A kind of assembled multifunctional horseway structure and construction method
By installing prefabricated multi-functional horse-drawn and using sound-absorbing and noise-reducing plates of silicon ceramic plates and stuffed felt materials, the problem of insufficient acoustic design is solved, and the sound clarity is improved and noise pollution is reduced. The acoustic quality of public spaces.
Patent Information
- Application Number
- CN202410222914.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-02-28
AI Technical Summary
The acoustic design of large public spaces such as opera houses, auditoriums and exhibition centers leads to poor sound reflection, insufficient reverberation time, low sound clarity, and echo, vibration and resonance phenomena, which cannot meet the acoustic requirements.
A prefabricated multi-function horse lane structure is adopted, including main support, bracket fixing parts, main crossbar frame, patterned base plate, patterned steel baffle, light translucent net, protective net and sound absorption noise reduction plate. These are installed through specific construction steps. The components are formed to form light bridge channel corridor pedals, skirting baffles and channel corridor guardrails. The sound-absorbing and noise-absorbing plate uses silicon ceramic plates and plush felt materials, and are fixed to the main crossbar frame and bracket to form a sound-absorbing plate to reduce sound noise.
Effectively absorb sound noise, improve the sound clarity of the underlying ceiling space, reduce noise pollution, extend reverberation time, and improve the acoustic quality of public spaces. It has the characteristics of simple structure, efficient installation and low maintenance.
Smart Images

Figure CN117905190B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of decoration, and in particular to an assembled multifunctional horseway structure and a construction method. Background Art
[0002] In recent years, with the rapid development of my country's economy and culture, people have higher and higher requirements for the acoustic quality of large public space environments. In particular, large-space public acoustics such as opera houses, auditoriums, conference centers, exhibition centers, and sports venues are mostly implemented using ordinary civil building sound insulation design, resulting in inadequate reflection of spatial sound, and the sound from the sound source cannot accurately fall on the audience seats; the reverberation time is insufficient, and the spatial reverberation time cannot be improved to meet the acoustic design target requirements; the clarity of the sound is insufficient, the sound quality is seriously defective, and echo, vibration, sound focusing and resonance phenomena occur, causing acoustic noise pollution, and failing to meet acoustic requirements. Summary of the invention
[0003] Due to the large cavity area of the suspended ceiling space in theaters, auditoriums, conference centers, exhibition centers, etc., in view of the shortcomings in the prior art, the purpose of the present invention is to provide an assembled multifunctional horseway structure and construction method to eliminate the disordered reflection and reverberation interference of the cavity sound in the ceiling on the sound of the lower ceiling space, thereby improving the clarity of the sound in the lower ceiling space.
[0004] In order to achieve the above objectives, the technical solution adopted by the present invention is:
[0005] An assembled multifunctional horseway structure, comprising a main support, a support fixing, a main crossbar frame, a patterned bottom plate, a patterned steel baffle, a light-transmitting net, a protective net, and a sound-absorbing and noise-reducing plate;
[0006] The main support includes type A main support and type B main support;
[0007] One end of the bracket fixing piece is installed on the main support, and the other end is installed and fixed on the structural floor;
[0008] The main force crossbar frame is used to fix the main force support;
[0009] The patterned bottom plate is fixedly mounted on the lower end of the main crossbar frame to form a light bridge passage corridor pedal;
[0010] The patterned steel baffle is fixedly installed between adjacent B-type main support brackets close to the A-type main support bracket to form a skirting baffle;
[0011] The light-transmitting net is fixedly installed on the outer side of the patterned steel baffle, and the A-type main support and the B-type main support are fixedly connected;
[0012] The protective net is fixedly installed between adjacent B-type main support brackets away from the A-type main support bracket to form a channel corridor guardrail;
[0013] The sound absorbing and noise reducing panels are respectively arranged and installed on the inner sides of the main cross bar frame, the A-type main support, and the B-type main support located on the outside.
[0014] As a preferred solution of the above, it includes guardrail cross bars, which are respectively arranged at the middle and lower ends of adjacent B-type main support away from the A-type main support.
[0015] As a preferred solution of the above, it includes a reinforcing cross bar, which is arranged and installed at the lower end of the adjacent A-type main force support.
