Smart construction site safety management and control method and system based on multi-source data analysis

Through multi-source data analysis, combined with images of construction workers and weather information, comprehensive safety tips are provided, which solves the problem of frequent safety accidents at construction sites and improves the safety of construction workers.

CN117726482BInactive Publication Date: 2024-10-01THE SECOND CONSTR BRANCH OF QINGDAO METRO GRP CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310971337.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-03
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to the diverse types of work and complex cross-cutting operations at the construction site, safety accidents occur frequently, and it is difficult for existing technologies to effectively improve the personal safety of construction workers.

Method used

Adopting smart construction site safety management and control methods and systems based on multi-source data analysis, by acquiring the whole-body images and weather information of construction workers, using hierarchical clustering algorithms and convolutional neural networks to match and send safety prompt information, and providing comprehensive information based on weather factors safety tips.

Benefits of technology

It improves the accuracy of clustering and the comprehensiveness of safety prompts, quickly matches and sends safety prompt information, and enhances the personal safety of construction workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117726482B_ABST
    Figure CN117726482B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of smart construction site technology, and provides a smart construction site safety management and control method and system based on multi-source data analysis, the method comprising: obtaining a full-body image of a current construction worker and current weather information; determining first safety reminder information corresponding to the current construction worker according to the full-body image of the current construction worker; determining second safety reminder information corresponding to the current construction worker according to the current weather information; combining the first safety reminder information and the second safety reminder information to obtain a safety reminder information set, and sending the safety reminder information set to the current construction worker to remind the current construction worker to pay attention to safety. The method in the present invention can provide more comprehensive safety reminders, thereby improving the personal safety of construction workers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of smart construction sites, and in particular to a smart construction site safety management and control method and system based on multi-source data analysis. Background Art

[0002] At present, at the construction site, due to the large number of work types in each construction site and the cross-operation between them, the construction is very complicated. Therefore, at many construction sites, the work is dangerous and safety accidents often occur, such as falling objects injuring construction workers, construction workers accidentally falling, electric shock causing casualties to construction workers, etc. Safety accidents often occur, so how to improve the personal safety of construction workers is particularly important. Summary of the invention

[0003] The purpose of the present invention is to provide a smart construction site safety management method and system based on multi-source data analysis to improve the above-mentioned problems.

[0004] In order to achieve the above objectives, the present application provides the following technical solutions:

[0005] On the one hand, an embodiment of the present application provides a smart construction site safety management and control method based on multi-source data analysis, the method comprising:

[0006] Get full-body images of current construction workers and current weather information;

[0007] Determine the first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker; determine the second safety prompt information corresponding to the current construction worker according to the current weather information;

[0008] The first safety prompt information and the second safety prompt information are combined to obtain a safety prompt information set, and the safety prompt information set is sent to the current construction personnel to remind the current construction personnel to pay attention to safety.

[0009] In a second aspect, an embodiment of the present application provides a smart construction site safety management and control system based on multi-source data analysis, wherein the system includes an acquisition module, a determination module and a sending module.

[0010] An acquisition module is used to obtain the full-body image of the current construction personnel and the current weather information;

[0011] A determination module, configured to determine first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker; and determine second safety prompt information corresponding to the current construction worker according to the current weather information;

[0012] The sending module is used to collect the first safety prompt information and the second safety prompt information to obtain a safety prompt information collection, and send the safety prompt information collection to the current construction personnel to remind the current construction personnel to pay attention to safety.

[0013] In a third aspect, the embodiment of the present application provides a smart construction site safety management and control device based on multi-source data analysis, the device comprising a memory and a processor. The memory is used to store a computer program; the processor is used to implement the steps of the smart construction site safety management and control method based on multi-source data analysis when executing the computer program.

[0014] In a fourth aspect, an embodiment of the present application provides a readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned smart construction site safety management and control method based on multi-source data analysis are implemented.

