A method for calculating the thrust force of underground pipe jacking tunnel

Through detailed parameter calculation and contact state judgment, the complexity of friction resistance calculation in pipe top tunnel construction is solved, and the accuracy of top thrust calculation is improved. It is suitable for pipe top tunnel construction in complex contact states.

CN117436263BActive Publication Date: 2024-11-19CHINA RAILWAY 20TH BUREAU GROUP CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202311443335.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-01
Publication Date
2024-11-19
Estimated Expiration
2043-11-01

AI Technical Summary

Technical Problem

The prior art failed to effectively consider the impact of self-weight and pipe hoisting machine offset on friction resistance calculation in pipe hoisting tunnel construction, resulting in the complexity of the contact state being insufficiently considered and the calculation results are not accurate enough.

Method used

By obtaining the parameters of the top pipe and formation, calculating the soil pressure and deflection, defining the offset of the top pipe machine, judging the pipe/soil/sludge contact form, selecting the friction coefficient, integrating the friction resistance, and calculating the top thrust with the oncoming resistance.

Benefits of technology

The accuracy of the top thrust calculation of the pipe top is improved, the complex contact state is taken into account, the shortcomings of the existing technology are made up for and more in line with the actual construction situation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117436263B_ABST
    Figure CN117436263B_ABST
Patent Text Reader

Abstract

The invention discloses a method for calculating the thrust of an underground pipe jacking tunnel. The method comprises the following steps: obtaining pipe jacking parameters and formation parameters, calculating the soil pressure on the upper side and both sides of the pipe jacking, the pipe segment deflection and the lower side soil pressure of the pipe jacking under the action of the overlying soil layer and the deadweight load of the pipe segment, defining the offset limit of the pipe jacking machine, taking the offset of the pipe jacking machine in the process of jacking as a boundary condition, bringing it into the pipe segment deflection of the pipe jacking, obtaining the deformation curve of the pipe jacking under the offset condition, then calculating the friction resistance of the pipe jacking in the process of jacking according to the pipe / soil / mud contact form of the pipe jacking, integrating the friction resistance of the pipe jacking in the process of jacking to calculate the total friction resistance of the pipe jacking, summing the total friction resistance of the pipe jacking and the head-on resistance of the pipe jacking machine, and calculating the total thrust of the pipe jacking; by fully considering various contact states of the pipe jacking and influencing factors, the insufficient consideration of the contact state of the pipe jacking in the existing calculation method is compensated, thereby improving the calculation accuracy of the thrust of the pipe jacking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for calculating the jacking force of an underground pipe jacking tunnel, in particular to a method for calculating the jacking force of a pipe jacking tunnel taking into account a complex contact state. Background Art

[0002] Pipe jacking tunnels include various forms such as circular and rectangular municipal pipelines, tunnel pipe curtain support, underground pedestrian passages, etc. During the pipe jacking construction process, working wells are usually constructed at the starting and ending sections of the pipe jacking, jacks are arranged on the back wall of the starting well of the pipe jacking tunnel, and pipe jacking machines are used to cut the soil at the end of the pipe jacking tunnel; during the construction process, the jacking force determines the structural design of the working well, the selection of the pipe jacking machine, and the design of the pipe jacking section. The jacking force of the pipe jacking is mainly composed of the friction resistance around the pipe jacking and the head-on resistance of the pipe jacking machine. The head-on resistance depends to a large extent on the jacking speed and the properties of the soil facing the pipe jacking machine. As the jacking distance increases, the friction resistance gradually becomes the main factor affecting the jacking force.

[0003] In order to reduce the frictional resistance during the jacking process, grouting drag reduction measures are usually used to reduce the friction coefficient between the jacking pipe and the surrounding soil, thereby reducing the frictional resistance. Under ideal conditions, grouting drag reduction measures can form a complete mud sleeve around the jacking pipe, thereby forming a pipe / mud contact state during the jacking process, and jacking is performed with a smaller friction coefficient and frictional resistance. However, in the actual construction process, due to the influence of factors such as deadweight and displacement of the jacking machine, the mud sleeve around the jacking pipe will dissipate, forming a pipe / soil / mud contact state.

[0004] Existing calculation theories are all under ideal conditions, considering the contact state of the pipe section during the jacking process as unchanged, without considering the influence of deadweight and pipe jacking machine deviation on the contact form of pipe / soil / mud, resulting in complex contact state. Therefore, a friction calculation method considering complex contact state is urgently needed to make up for the insufficient consideration of contact state. Summary of the invention

[0005] In view of this, an object of the present invention is to provide a method for calculating the jacking force of an underground pipe jacking tunnel to solve the technical problems mentioned in the prior art.

