A cryogenic tank propellant delivery structure and launch vehicle
By using a fork ring to connect the upper and lower boxes in the storage tank propellant conveying structure, and setting compensation sections at the upper and lower flanges of the conveying pipes, the problem of assembly difficulty in the prior art is solved, and lightweight and simplified are achieved Assembly and reliability of tank propellant delivery.
Patent Information
- Application Number
- CN202311812042.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-12-26
AI Technical Summary
In the prior art, the assembly operation of the storage tank propellant conveying structure needs to match the coordination of the common bottom upper box and lower box docking interface and the coordination of the internal and external conveying pipe assembly interface, which makes it difficult to process and manufacture.
The upper and lower boxes are connected by fork rings. The upper and lower ends of the conveying pipe are sealedly connected to the outflow flange and the butt flange respectively. A vacuum insulation layer is set between the inner and outer pipes, and compensation is set at the upper and lower flanges of the conveying pipe. The assembly operation is simplified by adapting to low temperature deformation and charging deformation.
The internal conveying of the propellant in the storage tank is realized without considering the coordination of the docking interface and the coordination of the assembly interface. The conveying pipe structure is light and the assembly operation is simple, which simplifies the rocket launch preparation process and improves reliability.
Smart Images

Figure CN117869113B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of launch vehicle tank structures, and in particular to a cryogenic tank propellant conveying structure and a launch vehicle. Background Art
[0002] The structure of the propellant delivery pipeline of the tank has an important impact on the propellant delivery efficiency, pressure loss, and structural weight. In the existing domestic common bottom tank technology, the external propellant delivery scheme is often adopted. The propellant of the upper tank reaches the engine through the delivery pipe arranged on the outer wall of the lower tank. The delivery pipeline structure is complicated, which not only introduces redundant structural weight, but also the convex envelope formed by the pipeline and bracket arranged outside the tank leads to a complex aerodynamic shape of the rocket, and the difficulty of aerodynamic shape optimization and flight trajectory design increases. Therefore, the upper tank propellant delivery pipe is adopted to pass through the lower tank, which can effectively shorten the propellant delivery path, improve the propellant delivery efficiency, and reduce the weight of the remaining propellant. Most of the existing non-common bottom launch vehicles adopt a double-layer tube propellant delivery scheme of a delivery pipe plus a tunnel tube, but the assembly of this scheme is complicated.
[0003] For example, the patent number CN 112282968 A, entitled A Low-temperature Common-bottom Tank for Internal Transportation of Propellant, discloses an assembled double-layer common-bottom tank consisting of "metal layer + PMI foam + metal layer" and a double-layer assembled internal transportation pipe structure, wherein a flow profile is arranged at the exact center of the upper metal layer of the common bottom, the upper end of the inner transportation pipe is welded and fixed to the upper metal layer of the common bottom, the upper end of the outer transportation pipe is assembled and connected to a flange arranged on the lower metal layer of the common bottom, the lower ends of the inner and outer transportation pipes are butt-jointed with the tank bottom through flanges, and after assembly, a vacuum is drawn between the inner and outer transportation pipes to ensure insulation reliability, thereby realizing low-temperature propellant transportation in the double-layer common-bottom tank.
[0004] However, this structure requires the upper box and the lower box to be bolted together. At the same time, the inner delivery pipe is welded to the upper metal layer of the common bottom. Considering the assembly accuracy, the outer delivery pipe and the lower box must be assembled in advance, and then the upper and lower boxes must be assembled and docked. When docking the upper and lower boxes, the inner delivery pipe must pass through the outer delivery pipe set in the lower box. Since the delivery pipe is a thin-walled structure with a compensation joint, its own rigidity is poor, and the difference in the diameter of the inner and outer pipes is small, the assembly is difficult; the assembly operation needs to match the coordination of the docking interface of the upper and lower metal layers of the common bottom and the coordination of the assembly interface of the inner and outer delivery pipes at the same time, which makes processing and manufacturing difficult. Summary of the invention
[0005] In view of this, the purpose of the embodiments of the present invention is to provide a cryogenic tank propellant delivery structure and a launch vehicle to solve the technical problem in the prior art that the assembly operation requires simultaneous matching of the coordination of the common bottom upper box and lower box docking interfaces and the coordination of the inner and outer delivery pipe assembly interfaces, which results in high processing and manufacturing difficulties.
