A distribution network-data center collaborative planning method and model solving method thereof

By constructing a dual Stackelberg game model to optimize the collaborative planning of the distribution network and data center, the potential role of data load in data center planning and the problem of collaborative planning not being considered are solved, and efficient collaboration between the data center and the distribution network is achieved. Decision-making improves economic and low-carbon benefits.

CN117829450BActive Publication Date: 2024-10-11JINGHAI ELECTRIC POWER SUPPLY COMPANY OF STATE GRID TIANJIN ELECTRIC POWER +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311569827.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-23
Publication Date
2024-10-11
Estimated Expiration
2043-11-23

AI Technical Summary

Technical Problem

Existing research fails to effectively consider the potential role of data load as a flexible resource in data center planning and operation, ignores the collaborative planning of data centers and distribution networks, and fails to formulate reasonable incentive mechanisms and pricing strategies to guide data loads to participate in data Center for demand response.

Method used

Construct a dual Stackelberg game model with distribution network, data center and data users as the main body. Through internal and external two-level game decomposition, optimize the distribution network expansion configuration, data center location and equipment configuration, and formulate demand response incentive prices to maximize Benefits for all parties.

Benefits of technology

It improves the scientificity and effectiveness of joint planning and decision-making between the distribution network and the data center, promotes the low-carbon operation and economic benefits of the data center, and optimizes the power supply and power consumption structure through data load demand response.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117829450B_ABST
    Figure CN117829450B_ABST
Patent Text Reader

Abstract

The present invention provides a distribution network-data center collaborative planning method, including constructing a dual Stackelberg game model with distribution network, data center and data users as the main body; dividing the game into two layers, inner and outer, according to the interactive relationship between each level; in the outer layer game, the distribution network acts as a leader and the data center operator acts as a follower; in the inner layer game, the data center acts as a leader and the data load aggregator acts as a follower. The present invention also provides a solution method for its dual Stackelberg game model. The present invention fully considers the demand response of data load and the interactive relationship of multi-subject game, and can improve the scientificity and effectiveness of the joint planning decision-making of distribution network and data center.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of energy intelligent planning, and in particular relates to a distribution network-data center collaborative planning method and a model solving method thereof. Background Art

[0002] In recent years, driven by the booming development of cloud computing, e-commerce and other application technologies, data centers (DC) have shown a rapid development trend. However, with the surge in the scale of data centers, their huge electricity consumption will bring high electricity bills to data center operators (DCOs), and will also have an adverse impact on the power supply, line capacity and voltage stability of the distribution network.

[0003] At present, experts and scholars' research on data centers mostly focuses on improving internal energy efficiency and its economic operation. Existing research determines the operation strategy of data centers based on the key factors affecting the benefits of data centers and the availability of internal resources (such as servers, cooling systems, distributed renewable energy, etc.); or enables data centers to participate in the operation and management of power grids by using the potential of regulating data loads in terms of time distribution and processing requirements.

[0004] In addition, only a small number of studies have promoted the low-carbon operation and economic benefits of data centers from the perspective of system planning through overall management of data center layout planning and operation scheduling.

[0005] There are currently three issues in the planning research:

[0006] (1) Some studies only involve traditional data center supply-side resource planning based on equipment optimization configuration, and do not consider the potential role of data load as a flexible resource in data center planning and operation.

[0007] (2) Existing research rarely studies the coordinated planning of data centers and distribution networks. In practice, the site selection and equipment capacity configuration of data centers have a crucial impact on the safe and stable operation and expansion planning of distribution networks.

[0008] (3) To simplify the problem, most existing studies assume that data center operators can directly dispatch and control data loads, ignoring the interactive response between terminal data users and data centers. However, in practice, the planning method that directly takes data loads as direct-controlled loads to participate in data center operation scheduling is not applicable. It is necessary to formulate reasonable incentive mechanisms and pricing strategies to guide data loads to actively participate in data center demand response (DC demand response, DC-DR).

[0009] Based on the above background, considering the interactive game relationship between multiple subjects in the market environment, exploring the distribution network-data center collaborative planning method taking into account the data load demand response potential has important practical value and engineering significance. Summary of the invention

[0010] To solve the above problems, the present invention proposes a distribution network-data center collaborative planning method considering data load demand response, and constructs it into a dual Stackelberg game model with distribution network, data center and data users as the main bodies, so as to improve the scientificity and effectiveness of the joint planning decision-making of distribution network and data center.

[0011] The present invention is implemented by the following technical solutions:

[0012] A distribution network-data center collaborative planning method based on data load demand response, comprising:

[0013] Construct a dual Stackelberg game model with distribution network, data center and data users as the main body; divide the game into two layers, inner and outer, according to the interaction relationship between each layer;

[0014] In the outer game, the distribution network, as the leader, takes maximizing the comprehensive benefits of the distribution network as the optimization goal, determines the expansion configuration of the distribution network, the design of the electricity price of the data center node, and the output of renewable energy; the data center operator, as the follower, takes maximizing economic benefits as the goal, determines the location of the data center, equipment configuration capacity, and operation strategy;

[0015] In the inner game, data centers, as leaders, set demand response incentive prices; data load aggregators, as followers, aim to maximize user benefits and determine the adjustment strategy for data load task requirements;

[0016] The mathematical form of the dual Stackelberg game model is a three-level programming model:

[0017] The upper layer is the distribution network expansion planning and spatiotemporal pricing model

[0018] The middle layer is the data center investment planning and data service pricing model

[0019] The lower layer is the data user demand response model

[0020] Further,

[0021] Before constructing the double Stackelberg game model,

[0022] The uncertainty of influencing factors is modeled using stochastic methods to provide probabilistic scenarios for the construction of subsequent models.

[0023] Further,

[0024] Influencing factors include data load demand, wind power output and conventional power load demand.

[0025] Further,

[0026] The truncated Gaussian distribution is used to describe the uncertainty of data load demand and power load demand of each node in the distribution network, where the uncertainty of data load demand is expressed as

[0027]

[0028] Where: s represents the operating scenario; Ω S represents the corresponding set of running scenarios s; t represents the running time; Ω T represents the corresponding set of running time t; Indicates data load requirements; represents the predicted value of data load demand; Indicates the standard deviation of data load requirements; Represents the upper limit of random fluctuations in data load demand; Represents the lower bound of random fluctuations in data load demand;

[0029] The uncertainty expression of the power load demand at each node of the distribution network is:

[0030]

[0031] Where: g is the power load node; Ω G is the corresponding set of power load nodes g; Represents the node power load demand in the distribution network; represents the predicted value of the node power load demand; represents the standard deviation of the node power load demand; Represents the upper limit of random fluctuations in data load demand; Represents the lower bound of random fluctuations in data load demand.

[0032] Further,

[0033] Using Weibull distribution model to describe the uncertainty of wind power output

[0034]

[0035]

[0036] Where: Indicates the maximum output power of the fan, P NWT represents the configuration capacity of the fan; k represents the shape parameter; c represents the scale parameter; v in Indicates the cut-in wind speed of the fan, v out Indicates the fan cut-out wind speed, v rate Indicates the rated wind speed of the fan; v s,t Indicates the actual wind speed.

[0037] Further,

[0038] Before building the double Stackelberg game model, determine the data center characteristic model;

[0039] The data center characteristic model includes equipment energy consumption model and data load model;

[0040] The equipment energy consumption model includes the server energy consumption model and the refrigeration equipment energy consumption model;

[0041] The server energy consumption is expressed by equations (5)-(8):

[0042]

[0043]

[0044]

[0045]

[0046] Formula (5) represents the power consumption characteristics of the server, Formulas (6)-(7) represent the utilization constraints of the server CPU, and Formula (8) represents the power-on quantity constraints of the server;

[0047] Where: Indicates the operating power of the server; Indicates CPU utilization; P ser_peak Represents the peak power of a single server; P ser_idle Indicates the silent power of a single server; Indicates the number of servers powered on; μ ser Indicates the service rate of a single server; U P,max Indicates the upper limit of CPU utilization; Indicates the actual data load processing requirements of the data center; n ser Indicates the number of server configurations; θ ser Indicates the server backup factor;

[0048] The load factor is used to describe the comprehensive energy efficiency of the refrigeration equipment. The operating power consumption of the refrigeration equipment is expressed as

[0049]

[0050]

[0051] Where: Indicates the operating power of the refrigeration equipment; Indicates the comprehensive load factor of the refrigeration equipment; P Ncool Indicates the configuration capacity of the cooling equipment.

[0052] Further,

[0053] Based on the interactive response method between the data center and the data load, the data load is divided into: transferable load, reducible load and rigid load.

[0054] Further,

[0055] The transferable load is expressed by equations (11)-(14)

[0056]

[0057]

[0058]

[0059]

[0060] Among them, formula (11) represents the load processing requirement of the transferable load, formula (12) represents the capacity proportion of the transferable load, and formulas (13)-(14) represent the time transfer characteristic constraints of the transferable load;

[0061] Where: Data load requirements indicating load that can be shifted before demand response; Data load requirements representing load that can be shifted after demand response; represents the transfer amount of the transferable load between time t and t'; represents the transfer amount of the transferable load between time t" and t; represents the data processing deadline of the transferable load at time t; Indicates the proportion of transferable load in the data user cluster; Represents the raw data load demand of the data load aggregator;

[0062] The load that can be reduced is expressed by equations (15)-(17):

[0063]

[0064]

[0065]

[0066] Where: Data load requirements indicating load that can be reduced before demand response; Data load requirements indicating load reduction that can be achieved after demand response; Indicates the load reduction amount by which the load can be reduced; Indicates that the proportion of load in the data user cluster can be reduced;

[0067] The rigid load is expressed by equation (18):

[0068]

[0069] Where: Data load requirements representing rigid loads.