[0006] A method for calculating the thrust force of an underground pipe jacking tunnel comprises the following steps:

[0007] S1. Obtaining pipe jacking parameters and formation parameters;

[0008] S2. Based on the jacking pipe parameters and the formation parameters, the upper soil pressure and the soil pressure on both sides of the jacking pipe are calculated, and the pipe segment deflection and the lower soil pressure of the jacking pipe under the action of the overlying soil layer and the deadweight load of the pipe segment are calculated using the elastic foundation theory;

[0009] S3, defining the offset limit of the pipe jacking machine, and determining the offset of the pipe jacking machine during the jacking process, and obtaining the excavation surface curve of the pipe jacking machine under the offset condition;

[0010] S4, taking the offset of the pipe jacking machine during the jacking process as a boundary condition, substituting it into the pipe segment deflection of the jacking pipe in S2, and obtaining the deformation curve of the jacking pipe under the offset condition;

[0011] S5. judging the pipe / soil / mud contact form of the jacking pipe based on the pipe segment deflection of the jacking pipe and the excavation surface curve of the jacking machine in the offset state;

[0012] S6. According to the pipe / soil / mud contact form of the jacking pipe, the pipe / soil / mud friction coefficient of the jacking pipe is selected to calculate the friction resistance of the jacking pipe during the jacking process;

[0013] S7, integrating the frictional resistance of the jacking pipe during the jacking process to calculate the total frictional resistance of the jacking pipe, and summing the total frictional resistance of the jacking pipe and the head-on resistance of the jacking machine to calculate the total jacking force of the jacking pipe.

[0014] Optionally, in said S1;

[0015] The pipe jacking parameters include the pipe segment bending stiffness EI, the pipe segment outer width b, the pipe segment outer height h, the pipe segment inner width b1 and the pipe segment inner height h1;

[0016] The formation parameters include the thickness H of the overlying soil layer, the weight γ of the overlying soil layer, the friction angle φ of the overlying soil layer and the cohesion c.

[0017] Optionally, in S2, the method for calculating the soil pressure on the upper side of the jacking pipe includes:

[0018] When the thickness H of the soil layer overlying the jacking pipe is ≤ 1-2 times of the outer width b of the pipe segment, the Bilbao theory is used to calculate the upper soil pressure of the jacking pipe when it is in a shallow buried state;

[0019] The overlying soil pressure G1 of the jacking pipe is: G1 = γHB1;

[0020]

[0021] Among them, B1 is the transverse span of the collapse arch when the jacking pipe is in a shallow buried state, and B is the width of the jacking pipe tunnel;

[0022] When the thickness H of the soil layer overlying the jacking pipe is ≥ 1-2 times of the outer width b of the pipe segment, the upper soil pressure of the jacking pipe when it is in a deeply buried state is calculated using the Proctor unloading arch theory;

[0023] The overburden pressure G2 of the jacking pipe is:

[0024]

[0025]

[0026]

[0027] Among them, B2 is the lateral span of the collapse arch when the top pipe is in a deep buried state, h0 is the height of the collapse arch, and f k is the soil layer solidity coefficient, also known as the Pugh friction coefficient;

[0028] The clamping effect T on both sides of the jacking pipe is divided into two parts, one part is the friction force of the soil when the soil settles, and the other part is the cohesion of the soil;

[0029] The clamping effect T on both sides of the jacking pipe is:

[0030] Among them, k1 and k2 are calculation coefficients.

[0031]

[0032] The soil pressure P on the upper side of the jacking pipe is: P = GT;

[0033] Among them, G is selected from G1 or G2.

[0034] Optionally, in S2, the method for calculating the soil pressure on both sides of the jacking pipe includes:

[0035] When the jacking pipe generates an over-excavation gap, the soil on both sides of the jacking pipe will move toward the pipe section of the jacking pipe, and the soil pressure on both sides of the jacking pipe is calculated using an active soil pressure calculation method;

[0036] The soil pressure P on both sides of a point at a depth y from the ground surface is y for:

[0037]

[0038] Among them, K a is the Rankine earth pressure coefficient,

[0039] Integrate the distance h between the lower surface of the top pipe and the upper surface of the top pipe to calculate the soil pressure P on both sides of the top pipe. a :

[0040]

[0041] Optionally, in S2, the method for calculating the deflection of the jacking pipe and the lower soil pressure includes:

[0042] Under the action of the load around the pipe section of the jacking pipe, the jacking pipe will produce vertical deformation. According to the Winkler calculation model, the deflection of the jacking pipe under the overlying load and the load on both sides is calculated, where;

[0043] The differential equilibrium equation q(x) of the deflection curve of the jacking pipe is:

[0044] in, is the fourth-order derivative of deflection, i.e., the rate of change of curvature, and p(x) is the foundation reaction force;

[0045] When the offset of the jacking pipe is not considered, the boundary conditions are selected and the deflection y(x) of the jacking pipe is calculated;

[0046]

[0047] When there is unit deflection at x = 0, the deflection curve equation of the beam R1(x) is:

[0048] R1(x)=ch(ρx)cox(ρx) / 2;

[0049] When there is a unit rotation angle at x = 0, the deflection curve equation of the beam R2(x) is:

[0050] R2(x)=ch(ρx)sin(ρx)+sh(ρx)cos(ρx) / 2;

[0051] When there is a unit bending moment at x = 0, the deflection curve equation of the beam R3(x) is:

[0052] R3(x)=sh(ρx)sin(ρx) / 2;

[0053] When there is unit shear force at x = 0, the deflection curve equation of the beam R4(x) is:

[0054] R4(x)=[ch(ρx)sin(ρx)-sh(ρx)cos(ρx)] / 4;

[0055] The jacking pipe is simplified as a simply supported beam with hinged ends. When x = 0, it is the left hinged end, and when x = a, it is the right hinged end. Since the hinge point does not produce vertical displacement and does not bear bending moment, the boundary conditions are selected as y(0), M(0) = 0, y(a), M(a) = 0, and the foundation characteristic coefficient is ε is the section at a distance ε from the end point o on the left side of the x section when solving the deflection y(x) for any x section, ε∈[0,x], Q0 is the shear force at the left hinged end when x=0, M0 is the bending moment at the left hinged end when x=0, θ0 is the rotation deformation at the left hinged end when x=0, q(ε)R4(x)[ρ(x-ε)]dε is the uniformly distributed load on the beam;

[0056] The lower soil pressure P of the jacking pipe x For: P x = kby(x);

[0057] Among them, k is the soil foundation coefficient under the jacking pipe, Where E is the compression modulus of the soil and H is the thickness of the soil.

