A generalized method and system for optimal allocation of water resources

By constructing a generalized water resources optimization allocation model, the problem of the mutual interference effect of water cycle on the supply and demand sides in water resources allocation was solved, and the coordinated allocation of physical water and virtual water was realized, thereby improving the accuracy and efficiency of water resources allocation.

CN117610714BActive Publication Date: 2026-11-10CHINA INST OF WATER RESOURCES & HYDROPOWER RES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311475407.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-07
Publication Date
2026-11-10
Estimated Expiration
2043-11-07

AI Technical Summary

Technical Problem

Existing water resource allocation methods ignore the mutual effects of the water cycle between the supply and demand sides, resulting in inaccurate allocation results that fail to truly reflect the quantity and quality of available water resources.

Method used

A generalized water resources optimization allocation model is constructed. By building a supply-side multi-source multi-objective integrated optimization model and a demand-side entity-virtual water integrated optimization model, and combining the NSGA-II algorithm and the entropy weight method, the allocation of multiple water sources in the industrial water supply network system is optimized to achieve coordinated allocation of entity water and virtual water.

Benefits of technology

It realizes the complete movement and allocation regulation of physical and virtual water, improves the matching degree between water resources and productivity, reflects the intertwined characteristics of supply, consumption and discharge processes, and enhances the accuracy and efficiency of allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117610714B_ABST
    Figure CN117610714B_ABST
Patent Text Reader

Abstract

This invention discloses a generalized water resource optimization allocation method and system, comprising: constructing a supply-side multi-source, multi-objective integrated optimization model; solving the supply-side multi-source, multi-objective integrated optimization model to obtain the optimal allocation scheme of multiple water sources in the industrial water supply network system; constructing a demand-side entity-virtual water integrated optimization model with the objective of maximizing the total economic output of the industry; using the optimal allocation scheme as the input parameter of the demand-side entity-virtual water integrated optimization model to solve the demand-side entity-virtual water integrated optimization model; and adjusting the parameters of the supply-side multi-source, multi-objective integrated optimization model using the optimization results of the demand-side model. This invention explores the construction of a base water resource optimization allocation model from a generalized perspective and provides an efficient solution method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of water resource regulation technology, specifically to a generalized water resource optimization allocation method and system. Background Technology

[0002] Water resource allocation primarily aims to improve the matching degree between water resources and productivity by coordinating the relationships between multiple water sources and multiple users. Previous water resource allocation methods were mainly based on static water resource assessments and water demand calculations, neglecting the interactive effects of water resource allocation with the supply and demand sides' supply-use-consumption-discharge-return water cycle. This resulted in inaccurate allocation results, failing to reflect the actual quantity and quality of available water resources. The demand side is the target and object of water resource allocation, while the supply side reflects the methods, total amount, and process of water resource allocation. From a water cycle perspective, the core essence of water resource allocation is the allocation of water consumption under a water balance state between the supply and demand sides.

[0003] Therefore, future research needs to place greater emphasis on the optimal allocation of water resources based on water consumption concepts such as water footprint, and to analyze and calculate the supply, consumption, and discharge balance of various water sources for different industries and sectors in the region, as well as the general water balance between sectors and industries, so as to manage and utilize water resources more realistically and comprehensively. Summary of the Invention

[0004] The purpose of this invention is to provide a generalized water resources optimization allocation method and system, to explore the construction of a base water resources optimization allocation model from a generalized perspective, and to provide an efficient solution method.

[0005] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: This invention provides a demand-based generalized water resource optimization allocation method, which includes: S1: Based on the practical requirements of industrial development and energy conservation and emission reduction, and taking into account competitive objectives, a multi-source, multi-objective overall optimization model for the supply side is constructed. S2: Solve the multi-source, multi-objective overall optimization model of the configuration model supply side to obtain the optimal allocation scheme of multiple water sources in the industrial water supply network system; S3: With the goal of maximizing the total output value of the industrial economy, construct a configuration model for demand-side entity-virtual water management optimization; S4: Use the optimal allocation scheme as the input parameter of the configuration model demand-side entity-virtual water management optimization model to solve the configuration model demand-side entity-virtual water management optimization model and obtain the configuration model demand-side model optimization result; S5: Determine whether the optimization result of the demand-side model of the configuration model meets the termination condition. If yes, output the optimization configuration result of the generalized water resources of the industry; otherwise, proceed to S6. S6: Use the optimization results of the demand-side model of the configuration model to adjust the parameters of the supply-side multi-source multi-objective overall optimization model of the configuration model and return to S2.

[0006] Alternatively, in S1, the configuration model supply-side multi-water-source multi-objective overall optimization model has an objective function, which includes minimizing the total water shortage of enterprises and projects in the industry, and minimizing the total power consumption of water supply from different water sources in the industry. The minimum total water shortage for enterprises and projects in the aforementioned industry is:

[0007] in, This indicates the total water shortage for enterprises and projects within the industry. For j district c Water demand for enterprise projects; for w Water purification plant supply j district c For enterprises, the metering point for water volume, including water transmission losses, is the water purification plant. for w Water purification plant and j district c The company's water supply relationship value, for rw Reclaimed water plant supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the reclaimed water plant. for rw Reclaimed water plant and j district c The company's water supply relationship value, for pt Mine water pretreatment station supply j district c The metering point for the enterprise's water volume, including water transmission losses, is the mine water pretreatment station. for pt Mine water pretreatment station and j district c The company's water supply relationship value, for dt Mine water deep treatment engineering supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the mine water deep treatment project. for dt Mine water deep treatment engineering and jdistrict c The company's water supply relationship value, , , and They are w Water purification and distribution plant rw Reclaimed water plant pt Mine water pretreatment station and dt Mine water deep treatment project j Leakage rate of district water supply; J, C, W, RW, PT, and DT represent the number of districts, enterprises, conventional water source purification plants, reclaimed water plants, mine water pretreatment stations, and mine water deep treatment projects, respectively. Total electricity consumption from different water sources in the aforementioned industry The minimum is:

[0008] in, for s Conventional water supply w The water volume of a water treatment plant, including water transmission losses, is measured at the reservoir. for s The unit water consumption of a water source project is the electricity consumption per unit volume of surface water. s The electrical energy consumed by water source projects for water intake, pumping station water transportation, and reservoir water storage; for s Water source and w Water supply relationship values ​​of the water purification plant for w Electricity consumption per unit of water produced by a water purification plant, i.e. w The amount of electricity consumed by a water purification plant to produce one unit of water; for rw The unit water production power consumption of a reclaimed water plant, i.e., the amount of industrial wastewater entering the plant. rw The amount of electricity consumed to produce one unit of reclaimed water after a series of processes at the reclaimed water plant. for pt The unit water production power consumption of a mine water pretreatment station is the electrical energy consumed to produce one unit of usable mine water after the mine water is collected underground and pretreated on the surface. For the pt After treatment at the mine water pretreatment station, the water enters... dt The volume of water undergoing desalination treatment in deep mine water treatment projects; for pt Mine water pretreatment station and dt Water conveyance relationship values ​​for deep mine water treatment projects for dtThe unit water production power consumption of a deep mine water treatment project is the electrical energy consumed to produce one unit of usable mine water after the mine water has been pretreated and further desalinated. S This refers to the quantity of conventional water sources; This refers to the volume of water that has been treated at the RW wastewater reclaimed water plant but has not been utilized. This is the scripture pt The volume of mine water pretreatment station that is treated but not utilized.