[0006] To achieve the above-mentioned purpose, in a first aspect, an embodiment of the present invention provides a cryogenic tank propellant delivery structure, the delivery structure comprising an upper tank, a lower tank, a fork-shaped ring and a delivery pipe;
[0007] The upper box and the lower box are connected up and down through the fork-shaped ring;
[0008] An outflow flange is provided at the center of the rear bottom of the upper box, and a docking flange is provided at the rear bottom of the lower box;
[0009] The upper and lower ends of the delivery pipe are respectively sealed and connected to the outflow flange and the docking flange.
[0010] In some possible implementations, the delivery pipe includes: an upper flange, a lower flange, an inner pipe and an outer pipe, and a vacuum insulation layer is provided between the inner pipe and the outer pipe;
[0011] The upper flange is used to be connected to the outflow flange; the lower flange is used to be connected to the docking flange.
[0012] In some possible implementations, an inner compensation joint is provided on the inner tube to compensate for deformation caused by low-temperature shrinkage of the inner tube at low temperatures.
[0013] In some possible implementations, an outer compensation joint is provided on the outer tube to compensate for the low-temperature shrinkage of the inner tube and the deformation caused by tank pressurization.
[0014] In some possible implementations, a first sealing and heat-insulating assembly is provided between the upper flange of the delivery pipe and the outflow flange, and the upper flange and the outflow flange are fastened and connected by a first fastener;
[0015] The first sealing and heat-insulating assembly comprises a first sealing ring and a first heat-insulating pad, wherein the first sealing ring is arranged on the upper and lower sides of the first heat-insulating pad.
[0016] In some possible implementations, a heat-insulating layer is laid on the outer sides of the upper flange and the outflow flange, and the heat-insulating layer comprises low-temperature glue, aerogel insulation pad, glass fiber cloth and polyurea coating from the inside to the outside.
[0017] In some possible implementations,
[0018] A second sealing and heat-insulating assembly is arranged between the lower flange of the delivery pipe and the butt flange, and the upper flange is fastened and connected to the outflow flange by a second fastener;
[0019] The second sealing and heat-insulating assembly comprises a second sealing ring and a second heat-insulating pad, wherein the second sealing ring is arranged on the upper and lower sides of the second heat-insulating pad.
[0020] In some possible implementations, the delivery pipe is a vacuum structure in which the inner pipe and the outer pipe are integrally welded, or the delivery pipe is a vacuum structure in which the inner pipe and the outer pipe are sealed and connected by bolts.
[0021] In some possible implementations, the outer tube is a corrugated hose, and the inner tube is a thin-walled cylindrical structure.
[0022] In a second aspect, an embodiment of the present invention provides a launch vehicle, comprising a cryogenic tank propellant transport structure as described in any one of the first aspects.
[0023] The beneficial technical effects of the above technical solution are:
[0024] The embodiment of the present invention provides a cryogenic tank propellant delivery structure and a launch vehicle, wherein the delivery structure includes an upper tank, a lower tank, a fork-shaped ring and a delivery pipe; the upper tank and the lower tank are connected up and down by a fork-shaped ring; an outflow flange is provided at the center position of the rear bottom of the upper tank, and a docking flange is provided at the rear bottom position of the lower tank; the upper and lower ends of the delivery pipe are respectively sealed with the outflow flange and the docking flange. In the embodiment of the present invention, the upper tank and the lower tank can be connected by a fork-shaped ring, and there is no need to consider the coordination of the docking interface, and the upper and lower ends of the delivery pipe are respectively sealed with the outflow flange and the docking flange, so that the propellant in the tank can be delivered, and there is no need to consider the coordination of the delivery pipe assembly interface, and the delivery pipe structure is light in weight and the assembly operation is simple. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 It is a schematic diagram of the overall structure of a cryogenic tank propellant delivery structure according to an embodiment of the present invention;
[0027] Figure 2 yes Figure 1 The enlarged view of point I in the middle;
[0028] Figure 3 yes Figure 1 The enlarged view of II in the middle;
[0029] Figure 4 yes Figure 1 Enlarged view of position III in the middle;
[0030] Figure 5 yes Figure 1 Enlarged view of position IIII in the figure.
