Real-time push method and system based on scientific and technological projects

Through detailed information extraction and user portrait construction of enterprise users, combined with the LDA topic model and breadth-first search algorithm, in-depth analysis and accurate matching of scientific and technological project data are achieved, solving the problem of irrelevant information push in the existing technology, and improving improve the personalization and efficiency of information services.

CN117648492BActive Publication Date: 2024-10-29GUANGZHOU HANSHEN INFORMATION TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311701602.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-10-29
Estimated Expiration
2043-12-12

AI Technical Summary

Technical Problem

Existing science and technology project information processing technology lacks in-depth data analysis and personalized recommendation mechanisms, and cannot effectively process complex project data, resulting in low information utilization efficiency and push content that does not match user needs.

Method used

By extracting user information and constructing portraits of target enterprise users, LDA topic models are used to split scientific and technological project data, and project groups are classified through breadth-first search algorithms. Project matching and real-time push are performed based on accurate user portraits.

Benefits of technology

It significantly improves the relevance and user experience of information push, and enhances the personalization and effectiveness of science and technology project information services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117648492B_ABST
    Figure CN117648492B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and discloses a real-time push method and system based on scientific and technological projects, which are used to improve the accuracy of real-time push based on scientific and technological projects. The method includes: extracting user information of a target enterprise user to obtain user data information of the target enterprise user; constructing an enterprise user portrait of the target enterprise user through the user data information to obtain a target enterprise user portrait of the user data information; collecting scientific and technological project data from multiple scientific and technological information sources, and splitting the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data; classifying multiple groups of sub-project data into project groups through a preset breadth-first search algorithm to obtain multiple project group data; based on the target enterprise user portrait data, performing project matching on multiple project group data to obtain a target project group, and pushing the target project group to the data end of the target enterprise user in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to a real-time push method and system based on scientific and technological projects. Background Art

[0002] In the current rapidly developing science and technology industry, the acquisition and processing of information has become particularly important. With the surge in the number of science and technology projects, enterprises are faced with the challenge of filtering out valuable project information from the vast ocean of information. Effectively acquiring, analyzing and utilizing this information is crucial to the innovative development and market competitiveness of enterprises. Therefore, there is a demand for efficient and intelligent information processing and push systems to help enterprises find science and technology projects that meet their needs and preferences among a large number of project information.

[0003] Existing technology project information processing technologies usually rely on traditional database queries and simple keyword matching. These methods often lack in-depth data analysis capabilities and personalized recommendation mechanisms. They cannot effectively process and parse large amounts of complex project data, nor can they accurately identify and match the specific needs of enterprise users. In addition, when processing technology project information from different sources, existing technologies often lack effective data integration and classification methods, resulting in low efficiency in information utilization, and the pushed content often deviates greatly from the actual needs of users. Summary of the invention

[0004] In view of this, an embodiment of the present invention provides a real-time push method and system based on scientific and technological projects, which are used to improve the accuracy of real-time push based on scientific and technological projects.

[0005] The present invention provides a real-time push method based on scientific and technological projects, comprising: extracting user information of a target enterprise user to obtain user data information of the target enterprise user; constructing an enterprise user portrait of the target enterprise user through the user data information to obtain a target enterprise user portrait of the user data information; collecting scientific and technological project data from multiple scientific and technological information sources, and performing information splitting on the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data; classifying multiple groups of the sub-project data into project groups through a preset breadth-first search algorithm to obtain multiple project group data; performing project matching on multiple project group data based on the target enterprise user portrait data to obtain a target project group, and pushing the target project group to the data end of the target enterprise user in real time.

[0006] In the present invention, the step of extracting user information of the target enterprise user to obtain user data information of the target enterprise user includes: extracting associated information of the target enterprise user to obtain an associated data set of the target enterprise user, wherein the associated data set includes enterprise name, enterprise type, enterprise region and business type data; tracking and identifying user behavior of the target enterprise user to obtain user behavior data of the target enterprise user, wherein the user behavior data includes: enterprise historical project data and enterprise consulting data; merging the associated data set and the user behavior data into the user data information.

[0007] In the present invention, the step of constructing an enterprise user portrait for the target enterprise user through the user data information to obtain the target enterprise user portrait of the user data information includes: performing vector conversion on the associated data set to obtain a first target vector set corresponding to the associated data set, and at the same time, performing vector conversion on the user behavior data to obtain a second target vector set of the user behavior data; performing weight matching on the first target vector set to obtain a first weight set, and at the same time, performing weight matching on the second target vector set to obtain a second weight set; based on the first weight set and the second weight set, performing vector fusion on the first target vector set and the second target vector set to obtain a target fusion vector set; inputting the target fusion vector set into a preset user portrait construction model to construct an enterprise user portrait to obtain the target enterprise user portrait of the user data information.

[0008] In the present invention, the step of collecting scientific and technological project data from multiple scientific and technological information sources and performing information splitting on the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data includes: performing data interface matching on multiple scientific and technological information sources to obtain a data collection interface corresponding to each of the scientific and technological information sources; collecting the scientific and technological project data from multiple scientific and technological information sources through a data collection interface corresponding to each of the scientific and technological information sources; performing data cleaning on the scientific and technological project data to obtain cleaned project data corresponding to the scientific and technological project data; performing vectorization processing on the cleaned project data to obtain vectorized data corresponding to the cleaned project data; inputting the vectorized data into the LDA topic model to perform topic distribution data analysis to obtain target topic distribution data; performing topic number extraction on the target topic distribution data to obtain the target topic number; performing topic information analysis on the target topic distribution data based on the target topic number to obtain multiple target topic information; performing topic correlation analysis on each two of the target topic information to obtain topic correlation data corresponding to each two of the target topic information; performing sub-project data extraction on the scientific and technological project data based on the topic correlation data corresponding to each two of the target topic information to obtain multiple groups of sub-project data.