[0058] Optionally, in S3, the offset limit problem generated by the pipe jacking machine during the jacking process is determined by pre-pushing the pipe. After pre-pushing the pipe for a certain distance, the offset value of the pipe jacking machine during the pre-pushing process is obtained. The correction and offset of the pipe jacking machine during the jacking process will produce periodic changes. The offset of the pipe jacking machine during the jacking process is determined by using a sine function or a cosine function, wherein;

[0059] If the pipe jacking machine deviates upward during the pushing process, and the upward deviation distance is close to the deviation limit, the pipe jacking machine is corrected downward;

[0060] If the pipe jacking machine causes an error in downward correction during the jacking process, a downward deviation will occur, and when the downward deviation distance is close to the deviation limit, the pipe jacking machine is corrected upward;

[0061] The upper excavation contour equation of the pipe jacking machine is f s (x) is:

[0062] The lower excavation contour equation of the pipe jacking machine is x (x) is:

[0063] The left excavation contour equation of the pipe jacking machine is f z (x) is:

[0064] The right excavation contour equation of the pipe jacking machine is y (x) is:

[0065] Where a represents the height of the jacking pipe, f(x) is the vertical offset value along the length direction of the jacking pipe during the jacking process, and t(x) is the horizontal offset value along the length direction of the jacking pipe during the jacking process.

[0066] Optionally, in said S4;

[0067] When the pipe jacking machine deflects during the jacking process, the pipe jacking deflection curve will change due to the deflection. At this time, the pipe jacking machine a is used as the boundary condition of the offset distance m, and the boundary condition of the pipe segment deflection curve becomes:

[0068] y(0)=0; M(0)=0; y(a)=m; M(a)=0;

[0069] The top pipe upper side deflection curve equation y s (x) is:

[0070]

[0071] The deflection curve equation of the lower side of the top pipe is y x (x) is:

[0072]

[0073] The deflection curve equation y of the left side of the top pipe z (x) is:

[0074] The deflection curve equation y of the right side of the top pipe y (x) is:

[0075] The deformation curve of the jacking pipe in the offset condition is obtained by using the upper deflection curve equation, the lower deflection curve equation, the left deflection curve equation and the right deflection curve equation of the jacking pipe.

[0076] Optionally, in S5, the deflection curve equation of the jacking pipe and the excavation contour line equation of the jacking machine are established in the same plane coordinate system to obtain the intersection relationship between the excavation contour line equation of the jacking machine and the deflection curve equation of the jacking pipe, and the pipe / soil / mud contact relationship between the upper and lower sides of the jacking pipe and the stratum is determined, assuming that the deflection curve equation of the jacking pipe intersects with the excavation contour line equation of the jacking machine at x1, x2,…, x i point, at x∈[x n ,x n+1 ], the contact relationship between the pipe / soil / mud on the upper side and the lower side of the jacking pipe is determined respectively, wherein;

[0077] (1) For the upper side of the top pipe, when y s (x)≤f s (x), the contact form of this section is pipe-mud contact. s (x)≥f s (x), then this section of contact is pipe-soil contact;

[0078] (2) For the lower side of the top pipe, when y s (x)≤f s (x), the contact form of this section is pipe-soil contact. s (x)≥f s(x), then this section of contact is pipe-mud contact.

[0079] Optionally, in S6, the pipe / soil / mud friction coefficient of the jacking pipe is determined according to the drag reduction measures in the construction process, and the friction resistance of the jacking pipe in the jacking process is calculated based on the pipe / soil / mud contact form of the jacking pipe obtained in S5;

[0080] The friction force F1'(x) at any point on the upper side of the jacking pipe is:

[0081]

[0082] The friction force F2'(x) at any point on the lower side of the jacking pipe is:

[0083]

[0084] The friction force F3'(x) at any point on the left side of the jacking pipe is:

[0085]

[0086] The friction force F4'(x) at any point on the right side of the jacking pipe is:

[0087]

[0088] The total frictional resistance of the jacking pipe during the jacking process is equal to the sum of the frictional resistance at any point on the upper side of the jacking pipe, the frictional resistance at any point on the lower side of the jacking pipe, the frictional resistance at any point on the left side of the jacking pipe, and the frictional resistance at any point on the right side of the jacking pipe.

[0089] Optionally, in S7:

[0090] The head resistance F of the pipe jacking machine Y For: F Y =BHR1;

[0091] Among them, R1 takes the passive earth pressure at the lower 1 / 3 of the height of the pipe jacking machine.

