A method for monitoring the construction of steel arch rib fastening in a long-span arch bridge

By monitoring strain and position changes in real time during the construction of steel arch ribs for long-span arch bridges, and combining finite element calculation models and environmental data, the accuracy and safety risks in cantilever construction were solved, achieving efficient and convenient construction control.

CN117451492BActive Publication Date: 2026-11-17CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310952217.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-31
Publication Date
2026-11-17
Estimated Expiration
2043-07-31

AI Technical Summary

Technical Problem

Existing technologies are insufficient to effectively monitor and control the cantilever construction process of large-span prefabricated steel pipe arch bridges, especially under the influence of environmental factors, which makes it difficult to guarantee construction accuracy and safety risks.

Method used

A construction monitoring method for steel arch ribs of long-span arch bridges is adopted. By inputting preset meteorological data into the finite element calculation model, setting up fastening cables, anchor cables and monitoring points, strain and position changes are monitored in real time. Combined with temperature sensors and Beidou positioning equipment, precise control and adjustment of the steel arch ribs are achieved.

Benefits of technology

This enabled real-time monitoring and adjustment of the construction process of long-span arch bridges, reducing construction safety risks, improving construction precision and the accuracy of control parameters, and ensuring the smooth progress of bridge construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117451492B_ABST
    Figure CN117451492B_ABST
Patent Text Reader

Abstract

This invention discloses a method for monitoring the construction of steel arch ribs for long-span arch bridges, comprising the following steps: inputting preset meteorological data for the arch base, approach bridge deck, and cable tower top, and setting up clamping cables, anchor cables, and clamping monitoring points on the steel arch ribs; fitting and assembling the steel arch ribs under the preset meteorological data conditions; calculating the strain of the main cable and the positional change parameters of the steel arch ribs during the hoisting construction of each steel arch rib section using the main cable under the preset meteorological data conditions; after each steel arch rib section is assembled, obtaining the strain of each clamping monitoring point through the interconnected clamping cables and anchor cables, and feeding the strain of the clamping monitoring points back to the finite element calculation model for calculation, predicting the strain of each clamping monitoring point after the hoisting construction of the next steel arch rib section is completed. This invention can monitor the current gasification environment and various stress points in real time, and make adjustments and guide on-site construction control based on environmental parameters, reducing construction safety risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of bridge construction technology, and in particular relates to a construction monitoring method for steel arch rib fastening of long-span arch bridges. Background Technology

[0002] With the rapid development of the road and bridge industry, there is an increasing number of bridge structures that need to cross rivers and deep mountain valleys. Steel arch bridges have gained unprecedented application space. However, with their widespread application, the complete set of manufacturing technologies for steel pipe arch bridges urgently needs to be improved. In particular, the scaffold-free construction technology for large-span prefabricated steel pipe arch bridges is the preferred solution for the arch ribs of current arch bridge construction. Large-span arch bridges have large spans, ultra-high piers, larger live loads, and higher design speeds, which correspondingly require high bridge construction control indicators. Currently, the common construction method for cantilever arch ribs of continuous steel structure arch bridges is the overall cable-stayed hoisting method. This involves dividing the main arch rib into several segments, which are fabricated in a factory or prefabrication yard, then hoisted to the bridge site and installed segment by segment from the arch foot towards the mid-span. When connecting with already installed segments, they are secured using cable-stayed anchors until the bridge is closed at the mid-span. During the cantilever assembly, the arch rib is temporarily fixed using a cable-stayed anchor system. This anchor system is the most important load-bearing component. As the cantilever length increases, the structural safety risk also increases. Furthermore, it is affected by factors such as ambient temperature, humidity, and wind, which can cause deviations in the construction control parameters of subsequent segments. This makes it difficult to control the accuracy of the cantilever installation and hinders effective monitoring and management of the bridge construction process, thus impeding the smooth progress of bridge construction. Therefore, there is an urgent need to summarize a complete set of automated monitoring methods for cable-stayed anchors to provide valuable experience for the construction of similar bridges in the future. Summary of the Invention