[0009] In the present invention, the step of classifying the multiple groups of sub-project data into project groups by using a preset breadth-first search algorithm to obtain multiple project group data includes: labeling the multiple groups of sub-project data into sub-project nodes to obtain multiple sub-project nodes; constructing connecting edges for every two sub-project nodes based on the topic correlation data corresponding to every two target topic information to obtain connecting edge information corresponding to every two sub-project nodes; constructing a project relationship graph based on the multiple sub-project nodes and the connecting edge information corresponding to every two sub-project nodes; performing node connectivity analysis on the project relationship graph by using the breadth-first search algorithm to obtain node connectivity data; traversing each sub-project node based on the node connectivity data to obtain a target project node set that can be reached by each sub-project node; and classifying the multiple groups of sub-project data into project groups based on the target project node set that can be reached by each sub-project node to obtain multiple project group data.

[0010] In the present invention, the step of classifying multiple groups of sub-project data into project groups based on the target project node set that can be reached by each of the sub-project nodes to obtain multiple project group data includes: extracting project data from multiple target project node sets based on the target project node set that can be reached by each of the sub-project nodes to obtain multiple project data sets; extracting project features from each of the project data sets to obtain a project feature set corresponding to each of the project data sets; generating a project group label corresponding to each of the project data sets based on the project feature set corresponding to each of the project data sets; and classifying multiple groups of sub-project data into project groups using the project group label corresponding to each of the project data sets to obtain multiple project group data.

[0011] In the present invention, the step of performing project matching on the plurality of project group data based on the target enterprise user portrait data to obtain a target project group, and pushing the target project group to the data end of the target enterprise user in real time includes: performing portrait feature extraction on the target enterprise user portrait data to obtain a portrait feature set; performing project label feature extraction on the plurality of project group data to obtain a label feature set; performing element intersection identification on the portrait feature set and the label feature set to obtain an intersection element set; performing element union identification on the portrait feature set and the label feature set to obtain a union element set; performing element similarity calculation on the plurality of project group data based on the intersection element set and the union element set to obtain similarity calculation data; performing project sorting on the plurality of project group data based on the similarity calculation data to obtain a project sorting list; performing project screening on the project sorting list based on a preset project screening number to obtain a target project group, and pushing the target project group to the data end of the target enterprise user in real time.

[0012] The present invention also provides a real-time push system based on scientific and technological projects, including:

[0013] An extraction module is used to extract user information of a target enterprise user to obtain user data information of the target enterprise user;

[0014] A construction module, used to construct an enterprise user portrait for the target enterprise user through the user data information, and obtain the target enterprise user portrait of the user data information;

[0015] A splitting module is used to collect scientific and technological project data from multiple scientific and technological information sources, and split the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data;

[0016] A classification module, used for classifying the plurality of groups of sub-project data into project groups by using a preset breadth-first search algorithm to obtain a plurality of project group data;

[0017] The matching module is used to perform project matching on the plurality of project group data based on the target enterprise user portrait data, obtain a target project group, and push the target project group to the data terminal of the target enterprise user in real time.

[0018] In the technical solution provided by the present invention, user information of the target enterprise user is extracted to obtain user data information of the target enterprise user; enterprise user portraits of the target enterprise user are constructed through the user data information to obtain target enterprise user portraits of the user data information; technology project data are collected from multiple technology information sources, and information is split on the technology project data through a preset LDA topic model to obtain multiple groups of sub-project data; multiple groups of sub-project data are classified into project groups through a preset breadth-first search algorithm to obtain multiple project group data; based on the target enterprise user portrait data, multiple project group data are matched with projects to obtain target project groups, and the target project groups are pushed to the data end of the target enterprise user in real time. In the present application scheme, firstly, through the detailed information extraction of the target enterprise user and the construction of user portraits based on this information, the scheme can deeply understand the specific needs and preferences of enterprise users. Then, the LDA topic model is used to extract key topics from multi-source technology project data, and these data are structured into groups through a breadth-first search algorithm, which effectively organizes and optimizes project information. Finally, based on the precisely constructed enterprise user portrait, the solution can achieve accurate matching of project groups and push the most relevant target project groups to enterprise users in real time, significantly improving the relevance of information push and user experience, while enhancing the personalization and effectiveness of science and technology project information services. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 The present invention is a flowchart of a real-time push method based on scientific and technological projects in an embodiment of the present invention.

[0021] Figure 2 This is a flow chart of constructing an enterprise user portrait for a target enterprise user in an embodiment of the present invention.

[0022] Figure 3 It is a schematic diagram of a real-time push system based on scientific and technological projects in an embodiment of the present invention.