[0031] Description of Figure Numbers:
[0032] 1. Upper box; 11. Outlet flange;
[0033] 2. Unpack;
[0034] 3. Fork ring;
[0035] 4. Delivery pipe; 41. Upper flange; 42. Lower flange; 43. Inner pipe; 431. Inner compensation joint; 44. Outer pipe; 441. Outer compensation joint;
[0036] 5. The first fastener;
[0037] 61. first sealing ring; 62. first thermal insulation pad;
[0038] 7. Second fastener;
[0039] 81. Second sealing ring; 82. Second thermal insulation pad. DETAILED DESCRIPTION
[0040] The features and exemplary embodiments of various aspects of the present invention will be described in detail below. In the detailed description below, many specific details are proposed in order to provide a comprehensive understanding of the present invention. However, it is obvious to those skilled in the art that the present invention can be implemented without some of these specific details. The following description of the embodiments is only to provide a better understanding of the present invention by illustrating examples of the present invention. In the drawings and the following description, at least part of the known structures and technologies are not shown in order to avoid unnecessary ambiguity of the present invention; and, for clarity, the size of some structures may be exaggerated. In addition, the features, structures or characteristics described below may be combined in one or more embodiments in any suitable manner.
[0041] The embodiment of the present invention provides a cryogenic tank propellant delivery structure, wherein the upper tank and the lower tank are respectively provided with docking flanges, and the delivery pipe is respectively docked with the common bottom and rear bottom flanges to realize the delivery of propellant in the tank. The delivery structure of the embodiment of the present invention has a light weight of the delivery pipe structure and is easy to assemble and operate; in addition, compared with the existing scheme, before the rocket is erected and filled, the delivery pipe in the tank does not need to be vacuumed twice, which greatly simplifies the rocket launch preparation process, is easy to operate, and has high reliability.
[0042] Figure 1 is a schematic diagram of the overall structure of a cryogenic tank propellant delivery structure according to an embodiment of the present invention. Figure 2 yes Figure 1 The enlarged view at I in the figure is as follows: Figure 1 and Figure 2As shown, the conveying structure includes an upper box 1, a lower box 2, a fork-shaped ring 3 and a conveying pipe 4; the upper box 1 and the lower box 2 are connected up and down through the fork-shaped ring 3; Figure 3 The center of the rear bottom of the upper box 1 is provided with an outflow flange 11, see Figure 4 A docking flange 21 is provided at the rear bottom of the lower box 2, and the upper and lower ends of the delivery pipe 4 are sealedly connected to the outflow flange 11 and the docking flange 21 respectively.
[0043] In the embodiment of the present invention, the upper box 1 and the lower box 2 can be connected by the fork ring 3, and there is no need to consider the coordination of the docking interface. The upper and lower ends of the delivery pipe 4 are respectively sealed with the outflow flange 11 and the docking flange 21, so that the propellant in the tank can be transported without considering the coordination of the docking interface of the delivery pipe 4. The delivery pipe 4 has a light structure and simple assembly operation.
[0044] Figure 3 yes Figure 1 The enlarged view of II in the middle. Figure 4 yes Figure 1 The enlarged view of point III in the figure is as follows: Figures 1 to 4 As shown, in some embodiments, the delivery pipe 4 includes: an upper flange 41, a lower flange 42, an inner pipe 43 and an outer pipe 44, and a vacuum insulation layer is provided between the inner pipe 43 and the outer pipe 44; the upper flange 41 is used to connect with the outflow flange 11; after the lower flange 42 is used to connect with the docking flange 21, the lower flange 42 can be connected with the delivery hose of the engine propellant, so as to realize the transmission of the cryogenic propellant via the "upper box-delivery pipe-engine" to realize the delivery in the cryogenic propellant box. In the embodiment of the present invention, there is a vacuum insulation layer between the inner pipe 43 and the outer pipe 44, and before the rocket is erected and filled, the delivery pipe 4 in the box does not need to be vacuumed twice, which greatly simplifies the rocket launch preparation process, is simple to operate, and has high reliability.
[0045] Figure 5 yes Figure 1 The enlarged view of IIII in the figure is as follows: Figure 5 As shown, in some embodiments, an inner compensation joint 431 is provided on the inner tube 43 to compensate for the deformation caused by the low-temperature contraction of the low-temperature inner tube 43; an outer compensation joint 441 is provided on the outer tube 44 to compensate for the deformation caused by the low-temperature contraction of the inner tube 43 and the tank pressurization.