[0015] The beneficial effects of the present invention are:

[0016] The present invention first adjusts the parameters of the hierarchical clustering algorithm through a series of historical full-body images, and then uses the hierarchical clustering algorithm with adjusted parameters to perform clustering operations. This method can improve the accuracy of clustering. In addition, after clustering, each clustering result is matched with corresponding safety prompt information. After obtaining the head image of the current construction worker, a similarity calculation is directly performed. In this way, the clustering result to which the current construction worker currently belongs can be quickly determined, and then the corresponding safety prompt information can be quickly matched. In addition to performing a safety analysis on the head image, the present invention also takes into account the current weather factors, and obtains the safety prompt information again for the weather factors. Finally, the final safety prompt information is obtained through the two factors of face information and weather information. Compared with a single safety prompt information, the method in the present invention can provide more comprehensive safety prompts, thereby improving the personal safety of construction workers.

[0017] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0019] Figure 1 It is a schematic diagram of the process of the smart construction site safety management and control method based on multi-source data analysis described in an embodiment of the present invention;

[0020] Figure 2 It is a schematic diagram of the structure of a smart construction site safety management and control device based on multi-source data analysis described in an embodiment of the present invention;

[0021] Figure 3 It is a schematic diagram of the structure of the smart construction site safety management and control equipment based on multi-source data analysis described in an embodiment of the present invention. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0023] It should be noted that similar reference numerals or letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0024] Example 1

[0025] like Figure 1 As shown, this embodiment provides a smart construction site safety management and control method based on multi-source data analysis, which includes step S1, step S2 and step S3.

[0026] Step S1, obtaining a full-body image of the current construction worker and current weather information;

[0027] In this step, construction personnel can be understood as the staff who work at the construction site every day, the leaders who inspect the progress of the work, or the personnel who enter the construction site;

[0028] Step S2: determining first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker; and determining second safety prompt information corresponding to the current construction worker according to the current weather information;

[0029] In this step, the first safety prompt information corresponding to the current construction worker is determined according to the full-body image of the current construction worker, and the specific implementation steps include steps S21 to S23;

[0030] Step S21, obtaining historical full-body images of a plurality of historical construction workers; extracting head images from the historical full-body images to obtain a first image, inputting the first image into a convolutional neural network, and obtaining a first feature vector output by a fully connected layer of the convolutional neural network;

[0031] In this step, in addition to using convolutional neural networks for feature extraction, methods such as principal component analysis can also be used for feature extraction;

[0032] Step S22: clustering the plurality of first images using a hierarchical clustering algorithm and the first eigenvector to obtain a plurality of first clustering results, grouping all first images belonging to the first clustering results to obtain a first image set, and calculating the mean of the coordinates of the first eigenvector corresponding to each first image in the first image set to obtain a second eigenvector;

[0033] In this step, in addition to using the hierarchical clustering algorithm for clustering, the DBSCAN algorithm and the K-means clustering algorithm can also be used; the second eigenvector in this step can be understood as the center of the class;

[0034] Step S23, adjusting the parameters of the hierarchical clustering algorithm according to the second feature vector and all the first images to obtain the hierarchical clustering algorithm after adjusting the parameters, and obtaining the first safety prompt information corresponding to the current construction worker according to the hierarchical clustering algorithm after adjusting the parameters and the full-body image of the current construction worker.

[0035] In this step, when adjusting parameters, for example, the distance threshold preset in the hierarchical clustering algorithm may be adjusted; the specific implementation steps of this step include step S231 and step S232;

[0036] Step S231, calculating the distance between each of the first eigenvectors and the second eigenvector to obtain a distance result, taking the first eigenvector corresponding to the largest distance result as the third eigenvector, combining the second eigenvector and the third eigenvector to obtain a combination matrix, calculating the covariance matrix of the combination matrix, and calculating the fourth eigenvector, the fourth eigenvector being the eigenvector of the covariance matrix;

