A method for arranging earthquake monitoring arrays in a dam

By arranging a acceleration sensor and a soil pressure gauge array in the dam body, the acceleration and horizontal positive stress of the dam foundation soil are measured, and the problem of real-time monitoring and accurate analysis of changes in the dynamic characteristics of the dam foundation is solved in the prior art, and the dam foundation is realized Real-time monitoring and accurate analysis of soil dynamic characteristics improve the reliability of seismic design and safe operation.

CN117908089BActive Publication Date: 2024-12-03ZHEJIANG UNIV +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202311719055.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-12-03
Estimated Expiration
2043-12-14

AI Technical Summary

Technical Problem

The prior art cannot monitor and feedback changes in the dynamic characteristics of the dam foundation soil in real time, and cannot accurately analyze the dynamic stress-dynamic strain relationship of the soil in the presence of an superstructure, resulting in challenges in seismic design and safe operation.

Method used

By arranging an acceleration sensor array and a soil pressure gauge array in the dam body, the acceleration and horizontal positive stress of the dam foundation soil are measured, and an inversion method is established to calculate the shear stress-shear strain relationship of the soil to provide more accurate dynamic parameter analysis.

Benefits of technology

Real-time monitoring and accurate analysis of the dynamic characteristics of the dam foundation soil is realized, the reliability and safe operation of seismic design are improved, the monitoring array layout plan is simplified, and the cost and complexity are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117908089B_ABST
    Figure CN117908089B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for arranging an array of earthquake monitoring stations in a dam body. The method includes establishing a calculation method for inverting the dynamic parameters of the dam foundation soil body under the consideration of the change of the horizontal normal stress; based on the inversion method, an array arrangement scheme is proposed, in which an array of earth pressure gauges is arranged at the same elevation on both sides of the acceleration sensor array when the acceleration sensor array is arranged along the depth direction; the acceleration data monitored by the array when the site encounters an earthquake is used to invert the stress-strain hysteresis loop of the dam foundation soil body, and then the dynamic shear modulus, damping ratio and other soil dynamic parameters of the soil body are calculated. The method of the present invention overcomes the shortcomings of the existing inversion method of the dynamic parameters of the dam foundation soil body that ignores the influence of the change of the horizontal normal stress of the dam foundation soil body on the shear stress. By arranging the array of earth pressure gauges at the same elevation on both sides of the acceleration sensor array, the change of the horizontal normal stress is measured. The scheme is simple and the inversion result is reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy projects, and in particular relates to a method for arranging an earthquake monitoring array in a dam body. Background Art

[0002] For a dam built on a deep overburden, its stability depends not only on the seismic stability of the dam body, but also on the seismic performance of the dam foundation. The dynamic parameters of the dam foundation soil are reference indicators for the seismic performance analysis of the dam foundation. The seismic response analysis of the soil layer is an important part of determining the seismic parameters of the site. Accurate analysis of the dynamic characteristics of the dam foundation soil has important reference value for the seismic design and safe operation of the dam body.

[0003] The dynamic stress-strain relationship of soil is the basis of soil dynamic characteristics analysis, and is currently generally measured in situ. The main physical quantity of the field test is the wave velocity of the soil, from which the initial modulus of the soil can be obtained. However, due to the construction service process and earthquake action, most of the soil dynamic parameters have changed compared with the original site, and due to the granular and multi-phase characteristics of the soil and the lack of effective deformation measurement methods, the internal strain of the soil is difficult to measure directly. In-situ testing can only reflect the dynamic shear deformation characteristics of the soil at a certain state. If you want to understand the changes in the dynamic characteristics of the soil in a certain period, you need to take samples multiple times, which is cumbersome and costly. When the dam is completed, due to the existence of the upper dam structure, it is impossible to take samples for in-situ testing of the dam foundation. In addition, when an earthquake occurs, the seismic characteristics in the site change rapidly, and in-situ testing cannot obtain the dynamic stress-strain relationship of the soil during the earthquake in a timely manner.

