Testing system and method for shear strength of interface during suction foundation penetration-extraction process

The symmetrical direct shear instrument and servo loading device are used to simulate the penetration-extraction process of the suction foundation, and the high-definition camera is used to record the seepage process. This solves the problem that the existing technology cannot simulate the soil seepage path of the suction foundation, and realizes the side monitoring of the suction foundation. High-accuracy shear strength testing of wall-soil interfaces.

CN117686355BActive Publication Date: 2024-10-18CHINA UNIV OF PETROLEUM (EAST CHINA)
View PDF 15 Cites 0 Cited by

Patent Information

Application Number
CN202311812091.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-10-18
Estimated Expiration
2043-12-27

AI Technical Summary

Technical Problem

The existing direct shear instrument cannot simulate the true seepage path of the soil during the penetration-extraction process of the suction foundation, cannot reflect the changes in the shear strength of the side wall of the suction foundation-soil, and cannot accurately test the resistance of the side wall-soil of the suction foundation. Shear strength.

Method used

A test system including a symmetrical direct shear instrument, a servo loading device, a controllable seepage unit and a high-definition camera is designed. The symmetrical direct shear instrument simulates the seepage paths inside and outside the suction foundation, and the servo loading device simulates penetration- The lateral stress changes during the pull-out process, and the high-definition camera records the seepage process to realize the shear strength test of the suction foundation side wall-soil interface.

Benefits of technology

This system can accurately simulate the lateral stress changes and seepage paths of the soil during the penetration-extraction process of the suction foundation, and improves the testing accuracy of the shear strength of the side wall-soil interface of the suction foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117686355B_ABST
    Figure CN117686355B_ABST
Patent Text Reader

Abstract

The invention discloses a test system and method for the shear strength of the interface during the suction foundation penetration-extraction process, which belongs to the field of marine engineering technology, and includes a workbench, an uncovered water tank, a pre-buried pile column, a symmetrical direct shear instrument, a servo loading device, a controllable seepage unit, a high-definition camera and an electronic control unit. The uncovered water tank is arranged on the workbench, and the symmetrical direct shear instrument is arranged inside the uncovered water tank. The symmetrical direct shear instrument includes a bottom plate, a top cover, a shear box one and a shear box two. The shear boxes one and two are slidably arranged on the bottom plate and the opening sides correspond to each other in the positive direction, and the divergent sides are respectively connected to the uncovered water tank through lateral variable stress loading devices. The pre-buried pile column vertically penetrates the symmetrical direct shear instrument to close the opening side of the shear box. The controllable seepage unit includes a water bucket, which is respectively connected to the inside of the two shear boxes through a water inlet pipe and a water outlet pipe. The invention simulates the lateral stress changes of the inner and outer walls and the seepage in the soil during the suction foundation penetration and extraction process, and tests the shear strength of the interface.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of marine engineering technology, and in particular to a system and method for testing the shear strength of an interface during a suction foundation penetration-extraction process. Background Art

[0002] Suction foundation is the most commonly used foundation form in marine engineering. It is shaped like an inverted large-diameter thin-walled barrel with a drainage hole on the top. During the construction process, the water in the foundation is sucked out by a submersible pump to form a pressure difference lower than that of the outside world. The suction foundation is penetrated to the expected depth under the action of negative pressure. After the service is completed, water is reversely injected into the drainage hole, and the foundation is pushed out by overpressure and then pulled out for recovery. During the penetration and recovery process, the suction foundation needs to overcome the friction between the side wall and the soil, and the shear strength of the side wall-soil interface needs to be studied in depth.

[0003] The direct shear tester is a commonly used interface strength test equipment that can accurately test the shear stress between the structure and the soil. For suction foundations, during the penetration process, the lateral stress around the barrel gradually increases with the increase of depth. During the extraction process, the lateral stress around the barrel gradually decreases with the decrease of depth. The change in lateral stress leads to a change in the interface shear strength. Conventional direct shear testers can only carry out tests under normal stress conditions and cannot reflect the change in interface contact stress.

[0004] During the suction penetration and water injection extraction stages, a seepage field is formed in the soil around the barrel, which flows around the barrel wall, that is, water seeps downward along the outer wall of the foundation and seeps upward along the inner wall. At present, conventional direct shear instruments cannot simulate the actual seepage path inside and outside the foundation, so accurate shear strength cannot be obtained.

