A planning method and system for construction scheme of earthwork excavation in soft soil deep foundation pit
By constructing a three-dimensional numerical simulation model and a constitutive model, the impact of deep foundation pit construction on the deformation of surrounding buildings was analyzed, and the construction process was adjusted to solve the problem of poor deformation control accuracy in deep foundation pit construction and achieve more precise deformation control. and optimization of construction plans.
Patent Information
- Application Number
- CN202311261467.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-09-26
AI Technical Summary
Existing deep foundation pit construction planning methods have poor accuracy when controlling deformation of the surrounding environment. Especially in complex environments, it is difficult to effectively decompose deformation control values, affecting the accuracy and safety of construction.
By obtaining the soft soil type and soil parameters of the target construction area, selecting an appropriate constitutive model, constructing a three-dimensional numerical simulation model, analyzing the deformation impact of deep foundation pit construction on surrounding buildings, and adjusting the construction process based on the analysis results to determine the optimal An optimal deformation control scheme combined with an early warning mechanism ensures construction safety.
It improves the accuracy of the deformation control of the surrounding environment during deep foundation pit construction, ensures that the deformation impact of each construction process is controllable, solves the problem of difficult control of deformation values in complex environments, and achieves more accurate construction plan planning.
Smart Images

Figure CN117436164B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction planning, and in particular to a method and a system for planning a construction plan for earthwork excavation in a soft soil deep foundation pit. Background Art
[0002] With the rapid development of underground construction technology, underground construction schemes are being used more and more widely. When conducting underground construction, the commonly used scheme is to adopt the deep foundation pit construction method, that is, the excavation depth in the target construction area exceeds 5 meters, or the depth does not exceed 5 meters, but the geological conditions, surrounding environment and underground pipelines are very complex. At present, the design and planning of deep foundation pit projects mainly focus on deformation control to control the deformation impact of engineering construction on surrounding buildings. However, the existing deformation control is limited to the total cumulative deformation value of surrounding buildings, and does not consider and analyze the impact of each sub-project on the deformation control of the surrounding buildings of the foundation pit and the surrounding environment. Under the characteristics of high and difficult requirements for deformation control of deep foundation pits in complex soft soil environments, in order to limit the deformation control value of the foundation pit and the surrounding environment, it is necessary to decompose the deformation control value into each construction process and set the deformation control warning value for each stage. It can be seen that the existing deep foundation pit construction planning method has the problem of poor control accuracy of the surrounding environment deformation value. Summary of the invention
[0003] The invention provides a soft soil deep foundation pit earthwork excavation construction plan planning method and planning system, so as to solve the problem that the existing deep foundation pit construction planning method has poor control accuracy of surrounding environment deformation value.
[0004] In order to achieve the above object, the present invention is implemented by the following technical solutions:
[0005] In a first aspect, the present invention provides a method for planning a construction plan for earthwork excavation in a soft soil deep foundation pit, comprising:
[0006] Obtaining the soft soil type and soil parameters of the target construction area, and selecting a corresponding constitutive model according to the soft soil type;
[0007] Determine the impact range of deep foundation pit construction and collect load parameters of buildings within the impact range;
[0008] A three-dimensional numerical simulation model is constructed according to the soil parameters, the constitutive model, and the load parameters, and the deformation influence of the deep foundation pit construction process on the buildings within the influence range is analyzed through the three-dimensional numerical simulation model;
[0009] Based on the deformation influence, the deep foundation pit construction process in the target construction area is adjusted to determine the optimal construction plan for deformation control.
[0010] Optionally, the step of obtaining the soft soil type and soil parameters of the target construction area includes:
[0011] Conduct on-site investigation of the soft soil in the target construction area, and determine the soft soil type and soil parameters of the target construction area based on the results of the on-site investigation.
[0012] Optionally, the selecting a corresponding constitutive model according to the soft soil type includes:
[0013] When the soft soil type is a complex soft soil type, a small strain elastoplastic model is selected as the constitutive model;
[0014] When the soft soil type is a soft soil type for which small strain parameters are difficult to obtain, a hardening elastoplastic model is selected as the constitutive model.
[0015] Optionally, the collecting load parameters of the buildings within the influence range includes:
[0016] Conduct on-site surveys on the buildings within the impact range to obtain the positional relationship between the buildings and the target construction area, the foundation form of the buildings, and the loads borne by the foundations, and use the positional relationship, foundation form, and loads borne as load parameters of the buildings.