[0003] The purpose of this invention is to provide a method for monitoring the construction of steel arch rib fastening for long-span arch bridges. This invention can monitor the current vaporization environment and various stress points during the installation of long-span arch bridges in real time, and adjust the steel arch rib assembly according to specific environmental parameters, thereby efficiently and conveniently guiding on-site construction control and reducing construction safety risks. To achieve the above objective, this invention employs the following technical effects: According to one aspect of the present invention, a method for monitoring the construction of steel arch rib fastening for long-span arch bridges is provided, the fastening monitoring method comprising the following steps: In the finite element calculation model of the long-span arch bridge, the preset meteorological data of the arch abutment, approach bridge deck and cable tower top surface are input respectively, and the fastening cables, anchor cables and fastening monitoring points are set on the steel arch rib. Then, the steel arch rib is fitted and assembled under the preset meteorological data conditions. After the fitting and assembly verification was qualified, under the preset meteorological data conditions, during the hoisting construction of each steel arch rib using the main cable, the strain of the main cable and the position change parameters of the steel arch rib were calculated respectively. When each steel arch rib is assembled, the strain force of the monitoring points of each steel arch rib is obtained through the interconnected fastening cables and anchor cables. The strain force of the monitoring points is fed back to the finite element calculation model for calculation. Based on the calculation results, the strain force of each monitoring point after the next steel arch rib is hoisted is estimated until the steel arch rib is closed.

[0004] In a further optimized version of the above scheme, during the hoisting and installation of each steel arch rib, the magnitude of the strain parameter change at the current anchoring monitoring point is determined based on the strain force of the main cable and the positional change parameters of the steel arch rib.

[0005] In a further preferred embodiment of the above scheme, at least two temperature sensors are installed at each end section of each steel arch rib. During the hoisting and construction of each steel arch rib, the temperature change parameters of the two ends section of the steel arch rib are obtained through the temperature sensors.

[0006] In a further preferred embodiment of the above scheme, the strain force of the main cable includes horizontal strain force. H max and vertical strain V max The calculation process for the strain force of the main cable is as follows: calculate the horizontal strain force based on the load-bearing capacity of the main cable. H max and vertical strain V max Then, based on the horizontal strain force H max and vertical strain V max Calculate the maximum tension T of the main cable; wherein, the horizontal strain force H max The following calculation model is satisfied: ; Vertical strain V max The following calculation model is satisfied: Then the maximum tension T of the main cable satisfies the following condition: ; In the above formula, f max q is the maximum sag under the rated load of the main cable, Q is the uniformly distributed load acting on the main cable, Q is the concentrated load at each suspension point of the main cable, and L is the span of the main cable. The angle between the main cable chord and the horizontal line.

[0007] In a further preferred embodiment of the above scheme, current meteorological observation data of the arch base, approach bridge deck, and cable tower top surface are obtained from the current meteorological monitoring station. The current observation data is compared with the preset meteorological data to determine whether there is any abnormal deviation during the hoisting of each steel arch rib. If there is an abnormal deviation, a position correction value is set for the main cable and the hanging monitoring point respectively.

[0008] In a further preferred embodiment of the above scheme, the position parameters of the steel arch rib during the current hoisting construction are obtained in real time based on the position correction value, and it is determined whether the steel arch rib deviates from the hoisting position of the main cable. If a deviation occurs, the hoisting position of the steel arch rib is corrected.

[0009] In a further preferred embodiment of the above scheme, during the hoisting and installation of each steel arch rib, the temperature change parameters at both ends of the steel arch rib are used to determine whether the shape of the steel arch rib has deviated. If a deviation occurs, the shape of the steel arch rib is adjusted by a shape correction value by correcting the strain of the main cable, and the shape of the steel arch rib is corrected according to the shape correction value.

[0010] In a further optimized version of the above scheme, after the steel arch ribs are fitted and assembled, the deviation of the steel arch ribs is verified.