[0009] Alternatively, the objective function may include the following constraints: Constraints include node water balance, enterprise project supply and demand, water conservancy projects, water resources management, and non-negativity of decision variables.

[0010] Optionally, the node water balance constraints include the node water balance of conventional water source purification plants, the node water balance of wastewater reclaimed water plants, the node water balance of mine water pretreatment stations, and the node water balance of mine water deep treatment projects. The water balance at the nodes of the conventional water source water purification plant includes:

[0011]

[0012]

[0013] The water balance at each node of the wastewater reclaimed water plant includes:

[0014] Water balance at the mine water pretreatment station node:

[0015]

[0016]

[0017] Water balance at key nodes of the mine water deep treatment project:

[0018]

[0019]

[0020] in, for w Water purification plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the water treatment plant. forw Water purification plant and j district c The company's water supply relationship value, for s conventional water sources to w Leakage rate of water transmission from water treatment plant for s Water source and w Water supply relationship values ​​of the water purification plant; for rw Reclaimed water plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the reclaimed water plant. for rw Reclaimed water plant and j district c The company's water supply relationship value, for pt Mine water pretreatment station supply j district c The metering point for the enterprise's water volume, including water transmission losses, is the mine water pretreatment station. for pt Mine water pretreatment station and j district c The company's water supply relationship value, for pt Mine water pretreatment station and dt Water conveyance relationship values ​​for deep mine water treatment projects for dt Mine water deep treatment engineering supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the mine water deep treatment project. for dt Mine water deep treatment engineering and j district c The company's water supply relationship value, , , and They are w Water purification plant rw Reclaimed water plant pt Mine water pretreatment station and dt Self-consumption coefficient of deep mine water treatment projects; for pt Mine water pretreatment station to dt Leakage rate of water conveyance in deep mine water treatment projects; and They are respectively rw Reclaimed water plants and pt Inflow rate of mine water pretreatment station; The supply and demand constraints for the enterprise project are as follows:

[0021] In the formula, The leakage rate of water supplied from water treatment plant W to district J. for rw Reclaimed water plant to j Leakage rate of district water supply for dt Mine water deep treatment project j Leakage rate of district water supply for j district c Water demand for enterprise projects for j district c Lower limit of enterprise water demand adjustment coefficient This represents the minimum lower limit of the water demand adjustment coefficient. for j district c Regarding the enterprise's water demand adjustment coefficient, This represents the maximum upper limit of the water demand adjustment coefficient. The constraints on water conservancy projects include the scale of water purification plants, wastewater reclaimed water plants, mine water pretreatment stations and deep mine water treatment projects, the scale of conventional water resource source projects and pipeline water transmission and distribution capacity. The scale of the conventional water resource and water source projects includes:

[0022] The scale of the water purification plant, wastewater reclaimed water plant, mine water pretreatment station, and mine water deep treatment project includes:

[0023]

[0024]

[0025] The pipeline's water transmission and distribution capacity includes:

[0026]

[0027] in, yes s The water supply capacity of conventional water sources; , , and They are wWater purification plant rw Wastewater reclaimed water plant pt Mine water pretreatment station and dt The water purification capacity of deep mine water treatment projects; yes w Water purification plant dr Water transport capacity in the pipeline direction, if j District by w Water purification plant dr If water is supplied via pipeline, then It is 1 if it is true, otherwise it is 0. yes j The water delivery capacity of the district's water inlet pipeline; The water resource management constraints are as follows:

[0028] The non-negativity constraint of the decision variables is:

[0029]

[0030] in, This is the annual total water withdrawal control target for the base's routine surface water resources.

[0031] Alternatively, S2 includes: S21: The NSGA-II algorithm is used to solve the multi-source, multi-objective overall optimization model of the configuration model supply side to obtain the Pareto solution set; S22: Use the entropy weight method to determine the optimal allocation scheme of multiple water sources in the industrial water supply network system from the Pareto solution set.

[0032] Alternatively, S21 includes: S211: Randomly generate an initial parent population P of size N. t Each individual in the population is a decision vector and corresponds to a multi-source water supply optimization scheme; S212: Using binary tournament method to obtain from parent population P t Select individuals, crossover, and mutation to produce a progeny population Q with a production size of N. t Then, with the parent population P t Mixing to form a population R of multi-source, multi-objective integrated water supply optimization schemes with a scale of 2N. t ; S213: Based on the objective function and constraints of the multi-source, multi-objective overall optimization model for the supply side of the configuration model, the population R... t Perform non-dominated hierarchical classification and assign non-dominated rankings to individuals. irank Individuals at each level are stored in different levels of non-dominated solution sets; then, the non-dominated solution sets are sorted by crowding. S214: Using comparison operators and elite strategies, from R t From among the N optimal multi-source water supply optimization schemes, the parent population P for the next iteration is selected. t+1 ; S215: Repeat S211-S214 in a loop until the termination condition is met.

[0033] Alternatively, S22 includes: S221: Solution set of Pareto The new set is obtained after standardization. ; The new set is:

[0034] h = 1,2,...,H; o = 1,2,...,O, where H and O are the number of objective functions and the number of solutions in the Pareto solution set, respectively. and These represent the Pareto solution set in the objective function. h The maximum and minimum values ​​on; S222: Calculate the characteristic weights of the new set; Among them, the characteristic proportion for:

[0035] S223: Calculate the entropy value of each objective function; Wherein, the entropy value for:

[0036] S224: Calculate the entropy weights of each objective function using the entropy values; Wherein, the entropy weight for:

[0037] S225: Assign scores to each solution in the Pareto solution set according to the entropy weight of each objective function, and the solution with the best score is the equilibrium solution; S226: Output the equilibrium solution as the optimal allocation scheme for multiple water sources in the industrial water supply network system.

[0038] Optionally, the configuration model demand-side entity-virtual water management optimization model has an objective function, which is:

[0039] in, f 3 represents the total economic output of the base; for p The unit virtual water economic value of the product; It is purchased from outside the base. p The amount of virtual water resources contained in the product. for p The unit cost of purchased virtual water for the product, i.e. p The unit virtual water purchase cost of the product for j district c enterprise p Product output water footprint for j district c enterprise p The product's self-consumption water footprint, where J, C, and P represent the number of zones, enterprises, and products, respectively.