[0037] This step can be understood as: for a first clustering result, first calculate the second eigenvector corresponding to the first clustering result, then calculate the distance between each first eigenvector in the first clustering result and the second eigenvector, and use the first eigenvector with the largest distance as the third eigenvector;

[0038] Step S232: adjust the parameters of the hierarchical clustering algorithm according to the fourth eigenvector and all the first images to obtain the hierarchical clustering algorithm after adjusting the parameters; obtain the first safety prompt information corresponding to the current construction personnel according to the hierarchical clustering algorithm after adjusting the parameters and the full-body image of the current construction personnel. The specific implementation steps of this step include step S2321 and step S2322;

[0039] Step S2321: using a preset evaluation model to evaluate the accuracy of each first clustering result, adjusting the parameters of the hierarchical clustering algorithm according to the evaluation result, and when the preset standard is reached, stopping the parameter adjustment to obtain a hierarchical clustering algorithm after adjusting the parameters; clustering the plurality of first images using the hierarchical clustering algorithm after adjusting the parameters to obtain a plurality of second clustering results, and matching a safety prompt information for each of the second clustering results;

[0040] In this step, after the accuracy of each clustering result is evaluated by using the evaluation model, the parameters of the hierarchical clustering algorithm are adjusted. The clustering accuracy of the adjusted hierarchical clustering algorithm is higher. In this way, the precision and accuracy of clustering can be improved.

[0041] At the same time, the safety prompt information corresponding to each second clustering result is uploaded by personnel based on experience;

[0042] At the same time, in this step, the accuracy of each first clustering result is evaluated using a preset evaluation model, and the parameters of the hierarchical clustering algorithm are adjusted according to the evaluation results. When the preset standard is reached, the parameter adjustment is stopped to obtain the hierarchical clustering algorithm after the adjustment of the parameters, which specifically includes step S23211 and step S23212:

[0043] Step S23211, obtaining a sample image, performing clustering processing on the sample image to obtain a third clustering result, marking each of the third clustering results with a symbol, where different symbols represent different accuracies, including accurate, generally accurate, and inaccurate, and calculating a covariance matrix corresponding to each of the third clustering results, and then calculating an eigenvector of the covariance matrix corresponding to each of the third clustering results, and recording it as a sixth eigenvector;

[0044] In this step, the sample image may be the above-mentioned historical full-body image or other images; when marked with symbols, for example, the symbol A may be used to represent accuracy, B may represent general accuracy, and C may represent inaccuracy; when clustering, a hierarchical clustering algorithm may be selected or other conventional algorithms may be selected; at the same time, in this step, the covariance matrix corresponding to each of the third clustering results may be calculated according to the above-mentioned method for calculating the covariance matrix corresponding to each of the first clustering results; in addition, the eigenvector of the covariance matrix may be calculated according to conventional methods;

[0045] Step S23212, taking the sixth eigenvector corresponding to each third clustering result as input and the annotation information corresponding to each third clustering result as output to train the convolutional neural network model to obtain an evaluation model, wherein, during training, for each training sample, in the preset convolution kernel of the convolutional neural network model, a width factor is introduced when performing a convolution operation on the input feature parameters for optimization to obtain a first calculation result; for each channel of the output feature parameter, a convolution operation is performed with a convolution kernel of a preset size, and a split factor is used for optimization to obtain a second calculation result; an evaluation model is obtained based on the second calculation result and the first calculation result, and a hierarchical clustering algorithm with adjusted parameters is obtained based on the evaluation model.

[0046] In this step, when the 1×1 convolution kernel of the convolutional neural network model performs convolution operation on the input feature parameters, a width factor is introduced for optimization. The width factor can be given a value when the input parameters are small, which can make the model smaller and the calculation speed faster in a specific case. The specific value can be customized according to user needs. For each channel of the output feature parameter, a 3×3 convolution kernel is used for convolution operation, and the split factor is used for optimization. The value of the split factor can be customized according to user needs. The split factor will reduce the internal features of each layer in the input layer by this factor, such as the number of precise digits of a number, thereby greatly releasing the storage space of the neural network.