[0004] The monitoring data of the field sensor array can directly reflect the dynamic characteristics of the soil and can be used to evaluate the long-term seismic service performance of rock and soil structures. The array helps to study the actual dynamic response of the in-situ soil and even the entire site under various load conditions, which cannot be truly restored by in-situ tests and indoor tests. The station will record the duration, magnitude and acceleration at the bottom of the hole of each earthquake. The study of the seismic characteristics of the site is based on the acceleration time history record. The cyclic shear stress-shear strain inversion method based on the earthquake acceleration response data recorded by the field array has become an effective means to indirectly calculate the dynamic characteristic parameters of the soil. When an earthquake occurs, the seismic characteristics of the site change to a certain extent. The in-situ test cannot determine the change characteristics of the specific parameters, while the inversion method can make further specific analysis of the site parameters and obtain the change characteristics of the specific parameters, thereby providing real-time feedback on the changes in the dynamic characteristics of the soil.

[0005] The main disadvantages of existing related technologies or methods are as follows: (1) Existing in-situ tests are often complicated to operate, have a small scope of application, and cannot monitor and feedback the changes in soil dynamic characteristics in real time. (2) Existing in-situ soil shear strength tests can only measure the shear strength of soil under natural stress state, and cannot simulate the shear strength of soil with upper structure and the changes in dynamic stress and strain during earthquake, which has certain limitations. (3) The inversion analysis method based on acceleration sensor array is often used in horizontal free fields, and is not suitable for the inversion of dynamic parameters of dam foundation soil when there is a dam structure on the upper part.

[0006] In existing research, the one-dimensional shear beam model is often used to perform inverse analysis of acceleration. This method is not applicable to the inverse analysis of stress and strain of the dam foundation soil with an overlying dam body. There are two reasons: 1) The research object in the one-dimensional shear beam model is a free foundation 2) It is assumed that the shear stress and shear strain of the free surface are both 0. In addition, some scholars often ignore the influence of the lateral normal stress in the soil in the force analysis of the unit soil under the non-horizontal free surface, which affects the accuracy of the inversion results. Summary of the invention

[0007] In order to solve the problems existing in the background technology, the purpose of the present invention is to provide a method for arranging an array of earthquake monitoring stations in a dam body, taking into account the influence of the change of the lateral normal stress in the dam foundation soil, and measuring the change of the horizontal normal stress by arranging an array of earth pressure gauges to obtain a more accurate soil shear stress-shear strain relationship. Based on the recorded acceleration data and dynamic earth pressure data of the dam foundation soil, a calculation method for inversion of the dynamic parameters of the dam foundation soil is directly given, and a concise and intuitive array arrangement scheme is provided for different positions of the dam foundation. In order to utilize the acceleration data monitored by the array when the site encounters an earthquake, the stress-strain hysteresis loop of the dam foundation soil is inverted to more accurately analyze the dynamic characteristics of the dam foundation soil, and provide a reliable reference for the seismic design and safe operation of the dam body.

[0008] The technical solution adopted by the present invention is as follows, comprising the following steps:

[0009] Step 1: First, an acceleration sensor array is arranged inside the earth-rock dam;

[0010] The acceleration sensor array is mainly composed of acceleration sensors distributed in an array and arranged at intervals;

[0011] Step 2: two earth pressure gauges are arranged at the same elevation on the left and right sides of each acceleration sensor, respectively, and the earth pressure gauges distributed in an array constitute an earth pressure gauge array;

[0012] The acceleration sensor array and the earth pressure gauge array together constitute a seismic monitoring array for measuring soil dynamic parameters; the acceleration sensor array and the earth pressure gauge array are used to measure the acceleration and horizontal normal stress of the soil inside the dam and the dam foundation respectively.

[0013] The acceleration sensor array comprises a plurality of columns, and each column of the acceleration sensor array is arranged in the embankment and the dam foundation at intervals along the river.

[0014] The acceleration sensor array comprises a plurality of rows, and each row in the acceleration sensor array is arranged in the dam and the dam foundation at intervals along the depth direction.

[0015] A row of acceleration sensors are arranged at the center axis of the earth-rock dam, the center line of the upstream weight-bearing area, and the center line of the downstream weight-bearing area.