[0040] Alternatively, the objective function of the configuration model demand-side entity-virtual water management optimization model has the following constraints: The relationship between water consumption in demand-side industrial and mining projects and water supply on the supply side; capacity constraints of coal-based energy and chemical products; supply and consumption balance of base products, i.e., the sum of self-produced products and purchased products equals the sum of self-consumption and marketable sales; the marketable sales and purchased products of the same product cannot be greater than 0 at the same time, i.e., a product is only considered for purchase when self-produced products cannot meet demand; by-product output constraints; development planning constraints; and non-negativity constraints of variables.

[0041] Alternatively, the relationship between the water consumption of the demand-side industrial and mining projects and the water supply of the supply side is as follows:

[0042] The capacity constraints of coal-based energy and chemical products include the relationship between output and capacity, and the relationship between output and marketable volume. The relationship between output and capacity is as follows:

[0043] The relationship between production volume and marketable volume is as follows:

[0044] in, for j district c enterprise pThe virtual water content contained in the physical quantity of upstream products consumed by the product. for w Water purification plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the water treatment plant. for rw Reclaimed water plant to j Leakage rate of district water supply for rw Reclaimed water plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the reclaimed water plant. for pt Mine water pretreatment station to j Leakage rate of district water supply for pt Mine water pretreatment station supply j district c The metering point for a company's water volume, including losses during water transmission, is the mine water pretreatment station. for dt Mine water deep treatment project j Leakage rate of district water supply for dt Mine water deep treatment engineering supply j district c The enterprise's water volume, including water transmission losses, is measured at the mine water deep treatment project. P, W, RW, PT, and DT represent the quantity of products, conventional water source purification plants, reclaimed water plants, mine water pretreatment stations, and mine water deep treatment projects, respectively. yes j district c enterprise p Product production capacity for j district c enterprise p Product project scale; product water footprint; The supply and consumption balance of the base products means that the sum of the product's own production and the amount purchased is equal to the sum of the self-consumption and the sales volume.

[0045] The available sales volume and the external purchase volume of the same product cannot both be greater than 0 at the same time. That is, external purchases will only be considered if the self-production of a product cannot meet the demand.

[0046] The by-product output constraint is:

[0047] For any pair of main products and its by-products The output ratio coefficient, and They are respectively j district c Enterprise main products and by-products Product water footprint; and They are respectively j district c Enterprise main products and by-products Production water footprint; The development plan constraints include the planned proportion of economic output value for each industry and the sales targets for coal-based energy and chemical products. The planned proportions of economic output value for each industry are as follows:

[0048]

[0049] p =1 represents coal. p =2 represents coal-fired power. p =3~P represents coal chemical industry; The unit virtual water economic value of coal. yes j district c The water footprint of a company's coal sales volume; yes j district c The marketable water footprint of coal-fired power plants; The virtual water economic value per unit of coal-fired power. μ 1. μ 2 and μ 3 represents the planned proportion of the total economic output of the three major industries: coal, electricity, and chemicals. The sales target for the products in the aforementioned industry is:

[0050] E p yes p The product's target sales volume; The non-negativity constraint for the variable is:

[0051]

[0052] in, for j district c enterprise p Product pairi The direct material consumption coefficient of a product, its physical meaning is j district c A company produces one unit p The product directly consumes i Quantity of products for j district c enterprise i Product output water footprint for j district c enterprise i Product water footprint for p The product's base scale and water footprint. for j district c enterprise p Product project scale, product water footprint It can be any symbol.

[0053] The present invention has the following beneficial effects: 1) This invention simultaneously considers "two coordinations", namely, coordinating conventional and unconventional water, and coordinating physical and virtual water, to achieve regulation of the movement and distribution of water resources in the natural and economic systems. 2) This invention can improve the matching degree between water resources and productivity by coordinating the relationship between multiple water sources and multiple users; 3) The configuration method of this invention reflects the basic characteristics of the intertwining and mutual generation between the physical water supply, consumption and discharge process and the virtual water production and consumption process. Attached Figure Description

[0054] Figure 1 A schematic diagram illustrating the flow of physical water versus virtual water in a coal-based energy and chemical industry base. Figure 2 A schematic diagram of a generalized water resource optimization allocation mechanism based on supply and demand feedback. Figure 3 To configure the model framework diagram; Figure 4 This is a flowchart of the generalized water resources optimization allocation method of the present invention. Detailed Implementation

[0055] The principles and features of the present invention are described below with reference to the accompanying drawings. The examples given are only for explaining the present invention and are not intended to limit the scope of the present invention.

[0056] As one implementation method, Figure 1 This diagram illustrates the flow and interaction of real and virtual water in a coal-based energy and chemical industry base. In the diagram, solid lines represent the flow paths of real water, and dashed lines represent the flow paths of virtual water.

[0057] Physical water follows the process laws of hydrology and water resources, while virtual water follows the laws of economic society and commodity trade. Physical water flows within a water supply system composed of water source projects, water transmission projects, water purification and distribution projects, sewage treatment projects, and water supply networks, while virtual water is "embedded" in products and flows alongside them. Furthermore, there is a transformation relationship between physical and virtual water; for example, physical water entering industrial and mining enterprises as a means of production to produce products represents the process of water resources transforming from "real" to "virtual." Products serve as the link between the supply and demand sides; changes in product output and structure affect both sides. Figure 2 As shown.

[0058] The broad allocation of water resources in coal-based energy and chemical industry bases, using products as a link, requires comprehensive consideration of three aspects: First, the allocation of physical water on the supply side, which is essentially the optimal allocation of physical water resources under various engineering and physical constraints on the supply side. Second, the allocation of physical water on the demand side, that is, water resources are allocated as utility resources to meet the water needs of various product production, and ultimately "embedded" in products in the form of evaporation, leakage, consumption, etc., completing the transformation of physical water into virtual water. Third, the coordination and allocation of virtual water within the demand side and between it and the external market, which includes both the adjustment of the transportation, processing, and transformation of products as raw materials and auxiliary materials between upstream and downstream of the supply chain within the base, and the optimization of product sales and procurement strategies.

[0059] Based on the generalized water resource optimization mechanism of supply-demand feedback, a theoretical and technical framework for a base-scale generalized water resource allocation model is proposed. The working principle is as follows: Figure 3 As shown.

[0060] First, based on the practical requirements of both the development of the coal-based energy and chemical industry and energy conservation and consumption reduction, and taking into account the two competitive objectives of minimizing water shortage and minimizing water and electricity consumption, a multi-source, multi-objective overall optimization module for the supply side of the configuration model is constructed to realize the refined allocation of physical water resources in the three-level network structure of "water source - water conservancy project - zoned enterprise", and to solve the optimal allocation scheme of multiple water sources in the water supply network system of the coal-based energy and chemical industry base.