[0047] Meanwhile, in this step, an evaluation model is obtained according to the second calculation result and the first calculation result, and specific implementation steps of obtaining the hierarchical clustering algorithm after adjusting parameters according to the evaluation model include step S232121 and step S232122;

[0048] Step S232121: splice the first calculation result and the second calculation result, calculate the correlation coefficient between the splicing result and the annotation information corresponding to each third clustering result, and when the correlation coefficient is greater than a first preset threshold, stop training to obtain an evaluation model;

[0049] In this step, the first preset threshold can be set by the user, for example, it can be 0.9, 0.8, 0.85, etc.;

[0050] Step S232122: input each of the fourth eigenvectors into the evaluation model, obtain the labeling information corresponding to each of the fourth eigenvectors, interpret each of the labeling information, and when the number of accurate labeling information in all the labeling information is greater than the second preset threshold, stop adjusting the parameters of the hierarchical clustering algorithm to obtain the hierarchical clustering algorithm after adjusting the parameters.

[0051] This step can be understood as, for example, after interpreting the annotation information corresponding to the 5 fourth eigenvectors, 4 of them are accurate, and the second preset threshold is 3, then it is proved that the clustering is accurate, and the parameters at this time can be determined to obtain the hierarchical clustering algorithm after adjusting the parameters. If the requirements are not met, then adjust the parameters and perform clustering again until the above conditions are met;

[0052] Step S2322, extract the head image from the full-body image of the current construction worker to obtain a second image, extract the fifth eigenvector of the second image, calculate the similarity between the fifth eigenvector and each of the first eigenvectors, and use the second clustering result of the first eigenvector with the greatest similarity as the clustering result to which the fifth eigenvector belongs, and use the safety prompt information corresponding to the clustering result to which the fifth eigenvector belongs as the first safety prompt information corresponding to the current construction worker.

[0053] In this step, after obtaining the head image of the current construction worker, the similarity can be directly calculated, and then the corresponding class can be found. This method can quickly locate the class corresponding to the current construction worker, and then quickly read out the corresponding safety prompt information;

[0054] For example, by calculating that the current construction worker belongs to the middle-aged woman class, and the corresponding safety tips for this class include that it is best not to wear high heels and slippers and to wear a helmet correctly; then this safety tip information will be used as the first safety tip information for the current construction worker;

[0055] The above steps are safety analysis for the head image. In addition to analyzing the head image, this embodiment also comprehensively considers the current weather factors, specifically including step S24 and step S25;

[0056] Step S24, obtaining historical weather information, wherein the historical weather information includes temperature information and wind speed information, combining the temperature information and the wind speed information to obtain a combination parameter, and matching the combination parameter with corresponding safety prompt information;

[0057] Step S25, training a convolutional neural network according to the combination parameter and the safety information corresponding to the combination parameter to obtain a first model, inputting the current weather information into the first model to obtain the safety prompt information corresponding to the current weather information, and recording the safety prompt information corresponding to the current weather information as second safety prompt information.

[0058] Step S3: collect the first safety reminder information and the second safety reminder information to obtain a safety reminder information collection, and send the safety reminder information collection to the current construction personnel to remind the current construction personnel to pay attention to safety.

[0059] In this step, the safety reminder information set can be sent to the construction workers' mobile phones or other devices for the current construction workers to view, so that the construction workers can make safety preparations according to the safety reminder information to improve their personal safety.