[0023] Reference numerals:

[0024] 301. Extraction module; 302. Construction module; 303. Splitting module; 304. Classification module; 305. Matching module. DETAILED DESCRIPTION

[0025] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0027] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0028] For ease of understanding, the specific process of the embodiment of the present invention is described below. Figure 1 , Figure 1 is a flow chart of a real-time push method based on scientific and technological projects according to an embodiment of the present invention. Figure 1 As shown, the following steps are included:

[0029] S101, extracting user information of a target enterprise user to obtain user data information of the target enterprise user;

[0030] Specifically, firstly, we extract detailed related information of enterprise users, which includes collecting basic information of enterprises such as enterprise name, enterprise type (such as technology companies, manufacturing, etc.), location (such as technology companies in Silicon Valley, New York, etc.), and business type data (for example, enterprises focusing on artificial intelligence, renewable energy or biotechnology). Next, we conduct user behavior tracking and identification, which involves capturing the interaction and behavior patterns of enterprises on the platform, such as historical project data in which enterprises have participated or shown interest in the past (for example, technology exhibitions that have been participated in or innovative projects that have been invested in), and enterprise consulting data (such as technical fields or project details that have been consulted on the platform). Finally, these related data and user behavior data are merged to form a comprehensive user data information. For example, if a technology company located in Silicon Valley frequently queries about artificial intelligence and machine learning projects on the platform, and has participated in R&D projects in related fields in the past, then this information will be integrated into the user data information of the enterprise, providing a basis for subsequent user portrait construction and personalized recommendations.

[0031] S102, constructing an enterprise user portrait for the target enterprise user based on the user data information to obtain the target enterprise user portrait of the user data information;

[0032] Specifically, key information is first extracted from the collected enterprise user data, including but not limited to basic information of the enterprise (such as enterprise name, type, region and business type), as well as user behavior data (such as historical project participation and consultation records). For example, if an enterprise is mainly active in the field of biotechnology and has often queried projects about drug development in the past, this information will serve as key data points. Next, these different types of data are vectorized, that is, text and category information is converted into numerical vectors for further data analysis. Thereafter, the importance of certain features is emphasized by assigning weights to these vectorized data sets, for example, a higher weight may be given to the activities of the enterprise in a specific field of technology. Then, these weighted vector sets are combined and fused to form a comprehensive target fusion vector set, which represents the comprehensive portrait of the enterprise user. Finally, this target fusion vector set is input into the preset user portrait construction model, which will build a detailed enterprise user portrait based on these comprehensive data. For example, for an enterprise user active in the field of biotechnology, its user portrait will highlight its frequency of activities in this field, its preferred project types (such as R&D or marketing), and related projects that it has successfully participated in in the past.

[0033] S103, collecting scientific and technological project data from multiple scientific and technological information sources, and splitting the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data;

[0034] Specifically, first determine and access a variety of science and technology information sources, such as science and technology news websites, professional forums, academic journals, and industry reports. For example, you can collect the latest scientific research project information from a professional science and technology news website, obtain details of ongoing scientific research work from academic journals, and extract market trends and technological progress from industry reports. Then, by setting a data collection interface for each science and technology information source, the system can automatically collect detailed data about science and technology projects from these sources. Subsequently, the collected science and technology project data is subjected to necessary cleaning processing, such as removing irrelevant content and format standardization to ensure data quality and consistency. The cleaned data is then vectorized and converted into a format suitable for machine learning model processing. At this point, these vectorized science and technology project data are input into the preset LDA topic model, and the model identifies the potential topic distribution by analyzing the text content, so that the original project data can be split into multiple groups of sub-project data according to the relevance of the topic. For example, if the original data contains multiple projects involving artificial intelligence applications, the LDA model may identify multiple related sub-topics such as "machine learning", "natural language processing", and "image recognition", and then classify the original data according to these topics, and finally generate sub-project groups focusing on different artificial intelligence application fields. This approach not only improves the organization and accessibility of data, but also provides a rich, structured information resource for subsequent project recommendations and analysis.

[0035] S104, classifying the multiple groups of sub-project data into project groups by using a preset breadth-first search algorithm to obtain multiple project group data;

[0036] Specifically, a project relationship graph is first created based on the sub-project data obtained from the LDA topic model. This process involves marking each sub-project as a node and establishing connecting edges based on the correlation or shared features between these sub-projects. For example, if two sub-projects are highly correlated in terms of technical fields, keywords, or participants, a connecting edge will be formed between them. Next, the breadth-first search algorithm is used to traverse this project relationship graph. The algorithm starts from a selected node, visits all adjacent nodes in hierarchical order, and classifies these interconnected nodes into a project group. For example, if a sub-project involving artificial intelligence is used as the starting point in the relationship graph, the breadth-first search may find a series of projects closely connected to it, which may involve related fields such as machine learning and data analysis. In this way, the algorithm is able to identify multiple different project groups based on common themes or features. Finally, each project group identified by the breadth-first search algorithm will contain a set of interconnected sub-projects, and these group data can then be used for further analysis and recommendation. In this way, by combining the deep text analysis of the LDA model with the effective data classification of the breadth-first search algorithm, a large amount of complex scientific and technological project data can be effectively organized and classified, thereby improving the availability and value of information.

[0037] S105. Based on the target enterprise user portrait data, multiple project group data are matched to obtain a target project group, and the target project group is pushed to the data terminal of the target enterprise user in real time.

[0038] Specifically, key features are first extracted from the constructed enterprise user portraits, which include the enterprise's areas of interest, historical project types, business needs, etc. For example, a company focusing on renewable energy may highlight its preference for environmental protection technology and green energy projects in its portrait. Next, similar feature extraction is performed on multiple project groups that have been classified by the breadth-first search algorithm to identify the key attributes of each group, such as technology field, project scale, or cooperation opportunities. Then, by comparing the feature set of the enterprise user portrait with the feature set of each project group, the similarity between them is calculated to determine the best matching project group. For example, if a project group mainly involves environmental protection technology innovation, and the target enterprise user shows a high interest in such projects in its portrait, the group and the enterprise user will be considered highly matched. After that, according to the similarity score, several project groups that best match the target enterprise user portrait are selected as target project groups. Finally, using the real-time push system, these selected target project group information are sent to the target enterprise users via email, application notifications, or other communication channels to ensure that users can receive the project information most relevant to their needs and interests in a timely manner. This method not only enables enterprise users to obtain project information related to their preferences more efficiently, but also improves the personalization of information services and user satisfaction.