[0070] Further,

[0071] Based on equations (11)-(18), after considering the data center demand response, the actual data load processing demand Expressed as

[0072]

[0073] Further,

[0074] Constructing distribution network expansion planning and spatiotemporal pricing model

[0075] Set the objective function to

[0076]

[0077] Where: profit Grid Represents the comprehensive benefit of the distribution network; N y represents the number of operating days in a year; ρ s Represents the probability corresponding to the running scenario s; represents the system operation benefit under operation scenario s; C Grid,inv Indicates the system investment cost.

[0078] Further,

[0079] in,

[0080] By annualizing each cost item, the system investment cost can be expressed as

[0081]

[0082] Where: ss represents the distribution transformer; Ω SS represents the corresponding set of distribution transformers ss; ij represents the distribution branch; Ω IJrepresents the corresponding set of distribution branches ij; m represents the type of distribution line to be selected; Ω M represents the corresponding set of the types of distribution lines to be selected m; δ TG represents the capital recovery factor of the distribution transformer, δ LN represents the capital recovery factor of the distribution line, δ TG and δ LN The mathematical expressions are Where ν represents the service life of each device, represents the discount rate; c TG It represents the unit investment cost of distribution transformer; It represents the unit investment cost of distribution lines; Indicates the expansion capacity of the distribution transformer; Indicates the total length of the distribution branch ij; A 0-1 variable indicating the expansion of the distribution branch ij using line m;

[0083] The system operation benefit is expressed as

[0084]

[0085] Where: represents the operating income of the distribution network; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the carbon emission cost of the system; represents the system’s wind curtailment cost;

[0086] The system operating income is expressed as:

[0087]

[0088] Where: h represents the node of the data center; Ω H represents the corresponding set of nodes h invested in the data center; Indicates the amount of electricity sold by the system to electricity users; Indicates the amount of electricity sold by the system to the data center; It indicates the price of electricity sold by the distribution network to ordinary electricity users; Indicates whether node h is a node to be built in the data center; Indicates the real-time node electricity price sold to data center operators by the distribution network at each node to be built;

[0089] The system maintenance cost is expressed as

[0090]

[0091] Where: It represents the unit maintenance cost of the distribution branch after capacity expansion; represents the unit maintenance cost of the distribution branch without capacity expansion; c TGm represents the unit maintenance cost of distribution transformers; Indicates the original capacity of the distribution transformer;

[0092] The system's electricity purchase cost from the external grid is expressed as

[0093]

[0094] Where: Indicates that the system purchases electricity from the external network; Indicates the price of electricity purchased by the system from the external network;

[0095] The system carbon emission cost is expressed as

[0096]

[0097] Where: c cm represents the unit carbon emission cost; e TPG represents the carbon emission coefficient of the external power grid;

[0098] The system wind curtailment cost is expressed as

[0099]

[0100] Where: Indicates the actual output power of the wind turbine; c aban It represents the unit wind curtailment cost of the wind farm.

[0101] Further,

[0102] Determine the constraints of the objective function, including investment constraints, operation constraints, wind farm constraints and power constraints.

[0103] Further,

[0104] Investment constraints are used to determine the expansion capacity of distribution transformers, the type of distribution lines that need to be expanded, and the real-time node electricity price at which the distribution network sells electricity to data center operators.

[0105]

[0106]

[0107]

[0108] Formula (28) represents the maximum configuration capacity constraint of the distribution transformer; Formula (29) represents the selection constraint of the distribution line, that is, each distribution branch can only select one type of line for expansion; Formula (30) represents the real-time node electricity price sold by the distribution network to the data center operator;

[0109] Where: S TG,max Indicates the maximum expansion capacity of the distribution transformer; DC,max represents the upper limit of the price of electricity sold by the distribution network to the data center operator; DC,min It represents the lower limit of the price of electricity sold by the distribution network to the data center operator;

[0110] The operation constraint is expressed as

[0111]

[0112]

[0113]

[0114]

[0115]

[0116]

[0117]

[0118]

[0119]

[0120]

[0121]

[0122] Formula (31) represents the active power balance constraint of the distribution network node; Formula (32) represents the reactive power balance constraint of the distribution network node; Formulas (33)-(34) represent the node voltage constraint based on the Distflow power flow model; Formulas (35)-(38) represent the power flow constraint of the distribution branch; Formulas (39)-(41) represent the power purchase power constraint of the distribution network;

[0123] Where: b represents the distribution network node; Ω B represents the corresponding set of distribution network node b; Represents the active power transmitted by the distribution branch ij; Represents the reactive power transmitted by the distribution branch ij; Indicates the reactive power of the distribution transformer; Represents the reactive power of the data center; Indicates the reactive power of the node load; Represents the reactive power of the wind farm; Represents the corresponding element of the distribution network node-branch association matrix; represents the corresponding element of the node-load correlation matrix; A 0-1 parameter indicating whether node b is connected to a distribution transformer or a wind farm; V s,b,t Represents the square of the node voltage amplitude; R ij Indicates the resistance value of branch ij after expansion; X ij It represents the reactance value of branch ij after expansion; It represents the rated capacity of the distribution branch ij before expansion; is the rated capacity of the distribution branch ij after expansion; Indicates the rated capacity of the selected distribution line m; is the power factor angle of the wind farm; The upper limit of node voltage allowed for safe operation of the distribution network; They are the lower limits of node voltages allowed for safe operation of the distribution network;

[0124] The wind farm output constraint is expressed as (42)-(43)

[0125]

[0126]

[0127] Where: Indicates the power factor angle of the wind farm;

[0128] The data center power constraint is expressed as

[0129]

[0130] Where: Represents the data center power factor angle.

[0131] Further,

[0132] Build data center investment planning and data service pricing model

[0133] Set the objective function to

[0134]

[0135] Where: profit DC Indicates the economic benefits of a data center; represents the system operation benefit under operation scenario s; C DC,inv Indicates the system investment cost.

[0136] Further,

[0137] The system investment cost is expressed as

[0138] CInv =δ TD C TD S TD +δ ser c ser n ser +δ ess c ess W Ness +δ cool c cool P Ncool (46),

[0139] Where: TD represents the capital recovery factor of the transformer in the data center; δ ser represents the capital recovery factor of the data center server; δ ess represents the capital recovery factor of the data center energy storage system; δ cool represents the capital recovery factor of the data center cooling equipment; c TD represents the unit investment cost of the transformer in the data center; c ser represents the unit investment cost of the data center server; c ess represents the unit investment cost of data center energy storage equipment; c cool Represents the unit investment cost of data center cooling equipment; S TD E is the configuration capacity of the transformer in the data center; Ness represents the configuration capacity of the electric energy storage in the data center;

[0140] The system operation benefit is expressed as

[0141]

[0142] Where: Represents the operating income of the system; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the incentive cost of the system;

[0143] The system operating income is expressed as

[0144]

[0145] Where: z WL It represents the basic price of data services provided by data center operators;

[0146] The system maintenance cost is expressed as

[0147]

[0148] Where: c TDmrepresents the unit maintenance cost of the transformer in the data center; c serm represents the unit maintenance cost of the data center server; c essm represents the unit maintenance cost of data center electric energy storage; c coolm Represents the unit maintenance cost of data center cooling equipment;

[0149] The electricity purchase cost of a data center operator is expressed as

[0150]

[0151] The total subsidy cost spent by data center operators is expressed as

[0152]

[0153] in, is linearly related to the reduction amount, is a time-varying function of the reduction amount and the response period:

[0154]

[0155]

[0156] Where: Indicates the incentive subsidy corresponding to the load that can be reduced to participate in demand response; Indicates the incentive subsidy corresponding to the transferable load participating in demand response; represents the unit incentive price of load that can be reduced at time t; represents the unit incentive price of the transferable load at time t.

[0157] Further,

[0158] Determine the constraints of the objective function of the data center investment planning and data service pricing model, including planning constraints and operation constraints.

[0159] Further,

[0160] The planning constraints are expressed as

[0161] 0≤n ser ≤n ser,max (54)

[0162] 0≤E Ness ≤E Ness,max (55)

[0163] 0≤P Ncool ≤P Ncool,max (56)

[0164] 0≤S TD ≤S TD,max(57)

[0165] Where: n ser,max Indicates the maximum number of servers to be configured; E Ness,max Indicates the maximum configuration capacity of the energy storage device; P Ncool,max Indicates the maximum configuration capacity of the refrigeration equipment; S TD,max Indicates the maximum new capacity of the transformer in the data center;

[0166] For cooling equipment, its configuration capacity must meet the power constraints when all servers are running at full load, as shown in formula (58):

[0167]

[0168] Due to the limitation of the number of data load tasks, the data center is only built at one of the nodes to be selected, so the number constraint of data center investment must be met, as shown in formula (59):

[0169]

[0170] The operation constraint is expressed as

[0171]

[0172]

[0173]

[0174]

[0175]

[0176]

[0177]

[0178] Where: Represents the electrical energy storage capacity; ε ess Indicates the self-discharge rate; Indicates charging power; Indicates discharge power; η ess_c Indicates charging efficiency; η ess_d Indicates discharge efficiency; SOC ess,min Indicates the upper limit of the state of charge; SOC ess,max Indicates the lower limit of charge state; A 0-1 variable representing the charge of the electric energy storage; A 0-1 variable representing the discharge of the electrical energy storage;

[0179] Formulas (60)-(61) represent the power constraints of the data center; Formulas (62)-(66) represent that the electric energy storage must satisfy the power balance constraints, energy storage capacity constraints, and charging and discharging power constraints during operation;

[0180] The data task service quality constraint is expressed as

[0181]

[0182] Where: T delay,max The maximum tolerable delay time of the data task;

[0183] The incentive price constraint is expressed as

[0184]

[0185]

[0186] Where: z RW,max represents the maximum unit incentive price that can reduce load; SW,max Indicates the maximum unit incentive price for load that can be transferred.

