Self-discharge refers to the phenomenon that the power automatically decreases or disappears. The parameter to measure the size of self-discharge is the self-discharge rate, which refers to the percentage of the capacity of the energy storage power station that decreases autonomously in unit time. The unit time is usually expressed in days, months or years.
[0072] At (t+△t), the energy storage battery is self-discharged and defined as Y D is the self-discharge rate of battery energy storage, then when Soc t (1-Y D )≥Soc min When the real-time capacity of the energy storage battery at (t+△t) is corrected to: Soc t+△t =Soc t (1-Y D ); when Soc t (1-Y D ) <Soc min When the real-time capacity of the energy storage battery at (t+△t) is corrected to: Soc t+△t=Soc min .
[0073] In an optional embodiment of this embodiment, S120, obtaining a comparison set of state evaluation indicators of the energy storage power station, includes:
[0074] S121. Obtain historical status data of the energy storage power station.
[0075] In this embodiment, the historical status data of the energy storage power station may be obtained by: obtaining the historical status data of the energy storage power station through a log file of the energy storage power station or a sensor disposed in the energy storage power station.
[0076] S122. Calculate a historical state estimation value vector corresponding to the historical state data; the historical state estimation value vector includes: historical state estimation values of the historical state data on multi-dimensional state evaluation indicators.
[0077] The historical state estimation value is the state estimation value of the historical data on the state evaluation index. The historical state estimation value vector is a multi-dimensional vector composed of the historical state estimation values corresponding to the multi-dimensional state evaluation index.
[0078] In this embodiment, a preset multi-dimensional state evaluation index is obtained, and the historical state estimation value of the historical state data on the state evaluation index of each dimension is calculated respectively according to the calculation method of the state evaluation index to obtain a historical state estimation value vector composed of the multi-dimensional historical state estimation values.
[0079] S123: Determine a set of historical highest state estimation values corresponding to the state evaluation indicators of each dimension in the historical state estimation value vector as a positive control set.
[0080] S124. Determine a set of historical minimum state estimation values corresponding to the state evaluation indicators of each dimension in the historical state estimation value vector as a negative control set.
[0081] In this embodiment, the historical highest state estimation values corresponding to the state evaluation indicators of each dimension constitute a positive control set, which is used as a control set to determine whether the current state estimation value vector shows a positive trend; the historical lowest state estimation values corresponding to the state evaluation indicators of each dimension constitute a negative control set, which is used as a control set to determine whether the current state estimation value vector shows a negative trend.
[0082] In an optional embodiment of the embodiment of the present invention, the status assessment indicators include: energy supply reliability status assessment indicators, equipment health status assessment indicators and environmental protection benefit status assessment indicators; wherein, the energy supply reliability status assessment indicators include: energy supply quality qualification rate, energy supply reliability rate, frequency and peak regulation capability; the equipment health status assessment indicators include: equipment average overload rate, equipment failure rate, equipment operating loss and equipment aging degree; the environmental protection benefit status assessment indicators include: renewable energy consumption contribution and pollutant emission reduction.
[0083] In this embodiment, the state of the energy storage power station is mainly manifested in three aspects: energy supply reliability, equipment health, and environmental protection benefits. Energy supply reliability is the external state of the energy storage power station, which is directly reflected in the energy supply quality and "dual regulation" capability. In terms of energy supply reliability, the energy supply reliability status evaluation index includes three indicators, namely, energy supply quality qualification rate, energy supply reliability rate, and frequency and peak regulation capability (i.e., "dual regulation" capability). The energy supply voltage and energy supply power of the energy storage power station are important indicators that are indispensable for the energy supply quality qualification rate. The energy supply reliability rate is the most intuitive indicator to describe the energy supply reliability performance, and it has a strong correlation with the health status of the energy storage power station. The higher its value, the higher the health level. The "dual regulation" capability is an important part of the energy storage power station for the power grid energy supply that cannot be ignored, and it is also the original intention of the energy storage power station. The "dual regulation" capability mainly includes frequency regulation mileage and peak regulation amplitude. The frequency regulation mileage reflects the actual contribution of the energy storage power station to frequency regulation during the dispatching cycle, and the peak regulation amplitude is the actual adjustable range of the energy storage power station.