[0039] By executing the above steps, user information of the target enterprise user is extracted to obtain the user data information of the target enterprise user; enterprise user portraits of the target enterprise user are constructed through the user data information to obtain the target enterprise user portraits of the user data information; technology project data are collected from multiple technology information sources, and the technology project data are split through the preset LDA topic model to obtain multiple groups of sub-project data; multiple groups of sub-project data are classified into project groups through the preset breadth-first search algorithm to obtain multiple project group data; based on the target enterprise user portrait data, multiple project group data are matched to obtain the target project group, and the target project group is pushed to the data end of the target enterprise user in real time. In the present application scheme, firstly, through the detailed information extraction of the target enterprise user and the construction of user portraits based on this information, the scheme can deeply understand the specific needs and preferences of enterprise users. Then, the LDA topic model is used to extract key topics from the multi-source technology project data, and the data are structured into groups through the breadth-first search algorithm, which effectively organizes and optimizes the project information. Finally, based on the precisely constructed enterprise user portrait, the solution can achieve accurate matching of project groups and push the most relevant target project groups to enterprise users in real time, significantly improving the relevance of information push and user experience, while enhancing the personalization and effectiveness of science and technology project information services.

[0040] In a specific embodiment, the process of executing step S101 may specifically include the following steps:

[0041] (1) Extracting related information of the target enterprise user to obtain a related data set of the target enterprise user, wherein the related data set includes enterprise name, enterprise type, enterprise region, and business type data;

[0042] (2) Track and identify the user behavior of the target enterprise users to obtain the user behavior data of the target enterprise users, where the user behavior data includes: enterprise historical project data and enterprise consulting data;

[0043] (3) Merge the associated data set and user behavior data into user data information.

[0044] Specifically, first, the associated information is extracted, which involves collecting basic information about the enterprise, such as the enterprise name, type (e.g., start-up technology company, manufacturing giant, etc.), geographic location (e.g., technology centers such as Silicon Valley and Tokyo), and business type (e.g., software development, biotechnology research, etc.). This information can be obtained from the official website of the enterprise, commercial databases, or public registration information. For example, for a start-up located in Silicon Valley, its associated information will include its innovation-oriented company type and geographical location advantages. Next, user behavior tracking and identification is performed, which involves analyzing the behavior patterns of the enterprise on the platform, such as historical project data that the enterprise has participated in in the past (e.g., technology innovation projects that have been invested in or participated in) and enterprise consulting data (such as asking questions about market trends or requests for technical support). These data reflect the actual activities and interests of the enterprise and can be obtained from the user activity records or transaction history of the platform. Then, these detailed associated data and user behavior data are merged to form a comprehensive user data information set. For example, for a company focusing on artificial intelligence, combining its enterprise type and regional advantages with its active participation in artificial intelligence projects and query records for such projects can form a data set that comprehensively reflects the characteristics and behavioral tendencies of the enterprise.

[0045] In a specific embodiment, if Figure 2 As shown, the process of executing step S102 may specifically include the following steps:

[0046] S201, performing vector conversion on the associated data set to obtain a first target vector set corresponding to the associated data set, and at the same time, performing vector conversion on the user behavior data to obtain a second target vector set of the user behavior data;

[0047] S202, performing weight matching on the first target vector set to obtain a first weight set, and at the same time, performing weight matching on the second target vector set to obtain a second weight set;

[0048] S203, based on the first weight set and the second weight set, performing vector fusion on the first target vector set and the second target vector set to obtain a target fusion vector set;

[0049] S204: Input the target fusion vector set into a preset user portrait construction model to construct an enterprise user portrait, and obtain a target enterprise user portrait of the user data information.

[0050] It should be noted that the collected set of related data and user behavior data are first converted into a processable digital vector form. This is because most data processing and machine learning models work better with numerical data. For example, the type of enterprise such as "tech startup" or "manufacturing giant" can be converted into a numerical label, and the region such as "Silicon Valley" or "Tokyo" is also converted into a corresponding numerical identifier. Similarly, user behavior data, such as historical project participation and consulting records, are also converted into numerical vectors, where each dimension represents a different behavioral feature. Next, the two sets of vector sets are weighted to emphasize the importance of certain dimensions. For example, for a specific enterprise, a higher weight may be given to its business type, while for another enterprise, the importance of geographical location may be emphasized. Subsequently, based on these weight sets, the two sets of vector sets are fused to form a comprehensive target fused vector set, which contains the comprehensive features of the related data and user behavior. Finally, this target fused vector set is input into the preset user profile construction model, which will build a detailed and comprehensive enterprise user profile based on these fused data. For example, for a company active in the field of artificial intelligence, its profile might highlight its expertise in the field and historical involvement in relevant projects, while incorporating characteristics of its geographic location and company type.