[0060] Through the above steps, it can be concluded that this embodiment first adjusts the parameters of the hierarchical clustering algorithm through a series of historical full-body images, and then uses the hierarchical clustering algorithm after parameter adjustment to perform clustering operations. This method can improve the accuracy of clustering; in addition, after clustering, the corresponding safety prompt information is matched for each clustering result; when the head image of the current construction worker is obtained, the similarity calculation is directly performed. In this way, the clustering result to which the current construction worker currently belongs can be quickly determined, and then the corresponding safety prompt information can be quickly matched; in addition to performing a safety analysis on the head image, this embodiment also takes into account the current weather factors, and obtains the safety prompt information again for the weather factors, and finally obtains the final safety prompt information through the two factors of face information and weather information. Compared with a single safety prompt information, the method in this embodiment can provide more comprehensive safety prompts, thereby improving the personal safety of construction workers.

[0061] Example 2

[0062] like Figure 2 As shown, this embodiment provides a smart construction site safety management and control system based on multi-source data analysis, and the system includes an acquisition module 701, a determination module 702 and a sending module 703.

[0063] The acquisition module 701 is used to acquire the full-body image of the current construction worker and the current weather information;

[0064] The determination module 702 is used to determine the first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker; and determine the second safety prompt information corresponding to the current construction worker according to the current weather information;

[0065] The sending module 703 is used to collect the first safety prompt information and the second safety prompt information to obtain a safety prompt information collection, and send the safety prompt information collection to the current construction personnel to remind the current construction personnel to pay attention to safety.

[0066] It should be noted that, regarding the system in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.

[0067] Example 3

[0068] Corresponding to the above method embodiments, the embodiments of the present disclosure also provide smart construction site safety management and control equipment based on multi-source data analysis. The smart construction site safety management and control equipment based on multi-source data analysis described below and the smart construction site safety management and control method based on multi-source data analysis described above can be referenced to each other.

[0069] Figure 3 FIG. 8 is a block diagram of a smart construction site safety management and control device 800 based on multi-source data analysis according to an exemplary embodiment. Figure 3 As shown, the smart construction site safety management and control device 800 based on multi-source data analysis may include: a processor 801, a memory 802. The smart construction site safety management and control device 800 based on multi-source data analysis may also include one or more of a multimedia component 803, an I / O interface 804, and a communication component 805.

[0070] The processor 801 is used to control the overall operation of the smart construction site safety management and control device 800 based on multi-source data analysis to complete all or part of the steps in the smart construction site safety management and control method based on multi-source data analysis. The memory 802 is used to store various types of data to support the operation of the smart construction site safety management and control device 800 based on multi-source data analysis. These data may include, for example, instructions for any application or method operating on the smart construction site safety management and control device 800 based on multi-source data analysis, as well as application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 802 or sent via the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the smart construction site safety management and control device 800 based on multi-source data analysis and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.

[0071] In an exemplary embodiment, the smart construction site safety management and control device 800 based on multi-source data analysis can be implemented by one or more application-specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned smart construction site safety management and control method based on multi-source data analysis.

[0072] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned smart construction site safety management and control method based on multi-source data analysis are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions can be executed by the processor 801 of the smart construction site safety management and control device 800 based on multi-source data analysis to complete the above-mentioned smart construction site safety management and control method based on multi-source data analysis.

[0073] Example 4

[0074] Corresponding to the above method embodiments, the embodiments of the present disclosure also provide a readable storage medium. The readable storage medium described below and the smart construction site safety management and control method based on multi-source data analysis described above can be referenced to each other.

[0075] A readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the smart construction site safety management and control method based on multi-source data analysis of the above-mentioned method embodiment.

[0076] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.