[0084] Exemplarily, the energy supply quality pass rate is calculated as follows: Among them, A1 is the energy supply quality qualification rate, α is the energy supply quality qualification time of the energy storage station, and β is the total energy supply time of the energy storage station. The calculation method of energy supply reliability is: Among them, A2 is the energy supply reliability rate, E loss is the average failure time of the energy storage power station. The frequency regulation mileage of the energy storage power station in a state assessment cycle is: Among them, P m is the actual output at the tth moment, and T is the total number of moments in the state evaluation cycle. The peak-shaving amplitude is δ=P E,max -P E,min ; Among them, P E,max and P E,min are the maximum and minimum output of the energy storage power station respectively. The peak and frequency regulation capabilities are Among them, A3 is the peak-shaving and frequency-shaving capability, b1 and b2 are the weight coefficients of frequency-shaving mileage and peak-shaving amplitude, respectively.
[0085] In terms of equipment health, the equipment health status assessment indicators include: equipment average overload rate, equipment failure rate, equipment operating loss and equipment aging degree, a total of 4 indicators. Equipment overload can cause equipment damage, which is not good for the health of the energy storage power station. Therefore, the average equipment overload rate is selected as one of the status assessment indicators. The equipment failure rate is an indicator that cannot be ignored for equipment health. The average equipment failure rate during working hours is used to simplify the situation of the entire energy station. The equipment loss rate is the operating loss when the energy storage power station is put into use after being connected to the grid. Due to the wide variety of equipment types and frequency of use, its loss can be merged into the battery loss of the energy storage power station. The degree of equipment aging has an important impact on the equipment health status of the energy storage power station, but it is difficult to quantify it. Defining it as a qualitative indicator can make a comprehensive judgment from the aspects of equipment service life and equipment operating status. Combined with the health of the equipment, the safety of personnel when the current equipment is used can be further evaluated.
[0086] For example, the average overload rate of the equipment is:
[0087] Among them, B1 is the average overload rate of the equipment, N is the total number of state estimation moments, and f d It means that the dth device is overloaded; D is the total number of devices in the energy storage power station.
[0088] The equipment failure rate is:
[0089] Among them, B2 is the equipment failure rate, D is the total number of equipment in the energy storage power station; H d is the downtime of the dth device due to equipment failure; H0 is the planned operating time. The loss rate of the equipment energy storage power station is directly reflected in the working life of the energy storage battery. Factors affecting the working life of the power station include ambient temperature, peak charging current, depth of discharge (DOD), number of charge and discharge cycles, etc. The working life of the power station is closely related to its working mode, among which DOD is the most critical factor affecting the maximum number of battery cycles. The larger the DOD, the fewer the number of battery cycles and the shorter the corresponding working life. In engineering, the relationship curve between the DOD of a specific type of battery and its maximum number of cycles measured experimentally is usually used as a benchmark, and the equivalent cycle life method is used to scientifically calculate the life loss of the energy storage power station.
[0090] The equivalent cycle life method converts the maximum number of cycles corresponding to different DODs to the equivalent number of cycles under full charge and discharge conditions (i.e., when DOD=1) and adds them up. Then, the actual working life of the energy storage system is deduced based on the maximum number of cycles when DOD=1. The SOC change curve of the energy storage power station is usually used to characterize the charge and discharge cycle. A complete charge and discharge cycle is a half-cycle of a charge cycle plus a half-cycle of a discharge cycle, i.e., SOC=1. a→Soc b →Soc c , a charging half cycle is Soc a →Soc b , a discharge half cycle Soc b →Soc a , where 0≤Soc a ≠Soc b ≤1, the corresponding DOD is: DOD ab =|Soc a -Soc b |; Define the equivalent cycle number of the energy storage power station as
[0091] Among them, DOD k is the discharge depth at the kth cycle, is the maximum number of cycles corresponding to the discharge depth. N(1) is the maximum number of cycles corresponding to the discharge depth DOD = 1. When half cycles occur in actual working conditions, the calculation should be halved.