[0051] In a specific embodiment, the process of executing step S103 may specifically include the following steps:

[0052] (1) Match the data interfaces of multiple scientific and technological information sources to obtain the data collection interface corresponding to each scientific and technological information source;

[0053] (2) Collect scientific and technological project data from multiple scientific and technological information sources through the data collection interface corresponding to each scientific and technological information source;

[0054] (3) Perform data cleaning on the scientific and technological project data to obtain the cleaned project data corresponding to the scientific and technological project data;

[0055] (4) Perform vectorization processing on the cleaning project data to obtain vectorized data corresponding to the cleaning project data;

[0056] (5) Input the vectorized data into the LDA topic model to analyze the topic distribution data and obtain the target topic distribution data;

[0057] (6) Extract the number of topics from the target topic distribution data to obtain the number of target topics;

[0058] (7) Based on the number of target topics, perform topic information analysis on the target topic distribution data to obtain multiple target topic information;

[0059] (8) Performing a topic correlation analysis on each pair of target topic information to obtain topic correlation data corresponding to each pair of target topic information;

[0060] (9) Based on the subject correlation data corresponding to every two target subject information, sub-project data is extracted from the scientific and technological project data to obtain multiple groups of sub-project data.

[0061] Specifically, first, these information sources are matched with data interfaces to ensure that each information source, such as science and technology news websites, professional forums, academic journals, and industry reports, has a corresponding data collection interface. For example, for a science and technology news website, the interface may be an API, through which the latest science and technology project information published on the website can be automatically obtained. Then, science and technology project data are collected from various information sources through these interfaces. These data may include project descriptions, keywords, participant information, etc. Subsequently, the collected data is cleaned, which includes removing irrelevant information and standardizing formats to ensure data quality and consistency. For example, the cleaning process may delete irrelevant advertising content and unify the date format of different information sources. The cleaned project data is then vectorized, that is, the text data is converted into a numerical vector format that can be processed by the machine learning model. After that, these vectorized data are input into the LDA topic model for topic distribution data analysis. This process involves identifying topics that are common in different project data. For example, topics such as "algorithm optimization" and "dataset processing" may be found in projects in the field of machine learning. Then, the number of these topics is extracted, and the detailed information of each topic and the correlation between them are further analyzed. For example, if we find that the two topics of "dataset processing" and "algorithm optimization" often appear in the same project, this indicates that they have high topic correlation. Finally, based on the correlation analysis results of these topics, the original science and technology project data is split into multiple groups of sub-project data, each of which focuses on a specific topic or combination of topics.

[0062] In a specific embodiment, the process of executing step S104 may specifically include the following steps:

[0063] (1) Labeling sub-project nodes for multiple groups of sub-project data to obtain multiple sub-project nodes;

[0064] (2) Based on the topic relevance data corresponding to each two target topic information, a connection edge is constructed for each two sub-project nodes to obtain the connection edge information corresponding to each two sub-project nodes;

[0065] (3) Construct a project relationship graph based on multiple sub-project nodes and the connection edge information corresponding to every two sub-project nodes;

[0066] (4) Perform node connectivity analysis on the project relationship graph using a breadth-first search algorithm to obtain node connectivity data;

[0067] (5) Based on the node connectivity data, traverse each sub-project node to obtain the set of target project nodes that each sub-project node can reach;

[0068] (6) Based on the target project node set that each sub-project node can reach, multiple groups of sub-project data are classified into project groups to obtain multiple project group data.

[0069] Specifically, first, detailed node annotation is performed on the sub-project data obtained through the LDA topic model analysis, that is, each sub-project is regarded as an independent node. For example, if a sub-project focuses on "artificial intelligence algorithm", the project is labeled as a node, and its labels or attributes include main keywords, related fields, etc. Next, based on the topic relevance data obtained from the LDA model, the connection edges between sub-project nodes are constructed. This step is completed by analyzing the topic relevance between two sub-projects. For example, if two projects both involve "machine learning" and "data analysis", a connection edge will be formed between them, indicating the close relationship between the two projects in terms of subject matter.

[0070] Once all sub-project nodes and the edges between them are determined, the next step is to use these nodes and edge information to build a project relationship graph. This relationship graph is a network structure, where each node represents a sub-project and each edge represents the topic correlation between two projects. For example, a large project relationship graph with the theme of "artificial intelligence" may contain nodes for multiple related sub-projects, ranging from basic algorithm research to application development, as well as multiple edges between these sub-projects.

[0071] After the project relationship graph is built, the next step is to apply the breadth-first search algorithm to analyze node connectivity. The breadth-first search algorithm is an algorithm that traverses or searches a tree structure or graph, starting from a node, visiting all adjacent nodes first, and then moving layer by layer to the next deep node. In this case, the algorithm starts from a specific sub-project node, such as "Deep Learning Algorithm", and then explores all directly connected nodes, such as "Image Recognition Technology" or "Natural Language Processing", to analyze the connectivity between nodes.

[0072] Based on the node connectivity data obtained by the breadth-first search algorithm, each sub-project node can be traversed to identify the set of other sub-project nodes that each node can reach. This process involves identifying which sub-projects are closely related to the starting node in terms of subject or content, thereby forming a group of projects with common characteristics or themes. For example, a search starting at the "Deep Learning Algorithm" node may find a series of closely related projects, such as "Neural Network Optimization", "Machine Vision Applications", etc., which are classified into the same project group.

[0073] Finally, based on the set of target project nodes that each sub-project node can reach, multiple groups of sub-project data are classified into project groups. This means that by analyzing each node and its reachable node set, the associated projects can be aggregated into different groups. Each group contains a series of thematically related projects, providing a basis for subsequent recommendations and analysis. For example, a project group with "deep learning" as the core can be formed, including all relevant research and development projects in this field. In this way, by carefully labeling the nodes of the sub-project data, constructing a project relationship graph, and using a breadth-first search algorithm for in-depth connectivity analysis, it is possible to effectively organize and classify a large number of complex scientific and technological project data in a structured manner, and provide more accurate and valuable project recommendations for target enterprise users.