[0016] The acceleration sensors in the same column of the acceleration sensor array have consistent elevations.

[0017] The row spacing between two adjacent rows in the acceleration sensor array is less than the shortest wavelength λ of the seismic wave at the site. min 1 / 8 of the earth pressure gauge array; the spacing of the earth pressure gauge array in the depth direction is less than the shortest wavelength λ of the seismic wave at the site min 1 / 8 of.

[0018] Application of a seismic monitoring array in determining dynamic parameters of dam foundation soil.

[0019] The dynamic parameters of the dam foundation soil include soil shear modulus and damping ratio.

[0020] A method for applying a seismic monitoring array to determine dynamic parameters of dam foundation soil comprises the following steps:

[0021] Step S1, first, establish expressions for shear stress and shear strain of dam foundation soil considering the change of horizontal normal stress;

[0022] Step S2, then, using the acceleration sensor array and the earth pressure gauge array in the seismic monitoring array, respectively measure the acceleration and horizontal normal stress of the soil in the dam and the dam foundation; and substitute the acceleration and horizontal normal stress into the expression of shear stress and shear strain of the dam foundation soil to obtain the shear stress and shear strain results;

[0023] Step S3, drawing a stress-strain hysteresis curve according to the shear stress and shear strain of the dam foundation soil, and finally obtaining the soil shear modulus and damping ratio according to the stress-strain hysteresis curve;

[0024] The expression of the soil shear modulus is:

[0025]

[0026] Among them, G sec is the shear modulus; τ max , τ min are the maximum and minimum values ​​of shear stress in the stress-strain hysteresis curve, γ max , γ min are the shear strains corresponding to the maximum shear stress and the minimum shear stress respectively;

[0027] The damping ratio expression is:

[0028]

[0029] Where, λ is the damping ratio; ΔW is the energy loss in the stress cycle; γ max , τ max are the maximum values ​​of shear strain and shear stress, respectively.

[0030] In step S1, when considering the change of horizontal normal stress, the expression of shear stress of dam foundation soil is:

[0031]

[0032] Among them, τ(z i ) indicates the depth is z i The soil shear stress at the location; i is the number of layers from top to bottom of the acceleration sensors arranged along the depth direction; z i is the depth of the i-th layer acceleration sensor; ρ is the soil density; is the horizontal acceleration at the depth of the i-th layer acceleration sensor; Δz i is the vertical distance between the acceleration sensor on the i-th layer and the acceleration sensor on the i-1th layer; is the rate of change of the horizontal normal stress at the depth of the i-th layer earth pressure gauge;

[0033] When considering the change of horizontal normal stress, the expression of shear strain of dam foundation soil is:

[0034]

[0035] Among them, γ(z i-1 ) indicates the depth is z i-1 The soil shear strain at i The depth is z i The position is determined by the acceleration Soil displacement obtained by quadratic integration.

[0036] The method of the present invention includes a method for arranging an array of earthquake monitoring stations in a dam body, and establishes an inversion relationship between the shear stress, shear strain, horizontal acceleration, and dynamic earth pressure of the dam foundation soil when considering the change of horizontal normal stress. Further, an array arrangement scheme is proposed for different positions of the dam foundation, and it is recommended that when a single-axis downstream acceleration sensor array is arranged along the depth direction, an earth pressure gauge array is arranged at the same elevation on both sides of the acceleration sensor array. At the position where the horizontal normal stress change is zero (dam axis, upstream and downstream pressure area), a single-axis downstream acceleration sensor array can be arranged only along the depth direction (along the upstream and downstream direction). The acceleration and dynamic earth pressure data monitored by the array when the site encounters an earthquake are used to invert the stress-strain hysteresis loop of the dam foundation soil, and then the soil dynamic parameters such as the dynamic shear modulus and damping ratio of the soil are calculated.