[0011] A further preferred embodiment of the above scheme, verifying the deviation of the steel arch ribs, includes the following steps: During the fitting process from both ends of the arch bridge toward the arch center, the position coordinates of the fastening monitoring points of each steel arch rib and the shape line of each steel arch rib are obtained sequentially. The position coordinates of the monitoring points of each steel arch rib are connected to form a monitoring line, and the lines of each steel arch rib are connected to form the steel arch rib line after the arch is formed. Determine the deviation between the monitoring profile, the steel arch rib profile, and the model profile after the arch is formed, and correct the steel arch rib profile according to the magnitude of the deviation.

[0012] In summary, the present invention adopts the above technical solution, and the present invention has the following technical effects: (1) This invention is designed to monitor the current gasification environment and stress points in real time during the installation of large-span arch bridges, and to make rapid adjustments to the assembly of steel arch ribs based on the specific environmental parameters, thereby providing efficient and convenient guidance for on-site construction control and reducing construction safety risks. At the same time, the monitoring points, environment and other monitoring parameters are fed back into the finite element calculation model, and the finite element calculation model is adjusted and improved in combination with the actual construction situation. Reasonable hoisting construction control parameters are re-optimized, thereby making more accurate judgments and predictions on the hoisting control parameters of steel arch ribs and improving the accuracy of steel arch rib installation of large-span bridges. Attached Figure Description

[0013] Figure 1This is a monitoring flowchart of a construction monitoring method for steel arch rib fastening of a long-span arch bridge according to the present invention; Figure 2 This is a schematic diagram of the inclined tie-down model of the steel arch rib of the long-span arch bridge of the present invention; Figure 3 This is a schematic diagram of the temperature sensor layout on the steel arch rib section of the present invention; In the attached diagram, the following structures are depicted: 1. Large-span steel arch rib model; 2. Interchange pier; 3. Anchor cable anchorage; 4. Cable tower; 5. Cable tower foundation; 6. Formal cable anchorage; 7. Temporary cable anchorage; 7a. Anchor cable; 8. Tensioning platform; 9. Crosswind cable anchorage; 10. Main cable; 20. Temperature sensor. Detailed Implementation To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are merely to provide the reader with a thorough understanding of one or more aspects of the present invention, and these aspects of the invention can be implemented even without these specific details.