[0046] In this embodiment, during the operation of the tank, cryogenic propellant flows through the inner tube 43, and an inner compensating joint 431 is provided on the inner tube 43 to compensate for low-temperature shrinkage and deformation; an outer compensating joint 441 is provided on the outer tube 44 to compensate for low-temperature shrinkage of the inner tube and pressure-charging deformation of the tank; the delivery pipe 4 is sealed and assembled with the tank, and can be used for propellant delivery to the upper tank 1, which simplifies the rocket assembly and testing process.
[0047] It often takes several months for a launch vehicle to be manufactured, assembled, tested, and launched. Before the propellant is filled for the official launch, the inner tube 43 and the outer tube 44 of the delivery tube 4 are both at room temperature; given that there is often a large temperature difference between the two propellants used in the launch vehicle, after the propellant is filled, there will also be a corresponding temperature difference between the inside and outside of the delivery tube 4, which leads to inconsistent deformation of the inner tube 43 and the outer tube 44. In addition, before ignition and launch, in order to ensure the engine starting pressure requirement, the propellant tank will be pre-pressurized with gas, which causes the distance between the outflow flange 11 connected to the delivery tube 4 and the docking flange 21 to change under the action of the stamping pressure. In this embodiment, the design of the inner compensation section 431 and the outer compensation section 441 can adapt to these deformations and ensure the stability and safety of the entire system. Traditional rocket assembly involves a lot of testing and calibration to ensure the adaptability of each component under extreme conditions, and the use of the inner compensation section 431 and the outer compensation section 441 greatly reduces or simplifies the complexity of these testing and calibration work because they can self-adjust to adapt to deformation. By reducing stress and deformation due to temperature changes, these compensating nodes help improve the overall reliability of the rocket.
[0048] The inner compensation section 431 is usually located on the inner tube 43, and has a relatively simple structure. It is mainly made of flexible materials or stainless steel / aluminum alloy with elastic properties. It is arranged on the inner tube 43 at intervals, and can achieve axial compensation and have a smaller angle compensation capability to envelop manufacturing errors. The outer compensation section 441 is located on the outer tube 44, and has a more complex structure because it needs to compensate for the low-temperature shrinkage of the inner tube 43 and the pressure deformation of the tank at the same time. It can include multiple small sections, each of which has a certain deformation capability.
[0049] The shapes of the inner compensation section 431 and the outer compensation section 441 can be corrugated or spiral, which can achieve both axial compensation and smaller angular compensation capabilities for enveloping manufacturing errors.
[0050] like Figure 3 As shown, in some embodiments, in order to ensure the sealing and heat insulation performance between the upper flange 41 and the outlet flange 11, a first sealing and heat insulation assembly is arranged between the upper flange 41 of the delivery pipe 4 and the outlet flange 11, and the upper flange 41 and the outlet flange 11 are fastened and connected by the first fastener 5; the first sealing and heat insulation assembly includes a first sealing ring 61 and a first heat insulation pad 62, and the first sealing ring 61 is arranged on the upper and lower sides of the first heat insulation pad 62. In this embodiment, since the inside and outside of the delivery pipe 4 are two kinds of propellants of two temperatures, respectively, the effect of the first sealing ring 61 is to prevent the leakage of the propellant, and the first heat insulation pad 62 can prevent the heat from being transmitted through the flange joint surface.
[0051] In some embodiments, in order to make the inside and outside of the delivery pipe 4 completely insulated and meet the transportation requirements in the cryogenic propellant box, an insulation layer can be laid on the outside of the upper flange 41 and the outflow flange 11. The insulation layer can be low-temperature glue, aerogel insulation pad, glass fiber cloth and polyurea coating from the inside to the outside, wherein the aerogel insulation pad can be replaced with cork, polyurethane foam or ceramic fiber paper. Its advantage is that by arranging the insulation layer inside and outside the delivery pipe, heat can be effectively prevented from flowing into or out of the delivery pipe, thereby maintaining the temperature stability of the cryogenic propellant and preventing it from evaporating prematurely. The insulation layer adopts a variety of materials from the inside to the outside, each material provides protection for different temperature ranges and environmental conditions, forming a multi-layer protection structure to improve the insulation effect. Low-temperature glue can adapt to extreme low temperature environments and maintain good bonding properties; aerogel insulation pad has excellent insulation performance and lightweight characteristics; glass fiber cloth enhances structural strength and has certain insulation performance; polyurea coating as the outermost layer provides good weather resistance and chemical stability.