[0037] The beneficial effects of the present invention are:

[0038] 1. The dam foundation dynamic characteristic inversion method proposed in the present invention takes into account the influence of the upper dam structure on the lateral normal stress of the dam foundation soil, more reasonably reflects the actual stress state of the dam foundation soil, improves the accuracy of the dynamic stress-dynamic strain inversion results, and can more reliably and comprehensively analyze the dynamic characteristics of the soil; the dam foundation soil dynamic stress-dynamic strain inversion method proposed in the present invention, which is obtained from the acceleration and dynamic earth pressure data, can obtain the change of dynamic stress-dynamic strain and the shear modulus of the soil at any depth where the acceleration sensor array is located during an earthquake by interpolation, and the method is simple, fast and cost-saving.

[0039] 2. The arrangement scheme of earthquake monitoring array in the dam body proposed by the present invention measures the rate of change of horizontal normal stress of the dam foundation soil by laying earth pressure gauges. The method is simple and feasible. It can be used permanently during the effective service period after being built once, saving manpower, material and financial resources. It can monitor data in real time when any earthquake occurs, and timely obtain the changes in dynamic parameters of the dam foundation soil in combination with the inversion method, providing a reliable reference for the safe operation of the dam body and the analysis of the seismic performance of the dam foundation.

[0040] 3. The method of the present invention overcomes the shortcoming of the existing dam foundation soil dynamic parameter inversion method that ignores the influence of the horizontal normal stress change of the dam foundation soil on the shear stress. By arranging an earth pressure gauge array at the same elevation on the left and right sides of the acceleration sensor array, the earth pressure gauge measures the change in the horizontal normal stress. The scheme is simple and the inversion result is reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 This is a schematic diagram of the layout of the seismic monitoring array inside the dam body;

[0042] Figure 2 This is a schematic diagram of stress analysis of the dam foundation soil unit;

[0043] Figure 3It is a schematic diagram of the inversion model based on acceleration and earth pressure array;

[0044] Figure 4 Schematic diagram of calculating shear modulus and damping ratio for stress-strain hysteresis loop;

[0045] In the figure: 1. Dam body; 2. Dam foundation; 3. Accelerometer; 4. Earth pressure gauge; 5. Dam centerline; 6. Centerline of upstream and downstream weight zones. DETAILED DESCRIPTION

[0046] The present invention is described in detail below in conjunction with specific implementation cases. The following implementation cases will help those skilled in the art to further understand the present invention, but will not limit the present invention in any form.

[0047] The method of the present invention includes establishing a calculation method for inverting the dynamic parameters of the dam foundation soil under the consideration of the change of the horizontal normal stress; based on the above inversion method, it is proposed that when a single-axis downstream acceleration sensor array is arranged along the depth direction, an array arrangement scheme of earth pressure gauge arrays should be arranged at the same elevation on both sides of the left and right sides of the acceleration sensor array. In particular, at the position where the horizontal normal stress change is zero (dam axis, upstream and downstream pressure areas), a single-axis downstream acceleration sensor array can be arranged only along the depth direction (along the upstream and downstream directions) to simplify the array arrangement scheme. Using the acceleration and dynamic earth pressure data monitored by the array when the site encounters an earthquake, the stress-strain hysteresis loop of the dam foundation soil is inverted, and then the soil dynamic parameters such as the dynamic shear modulus and damping ratio of the soil are calculated.

[0048] The method for arranging an earthquake monitoring array in a dam body of the present invention comprises the following steps:

[0049] Step 1: First, arrange the acceleration sensor array inside the earth-rock dam, such as Figure 1 As shown,

[0050] The acceleration sensor array is mainly composed of 3 acceleration sensors distributed in an array and arranged at intervals;

[0051] Step 2: two earth pressure gauges 4 are arranged at the same height on the left and right sides of each acceleration sensor 3, and the earth pressure gauges 4 distributed in an array form an earth pressure gauge array;

[0052] The acceleration sensor array and the earth pressure gauge array together constitute a seismic monitoring array for measuring soil dynamic parameters; the acceleration sensor array and the earth pressure gauge array are used to measure the acceleration and horizontal normal stress of the soil in the embankment and dam foundation respectively, and the acceleration sensor array and the earth pressure gauge array together constitute a seismic monitoring array.

[0053] In a specific implementation, the soil dynamic parameters include soil shear modulus and damping ratio.