[0014] Combination Figure 1 As shown, according to a construction monitoring method for steel arch rib fastening of a long-span arch bridge according to the present invention, the fastening monitoring method includes the following steps: Step 1: Input the preset meteorological data for the arch abutment, approach bridge deck, and cable tower top surface into the finite element calculation model of the long-span arch bridge. Also, set up the fastening cables, anchor cables, and fastening monitoring points on the steel arch ribs. Then, under the preset meteorological data conditions, fit and assemble the steel arch ribs, and verify the fitted assembly. After the fitted assembly of the steel arch ribs is completed, verify the deviation of the steel arch ribs. The verification steps are as follows: during the fitting process from both ends of the arch bridge towards the arch center, sequentially obtain the position coordinates of the fastening monitoring points of each steel arch rib section and the shape of each steel arch rib section. The monitoring lines are formed by connecting the position coordinates of the monitoring points of each steel arch rib section to form a monitoring line, and the monitoring lines of each steel arch rib section are connected to form the steel arch rib line after the arch is completed. The deviation between the monitoring line, the steel arch rib line and the model line after the arch is completed is judged, and the steel arch rib line is corrected according to the magnitude of the deviation. The deviation accuracy of the assembled steel arch rib section is verified to see if it meets the requirements of the engineering design. The deviation of the arch rib axis from the overall control is within ±10mm, and the actual error of the steel arch rib axis after the bridge is completed is less than 6mm. In this invention, a finite element calculation model is established using Midas / Civil finite element calculation software, such as... Figure 2As shown, a large-span steel arch rib model 1 and a main cable 10 are established in the calculation model. Piers 2 are located at the junction of the two banks of the ravine. A pylon 4 is installed on the pylon 2, slightly off-center from the main bridge. Anchor cables 3, cable tower foundations 5, and side-wind cable anchors 9 are installed on the slopes of both banks and behind the arch foot. A tensioning platform 8 is installed on the top surface of the pylon 4 (cable tower), and anchor holes are installed on the tensioning platform 8. Based on the structural dimensions of the steel arch rib 1, formal and temporary cables 6 and 7 are arranged between the steel arch rib model 1 and the pylon 4. Anchor cables 3 and 9 are installed between the anchor cables 3 and the main cable 4. Anchor cables 7a are arranged between tower 4 and between tower foundation 5 and tower 4. In actual construction, four surface stress gauges are arranged at the bottom section of tower 4 (junction pier), and two stress gauges (anchor monitoring points) are arranged at each anchor section of the steel arch rib. Sinusoidal surface strain gauges are used to collect strain changes for monitoring the surface strain of tower 4. Tower 4 consists of a concrete junction pier and an extension tower. Due to the large difference in stiffness of tower 4, the deformation data are inconsistent. It is necessary to monitor the deviation of the junction pier cap beam and the top of the tower at the same time. The accuracy of tower deviation is 1mm, and the monitoring frequency should be once every 20-30 seconds. If the anchorage system slips or deviates under the tension of the formal anchor cable 6 and the temporary anchor cable 7, it will have serious consequences for the entire tower system and even the entire temporary structure of the arch bridge. The slippage of the rear anchor of the formal anchor cable 6 is monitored throughout the entire process. The rear anchor slippage monitoring mainly relies on the guy wire sensor to measure the slippage. Four monitoring points are set up for each anchor. The accuracy of the rear anchor slippage monitoring points is not less than 1mm, and the monitoring frequency should be once every 20 to 30 seconds. Step 2: After the fitting and assembly verification is qualified, under the preset meteorological data conditions, during the hoisting construction of each steel arch rib using the main cable, the strain force of the main cable and the position change parameters of the steel arch rib are obtained respectively; In this invention, during the hoisting construction of each steel arch rib, the strain parameter change of the current anchoring monitoring point is judged according to the strain force of the main cable and the position change parameters of the steel arch rib, so as to grasp the structural stress state of each monitoring point in real time, adjust the hoisting operation, reduce safety risks, and form a complete structure; In this invention, meteorological observation stations are set up at the arch base, approach bridge deck, and cable tower top surface, respectively, mainly to observe parameters such as ambient temperature, humidity, wind speed and wind direction, to conduct environmental monitoring of the entire bridge range, in order to cope with extreme weather in mountainous canyons and provide basic meteorological data for bridge construction and installation; The trolley on the main cable 10 is the main load-bearing component of the steel arch rib. With the changes in hoisting, the sag of the main cable 10 is also constantly changing. During the installation process, due to construction deviation, The sag of the main cable varies, causing some cables to deviate in tension. Therefore, it is necessary to dynamically monitor the strain (tension) of the main cable 10 to understand the actual stress situation. The strain (tension) of the main cable 10 is monitored using a vibrating wire sensor. The strain of the main cable 10 is obtained by comparing the measured frequency with the foundation frequency. The strain of the main cable 10, the operating voltage, current, temperature, and vibration frequency of the power source equipment are monitored in real time. The operating status of the power source equipment is judged based on the trend of the monitoring data. When the monitoring data is abnormal, timely proactive intervention is carried out to avoid interruption or motor damage during hoisting and to prevent risks before they occur. Beidou positioning equipment is installed on the top surface of the 4th tower (cable tower). Two mobile positioning stations are set on the top surface of each 4th tower (cable tower), and a base positioning station is set on the ground. The deviation of the 4th tower (cable tower) is obtained by dynamically analyzing the Beidou positioning data.The offset monitoring frequency of tower 4 (cable tower) is once every 10 seconds, with a monitoring accuracy of 1 cm. To ensure monitoring accuracy, the backend system dynamically corrects the monitoring accuracy and periodically verifies the accuracy using a total station. During the on-site steel structure hoisting, the current weather conditions significantly affect the process, making it impossible to determine the specific offset of the trolley on the main cable 10 using video monitoring and optical measurement equipment. This poses a significant safety risk during high-altitude hoisting operations. Therefore, a Beidou positioning device is installed on the trolley for precise three-dimensional positioning, achieving high-precision centimeter-level positioning of the trolley's three-dimensional coordinates. Additionally, an AI camera is installed on the trolley to collect images of the main cable 10's operation and the trolley's dynamic tracking, providing insights into the on-site hoisting status and enabling visualized positioning of the steel arch ribs. When an anomaly occurs, an alert is issued. Accurate positioning is possible even in dense fog, severe weather conditions, or strong winds. The data on the position of the trolley is digitized. The specific process for obtaining parameters regarding the positional changes of the steel arch rib is as follows: A Beidou positioning device is installed on each of the trolleys on both the upstream and downstream sides of the main cable 10 to monitor the trolley's speed, displacement, and other information. During the hoisting operation of the steel arch rib on the trolley, the Beidou positioning device acquires real-time information on the trolley's position and sends this information to the finite element calculation model for feedback. This real-time position information includes speed, position, relative displacement, and lifting height. Based on this information, the position information of the steel arch rib is analyzed. Then, the travel encoder on the trolley measures the amount of cable exiting the main cable 10. The amount of cable exit is then compared and corrected with the real-time position information of the trolley, thereby achieving precise control and dynamic display of the steel arch rib. This ensures that the synchronization accuracy of the trolleys on both sides is controlled within 5cm, guaranteeing the accuracy and positional accuracy of the steel arch rib construction process. Step 3: After each steel arch rib section is assembled, the strain force at the monitoring points of each steel arch rib section is obtained through the interconnected fastening cables and anchor cables. The strain force at the monitoring points is fed back to the finite element calculation model for calculation. Based on the calculation results, the strain force at each monitoring point after the next steel arch rib section is hoisted is estimated until the steel arch rib is closed. During the actual hoisting process, the strain force of the fastening cables and anchor cables on the monitoring points of each steel arch rib section will change at any time due to the influence of current environmental monitoring parameters. The effects of external forces such as thermal expansion and contraction deformation and wind force and speed will also cause the strain force of the fastening cables and anchor cables on the assembled steel arch rib model to change accordingly. After each steel arch rib section is hoisted, the entire bridge arch rib changes in space, and the force of the fastening cables and anchor cables on the steel arch rib also changes accordingly. The strain force reaches its maximum before the steel arch rib is closed and the strain force reaches its minimum after the steel arch rib is closed. Based on the strain force after each hoisting, the strain force after the next hoisting is predicted, so as to adjust the running status of the fastening cables and anchor cables in real time.