[0061] Then, with the goal of maximizing the total economic output of the energy and chemical industry base, we coordinate physical and virtual water resources and construct a configuration model demand-side physical-virtual water coordination and optimization module. Using the results of the configuration model supply-side module as input parameters, we complete the rational utilization and transformation of virtual and physical water resources on the demand side through energy and chemical product structure adjustment and product import and export trade optimization, and obtain optimization strategies for product output, self-consumption, external sales, and external purchase.

[0062] Secondly, based on the optimization results of the demand-side module of the configuration model, the parameters of the supply-side multi-source multi-objective overall optimization module are adjusted and solved again; Finally, the supply and demand modules of the configuration model are iteratively optimized until the termination condition is met, ultimately obtaining the optimal pattern of generalized water resource allocation for the coal-based energy and chemical industry base.

[0063] Specifically, this invention provides a demand-based generalized water resource optimization allocation method, referring to... Figure 4 As shown, the demand-based generalized water resource optimization allocation method of the present invention includes: S1: Based on the practical requirements of industrial development and energy conservation and emission reduction, and taking into account competitive objectives, a multi-source, multi-objective overall optimization model for the supply side is constructed. The configuration model supply-side multi-source multi-objective overall optimization model has an objective function, which includes minimizing the total water shortage of enterprises and projects in the industry, and minimizing the total power consumption of water supply from different water sources in the industry; The minimum total water shortage for enterprise projects within the industry is:

[0064] in, This indicates the total water shortage for enterprises and projects within the industry. For j district c Water demand for enterprise projects; for w Water purification plant supply j district c For enterprises, the metering point for water volume, including water transmission losses, is the water purification plant. for w Water purification plant and j district c The company's water supply relationship value, for rw Reclaimed water plant supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the reclaimed water plant. for rw Reclaimed water plant and j district c The company's water supply relationship value, for pt Mine water pretreatment station supply j district c The metering point for the enterprise's water volume, including water transmission losses, is the mine water pretreatment station. for pt Mine water pretreatment station and j district c The company's water supply relationship value, for dt Mine water deep treatment engineering supply j district cThe metering point for the enterprise's water volume, including water transmission losses, is at the mine water deep treatment project. for dt Mine water deep treatment engineering and j district c The company's water supply relationship value, , , and They are w Water purification and distribution plant rw Reclaimed water plant pt Mine water pretreatment station and dt Mine water deep treatment project j The leakage rate of the district water supply; J, C, W, RW, PT, and DT represent the number of districts, enterprises, conventional water source purification plants, reclaimed water plants, mine water pretreatment stations, and mine water deep treatment projects, respectively.

[0065] Total electricity consumption for water supply from different water sources in the industry The minimum is:

[0066] in, for s Conventional water supply w The water volume of a water treatment plant, including water transmission losses, is measured at the reservoir. for s The unit water consumption of a water source project is the electricity consumption per unit volume of surface water. s The electrical energy consumed by water source projects for water intake, pumping station water transportation, and reservoir water storage; for s Water source and w Water supply relationship values ​​of the water purification plant for w Electricity consumption per unit of water produced by a water purification plant, i.e. w The amount of electricity consumed by a water purification plant to produce one unit of water; for rw The unit water production power consumption of a reclaimed water plant, i.e., the amount of industrial wastewater entering the plant. rw The amount of electricity consumed to produce one unit of reclaimed water after a series of processes at the reclaimed water plant. for pt The unit water production power consumption of a mine water pretreatment station is the electrical energy consumed to produce one unit of usable mine water after the mine water is collected underground and pretreated on the surface. For the pt After treatment at the mine water pretreatment station, the water enters... dt The volume of water undergoing desalination treatment in deep mine water treatment projects; for pt Mine water pretreatment station and dtWater conveyance relationship values ​​for deep mine water treatment projects for dt The unit water production power consumption of a deep mine water treatment project is the electrical energy consumed to produce one unit of usable mine water after the mine water has been pretreated and further desalinated. S This refers to the quantity of conventional water sources; This refers to the volume of water that has been treated at the RW wastewater reclaimed water plant but has not been utilized. This refers to the volume of water that has been treated at the PT mine water pretreatment station but has not been utilized.

[0067] Water and electricity consumption per unit of various water conservancy projects Based on the following water supply calculations:

[0068] In other words, without considering the scale effect of energy consumption in engineering projects, the electricity consumption per unit of water is a constant; however, when considering the scale effect of energy consumption in engineering projects, the electricity consumption per unit of water is related to the water supply of the project. A function This function is typically non-linear and needs to be obtained by fitting measured data on water supply and electricity consumption per unit of water.

[0069] Alternatively, the objective function may include the following constraints: Constraints include node water balance, enterprise project supply and demand, water conservancy projects, water resources management, and non-negativity of decision variables.

[0070] Optionally, the node water balance constraints include the node water balance of conventional water source purification plants, the node water balance of wastewater reclaimed water plants, the node water balance of mine water pretreatment stations, and the node water balance of mine water deep treatment projects. The water balance at the nodes of the conventional water source water purification plant includes:

[0071]

[0072]

[0073] The water balance at each node of the wastewater reclaimed water plant includes:

[0074] Water balance at the mine water pretreatment station node:

[0075]

[0076]

[0077] Water balance at key nodes of the mine water deep treatment project:

[0078]

[0079]

[0080] in, for w Water purification plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the water treatment plant. for w Water purification plant and j district c The company's water supply relationship value, for s conventional water sources to w Leakage rate of water transmission from water treatment plant for s Water source and w Water supply relationship values ​​of the water purification plant; for rw Reclaimed water plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the reclaimed water plant. for rw Reclaimed water plant and j district c The company's water supply relationship value, for pt Mine water pretreatment station supply j district c The metering point for the enterprise's water volume, including water transmission losses, is the mine water pretreatment station. for pt Mine water pretreatment station and j district c The company's water supply relationship value, for pt Mine water pretreatment station and dt Water conveyance relationship values ​​for deep mine water treatment projects for dt Mine water deep treatment engineering supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the mine water deep treatment project. for dt Mine water deep treatment engineering and j district c The company's water supply relationship value, , , and They are w Water purification plant rw Reclaimed water plant pt Mine water pretreatment station and dt Self-consumption coefficient of deep mine water treatment projects; for pt Mine water pretreatment station to dt Leakage rate of water conveyance in deep mine water treatment projects; and They are respectively rw Reclaimed water plants and pt Inflow rate of mine water pretreatment station; The supply and demand constraints for the enterprise project are as follows:

[0081] In the formula, The leakage rate of water supplied from water treatment plant W to district J. for rw Reclaimed water plant to j Leakage rate of district water supply for dt Mine water deep treatment project j Leakage rate of district water supply for j district c Water demand for enterprise projects for j district c Lower limit of enterprise water demand adjustment coefficient This represents the minimum lower limit of the water demand adjustment coefficient. for j district c Regarding the enterprise's water demand adjustment coefficient, This represents the maximum upper limit of the water demand adjustment coefficient. The constraints on water conservancy projects include the scale of water purification plants, wastewater reclaimed water plants, mine water pretreatment stations and deep mine water treatment projects, the scale of conventional water resource source projects and pipeline water transmission and distribution capacity. The scale of the conventional water resources and water source projects includes:

[0082] The scale of the water purification plant, wastewater reclaimed water plant, mine water pretreatment station, and mine water deep treatment project includes:

[0083]

[0084]

[0085] The pipeline water transmission and distribution capacity is as follows: The scale of the inlet water transmission pipelines of conventional water source purification plants is generally the same as the purification capacity, requiring no separate constraints; the water distribution of reclaimed water plants and mine water utilization projects generally does not exceed the network's carrying capacity. Therefore, the model only constrains the water transmission capacity of the water plant's outlet distribution network (pipelines from the water plant in all directions to its branch outlets) and the inlet distribution network (inlet pipelines of each park / mine area), including:

[0086]

[0087] in, yes s The water supply capacity of conventional water sources; , , and They are w Water purification plant rw Wastewater reclaimed water plant pt Mine water pretreatment station and dt The water purification capacity of deep mine water treatment projects; yes w Water purification plant dr Water transport capacity in the pipeline direction, if j District by w Water purification plant dr If water is supplied via pipeline, then It is 1 if it is true, otherwise it is 0; yes j The water delivery capacity of the district's water inlet pipeline; The water resource management constraints are as follows:

[0088] The non-negativity constraint of the decision variables is:

[0089]

[0090] in, This is the annual total water withdrawal control target for the base's routine surface water resources.

[0091] S2: Solve the multi-source, multi-objective overall optimization model of the configuration model supply side to obtain the optimal allocation scheme of multiple water sources in the industrial water supply network system; Alternatively, S2 includes: S21: The NSGA-II algorithm is used to solve the multi-source, multi-objective overall optimization model of the configuration model supply side to obtain the Pareto solution set; Specifically, it includes: S211: Randomly generate an initial parent population P of size N. t Each individual in the population is a decision vector and corresponds to a multi-source water supply optimization scheme; S212: Using binary tournament method to obtain from parent population P t Select individuals, crossover, and mutation to produce a progeny population Q with a production size of N. t Then, with the parent population P t Mixing to form a population R of multi-source, multi-objective integrated water supply optimization schemes with a scale of 2N. t ; S213: Based on the objective function and constraints of the supply-side multi-source multi-objective overall optimization model of the configuration model, the population R... t Perform non-dominated hierarchical classification and assign non-dominated rankings to individuals. i rank (Best non-dominant individual) i rank =1, the next level of individuals is assigned... i rank =2, and so on); store the individuals of each level into the non-dominated solution set of different levels respectively; then, sort the non-dominated solution sets by crowding degree. S214: Using comparison operators and elite strategies, from R t From among the N optimal multi-source water supply optimization schemes, the parent population P for the next iteration is selected. t+1 ; S215: Repeat S211-S214 in a loop until the termination condition is met.

[0092] S22: Determine the optimal allocation scheme of multiple water sources in the industrial water supply network system from the Pareto solution set using the entropy weight method. The entropy weight method is an objective assignment method based on information theory. Its principle is: for a certain indicator (objective function), the entropy value is used to judge the degree of dispersion of the indicator value. The greater the degree of dispersion, the smaller its information entropy value, and the greater the influence (i.e., weight) of the indicator on the comprehensive evaluation.

[0093] Therefore, S22 specifically includes: S221: Solution set of Pareto The new set is obtained after standardization. ; The new set is:

[0094] h = 1,2,...,H; o = 1,2,...,O, where H and O are the number of objective functions and the number of solutions in the Pareto solution set, respectively. and These represent the Pareto solution set in the objective function. h The maximum and minimum values ​​on; S222: Calculate the characteristic weights of the new set; Among them, the characteristic proportion for:

[0095] S223: Calculate the entropy value of each objective function; Wherein, the entropy value for:

[0096] S224: Calculate the entropy weights of each objective function using the entropy values; Wherein, the entropy weight for:

[0097] S225: Assign scores to each solution in the Pareto solution set according to the entropy weight of each objective function, and the solution with the best score is the equilibrium solution; S226: Output the equilibrium solution as the optimal allocation scheme for multiple water sources in the industrial water supply network system.

[0098] S3: With the goal of maximizing the total output value of the industrial economy, construct a configuration model for demand-side entity-virtual water management optimization; From the perspective of water-using enterprises on the demand side, the purpose of optimizing water resource utilization is to improve the comprehensive utilization efficiency of water resources by optimizing and coordinating the virtual water associated with upstream and downstream product supply and consumption, as well as purchased virtual water, thereby increasing the economic output value of enterprise production projects. Conventionally, the total industrial economic output value is calculated based on the final product, and the value of the same product is not double-counted within the industrial base. That is, the marketable value of a product is included in the total industrial economic output value, while self-consumption is used as raw material for downstream products, and is included in the total economic output value through the marketable portion of downstream product output. Furthermore, the economic value "inherent" with purchased products should not be included in the base's output value and should be deducted from the total output value. Therefore, optionally, the configuration model demand-side entity-virtual water integrated optimization model has an objective function, which is:

[0099] in, f3 represents the total economic output of the base; for p The unit virtual water economic value of the product; It is purchased from outside the base. p The amount of virtual water resources contained in the product. for p The unit cost of purchased virtual water for the product, i.e. p The unit virtual water purchase cost of the product for j district c enterprise p Product output water footprint for j district c enterprise p The product's self-consumption water footprint, where J, C, and P represent the number of zones, enterprises, and products, respectively.

[0100] Alternatively, the objective function of the configuration model demand-side entity-virtual water management optimization model has the following constraints: The relationship between water consumption in demand-side industrial and mining projects and water supply on the supply side; capacity constraints of coal-based energy and chemical products; supply and consumption balance of base products, i.e., the sum of self-produced products and purchased products equals the sum of self-consumption and marketable sales; the marketable sales and purchased products of the same product cannot be greater than 0 at the same time, i.e., a product is only considered for purchase when self-produced products cannot meet demand; by-product output constraints; development planning constraints; and non-negativity constraints of variables.