[0052] In some alternative embodiments, the following alternative implementations may be adopted: ceramic fiber paper can be used instead of aerogel insulation pads. Ceramic fiber paper has low thermal conductivity, high temperature resistance and good flexibility, and is suitable for surfaces of complex shapes. A layer of reflective material, such as aluminum foil or aluminized film, can be added to the outside of the insulation layer to effectively reflect external heat and reduce heat transfer to the delivery pipe. Polyurethane coating can be used instead of polyurea coating. Polyurethane coating also has good weather resistance and chemical stability, and can provide additional thermal insulation effect. The thermal insulation effect can be improved by increasing the thickness of each layer of material, but the weight and cost will also increase accordingly.
[0053] like Figure 4 As shown, in some embodiments, for the purpose of sealing and heat insulation performance between the lower flange 42 and the docking flange 21, a second sealing and heat insulation assembly can be provided between the lower flange 42 and the docking flange 21 of the delivery pipe 4, and the upper flange 41 is fastened and connected to the outflow flange 11 by a second fastener 7; the second sealing and heat insulation assembly includes a second sealing ring 81 and a second heat insulation pad 82, and the second sealing ring 81 is provided on the upper and lower sides of the second heat insulation pad 82. In this embodiment, since the inside and outside of the delivery pipe 4 are two kinds of propellants of two different temperatures, respectively, the effect of the second sealing ring 81 is to prevent the leakage of the propellant, and the second heat insulation pad 82 can prevent the heat from being transmitted through the flange docking surface.
[0054] In some embodiments, the first fastener 5 and the second fastener 7 both include bolts, flat washers, spring washers, and nuts.
[0055] like Figure 3 and Figure 4As shown, in some embodiments, the delivery pipe 4 is an integrally welded structure of an inner pipe 43 and an outer pipe 44, or the delivery pipe 4 is an integral structure of an inner pipe 43 and an outer pipe 44 sealed and connected by bolts. The embodiment of the present invention does not need to set an insulation layer on the outside of the inner pipe 43 and the inside of the outer pipe 44, nor does it need secondary vacuuming, which greatly simplifies the rocket launch preparation process, is simple to operate, and has high reliability. In addition, the delivery pipe 4 is an integrated product, and can be tested and verified by internal pressure, external pressure, and insulation in the state of parts, that is, the delivery pipe 4 can be tested separately. After the product is qualified, it is assembled by flange docking arranged on the common bottom and rear bottom of the tank. Compared with the traditional double-layer pipe box internal delivery solution, there is no need to use special tooling to complete the docking assembly operation of the inner pipe passing through the outer pipe, and the general assembly process is simple and reliable.
[0056] In some embodiments, the outer tube 44 is a corrugated hose and the inner tube 43 is a thin-walled cylindrical structure. The outer tube 44 is a corrugated hose, which has a strong ability to resist external pressure, can effectively reduce the weight of the structure, and improve the stability of external pressure, while the inner tube 43 is a thin-walled cylindrical structure, which not only has a strong internal pressure bearing capacity, but also has a low processing and manufacturing cost.
[0057] In addition, an embodiment of the present invention further provides a launch vehicle, which includes any one of the above-mentioned cryogenic tank propellant delivery structures.
[0058] In the embodiment of the present invention, the upper box 1 and the lower box 2 can be connected by the fork ring 3, and there is no need to consider the coordination of the docking interface. The upper and lower ends of the delivery pipe 4 are respectively sealed with the outflow flange 11 and the docking flange 21, so that the propellant in the tank can be transported without considering the coordination of the assembly interface of the delivery pipe 4. The delivery pipe 4 has a light structure and simple assembly operation.