[0015] In this invention, the strain force of the main cable includes horizontal strain force. H maxand vertical strain V max The calculation process for the strain force of the main cable is as follows: calculate the horizontal strain force based on the load-bearing capacity of the main cable. H max and vertical strain V max Then, based on the horizontal strain force H max and vertical strain V max Calculate the maximum tension T of the main cable: Wherein, the horizontal strain force H max The following calculation model is satisfied: ; Vertical strain V max The following calculation model is satisfied: ; The maximum tension T of the main cable max satisfy: ; In the formula, f max q is the maximum sag under the rated load of the main cable, Q is the uniformly distributed load acting on the main cable, Q is the concentrated load at each suspension point of the main cable, and L is the span of the main cable. The angle between the main cable chord and the horizontal line.

[0016] In this invention, current meteorological observation data of the arch base, approach bridge deck, and cable tower top surface are obtained through the current meteorological monitoring station. The current observation data is compared with preset meteorological data to determine whether there is any abnormal deviation during the hoisting of each steel arch rib. If there is an abnormal deviation, a position correction value is set for the main cable and the anchoring monitoring point respectively. Based on the position correction value, the position parameters of the steel arch rib during the current hoisting construction are obtained in real time to determine whether the steel arch rib deviates from the hoisting position of the main cable. If a deviation occurs, the hoisting position of the steel arch rib is corrected.