[0005] The relevant research reports of the prior art mainly include: Chinese patent with publication number CN108106949A discloses a method and a symmetrical direct shear apparatus for in-situ testing of the shear strength of the pile-soil interface, and Chinese patent with publication number CN218212441U discloses a side-limited annular direct shear apparatus for simulating the shear strength of the pile-mudstone contact surface. The above patents all include two symmetrically distributed shear boxes, which are close to the side walls of the pile foundation, and use a servo loading device to mobilize the vertical movement of the pile foundation and test the interface shear strength. Compared with the conventional direct shear apparatus, the direct shear apparatus can ensure that the normal forces at each point at the interface are the same in magnitude and all point to the center of the circle, so that the shear surface is evenly stressed. However, the direct shear apparatus conducts tests under normal stress conditions, and there is no seepage in the soil sample, so it is not suitable for testing the shear strength of the suction foundation side wall-soil.

[0006] Publication number CN 110455646 A discloses a visual interface direct shear apparatus that can take into account the effects of temperature and seepage. The system circulates free water through vacuum pump suction to achieve seepage in the soil sample. However, the system only has a single-sided shear box and cannot simulate the seepage in the soil inside and outside the foundation. In addition, the system conducts interface shear experiments under constant stress conditions and fails to reflect the changes in lateral stress during the penetration and extraction of the suction foundation. Therefore, it is not suitable for testing the shear strength of the suction foundation side wall-soil. Based on the above background, it is urgent to develop a set of direct shear apparatus that can simulate the suction foundation penetration-extraction process and test the interface shear strength. Summary of the invention

[0007] In view of the above-mentioned deficiencies in the prior art, one object of the present invention is to propose a testing system for the shear strength of the interface during the penetration-extraction process of the suction foundation, so as to solve the problem that the existing direct shear instrument cannot simulate the real seepage path in the soil inside and outside the suction foundation, that is, it fails to reflect the changes in lateral stress during the penetration and extraction process of the suction foundation, and is not suitable for testing the shear strength of the suction foundation side wall-soil.

[0008] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0009] A test system for the shear strength of the interface during the suction foundation penetration-extraction process comprises a workbench, an uncovered water tank, embedded piles, a symmetrical direct shear instrument, a servo loading device, a controllable seepage unit, a high-definition camera and an electronic control unit. The uncovered water tank is fixed on the workbench, the high-definition camera is placed on the front side of the uncovered water tank, and the symmetrical direct shear instrument is arranged on the inner side of the uncovered water tank, and its bottom is laterally slidably matched with the uncovered water tank.

[0010] The symmetrical direct shear apparatus comprises a bottom plate, a top cover, a shear box 1 and a shear box 2, wherein the shear box 1 and the shear box 2 are both C-shaped shell structures, the shear box 1 and the shear box 2 are vertically relatively slidably arranged above the bottom plate, and the opening sides are positively corresponding, and the opposite sides of the two shear boxes are connected to the corresponding side walls of the uncovered water tank through a lateral variable stress loading device.

[0011] There are two top covers and they are arranged symmetrically on the left and right. The two top covers slide horizontally with the top of shear box one and shear box two respectively. The embedded pile column is a columnar structure with a square cross-section, and vertically penetrates the symmetrical direct shear apparatus and slides vertically with it. The front and rear sides of the embedded pile column are always in contact with the shear box and can slide with it. The embedded pile column closes the opening side of the shear box.

[0012] The controllable seepage unit includes a water bucket, which is connected to two top cover pipelines through a water inlet pipeline and a water outlet pipeline, and is communicated with the interior of two shear boxes respectively. The cavities inside the two shear boxes are communicated with the interior of the uncovered water tank through water-permeable holes on the bottom plate.

[0013] The servo loading device is arranged above the uncovered water tank through a reaction beam. The servo loading device is equipped with a displacement sensor, and its telescopic end is connected to the upper end of the embedded pile column through a force sensor to drive the embedded pile column to penetrate downward or be pulled out upward.

[0014] Furthermore, the coverless water tank, shear box one and shear box two are all made of transparent acrylic material or fiberglass. The coverless water tank is a box structure with an open top, and its length, width and height are 0.5m×0.5m×1.0m respectively.

[0015] Two slide rails are fixedly provided at the bottom of the uncovered water tank. The two slide rails are arranged in parallel, one in front of the other. Each slide rail is provided with at least two rollers. The rollers are installed at the bottom of the base plate through roller brackets. The base plate can move left and right relative to the uncovered water tank.

[0016] Furthermore, a square opening matching the cross section of the embedded pile column is opened in the middle of the bottom plate, and the lower end of the embedded pile column can pass through the square opening and extend to the bottom of the bottom plate.