[0187] Further,

[0188] Build a data user demand response model,

[0189] Determine the objective function as

[0190]

[0191] Where: profit WL Indicates the expected benefits to data users; Represents the expected benefit of data users under operating scenario s.

[0192] Further,

[0193] The expected benefit of data users is expressed as

[0194]

[0195] in,

[0196]

[0197]

[0198] Where: Indicates that the load that can be reduced is lost due to the benefits of participating in demand response; represents the loss of benefits of the transferable load due to participation in demand response; α RW,loss represents the utility loss coefficient of load reduction; α SW,lossrepresents the utility loss coefficient of the transferable load; Δt f Indicates the maximum delay time that can be used to transfer load.

[0199] The present invention also provides a method for solving a double Stackelberg game model, the main steps of which include:

[0200] Step 1,

[0201] Load the initial parameters of the model, such as distribution network grid and load data, data center equipment parameters, and data user load curves;

[0202] Step 2,

[0203] Constructing distribution network expansion planning and spatiotemporal pricing model Data center investment planning and data service pricing model and data user demand response model

[0204] Step 3,

[0205] The KKT condition is used to model the data user demand response Transformed into additional constraints and incorporated into data center investment planning and data service pricing models Get a single layer model

[0206] Step 4,

[0207] Set the initial solution, i.e. the initial construction location and power load curve of the data center; reset the iteration counter v=1;

[0208] Step 5,

[0209] Solving the distribution network expansion planning and spatiotemporal pricing model And pass the node marginal electricity price to the reconstructed single-layer model

[0210] Step 6,

[0211] Solve the reconstructed single-layer model based on the node marginal electricity price Obtain the load curve and optimal construction node of the data center and pass it to the distribution network expansion planning and spatiotemporal pricing model

[0212] Step 7,

[0213] Determine whether the absolute value of the price difference between two adjacent iterations is less than a certain set threshold; if so, output the optimal expansion plan of the distribution network and the optimal investment and construction plan of the data center, and terminate the iteration; otherwise, set v=v+1 and return to step 5.

[0214] Further,

[0215] The specific solution process is:

[0216] Provide a data user demand response model The compact form is:

[0217]

[0218] Where:

[0219]

[0220]

[0221]

[0222] profit WL Indicates the expected benefits to data users; Data load requirements representing load that can be shifted after demand response; represents the transfer amount of the transferable load between time t and t'; Data load requirements indicating load reduction that can be achieved after demand response; Indicates the load reduction amount by which the load can be reduced; represents the actual data load processing requirements of the data center; s represents the operation scenario, and t represents the operation time;

[0223] p represents the data user demand response model The number of the constraints in the equation; Ω P Representation data user demand response model The corresponding set of constraints p in the medium; λ p Demand response model for data users The Lagrange multiplier corresponding to the medium constraint; q represents the data user demand response model The number of the inequality constraint in Ω Q Representation data user demand response model The corresponding set of inequality constraints q in g; p Representation data user demand response model The equality constraints in h q Representation data user demand response model Inequality constraints in μ q Demand response model for data users Lagrange multipliers corresponding to the inequality constraints in ;

[0224] According to formula (74), the corresponding Lagrangian function (75) is written, and then the data user demand response model is obtained The optimality conditions (76)-(78) of ; where the complementary relaxation condition (78) is a set of nonlinear constraints, linearized using the big M method:

[0225]

[0226]

[0227]

[0228]

[0229] The KKT condition is used to model the data user demand response Transformed into a set of equivalent optimality conditions and incorporated as additional constraints into data center investment planning and data service pricing models Merge the middle and lower layer models into a single layer model

[0230] The optimal point of the transformed bi-level programming model is obtained using a solution framework based on fixed point iteration.

[0231] The present invention uses a data load aggregator (DLA) as an independent entity to interact with the data center on behalf of the dispersed data user groups in the region, and makes the optimal decision on the interactive response with the data center with the goal of maximizing user benefits under the premise of meeting the service quality constraints.

[0232] Compared with traditional planning methods, the present invention fully considers the demand response of data load and the interactive relationship between multiple subjects, and can improve the scientificity and effectiveness of the joint planning decision-making of distribution network and data center.

[0233] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0234] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0235] Figure 1 A schematic diagram of the framework of the distribution network-data center collaborative planning model based on double game is shown;

[0236] Figure 2 A schematic diagram of the specific solution process of the double Stackelberg game model is shown. DETAILED DESCRIPTION

[0237] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0238] The distribution network including data centers is mainly composed of distribution transformers, lines, distributed power sources and data centers. The internal structure of a typical data center mainly includes servers, supporting refrigeration equipment, electric energy storage, etc. In actual operation, the distribution network purchases electricity from the external power grid through distribution transformers or relies on distributed power generation to obtain the required electricity to meet the stable power supply of data centers and other power users in the region. Data centers obtain electricity from the distribution network and provide data services to data users.

[0239] However, due to the surge in power load caused by the access of data centers, the original distribution network structure can no longer meet the requirements of safe operation, and the distribution network operators are facing the risk of a surge in power supply costs. Therefore, distribution network operators hope to guide data centers to rationally select sites and adjust their own energy consumption characteristics by setting reasonable time / space electricity prices for data centers, so that the distribution network can achieve a comprehensive optimization of line expansion costs and operating costs while meeting the premise of safe operation. Accordingly, data center operators combine their own benefits, select the best nodes to invest in the construction of data centers, and change their own energy consumption characteristics through data load task management to maximize their economic benefits. Since data centers cannot directly dispatch data loads, data center operators mostly use data service pricing to incentivize data loads to participate in demand response.

[0240] Therefore, the present invention proposes a distribution network-data center collaborative planning method considering data load demand response, and constructs a dual Stackelberg game model with distribution network, data center and data users as the main body (the planning model architecture is as follows Figure 1As shown in Figure 1). Based on the interaction between each level, the game is divided into two layers, inner and outer. In the outer game, the distribution network, as the leader, takes the maximization of the comprehensive benefits of the distribution network as the optimization goal, and determines the expansion configuration of the distribution network, the design of the node electricity price of the data center, and the output of renewable energy; the data center operator, as the follower, takes the maximization of economic benefits as the goal, and determines the location of the data center, the equipment configuration capacity, and the operation strategy. In the inner game, the data center, as the leader, sets the demand response incentive price; the data load aggregator, as the follower, takes the maximization of user benefits as the goal, and determines the adjustment strategy of the data load task demand.

[0241] The implementation process of the present invention is specifically described in detail as follows.

[0242] 1. Modeling of system uncertainty factors

[0243] During the operation phase, the actual benefits of the system are often affected by many uncertain factors, such as data load demand, renewable energy power generation output, and conventional power load demand. To ensure the effectiveness of the final planning scheme, the present invention uses a random method to model the uncertainty of the above-mentioned influencing factors and provide a probabilistic scenario for the construction of subsequent models.

[0244] 1.1 Data load requirements

[0245] It is usually difficult for data center operators to accurately predict the data load requirements of data load aggregators. The present invention uses truncated Gaussian distribution to describe the uncertainty of data load requirements.

[0246]

[0247] Where: s represents the operating scenario; Ω S represents the corresponding set of running scenarios s; t represents the running time; Ω T represents the corresponding set of running time t; Indicates data load requirements; represents the predicted value of data load demand; Indicates the standard deviation of data load requirements; Represents the upper limit of random fluctuations in data load demand; Represents the lower bound of random fluctuations in data load demand.

[0248] 1.2. Conventional power load demand

[0249] The composition of power load is complex and diversified. Affected by technical conditions and human factors, power load demand is difficult to accurately predict and has strong uncertainty. This paper uses truncated Gaussian distribution to describe the randomness of power load demand at each node of the distribution network. The specific mathematical model is expressed as

[0250]

[0251] Where: g is the power load node; Ω G is the corresponding set of power load nodes g; Represents the node power load demand in the distribution network; represents the predicted value of the node power load demand; represents the standard deviation of the node power load demand; Represents the upper limit of random fluctuations in data load demand; Represents the lower bound of random fluctuations in data load demand.

[0252] 1.3. Power generation output from renewable energy

[0253] This study uses wind power generation as an example to illustrate the uncertainty of renewable energy power generation output. Wind power output is mainly affected by the environment such as wind speed at its installation location. To describe the randomness of wind speed, the Weibull distribution model is usually used in long-term planning to determine the maximum output power of wind turbines.