[0074] In a specific embodiment, the process of performing the step of classifying the multiple groups of sub-project data into project groups may specifically include the following steps:

[0075] (1) Based on the target project node set that can be reached by each sub-project node, project data are extracted from multiple target project node sets respectively to obtain multiple project data sets;

[0076] (2) Extract project features from each project data set to obtain a project feature set corresponding to each project data set;

[0077] (3) Generate a project group label corresponding to each project data set based on the project feature set corresponding to each project data set;

[0078] (4) Classify multiple groups of sub-project data into project groups using the project group labels corresponding to each project data set to obtain multiple project group data.

[0079] Specifically, first, from the constructed project relationship graph, based on the target project node set that each sub-project node can reach, relevant project data is extracted. This means that for each sub-project node in the graph, all other project nodes that can be directly or indirectly associated with it through connecting edges are analyzed, so as to collect a set of relevant project information. For example, suppose there is a sub-project node with "renewable energy" as the core, which may be connected to nodes such as "solar technology", "wind energy utilization" and "biomass energy", which together constitute the target project node set.

[0080] Next, for each set of target project nodes, project feature extraction is performed to obtain the project features of each set. This step includes analyzing the key attributes of each project, such as the technology field involved, project scale, cooperation opportunities, historical performance, etc. In the above "renewable energy" example, features such as specific technical details, market potential, R&D team, and funding requirements of each project may be extracted. These features help to gain a deeper understanding of the uniqueness and potential value of each project.

[0081] Subsequently, based on the extracted project feature set, corresponding project group labels are generated for each project dataset. These labels reflect the main characteristics and categories of the projects, such as "innovative solar energy solutions", "wind energy efficiency optimization", etc., helping to classify different projects into more precise groups. In the above example, each "renewable energy" related project may be labeled with a specific energy type, such as "solar energy innovation" or "wind energy development project".

[0082] Finally, these project group labels are used to classify multiple groups of sub-project data into detailed project groups, thus obtaining multiple project group data. This means that, based on the group label of each project, related projects are clustered together to form a project group for a specific theme or field. In the case of "Renewable Energy", all projects labeled "Solar Energy Innovation" will be classified into one group, while all projects labeled "Wind Energy Development Projects" will constitute another group.

[0083] In a specific embodiment, the process of executing step S105 may specifically include the following steps:

[0084] (1) Extracting portrait features from the target enterprise user portrait data to obtain a portrait feature set;

[0085] (2) Extract project label features from multiple project group data to obtain a label feature set;

[0086] (3) Perform element intersection identification on the image feature set and the label feature set to obtain an intersection element set;

[0087] (4) Perform element union identification on the image feature set and the label feature set to obtain a union element set;

[0088] (5) Calculate the element similarity of multiple project group data based on the intersection element set and the union element set to obtain similarity calculation data;

[0089] (6) Sort multiple project group data based on similarity calculation data to obtain a project sorting list;

[0090] (7) Based on the preset number of project screenings, the project sorting list is screened to obtain the target project group, and the target project group is pushed to the data terminal of the target enterprise user in real time.

[0091] It should be noted that the first step is to conduct in-depth feature extraction on the constructed target enterprise user portrait. The key to this step is to identify the core attributes and preferences of enterprise users. For example, a corporate user portrait focusing on artificial intelligence may include its strong interest in machine learning, algorithm development and other fields. These features will be extracted to form a detailed portrait feature set.

[0092] Next, project label feature extraction is performed on multiple project groups that have been classified by the breadth-first search algorithm. This means identifying key project features and labels from each project group, such as the technology field involved, target market, project size, etc. For example, a project group on sustainable energy may include project labels for multiple sub-fields such as solar energy, wind energy, and biomass energy.

[0093] Next, the enterprise user portrait feature set and the project group's label feature set are compared to identify the intersection and union of elements. The intersection element set refers to those features that exist in both the user portrait and the project group label, indicating the direct correlation between the user and the project. For example, if the user portrait has the features of "machine learning" and "data analysis", and a project group is also labeled with these technical fields, then these constitute the intersection elements. At the same time, it is also necessary to identify the union elements of the portrait feature set and the label feature set, which includes all unique features in the user portrait and the project group for subsequent similarity calculations.

[0094] Based on the intersection and union element sets, the element similarity of multiple project group data is calculated. This step evaluates the matching degree between them by comparing the similarity between the user portrait feature set and each project group label feature set. For example, using Jaccard similarity or other related measurement methods, the similarity between the user portrait and each project group label set can be calculated. The higher the similarity, the more consistent the project group is with the preferences and needs of enterprise users.

[0095] After that, all project groups are sorted according to the similarity calculation results to form a project sorting list. This list is arranged from high to low according to the degree of match with the user profile, so that the most relevant project groups are at the top. For example, for an enterprise user focusing on artificial intelligence, those project groups that are highly focused on machine learning or data analysis will be ranked at the top.

[0096] Finally, according to the preset project screening criteria, several most matching project groups are selected from the sorted list as target project groups. These selected project groups will be regarded as the projects that best meet the current needs and interests of enterprise users, and therefore have the highest recommendation priority. Then, these target project group information is sent to target enterprise users through a real-time push system to ensure that users can receive the project information most relevant to their preferences and needs in a timely manner. For example, through emails, mobile app notifications or other digital communication channels, the detailed information of these selected project groups can be quickly delivered to enterprise users, thereby achieving efficient and personalized information push.