[0017] There are two groups of water permeable holes, which are respectively located on the left and right sides of the square opening, and each group of water permeable holes includes a plurality of water permeable holes arranged in a square array.

[0018] Furthermore, two first sliding grooves are opened on the upper surface of the bottom plate, and the two first sliding grooves are arranged relatively parallel on the front and rear sides of shear box one and shear box two. A first guide sliding block is provided at the lower end of the front and rear sides of each shear box, and each first guide sliding block is located in the first sliding groove on the same side and cooperates with the bottom plate in transverse sliding.

[0019] Furthermore, the upper and lower ends of shear box one and shear box two are both flush end surfaces, and second sliding grooves are opened on the front and rear outer walls of the upper ends of the two shear boxes. The front and rear sides of the top cover are folded downward to form a folded edge, and the inner side of the folded edge is fixedly connected to the second guide sliding block slidingly arranged in the second sliding groove.

[0020] The two top covers have rectangular notches on one side close to each other, and the two notches correspond to each other in a positive direction. When the top covers are in a closed state, the two notches cooperate to form a square through-hole that matches the cross-section of the embedded pile column.

[0021] During operation, the embedded pile column moves downward and penetrates through the square hole between the two top covers and passes through the square opening on the bottom plate. Each top cover keeps the top of the shear box at its lower end in a closed state.

[0022] Furthermore, the reaction beam is a gate-shaped steel frame structure and spans across the left and right sides of the uncovered water tank, and its bottom is fixedly connected to the surface of the workbench by bolts.

[0023] The servo loading device includes a servo cylinder, the cylinder body of which is fixedly connected to the top lower side of the reaction beam, the lower end of its piston rod is connected to the top of the embedded pile column through a force sensor, and the displacement sensor and the force sensor are both communicatively connected to the electronic control unit.

[0024] When working, the servo cylinder provides force loading and displacement loading to the embedded piles, and the displacement loading rate is 0.001m / s~0.2m / s.

[0025] Furthermore, the lateral variable stress loading device includes a group of vacuum air bags, each group of vacuum air bags includes a plurality of sub-air bags arranged adjacent to each other from top to bottom, the sub-air bags in the same group are interconnected and are provided with an inflation device.

[0026] Each group of vacuum air bags is equipped with an air pressure sensor, which is communicatively connected with the electronic control unit.

[0027] Furthermore, one end of the water inlet pipeline is connected to the water bucket, and the other end is connected to the joint on the right top cover, and a vacuum pump is configured on the water inlet pipeline.

[0028] One end of the water outlet pipeline is connected to the joint on the left top cover, and the other end is connected to the water bucket. A vacuum pump 2 is arranged on the water outlet pipeline, and the signal ends of the vacuum pumps 1 and 2 are respectively connected to the electronic control unit for communication.

[0029] Another object of the present invention is to provide a method for testing the shear strength of the interface during the suction-based penetration-extraction process.

[0030] The test method for the shear strength of the interface during the suction foundation penetration-extraction process adopts the above-mentioned test system for the shear strength of the interface during the suction foundation penetration-extraction process, and the test method comprises the following steps:

[0031] S1. After the test system is installed, shear box 1 is adjusted to the left end point of its travel, and shear box 2 is adjusted to the right end point of its travel. The servo loading device drives the embedded pile column to move vertically downward through the inner sides of the two shear boxes and out from the bottom of the base plate. The embedded pile column stops moving after reaching the predetermined position.

[0032] S2. Pour water into the uncovered water tank. Stop pouring water when the water level reaches 4 / 5 of the height of the uncovered water tank. Fix the high-definition camera in front of the uncovered water tank with the lens facing the uncovered water tank.

[0033] S3. Lay filter paper on the inner bottom of shear box 1 and shear box 2 respectively, add soil samples into the cavities formed by shear box 1, shear box 2 and embedded piles, until the soil samples fill the cavities on the left and right sides of the embedded piles, and lay the same filter paper on the upper surface of the soil samples.

[0034] Afterwards, the two top covers move toward the middle to close the tops of the shear box one and the shear box two respectively.

[0035] S4. Pour water into the water bucket, and the water is pumped into the interior of shear box 2 through the water inlet pipe. At the same time, the water inside shear box 1 is pumped into the water bucket through the water outlet pipe. The water in the water bucket circulates through the soil samples inside the two shear boxes and the water in the uncovered water tank.