[0092] According to the actual SOC change curve of the battery during the research period, the rain flow counting method is usually used in engineering to count and extract each actual cycle. The total number of cycles is K, corresponding to DOD1, DOD2, ..., DOD K , then the equivalent number of cycles N′ within the study duration is: Equipment loss indicators are: Among them, the equipment loss index is B3. When B3=1, it can be considered that the equipment loss of the energy storage power station has reached the limit.
[0093] Personnel safety is related to the current health status of the equipment. Personnel safety evaluation (B) can be established based on various indicator parameters: Among them, a, b, c and d represent the weight of the impact of each current indicator on equipment health.
[0094] In terms of environmental benefits, the environmental benefit status assessment indicators include two indicators: renewable energy consumption contribution and pollutant emission reduction. Renewable energy consumption contribution refers to the increase in renewable energy consumption due to the participation of energy storage power stations in peak load regulation and frequency regulation. Energy storage power stations promote wind and solar power generation and can replace thermal power generation to reduce pollutant emissions.
[0095] In the peak load regulation scenario, the energy storage power station improves the renewable energy consumption capacity of the system during the valley by shaving the peak and filling the valley, thereby increasing the amount of renewable energy consumed; in the frequency regulation scenario, the energy storage power station participates in the system frequency regulation by replacing renewable energy, thereby improving the level of renewable energy consumption. In order to more reasonably reflect this indicator, it is standardized and can be expressed as: Among them, C1 is the contribution of renewable energy consumption, P renew It is the renewable energy electricity generated by the energy storage power station to participate in peak load and frequency regulation, and P is the rated capacity of the energy storage power station.
[0096] When renewable energy stations release the same amount of electricity as thermal power units, their pollutant emission reduction benefits are: Among them, V j is the emission reduction value per unit mass of the jth pollutant, J is the total number of pollutant types; Q ih is the emission of the jth pollutant of the thermal power unit, kg / MWh; Q irenew is the emission of the jth pollutant from the renewable energy station, kg / MWh.
[0097] Embodiment 2
[0098] Figure 2 1 is a flow chart of a state evaluation method for an energy storage power station provided by the second embodiment of the present invention. This embodiment further defines the calculation method of the correlation degree and the state vector diagram generation method of the above embodiment. Figure 2 As shown, the method includes:
[0099] S210, obtaining current state data of the energy storage power station at at least two moments, and calculating a current state estimation value vector corresponding to the current state data at each moment;
[0100] S220, obtaining a control set of state assessment indicators of the energy storage power station; the control set includes: a positive control set and a negative control set.
[0101] In this embodiment, the positive control set can be expressed as The negative control set can be expressed as in, is the historical highest state estimation value corresponding to the g-th dimension state evaluation indicator; is the historical lowest state estimation value corresponding to the state evaluation indicator of the g-th dimension, and G is the number of state evaluation indicators.
[0102] S230: Calculate a first degree of association between the current state estimation value vector and the positive control set.
[0103] In this embodiment, the calculation formula of the first correlation degree between the current state estimation value vector and the positive control set is:
[0104]
[0105]
[0106] in, represents the first degree of association between the current state estimation value vector at time t and the positive control set, represents the first correlation coefficient between the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time and the positive control set, is the element corresponding to the g-th dimension state evaluation index in the positive control set, s tg is the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time; ρ is the resolution coefficient.
[0107] S240: Calculate a second degree of association between the current state estimation value vector and the negative control set.
[0108] In this embodiment, the calculation formula of the second correlation degree between the current state estimation value vector and the negative control set is:
[0109]
[0110]
[0111] in, represents the second correlation between the current state estimation value vector at time t and the negative control set, represents the second correlation coefficient between the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time and the negative control set, is the element corresponding to the g-th dimension state evaluation index in the negative control set, s tg is the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time; ρ is the resolution coefficient.
[0112] S250 , establishing a state vector coordinate system with the first correlation degree and the second correlation degree as two-dimensional coordinate axes.
[0113] Exemplarily, a rectangular coordinate system is established with the first correlation as the vertical axis and the second correlation as the horizontal axis as the state vector coordinate system.
[0114] S260 . For the current state data at each moment, determine a current state vector according to a first correlation degree and a second correlation degree corresponding to the current state data.