[0092]

[0093] The beneficial effects that the present invention can produce include:

[0094] The present invention provides a method for calculating the thrust of an underground pipe jacking tunnel. The method predicts the friction of the pipe jacking and defines the offset limit of the pipe jacking machine by considering the deflection of the pipe segment under the action of the overlying soil layer and the deadweight load of the pipe segment, and the displacement problem caused by the change of soil properties and the unevenness of the oncoming soil during the process of the pipe jacking machine pushing the pipe. The method also assumes the displacement of the pipe jacking machine during the pushing process in the form of a sine function or a cosine function, and judges the pipe / soil / mud contact form of the pipe jacking. The method fully considers various contact states of the pipe jacking and influencing factors, so as to make up for the insufficient consideration of the contact state of the pipe jacking in the existing calculation method, thereby improving the calculation accuracy of the thrust of the pipe jacking. BRIEF DESCRIPTION OF THE DRAWINGS

[0095] Figure 1 It is a schematic flow chart of a method for calculating the thrust of an underground pipe jacking tunnel according to the present invention;

[0096] Figure 2 A schematic diagram of calculating the soil pressure around a jacking pipe section of a jacking pipe tunnel according to a jacking force calculation method of an underground jacking pipe tunnel of the present invention;

[0097] Figure 3 A schematic diagram of pipe segment deflection and lower soil reaction force based on Winkler theory in a method for calculating jacking force of an underground pipe jacking tunnel according to the present invention;

[0098] Figure 4 A schematic diagram of the analysis of the pipe / soil / mud contact state of the pipe jacking machine offset in a method for calculating the jacking force of an underground pipe jacking tunnel according to the present invention;

[0099] Figure 5 A schematic diagram of the calculation of the earth pressure of the Bill Bowman theory of a method for calculating the thrust of an underground pipe jacking tunnel according to the present invention;

[0100] Figure 6 A schematic diagram of calculating the earth pressure of the Proch unloading arch theory of a method for calculating the thrust of an underground pipe jacking tunnel according to the present invention;

[0101] Figure 7 A schematic diagram of monitoring values ​​of horizontal and vertical deviations of a pipe jacking machine in a method for calculating the thrust of an underground pipe jacking tunnel according to the present invention;

[0102] Figure 8 The present invention provides a schematic diagram for comparing the specification of a method for calculating the thrust of an underground pipe jacking tunnel, a prediction method, and field measured values. DETAILED DESCRIPTION

[0103] The present invention is described in detail below in conjunction with embodiments, but the present invention is not limited to these embodiments.

[0104] like Figure 1-8As shown, the present invention provides a method for calculating the thrust of an underground pipe jacking tunnel, comprising the following steps:

[0105] Step 1: Obtain pipe jacking parameters and formation parameters, including:

[0106] The pipe jacking parameters include the pipe segment bending stiffness EI, the pipe segment outer width b, the pipe segment outer height h, the pipe segment inner width b1 and the pipe segment inner height h1;

[0107] The formation parameters include the thickness H of the overburden layer, the weight γ of the overburden layer, the friction angle φ of the overburden layer and the cohesion c.

[0108] Step 2: Based on the pipe jacking parameters and the formation parameters, calculate the upper and side soil pressures of the pipe jacking, and use the elastic foundation theory to calculate the pipe segment deflection and lower soil pressure of the pipe jacking under the action of the overlying soil layer and the pipe segment's own weight load.

[0109] Furthermore, the calculation method of the soil pressure on the upper side of the jacking pipe includes:

[0110] When the thickness of the soil layer overlying the jacking pipe H is ≤ 1-2 times of the outer width b of the pipe segment, the Bilbao theory is used to calculate the upper soil pressure of the jacking pipe in a shallow buried state;

[0111] The overlying soil pressure G1 of the jacking pipe is: G1 = γHB1;

[0112]

[0113] Among them, B1 is the transverse span of the collapse arch when the jacking pipe is in a shallow buried state, and B is the width of the jacking pipe tunnel;

[0114] When the thickness of the soil layer overlying the jacking pipe H is ≥ 1-2 times of the outer width b of the pipe segment, the upper soil pressure of the jacking pipe in the deep buried state is calculated using the Proctor unloading arch theory;

[0115] The overburden pressure G2 of the jacking pipe is:

[0116]

[0117]

[0118]

[0119] Among them, B2 is the lateral span of the collapse arch when the top pipe is in a deep buried state, h0 is the height of the collapse arch, and f k is the soil firmness coefficient, also known as the Pugh friction coefficient, f k It reflects the firmness of the soil layer. k The larger it is, the better the soil quality is and the smaller the collapse height is.

[0120] The clamping effect T on both sides of the jacking pipe is divided into two parts, one is the friction force of the soil when the soil settles, and the other is the cohesion of the soil;

[0121] The clamping effect T on both sides of the top pipe is:

[0122] Among them, k1 and k2 are calculation coefficients.

[0123]

[0124] The soil pressure P on the upper side of the jacking pipe is: P = GT;

[0125] Among them, G is selected from G1 or G2.

[0126] Furthermore, the calculation method of the soil pressure on both sides of the jacking pipe includes:

[0127] When the jacking pipe produces an over-excavation gap, the soil on both sides of the jacking pipe will move toward the pipe section of the jacking pipe. The soil pressure on both sides of the jacking pipe is calculated using the active soil pressure method.