[0254]

[0255]

[0256] Where: Indicates the maximum output power of the fan, P NWT represents the configuration capacity of the fan; k represents the shape parameter; c represents the scale parameter; v in Indicates the cut-in wind speed of the fan, v out Indicates the fan cut-out wind speed, v rate Indicates the rated wind speed of the fan; v s,t Indicates the actual wind speed.

[0257] 2. Data Center Characteristics Modeling

[0258] The data center characteristic model of the present invention includes an equipment energy consumption model and a data load model. The equipment energy consumption model is used to describe the power consumption of the data center required to meet the data load. The data load model considers three types of data loads to characterize the typical scenarios of data users' interactive responses with the data center.

[0259] 2.1 Equipment Energy Consumption Model

[0260] The energy consumption of data center equipment is mainly generated by servers, refrigeration equipment and other auxiliary equipment. Ignoring the power consumption of other auxiliary equipment, the sum of the power consumption of servers and refrigeration equipment is regarded as the total power consumption of the data center.

[0261] 2.1.1 Server Energy Consumption

[0262] The energy consumption of the server is mainly determined by the CPU utilization, server power parameters, and the number of servers powered on at each moment. Assuming that all servers in the data center have the same model and configuration, the data load is evenly distributed to each powered-on server. Equation (5) represents the power consumption characteristics of the server, equations (6)-(7) represent the utilization constraints of the server CPU, and equation (8) represents the power-on number constraints of the server.

[0263]

[0264]

[0265]

[0266]

[0267] Where: Indicates the operating power of the server; Indicates CPU utilization; P ser_peak Represents the peak power of a single server; P ser_idle Indicates the silent power of a single server; Indicates the number of servers powered on; μ ser Indicates the service rate of a single server; U P,max Indicates the upper limit of CPU utilization; Indicates the actual data load processing requirements of the data center; n ser Indicates the number of server configurations; θ ser Indicates the server backup factor.

[0268] 2.1.2 Energy consumption of refrigeration equipment

[0269] In order to ensure that the ambient temperature meets the operating requirements of the servers and other equipment in the data center, the data center needs to be equipped with a certain amount of refrigeration equipment. The load factor is used to describe the comprehensive energy efficiency of the refrigeration equipment. The operating power consumption of the refrigeration equipment is expressed as:

[0270]

[0271]

[0272] Where: Indicates the operating power of the refrigeration equipment; Indicates the comprehensive load factor of the refrigeration equipment; P Ncool Indicates the configuration capacity of the cooling equipment.

[0273] 2.2 Data Load Model

[0274] Based on the interactive response between data centers and data loads, data loads can be roughly divided into three categories: transferable loads, reducible loads, and rigid loads. The characteristics of each type of data load are modeled as follows.

[0275] 2.2.1 Transferable Load

[0276] Transferable load refers to a data load with a fixed total task volume within a certain time range, but flexible task requirements in each period. In view of the operating characteristics of transferable load, data center operators can postpone the processing time of transferable load data tasks within the scheduling cycle allowed by the load. For example, for the load demand of transferable load at time t, it can be postponed by Δt f The load characteristics of the transferable load can be expressed as formula (11)-(14). Among them, formula (11) represents the load processing requirement of the transferable load, formula (12) represents the capacity proportion of the transferable load, and formula (13)-(14) represents the time transfer characteristic constraints of the transferable load.

[0277]

[0278]

[0279]

[0280]

[0281] Where: Data load requirements indicating load that can be shifted before demand response; Data load requirements representing load that can be shifted after demand response; represents the transfer amount of the transferable load between time t and t'; represents the transfer amount of the transferable load between time t" and t; represents the data processing deadline of the transferable load at time t; Indicates the proportion of transferable load in the data user cluster; Represents the raw data load demand of the data load aggregator.

[0282] 2.2.2、Load reduction possible

[0283] Reducible load refers to non-core data load whose data demand can be flexibly reduced within a certain time range. Its load characteristics are as follows:

[0284]

[0285]

[0286]

[0287] Where: Data load requirements indicating load that can be reduced before demand response; Data load requirements indicating load reduction that can be achieved after demand response; Indicates the load reduction amount by which the load can be reduced; Indicates the proportion of load that can be reduced in the data user cluster.

[0288] 2.2.3 Rigid load

[0289] Rigid load refers to important data loads that have strict requirements on the time and quality of data processing. Such loads do not have demand-side regulation potential and cannot participate in demand response scheduling. Its load characteristics can be expressed as:

[0290]

[0291] Where: Data load requirements representing rigid loads.

[0292] Based on equations (11)-(18), after considering the data center demand response, the actual data load processing demand It can be expressed as:

[0293]

[0294] 3. Construct distribution network expansion planning and spatiotemporal pricing model

[0295] 3.1 Objective Function

[0296] The distribution network planning model aims to maximize the difference between the annual operating benefit and investment cost of the distribution network, which can be expressed as:

[0297]

[0298] Where: profit Grid Represents the comprehensive benefit of the distribution network; N y represents the number of operating days in a year; ρ s Represents the probability corresponding to the running scenario s; represents the system operation benefit under operation scenario s; C Grid,inv Indicates the system investment cost.

[0299] The system investment cost is mainly composed of the cost of distribution transformers and distribution line expansion. By annualizing each cost item, the system investment cost can be expressed as:

[0300]

[0301] Where: ss represents the distribution transformer; Ω SS represents the corresponding set of distribution transformers ss; ij represents the distribution branch; Ω IJ represents the corresponding set of distribution branches ij; m represents the type of distribution line to be selected; Ω M represents the corresponding set of the types of distribution lines to be selected m; δ TG represents the capital recovery factor of the distribution transformer, δ LN represents the capital recovery factor of the distribution line, δ TG and δ LN The mathematical expressions are Where ν represents the service life of each device, represents the discount rate; c TG It represents the unit investment cost of distribution transformer; It represents the unit investment cost of distribution lines; Indicates the expansion capacity of the distribution transformer; Indicates the total length of the distribution branch ij; A 0-1 variable indicating the capacity expansion of distribution branch ij using line m.

[0302] The system operation benefits are composed of operating income and operation and maintenance costs:

[0303]

[0304] Where: represents the operating income of the distribution network; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the carbon emission cost of the system; Represents the system’s wind curtailment cost.

[0305] System operating income refers to the income obtained by the system from selling electricity to ordinary electricity users and data centers, which can be expressed as:

[0306]

[0307] Where: h represents the node of the data center; Ω H represents the corresponding set of nodes h invested in the data center; Indicates the amount of electricity sold by the system to electricity users; Indicates the amount of electricity sold by the system to the data center; It indicates the price of electricity sold by the distribution network to ordinary electricity users; Indicates whether node h is a node to be built in the data center; It indicates the real-time node electricity price sold by the distribution network at each node to be built to the data center operator.

[0308] System maintenance costs mainly include the maintenance costs of distribution transformers and distribution lines:

[0309]

[0310] Where: It represents the unit maintenance cost of the distribution branch after capacity expansion; represents the unit maintenance cost of the distribution branch without capacity expansion; c TGm represents the unit maintenance cost of distribution transformers; Indicates the original capacity of the distribution transformer.

[0311] The cost of purchasing electricity from the external network can be expressed as:

[0312]

[0313] Where: Indicates the amount of electricity purchased by the system from the external grid, that is, the active power of the distribution transformer; Indicates the price of electricity purchased by the system from the external network.

[0314] The carbon emission cost on the power generation side generated by the system purchasing electricity from the external power grid is used to represent the low-carbon benefit. The system carbon emission cost can be expressed as:

[0315]

[0316] Where: c cm represents the unit carbon emission cost; e TPG represents the carbon emission coefficient of the external power grid;

[0317] When renewable energy generators are configured in the distribution network, it is inevitable that new energy power will be abandoned during operation. The system wind abandonment cost can be expressed as:

[0318]

[0319] Where: Indicates the actual output power of the wind turbine; c aban It represents the unit wind curtailment cost of the wind farm.

[0320] 3.2 Constraints

[0321] 3.2.1 Investment constraints

[0322] The investment constraint is used to determine the expansion capacity of the distribution transformer, the type of distribution line to be expanded, and the real-time node electricity price of the distribution network selling electricity to the data center operator. Equation (28) represents the maximum configuration capacity constraint of the distribution transformer. Equation (29) represents the distribution line selection constraint, that is, each distribution branch can only select one type of line for expansion. Equation (30) represents the real-time node electricity price of the distribution network selling electricity to the data center operator.

[0323]

[0324]

[0325]

[0326] Where: S TG,max Indicates the maximum expansion capacity of the distribution transformer; DC,max represents the upper limit of the price of electricity sold by the distribution network to the data center operator; DC,min It represents the lower limit of the price of electricity sold by the distribution network to the data center operator.

[0327] 3.2.2 Operational constraints

[0328] In order to ensure the safe and stable operation of the distribution network under various operation scenarios, the following operation constraints need to be considered. Equations (31)-(32) represent the active and reactive balance constraints of the distribution network nodes. Equations (33)-(34) represent the node voltage constraints based on the Distflow power flow model. Equations (35)-(38) represent the power flow constraints of the distribution branch, and the polygon method is used for linearization. Equations (39)-(41) represent the power purchase constraints of the distribution network. The power purchased by the distribution network from the main grid shall not exceed the rated capacity of the distribution transformer.