[0016] As a preferred solution of the above, it includes a multifunctional cross bar, which is respectively arranged at the middle and lower ends of the adjacent B-type main support close to the A-type main support.
[0017] As a preferred solution of the above, it also includes a main force diagonal brace, one end of the main force diagonal brace is arranged and fixed on the upper end of the main force support, and the other end is provided with a diagonal brace fixing piece.
[0018] As a preferred solution of the above, the main cross bar frame includes an upper cross bar, a lower cross bar, a middle cross bar, and a supporting cross bar. The upper cross bar is arranged above the middle cross bar, and the lower cross bar is arranged below the middle cross bar; the supporting cross bar is arranged and fixed between the lower cross bars, and has the same length as the middle cross bar.
[0019] As a preferred solution of the above, the sound absorbing and noise reducing board includes a silicon ceramic board and a plush felt; the plush felt is arranged on the silicon ceramic board to form a sound absorbing board.
[0020] As a preferred solution of the above, the sound absorbing and noise reducing board further comprises a fixing frame, and the fixing frame is installed and fixed around the four sides of the sound absorbing board.
[0021] As a preferred solution of the above, the silicon ceramic plate includes, from top to bottom, a first silicon ceramic plate layer, a second silicon ceramic plate layer, and a wood grain skin.
[0022] A construction method of an assembled multifunctional horse trail structure, based on the above-mentioned assembled multifunctional horse trail structure, comprises the following steps:
[0023] S1. Confirm the layout position and layout requirements of the multifunctional sound-absorbing and noise-reducing light bridge in the inner cavity of the assembled ceiling, and lay out the lines and position them;
[0024] S2. Bracket fixing installation
[0025] According to the positioning of the line in step S1, the through bolt holes at the position of the bracket fixing part are drilled in place, and the bracket fixing part is fixedly installed on the structural floor;
[0026] S3. Installation of diagonal support bracket fixings
[0027] According to the positioning of the fixing holes of the diagonal brace fixing parts, after determining the installation position of the diagonal brace fixing parts, drill the holes for the explosive bolts at the bottom of the structural floor slab, and tighten and fix the diagonal brace fixing parts together with the explosive bolts;
[0028] S4. Main support installation
[0029] After the bracket fixings are installed, insert the main brackets into the bracket fixings according to the bracket fixing installation positions corresponding to the main brackets, and then connect and fix them with sleeve bolts respectively;
[0030] S5. Installation of main diagonal support frame
[0031] After the bracket fixings and main support are installed, align the fixing holes on the upper ends of the left and right main diagonal braces with the installation holes of the diagonal brace fixings, and then connect them with bolts; at the same time, align the fixing holes on the lower ends of the left and right main diagonal braces with the diagonal brace fixing holes on the main support, and connect and fix them with bolts to complete the installation of the main diagonal braces;
[0032] S6. Main frame crossbar installation
[0033] After the main support and main diagonal brace are installed, the main frame crossbars are installed from top to bottom, first install the upper crossbar, the middle crossbar, the small crossbar, then the lower crossbar, and finally the supporting crossbar; align the mounting holes at both ends of each crossbar with the mounting sleeves on the main support, and then use bolts to fix each crossbar on the main support;
[0034] S7. Installation of multifunctional crossbars, guardrail crossbars and reinforced crossbars
[0035] After the main frame crossbar is installed, first install the left multifunctional crossbar, then install the right guardrail crossbar, and finally install the reinforcement crossbar; during installation, align the mounting holes at both ends of each crossbar with the mounting sleeves on the main support, and then use bolts to fix each crossbar on the main support;
[0036] S8. Installation of steps, protective nets, skirting boards and light-transmitting nets in the corridor of the light bridge
[0037] After the installation of the multifunctional crossbar, guardrail crossbar and reinforced crossbar is completed, first take out the patterned bottom plate and lay it directly on the light bridge channel; then use the reserved screw holes on the finished protective net to fix the protective net on the right-side B-type main bracket with self-tapping screws to complete the installation of the protective net; then use the reserved screw holes on the patterned steel baffle to fix the self-tapping screws on the A-type main bracket under the left bridge; finally, reserve the movable hinge adjustment brackets around the light-transmitting net, and fix the light-transmitting net on the A-type main bracket and B-type main bracket under the left bridge with alloy self-tapping screws to complete the installation of the light-transmitting net;
[0038] S9. Installation of sound absorbing and noise reduction panels
[0039] After the installation of the pedals, protective nets, skirting baffles and light-transmitting nets in the corridor of the light bridge is completed, the alloy self-tapping bolts together with the sound-absorbing and noise-reducing boards are fixed on the light bridge frame according to the self-tapping bolt fixing holes reserved on the sound-absorbing and noise-reducing boards, and the sound-absorbing and noise-reducing boards of different sizes are installed and fixed on the light bridge frame in turn;
[0040] S10. After the overall structure assembly described in steps S1 to S9 is completed, an overall acoustic test is performed;
[0041] S11. After completing steps S1 to S10, clean and protect the entire structure.