[0017] In this embodiment of the invention, at least two temperature sensors 20 are installed at each end section of each steel arch rib. During the hoisting and installation of each steel arch rib, the temperature change parameters of the two ends section of the steel arch rib are obtained through the temperature sensors. Since the installation of the steel arch rib is mainly a high-altitude operation, to reduce safety risks, the high-altitude operation is arranged during the daytime, which is greatly affected by the overall temperature rise and temperature gradient, making precise positioning of the steel arch rib impossible. By monitoring the temperature of the two ends section of the steel arch rib and predicting the impact of temperature on the deformation of the main arch during construction, the deformation during construction can be evaluated in a timely and intuitive manner. The influence of temperature on the strain of the steel arch rib can be eliminated by the automatic temperature correction of the temperature sensors. Two temperature sensors 20 need to be installed at each section, with specific locations as follows: Figure 3 As shown, in this invention, during the hoisting and installation of each steel arch rib section by the main cable, the temperature change parameters at both ends of the steel arch rib are used to determine whether the steel arch rib profile has shifted. If a shift occurs, the profile of the steel arch rib is adjusted by a profile correction value based on the strain of the main cable. This correction value is used to correct the deviation of the steel arch rib profile, thus ensuring that the impact of temperature changes on the profile changes of the steel arch rib before and after closure is minimized, reducing deviation of the steel arch rib and improving the accuracy of bridge construction and assembly. The profile correction value ε satisfies: ; In the above formula, λ a λ is the chord length of the steel arch rib; λ0 and λ1 are the starting and ending linear values ​​of the steel arch rib, respectively; t0 and t1 are the starting and ending temperature values, respectively, with a negative sign when t1 > t0 and a positive sign when t1 < t0; δ is the linear expansion coefficient of the main cable affected by temperature. A is The cross-sectional area of ​​the main cable; E The equivalent elastic modulus of the main cable; therefore, the profile of the steel arch rib is corrected according to the profile correction value to satisfy: F(X, Y, Z) = ε * ( t c - t s ) ±δ; Where F(X, Y, Z) are the corrected three-dimensional spatial coordinate values. t c This is the temperature value during the current construction period. t s For the preset temperature value, when t c > t s When ±δ takes a negative sign, t c < t sTake the positive sign, and set the preset temperature value to 20℃~25℃. δ is the linear expansion coefficient of the main cable affected by temperature.

[0018] This invention allows for real-time monitoring of equipment operation based on current construction conditions, and enables control of main cable strain according to temperature changes. This allows for determination of alignment, tension, etc., at any location, thereby reducing construction safety risks. It is of great significance in mitigating the impact of extreme weather in mountainous canyons on construction safety, enabling rapid and precise hoisting construction, reducing errors, and improving installation accuracy.

[0019] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for monitoring the construction of a large-span arch bridge steel arch rib buckling, characterized in that: The method for monitoring the installation process includes the following steps: In the finite element calculation model of the long-span arch bridge, the preset meteorological data of the arch abutment, approach bridge deck and cable tower top surface are input respectively, and the fastening cables, anchor cables and fastening monitoring points are set on the steel arch rib. Then, the steel arch rib is fitted and assembled under the preset meteorological data conditions. After the fitting and assembly verification was qualified, under the preset meteorological data conditions, during the hoisting construction of each steel arch rib using the main cable, the strain of the main cable and the position change parameters of the steel arch rib were calculated respectively. When each steel arch rib is assembled, the strain force of the monitoring points of each steel arch rib is obtained through the interconnected fastening cables and anchor cables. The strain force of the monitoring points is fed back to the finite element calculation model for calculation. Based on the calculation results, the strain force of each monitoring point after the next steel arch rib is hoisted is estimated until the steel arch rib is closed. During the hoisting of each steel arch rib, the magnitude of the strain parameter change at the current monitoring point is also determined based on the strain force of the main cable and the position change parameters of the steel arch rib. The main cable strain force includes a horizontal strain force H max and a vertical strain force V max The calculation process of the main cable strain force is as follows: the horizontal strain force H max and the vertical strain force V max are calculated according to the main cable load bearing calculation; and then the maximum tension T of the main cable is calculated according to the horizontal strain force H max and the vertical strain force V max ; wherein the horizontal strain force H max satisfies the following calculation model: ; Vertical strain V max The following calculation model is satisfied: Then the maximum tension T of the main cable satisfies the following condition: ; In the above formula, f max q is the maximum sag under the rated load of the main cable, Q is the uniformly distributed load acting on the main cable, Q is the concentrated load at each suspension point of the main cable, and L is the span of the main cable. The angle between the main cable chord and the horizontal line.