[0128] The soil pressure P on both sides of a point at a depth y from the ground surface y for:

[0129]

[0130] Among them, K a is the Rankine earth pressure coefficient,

[0131] Integrate the distance h between the lower surface of the jacking pipe and the upper surface of the jacking pipe to calculate the soil pressure P on both sides of the jacking pipe a :

[0132]

[0133] Further, the calculation method of the deflection and lower earth pressure of the jacking pipe includes:

[0134] Under the action of the load around the pipe section of the jacking pipe, the jacking pipe will produce vertical deformation. According to the Winkler calculation model, the deflection of the jacking pipe under the overlying load and the load on both sides is calculated, where;

[0135] The differential equilibrium equation of the deflection curve of the jacking pipe is:

[0136] in, is the fourth-order derivative of deflection, i.e., the rate of change of curvature, and p(x) is the foundation reaction force;

[0137] When the offset of the pipe is not considered, the boundary conditions are selected and the deflection y(x) of the pipe is calculated;

[0138]

[0139] When there is unit deflection at x = 0, the deflection curve equation of the beam R1(x) is:

[0140] R1(x)=ch(ρx)cox(ρx) / 2;

[0141] When there is a unit rotation angle at x = 0, the deflection curve equation of the beam R2(x) is:

[0142] R2(x)=ch(ρx)sin(ρx)+sh(ρx)cos(ρx) / 2;

[0143] When there is a unit bending moment at x = 0, the deflection curve equation of the beam R3(x) is:

[0144] R3(x)=sh(ρx)sin(ρx) / 2;

[0145] When there is unit shear force at x = 0, the deflection curve equation of the beam R4(x) is:

[0146] R4(x)=[ch(ρx)sin(ρx)-sh(ρx)cos(ρx)] / 4;

[0147] The jacking pipe is simplified as a simply supported beam with hinged ends. When x = 0, it is the left hinged end, and when x = a, it is the right hinged end. Since the hinge point does not produce vertical displacement and does not bear bending moment, the boundary conditions are selected as y(0), M(0) = 0, y(a), M(a) = 0, and the foundation characteristic coefficient is ε is the section at a distance ε from the end point o on the left side of the x section when solving the deflection y(x) for any x section, ε∈[0,x], Q0 is the shear force at the left hinged end when x=0, M0 is the bending moment at the left hinged end when x=0, θ0 is the rotation deformation at the left hinged end when x=0, q(ε)R4(x)[ρ(x-ε)]dε is the uniformly distributed load on the beam;

[0148] Earth pressure P under the jacking pipe x For: P x = kby(x);

[0149] Among them, k is the soil foundation coefficient under the jacking pipe, Where E is the compression modulus of the soil and H is the thickness of the soil.

[0150] Step 3. During the process of pushing the pipe, the pipe jacking machine will cause offset due to changes in soil properties and the unevenness of the oncoming soil. When predicting the frictional resistance of the pipe, it is necessary to define the offset limit of the pipe jacking machine. At the same time, since the correction and offset of the pipe jacking machine during the pushing process will produce periodic changes, the sine function or cosine function is used to determine the offset of the pipe jacking machine during the pushing process, and the excavation surface curve of the pipe jacking machine under the offset condition is obtained.

[0151] Specifically, the offset limit problem generated by the pipe jacking machine during the jacking process is determined by pre-pushing the pipe. After pre-pushing the pipe for a certain distance, the offset value of the pipe jacking machine during the pre-pushing process is obtained, where:

[0152] If the pipe jacking machine deviates upward during the pushing process, and the upward deviation distance is close to the deviation limit, the pipe jacking machine is corrected downward;

[0153] If the pipe jacking machine causes an error in the downward correction during the pushing process, a downward deviation will occur, and when the downward deviation distance is close to the deviation limit, the pipe jacking machine will be corrected upward;

[0154] The equation of the upper excavation contour line of the pipe jacking machine is f s (x) is:

[0155] The equation of the lower excavation contour of the pipe jacking machine is f x (x) is:

[0156] The left excavation contour equation of the pipe jacking machine is f z (x) is:

[0157] The right excavation contour equation of the pipe jacking machine is f y (x) is:

[0158] Where a represents the height of the jacking pipe, f(x) is the vertical offset value along the length direction of the jacking pipe during the jacking process, and t(x) is the horizontal offset value along the length direction of the jacking pipe during the jacking process.

[0159] Step 4: Based on the elastic foundation theory, the displacement of the pipe jacking machine during the jacking process is used as a boundary condition and substituted into the pipe segment deflection of the jacking pipe in step 2 to obtain the deformation curve of the jacking pipe under the displacement condition.

[0160] Specifically, when the pipe jacking machine deflects during the jacking process, the pipe jacking deflection curve will change due to the deflection. At this time, the pipe jacking machine a is used as the boundary condition of the offset distance m, and the boundary condition of the pipe segment deflection curve becomes:

[0161] y(0)=0; M(0)=0; y(a)=m; M(a)=0;

[0162] Deflection curve equation of top pipe y s (x) is:

[0163]

[0164] Deflection curve equation of the lower side of the top pipe y x (x) is:

[0165]

[0166] Deflection curve equation of the left side of the top pipe y z (x) is:

[0167] Deflection curve equation of the right side of the top pipe y y (x) is:

[0168] The deformation curve of the jacking pipe in the offset condition is obtained by using the upper deflection curve equation, the lower deflection curve equation, the left deflection curve equation and the right deflection curve equation of the jacking pipe.

[0169] Step 5: Determine the pipe / soil / mud contact form of the pipe jacking based on the pipe segment deflection of the pipe jacking machine and the excavation surface curve when the pipe jacking machine is offset.