[0042] Beneficial effects of the invention: The invention effectively absorbs the diffusion of sound noise, plays a good sound absorption and noise reduction effect, improves the clarity of sound in the bottom ceiling space, reduces noise pollution, increases the reverberation time of the auditorium space, and greatly improves and enhances the acoustic quality of the public space. The invention has the characteristics of simple and reliable structure, high installation efficiency, and low maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 This is the floor plan of the multi-purpose auditorium;
[0044] Figure 2 for Figure 1 Elevation drawing of middle AA;
[0045] Figure 3 for Figure 2 A partial enlarged view of middle E;
[0046] Figure 4 for Figure 3 The perspective structure diagram of middle D;
[0047] Figure 5 for Figure 4 A partial enlarged view of middle F;
[0048] Figure 6 for Figure 2 A partial enlarged view of B in the middle;
[0049] Figure 7 It is a structural schematic diagram of the main support;
[0050] Figure 8 This is the assembly drawing of the main diagonal brace and the main support;
[0051] Fig. 9 It is the assembly drawing of the bracket fixings and the structural floor;
[0052] Fig.10 It is the assembly drawing of the diagonal brace fixings and the structural floor;
[0053] Fig.11 It is the assembly drawing of the main crossbar frame and the main support;
[0054] Fig.12 It is the assembly drawing of the multifunctional crossbar, the reinforced crossbar, the guardrail crossbar and the main support;
[0055] Fig.13 This is the assembly drawing of the light-transmitting net, protective net and main support;
[0056] Fig.14 This is a structural diagram of one section of the assembly of the sound-absorbing and noise-reducing panel and the main support;
[0057] Fig.15 This is a schematic diagram of the exterior facade of the assembled multifunctional horseway structure;
[0058] Fig.16 This is a schematic diagram of the interior elevation of the assembled multifunctional horseway structure;
[0059] Fig.17 This is a schematic diagram of the structure of the sound-absorbing and noise-reducing board;
[0060] Fig.18 This is a schematic diagram of the decomposition of the sound-absorbing and noise-reducing panel.
[0061] The markings in the figure are as follows: 1. Structural floor; 2. Main diagonal brace; 3. Protective net; 4. Patterned bottom plate; 5. Patterned steel baffle; 6. Translucent net; 7. Sound-absorbing and noise-reducing board; 71. Silicon ceramic board; 711. First layer of silicon ceramic board; 712. Second layer of silicon ceramic board; 713. Wood grain leather; 72. Plush felt; 8. Main support; 81. Type A main support; 82. Type B main support; 9. Multi-function cross bar; 10. Lamps; 11. Diagonal brace fixings; 12. Bracket fixings; 13. Main diagonal brace; 14. Main cross bar frame; 15. Reinforced cross bar; 16. Guardrail cross bar; 17. Guardrail net. DETAILED DESCRIPTION
[0062] In order to make the purpose, technical solution and advantages of the present invention clearer and more specific, the content of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It is understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all the contents.