[0059] The embodiment of the present invention does not need to set an insulation layer on the outside of the inner tube 43 and the inside of the outer tube 44, nor does it need secondary vacuuming, which greatly simplifies the rocket launch preparation process, is simple to operate, and has high reliability. In addition, the delivery pipe 4 is an integrated product, and can be tested and verified by internal pressure, external pressure, and insulation in the state of parts, that is, the delivery pipe 4 can be tested separately. After the product is qualified, it is assembled by flange docking set at the common bottom and rear bottom of the tank. Compared with the traditional double-layer pipe box internal delivery solution, there is no need to use special tooling to complete the docking assembly operation of the inner tube passing through the outer tube, and the general assembly process is simple and reliable.
[0060] In the description of the embodiments of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0061] In the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed, connected, connected" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0062] Although the present invention has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced by equivalents without departing from the scope of the present invention. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there are no structural conflicts. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A cryogenic tank propellant delivery structure, characterized in that: The conveying structure comprises an upper box (1), a lower box (2), a fork-shaped ring (3) and a conveying pipe (4); The upper box (1) and the lower box (2) are connected vertically via the fork-shaped ring (3); An outflow flange (11) is provided at the center of the rear bottom of the upper box (1), and a docking flange (21) is provided at the rear bottom of the lower box (2); The upper and lower ends of the delivery pipe (4) are respectively sealedly connected to the outflow flange (11) and the docking flange (21); The delivery pipe (4) comprises: an upper flange (41), a lower flange (42), an inner pipe (43) and an outer pipe (44); a vacuum insulation layer is provided between the inner pipe (43), the outer pipe (44) and the lower flange (42); The delivery pipe (4) is an integrated product and can be subjected to internal pressure, external pressure and thermal insulation tests in a component state. After the delivery pipe (4) is manufactured and tested, it is installed as a whole. The upper end of the delivery pipe (4) is connected to the outlet flange (11) via the upper flange (41), and the lower end of the delivery pipe (4) is connected to the docking flange (21) via the lower flange (42). Neither the inner pipe (43) nor the outer pipe (44) is directly connected to the outlet flange (11) or the docking flange (21). The delivery pipe (4) is a vacuum structure in which the inner pipe (43) and the outer pipe (44) are integrally welded, or the delivery pipe (4) is a vacuum structure in which the inner pipe (43) and the outer pipe (44) are sealed and connected by bolts.
2. A cryogenic tank propellant delivery structure according to claim 1, characterized in that: The inner tube (43) is provided with an inner compensation joint (431) for compensating for deformation caused by low-temperature shrinkage of the inner tube (43).
3. A cryogenic tank propellant delivery structure according to claim 1, characterized in that: The outer tube (44) is provided with an outer compensation joint (441) for compensating for the low-temperature shrinkage of the inner tube (43) and the deformation caused by tank pressurization.
4. A cryogenic tank propellant delivery structure according to claim 1, characterized in that: A first sealing and heat-insulating assembly is provided between the upper flange (41) of the delivery pipe (4) and the outlet flange (11), and the upper flange (41) and the outlet flange (11) are fastened and connected via a first fastener (5); The first sealing and heat-insulating assembly comprises a first sealing ring (61) and a first heat-insulating pad (62), wherein the first sealing ring (61) is arranged on the upper and lower sides of the first heat-insulating pad (62).
5. A cryogenic tank propellant delivery structure according to claim 4, characterized in that: A heat insulation layer is laid on the outer sides of the upper flange (41) and the outflow flange (11), wherein the heat insulation layer comprises, from the inside to the outside, low-temperature glue, aerogel insulation pad, glass fiber cloth and polyurea coating.
6. A cryogenic tank propellant delivery structure according to claim 1, characterized in that: A second sealing and heat-insulating assembly is provided between the lower flange (42) of the delivery pipe (4) and the docking flange (21), and the upper flange (41) is fastened and connected to the outflow flange (11) via a second fastener (7); The second sealing and heat-insulating assembly comprises a second sealing ring (81) and a second heat-insulating pad (82), wherein the second sealing ring (81) is arranged on the upper and lower sides of the second heat-insulating pad (82).
7. A cryogenic tank propellant delivery structure according to claim 1, characterized in that: The outer tube (44) is a corrugated hose, and the inner tube (43) is a thin-walled cylindrical structure.
8. A launch vehicle, characterized in that: The launch vehicle comprises a cryogenic tank propellant delivery structure as described in any one of claims 1-7.