2. The construction monitoring method for steel arch rib fastening of a long-span arch bridge according to claim 1, characterized in that: At least two temperature sensors are installed at each end of each steel arch rib section. During the hoisting and construction of each steel arch rib section, the temperature change parameters of the two ends of the steel arch rib section are obtained through the temperature sensors.

3. The construction monitoring method for steel arch rib fastening of a long-span arch bridge according to claim 1, characterized in that: The current meteorological observation data of the arch base, approach bridge deck and cable tower top are obtained by the current meteorological monitoring station. The current observation data is compared with the preset meteorological data to determine whether there is any abnormal deviation during the hoisting of each steel arch rib. If there is an abnormal deviation, a position correction value is set for the main cable and the hanging monitoring point respectively.

4. The construction monitoring method for steel arch rib fastening of a long-span arch bridge according to claim 3, characterized in that: Based on the position correction value, the position parameters of the steel arch rib during the current hoisting construction are obtained in real time to determine whether the steel arch rib deviates from the main cable hoisting position. If a deviation occurs, the hoisting position of the steel arch rib is corrected.

5. The construction monitoring method for steel arch rib fastening of a long-span arch bridge according to claim 2, characterized in that: During the hoisting and installation of each steel arch rib, the temperature change parameters at both ends of the steel arch rib are used to determine whether the rib's profile has shifted. If a shift occurs, the profile of the steel arch rib is adjusted by a profile correction value based on the strain of the main cable. The profile correction value ε satisfies the following conditions: ; In the above formula, λ a λ is the chord length of the steel arch rib; λ0 and λ1 are the starting and ending linear values ​​of the steel arch rib, respectively; t0 and t1 are the starting and ending temperature values, respectively, with a negative sign when t1 > t0 and a positive sign when t1 < t0; δ is the linear expansion coefficient of the main cable affected by temperature. A for The cross-sectional area of ​​the main cable; E The equivalent elastic modulus of the main cable; therefore, the profile of the steel arch rib is corrected according to the profile correction value to satisfy: F(X,Y,Z)= ε * ( t c - t s ) ±δ; Where F(X, Y, Z) are the corrected three-dimensional spatial coordinate values. t c This is the temperature value during the current construction period. t s For the preset temperature value, when t c > t s When ±δ takes a negative sign, t c < t s Take the positive sign, and set the preset temperature value to 20℃~25℃. δ is the linear expansion coefficient of the main cable affected by temperature.

6. The construction monitoring method for steel arch rib fastening of a long-span arch bridge according to claim 1, characterized in that: After the steel arch ribs were fitted and assembled, the deviation of the steel arch ribs was verified.

7. The construction monitoring method for steel arch rib fastening of a long-span arch bridge according to claim 6, characterized in that: Verification of the deviation of the steel arch ribs includes the following steps: During the fitting process from both ends of the arch bridge toward the arch center, the position coordinates of the fastening monitoring points of each steel arch rib and the shape line of each steel arch rib are obtained sequentially. The position coordinates of the monitoring points of each steel arch rib are connected to form a monitoring line, and the lines of each steel arch rib are connected to form the steel arch rib line after the arch is formed. Determine the deviation between the monitoring profile, the steel arch rib profile, and the model profile after the arch is formed, and correct the steel arch rib profile according to the magnitude of the deviation.

Citation Information

Patent Citations

  • Interactive control method for steel tube arch bridge main arch rib installation line shape

    CN110362953A