[0063] like Figures 1 to 18 As shown, the present invention provides an assembled multifunctional horse track structure, including a main support 8, a support fixing member 12, a main crossbar frame 14, a patterned bottom plate 4, a patterned steel baffle 5, a light-transmitting net 6, a protective net 3, and a sound-absorbing and noise-reducing plate 7;
[0064] The main support 8 includes an A-type main support 81 and a B-type main support 82;
[0065] One end of the bracket fixing member 12 is mounted on the main support 8, and the other end is mounted and fixed on the structural floor 1;
[0066] The main force crossbar frame 14 is used to fix and connect the main force bracket 8;
[0067] The patterned bottom plate 4 is fixedly mounted on the lower end of the main crossbar frame 14 to form a light bridge passage corridor pedal;
[0068] The patterned steel baffle plate 5 is fixedly installed between adjacent B-type main force brackets 82 near the A-type main force bracket 81 to form a kicking baffle plate;
[0069] The light-transmitting net 6 is fixedly installed on the outer side of the patterned steel baffle 5, and the A-type main support 81 is fixedly connected to the B-type main support 82;
[0070] The protection net 3 is fixedly installed between adjacent B-type main support brackets 82 away from the A-type main support bracket 81 to form a channel corridor guardrail;
[0071] The sound absorbing and noise reducing panels 7 are respectively arranged and installed on the inner sides of the main force cross bar frame 14, the A-type main force bracket 81, and the B-type main force bracket 82 located on the outside.
[0072] Among them, through the assembly of the above-mentioned main bracket 8, bracket fixing part 12, main cross bar frame 14, patterned bottom plate 4, patterned steel baffle 5, light-transmitting net 6, protective net 3, and sound-absorbing and noise-reducing plate 7, an assembled multifunctional horseway structure with a certain internal cavity is formed, which can effectively absorb the diffusion of sound noise, so that the noise is continuously reflected and refracted in the internal cavity, thereby further enhancing the absorption effect of noise, so as to eliminate the disordered reflection and reverberation interference of the sound in the ceiling cavity on the sound of the lower ceiling space, and play a good sound absorption and noise reduction effect, thereby improving the clarity of the sound in the lower ceiling space, reducing noise pollution, and ensuring that people at different positions in the large space can clearly distinguish the sound signal source, thereby meeting people's requirements for spatial acoustics.
[0073] Furthermore, it includes a guardrail crossbar 16, which is respectively arranged at the middle and lower ends of the adjacent B-type main support 82 away from the A-type main support 81 to increase the rigidity and support strength of the protection net 3, while also ensuring the stability of the overall structure.
[0074] Furthermore, it includes a reinforcing cross bar 15 , which is arranged and installed at the lower end of the adjacent A-type main force bracket 81 to increase the stability of the A-type main force bracket 81 .
[0075] Furthermore, it includes a multifunctional crossbar 9, which is respectively arranged at the middle and lower ends of the adjacent B-type main support 82 near the A-type main support 81; through the multifunctional crossbar 9, the bridge also has the functions of using some stage lighting 10 and maintaining the horseway, so as to achieve multifunctional comprehensive utilization. It should be noted that the horseway is equipped with a smoke exhaust port that can be remotely controlled by the fire control room or automatically opened in conjunction with the alarm, and has the function of fire smoke exhaust ventilation.
[0076] Furthermore, it also includes a main diagonal brace frame 13, one end of which is set and fixed on the upper end of the main support 8, and the other end is provided with a diagonal brace frame fixing part 11; so as to increase the rigidity and seismic resistance of the main support 8, while ensuring the stability of the main support 8, and also increasing the stability of the entire device, thereby providing a basic stability guarantee for the assembly of the assembled multi-functional horseway structure.
[0077] Furthermore, the main crossbar frame 14 includes an upper crossbar, a lower crossbar, a middle crossbar, and a supporting crossbar. The upper crossbar is arranged above the middle crossbar, and the lower crossbar is arranged below the middle crossbar; the supporting crossbar is arranged and fixed between the lower crossbars, and has the same length as the middle crossbar. The main crossbar frame 14 is used to fix and connect the main brackets 8 to ensure the stability of the basic channel of the assembled optical bridge.
[0078] Furthermore, the sound-absorbing and noise-reducing board 7 includes a silicon ceramic board 71 and a plush felt 72; the plush felt 72 is arranged on the silicon ceramic board 71 to form a sound-absorbing board, and a double-layer sound-absorbing board is used to achieve double sound insulation performance.
