A method for optimizing the mutual assistance operation of feeder groups in distribution network

Through network reconstruction and radial network traversal optimization methods, the problem of mutual operation optimization between distribution network feeder components is solved, rapid solution and power supply capacity improvement are achieved, and the low load transfer efficiency and solution problem in the existing technology are solved. Time-consuming problem.

CN117913818BActive Publication Date: 2024-10-11GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410099739.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-11
Estimated Expiration
2044-01-24

AI Technical Summary

Technical Problem

It is difficult for the existing technology to effectively solve the load transfer problem between multiple feeder groups, resulting in limited relief of the power supply pressure of the distribution network. The traditional convex optimization method takes a long time to solve or cannot be solved, and cannot effectively optimize the distribution network feeder group. Inter-partition mutual aid operation.

Method used

Through network reconstruction, a power supply capacity model is established to determine the maximum power supply capacity and available transfer capacity of adjacent feeder groups, adjust the opening and closing status of switch nodes, and use the traversal optimization method of the radial network to find the optimal load balance. mutual support program.

Benefits of technology

It realizes the rapid mutual operation optimization among the distribution network feeder components, improves the solution efficiency, improves the power supply capacity of the distribution network through load transfer, and ensures the reliability and stability of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117913818B_ABST
    Figure CN117913818B_ABST
Patent Text Reader

Abstract

The present invention provides a method for optimizing the mutual aid operation of feeder groups in a distribution network, comprising: reconstructing the network of an original distribution network to obtain a reconstructed distribution network; establishing a power supply capacity model based on the reconstructed distribution network; the power supply capacity model is related to the load carried by the main transformer of an adjacent feeder group partition and the load balance; determining the available transfer capacity of an adjacent feeder group partition based on the maximum power supply capacity output by the power supply capacity model; the maximum power supply capacity refers to the maximum value of the active load provided by a power station; the available transfer capacity refers to the active load of an adjacent feeder group partition for transfer to other feeder group partitions; determining a mutual aid support scheme based on the available transfer capacity between feeder groups; the mutual aid support scheme is realized by adjusting the opening and closing states of switch nodes in the distribution network; the method aims to find a fast mutual aid support scheme between feeder groups with the best load balance, thereby improving the power supply capacity of the distribution network through load transfer between feeder groups.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distribution network operation control, and in particular to a method for optimizing the mutual assistance operation of a feeder group in a distribution network. Background Art

[0002] In recent years, with the continuous growth of user load, especially during the peak summer period, the distribution network has been under tremendous power supply pressure. The load transfer technology of the distribution network adjusts the switches between adjacent feeder group sections to transfer the load between different feeder group sections to alleviate the power supply pressure of the distribution network. The current load transfer technology is only for small-scale distribution networks, such as direct reconstruction of a single feeder or two feeders, which has a very limited effect on alleviating the power supply pressure of the distribution network. There is currently little research on load transfer between multiple feeder group sections (each feeder group section is a multiple feeder). This problem requires accurate measurement of the available transfer capacity of adjacent feeder group sections to support the operation optimization of feeder group sections. And the key to the problem is that due to the large grid scale of multiple feeder group sections, the dimensions of the binary variables and continuous variables of the optimization problem are high, resulting in the traditional convex optimization method taking a long time to solve, or even unable to solve. Therefore, it is of great significance to solve the problem of mutual operation optimization between feeder group sections in the distribution network.

[0003] In view of this, the present invention provides a method for optimizing the mutual assistance operation of feeder groups in a distribution network, so as to solve the problem of optimizing the mutual assistance operation among intervals of feeder groups in a distribution network and improve the solution efficiency. Summary of the invention

[0004] The object of the present invention is to provide a method for optimizing the mutual aid operation of feeder groups in a distribution network, comprising: step 1: reconstructing the original distribution network to obtain a reconstructed distribution network; step 2: establishing a power supply capacity model based on the reconstructed distribution network; the power supply capacity model is related to the load and load balance of the main transformer of the adjacent feeder group partition, and is used to determine the maximum power supply capacity of the adjacent feeder group partition; step 3: determining the available transfer capacity of the adjacent feeder group partition based on the maximum power supply capacity output by the power supply capacity model; the maximum power supply capacity refers to the maximum value of the active load provided by the power station; the available transfer capacity refers to the active load of the adjacent feeder group partition for transferring to other feeder group partitions; step 4: determining a mutual aid support scheme based on the available transfer capacity of the feeder group interval; the mutual aid support scheme is achieved by adjusting the opening and closing states of the switch nodes in the distribution network.