[0077] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. Smart construction site safety management and control method based on multi-source data analysis, It is characterized in that include: Get full-body images of current construction workers and current weather information; Determine the first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker; determine the second safety prompt information corresponding to the current construction worker according to the current weather information; The first safety prompt information and the second safety prompt information are combined to obtain a safety prompt information set, and the safety prompt information set is sent to the current construction personnel to remind the current construction personnel to pay attention to safety; Determining first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker includes: Acquire historical full-body images of a plurality of historical construction workers; extract the head image from the historical full-body image to obtain a first image, input the first image into a convolutional neural network, and obtain a first feature vector output by a fully connected layer of the convolutional neural network; Clustering the plurality of first images using a hierarchical clustering algorithm and the first eigenvector to obtain a plurality of first clustering results, grouping all first images belonging to the first clustering results to obtain a first image set, and calculating the mean of the coordinates of the first eigenvector corresponding to each first image in the first image set to obtain a second eigenvector; The parameters of the hierarchical clustering algorithm are adjusted according to the second feature vector and the first feature vectors of all the first images to obtain the hierarchical clustering algorithm with adjusted parameters, and the first safety prompt information corresponding to the current construction worker is obtained according to the hierarchical clustering algorithm with adjusted parameters and the full-body image of the current construction worker.

2. According to the smart construction site safety management and control method based on multi-source data analysis according to claim 1, It is characterized in that The parameters of the hierarchical clustering algorithm are adjusted according to the second feature vector and the first feature vectors of all the first images to obtain the hierarchical clustering algorithm after the parameters are adjusted, and the first safety prompt information corresponding to the current construction worker is obtained according to the hierarchical clustering algorithm after the parameters are adjusted and the full-body image of the current construction worker, including: Calculate the distance between each of the first eigenvectors and the second eigenvector to obtain a distance result, use the first eigenvector corresponding to the largest distance result as the third eigenvector, combine the second eigenvector and the third eigenvector to obtain a combination matrix, calculate the covariance matrix of the combination matrix, and calculate the fourth eigenvector, the fourth eigenvector being the eigenvector of the covariance matrix; The parameters of the hierarchical clustering algorithm are adjusted according to the fourth eigenvector and all of the first images to obtain the hierarchical clustering algorithm after parameter adjustment; the first safety prompt information corresponding to the current construction worker is obtained according to the hierarchical clustering algorithm after parameter adjustment and the full-body image of the current construction worker.

3. According to the smart construction site safety management and control method based on multi-source data analysis according to claim 2, It is characterized in that Adjusting parameters of a hierarchical clustering algorithm according to the fourth eigenvector and all of the first images to obtain a hierarchical clustering algorithm after adjusting parameters; The first safety prompt information corresponding to the current construction worker is obtained according to the hierarchical clustering algorithm after adjusting the parameters and the full-body image of the current construction worker, including: The accuracy of each first clustering result is evaluated by using a preset evaluation model, and the parameters of the hierarchical clustering algorithm are adjusted according to the evaluation results. When the preset standard is reached, the parameter adjustment is stopped to obtain the hierarchical clustering algorithm after the parameter adjustment; the plurality of first images are clustered by using the hierarchical clustering algorithm after the parameter adjustment to obtain a plurality of second clustering results, and a safety prompt information is matched for each of the second clustering results; Extract the head image from the full-body image of the current construction worker to obtain a second image, extract the fifth eigenvector of the second image, calculate the similarity between the fifth eigenvector and each of the first eigenvectors, use the second clustering result of the first eigenvector with the greatest similarity as the clustering result to which the fifth eigenvector belongs, and use the safety prompt information corresponding to the clustering result to which the fifth eigenvector belongs as the first safety prompt information corresponding to the current construction worker.

4. According to the smart construction site safety management and control method based on multi-source data analysis according to claim 3, It is characterized in that The accuracy of each first clustering result is evaluated by using a preset evaluation model, and the parameters of the hierarchical clustering algorithm are adjusted according to the evaluation results. When the preset standard is reached, the parameter adjustment is stopped to obtain the hierarchical clustering algorithm after the adjusted parameters, including: Acquire a sample image, perform clustering processing on the sample image to obtain a third clustering result, annotate each of the third clustering results with a symbol, where different symbols represent different accuracies, and the different accuracies include accurate, generally accurate, and inaccurate, and simultaneously calculate a covariance matrix corresponding to each of the third clustering results, and then calculate an eigenvector of the covariance matrix corresponding to each of the third clustering results, and record it as a sixth eigenvector; The sixth eigenvector corresponding to each third clustering result is used as input, and the annotation information corresponding to each third clustering result is used as output to train the convolutional neural network model to obtain an evaluation model, wherein, during the training, for each training sample, in the preset convolution kernel of the convolutional neural network model, a width factor is introduced when performing a convolution operation on the input feature parameters for optimization to obtain a first calculation result; a convolution operation is performed on each channel of the output feature parameters using a convolution kernel of a preset size, and a split factor is used for optimization to obtain a second calculation result; an evaluation model is obtained based on the second calculation result and the first calculation result, and a hierarchical clustering algorithm with adjusted parameters is obtained based on the evaluation model.