[0170] Specifically, by establishing the deflection curve equation of the jacking pipe and the excavation contour equation of the jacking machine in the same plane coordinate system, the intersection relationship between the excavation contour equation of the jacking machine and the deflection curve equation of the jacking pipe is obtained, and the pipe / soil / mud contact relationship between the upper and lower sides of the jacking pipe and the stratum is determined. It is assumed that the deflection curve equation of the jacking pipe intersects with the excavation contour equation of the jacking machine at x1, x2,…, x i point, at x∈[x n ,x n+1 ], the contact relationship between the pipe / soil / mud on the upper and lower sides of the jacking pipe is determined respectively, where;

[0171] (1) For the upper side of the top pipe, when y s (x)≤f s (x), the contact form of this section is pipe-mud contact. s (x)≥f s (x), then this section of contact is pipe-soil contact;

[0172] (2) For the lower side of the top pipe, when y s (x)≤f s (x), the contact form of this section is pipe-soil contact. s (x)≥fs (x), then this section of contact is pipe-mud contact.

[0173] Step 6: According to the pipe / soil / mud contact form of the jacking pipe, select the pipe / soil / mud friction coefficient of the jacking pipe and calculate the friction resistance of the jacking pipe during the jacking process.

[0174] Specifically, according to the drag reduction measures in the construction process, the pipe / soil / mud friction coefficient of the jacking pipe is determined, and based on the pipe / soil / mud contact form of the jacking pipe obtained in step 5, the friction resistance of the jacking pipe during the jacking process is calculated;

[0175] The friction force F1'(x) at any point on the upper side of the top pipe is:

[0176]

[0177] The friction force F2'(x) at any point on the lower side of the top pipe is:

[0178]

[0179] The friction force F3'(x) at any point on the left side of the top pipe is:

[0180]

[0181] The friction force F4'(x) at any point on the right side of the jacking pipe is:

[0182]

[0183] The total frictional resistance of the jacking pipe during the jacking process is equal to the sum of the frictional resistance at any point on the upper side of the jacking pipe, the frictional resistance at any point on the lower side of the jacking pipe, the frictional resistance at any point on the left side of the jacking pipe, and the frictional resistance at any point on the right side of the jacking pipe.

[0184] Step 7: Integrate the frictional resistance of the jacking pipe during the jacking process to calculate the total frictional resistance of the jacking pipe, and sum the total frictional resistance of the jacking pipe and the head-on resistance of the jacking machine to calculate the total jacking force of the jacking pipe, where the head-on resistance F of the jacking machine is Y For: F Y =BHR1;

[0185] R1 takes the passive earth pressure at the lower 1 / 3 of the height of the pipe jacking machine.

[0186]

[0187] As an embodiment of the present invention, refer to Figure 1-Figure 4As shown in the figure, the initial parameters of a pipe jacking project are as follows: the outer width of the pipe jacking section b = 9.1m, the inner width b1 = 7.8m, the outer height h = 5.5m, the inner height h1 = 4.2m, the bending stiffness of the pipe jacking EI = 4.967×109kN·m2, the average weight of the overlying soil γ = 19.1kN·m3, the thickness of the overlying soil H = 9m, the average internal friction angle of the overlying soil is 28°, and the average cohesion of the soil c = 32kN. By monitoring the jacking process, the displacement of the pipe jacking machine during the jacking process is obtained as follows Figure 5 shown.

[0188] According to the estimation formula of top thrust in the "Water Supply and Drainage Pipeline Engineering Construction and Acceptance Code": F = 2 (b + h) Lf F +bhR1, where f F is the average frictional resistance between the outer wall of the pipe segment and the soil. In this embodiment, f F Take 8kN / m 2 , R1 is the head-on resistance of the earth pressure balance pipe jacking machine, which can be approximately taken as

[0189] The above parameters are put into the above formula for calculation, and the obtained standard value, the predicted thrust force of the present invention and the thrust force actually measured on site are as follows: Figure 7 shown.

[0190] Combination Figure 6 By comparison, it can be seen that there is a certain gap between the calculation results of the present invention and the calculation results of the existing specifications, and the calculation results of the present invention are more consistent with the nonlinear change trend of the actual jacking force, and the calculation results of the present invention are more consistent with the jacking force required for actual jacking on site.

[0191] In the present invention, the calculation method predicts the frictional resistance of the jacking pipe and defines the offset limit of the pipe jacking machine by considering the deflection of the pipe section under the action of the overlying soil layer and the deadweight load of the pipe section, and considering the offset problem caused by the change of soil properties and the unevenness of the oncoming soil during the jacking process of the jacking machine. The offset of the pipe jacking machine during the jacking process is assumed in the form of a sine function or a cosine function, and the pipe / soil / mud contact form of the jacking pipe is judged. The various contact states of the jacking pipe and the influencing factors are fully considered to make up for the insufficient consideration of the contact state of the jacking pipe in the existing calculation method, thereby improving the calculation accuracy of the jacking force of the jacking pipe.

[0192] The above are only several embodiments of the present invention and are not intended to limit the present invention in any form. Although the present invention is disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Any technician familiar with the profession, without departing from the scope of the technical solution of the present invention, using the above disclosed technical content to make slight changes or modifications are equivalent to equivalent implementation cases and fall within the scope of the technical solution.