[0017] Optionally, the analyzing the influence of the deep foundation pit construction process on the deformation of the buildings within the influence range by means of a three-dimensional numerical simulation model includes:
[0018] Analyze the construction load, surrounding pile load, traffic dynamic load, and groundwater seepage of the deep foundation pit construction process through a three-dimensional numerical simulation model, and calculate the deformation control value of the building within the said influence range;
[0019] The deformation control value as well as the construction load, surrounding pile load, traffic dynamic load and groundwater seepage are taken as the deformation influence of the building within the influence range.
[0020] Optionally, adjusting the deep foundation pit construction process in the target construction area based on the deformation influence includes:
[0021] The optimal construction plan is controlled according to the deformation influence, and the deep foundation pit construction process is adjusted in combination with the deformation control value.
[0022] Optionally, the method further includes:
[0023] Early warning is carried out based on the deep foundation pit construction process in the target construction area, where the early warning mechanism includes:
[0024] The data is stable and controllable. According to normal dynamic construction, the deformation of the foundation pit and environment in the next stage is predicted through parameter optimization to guide the construction.
[0025] When the deformation is too large and approaches or exceeds the specified safety control standard, the factors affecting environmental changes are comprehensively analyzed based on the monitoring results, and timely measures are taken.
[0026] In a second aspect, the present invention provides a soft soil deep foundation pit earthwork excavation construction plan planning system, including a processor and a memory;
[0027] Memory, used to store computer programs;
[0028] The processor is used to implement any method step described in the first aspect when executing a program stored in the memory.
[0029] Beneficial effects:
[0030] The method for planning a construction plan for a soft soil deep foundation pit excavation provided by the present invention obtains the soft soil type and soil parameters of the target construction area, and selects a corresponding constitutive model according to the soft soil type; determines the influence range of the deep foundation pit construction, and collects the load parameters of the buildings within the influence range; constructs a three-dimensional numerical simulation model according to the soil parameters, the constitutive model, and the load parameters, and analyzes the deformation influence of the deep foundation pit construction process on the buildings within the influence range through the three-dimensional numerical simulation model; adjusts the deep foundation pit construction process in the target construction area based on the deformation influence, and determines the optimal construction plan for deformation control; the method understands the deformation control value generated by each construction process by analyzing each construction process, thereby solving the problem that the existing deep foundation pit construction planning method is difficult to control the deformation value under complex surrounding environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 The present invention is a flowchart of a method for planning a construction plan for a soft soil deep foundation pit according to a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0032] The technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one" or "one" do not indicate quantity restrictions, but indicate the existence of at least one. Words such as "connect" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship also changes accordingly.
[0034] Example 1
[0035] See also Figure 1 The present application embodiment provides a method for planning a construction plan for a soft soil deep foundation pit excavation, comprising:
[0036] Obtaining the soft soil type and soil parameters of the target construction area, and selecting a corresponding constitutive model according to the soft soil type;
[0037] Determine the impact range of deep foundation pit construction and collect load parameters of buildings within the impact range;
[0038] A three-dimensional numerical simulation model is constructed according to the soil parameters, the constitutive model, and the load parameters, and the deformation influence of the deep foundation pit construction process on the buildings within the influence range is analyzed through the three-dimensional numerical simulation model;
[0039] Based on the deformation influence, the deep foundation pit construction process in the target construction area is adjusted to determine the optimal construction plan for deformation control.
[0040] Optionally, the obtaining of the soft soil type and soil parameters of the target construction area includes:
[0041] Conduct on-site investigation of the soft soil in the target construction area, and determine the soft soil type and soil parameters of the target construction area based on the results of the on-site investigation.
[0042] In the above embodiment, the soft soil type and soil parameters of the target construction area are obtained, and the corresponding constitutive model is selected according to the soft soil type; the influence range of the deep foundation pit construction is determined, and the load parameters of the buildings within the influence range are collected; a three-dimensional numerical simulation model is constructed according to the soil parameters, the constitutive model, and the load parameters, and the deformation influence of the deep foundation pit construction process on the buildings within the influence range is analyzed through the three-dimensional numerical simulation model; the deep foundation pit construction process in the target construction area is adjusted based on the deformation influence, and the optimal construction plan for deformation control is determined; this method solves the problem of the difficulty in controlling deformation values in the existing deep foundation pit construction planning method under complex surrounding environment by analyzing each construction process.
[0043] Optionally, the selecting a corresponding constitutive model according to the soft soil type includes:
[0044] When the soft soil type is a complex soft soil type, a small strain elastoplastic model is selected as the constitutive model;
[0045] When the soft soil type is a soft soil type for which small strain parameters are difficult to obtain, a hardening elastoplastic model is selected as the constitutive model.