[0329] The operation constraint is expressed as

[0330]

[0331]

[0332]

[0333]

[0334]

[0335]

[0336]

[0337]

[0338]

[0339]

[0340]

[0341] Where: b represents the distribution network node; Ω Brepresents the corresponding set of distribution network node b; Represents the active power transmitted by the distribution branch ij; Represents the reactive power transmitted by the distribution branch ij; Indicates the reactive power of the distribution transformer; Represents the reactive power of the data center; Indicates the reactive power of the node load; Represents the reactive power of the wind farm; Represents the corresponding element of the distribution network node-branch association matrix; represents the corresponding element of the node-load correlation matrix; A 0-1 parameter indicating whether node b is connected to a distribution transformer or a wind farm; V s,b,t Represents the square of the node voltage amplitude; R ij Indicates the resistance value of branch ij after expansion; X ij It represents the reactance value of branch ij after expansion; It represents the rated capacity of the distribution branch ij before expansion; is the rated capacity of the distribution branch ij after expansion; Indicates the rated capacity of the selected distribution line m; is the power factor angle of the wind farm; The upper limit of node voltage allowed for safe operation of the distribution network; They are respectively the lower limits of node voltages allowed for safe operation of the distribution network.

[0342] In addition, this study assumes that the wind farm and data center have fixed power factors. Equations (42)-(43) represent the wind farm output constraints. Equation (44) represents the data center power constraints.

[0343]

[0344]

[0345]

[0346] Where: represents the wind farm power factor angle, Represents the data center power factor angle.

[0347] 4. Build data center investment planning and data service pricing model

[0348] 4.1 Objective Function

[0349] The data center planning model aims to maximize the difference between the annual operating benefit and investment cost of the data center, which is expressed as follows:

[0350]

[0351] Where: profit DC Indicates the economic benefits of a data center; represents the system operation benefit under operation scenario s; C DC,inv Indicates the system investment cost.

[0352] 4.1.1 Investment cost

[0353] The investment cost of the data center system is mainly composed of the cost of transformer configuration, server configuration, electric energy storage configuration and cooling equipment configuration. By annualizing each cost item, the system investment cost can be expressed as:

[0354] C Inv =δ TD C TD S TD +δ ser c ser n ser +δ ess c ess W Ness +δ cool c cool P Ncool (46),

[0355] Where: TD represents the capital recovery factor of the transformer in the data center; δ ser represents the capital recovery factor of the data center server; δ ess represents the capital recovery factor of the data center energy storage system; δ cool represents the capital recovery factor of the data center cooling equipment; c TD represents the unit investment cost of the transformer in the data center; c ser represents the unit investment cost of the data center server; c ess represents the unit investment cost of data center energy storage equipment; c cool Represents the unit investment cost of data center cooling equipment; S TD E is the configuration capacity of the transformer in the data center; Ness Represents the configured capacity of the electrical energy storage in the data center.

[0356] 4.1.2 Operational benefits

[0357] The system operation benefits are composed of operating income and operation and maintenance costs:

[0358]

[0359] Where: Represents the operating income of the system; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; Represents the incentive cost of the system.

[0360] System operation income refers to the income obtained by data center operators from providing data processing services to end data users, which can be expressed as:

[0361]

[0362] Where: z WL Indicates the basic price of data services provided by data center operators.

[0363] The maintenance costs of a data center mainly include the operation and maintenance costs of transformers, servers, electric energy storage, and refrigeration equipment within the data center:

[0364]

[0365] Where: c TDm represents the unit maintenance cost of the transformer in the data center; c serm represents the unit maintenance cost of the data center server; c essm represents the unit maintenance cost of data center electric energy storage; c coolm Represents the unit maintenance cost of the data center cooling equipment.

[0366] The electricity purchase cost for data center operators can be expressed as:

[0367]

[0368] During system operation, data center operators’ participation in demand response will result in utility loss, so data center operators need to provide incentive compensation for such data loads. The total subsidy cost spent by data center operators depends on the participation of curtailable loads and transferable loads in demand response, as shown in formula (51). Assume is linearly related to the reduction amount, is a time-varying function related to the reduction amount and the response period, as shown in equations (52)-(53).

[0369]

[0370]

[0371]

[0372] Where: Indicates the incentive subsidy corresponding to the load that can be reduced to participate in demand response; Indicates the incentive subsidy corresponding to the transferable load participating in demand response; represents the unit incentive price of load that can be reduced at time t; represents the unit incentive price of the transferable load at time t.

[0373] 4.2 Constraints

[0374] 4.2.1 Planning constraints

[0375] Considering the land area and equipment capital cost, it is necessary to constrain the maximum configuration capacity / quantity of various types of equipment in the data center, as shown in equations (54)-(57).

[0376] 0≤n ser ≤n ser,max (54),

[0377] 0≤E Ness ≤E Ness,max (55),

[0378] 0≤P Ncool ≤P Ncool,max (56),

[0379] 0≤S TD ≤S TD,max (57),

[0380] Where: n ser,max Indicates the maximum number of servers to be configured; E Ness,max Indicates the maximum configuration capacity of the energy storage device; P Ncool,max Indicates the maximum configuration capacity of the refrigeration equipment; S TD,max Indicates the maximum new capacity of the transformer in the data center.

[0381] For the cooling equipment, its configuration capacity must meet the power constraints when all servers are running at full load, as shown in formula (58).

[0382]

[0383] Due to the limitation of the number of data load tasks, the data center is only built at one of the nodes to be selected, so the number constraint of data center construction must be met, as shown in formula (59).

[0384]

[0385] 4.2.2 Operational constraints

[0386] Equations (60)-(61) represent the power constraints of the data center; Equations (62)-(66) indicate that the electric energy storage must satisfy the power balance constraints, energy storage capacity constraints, and charging and discharging power constraints during operation.

[0387]

[0388]

[0389]

[0390]

[0391]

[0392]

[0393]

[0394] Where: Represents the electrical energy storage capacity; ε ess Indicates the self-discharge rate; Indicates charging power; Indicates discharge power; η ess_c Indicates charging efficiency; η ess_d Indicates discharge efficiency; SOC ess,min Indicates the upper limit of the state of charge; SOC ess,max Indicates the lower limit of charge state; A 0-1 variable representing the charge of the electric energy storage; A 0-1 variable representing the discharge of the electrical energy storage.

[0395] In the data center operation phase, this paper assumes that the data load processing tasks are evenly distributed to each active server. According to the M / M / 1 queuing theory model, the data task service quality constraint can be expressed as formula (67).

[0396]

[0397] Where: T delay,max The maximum tolerable delay time of a data task.

[0398] To ensure the rationality of the design, data center operators need to set limits on the incentive price for data users to participate in demand response, as shown in equations (68)-(69).

[0399]

[0400]

[0401] Where: z RW,max represents the maximum unit incentive price that can reduce load; SW,max Indicates the maximum unit incentive price for load that can be transferred.

[0402] In addition, the data center must also meet the energy consumption constraints of data center equipment during the operation phase (5)-(10).

[0403] 5. Build a data user demand response model.

[0404] For data centers, the willingness of end users to participate in demand response will directly affect the available potential of demand-side resources in the system and directly affect the planning decisions of data centers. The present invention uses a data user demand response model to represent the expected benefits of data users participating in demand response under external incentives.

[0405] 5.1 Objective Function

[0406] In the present invention, the data load aggregator participates in demand response on behalf of the dispersed data user cluster. The data user decision model aims to maximize the expected benefits of data users, which is expressed as follows:

[0407]

[0408] Where: profit WL Indicates the expected benefits to data users; Represents the expected benefit of data users under operating scenario s.

[0409] The expected benefits of data users mainly depend on the relationship between their participation costs and expected benefits, which are composed of three items: incentive subsidies for participating in demand response, expenditures on purchasing data services, and user benefit impairment, as shown in formula (71). Among them, the second item represents the reduction in expenditures on purchasing data services before and after participating in demand response, which can be regarded as the weight of economic benefits brought to data users by accepting the scheduling of data center operators. In addition, data users' participation in interactive response will change their inherent data usage habits and preferences, thereby resulting in user benefit impairment, as shown in formulas (72)-(73)

[0410]

[0411]

[0412]

[0413] Where: Indicates that the load that can be reduced is lost due to the benefits of participating in demand response; represents the loss of benefits of the transferable load due to participation in demand response; α RW,loss represents the utility loss coefficient of load reduction; α SW,loss represents the utility loss coefficient of the transferable load; Δt f Indicates the maximum delay time that can be used to transfer load.

[0414] 5.2 Constraints

[0415] Data users participating in demand response need to meet the data task request constraints, such as equations (11)-(19).

[0416] 6. Solution method of double game model

[0417] The double Stackelberg game model proposed in this paper is mathematically expressed as a three-layer planning model: the upper layer is the distribution network expansion planning and spatiotemporal pricing model (Equations (20)-(44)), the middle layer is the data center investment planning and data service pricing model (Equations (45)-(69), (5)-(10)), the lower layer is the data user demand response model (Equations (70)-(73), (11)-(19)). The three-layer models are nested and tightly coupled. There is no universal solution algorithm for this type of model. Considering that the data user decision model is a convex optimization model when the unit price of the incentive subsidy for participating in demand response is determined, the KKT condition can be used to equate the lower-layer data user demand response decision model to the additional constraints of the middle-layer data center investment planning and data service pricing model, thereby converting the middle and lower-layer problems into a single-layer model. Through the above operations, the original three-level planning model can be equivalently transformed into a model that only contains and The two-level programming model is then solved using an interactive iterative framework. The specific solution method is introduced below.