[0115] In this embodiment, the current state vector represents the state of the energy storage power station through the correlation with the positive control set and the negative control set. The starting point of the current state vector is the origin of the coordinate (0.0), and the end point is (first correlation, second correlation).
[0116] S270. Draw the current state vector at each moment in the state vector coordinate system to obtain a state vector diagram of the energy storage power station.
[0117] In this implementation, Figure 3It is a state vector diagram of an energy storage power station, such as Figure 3 As shown, when the state of the energy storage power station develops from the state vector x1 at the first moment to the state vector x2 at the second moment, the state displacement vector Δx can effectively describe the development process of things.
[0118] S280. Evaluate the state change of the energy storage power station according to the state displacement vector between the state vectors at each moment on the state vector diagram.
[0119] In this embodiment, if Figure 3 As shown, if the state displacement vector Δx points to the second quadrant, it means that the energy storage power station changes in a positive direction with time; if it points to the second quadrant, it means that the energy storage power station changes in a negative direction with time.
[0120] The technical solution of the embodiment of the present invention obtains the current state data of the energy storage power station at at least two moments, and calculates the current state estimation value vector corresponding to the current state data at each moment; obtains a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set; calculates the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set; draws a state vector diagram of the energy storage power station according to the first correlation and the second correlation corresponding to the current state data at each moment; evaluates the state change of the energy storage power station according to the vector displacement between the state vectors at each moment on the state vector diagram, thereby realizing a global evaluation of the state change trend of the energy storage power station from the time dimension, and being able to intuitively understand the state change trend of the energy storage power station.
[0121] In an optional embodiment of the embodiment of the present invention, the current state vector at each moment is plotted in the state vector coordinate system to obtain a state vector diagram of the energy storage power station, including:
[0122] Determine a target state vector corresponding to each of the state vectors in multiple time dimensions;
[0123] The state displacement vectors of each target state vector in the time dimension are plotted in the state vector coordinate system to obtain a state vector diagram of the energy storage power station.
[0124] Although the state displacement vector in the time dimension can represent the state change within a period of time, from the perspective of global observation, its development process diagram will be too messy. This will make it impossible for decision makers to grasp the development direction of the evaluation object, affecting the decision makers' specific judgment and decision. Therefore, in this embodiment, the introduction of the time dimension can well solve the global observation problem, convert the state vector of one time dimension to multiple time dimensions, and well grasp the development process of the health of the evaluation object.
[0125] In this embodiment, the target state vector corresponding to each state vector in multiple time dimensions is determined as: Among them, x t is the state vector at the tth moment, x t ′ is the target state vector at the tth moment. For example, Figure 4 is another state vector diagram of an energy storage power station. Figure 4 As shown, the state vectors at two moments are synthesized to obtain a synthetic state vector. Figure 4 The state displacement vectors at different times in the state vector diagram shown reflect the state changes of the energy storage power station at different times. If the state displacement vector continues to deviate upward, the positive correlation continues to increase, and the negative correlation continues to decrease, it means that the energy storage power station is constantly developing in a positive direction. If the state displacement vector continues to deviate downward, the positive correlation continues to decrease, and the negative correlation continues to increase, it means that the energy storage power station is constantly developing in a negative direction.
[0126] Embodiment 3
[0127] Figure 5 Schematic diagram of the structure of a state assessment device for an energy storage power station provided by Embodiment 3 of the present invention. Figure 5 As shown, the device includes: a data acquisition module 310, a control set acquisition module 320, a correlation calculation module 330, a vector diagram drawing module 340 and a state evaluation module 350; wherein,
[0128] The data acquisition module 310 is used to acquire the current state data of the energy storage power station at at least two moments, and calculate the current state estimation value vector corresponding to the current state data at each moment;
[0129] A control set acquisition module 320 is used to acquire a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set;
[0130] A correlation calculation module 330 is used to calculate the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set;
[0131] A vector diagram drawing module 340, configured to draw a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment;
[0132] The state evaluation module 350 is used to evaluate the state change of the energy storage power station according to the state displacement vector between the state vectors at each moment on the state vector diagram.