[0097] The embodiment of the present invention also provides a real-time push system based on scientific and technological projects, such as Figure 3 As shown, the real-time push system based on scientific and technological projects specifically includes:

[0098] An extraction module 301 is used to extract user information of a target enterprise user to obtain user data information of the target enterprise user;

[0099] A construction module 302 is used to construct an enterprise user portrait for the target enterprise user through the user data information to obtain the target enterprise user portrait of the user data information;

[0100] The splitting module 303 is used to collect scientific and technological project data from multiple scientific and technological information sources, and split the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data;

[0101] A classification module 304 is used to classify the plurality of groups of sub-project data into project groups by using a preset breadth-first search algorithm to obtain a plurality of project group data;

[0102] The matching module 305 is used to perform project matching on the plurality of project group data based on the target enterprise user portrait data, obtain a target project group, and push the target project group to the data terminal of the target enterprise user in real time.

[0103] Through the collaborative work of the above modules, user information of the target enterprise user is extracted to obtain the user data information of the target enterprise user; enterprise user portraits of the target enterprise user are constructed through the user data information to obtain the target enterprise user portraits of the user data information; technology project data are collected from multiple technology information sources, and the technology project data are split through the preset LDA topic model to obtain multiple groups of sub-project data; multiple groups of sub-project data are classified into project groups through the preset breadth-first search algorithm to obtain multiple project group data; based on the target enterprise user portrait data, multiple project group data are matched to obtain the target project group, and the target project group is pushed to the data end of the target enterprise user in real time. In the present application scheme, firstly, through the detailed information extraction of the target enterprise user and the construction of user portraits based on this information, the scheme can deeply understand the specific needs and preferences of enterprise users. Then, the LDA topic model is used to extract key topics from multi-source technology project data, and these data are structured into groups through the breadth-first search algorithm, which effectively organizes and optimizes the project information. Finally, based on the precisely constructed enterprise user portrait, the solution can achieve accurate matching of project groups and push the most relevant target project groups to enterprise users in real time, significantly improving the relevance of information push and user experience, while enhancing the personalization and effectiveness of science and technology project information services.

[0104] The above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit the same. Although the present invention has been described in detail with reference to the embodiments, a person skilled in the art should understand that the specific implementation modes of the present invention can still be modified or replaced by equivalents, and any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A real-time push method based on scientific and technological projects, characterized in that: include: Extracting user information of the target enterprise user to obtain user data information of the target enterprise user; Constructing an enterprise user profile for the target enterprise user through the user data information to obtain the target enterprise user profile of the user data information; Collect scientific and technological project data from multiple scientific and technological information sources, and split the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data, specifically including: matching the data interfaces of multiple scientific and technological information sources to obtain the data collection interface corresponding to each of the scientific and technological information sources; collecting the scientific and technological project data from multiple scientific and technological information sources through the data collection interface corresponding to each of the scientific and technological information sources; cleaning the scientific and technological project data to obtain the cleaned project data corresponding to the scientific and technological project data; vectorizing the cleaned project data to obtain the vectorized data corresponding to the cleaned project data; inputting the vectorized data into the LDA topic model to perform topic distribution data analysis to obtain target topic distribution data; extracting the number of topics from the target topic distribution data to obtain the number of target topics; based on the number of target topics, performing topic information analysis on the target topic distribution data to obtain multiple target topic information; performing topic correlation analysis on each two of the target topic information to obtain the topic correlation data corresponding to each two of the target topic information; extracting sub-project data from the scientific and technological project data based on the topic correlation data corresponding to each two of the target topic information to obtain multiple groups of sub-project data; Classifying the plurality of groups of sub-project data into project groups by using a preset breadth-first search algorithm to obtain a plurality of project group data, specifically including: labeling the plurality of groups of sub-project data into sub-project nodes to obtain a plurality of sub-project nodes; constructing connecting edges for each two sub-project nodes based on the topic correlation data corresponding to each two target topic information to obtain connecting edge information corresponding to each two sub-project nodes; constructing a project relationship graph based on the plurality of sub-project nodes and the connecting edge information corresponding to each two sub-project nodes; performing node connectivity analysis on the project relationship graph by using the breadth-first search algorithm to obtain node connectivity data; traversing each sub-project node based on the node connectivity data to obtain a target project node set that can be reached by each sub-project node; classifying the plurality of groups of sub-project data into project groups based on the target project node set that can be reached by each sub-project node to obtain a plurality of project group data; The step of classifying the multiple groups of the sub-project data into project groups based on the target project node set that each of the sub-project nodes can reach to obtain multiple project group data specifically includes: extracting project data from multiple target project node sets based on the target project node set that each of the sub-project nodes can reach to obtain multiple project data sets; extracting project features from each of the project data sets to obtain a project feature set corresponding to each of the project data sets; generating a project group label corresponding to each of the project data sets based on the project feature set corresponding to each of the project data sets; and classifying the multiple groups of the sub-project data into project groups using the project group label corresponding to each of the project data sets to obtain multiple project group data; Based on the target enterprise user portrait data, multiple project group data are matched with each other to obtain a target project group, and the target project group is pushed to the data end of the target enterprise user in real time, specifically including: extracting portrait features from the target enterprise user portrait data to obtain a portrait feature set; extracting project label features from the multiple project group data to obtain a label feature set; identifying element intersections of the portrait feature set and the label feature set to obtain an intersection element set; identifying element unions of the portrait feature set and the label feature set to obtain a union element set; calculating element similarities of multiple project group data based on the intersection element set and the union element set to obtain similarity calculation data; sorting multiple project group data based on the similarity calculation data to obtain a project sorting list; filtering the project sorting list based on a preset project screening number to obtain a target project group, and pushing the target project group to the data end of the target enterprise user in real time.