[0079] Furthermore, the sound absorbing and noise reducing board 7 further includes a fixing frame 73, which is installed and fixed around the sound absorbing board to fix and support the sound absorbing board and realize edge sealing of the sound absorbing board.
[0080] Furthermore, the silicon ceramic board 71 includes, from top to bottom, a first silicon ceramic board 711, a second silicon ceramic board 712, and a wood grain skin 713. The silicon ceramic board 71 is an acoustic silicon ceramic board. The present invention uses an acoustic silicon ceramic board to replace the traditional gypsum board or silicate board ceiling. When sound is incident on the surface of the silicon ceramic board, the sound wave will penetrate the surface into the material. Due to the viscosity and friction resistance generated by the movement of air, the sound energy is gradually converted into heat energy and consumed, thereby generating a sound absorption effect, making its sound absorption performance higher than other thin plate materials, and the sound absorption coefficient reaches more than 0.5. Therefore, there is no need to add auxiliary sound insulation materials such as glass wool on the back, which greatly reduces the ceiling load, and its fire resistance meets the requirements of "Classification of Combustion Performance of Building Materials and Products" GB8624-2012.
[0081] A construction method of an assembled multifunctional horse trail structure, based on the above-mentioned assembled multifunctional horse trail structure, comprises the following steps:
[0082] S1. Confirm the layout position and layout requirements of the multifunctional sound-absorbing and noise-reducing light bridge in the inner cavity of the assembled ceiling, and lay out the lines and position them;
[0083] S2. Bracket fixing installation
[0084] According to the positioning of the line in step S1, the through bolt holes of the bracket fixing member 12 are drilled in place, and the bracket fixing member 12 is fixedly installed on the structural floor 1;
[0085] S3. Installation of diagonal support bracket fixings
[0086] According to the positioning of the fixing holes of the diagonal brace fixing member 11, after determining the installation position of the diagonal brace fixing member 11, the explosive bolt holes are drilled in place at the bottom of the structural floor 1, and the diagonal brace fixing member 11 is tightened and fixed together with the explosive bolts;
[0087] S4. Main support installation
[0088] After the bracket fixing member 12 is installed, the main bracket 8 is inserted into the bracket fixing member 12 according to the installation position of the bracket fixing member 12 corresponding to each main bracket 8, and then connected and fixed with sleeve bolts respectively;
[0089] S5. Installation of main diagonal support frame
[0090] After the bracket fixing member 12 and the main support 8 are installed, align the fixing holes at the upper ends of the left and right main diagonal braces 13 with the mounting holes of the diagonal brace fixing member 11, and then connect them with bolts; at the same time, align the fixing holes at the lower ends of the left and right main diagonal braces 13 with the diagonal brace fixing holes 11 on the main support, and connect and fix them with bolts to complete the installation of the main diagonal braces 13;
[0091] S6. Main frame crossbar installation
[0092] After the main support 8 and the main diagonal brace 13 are installed, the main frame crossbar 14 is installed in a top-down order, first installing the upper crossbar, the middle crossbar, the small crossbar, then the lower crossbar, and finally the supporting crossbar; align the mounting holes at both ends of each crossbar with the mounting sleeves on the main support, and then fix each crossbar on the main support 8 with bolts;
[0093] S7. Installation of multifunctional crossbars, guardrail crossbars and reinforced crossbars
[0094] After the main frame cross bar 14 is installed, the left multifunctional cross bar 9 is installed first, then the right guardrail cross bar 16 is installed, and finally the reinforcing cross bar 15 is installed; during installation, the mounting holes at both ends of each cross bar are aligned with the mounting sleeves on the main support 8, and then each cross bar is fixed to the main support 8 with bolts to increase the rigidity and stability of the overall structure.