Claims

1. A method for calculating the thrust of an underground pipe jacking tunnel, characterized in that: The steps include: S1. Obtaining pipe jacking parameters and formation parameters; S2. Based on the jacking pipe parameters and the formation parameters, the upper soil pressure and the two side soil pressures of the jacking pipe are calculated, and the pipe segment deflection and the lower soil pressure of the jacking pipe under the overlying soil layer and the pipe segment deadweight load are calculated using the elastic foundation theory, wherein; The method for calculating the deflection and lower earth pressure of the jacking pipe includes: Under the action of the load around the pipe section of the jacking pipe, the jacking pipe will produce vertical deformation. According to the Winkler calculation model, the deflection of the jacking pipe under the overlying load and the load on both sides is calculated, where; The differential equilibrium equation q(x) of the deflection curve of the jacking pipe is: in, is the fourth-order derivative of deflection, i.e., the rate of change of curvature, and p(x) is the foundation reaction force; When the offset of the jacking pipe is not considered, the boundary conditions are selected and the deflection y(x) of the jacking pipe is calculated; When there is unit deflection at x = 0, the deflection curve equation of the beam R1(x) is: R1(x)=ch(ρx)cox(ρx) / 2; When there is a unit rotation angle at x = 0, the deflection curve equation of the beam R2(x) is: R2(x)=ch(ρx)sin(ρx)+sh(ρx)cos(ρx) / 2; When there is a unit bending moment at x = 0, the deflection curve equation of the beam R3(x) is: R3(x)=sh(ρx)sin(ρx) / 2; When there is unit shear force at x = 0, the deflection curve equation of the beam R4(x) is: R4(x)=[ch(ρx)sin(ρx)-sh(ρx)cos(ρx)] / 4; The jacking pipe is simplified as a simply supported beam with hinged ends. When x = 0, it is the left hinged end, and when x = a, it is the right hinged end. Since the hinge point does not produce vertical displacement and does not bear bending moment, the boundary conditions are selected as y(0), M(0) = 0, y(a), M(a) = 0, and the foundation characteristic coefficient is ε is the section at a distance ε from the end point o on the left side of the x section when solving the deflection y(x) for any x section, ε∈[0,x], Q0 is the shear force at the left hinged end when x=0, M0 is the bending moment at the left hinged end when x=0, θ0 is the rotation deformation at the left hinged end when x=0, q(ε)R4(x)[ρ(x-ε)]dε is the uniformly distributed load on the beam; The lower soil pressure P of the jacking pipe x For: P x = kby(x); Among them, k is the soil foundation coefficient under the jacking pipe, Where E is the compression modulus of the soil, and H is the thickness of the soil; S3, defining the offset limit of the pipe jacking machine, and determining the offset of the pipe jacking machine during the jacking process, and obtaining the excavation surface curve of the pipe jacking machine under the offset condition; S4, taking the offset of the pipe jacking machine during the jacking process as a boundary condition, substituting it into the pipe segment deflection of the jacking pipe in S2, and obtaining the deformation curve of the jacking pipe under the offset condition; S5. judging the pipe / soil / mud contact form of the jacking pipe based on the pipe segment deflection of the jacking pipe and the excavation surface curve of the jacking machine in the offset state; S6. According to the pipe / soil / mud contact form of the jacking pipe, the pipe / soil / mud friction coefficient of the jacking pipe is selected to calculate the friction resistance of the jacking pipe during the jacking process; S7, integrating the frictional resistance of the jacking pipe during the jacking process to calculate the total frictional resistance of the jacking pipe, and summing the total frictional resistance of the jacking pipe and the head-on resistance of the jacking machine to calculate the total jacking force of the jacking pipe.

2. The method for calculating the thrust of an underground pipe jacking tunnel according to claim 1, characterized in that: In said S1; The pipe jacking parameters include the pipe segment bending stiffness EI, the pipe segment outer width b, the pipe segment outer height h, the pipe segment inner width b1 and the pipe segment inner height h1; The formation parameters include the thickness H of the overlying soil layer, the weight γ of the overlying soil layer, the friction angle φ of the overlying soil layer and the cohesion c.

3. The method for calculating the thrust of an underground pipe jacking tunnel according to claim 2, characterized in that: In S2, the method for calculating the soil pressure on the upper side of the jacking pipe includes: When the thickness H of the soil layer overlying the jacking pipe is ≤ 1-2 times of the outer width b of the pipe segment, the Bilbao theory is used to calculate the upper soil pressure of the jacking pipe when it is in a shallow buried state; The overlying soil pressure G1 of the jacking pipe is: G1 = γHB1; Among them, B1 is the transverse span of the collapse arch when the jacking pipe is in a shallow buried state, and B is the width of the jacking pipe tunnel; When the thickness H of the soil layer overlying the jacking pipe is ≥ 1-2 times of the outer width b of the pipe segment, the upper soil pressure of the jacking pipe when it is in a deeply buried state is calculated using the Proctor unloading arch theory; The overburden pressure G2 of the jacking pipe is: Among them, B2 is the lateral span of the collapse arch when the top pipe is in a deep buried state, h0 is the height of the collapse arch, and f k is the soil layer solidity coefficient, also known as the Pugh friction coefficient; The clamping effect T on both sides of the jacking pipe is divided into two parts, one part is the friction force of the soil when the soil settles, and the other part is the cohesion of the soil; The clamping effect T on both sides of the jacking pipe is: Among them, k1 and k2 are calculation coefficients. The soil pressure P on the upper side of the jacking pipe is: P = GT; Among them, G is selected from G1 or G2.