2. The real-time push method based on scientific and technological projects according to claim 1 is characterized in that: The step of extracting user information of the target enterprise user to obtain user data information of the target enterprise user includes: Extracting related information of the target enterprise user to obtain a related data set of the target enterprise user, wherein the related data set includes enterprise name, enterprise type, enterprise region and business type data; Tracking and identifying the user behavior of the target enterprise user to obtain the user behavior data of the target enterprise user, wherein the user behavior data includes: enterprise historical project data and enterprise consulting data; The associated data set and the user behavior data are combined into the user data information.

3. The real-time push method based on scientific and technological projects according to claim 2 is characterized in that: The step of constructing an enterprise user portrait for the target enterprise user through the user data information to obtain the target enterprise user portrait of the user data information includes: Performing vector conversion on the associated data set to obtain a first target vector set corresponding to the associated data set, and performing vector conversion on the user behavior data to obtain a second target vector set of the user behavior data; Performing weight matching on the first target vector set to obtain a first weight set, and at the same time, performing weight matching on the second target vector set to obtain a second weight set; Based on the first weight set and the second weight set, performing vector fusion on the first target vector set and the second target vector set to obtain a target fusion vector set; The target fusion vector set is input into a preset user portrait construction model to construct an enterprise user portrait, so as to obtain a target enterprise user portrait of the user data information.

4. A real-time push system based on scientific and technological projects, used to execute the real-time push method based on scientific and technological projects as claimed in any one of claims 1 to 3, characterized in that: include: An extraction module is used to extract user information of a target enterprise user to obtain user data information of the target enterprise user; A construction module, used to construct an enterprise user portrait for the target enterprise user through the user data information, and obtain the target enterprise user portrait of the user data information; A splitting module is used to collect scientific and technological project data from multiple scientific and technological information sources, and to perform information splitting on the scientific and technological project data through a preset LDA topic model to obtain multiple groups of sub-project data, specifically including: performing data interface matching on multiple scientific and technological information sources to obtain a data collection interface corresponding to each of the scientific and technological information sources; collecting the scientific and technological project data from multiple scientific and technological information sources through a data collection interface corresponding to each of the scientific and technological information sources; performing data cleaning on the scientific and technological project data to obtain cleaned project data corresponding to the scientific and technological project data; performing vectorization processing on the cleaned project data to obtain vectorized data corresponding to the cleaned project data; inputting the vectorized data into the LDA topic model to perform topic distribution data analysis to obtain target topic distribution data; performing topic number extraction on the target topic distribution data to obtain the target topic number; based on the target topic number, performing topic information analysis on the target topic distribution data to obtain multiple target topic information; performing topic correlation analysis on each two of the target topic information to obtain topic correlation data corresponding to each two of the target topic information; performing sub-project data extraction on the scientific and technological project data based on the topic correlation data corresponding to each two of the target topic information to obtain multiple groups of sub-project data; The classification module is used to classify the multiple groups of sub-project data into project groups by using a preset breadth-first search algorithm to obtain multiple project group data, specifically including: marking the multiple groups of sub-project data with sub-project nodes to obtain multiple sub-project nodes; constructing connecting edges for each two sub-project nodes based on the topic correlation data corresponding to each two target topic information to obtain connecting edge information corresponding to each two sub-project nodes; constructing a project relationship graph based on the multiple sub-project nodes and the connecting edge information corresponding to each two sub-project nodes; performing node connectivity analysis on the project relationship graph by using the breadth-first search algorithm to obtain node connectivity data; traversing each sub-project node based on the node connectivity data to obtain a target project node set that each sub-project node can reach; classifying the multiple groups of sub-project data into project groups based on the target project node set that each sub-project node can reach to obtain multiple project group data; The step of classifying the multiple groups of the sub-project data into project groups based on the target project node set that each of the sub-project nodes can reach to obtain multiple project group data specifically includes: extracting project data from multiple target project node sets based on the target project node set that each of the sub-project nodes can reach to obtain multiple project data sets; extracting project features from each of the project data sets to obtain a project feature set corresponding to each of the project data sets; generating a project group label corresponding to each of the project data sets based on the project feature set corresponding to each of the project data sets; and classifying the multiple groups of the sub-project data into project groups using the project group label corresponding to each of the project data sets to obtain multiple project group data; A matching module is used to perform project matching on multiple project group data based on the target enterprise user portrait data to obtain a target project group, and push the target project group to the data end of the target enterprise user in real time, specifically including: extracting portrait features from the target enterprise user portrait data to obtain a portrait feature set; extracting project label features from multiple project group data to obtain a label feature set; identifying element intersections of the portrait feature set and the label feature set to obtain an intersection element set; identifying element unions of the portrait feature set and the label feature set to obtain a union element set; calculating element similarities of multiple project group data based on the intersection element set and the union element set to obtain similarity calculation data; sorting multiple project group data based on the similarity calculation data to obtain a project sorting list; screening the project sorting list based on a preset project screening number to obtain a target project group, and pushing the target project group to the data end of the target enterprise user in real time.

Citation Information

Patent Citations

  • Web service classification method fusing unstructured information and structured information

    CN113111288A

  • Intelligent matching method for science and technology service items, storage medium and equipment

    CN114356885A

  • Enterprise portrait construction method and device and electronic equipment

    CN116975393A