[0054] The acceleration sensor array comprises a plurality of columns, and each column of the acceleration sensor array is arranged in parallel and at intervals along the river in the embankment and the dam foundation.

[0055] The acceleration sensor array comprises a plurality of rows, and each row in the acceleration sensor array is arranged at intervals in the dam and the dam foundation along the depth direction.

[0056] A row of acceleration sensors are arranged at the dam center axis 5 (i.e. the dam center axis), the center line of the upstream weighted area, and the center line of the downstream weighted area of ​​the earth-rock dam.

[0057] In a specific implementation, the earth pressure gauge 4 may not be installed at the dam center axis 5 (i.e., the embankment center axis), the center line of the upstream weighted area, and the center line of the downstream weighted area.

[0058] The acceleration sensors 3 in the same column of the acceleration sensor array have the same elevation.

[0059] The spacing between two adjacent rows of the acceleration sensor array is less than the shortest wavelength λ of the seismic wave at the site. min 1 / 8 of the depth, that is, the spacing of the acceleration sensor array along the depth direction should be less than the shortest wavelength λ of the seismic wave at the site. min 1 / 8 of the total length; the spacing of each row of the earth pressure gauge array along the depth direction is less than the shortest wavelength λ of the seismic wave at the site min 1 / 8 of the horizontal normal stress of the soil between adjacent earth pressure gauges 4, assuming that the change rate k t The distribution is linear in the depth direction.

[0060] The application of the arranged seismic monitoring array in the dam body to determine the dynamic parameters of the dam foundation soil includes the shear modulus and damping ratio of the soil.

[0061] The application method of the seismic monitoring array in determining the dynamic parameters of the dam foundation soil includes the following steps:

[0062] Step S1, first, establish expressions for shear stress and shear strain of dam foundation soil considering the change of horizontal normal stress;

[0063] In step S1, when considering the change of horizontal normal stress, the expression of shear stress of dam foundation soil is:

[0064]

[0065] Among them, τ(z i ) indicates the depth is z i The soil shear stress at the location; i is the number of layers from top to bottom of the acceleration sensors arranged along the depth direction; z i is the depth of the i-th layer acceleration sensor; ρ is the soil density; is the horizontal acceleration at the depth of the i-th layer acceleration sensor; Δz i is the vertical distance between the acceleration sensor on the i-th layer and the acceleration sensor on the i-1th layer; is the rate of change of the horizontal normal stress at the depth of the i-th layer earth pressure gauge;

[0066] When considering the change of horizontal normal stress, the expression of shear strain of dam foundation soil is:

[0067]

[0068] Among them, γ(z i-1 ) indicates the depth is z i-1 The soil shear strain at i The depth is z i The position is determined by the acceleration u i Soil displacement obtained by quadratic integration.

[0069] Step S2: Next, the acceleration sensor array and the earth pressure gauge array in the seismic monitoring array are used to respectively measure the acceleration and horizontal normal stress of the soil in the dam and the dam foundation; and the acceleration and horizontal normal stress are substituted into the expressions of shear stress and shear strain of the dam foundation soil to obtain the shear stress and shear strain results, such as Figure 2 and Figure 3 As shown;

[0070] Step S3, drawing a stress-strain hysteresis curve according to the shear stress and shear strain of the dam foundation soil, and finally obtaining the soil shear modulus and damping ratio according to the stress-strain hysteresis curve;

[0071] like Figure 4 As shown, the stress-strain hysteresis loop is obtained through the shear stress time history and the shear strain time history, and the shear modulus is calculated by selecting the ratio of the average value of the maximum shear stress and the minimum shear stress to the average value of the maximum shear strain and the minimum shear strain.

[0072] The expression of soil shear modulus is:

[0073]

[0074] Among them, G sec is the shear modulus; τ max , τ min are the maximum and minimum values ​​of shear stress in the stress-strain hysteresis curve, γ max , γ min are the shear strains corresponding to the maximum shear stress and the minimum shear stress respectively;

[0075] The expression of damping ratio is:

[0076]

[0077] Where, λ is the damping ratio; ΔW is the energy loss in the stress cycle, which is equal to the area of ​​the hysteresis curve; γ max , τ max are the maximum values ​​of shear strain and shear stress, respectively.