[0133] Optionally, the control set acquisition module 320 is specifically configured to:
[0134] Acquiring historical status data of the energy storage power station;
[0135] Calculating a historical state estimation value vector corresponding to the historical state data; the historical state estimation value vector includes: historical state estimation values of the historical state data on multi-dimensional state evaluation indicators;
[0136] Determine a set of historical highest state estimation values corresponding to each dimensional state evaluation indicator in the historical state estimation value vector as a positive control set;
[0137] A set of historical minimum state estimation values corresponding to the state evaluation indicators of each dimension in the historical state estimation value vector is determined as a negative control set.
[0138] Optionally, the correlation calculation module 330 includes:
[0139] The first calculation unit is used to calculate the first correlation degree between the current state estimation value vector and the positive control set, and the calculation formula is:
[0140]
[0141]
[0142] in, represents the first degree of association between the current state estimation value vector at the i-th moment and the positive control set, represents the first correlation coefficient between the current state estimation value corresponding to the j-th dimension state evaluation index in the current state estimation value vector at the i-th moment and the positive control set, is the element corresponding to the j-th dimension state evaluation index in the positive control set, s ij is the current state estimation value corresponding to the j-th dimension state evaluation index in the current state estimation value vector at the i-th moment; ρ is the resolution coefficient;
[0143] The second calculation unit is used to calculate the second correlation degree between the current state estimation value vector and the negative control set, and the calculation formula of the second correlation degree is:
[0144]
[0145]
[0146] in, represents the second correlation between the current state estimation value vector at the i-th moment and the negative control set, represents the second correlation coefficient between the current state estimation value corresponding to the j-th dimension state evaluation index in the current state estimation value vector at the i-th moment and the negative control set, is the element corresponding to the j-th dimension state evaluation index in the negative control set.
[0147] Optionally, the vector graph drawing module 340 is specifically used for:
[0148] Establishing a state vector coordinate system with the first correlation degree and the second correlation degree as two-dimensional coordinate axes;
[0149] For the current state data at each moment, determining a current state vector according to a first correlation degree and a second correlation degree corresponding to the current state data;
[0150] The current state vector at each moment is plotted in the state vector coordinate system to obtain a state vector diagram of the energy storage power station.
[0151] Optionally, the state assessment module 350 is specifically used for:
[0152] Determine a target state vector corresponding to each of the state vectors in multiple time dimensions;
[0153] The state displacement vectors of each target state vector in the time dimension are plotted in the state vector coordinate system to obtain a state vector diagram of the energy storage power station.
[0154] Optionally, the status assessment index includes: energy supply reliability status assessment index, equipment health status assessment index and environmental protection benefit status assessment index;
[0155] Among them, energy supply reliability status assessment indicators include: energy supply quality qualification rate, energy supply reliability rate, frequency and peak regulation capability; equipment health status assessment indicators include: equipment average overload rate, equipment failure rate, equipment operating loss and equipment aging degree; environmental protection benefit status assessment indicators include: renewable energy consumption contribution and pollutant emission reduction.
[0156] Optionally, the data acquisition module 310 is specifically used to:
[0157] Establish a simulation model of the energy storage power station under charging and discharging conditions;
[0158] Acquiring current state data of the energy storage power station at at least two moments through the simulation model;
[0159] The simulation model is as follows: when the energy storage station is in the charging state, u,t ≥P E,t When Soc t+△t =Soc t +ηP E,t △t; when Socu,t <P E,t When Soc t+△t =Soc max ;
[0160] Among them, Soc u,t =Soc max -Soc t ,
[0161] When the energy storage power station is in the discharge state, when Soc u,t ≥P E,t hour, When Soc u,t <P E,t When Soc t+△t =Soc min ;
[0162] Among them, Soc u,t =Soc t -Soc min ,
[0163] When the energy storage power station is in an idle state, Soc t+△t =Soc t , P E,t =0;
[0164] When Soc t (1-Y D )≥Soc min When Soc t+△t =Soc t (1-Y D ); when Soc t (1-Y D ) <Soc min When Soc t+△t =Soc min ;
[0165] Among them, P E,t is the real-time power of the energy storage power station at time t; △P t is the power demand of the energy storage power station, Soc t is the real-time capacity of the energy storage power station at time t, Soc t+△t is the real-time capacity of the energy storage power station at time t, Soc u,t is the available capacity of the energy storage power station at time t, Soc max is the upper limit of the capacity of the energy storage power station, Soc min is the lower capacity limit of the energy storage power station, P charge,max is the maximum charging power of the energy storage station, P discharge,maxis the maximum discharge power of the energy storage station; η is the charging and discharging efficiency of the energy storage station; Y D is the self-discharge rate of the energy storage power station.