5. According to the smart construction site safety management and control method based on multi-source data analysis according to claim 4, It is characterized in that Obtaining an evaluation model according to the second calculation result and the first calculation result, and obtaining a hierarchical clustering algorithm after adjusting parameters according to the evaluation model, including: The first calculation result and the second calculation result are spliced ​​together, and a correlation coefficient between the spliced ​​result and the annotation information corresponding to each third clustering result is calculated, and when the correlation coefficient is greater than a first preset threshold, training is stopped to obtain an evaluation model; Each of the fourth eigenvectors is input into the evaluation model to obtain the labeling information corresponding to each of the fourth eigenvectors, and each of the labeling information is interpreted. When the number of accurate labeling information in all the labeling information is greater than a second preset threshold, the parameters of the hierarchical clustering algorithm are stopped to obtain the hierarchical clustering algorithm after the parameters are adjusted.

6. According to the smart construction site safety management and control method based on multi-source data analysis according to claim 1, It is characterized in that Determining the second safety prompt information corresponding to the current construction personnel according to the current weather information includes: Acquire historical weather information, the historical weather information including temperature information and wind speed information, combine the temperature information and the wind speed information to obtain a combination parameter, and match the combination parameter with corresponding safety prompt information; A convolutional neural network is trained according to the combination parameter and the safety information corresponding to the combination parameter to obtain a first model, the current weather information is input into the first model to obtain the safety prompt information corresponding to the current weather information, and the safety prompt information corresponding to the current weather information is recorded as second safety prompt information.

7. Smart construction site safety management and control system based on multi-source data analysis, It is characterized in that include: An acquisition module is used to obtain the full-body image of the current construction personnel and the current weather information; A determination module, configured to determine first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker; and determine second safety prompt information corresponding to the current construction worker according to the current weather information; A sending module, used for collecting the first safety prompt information and the second safety prompt information to obtain a safety prompt information collection, and sending the safety prompt information collection to the current construction personnel to remind the current construction personnel to pay attention to safety; Determining first safety prompt information corresponding to the current construction worker according to the full-body image of the current construction worker includes: Acquire historical full-body images of a plurality of historical construction workers; extract the head image from the historical full-body image to obtain a first image, input the first image into a convolutional neural network, and obtain a first feature vector output by a fully connected layer of the convolutional neural network; Clustering the plurality of first images using a hierarchical clustering algorithm and the first eigenvector to obtain a plurality of first clustering results, grouping all first images belonging to the first clustering results to obtain a first image set, and calculating the mean of the coordinates of the first eigenvector corresponding to each first image in the first image set to obtain a second eigenvector; The parameters of the hierarchical clustering algorithm are adjusted according to the second feature vector and the first feature vectors of all the first images to obtain the hierarchical clustering algorithm with adjusted parameters, and the first safety prompt information corresponding to the current construction worker is obtained according to the hierarchical clustering algorithm with adjusted parameters and the full-body image of the current construction worker.

Citation Information

Patent Citations

  • Safety control method and system for fault processing operation site of power utilization acquisition equipment

    CN111445106A

  • Equipment energy-saving control method and device, equipment and readable storage medium

    CN116152746A

  • Construction safety monitoring method based on construction site

    CN116311088A