[0078] The acceleration sensor 3 is arranged at the measuring point, that is, the measuring point is the position point where the acceleration sensor 3 is arranged, and the acceleration sensor 3 is used to measure the acceleration of the soil at the measuring point; if the acceleration sensor 3 is not set at the position to be measured in the soil, two measuring points adjacent to the position to be measured are selected, and the acceleration of the two measuring points is linearly interpolated according to the distance using the linear interpolation method to obtain the acceleration of the position to be measured; and then the acceleration response curve of the soil at any depth is obtained.

[0079] In a specific implementation, the accelerations between adjacent acceleration sensors 3 are linearly distributed, and a linear interpolation method is used to interpolate the acceleration time history curves recorded by the acceleration sensors arranged along the depth direction to obtain the acceleration response curve of the soil at any depth.

[0080] The earth pressure gauge 4 is used to measure the horizontal normal stress of the soil. The change of the horizontal normal stress is measured by two adjacent earth pressure gauges 4, and the ratio k of the difference between the earth pressure values ​​recorded by the two adjacent earth pressure gauges 4 and the distance between the adjacent earth pressure gauges 4 is obtained. t , to approximate the rate of change of horizontal normal stress:

[0081] Right now

[0082] Shear strain can be obtained by performing second-order interpolation on the displacement after obtaining the displacement signal by quadratic integration of the acceleration signal. At the position where the rate of change of the horizontal normal stress is 0, such as the center axis 5 of the dam body and the center line 6 of the upstream and downstream weighted areas, the acceleration sensor 3 can be arranged only along the depth direction. The earth pressure gauge arrays arranged at the same elevation on the left and right sides of the acceleration sensor array should be as close as possible to the middle acceleration sensor 3 to make the solution of the rate of change of the horizontal normal stress more accurate.

[0083] The embodiments of the present invention and their implementation process are as follows:

[0084] 1. Conditions: An acceleration sensor array is arranged in the dam body 1 and the dam foundation 2. The spacing of the acceleration sensor array along the depth direction should be less than the shortest wavelength λ of the seismic wave at the site. min 1 / 8 of the depth, earth pressure gauges 4 are arranged at the same height on the left and right sides of the acceleration sensor 3 in the acceleration sensor array, and the spacing of the earth pressure gauge array along the depth direction should be less than the shortest wavelength λ of the seismic wave at the site minThe change of horizontal normal stress is measured by two adjacent earth pressure gauges 4. The earth pressure gauge 4 in the earth pressure gauge array should be as close as possible to the middle acceleration sensor 3 to make the solution of the horizontal normal stress change rate more accurate. When the radius of the arranged earth pressure gauge 4 is less than 6 cm, the distance between two adjacent earth pressure sensors should be greater than 8 cm to ensure that the error of mutual influence between sensors is no more than 3%.

[0085] 2. Parameter setting: i is the number of layers of acceleration sensors arranged along the depth direction from top to bottom, i is 0 at the surface; the vertical spacing between adjacent acceleration sensors is Δz i =z i -z i-1 , the horizontal spacing between adjacent earth pressure sensors is Δs E .

[0086] 3. Process:

[0087] Step 1:

[0088] When considering the change of horizontal normal stress, the dynamic equilibrium equation of the dam foundation soil is:

[0089]

[0090] Among them, τ is the soil shear stress, z is the soil depth, σ is the soil normal stress, x is the horizontal distance in the soil layer, ρ is the soil density, and ü is the horizontal acceleration;

[0091] Step 2:

[0092] Deeply integrating the dynamic balance equation in step 1, we have:

[0093]

[0094] Among them, τ z is the integration result after depth integration.

[0095] Step 3:

[0096] In step 2, τ z The two terms before and after the expression are processed separately, let:

[0097]

[0098] Among them, τ A is τ z The first term in the expression, τ B is τ z The second term in the expression.