[0036] After the internal seepage of shear box 1 and shear box 2 is stable, the two lateral variable stress loading devices apply lateral forces to the two shear boxes respectively, and drive shear box 1 and shear box 2 to move toward the center. After the lateral forces applied by the soil samples on the left and right sides of the embedded pile column are stable, shear box 1 and shear box 2 stop moving, and the lateral force values ​​on the left and right sides of the embedded pile column are recorded.

[0037] S5. The servo loading device applies downward penetration force or upward pull-out force to the embedded pile column, gradually loading from zero. The force sensor and displacement sensor collect and record data in real time until the embedded pile column is sheared against the soil sample. The force sensor records the penetration force value or pull-out force value at the moment of shear failure. The embedded pile column stops moving after moving 5 cm downward or upward. The displacement sensor collects the moving distance of the embedded pile column and transmits the data to the electronic control unit in real time. The electronic control unit controls the servo cylinder.

[0038] Furthermore, in the processes of S4 and S5, the high-definition camera recorded the microscopic flow mechanism of the soil samples in the two shear boxes during the seepage process by shooting frame by frame, providing a reference for the shear study of the suction foundation sidewall-soil interface.

[0039] By adopting the above technical scheme, the beneficial technical effect of the present invention is: the present invention controls the lateral stress of the soil on both sides of the embedded pile column, respectively, can simulate the change of the lateral stress of the inner and outer walls during the penetration and extraction of the suction foundation, simulate the real seepage path inside and outside the suction foundation, and obtain the shear strength of the suction foundation side wall-soil interface with high accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic diagram of the structure of the testing system of the present invention for the interface shear strength during the suction foundation penetration-extraction process.

[0041] Figure 2 yes Figure 1 A partial enlarged view of part A of the present invention.

[0042] Figure 3 It is a top view of the testing system of the present invention for the interface shear strength of the suction foundation penetration-extraction process.

[0043] Figure 4 yes Figure 1 A schematic diagram of the combined structure of a certain part shows the embedded piles and the symmetrical direct shear apparatus.

[0044] Figure 5 yes Figure 4 A partial exploded view of the combined structure.

[0045] Figure 6 It is a usage status diagram of the test system of the present invention for the interface shear strength of the suction foundation penetration-extraction process. DETAILED DESCRIPTION

[0046] The present invention is described in detail below in conjunction with the accompanying drawings:

[0047] The present invention proposes a testing system for the shear strength of the interface during the suction foundation penetration-extraction process. In order to make the advantages and technical solutions of the present invention clearer and more specific, the present invention is described in detail below in conjunction with specific embodiments.

[0048] Embodiment 1, combination Figures 1 to 5 As shown, a test system for the shear strength of the interface during the suction foundation penetration-extraction process includes a workbench 1, an uncovered water tank 2, a pre-buried pile 3, a symmetrical direct shear instrument, a servo loading device, a controllable seepage unit, a high-definition camera 5 and an electronic control unit. The uncovered water tank 2 is fixed on the workbench 1. The uncovered water tank 2 is a box structure with an open top, and its length, width and height are 0.5m×0.5m×1.0m respectively. The high-definition camera 5 is placed on the front side of the uncovered water tank 2, and the symmetrical direct shear instrument is arranged on the inner side of the uncovered water tank 2, and its bottom is laterally slidably matched with the uncovered water tank 2.

[0049] The symmetrical direct shear apparatus includes a bottom plate 41, a top cover 44, a shear box 1 42 and a shear box 2 43. The uncovered water tank 2, the shear box 1 42 and the shear box 2 43 are all made of transparent acrylic material or fiberglass. The shear box 1 42 and the shear box 2 43 are both C-shaped shell structures. The shear box 1 42 and the shear box 2 43 are vertically relatively slidably arranged above the bottom plate 41, and the opening sides are positively corresponding.

[0050] The embedded pile column 3 is a columnar structure with a square cross section and is arranged vertically. The embedded pile column 3 is a small differential unit taken out along the circumferential direction of the suction foundation.

[0051] Specifically, two first slide grooves 411 are opened on the upper surface of the bottom plate 41, and the two first slide grooves 411 are arranged relatively parallel on the front and rear sides of the shear box 1 42 and the shear box 2 43. A first guide slide block 412 is provided at the lower end of the front and rear sides of each shear box, and each first guide slide block 412 is located in the first slide groove 411 on the same side and slides horizontally with the bottom plate 41.