[0418] Firstly, a data user demand response model is given. The compact form is:

[0419] Maximizeprofit WL (D SW ,D RW ,D WL )

[0420]

[0421] Where:

[0422]

[0423]

[0424]

[0425] profit WL Indicates the expected benefits to data users; Data load requirements representing load that can be shifted after demand response; represents the transfer amount of the transferable load between time t and t'; Data load requirements indicating load reduction that can be achieved after demand response; Indicates the load reduction amount by which the load can be reduced; represents the actual data load processing requirements of the data center; s represents the operation scenario, t represents the operation time; p represents the data user demand response model The number of the constraints in the equation; Ω P Representation data user demand response model The corresponding set of constraints p in the medium; λ p Demand response model for data users The Lagrange multiplier corresponding to the medium constraint; q represents the data user demand response model The number of the inequality constraint in Ω Q Representation data user demand response model The corresponding set of inequality constraints q in g; p Representation data user demand response model The equality constraints in h q Representation data user demand response model Inequality constraints in μ q Demand response model for data users Lagrange multipliers corresponding to the inequality constraints in ;

[0426] According to formula (74), the corresponding Lagrangian function (75) can be written, and then we can get The optimality conditions (76)-(78) are as follows. The complementary relaxation condition (78) is a set of nonlinear constraints that can be linearized using the big M method.

[0427]

[0428]

[0429]

[0430]

[0431] The KKT condition is used to model the data user demand response Transformed into a set of equivalent optimality conditions and incorporated as additional constraints into data center investment planning and data service pricing models Middle and lower layer models can be combined into a single layer model At this point, the original model can be equivalently transformed into a model that only contains and A two-layer model. Non-convex, KKT condition is no longer applicable. Therefore, the present invention adopts a solution framework based on fixed point iteration to obtain the optimal point of the transformed bi-level programming model.

[0432] The specific solution process of the dual Stackelberg game model proposed in the present invention is as follows: Figure 2 The main steps include:

[0433] Step 1: Load the initial parameters of the model, such as distribution network grid and load data, data center equipment parameters, and data user load curves.

[0434] Step 2: Construct distribution network expansion planning and spatiotemporal pricing model Data center investment planning and data service pricing model and data user demand response model

[0435] Step 3: Use KKT conditions to Transformed into additional constraints (75)-(78) and incorporated into the data center planning model Get a single layer model

[0436] Step 4: Set the initial solution, i.e. the initial construction location and power load curve of the data center; reset the iteration counter v=1.

[0437] Step 5: Solve the distribution network expansion planning and spatiotemporal pricing model And pass the node marginal electricity price to the reconstructed single-layer model

[0438] Step 6: Solve the single-layer model based on the node marginal electricity price Get the load curve and optimal construction node of the data center and pass it to

[0439] Step 7: Determine whether the absolute value of the price difference between two adjacent iterations is less than a certain threshold (such as 1e-5). If so, output the optimal expansion plan of the distribution network and the optimal investment and construction plan of the data center, and the iteration ends; otherwise, set v=v+1 and return to step 5.

[0440] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A distribution network-data center collaborative planning method based on data load demand response, characterized in that: The method comprises, Construct a dual Stackelberg game model with distribution network, data center and data users as the main body; divide the game into two layers, inner and outer, according to the interaction relationship between each layer; In the outer game, the distribution network, as the leader, takes maximizing the comprehensive benefits of the distribution network as the optimization goal, determines the expansion configuration of the distribution network, the design of the electricity price of the data center node, and the output of renewable energy; the data center operator, as the follower, takes maximizing economic benefits as the goal, determines the location of the data center, equipment configuration capacity, and operation strategy; In the inner game, data centers, as leaders, set demand response incentive prices; data load aggregators, as followers, aim to maximize user benefits and determine the adjustment strategy for data load task requirements; The mathematical form of the dual Stackelberg game model is a three-level programming model: The upper layer is the distribution network expansion planning and spatiotemporal pricing model Setting distribution network expansion planning and spatiotemporal pricing model The objective function is: Among them: profit Grid Represents the comprehensive benefit of the distribution network; N y Indicates the number of operating days in a year; Ω S represents the corresponding set of running scenarios s; ρ s Represents the probability corresponding to the running scenario s; represents the system operation benefit under operation scenario s; C Grid ,inv Indicates the system investment cost; in, By annualizing each cost item, the system investment cost can be expressed as: Where: ss represents the distribution transformer; Ω SS represents the corresponding set of distribution transformers ss; ij represents the distribution branch; Ω IJ represents the corresponding set of distribution branches ij; m represents the type of distribution line to be selected; Ω M represents the corresponding set of the types of distribution lines to be selected m; δ TG represents the capital recovery factor of the distribution transformer, δ LN represents the capital recovery factor of the distribution line, δ TG and δ LN The mathematical expressions are in Indicates the service life of each device. represents the discount rate; c TG It represents the unit investment cost of distribution transformer; It represents the unit investment cost of distribution lines; Indicates the expansion capacity of the distribution transformer; Indicates the total length of the distribution branch ij; A 0-1 variable indicating the expansion of the distribution branch ij using line m; The system operation benefit is expressed as: in: represents the operating income of the distribution network; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the carbon emission cost of the system; represents the system’s wind curtailment cost; The system operating income is expressed as: Where: t represents the operating time; g represents the index of the power load node, Ω G represents the set corresponding to the index g; h represents the node invested in the data center; Ω H represents the corresponding set of nodes h invested in the data center; Indicates the amount of electricity sold by the system to electricity users; Indicates the amount of electricity sold by the system to the data center; It indicates the price of electricity sold by the distribution network to ordinary electricity users; Indicates whether node h is a node to be built in the data center; Indicates the real-time node electricity price sold to data center operators by the distribution network at each node to be built; The system maintenance cost is expressed as: in: It represents the unit maintenance cost of the distribution branch after capacity expansion; represents the unit maintenance cost of the distribution branch without capacity expansion; c TGm represents the unit maintenance cost of distribution transformers; Indicates the original capacity of the distribution transformer; The system's electricity purchase cost from the external grid is expressed as: in: Indicates the amount of electricity purchased by the system from the external grid, that is, the active power of the distribution transformer; Indicates the price of electricity purchased by the system from the external network; The system carbon emission cost is expressed as: Where: c cm represents the unit carbon emission cost; e TPG represents the carbon emission coefficient of the external power grid; The system wind curtailment cost is expressed as: in: Indicates the actual output power of the wind turbine; c aban It represents the unit wind curtailment cost of the wind farm; Indicates the maximum output power of the fan; Sure The constraints of the objective function include investment constraints, operation constraints, wind farm constraints and power constraints; Investment constraints are used to determine the expansion capacity of distribution transformers, the type of distribution lines that need to be expanded, and the real-time node electricity price that the distribution network sells electricity to data center operators: represents the maximum configuration capacity constraint of the distribution transformer; Indicates the distribution line selection constraints; Indicates the real-time node electricity price sold by the distribution network to the data center operator; Where: S TG,max Indicates the maximum expansion capacity of the distribution transformer; DC,max represents the upper limit of the price of electricity sold by the distribution network to the data center operator; DC,min Represents the lower limit of the price of electricity sold by the distribution network to the data center operator; Ω T represents the corresponding set of running time t; The active power balance constraint of distribution network nodes is expressed as: Where: b represents the distribution network node, Ω B represents the corresponding set of distribution network node b; Represents the corresponding element of the distribution network node-branch association matrix; Represents the active power transmitted by the distribution branch ij; A 0-1 parameter indicating whether node b is connected to a distribution transformer or wind farm; Indicates whether node h is a node to be built in the data center; Represents the reactive power of the data center; represents the corresponding element of the node-load correlation matrix; The reactive power balance constraint of distribution network nodes is expressed as: in: Represents the reactive power transmitted by the distribution branch ij; Indicates the reactive power of the distribution transformer; Represents the reactive power of the data center; Represents the reactive power of the node load; Represents the reactive power of the wind farm; The node voltage constraint based on the Distflow power flow model is expressed as: Where: V s,b,t Represents the square of the node voltage amplitude; R ij Indicates the resistance value of branch ij after expansion; The upper limit of node voltage allowed for safe operation of the distribution network; The lower limit of node voltage allowed for safe operation of distribution network; X ij It represents the reactance value of branch ij after expansion; The power flow constraint of the distribution branch is expressed as: in: is the rated capacity of the distribution branch ij after expansion; It represents the rated capacity of the distribution branch ij before expansion; Indicates the rated capacity of the selected distribution line m; The power constraint of the distribution network is expressed as: The wind farm output constraint is expressed as: in: Indicates the power factor angle of the wind farm; The data center power constraint is expressed as: in: Indicates the power factor angle of the data center; The middle layer is the data center investment planning and data service pricing model Set up data center investment planning and data service pricing model The objective function is: Among them: profit DC Indicates the economic benefits of a data center; represents the system operation benefit under operation scenario s; C DC,inv Indicates the system investment cost; The system investment cost is expressed as Where: TD represents the capital recovery factor of the transformer in the data center; δ ser represents the capital recovery factor of the data center server; δ ess represents the capital recovery factor of the data center energy storage system; δ cool represents the capital recovery factor of the data center cooling equipment; c TD represents the unit investment cost of the transformer in the data center; c ser represents the unit investment cost of the data center server; c ess represents the unit investment cost of data center energy storage equipment; c cool Represents the unit investment cost of data center cooling equipment; S TD is the configuration capacity of the transformer in the data center; n ser Indicates the number of server configurations; E Ness Represents the configuration capacity of the data center energy storage equipment; P Ncool Indicates the configuration capacity of the refrigeration equipment; The system operation benefit is expressed as: in: Represents the operating income of the system; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the incentive cost of the system; The system operating income is expressed as: in: Load data load demand that can be transferred after demand response; WL It represents the basic price of data services provided by data center operators; The system maintenance cost is expressed as: Where: c TDm represents the unit maintenance cost of the transformer in the data center; c serm represents the unit maintenance cost of the data center server; c essm represents the unit maintenance cost of data center electric energy storage; c coolm Represents the unit maintenance cost of data center cooling equipment; The electricity purchase cost for data center operators is expressed as: The incentive cost of a data center operator is expressed as: in: Linearly related to the reduction amount; is a time-varying function of the reduction amount and the response period: in: Indicates the incentive subsidy corresponding to the load that can be reduced to participate in demand response; Indicates the incentive subsidy corresponding to the transferable load participating in demand response; represents the unit incentive price of load that can be reduced at time t; represents the unit incentive price of the transferable load at time t; represents the transfer amount of the transferable load between time t and t'; represents the data processing deadline of the transferable load at time t; Indicates the load reduction amount by which the load can be reduced; The constraints for determining the objective function of the data center investment planning and data service pricing model include: planning constraints and operation constraints; The planning constraints are expressed as: 0≤n ser ≤n ser,max , 0≤E Ness ≤E Ness,max , 0≤P Ncool ≤P Ncool,max , 0≤S TD ≤S TD,max , Where: n ser,max Indicates the maximum number of servers to be configured; E Ness,max Indicates the maximum configuration capacity of the energy storage device; P Ncool,max Indicates the maximum configuration capacity of the refrigeration equipment; S TD,max Indicates the maximum new capacity of the transformer in the data center; For cooling equipment, its configuration capacity must meet the power constraints when all servers are running at full load: Where: P ser_peak Indicates the peak power of a single server; Indicates the comprehensive load factor of the refrigeration equipment; Due to the limitation of the number of data load tasks, the data center is only built at one of the nodes to be selected, so the number of data center investments must be met: The running constraints are expressed as: in: Represents the operating power of the server; ε ess Indicates the self-discharge rate; Indicates charging power; Indicates the operating power of the refrigeration equipment; Indicates discharge power; Represents the electrical energy storage capacity; η ess_c Indicates charging efficiency; η ess_d Indicates discharge efficiency; SOC ess,min Indicates the upper limit of the state of charge; SOC ess,max Indicates the lower limit of charge state; A 0-1 variable representing the charge of the electric energy storage; A 0-1 variable representing the discharge of the electric energy storage; the data task service quality constraint is expressed as: Where: μ ser Indicates the service rate of a single server; Indicates the actual data load processing requirements of the data center; T delay ,max The maximum tolerable delay time of the data task; Indicates the number of servers powered on; The incentive price constraint is expressed as: in: represents the unit incentive price of load reduction at time t; z RW,max represents the maximum unit incentive price that can be used to reduce load; represents the unit incentive price of the transferable load at time t; z SW,max represents the maximum unit incentive price for the load that can be transferred; The lower layer is the data user demand response model Set up and determine the data user demand response model The objective function is: Among them: profit WL Indicates the expected benefits to data users; represents the expected benefit of data users under operation scenario s; The expected benefit of data users is expressed as: in, in: Represents the raw data load demand of the data load aggregator; Indicates that the load that can be reduced is lost due to the benefits of participating in demand response; represents the loss of benefits of the transferable load due to participation in demand response; α RW,loss The utility loss factor that indicates the load that can be cut; Indicates the load data load demand that can be reduced before demand response; α SW,loss represents the utility loss coefficient of the transferable load; Δt f Indicates the maximum delay time that can be used to transfer load.