[0099] Step 4:

[0100] Assuming that the acceleration between adjacent acceleration sensors 3 is linearly distributed, the acceleration time history curve recorded by the acceleration sensors 3 arranged along the depth direction is interpolated by the linear interpolation method to obtain the acceleration response curve of the soil at any depth. i τ A The calculation expression is:

[0101]

[0102] Among them, τ A (z i ) is the depth z i τ A The calculation expression of z i is the depth of the ith layer of acceleration sensor; ü i is the horizontal acceleration at the depth of the i-th layer acceleration sensor; Δz i is the vertical distance between the acceleration sensor on the i-th layer and the acceleration sensor on the i-1th layer;

[0103] Step 5:

[0104] The difference between the earth pressure values ​​recorded by two adjacent earth pressure gauges 4 is ΔE=E n -E n+1 (n is the number of soil pressure gauges in each layer) and the spacing Δs E The ratio of the horizontal normal stress to the horizontal normal stress is approximately expressed by the ratio of the horizontal normal stress to the horizontal normal stress. The horizontal normal stress change rate is defined as k t ,Right now:

[0105]

[0106] but

[0107] Among them, E n represents the earth pressure value recorded by earth pressure gauge 4 at the nth layer;

[0108] Step 6:

[0109] Assume that the change rate k of the horizontal normal stress of the soil between adjacent earth pressure gauges 4 is t It is distributed linearly in the depth direction, so the depth is z i τ B It can be calculated using the following expression:

[0110]

[0111] Among them, τ B (z i ) is the depth z i τ B The calculation expression of ; is the rate of change of the horizontal normal stress at the depth where the i-th layer earth pressure gauge is located;

[0112] Step 7:

[0113] The expression of shear stress of dam foundation soil is established when considering the change of horizontal normal stress:

[0114]

[0115] Among them, τ(z i ) is the depth z i Soil shear stress at ;

[0116] Step 8:

[0117] The shear strain can be obtained by performing second-order interpolation on the displacement signal obtained by the second integration of the acceleration signal. The shear strain expression of the dam foundation soil is established when the change of the horizontal normal stress is considered:

[0118]

[0119] Among them, γ(z i-1 ) indicates the depth is z i-1 The soil shear strain at u i For z i The position is determined by the acceleration u i Soil displacement obtained by quadratic integration;

[0120] Step 9:

[0121] At the position of the dam centerline 5 and the centerline 6 of the weighted area, the influence of the change of the horizontal normal stress can be ignored, that is, steps 4, 5, and 6 can be omitted. The calculation method of the soil shear stress-shear strain at this position is:

[0122]

[0123]

[0124] Step 10:

[0125] The soil shear modulus can be expressed by the secant modulus:

[0126]

[0127] Among them, G sec is the shear modulus, τ max , τ min are the maximum and minimum values ​​of shear stress, γ max , γ min are the shear strains corresponding to the maximum shear stress and the minimum shear stress, respectively.

[0128] The damping ratio can be defined as:

[0129]

[0130] Where λ is the damping ratio, ΔW is the energy loss in the stress cycle, which is equal to the area of ​​the hysteresis loop, and γ max , τ max are the maximum values ​​of shear strain and shear stress, respectively.

Claims

1. A method for arranging an earthquake monitoring array in a dam body, characterized in that: The following steps are involved: Step 1: First, an acceleration sensor array is arranged inside the earth-rock dam; The acceleration sensor array is mainly composed of acceleration sensors (3) distributed in an array and arranged at intervals; Step 2: two earth pressure gauges (4) are respectively arranged at the same elevation on the left and right sides of each acceleration sensor (3), wherein the earth pressure gauges (4) arranged in an array form an earth pressure gauge array; The acceleration sensor array and the earth pressure gauge array together constitute a seismic monitoring array for measuring soil dynamic parameters; the acceleration sensor array and the earth pressure gauge array are used to measure the acceleration and horizontal normal stress of the soil in the dam body and the dam foundation respectively; A row of acceleration sensors are arranged at the dam centerline (5), the centerline of the upstream weighted area, and the centerline of the downstream weighted area of ​​the earth-rock dam; no earth pressure gauge (4) is arranged at the dam centerline (5), the centerline of the upstream weighted area, and the centerline of the downstream weighted area of ​​the earth-rock dam.