[0052] The opposite sides of the shear box 1 42 and the shear box 2 43 are connected to the corresponding side wall of the uncovered water tank 2 through a lateral variable stress loading device. The lateral variable stress loading device includes a group of vacuum air bags 8, each group of vacuum air bags 8 includes a plurality of sub-air bags arranged adjacent to each other from top to bottom, and the sub-air bags in the same group are interconnected and equipped with an inflation device, which adopts an inflation device already available in the prior art. Each group of vacuum air bags 8 is equipped with an air pressure sensor, which is communicatively connected to the electronic control unit.

[0053] The two groups of vacuum air bags 8 act on shear box 1 42 and shear box 2 43 respectively, changing the contact stress of the soil sample 9 in shear box 1 42 and shear box 2 43 on the embedded pile column 3, realizing the shear stress of the interface under variable stress conditions, and controlling the application of force on both sides of the embedded pile column 3 through the vacuum air bags 8 and shear boxes on the left and right sides respectively.

[0054] Two slide rails 21 are fixedly provided at the bottom of the uncovered water tank 2. The two slide rails 21 are arranged relatively parallel to each other, one in front of the other. Each slide rail 21 is provided with at least two rollers 22. The rollers 22 are installed at the bottom of the bottom plate 41 through roller 22 brackets. The bottom plate 41 can move left and right relative to the uncovered water tank 2.

[0055] A square opening 413 matching the cross section of the embedded pile column 3 is provided in the middle of the bottom plate 41, and the lower end of the embedded pile column 3 can pass through the square opening 413 and extend to the bottom of the bottom plate 41. Two groups of water holes 414 are provided on the bottom plate 41, and the two groups of water holes are respectively located on the left and right sides of the square opening 413, and each group of water holes includes a plurality of water holes 414 arranged in a square array. The two groups of water holes 414 correspond to the inside of the shear box 1 42 and the shear box 2 43, respectively. The water in the shear box 1 42 and the shear box 2 43 can convect with the water in the uncovered water tank 2 through the water holes 414, respectively, to simulate the flow state of the water inside the soil sample 9 under the action of the internal and external pressure difference during the suction foundation penetration or extraction process.

[0056] Adjustable limit heads 23 are respectively provided on the left and right sides of the lower inner side of the uncovered water tank 2. The two adjustable limit heads 23 are relatively arranged and fixed on the inner wall of the uncovered water tank 2. The two adjustable limit heads 23 respectively limit the movement of the shear box 1 42 and the shear box 2 43.

[0057] There are two top covers 44 and they are arranged symmetrically. The two top covers 44 slide horizontally with the top of shear box 1 42 and shear box 2 43 respectively. The embedded pile column 3 vertically penetrates the symmetrical direct shear apparatus and slides vertically with it. The front and rear sides of the embedded pile column 3 are always in contact with the shear box and can slide with it. The embedded pile column 3 closes the opening side of the shear box. During the test, the front and rear side walls of the embedded pile column 3 always keep in contact with the inner side walls of shear box 1 42 and shear box 2 43, and the soil sample 9 will not flow out from the inside of shear box 1 42 and shear box 2 43. The friction between the embedded pile column 3 and shear box 1 42 and shear box 2 43 is negligible.

[0058] The upper and lower ends of shear box 1 42 and shear box 2 43 are both flush end surfaces, and second slide grooves 45 are opened on the front and rear outer walls of the upper ends of shear box 1 42 and shear box 2 43. The front and rear sides of the top cover 44 are folded downward to form a folded edge, and the inner side of the folded edge is fixedly connected to the second guide sliding block 46 slidably set in the second slide groove 45.

[0059] The two top covers 44 have rectangular notches 441 on their mutually adjacent sides, and the two notches 441 correspond to each other. When the top covers 44 are in the closed state, the notches 441 of the shear box 1 42 and the shear box 2 43 cooperate to form a square through-hole that matches the cross-section of the embedded pile column 3 .

[0060] During operation, the embedded pile column 3 moves downward and penetrates through the square hole between the two top covers 44 and passes through the square opening on the bottom plate 41. Each top cover 44 keeps the top of the shear box at its lower end in a closed state.

[0061] The controllable seepage unit includes a water bucket 61, which is connected to the two top covers 44 through an inlet pipe 62 and an outlet pipe 63, and is communicated with the interior of the two shear boxes respectively. The cavities inside the two shear boxes are communicated with the interior of the uncovered water tank 2 through the water-permeable holes on the bottom plate 41.

[0062] One end of the water inlet pipeline 62 is connected to the water bucket 61 , and the other end is connected to the joint 47 on the right top cover 44 . A vacuum pump 64 is disposed on the water inlet pipeline 62 .