[0101] Alternatively, the relationship between the water consumption of the demand-side industrial and mining projects and the water supply of the supply side is as follows:

[0102] The capacity constraints of coal-based energy and chemical products include the relationship between output and capacity, and the relationship between output and marketable volume. The relationship between output and capacity is as follows:

[0103] The relationship between production volume and marketable volume is as follows:

[0104] in, for j district c enterprise p The virtual water content contained in the physical quantity of upstream products consumed by the product. for w Water purification plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the water treatment plant. for rw Reclaimed water plant toj Leakage rate of district water supply for rw Reclaimed water plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the reclaimed water plant. for pt Mine water pretreatment station to j Leakage rate of district water supply for pt Mine water pretreatment station supply j district c The metering point for a company's water volume, including losses during water transmission, is the mine water pretreatment station. for dt Mine water deep treatment project j Leakage rate of district water supply for dt Mine water deep treatment engineering supply j district c The enterprise's water volume, including water transmission losses, is measured at the mine water deep treatment project. P, W, RW, PT, and DT represent the quantity of products, conventional water source purification plants, reclaimed water plants, mine water pretreatment stations, and mine water deep treatment projects, respectively. yes j district c enterprise p Product production capacity for j district c enterprise p Product project scale; product water footprint; The supply and consumption balance of the base products means that the sum of the product's own production and the amount purchased is equal to the sum of the self-consumption and the sales volume.

[0105] The available sales volume and the external purchase volume of the same product cannot both be greater than 0 at the same time. That is, external purchases will only be considered if the self-production of a product cannot meet the demand.

[0106] The by-product output constraint: Some coal chemical products generate by-products during production. The ratio of main to by-product output is related to production conditions and fluctuates within a certain range. Since by-products account for a small proportion of total output and economic value, the main to by-product output ratio is simplified to a fixed value. Therefore, the by-product output constraint is:

[0107] For any pair of main products and its by-products The output ratio coefficient, and They are respectively j district c Enterprise main products and by-products Product water footprint; and They are respectively j district c Enterprise main products and by-products Production water footprint; The development plan constraints include the planned proportion of economic output value for each industry and the sales targets for coal-based energy and chemical products. The planned proportions of economic output value for each industry are as follows:

[0108]

[0109] p =1 represents coal. p =2 represents coal-fired power. p =3~P represents coal chemical industry; The unit virtual water economic value of coal. yes j district c The water footprint of a company's coal sales volume; yes j district c The marketable water footprint of coal-fired power plants; The virtual water economic value per unit of coal-fired power. μ 1. μ 2 and μ 3 represents the planned proportion of the total economic output of the three major industries: coal, electricity, and chemicals. The sales target for the products in the aforementioned industry is:

[0110] E p yes p The product's target sales volume; The non-negativity constraint for the variable is:

[0111]

[0112] in, for j district c enterprise p Product pair i The direct material consumption coefficient of a product, its physical meaning is j districtc A company produces one unit p The product directly consumes i Quantity of products for j district c enterprise i Product output water footprint for j district c enterprise i Product water footprint for p The product's base scale and water footprint. for j district c enterprise p Product project scale, product water footprint It can be any symbol.

[0113] S4: Use the optimal allocation scheme as the input parameter of the configuration model demand-side entity-virtual water management optimization model to solve the configuration model demand-side entity-virtual water management optimization model and obtain the configuration model demand-side model optimization result; This invention utilizes a linear programming algorithm to solve the configuration model demand-side entity-virtual water management optimization model.

[0114] S5: Determine whether the optimization result of the demand-side model of the configuration model meets the termination condition. If yes, output the optimization configuration result of the generalized water resources of the industry; otherwise, proceed to S6. S6: Use the optimization results of the demand-side model of the configuration model to adjust the parameters of the supply-side multi-source multi-objective overall optimization model of the configuration model and return to S2.

[0115] It should be noted that the termination conditions and parameter adjustments include: like At that time, according to the first n The solution results of the demand-side entity—virtual water management optimization module are calculated as follows: ①Predicted water inflow of each mine and the first n The difference in mine water volume input from the -1 round supply-side multi-source multi-objective overall optimization module is denoted as... ( pt = 1,2,...,PT); ② The predicted wastewater discharge volume of the enterprises served by the reclaimed water project and the first n The difference in drainage volume input to the supply-side multi-source multi-objective overall optimization module in round -1 is denoted as ( rw = 1,2,...,RW). If Then, calculate the difference between the predicted water inflow of each mine and the predicted drainage of the enterprises served by the reclaimed water project and the initial parameters.

[0116] Water balance assessment: ①For any pt If there is If the output values ​​of the relevant coal mine project decision variables are retained, otherwise the parameters are adjusted and the project continues to participate in subsequent optimizations. ②For any rw If there is If the output values ​​of the relevant coal chemical project decision variables are not found, then the output values ​​are retained; otherwise, the parameters are adjusted and the project continues to participate in subsequent optimizations. and This represents the maximum tolerance error value.

[0117] The present invention also provides a system based on the above-described demand-based generalized water resource optimization allocation method, the system comprising: The model building module is used to construct a configuration model supply-side multi-source multi-objective overall optimization model based on the realistic requirements of industrial development and energy conservation and emission reduction, while taking into account competitive objectives; and to construct a configuration model demand-side entity-virtual water overall optimization model with the objective of maximizing the total output value of industrial economy. The model solving module is used to solve the multi-source, multi-objective overall optimization model of the supply side of the configuration model to obtain the optimal allocation scheme of multiple water sources in the industrial water supply network system; and to use the optimal allocation scheme as the input parameter of the entity-virtual water overall optimization model of the demand side of the configuration model to solve the entity-virtual water overall optimization model of the demand side of the configuration model to obtain the optimization result of the demand side model of the configuration model. The judgment module is used to determine whether the optimization result of the configuration model demand-side model meets the termination condition; The result output module is used to output the results of the optimal allocation of generalized water resources in the industry. The parameter adjustment module is used to adjust the parameters of the configuration model supply-side multi-source multi-objective overall optimization model by utilizing the optimization results of the configuration model demand-side model.