2. The method for arranging an earthquake monitoring array in a dam according to claim 1, characterized in that: The acceleration sensor array comprises a plurality of columns, and the columns in the acceleration sensor array are arranged in the dam body and the dam foundation at intervals along the river.

3. The method for arranging an earthquake monitoring array in a dam according to claim 1, characterized in that: The acceleration sensor array comprises a plurality of rows, and each row in the acceleration sensor array is arranged in the dam body and the dam foundation at intervals along the depth direction.

4. The method for arranging an earthquake monitoring array in a dam according to claim 1, characterized in that: The elevations of the acceleration sensors (3) in the same column of the acceleration sensor array are consistent.

5. The method for arranging an earthquake monitoring array in a dam according to claim 1, characterized in that: The row spacing between two adjacent rows in the acceleration sensor array is less than the shortest wavelength λ of the seismic wave at the site. min 1 / 8 of the earth pressure gauge array; the spacing of the earth pressure gauge array in the depth direction is less than the shortest wavelength λ of the seismic wave at the site min 1 / 8 of.

6. Application of a seismic monitoring array arranged by the method for arranging a seismic monitoring array in a dam body as claimed in any one of claims 1 to 5 in determining dynamic parameters of dam foundation soil.

7. The application of a seismic monitoring array according to claim 6 in determining the dynamic parameters of dam foundation soil is characterized by: The dynamic parameters of the dam foundation soil include soil shear modulus and damping ratio.

8. The method for using a seismic monitoring array in determining dynamic parameters of dam foundation soil according to claim 6, characterized in that: The steps include: Step S1, first, establish expressions for shear stress and shear strain of dam foundation soil considering the change of horizontal normal stress; Step S2, then, using the acceleration sensor array and the earth pressure gauge array in the seismic monitoring array, respectively measure the acceleration and horizontal normal stress of the soil in the dam body and the dam foundation; and substitute the acceleration and horizontal normal stress into the expression of shear stress and shear strain of the dam foundation soil to obtain the shear stress and shear strain results; Step S3, drawing a stress-strain hysteresis curve according to the shear stress and shear strain of the dam foundation soil, and finally obtaining the soil shear modulus and damping ratio according to the stress-strain hysteresis curve; The expression of the soil shear modulus is: Among them, G sec is the shear modulus; τ max , τ min are the maximum and minimum values ​​of shear stress in the stress-strain hysteresis curve, γ max , γ min are the shear strains corresponding to the maximum shear stress and the minimum shear stress respectively; The damping ratio expression is: Where, λ is the damping ratio; ΔW is the energy loss in the stress cycle; γ max , τ max are the maximum values ​​of shear strain and shear stress, respectively.

9. The method for using a seismic monitoring array in determining dynamic parameters of dam foundation soil according to claim 8, characterized in that: In step S1, when considering the change of horizontal normal stress, the expression of shear stress of dam foundation soil is: Among them, τ(z i ) indicates the depth is z i The soil shear stress at the location; i is the number of layers from top to bottom of the acceleration sensors arranged along the depth direction; z i is the depth of the i-th layer acceleration sensor; ρ is the soil density; is the horizontal acceleration at the depth of the i-th layer acceleration sensor; Δz i is the vertical distance between the acceleration sensor on the i-th layer and the acceleration sensor on the i-1th layer; is the rate of change of the horizontal normal stress at the depth of the i-th layer earth pressure gauge; When considering the change of horizontal normal stress, the expression of shear strain of dam foundation soil is: Among them, γ(z i-1 ) indicates the depth is z i-1 The soil shear strain at i The depth is z i The position is determined by the acceleration Soil displacement obtained by quadratic integration.

Citation Information

Patent Citations

  • In-situ soil exploration device and in-situ soil exploration method

    CN103233453A

  • Soil shear strength parameter in-situ test apparatus and test method thereof

    CN105928803A

  • Device and method for measuring actual Poisson ratio of foundation soil body under lateral confinement stress condition

    CN110567429A

  • Combined foundation monitoring method for dynamic compaction reinforcement

    CN113265998A

  • Method for predicting piling force when end part of precast pile encounters boulders

    CN113378275A