[0166] The state assessment device of the energy storage power station provided in the embodiment of the present invention can execute the state assessment method of the energy storage power station provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0167] Embodiment 4
[0168] Figure 6 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0169] like Figure 6 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0170] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0171] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a state assessment method for an energy storage power station.
[0172] In some embodiments, the state assessment method of the energy storage power station may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the state assessment method of the energy storage power station described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the state assessment method of the energy storage power station in any other appropriate manner (e.g., by means of firmware).
[0173] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0174] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0175] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0176] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0177] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0178] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0179] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0180] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A state assessment method for an energy storage power station, It is characterized in that The method comprises: Obtaining current state data of the energy storage power station at at least two moments, and calculating a current state estimation value vector corresponding to the current state data at each moment; Obtaining a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set; Calculating the degree of association between the current state estimation value vector and the control set; wherein the degree of association includes: a first degree of association between the current state estimation value vector and the positive control set, and a second degree of association between the current state estimation value vector and the negative control set; Draw a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment; Evaluating the state change of the energy storage power station according to the state displacement vector between the state vectors at each moment on the state vector diagram; The step of calculating the correlation between the current state estimation value vector and the reference set includes: Calculate the first degree of association between the current state estimation value vector and the positive control set, the calculation formula of the first degree of association is: in, represents the first degree of association between the current state estimation value vector at time t and the positive control set, represents the first correlation coefficient between the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time and the positive control set, is the element corresponding to the g-th dimension state evaluation index in the positive control set, s tg is the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time; ρ is the resolution coefficient; G is the number of state evaluation indicators; Calculate the second degree of association between the current state estimation value vector and the negative control set, the calculation formula of the second degree of association is: in, represents the second correlation between the current state estimation value vector at time t and the negative control set, represents the second correlation coefficient between the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time and the negative control set, is the element corresponding to the g-th dimension state evaluation index in the negative control set, s tg is the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time; ρ is the resolution coefficient.
2. The method according to claim 1, It is characterized in that Obtaining a comparison set of state assessment indicators of the energy storage power station, including: Acquiring historical status data of the energy storage power station; Calculating a historical state estimation value vector corresponding to the historical state data; the historical state estimation value vector includes: historical state estimation values of the historical state data on multi-dimensional state evaluation indicators; Determine a set of historical highest state estimation values corresponding to each dimensional state evaluation indicator in the historical state estimation value vector as a positive control set; A set of historical minimum state estimation values corresponding to the state evaluation indicators of each dimension in the historical state estimation value vector is determined as a negative control set.
3. The method according to claim 1, It is characterized in that The step of drawing a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment includes: Establishing a state vector coordinate system with the first correlation degree and the second correlation degree as two-dimensional coordinate axes; For the current state data at each moment, determining a current state vector according to a first correlation degree and a second correlation degree corresponding to the current state data; The current state vector at each moment is plotted in the state vector coordinate system to obtain a state vector diagram of the energy storage power station.
4. The method according to claim 3, It is characterized in that The step of drawing the current state vector at each moment in the state vector coordinate system to obtain the state vector diagram of the energy storage power station includes: Determine a target state vector corresponding to each of the state vectors in multiple time dimensions; The state displacement vectors of each target state vector in the time dimension are plotted in the state vector coordinate system to obtain a state vector diagram of the energy storage power station.
5. The method according to claim 1, It is characterized in that The status evaluation indicators include: energy supply reliability status evaluation indicators, equipment health status evaluation indicators and environmental protection benefit status evaluation indicators; Among them, energy supply reliability status assessment indicators include: energy supply quality qualification rate, energy supply reliability rate, frequency and peak regulation capability; equipment health status assessment indicators include: equipment average overload rate, equipment failure rate, equipment operating loss and equipment aging degree; environmental protection benefit status assessment indicators include: renewable energy consumption contribution and pollutant emission reduction.