[0063] One end of the water outlet pipe 63 is connected to the joint on the left top cover 44, and the other end is connected to the water bucket 61. The water outlet pipe 63 is provided with a vacuum pump 2 65, and the signal ends of the vacuum pump 1 64 and the vacuum pump 2 65 are respectively connected to the electronic control unit for communication.

[0064] The servo loading device is arranged above the uncovered water tank 2 through a reaction beam 7. The servo loading device is equipped with a displacement sensor, and its telescopic end is connected to the upper end of the embedded pile column 3 through a force sensor 72 to drive the embedded pile column 3 to penetrate downward or be pulled out upward.

[0065] The reaction beam 7 is a gate-shaped steel frame structure and spans across the left and right sides of the uncovered water tank 2 , and its bottom is fixedly connected to the surface of the workbench 1 by bolts.

[0066] The servo loading device includes a servo cylinder 71, the cylinder body of which is fixedly connected to the top lower side of the reaction beam 7, and the lower end of its piston rod is connected to the top of the embedded pile column 3 through a force sensor 72, and the displacement sensor and the force sensor 72 are both connected to the electronic control unit for communication.

[0067] When working, the servo oil cylinder 71 provides force loading and displacement loading to the embedded pile column 3, and the displacement loading rate is 0.001m / s~0.2m / s.

[0068] Embodiment 2, combined Figures 1 to 6 , a method for testing the shear strength of the interface during the suction base penetration-pulling process, using the testing system for the shear strength of the interface during the suction base penetration-pulling process described in Example 1.

[0069] The test method includes the following steps:

[0070] S1. After the test system is installed, the shear box 1 42 is adjusted to the left end point of its travel, and the shear box 2 43 is adjusted to the right end point of its travel. The servo loading device drives the embedded pile column 3 to move vertically downward through the inner sides of the two shear boxes and out from the bottom of the base plate 41. The embedded pile column 3 stops moving after reaching the predetermined position.

[0071] S2. Pour water into the uncovered water tank 2. Stop pouring water when the water level reaches 4 / 5 of the height of the uncovered water tank 2. Fix the high-definition camera 5 in front of the uncovered water tank 2 with the lens facing the uncovered water tank 2.

[0072] S3. Lay filter paper 10 on the inner bottom of shear box 1 42 and shear box 2 43 respectively, add soil samples 9 into the cavities formed by shear box 1 42, shear box 2 43 and embedded piles 3, until the soil samples 9 fill the cavities on the left and right sides of the embedded piles 3, and lay the same filter paper 10 on the upper surface of the soil samples 9.

[0073] Afterwards, the two top covers 44 move toward the middle to close the tops of the shear box 1 42 and the shear box 2 43 respectively.

[0074] S4. Pour water into the water bucket 61. The water bucket 61 pumps water into the shear box 2 43 through the water inlet pipe 62. At the same time, the water in the shear box 1 42 is pumped into the water bucket 61 through the water outlet pipe 63. The water in the water bucket 61 circulates through the soil samples 9 inside the two shear boxes and the water in the uncovered water tank 2. The water pressures in the shear boxes 1 42 and 43 are controlled by the vacuum pump 2 65 and the vacuum pump 1 64 respectively.

[0075] The filter paper 10 can filter the flow of the soil sample 9 to prevent the soil sample 9 from entering the uncovered water tank 2, so that the water in the uncovered water tank 2 always remains clear, making it easy for the high-definition camera 5 to shoot the soil sample 9 in the shear box.

[0076] After the internal seepage of shear box 1 42 and shear box 2 43 is stabilized, the two lateral variable stress loading devices apply lateral forces to the two shear boxes respectively, and drive shear box 1 42 and shear box 2 43 to move toward the center. After the lateral forces applied by the soil samples 9 on the left and right sides of the embedded pile column 3 are stabilized, shear box 1 42 and shear box 2 43 stop moving, and the lateral force values ​​on the left and right sides of the embedded pile column 3 are recorded.

[0077] S5. The servo loading device applies a downward penetration force or an upward pull-out force to the embedded pile column 3, gradually loading from zero. The force sensor 72 and the displacement sensor collect and record data in real time until the embedded pile column 3 is sheared against the soil sample 9. The force sensor 72 records the penetration force value or the pull-out force value at the moment of shear failure. The embedded pile column 3 stops moving after moving 5 cm downward or upward. The displacement sensor collects the moving distance of the embedded pile column 3 and transmits the data to the electronic control unit in real time. The electronic control unit controls the servo cylinder 71.