[0046] Optionally, the collecting load parameters of the buildings within the influence range includes:
[0047] Conduct on-site surveys on the buildings within the impact range to obtain the positional relationship between the buildings and the target construction area, the foundation form of the buildings, and the loads borne by the buildings, and use the positional relationship, foundation form, and loads borne as load parameters of the buildings.
[0048] Optionally, the analyzing the influence of the deep foundation pit construction process on the deformation of the buildings within the influence range by means of a three-dimensional numerical simulation model includes:
[0049] Analyze the construction load, surrounding pile load, traffic dynamic load, and groundwater seepage of the deep foundation pit construction process through a three-dimensional numerical simulation model, and calculate the deformation control value of the building within the said influence range;
[0050] The deformation control value as well as the construction load, surrounding pile load, traffic dynamic load and groundwater seepage are taken as the deformation influence of the building within the influence range.
[0051] Optionally, adjusting the deep foundation pit construction process in the target construction area based on the deformation influence includes:
[0052] The optimal construction plan is controlled according to the deformation influence, and the deep foundation pit construction process is adjusted in combination with the deformation control value.
[0053] Optionally, the method further includes:
[0054] Early warning is carried out based on the deep foundation pit construction process in the target construction area, where the early warning mechanism includes:
[0055] The data is stable and controllable. According to normal dynamic construction, the deformation of the foundation pit and environment in the next stage is predicted through parameter optimization to guide the construction.
[0056] When the deformation is too large and approaches or exceeds the specified safety control standard, the factors affecting the environmental changes are comprehensively analyzed based on the test results, and timely measures are taken.
[0057] Example 2
[0058] 1. Choose an appropriate constitutive model
[0059] Hardening elastoplastic models such as the HS model and the MCC model are relatively accurate in the deformation of the wall and the soil behind the wall, but they do not take into account the small strain characteristics of the soil, and the scope of influence of surface settlement is relatively large. Small strain elastoplastic models such as the HS-Small model are more suitable for analyzing the impact of foundation pit excavation on the surrounding environment. For numerical calculations of deep foundation pits in soft soil under complex environments, it is recommended to select a small strain elastoplastic model as the soil constitutive model, which can better predict the deformation of the surrounding environment. When small strain parameters are difficult to obtain, a hardening elastoplastic model can be selected.
[0060] 2. Selection of soil parameters
[0061] In terms of soil parameters, the current deep foundation pit engineering survey results mainly meet the calculation requirements of the elastic-ideal plastic model. Some of the main parameters required for the hardening elastic-plastic model and the small strain elastic-plastic model are not tested. Therefore, if the soil parameters of these two models are not obtained through experiments or there are no local empirical parameters, it is difficult to obtain accurate calculation results. At present, the industry and related scholars are also paying more and more attention to the important role of small strain characteristics of soil in predicting soil deformation. For example, Shanghai, Nanjing, Jinan and other places have carried out large-scale small strain parameter tests to determine the small strain hardening empirical parameters of local soil layers. The small strain parameters of soil layers in soft soil areas can refer to the local empirical parameters in Shanghai.
[0062] 3. Load determination
[0063] Before construction, a survey is conducted on the adjacent buildings (structures) within the main impact area of the foundation pit project. The survey content includes the positional relationship between the buildings (structures) and the foundation pit, the foundation form of the buildings (structures), and the loads borne by the buildings (including loads and permanent loads. If there is no specific data, they will be determined according to the specifications combined with actual conditions and experience).
[0064] 4. Preliminary determination of the site calculation model and clear construction procedures
[0065] A numerical model is established based on the determined constitutive model, soil parameters, loads, design drawings, etc. The model establishment must be consistent with the actual construction (including the consistency of model components with construction drawings, the consistency of excavation steps with construction plan procedures, etc.), and the accuracy of the calculation results must meet the engineering requirements.
[0066] 5. Construction plan optimization
[0067] Before construction, three-dimensional numerical simulation is used to analyze the impact of each sub-project construction process, especially the excavation of the foundation pit, on the deformation of adjacent buildings (structures). The construction environment, including construction loads, surrounding loads, traffic dynamic loads, groundwater seepage and other factors, is considered to determine the optimal construction plan for deformation control.
[0068] 6. Deformation Control Value Decomposition
[0069] According to the optimal construction plan for deformation control, combined with the designed deformation control value and the calculation results of each construction process, the deformation control standards for each construction stage are determined.