[0095] S8. Installation of steps, protective nets, skirting boards and light-transmitting nets in the corridor of the light bridge
[0096] After the multifunctional crossbar 9, the guardrail crossbar 16, and the reinforcing crossbar 15 are installed, first take out the patterned bottom plate 4, and lay the patterned bottom plate 4 directly on the light bridge channel; then use the reserved screw holes on the finished protective net 3 to fix the protective net 4 on the right B-type main bracket 82 with self-tapping screws to complete the installation of the protective net 3; then use the reserved screw holes on the patterned steel baffle 5 to fix the self-tapping screws on the A-type main bracket 81 under the left bridge; finally, reserve movable hinges around the light-transmitting net 6 to adjust the brackets, and use alloy self-tapping screws to fix the light-transmitting net 6 on the A-type main bracket 81 and the B-type main bracket 82 under the left bridge, respectively, to complete the installation of the light-transmitting net 6;
[0097] S9. Installation of sound absorbing and noise reduction panels
[0098] After the installation of the light bridge corridor pedal, protective net 3, skirting baffle and light-transmitting net 6 is completed, the alloy self-tapping bolts together with the sound-absorbing and noise-reducing board 7 are fixed on the light bridge frame according to the self-tapping bolt fixing holes reserved on the sound-absorbing and noise-reducing board 7, and the sound-absorbing and noise-reducing boards 7 of different sizes are installed and fixed on the light bridge frame in turn;
[0099] S10. After the overall structure described in steps S1 to S9 is assembled, an overall acoustic test is performed to correct any problems that may occur in the decoration. During the construction, a "sample first" method can also be implemented, where a sample is made according to the construction plan, and then construction is carried out after it is inspected and qualified by relevant personnel. Intermediate tests are required during sample construction to correct deviations in acoustic calculations, and problems that do not meet the requirements of acoustic decoration are discovered and corrected in a timely manner;
[0100] S11. After completing steps S1 to S10, clean and protect the entire structure, and protect the finished product.
[0101] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable ordinary technicians in the field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made based on the essence of the content of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled multifunctional horseway structure, comprising a main support, a support fixing, a main crossbar frame, a patterned bottom plate, a patterned steel baffle, a light-transmitting net, a protective net, and a sound-absorbing and noise-reducing plate, characterized in that: The main support includes type A main support and type B main support; One end of the bracket fixing piece is installed on the main support, and the other end is installed and fixed on the structural floor; The main force crossbar frame is used to fix the main force support; The patterned bottom plate is fixedly mounted on the lower end of the main crossbar frame to form a light bridge passage corridor pedal; The patterned steel baffle is fixedly installed between adjacent B-type main support brackets close to the A-type main support bracket to form a skirting baffle; The light-transmitting net is fixedly installed on the outer side of the patterned steel baffle, and the A-type main support and the B-type main support are fixedly connected; The protective net is fixedly installed between adjacent B-type main support brackets away from the A-type main support bracket to form a channel corridor guardrail; The sound absorbing and noise reducing panels are respectively arranged and installed on the inner side of the main force cross bar frame, the A-type main force bracket, and the B-type main force bracket located on the outside; It includes a guardrail crossbar, which is respectively arranged at the middle and lower ends of the adjacent B-type main support away from the A-type main support; It includes a multifunctional crossbar, which is respectively arranged at the middle and lower ends of the adjacent B-type main support close to the A-type main support; the horseway is provided with a smoke exhaust port which is remotely controlled by the fire control room or automatically opened in conjunction with an alarm; and a lamp is also installed on the multifunctional crossbar; The sound-absorbing and noise-reducing board comprises a silicon ceramic board and a plush felt; the plush felt is arranged on the silicon ceramic board to form a sound-absorbing board.
2. The assembled multifunctional horse track structure according to claim 1 is characterized in that: It also includes a main force diagonal brace frame, one end of which is arranged and fixed on the upper end of the main force support, and the other end is provided with a diagonal brace frame fixing piece.
3. The assembled multifunctional horse track structure according to claim 1 is characterized in that: The main cross bar frame includes an upper cross bar, a lower cross bar, a middle cross bar, and a supporting cross bar. The upper cross bar is arranged above the middle cross bar, and the lower cross bar is arranged below the middle cross bar. The supporting cross bar is arranged and fixed between the lower cross bars, and has the same length as the middle cross bar.
4. The assembled multifunctional horse track structure according to claim 1 is characterized in that: The sound absorbing and noise reducing board also includes a fixing frame, and the fixing frame is installed and fixed around the sound absorbing board.