6. The method according to claim 1, It is characterized in that The obtaining of current status data of the energy storage power station at at least two moments includes: Establish a simulation model of the energy storage power station under charging and discharging conditions; Acquiring current state data of the energy storage power station at at least two moments through the simulation model; The simulation model is as follows: when the energy storage station is in the charging state, u,t ≥P E,t When Soc t+Δt =Soc t +ηP E,t Δt; when Soc u,t <P E,t When Soc t+Δt =Soc max ; Among them, Soc u,t =Soc max -Soc t , When the energy storage power station is in the discharge state, when Soc u,t ≥P E,t hour, When Soc u,t <P E,t When Soc t+Δt =Soc min ; Among them, Soc u,t =Soc t -Soc min , When the energy storage power station is in an idle state, Soc t+Δt =Soc t , P E,t =0; When Soc t (1-Y D )≥Soc min When Soc t+Δt =Soc t (1-Y D ); when Soc t (1-Y D )<Soc min When Soc t+Δt =Soc min ; Among them, P E,t is the real-time power of the energy storage power station at time t; ΔP t is the power demand of the energy storage power station, Soc t is the real-time capacity of the energy storage power station at time t, Soc t+Δt is the real-time capacity of the energy storage power station at time t+△t, Soc u,t is the available capacity of the energy storage power station at time t, Soc max is the upper limit of the capacity of the energy storage power station, Soc min is the lower capacity limit of the energy storage power station, P charge,max is the maximum charging power of the energy storage station, P discharge,max is the maximum discharge power of the energy storage station; η is the charging and discharging efficiency of the energy storage station; Y D is the self-discharge rate of the energy storage power station; △t is the charging and discharging time.
7. A state assessment device for an energy storage power station, It is characterized in that include: A data acquisition module, used to acquire current state data of the energy storage power station at at least two moments, and calculate a current state estimation value vector corresponding to the current state data at each moment; A control set acquisition module is used to acquire a control set of the energy storage power station on the state evaluation index; the control set includes: a positive control set and a negative control set; A correlation calculation module, used to calculate the correlation between the current state estimation value vector and the control set; wherein the correlation includes: a first correlation between the current state estimation value vector and the positive control set, and a second correlation between the current state estimation value vector and the negative control set; A vector diagram drawing module, used for drawing a state vector diagram of the energy storage power station according to the first correlation degree and the second correlation degree corresponding to the current state data at each moment; A state evaluation module, used to evaluate the state change of the energy storage power station according to the state displacement vector between the state vectors at each moment on the state vector diagram; Wherein, the correlation calculation module includes: The first calculation unit is used to calculate the first correlation degree between the current state estimation value vector and the positive control set, and the calculation formula is: in, represents the first degree of association between the current state estimation value vector at time t and the positive control set, represents the first correlation coefficient between the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time and the positive control set, is the element corresponding to the g-th dimension state evaluation index in the positive control set, s tg is the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time; ρ is the resolution coefficient; G is the number of state evaluation indicators; The second calculation unit is used to calculate the second correlation degree between the current state estimation value vector and the negative control set, and the calculation formula of the second correlation degree is: in, represents the second correlation between the current state estimation value vector at time t and the negative control set, represents the second correlation coefficient between the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time and the negative control set, is the element corresponding to the g-th dimension state evaluation index in the negative control set, s tg is the current state estimation value corresponding to the g-th dimension state evaluation index in the current state estimation value vector at the t-th time; ρ is the resolution coefficient.
8. An electronic device, It is characterized in that The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the state assessment method of the energy storage power station according to any one of claims 1 to 6.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the state assessment method of an energy storage power station according to any one of claims 1 to 6 when executed.
Citation Information
Patent Citations
Energy storage power station battery compartment battery fault pre-judging and positioning method
CN112731159A
Multi-dimensional evaluation method and system for power generation output characteristics of new energy station
CN113346491A
Energy storage scheduling support evaluation method
CN114865668A
Comprehensive evaluation system and method for running state of distributed energy storage device
CN115511270A