[0070] 7. Dynamic construction
[0071] The early warning mechanism is:
[0072] 1) The data is stable and controllable. According to normal dynamic construction, through parameter optimization, the deformation of the foundation pit and environment in the next stage is predicted to guide the construction.
[0073] 2) When the deformation is too large and approaches or exceeds the established safety control standard, comprehensively analyze the factors affecting environmental changes based on the monitoring results and take timely measures.
[0074] The numerical calculation results are compared with the monitoring results during the whole construction process. When the deformation value is warned, the calculation parameters are reduced or amplified. After resetting multiple groups of calculation parameters, a group of calculation parameters closest to the monitoring value is selected and verified with subsequent monitoring points. If there is a deviation, the inversion work is repeated. At present, some calculation software such as Midas GTS has parameter analysis function, which can quickly realize the above operation.
[0075] This embodiment also provides a soft soil deep foundation pit earthwork excavation construction plan planning system, including a processor and a memory;
[0076] Memory, used to store computer programs;
[0077] The processor is used to implement any method step in the method for planning a construction plan for soft soil deep foundation pit excavation when executing the program stored in the memory.
[0078] The above-mentioned soft soil deep foundation pit earthwork excavation construction plan planning system can implement various embodiments of the above-mentioned soft soil deep foundation pit earthwork excavation construction plan planning method, and can achieve the same beneficial effects, which will not be described here.
[0079] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A method for planning a construction plan for earthwork excavation in a soft soil deep foundation pit, characterized in that: include: Obtaining the soft soil type and soil parameters of the target construction area, and selecting a corresponding constitutive model according to the soft soil type; Determine the impact range of deep foundation pit construction and collect load parameters of buildings within the impact range; Constructing a three-dimensional numerical simulation model according to the soil parameters, the constitutive model, and the load parameters, and analyzing the influence of the deep foundation pit construction process on the deformation of the building within the influence range through the three-dimensional numerical simulation model; Based on the deformation influence, the deep foundation pit construction process in the target construction area is adjusted to determine the optimal construction plan for deformation control; The selecting a corresponding constitutive model according to the soft soil type includes: When the soft soil type is a complex soft soil type, a small strain elastoplastic model is selected as the constitutive model; When the soft soil type is a soft soil type for which small strain parameters are difficult to obtain, a hardening elastic-plastic model is selected as the constitutive model; The collecting of load parameters of buildings within the influence range includes: Conducting on-site investigation on the buildings within the influence range to obtain the positional relationship between the buildings and the foundation pit construction area, the foundation form of the buildings, and the load of the buildings, and using the positional relationship, foundation form, and total load of the buildings as load parameters within the influence range of the foundation pit; The deformation effect of deep foundation pit construction process on buildings within the impact range is analyzed through a three-dimensional numerical simulation model, including: Analyze the construction load, surrounding pile load, traffic dynamic load, and groundwater seepage of the deep foundation pit construction process through a three-dimensional numerical simulation model, and calculate the deformation control value of the building within the said influence range; The deformation control value as well as the construction load, surrounding pile load, traffic dynamic load and groundwater seepage are used as the deformation influence of the building within the influence range; Based on the deformation influence, the deep foundation pit construction process in the target construction area is adjusted, including: The optimal construction plan is controlled according to the deformation influence, and the deep foundation pit construction process is adjusted in combination with the deformation control value.
2. The method for planning a construction plan for a soft soil deep foundation pit excavation according to claim 1, characterized in that: The step of obtaining the soft soil type and soil parameters of the target construction area includes: Conduct on-site investigation of the soft soil in the target construction area, and determine the soft soil type and soil parameters of the target construction area based on the results of the on-site investigation.
3. The method for planning a construction plan for a soft soil deep foundation pit excavation according to claim 1, characterized in that: The method further comprises: Early warning is carried out based on the deep foundation pit construction process in the target construction area, where the early warning mechanism includes: The data is stable and controllable. According to normal dynamic construction, the deformation of the foundation pit and environment in the next stage is predicted through parameter optimization to guide the construction. When the deformation is too large and approaches or exceeds the specified safety control standard, the factors affecting environmental changes are comprehensively analyzed based on the monitoring results, and timely measures are taken.
4. A soft soil deep foundation pit earthwork excavation construction plan planning system, characterized in that: Including processor and memory; Memory, used to store computer programs; A processor, for implementing any of the methods described in claims 1-3 when executing a program stored in a memory.
Citation Information
Patent Citations
Numerical simulation analysis method for deformation of soft soil deep foundation pit
CN104598296A
Shallow-buried tunnel construction dynamic control method based on three-dimensional live-action numerical analysis
CN115690354A