[0118] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A generalized method for optimizing water resource allocation, characterized in that, The generalized water resources optimization allocation method includes: S1: Based on the practical requirements of industrial development and energy conservation and emission reduction, and taking into account competitive objectives, a multi-source, multi-objective overall optimization model for the supply side is constructed. S2: Solve the multi-source, multi-objective overall optimization model of the configuration model supply side to obtain the optimal allocation scheme of multiple water sources in the industrial water supply network system; S3: With the goal of maximizing the total output value of the industrial economy, construct a configuration model for demand-side entity-virtual water management optimization; S4: Use the optimal allocation scheme as the input parameter of the configuration model demand-side entity-virtual water management optimization model to solve the configuration model demand-side entity-virtual water management optimization model and obtain the configuration model demand-side model optimization result; S5: Determine whether the optimization result of the demand-side model of the configuration model meets the termination condition. If yes, output the optimization allocation result of the generalized water resources of the industry; otherwise, proceed to S6. S6: Use the optimization results of the demand-side model of the configuration model to adjust the parameters of the supply-side multi-source multi-objective overall optimization model of the configuration model and return to S2; In S1, the configuration model supply-side multi-source multi-objective overall optimization model has an objective function, which includes minimizing the total water shortage of enterprises and projects in the industry, and minimizing the total power consumption of water supply from different water sources in the industry. The minimum total water shortage for enterprises and projects in the aforementioned industry is: in, This indicates the total water shortage for enterprises and projects within the industry. For j district c Water demand for enterprise projects; for w Water purification plant supply j district c For enterprises, the metering point for water volume, including water transmission losses, is the water purification plant. for w Water purification plant and j district c The company's water supply relationship value, for rw Reclaimed water plant supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the reclaimed water plant. for rw Reclaimed water plant and j district c The company's water supply relationship value, for pt Mine water pretreatment station supply j district c The metering point for the enterprise's water volume, including water transmission losses, is the mine water pretreatment station. for pt Mine water pretreatment station and j district c The company's water supply relationship value, for dt Mine water deep treatment engineering supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the mine water deep treatment project. for dt Mine water deep treatment engineering and j district c The company's water supply relationship value, , , and They are w Water purification and distribution plant rw Reclaimed water plant pt Mine water pretreatment station and dt Mine water deep treatment project j Leakage rate of district water supply; J, C, W, RW, PT, and DT represent the number of districts, enterprises, conventional water source purification plants, reclaimed water plants, mine water pretreatment stations, and mine water deep treatment projects, respectively. Total electricity consumption from different water sources in the aforementioned industry The minimum is: in, for s Conventional water supply w The water volume of a water treatment plant, including water transmission losses, is measured at the reservoir. for s The unit water consumption of a water source project is the electricity consumption per unit volume of surface water. s The electrical energy consumed by water source projects for water intake, pumping station water transportation, and reservoir water storage; for s Water source and w Water supply relationship values ​​of the water purification plant for w Electricity consumption per unit of water produced by a water purification plant, i.e. w The amount of electricity consumed by a water purification plant to produce one unit of water; for rw The unit water production power consumption of a reclaimed water plant, i.e., the amount of industrial wastewater entering the plant. rw The amount of electricity consumed to produce one unit of reclaimed water after a series of processes at the reclaimed water plant. for pt The unit water production power consumption of a mine water pretreatment station is the electrical energy consumed to produce one unit of usable mine water after the mine water is collected underground and pretreated on the surface. For the pt After treatment at the mine water pretreatment station, the water enters... dt The volume of water undergoing desalination treatment in deep mine water treatment projects; for pt Mine water pretreatment station and dt Water conveyance relationship values ​​for deep mine water treatment projects for dt The unit water production power consumption of a deep mine water treatment project is the electrical energy consumed to produce one unit of usable mine water after the mine water has been pretreated and further desalinated. S This refers to the quantity of conventional water sources; This refers to the volume of water that has been treated at the RW wastewater reclaimed water plant but has not been utilized. This is the scripture pt The volume of mine water pretreatment station that is treated but not utilized; The configuration model demand-side entity-virtual water management optimization model has an objective function, which is: in, f 3 represents the total economic output of the base; for p The unit virtual water economic value of the product; It is purchased from outside the base. p The amount of virtual water resources contained in the product. for p The unit cost of purchased virtual water for the product, i.e. p The unit virtual water purchase cost of the product for j district c enterprise p Product output water footprint for j district c enterprise p The product's self-consumption water footprint, where J, C, and P represent the number of zones, enterprises, and products, respectively.

2. The generalized water resources optimization allocation method according to claim 1, characterized in that, The objective function includes the following constraints: Constraints include node water balance, enterprise project supply and demand, water conservancy projects, water resources management, and non-negativity of decision variables.

3. The generalized water resources optimization allocation method according to claim 2, characterized in that, The node water balance constraints include the node water balance of conventional water source purification plants, the node water balance of wastewater reclaimed water plants, the node water balance of mine water pretreatment stations, and the node water balance of mine water deep treatment projects. The water balance at the nodes of the conventional water source water purification plant includes: The water balance at each node of the wastewater reclaimed water plant includes: Water balance at the mine water pretreatment station node: Water balance at key nodes of the mine water deep treatment project: in, for w Water purification plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the water treatment plant. for w Water purification plant and j district c The company's water supply relationship value, for s conventional water sources to w Leakage rate of water transmission from water treatment plant for s Water source and w Water supply relationship values ​​of the water purification plant; for rw Reclaimed water plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the reclaimed water plant. for rw Reclaimed water plant and j district c The company's water supply relationship value, for pt Mine water pretreatment station supply j district c The metering point for the enterprise's water volume, including water transmission losses, is the mine water pretreatment station. for pt Mine water pretreatment station and j district c The company's water supply relationship value, for pt Mine water pretreatment station and dt Water conveyance relationship values ​​for deep mine water treatment projects for dt Mine water deep treatment engineering supply j district c The metering point for the enterprise's water volume, including water transmission losses, is at the mine water deep treatment project. for dt Mine water deep treatment engineering and j district c The company's water supply relationship value, , , and They are w Water purification plant rw Reclaimed water plant pt Mine water pretreatment station and dt Self-consumption coefficient of deep mine water treatment projects; for pt Mine water pretreatment station to dt Leakage rate of water conveyance in deep mine water treatment projects; and They are respectively rw Reclaimed water plants and pt Inflow rate of mine water pretreatment station; The supply and demand constraints for the enterprise project are as follows: In the formula, The leakage rate of water supplied from water treatment plant W to district J. for rw Reclaimed water plant to j Leakage rate of district water supply for dt Mine water deep treatment project j Leakage rate of district water supply for j district c Water demand for enterprise projects for j district c Lower limit of enterprise water demand adjustment coefficient This represents the minimum lower limit of the water demand adjustment coefficient. for j district c Regarding the enterprise's water demand adjustment coefficient, This represents the maximum upper limit of the water demand adjustment coefficient. The constraints on water conservancy projects include the scale of water purification plants, wastewater reclaimed water plants, mine water pretreatment stations and deep mine water treatment projects, the scale of conventional water resource source projects and pipeline water transmission and distribution capacity. The scale of the conventional water resource and water source projects includes: The scale of the water purification plant, wastewater reclaimed water plant, mine water pretreatment station, and mine water deep treatment project includes: The pipeline's water transmission and distribution capacity includes: in, yes s The water supply capacity of conventional water sources; , , and They are w Water purification plant rw Wastewater reclaimed water plant pt Mine water pretreatment station and dt The water purification capacity of deep mine water treatment projects; yes w Water purification plant dr Water transport capacity in the pipeline direction, if j District by w Water purification plant dr If water is supplied via pipeline, then It is 1 if it is true, otherwise it is 0. yes j The water delivery capacity of the district's water inlet pipeline; The water resource management constraints are as follows: The non-negativity constraint of the decision variables is: in, This is the annual total water withdrawal control target for the base's routine surface water resources.