2. The method according to claim 1, characterized in that Before constructing the double Stackelberg game model, The uncertainty of influencing factors is modeled using stochastic methods to provide probabilistic scenarios for the construction of subsequent models.

3. The method according to claim 2, characterized in that Influencing factors include data load demand, wind power output and conventional power load demand.

4. The method according to claim 3, characterized in that: The truncated Gaussian distribution is used to describe the uncertainty of data load demand and power load demand of each node in the distribution network, where the uncertainty of data load demand is expressed as: in: represents the predicted value of data load demand; Indicates the standard deviation of data load requirements; Represents the upper limit of random fluctuations in data load demand; Represents the lower bound of random fluctuations in data load demand; The uncertainty of the power load demand at each node in the distribution network is expressed as: in: Represents the power load demand of nodes in the distribution network; represents the predicted value of the node power load demand; represents the standard deviation of the node power load demand; represents the upper limit of random fluctuations in electricity load demand; Represents the lower limit of random fluctuations in power load demand.

5. The method according to claim 4, characterized in that The Weibull distribution model is used to describe the uncertainty of wind power output: Where: P NWT represents the configuration capacity of the fan; k represents the shape parameter; c represents the scale parameter; v in Indicates the cut-in wind speed of the fan; v out Indicates the fan cut-out wind speed; v rate Indicates the rated wind speed of the fan; v s,t Indicates the actual wind speed.

6. The method according to claim 5, characterized in that Before building the double Stackelberg game model, determine the data center characteristic model; The data center characteristic model includes equipment energy consumption model and data load model; The equipment energy consumption model includes the server energy consumption model and the refrigeration equipment energy consumption model; The server energy consumption is expressed as: Server power consumption characteristics constraints: Server CPU utilization constraints: Constraints on the number of servers that can be started: in: Indicates CPU utilization; P ser_idle Indicates the silent power of a single server; U P,max Indicates the upper limit of CPU utilization; θ ser Indicates the server backup factor; The load factor is used to describe the comprehensive energy efficiency of the refrigeration equipment. The operating power consumption of the refrigeration equipment is expressed as:

7. The method according to claim 6, characterized in that According to the interactive response mode between data center and data load, data load is divided into: transferable load, reducible load and rigid load; The transferable load is expressed as: Load handling requirements for shiftable loads: Transferable load capacity ratio: Transferable load time transfer characteristic constraints: in: Data load requirements indicating load that can be shifted before demand response; Data load requirements representing load that can be shifted after demand response; represents the transfer amount of the transferable load between time t" and t; Indicates the proportion of transferable load in the data user cluster; The load that can be reduced is expressed as: in: Data load requirements indicating load that can be reduced before demand response; Data load requirements indicating load reduction that can be achieved after demand response; Indicates that the proportion of load in the data user cluster can be reduced; The rigid load is expressed as: in: Data load requirement representing rigid loads.

8. The method according to claim 7, characterized in that Actual data load processing requirements after considering data center demand response It is expressed as:

9. A method for solving a double Stackelberg game model, characterized in that: The main steps include: Step 1, Load the initial parameters of the model, including distribution network grid and load data, data center equipment parameters and data user load curve; Step 2, Constructing distribution network expansion planning and spatiotemporal pricing model Data center investment planning and data service pricing model and data user demand response model The upper layer is the distribution network expansion planning and spatiotemporal pricing model Setting distribution network expansion planning and spatiotemporal pricing model The objective function is: Among them: profit Grid Represents the comprehensive benefit of the distribution network; N y Indicates the number of operating days in a year; Ω S represents the corresponding set of running scenarios s; ρ s Represents the probability corresponding to the running scenario s; represents the system operation benefit under operation scenario s; C Grid ,inv Indicates the system investment cost; in, By annualizing each cost item, the system investment cost can be expressed as: Where: ss represents the distribution transformer; Ω SS represents the corresponding set of distribution transformers ss; ij represents the distribution branch; Ω IJ represents the corresponding set of distribution branches ij; m represents the type of distribution line to be selected; Ω M represents the corresponding set of the types of distribution lines to be selected m; δ TG represents the capital recovery factor of the distribution transformer, δ LN represents the capital recovery factor of the distribution line, δ TG and δ LN The mathematical expressions are in Indicates the service life of each device, represents the discount rate; c TG It represents the unit investment cost of distribution transformer; It represents the unit investment cost of distribution lines; Indicates the expansion capacity of the distribution transformer; Indicates the total length of the distribution branch ij; A 0-1 variable indicating the expansion of the distribution branch ij using line m; The system operation benefit is expressed as: in: represents the operating income of the distribution network; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the carbon emission cost of the system; represents the system’s wind curtailment cost; The system operating income is expressed as: Where: t represents the operating time; g represents the index of the power load node, Ω G represents the set corresponding to the index g; h represents the node invested in the data center; Ω H represents the corresponding set of nodes h invested in the data center; Indicates the amount of electricity sold by the system to electricity users; Indicates the amount of electricity sold by the system to the data center; It indicates the price of electricity sold by the distribution network to ordinary electricity users; Indicates whether node h is a node to be built in the data center; represents the real-time node electricity price sold to data center operators by the distribution network of each node to be built; Δt represents the operating time; The system maintenance cost is expressed as: in: It represents the unit maintenance cost of the distribution branch after capacity expansion; represents the unit maintenance cost of the distribution branch without capacity expansion; c TGm represents the unit maintenance cost of distribution transformers; Indicates the original capacity of the distribution transformer; The system's electricity purchase cost from the external grid is expressed as: in: Indicates the amount of electricity purchased by the system from the external grid, that is, the active power of the distribution transformer; Indicates the price of electricity purchased by the system from the external network; The system carbon emission cost is expressed as: Where: c cm represents the unit carbon emission cost; e TPG represents the carbon emission coefficient of the external power grid; The system wind curtailment cost is expressed as: in: Indicates the actual output power of the wind turbine; c aban It represents the unit wind curtailment cost of the wind farm; Indicates the maximum output power of the fan; Sure The constraints of the objective function include investment constraints, operation constraints, wind farm constraints and power constraints; Investment constraints are used to determine the expansion capacity of distribution transformers, the type of distribution lines that need to be expanded, and the real-time node electricity price that the distribution network sells electricity to data center operators: represents the maximum configuration capacity constraint of the distribution transformer; Indicates the distribution line selection constraints; Indicates the real-time node electricity price sold by the distribution network to the data center operator; Where: S TG,max Indicates the maximum expansion capacity of the distribution transformer; DC,max represents the upper limit of the price of electricity sold by the distribution network to the data center operator; DC,min Represents the lower limit of the price of electricity sold by the distribution network to the data center operator; Ω T represents the corresponding set of running time t; The active power balance constraint of distribution network nodes is expressed as: Where: b represents the distribution network node, Ω B represents the corresponding set of distribution network node b; represents the corresponding element of the node-branch association matrix of the distribution network; Represents the active power transmitted by the distribution branch ij; A 0-1 parameter indicating whether node b is connected to a distribution transformer or wind farm; Indicates whether node h is a node to be built in the data center; Represents the reactive power of the data center; represents the corresponding element of the node-load correlation matrix; The reactive power balance constraint of distribution network nodes is expressed as: in: Represents the reactive power transmitted by the distribution branch ij; Indicates the reactive power of the distribution transformer; Represents the reactive power of the data center; Represents the reactive power of the node load; Represents the reactive power of the wind farm; The node voltage constraint based on the Distflow power flow model is expressed as: Where: V s,b,t Represents the square of the node voltage amplitude; R ij Indicates the resistance value of branch ij after expansion; The upper limit of node voltage allowed for safe operation of the distribution network; The lower limit of node voltage allowed for safe operation of distribution network; X ij It represents the reactance value of branch ij after expansion; The power flow constraint of the distribution branch is expressed as: in: is the rated capacity of the distribution branch ij after expansion; It represents the rated capacity of the distribution branch ij before expansion; Indicates the rated capacity of the selected distribution line m; The power constraint of the distribution network is expressed as: The wind farm output constraint is expressed as: in: Indicates the power factor angle of the wind farm; The data center power constraint is expressed as: in: Indicates the power factor angle of the data center; The middle layer is the data center investment planning and data service pricing model Set up data center investment planning and data service pricing model The objective function is: Among them: profit DC Indicates the economic benefits of a data center; represents the system operation benefit under operation scenario s; C DC,inv Indicates the system investment cost; The system investment cost is expressed as Where: TD represents the capital recovery factor of the transformer in the data center; δ ser represents the capital recovery factor of the data center server; δ ess represents the capital recovery factor of the data center energy storage system; δ cool represents the capital recovery factor of the data center cooling equipment; c TD represents the unit investment cost of the transformer in the data center; c ser represents the unit investment cost of the data center server; c ess represents the unit investment cost of data center energy storage equipment; c cool Represents the unit investment cost of data center cooling equipment; S TD is the configuration capacity of the transformer in the data center; n ser Indicates the number of server configurations; E Ness Represents the configuration capacity of the data center energy storage equipment; P Ncool Indicates the configuration capacity of the refrigeration equipment; The system operation benefit is expressed as: in: Represents the operating income of the system; Represents the maintenance cost of the system; It represents the electricity purchase cost of the system; represents the incentive cost of the system; The system operating income is expressed as: in: Load data load demand that can be transferred after demand response; WL It represents the basic price of data services provided by data center operators; The system maintenance cost is expressed as: Where: c TDm represents the unit maintenance cost of the transformer in the data center; c serm represents the unit maintenance cost of the data center server; c essm represents the unit maintenance cost of data center electric energy storage; c coolm represents the unit maintenance cost of the data center cooling equipment; the electricity purchase cost of the data center operator is expressed as: The incentive cost of a data center operator is expressed as: in: Linearly related to the reduction amount; is a time-varying function of the reduction amount and the response period: in: Indicates the incentive subsidy corresponding to the load that can be reduced to participate in demand response; Indicates the incentive subsidy corresponding to the transferable load participating in demand response; represents the unit incentive price of load that can be reduced at time t; represents the unit incentive price of the transferable load at time t; represents the transfer amount of the transferable load between time t and t'; represents the data processing deadline of the transferable load at time t; Indicates the load reduction amount by which the load can be reduced; The constraints for determining the objective function of the data center investment planning and data service pricing model include: planning constraints and operation constraints; The planning constraints are expressed as: 0≤n ser ≤n ser,max , 0≤E Ness ≤E Ness,max , 0≤P Ncool ≤P Ncool,max , 0≤S TD ≤S TD,max , Where: n ser,max Indicates the maximum number of servers to be configured; E Ness,max Indicates the maximum configuration capacity of the energy storage device; P Ncool,max Indicates the maximum configuration capacity of the refrigeration equipment; S TD,max Indicates the maximum new capacity of the transformer in the data center; For cooling equipment, its configuration capacity must meet the power constraints when all servers are running at full load: Where: P ser_peak Indicates the peak power of a single server; Indicates the comprehensive load factor of the refrigeration equipment; Due to the limitation of the number of data load tasks, the data center is only built at one of the nodes to be selected, so the number of data center investments must be met: The running constraints are expressed as: in: Represents the operating power of the server; ε ess Indicates the self-discharge rate; Indicates charging power; Indicates the operating power of the refrigeration equipment; Indicates discharge power; Represents the electrical energy storage capacity; η ess_c Indicates charging efficiency; η ess_d Indicates discharge efficiency; SOC ess,min Indicates the upper limit of the state of charge; SOC ess,max Indicates the lower limit of charge state; A 0-1 variable representing the charge of the electric energy storage; A 0-1 variable representing the discharge of the electrical energy storage; The data task service quality constraint is expressed as: Where: μ ser Indicates the service rate of a single server; Indicates the actual data load processing requirements of the data center; T delay ,max The maximum tolerable delay time of the data task; Indicates the number of servers powered on; The incentive price constraint is expressed as: in: represents the unit incentive price of load reduction at time t; z RW,max represents the maximum unit incentive price that can be used to reduce load; represents the unit incentive price of the transferable load at time t; z SW,max represents the maximum unit incentive price for the load that can be transferred; The lower layer is the data user demand response model Set up and determine the data user demand response model The objective function is: Among them: profit WL Indicates the expected benefits to data users; represents the expected benefit of data users under operation scenario s; The expected benefit of data users is expressed as: in, in: Represents the raw data load demand of the data load aggregator; Indicates that the load that can be reduced is lost due to the benefits of participating in demand response; represents the loss of benefits of the transferable load due to participation in demand response; α RW,loss The utility loss factor that indicates the load that can be cut; Indicates the load data load demand that can be reduced before demand response; α SW,loss represents the utility loss coefficient of the transferable load; Δt f Indicates the maximum delay time that can be used to transfer load Step 3, The KKT condition is used to model the data user demand response Transformed into additional constraints and incorporated into data center investment planning and data service pricing models Get a single layer model Step 4, Set the initial construction location and power load curve of the data center; Reset iteration counter v=1; Step 5, Solving the distribution network expansion planning and spatiotemporal pricing model And pass the node marginal electricity price to the reconstructed single-layer model Step 6, Solve the reconstructed single-layer model based on the node marginal electricity price Obtain the load curve and optimal construction node of the data center, and pass it to the distribution network expansion planning and spatiotemporal pricing model Step 7, Determine whether the absolute value of the price difference between two adjacent iterations is less than a certain set threshold; if so, output the optimal expansion plan of the distribution network and the optimal investment and construction plan of the data center, and terminate the iteration; otherwise, set v=v+1 and return to step 5.

10. The method according to claim 9, characterized in that The specific solution process is: Provide a data user demand response model The compact form: Maximize profit WL (D SW ,D RW ,D WL ) in: profit WL represents the expected benefit of data users; p represents the data user demand response model The number of the constraints in the equation; Ω P Representation data user demand response model The corresponding set of constraints p in the medium; λ p Demand response model for data users The Lagrange multiplier corresponding to the medium constraint; q represents the data user demand response model The number of the inequality constraint in Ω Q Representation data user demand response model The corresponding set of inequality constraints q in g; p Representation data user demand response model The equality constraints in h q Representation data user demand response model Inequality constraints in μ q Demand response model for data users Lagrange multipliers corresponding to the inequality constraints in ; Response model based on data user needs The compact form of , write the corresponding Lagrangian function: Then we get the data user demand response model The optimality condition is: The complementary relaxation condition is a set of nonlinear constraints, linearized using the Big M method; The KKT condition is used to model the data user demand response Transformed into a set of equivalent optimality conditions and incorporated as additional constraints into data center investment planning and data service pricing models Merge the middle and lower layer models into a single layer model The optimal point of the transformed bi-level programming model is obtained using a solution framework based on fixed point iteration.