[0078] Furthermore, during the processes of S4 and S5, the high-definition camera 5 records the microscopic flow mechanism of the soil samples 9 in the two shear boxes during the seepage process by shooting frame by frame, providing a reference for the shear study of the suction foundation side wall-soil interface. The pictures taken by the high-definition camera 5 are simulated by computer software using software to simulate the microscopic flow state of the soil sample 9 under the water circulation flow state and during the penetration or extraction of the suction foundation.

[0079] Parts not described in the present invention can be implemented by adopting or drawing on existing technologies.

[0080] Furthermore, the terms “first” and “second” are used for descriptive purposes only and should not be understood as indicating or implying relative importance.

[0081] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "up", "down", "front", "back", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0082] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. Suction-based penetration-extraction process interface shear strength test system, characterized by: It includes a workbench, an uncovered water tank, embedded piles, a symmetrical direct shear instrument, a servo loading device, a controllable seepage unit, a high-definition camera and an electronic control unit. The uncovered water tank is fixed on the workbench, the high-definition camera is placed on the front side of the uncovered water tank, and the symmetrical direct shear instrument is arranged on the inner side of the uncovered water tank, and its bottom is laterally slidably matched with the uncovered water tank; The symmetrical direct shear apparatus comprises a bottom plate, a top cover, a shear box 1 and a shear box 2, wherein the shear box 1 and the shear box 2 are both C-shaped shell structures, the shear box 1 and the shear box 2 are vertically relatively slidably arranged above the bottom plate, and the opening sides are positively corresponding, and the opposite sides of the two shear boxes are respectively connected to the corresponding side walls of the uncovered water tank through a lateral variable stress loading device; There are two top covers and they are arranged symmetrically on the left and right. The two top covers are respectively slidably matched with the tops of the shear box 1 and the shear box 2 in a horizontal direction. The embedded pile column is a columnar structure with a square cross section, and vertically penetrates the symmetrical direct shear apparatus and is slidably matched with it vertically. The front and rear sides of the embedded pile column are respectively always in contact with the shear box and can be slidably matched. The embedded pile column closes the opening side of the shear box. The controllable seepage unit includes a water bucket, which is connected to two top cover pipelines through a water inlet pipeline and a water outlet pipeline, and is communicated with the interior of two shear boxes respectively. The cavities inside the two shear boxes are communicated with the interior of the uncovered water tank through water permeable holes on the bottom plate respectively. The servo loading device is arranged above the uncovered water tank through a reaction beam. The servo loading device is equipped with a displacement sensor, and its telescopic end is connected to the upper end of the embedded pile column through a force sensor to drive the embedded pile column to penetrate downward or pull out upward; The test method of the shear strength of the interface during the suction foundation penetration-extraction process adopts the above-mentioned test system of the shear strength of the interface during the suction foundation penetration-extraction process, and the test method comprises the following steps: S1. After the test system is installed, the shear box 1 is adjusted to the left stop point of its travel, and the shear box 2 is adjusted to the right stop point of its travel. The servo loading device drives the embedded pile column to move vertically downward through the inner sides of the two shear boxes and out from the bottom of the base plate. The embedded pile column stops moving after reaching the predetermined position. S2. Fill water into the uncovered water tank. Stop filling water when the water level reaches 4 / 5 of the height of the uncovered water tank. Fix a high-definition camera in front of the uncovered water tank with the lens facing the uncovered water tank. S3, laying filter paper on the inner bottom of shear box 1 and shear box 2 respectively, adding soil samples into the cavities formed by shear box 1, shear box 2 and embedded piles respectively, until the soil samples fill the cavities on the left and right sides of the embedded piles, and laying the same filter paper on the upper surface of the soil samples; Afterwards, the two top covers move toward the middle to seal the tops of the shear box 1 and the shear box 2 respectively; S4, water is poured into the water bucket, and the water is pumped into the second shear box through the water inlet pipe. At the same time, the water in the first shear box is pumped into the water bucket through the water outlet pipe. The water in the water bucket circulates through the soil samples in the two shear boxes and the water in the uncovered water tank; After the internal seepage of shear box 1 and shear box 2 is stable, two lateral variable stress loading devices apply lateral forces to the two shear boxes respectively, and drive shear box 1 and shear box 2 to move toward the center. After the lateral forces applied by the soil samples on the left and right sides of the embedded pile column are stable, shear box 1 and shear box 2 stop moving, and the lateral force values ​​on the left and right sides of the embedded pile column are recorded. S5. The servo loading device applies downward penetration force or upward pull-out force to the embedded pile column, gradually loading from zero. The force sensor and displacement sensor collect and record data in real time until the embedded pile column is sheared and damaged with the soil sample. The embedded pile column stops moving after moving 5 cm downward or upward.

2. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 1 is characterized in that: The coverless water tank, shear box 1 and shear box 2 are all made of transparent acrylic material or fiberglass. The coverless water tank is a box structure with an open top, and its length, width and height are 0.5m×0.5m×1.0m respectively; Two slide rails are fixedly provided at the bottom of the uncovered water tank. The two slide rails are arranged in parallel, one in front of the other. Each slide rail is provided with at least two rollers. The rollers are installed at the bottom of the base plate through roller brackets. The base plate can move left and right relative to the uncovered water tank.

3. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 1 is characterized in that: A square opening matching the cross section of the embedded pile is provided in the middle of the bottom plate, and the lower end of the embedded pile can pass through the square opening and extend to the bottom of the bottom plate; There are two groups of water permeable holes, which are respectively located on the left and right sides of the square opening, and each group of water permeable holes includes a plurality of water permeable holes arranged in a square array.

4. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 1 is characterized in that: Two first slide grooves are opened on the upper surface of the bottom plate, and the two first slide grooves are arranged in parallel on the front and rear sides of shear box one and shear box two. A first guide slide block is provided at the lower end of the front and rear sides of each shear box, and each first guide slide block is located in the first slide groove on the same side and cooperates with the bottom plate in transverse sliding.

5. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 3 is characterized in that: The upper and lower ends of the shear box 1 and the shear box 2 are both flush end surfaces, and second slide grooves are provided on the front and rear outer side walls of the upper ends of the two shear boxes. The front and rear sides of the top cover are folded downward to form a folded edge, and the inner side of the folded edge is fixedly connected to the second guide slider slidably arranged in the second slide groove; The two top covers have rectangular notches on one side close to each other, and the two notches are positively opposite to each other. When the top covers are in a closed state, the two notches cooperate to form a square through-hole that matches the cross-section of the embedded pile column. During operation, the embedded pile column moves downward and penetrates through the square hole between the two top covers and passes through the square opening on the bottom plate. Each top cover keeps the top of the shear box at its lower end in a closed state.

6. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 1 is characterized in that: The reaction beam is a gate-shaped steel frame structure and spans across the left and right sides of the uncovered water tank, and its bottom is fixedly connected with the surface of the workbench by bolts; The servo loading device comprises a servo oil cylinder, the cylinder body of which is fixedly connected to the lower side of the top of the reaction beam, the lower end of its piston rod is connected to the top of the embedded pile column through a force sensor, and the displacement sensor and the force sensor are both connected to the electronic control unit for communication; When working, the servo cylinder provides force loading and displacement loading to the embedded piles, and the displacement loading rate is 0.001m / s~0.2m / s.

7. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 1 is characterized in that: The lateral variable stress loading device includes a group of vacuum air bags, each group of vacuum air bags includes a plurality of sub-air bags arranged adjacent to each other from top to bottom, the sub-air bags in the same group are interconnected and are equipped with an inflation device; Each group of vacuum air bags is equipped with an air pressure sensor, which is communicatively connected with the electronic control unit.

8. The test system for the interface shear strength of the suction base penetration-extraction process according to claim 1 is characterized in that: One end of the water inlet pipeline is connected to the water bucket, and the other end is connected to the joint on the right top cover. A vacuum pump 1 is arranged on the water inlet pipeline; One end of the water outlet pipeline is connected to the joint on the left top cover, and the other end is connected to the water bucket. A vacuum pump 2 is arranged on the water outlet pipeline, and the signal ends of the vacuum pumps 1 and 2 are respectively connected to the electronic control unit for communication.

9. The test system for the interface shear strength of the suction-based penetration-extraction process according to claim 1, characterized in that: During S4 and S5, the high-definition camera recorded the microscopic flow mechanism of the soil samples in the two shear boxes during the seepage process by shooting frame by frame.

Citation Information

Patent Citations

  • Method and symmetrical direct shear apparatus for in-situ testing of pile-soil interface shear strength

    CN108106949A

  • Visual interfacedirect shear apparatuscapable of taking temperature and seepage effect into account

    CN110455646A

  • Lateral confinement annular direct shear apparatus for simulating shear strength of pile-mudstone contact surface

    CN218212441U

  • Temperature control pile-soil interface direct shear test device

    CN105910920A

  • Energy pile pile-soil interface shear experimental apparatus and experimental method

    CN107727517A