4. The method for calculating the thrust of an underground pipe jacking tunnel according to claim 2, characterized in that: In S2, the method for calculating the soil pressure on both sides of the jacking pipe includes: When the jacking pipe generates an over-excavation gap, the soil on both sides of the jacking pipe will move toward the pipe section of the jacking pipe, and the soil pressure on both sides of the jacking pipe is calculated using an active soil pressure calculation method; The soil pressure P on both sides of a point at a depth y from the ground surface is y for: Among them, K a is the Rankine earth pressure coefficient, Integrate the distance h between the lower surface of the jacking pipe and the upper surface of the jacking pipe to calculate the soil pressure P on both sides of the jacking pipe. a :

5. The method for calculating the thrust of an underground pipe jacking tunnel according to claim 1, characterized in that: In S3, the offset limit problem generated by the pipe jacking machine during the jacking process is determined by pre-pushing the pipe. After pre-pushing the pipe for a certain distance, the offset value of the pipe jacking machine during the pre-pushing process is obtained. The correction and offset of the pipe jacking machine during the jacking process will produce periodic changes. The offset of the pipe jacking machine during the jacking process is determined by using a sine function or a cosine function, wherein; If the pipe jacking machine deviates upward during the pushing process, and the upward deviation distance is close to the deviation limit, the pipe jacking machine is corrected downward; If the pipe jacking machine causes an error in downward correction during the jacking process, a downward deviation will occur, and when the downward deviation distance is close to the deviation limit, the pipe jacking machine is corrected upward; The upper excavation contour equation of the pipe jacking machine is f s (x) is: The lower excavation contour equation of the pipe jacking machine is x (x) is: The left excavation contour equation of the pipe jacking machine is f z (x) is: The right excavation contour equation of the pipe jacking machine is y (x) is: Where a represents the height of the jacking pipe, f(x) is the vertical offset value along the length direction of the jacking pipe during the jacking process, and t(x) is the horizontal offset value along the length direction of the jacking pipe during the jacking process.

6. The method for calculating the thrust of an underground pipe jacking tunnel according to claim 5, characterized in that: In said S4; When the pipe jacking machine deflects during the jacking process, the pipe jacking deflection curve will change due to the deflection. At this time, the pipe jacking machine a is used as the boundary condition of the offset distance m, and the boundary condition of the pipe segment deflection curve becomes: y(0)=0; M(0)=0; y(a)=m; M(a)=0; The top pipe upper side deflection curve equation y s (x) is: The deflection curve equation of the lower side of the top pipe is y x (x) is: The deflection curve equation y of the left side of the top pipe z (x) is: The deflection curve equation y of the right side of the top pipe y (x) is: The deformation curve of the jacking pipe in the offset condition is obtained by using the upper deflection curve equation, the lower deflection curve equation, the left deflection curve equation and the right deflection curve equation of the jacking pipe.

7. The method for calculating the thrust of an underground pipe jacking tunnel according to claim 6, characterized in that: In S5, the deflection curve equation of the jacking pipe and the excavation contour line equation of the jacking machine are established in the same plane coordinate system to obtain the intersection relationship between the excavation contour line equation of the jacking machine and the deflection curve equation of the jacking pipe, and the pipe / soil / mud contact relationship between the upper and lower sides of the jacking pipe and the stratum is determined. It is assumed that the deflection curve equation of the jacking pipe intersects with the excavation contour line equation of the jacking machine at x1, x2,…, x i point, at x∈[x n ,x n+1 ], the contact relationship between the pipe / soil / mud on the upper side and the lower side of the jacking pipe is determined respectively, wherein; (1) For the upper side of the top pipe, when y s (x)≤f s (x), the contact form of this section is pipe-mud contact. s (x)≥f s (x), then this section of contact is pipe-soil contact; (2) For the lower side of the top pipe, when y s (x)≤f s (x), the contact form of this section is pipe-soil contact. s (x)≥f s (x), then this section of contact is pipe-mud contact.

8. The method for calculating the thrust force of an underground pipe jacking tunnel according to claim 7, characterized in that: In S6, according to the drag reduction measures in the construction process, the pipe / soil / mud friction coefficient of the jacking pipe is determined, and based on the pipe / soil / mud contact form of the jacking pipe obtained in S5, the friction resistance of the jacking pipe during the jacking process is calculated; The friction force F1'(x) at any point on the upper side of the jacking pipe is: The friction force F2'(x) at any point on the lower side of the jacking pipe is: The friction force F3'(x) at any point on the left side of the jacking pipe is: The friction force F4'(x) at any point on the right side of the jacking pipe is: The total frictional resistance of the jacking pipe during the jacking process is equal to the sum of the frictional resistance at any point on the upper side of the jacking pipe, the frictional resistance at any point on the lower side of the jacking pipe, the frictional resistance at any point on the left side of the jacking pipe, and the frictional resistance at any point on the right side of the jacking pipe.

9. The method for calculating the thrust force of an underground pipe jacking tunnel according to claim 1, characterized in that: In the S7: The head resistance F of the pipe jacking machine Y For: F Y =BHR1; Among them, R1 takes the passive earth pressure at the lower 1 / 3 of the height of the pipe jacking machine.

Citation Information

Cited By

  • Jacking force calculation method, system and equipment based on pipe roofing with male and female lock catches

    CN120493662A

  • Method, system and equipment for calculating thrust force of pipe roof with male and female lock buckles

    CN120493662B