5. The assembled multifunctional horse track structure according to claim 1 is characterized in that: The silicon ceramic plate comprises, from top to bottom, a first silicon ceramic plate layer, a second silicon ceramic plate layer, and a wood grain skin.
6. A construction method for an assembled multifunctional horse trail structure, based on the assembled multifunctional horse trail structure according to claim 1, characterized in that: The steps include: S1. Confirm the layout position and layout requirements of the multifunctional sound-absorbing and noise-reducing light bridge in the inner cavity of the assembled ceiling, and lay out the lines and position them; S2. Bracket fixing installation According to the positioning of the line in step S1, the through bolt holes at the position of the bracket fixing part are drilled in place, and the bracket fixing part is fixedly installed on the structural floor; S3. Installation of diagonal support bracket fixings According to the positioning of the fixing holes of the diagonal brace fixing parts, after determining the installation position of the diagonal brace fixing parts, drill the holes for the explosive bolts at the bottom of the structural floor slab, and tighten and fix the diagonal brace fixing parts together with the explosive bolts; S4. Main support installation After the bracket fixings are installed, insert the main brackets into the bracket fixings according to the bracket fixing installation positions corresponding to the main brackets, and then connect and fix them with sleeve bolts respectively; S5. Installation of main diagonal support frame After the bracket fixings and main support are installed, align the fixing holes on the upper ends of the left and right main diagonal braces with the installation holes of the diagonal brace fixings, and then connect them with bolts; at the same time, align the fixing holes on the lower ends of the left and right main diagonal braces with the diagonal brace fixing holes on the main support, and connect and fix them with bolts to complete the installation of the main diagonal braces; S6. Main frame crossbar installation After the main support and main diagonal brace are installed, the main frame crossbars are installed from top to bottom, first install the upper crossbar, the middle crossbar, the small crossbar, then the lower crossbar, and finally the supporting crossbar; align the mounting holes at both ends of each crossbar with the mounting sleeves on the main support, and then use bolts to fix each crossbar on the main support; S7. Multifunctional crossbar, guardrail crossbar, and reinforced crossbar installation After the main frame crossbar is installed, first install the left multifunctional crossbar, then install the right guardrail crossbar, and finally install the reinforcement crossbar; during installation, align the mounting holes at both ends of each crossbar with the mounting sleeves on the main support, and then use bolts to fix each crossbar on the main support; S8. Installation of steps, protective nets, skirting boards and light-transmitting nets in the corridor of the light bridge After the installation of the multifunctional crossbar, guardrail crossbar and reinforced crossbar is completed, first take out the patterned bottom plate and lay it directly on the light bridge channel; then use the reserved screw holes on the finished protective net to fix the protective net on the right-side B-type main bracket with self-tapping screws to complete the installation of the protective net; then use the reserved screw holes on the patterned steel baffle to fix the self-tapping screws on the A-type main bracket under the left bridge; finally, reserve the movable hinge adjustment brackets around the light-transmitting net, and fix the light-transmitting net on the A-type main bracket and B-type main bracket under the left bridge with alloy self-tapping screws to complete the installation of the light-transmitting net; S9. Installation of sound absorbing and noise reduction panels After the installation of the pedals, protective nets, skirting baffles and light-transmitting nets in the corridor of the light bridge is completed, the alloy self-tapping bolts together with the sound-absorbing and noise-reducing boards are fixed on the light bridge frame according to the self-tapping bolt fixing holes reserved on the sound-absorbing and noise-reducing boards, and the sound-absorbing and noise-reducing boards of different sizes are installed and fixed on the light bridge frame in turn; S10. After the overall structure assembly of steps S1 to S9 is completed, overall acoustic testing is performed; S11. After completing steps S1 to S10, clean and protect the entire structure.
Citation Information
Patent Citations
Modular truss roof structure and manufacturing method
CN110984456A
Mounting structure for roof trusses and arc-shaped multilayer berm and construction method of berm
CN111852041A
Ceramic fiber ceiling and hung ceiling system thereof
CN112282258A
Maintenance passageway acoustic panel connection device
CN201517275U