4. The generalized water resources optimization allocation method according to any one of claims 1-3, characterized in that, S2 includes: S21: The NSGA-II algorithm is used to solve the multi-source, multi-objective overall optimization model of the configuration model supply side to obtain the Pareto solution set; S22: Use the entropy weight method to determine the optimal allocation scheme of multiple water sources in the industrial water supply network system from the Pareto solution set.

5. The generalized water resources optimization allocation method according to claim 4, characterized in that, S21 includes: S211: Randomly generate an initial parent population P of size N. t Each individual in the population is a decision vector and corresponds to a multi-source water supply optimization scheme; S212: Using binary tournament method to obtain from parent population P t Select individuals, crossover, and mutation to produce a progeny population Q with a production size of N. t Then, with the parent population P t Mixing to form a population R of multi-source, multi-objective integrated water supply optimization schemes with a scale of 2N. t ; S213: Based on the objective function and constraints of the multi-source, multi-objective overall optimization model for the supply side of the configuration model, the population R... t Perform non-dominated hierarchical classification and assign non-dominated rankings to individuals. i rank Individuals at each level are stored in different levels of non-dominated solution sets; then, the non-dominated solution sets are sorted by crowding. S214: Using comparison operators and elite strategies, from R t From among the N optimal multi-source water supply optimization schemes, the parent population P for the next iteration is selected. t+1 ; S215: Repeat S211-S214 in a loop until the termination condition is met.

6. The generalized water resources optimization allocation method according to claim 4, characterized in that, S22 includes: S221: Solution set of Pareto The new set is obtained after standardization. ; The new set is: h = 1,2,...,H; o = 1,2,...,O, where H and O are the number of objective functions and the number of solutions in the Pareto solution set, respectively. and These represent the Pareto solution set in the objective function. h The maximum and minimum values ​​on; S222: Calculate the characteristic weights of the new set; Among them, the characteristic proportion for: S223: Calculate the entropy value of each objective function; Wherein, the entropy value for: S224: Calculate the entropy weights of each objective function using the entropy values; Wherein, the entropy weight for: S225: Assign scores to each solution in the Pareto solution set according to the entropy weight of each objective function, and the solution with the best score is the equilibrium solution; S226: Output the equilibrium solution as the optimal allocation scheme for multiple water sources in the industrial water supply network system.

7. The generalized water resources optimization allocation method according to claim 1, characterized in that, The objective function of the configuration model demand-side entity—virtual water management optimization model has the following constraints: The relationship between water consumption in demand-side industrial and mining projects and water supply on the supply side; capacity constraints of coal-based energy and chemical products, and the balance of supply and consumption of base products, i.e., the sum of self-produced products and purchased products equals the sum of self-consumption and marketable products; the marketable products and purchased products of the same product cannot be greater than 0 at the same time, i.e., a product is only considered for purchase when self-produced products cannot meet demand; by-product output constraints; development planning constraints; and non-negativity constraints of variables. The relationship between the water consumption of industrial and mining projects on the demand side and the water supply on the supply side is as follows: The capacity constraints of coal-based energy and chemical products include the relationship between output and capacity, and the relationship between output and marketable volume. The relationship between output and capacity is as follows: The relationship between production volume and marketable volume is as follows: in, for j district c enterprise p The virtual water content contained in the physical quantity of upstream products consumed by the product. for w Water purification plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the water treatment plant. for rw Reclaimed water plant to j Leakage rate of district water supply for rw Reclaimed water plant supply j district c The metering point for a company's water volume, including water transmission losses, is at the reclaimed water plant. for pt Mine water pretreatment station to j Leakage rate of district water supply for pt Mine water pretreatment station supply j district c The metering point for a company's water volume, including losses during water transmission, is the mine water pretreatment station. for dt Mine water deep treatment project j Leakage rate of district water supply for dt Mine water deep treatment engineering supply j district c The enterprise's water volume, including water transmission losses, is measured at the mine water deep treatment project. P, W, RW, PT, and DT represent the quantity of products, conventional water source purification plants, reclaimed water plants, mine water pretreatment stations, and mine water deep treatment projects, respectively. yes j district c enterprise p Product production capacity for j district c enterprise p Product project scale; product water footprint; The supply and consumption balance of the base products means that the sum of the product's own production and the amount purchased is equal to the sum of the self-consumption and the sales volume. The available sales volume and the external purchase volume of the same product cannot both be greater than 0 at the same time. That is, external purchases will only be considered if the self-production of a product cannot meet the demand. The by-product output constraint is: For any pair of main products and its by-products The output ratio coefficient, and They are respectively j district c Enterprise main products and by-products Product water footprint; and They are respectively j district c Enterprise main products and by-products Production water footprint; The development plan constraints include the planned proportion of economic output value for each industry and the sales targets for coal-based energy and chemical products. The planned proportions of economic output value for each industry are as follows: p =1 represents coal. p =2 represents coal-fired power. p =3~P represents coal chemical industry; The virtual water economic value per unit of coal. yes j district c The water footprint of a company's coal sales volume; yes j district c The marketable water footprint of coal-fired power plants; The unit virtual water economic value of coal-fired power plants. μ 1. μ 2 and μ 3 represents the planned proportion of the total economic output of the three major industries: coal, electricity, and chemicals. Sales targets for the aforementioned coal-based energy and chemical products: E p yes p The product's target sales volume; The non-negativity constraint for the variable is: in, for j district c enterprise p Product pair i The direct material consumption coefficient of a product, its physical meaning is j district c A company produces one unit p The product directly consumes i Quantity of products for j district c enterprise i Product output water footprint for j district c enterprise i Product water footprint for p The product's base scale and water footprint. for j district c enterprise p Product project scale, product water footprint It can be any symbol.

8. A system based on the generalized water resources optimization allocation method according to any one of claims 1-7, characterized in that, The system includes: The model building module is used to construct a configuration model supply-side multi-source multi-objective overall optimization model based on the realistic requirements of industrial development and energy conservation and emission reduction, while taking into account competitive objectives; and to construct a configuration model demand-side entity-virtual water overall optimization model with the objective of maximizing the total output value of industrial economy. The model solving module is used to solve the multi-source, multi-objective overall optimization model of the supply side of the configuration model to obtain the optimal allocation scheme of multiple water sources in the industrial water supply network system; and to use the optimal allocation scheme as the input parameter of the entity-virtual water overall optimization model of the demand side of the configuration model to solve the entity-virtual water overall optimization model of the demand side of the configuration model to obtain the optimization result of the demand side model of the configuration model. The judgment module is used to determine whether the optimization result of the configuration model demand-side model meets the termination condition; The result output module is used to output the results of the optimal allocation of generalized water resources in the industry. The parameter adjustment module is used to adjust the parameters of the configuration model supply-side multi-source multi-objective overall optimization model by utilizing the optimization results of the configuration model demand-side model.