[0005] Further, it includes: according to the connection relationship between the load nodes and the substations and switch nodes, a non-connected graph formed by multiple isolated power grid sub-areas is obtained; the vertices of the non-connected graph are the power grid sub-areas; through the connectivity calculation method, the load node sets of multiple sub-connected graphs in the non-connected graph are determined respectively; the vertices in the sub-connected graphs are the load nodes in the corresponding power grid sub-areas, and the edges are the connection relationships of the corresponding load nodes; according to the connection relationships between the load nodes in the multiple load node sets and the load nodes in the substations, switch nodes and other load node sets, the connection relationships of the vertices in the non-connected graph are determined to obtain the reconstructed distribution network.

[0006] Furthermore, the connectivity calculation method is used to determine the load node set of each sub-connected graph in the non-connected graph, including: starting from any load node in the sub-connected graph, visiting other load nodes connected to the load node in turn through a breadth-first search traversal algorithm, and taking the load node and other load nodes connected to it as the load node set of the sub-connected graph.

[0007] Furthermore, the connection relationship between each vertex in the non-connected graph is determined according to the connection relationship between the load nodes in multiple load node sets and the substations, switch nodes and load nodes in other load node sets, including: when at least one load node in the load node set is connected to the substation, switch node and / or load nodes in other load node sets, determining that the vertex corresponding to the load node set has a connection relationship with the vertex corresponding to the substation, the switch node and / or the other load node set.

[0008] Furthermore, the power supply capability model includes a power supply objective function and power supply constraint conditions;

[0009] The power supply objective function is:

[0010]

[0011] Among them, max( ) means taking the maximum value; It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; It represents the variance of active power of all adjacent feeder group partitions at time t, that is, the load balance degree of adjacent feeder group partitions;

[0012] The power supply constraints include power balance constraints, safety constraints and distribution network topology radial constraints based on radial networks;

[0013] The power balance constraint of the distribution network based on the radial network is:

[0014]

[0015] in, Indicates the active load of the substation node; represents the active load of node j at time t; i, j and k represent different node variables in the reconstructed distribution network; represents the set of upstream nodes of node j in the reconstructed distribution network; represents the set of downstream nodes of node j in the reconstructed distribution network; represents the active power flow of the upstream line of node j in the reconstructed distribution network; represents the active power flow of the downstream line of node j in the reconstructed distribution network; B represents the set of all nodes in the reconstructed distribution network;

[0016] The safety constraints are:

[0017]

[0018] in, It represents the line current carrying capacity between node i and node j at time t; Indicates the upper limit of the line current carrying capacity; Indicates the active power of the substation; Indicates the upper limit of the load carried by the substation;

[0019] The radial constraint of the distribution network topology is:

[0020]

[0021]

[0022] Among them, ij represents the branch formed between node i and node j; E represents the branch set; Represents the set of branches where switches are installed; represents the opening and closing state of the branch switch between nodes j and j at time t; Indicates the number of nodes; Indicates the number of substations; Indicates the power of the virtual substation; represents a constant; Represents a set of substation nodes; Represents the virtual load of the virtual substation; represents the active power flow of the virtual branch between nodes j and k; represents the active power flow of the virtual branch between nodes j and j; Indicates the opening and closing state of the virtual branch switch between node i and node j. The variable of the change mark is 0-1. When it is 1, it indicates that the switch is in the closed state during the t period, and when it is 0, it indicates the open state; represents the virtual active load of node j; Indicates the minimum value of branch active power; It represents the line current carrying capacity between node i and node j at time t; Indicates the maximum value of branch active power; Indicates whether the switch on the branch between node i and node j changes from closed to open. Indicates whether the switch on the branch between node i and node j changes from open to closed; represents the opening and closing state of the branch switch between nodes j and j at time t-1; T represents the total time set; Indicates the maximum allowable number of switch adjustments within the T period.

[0023] Furthermore, the sum of the active loads of all main transformers in adjacent feeder group zones at time t is The expression is:

[0024]

[0025] Where m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; represents the active power of the mth feeder at time t;

[0026] The variance of active power of all adjacent feeder groups at time t is The expression is:

[0027]

[0028] in, It represents the sum of active loads carried by all main transformers in adjacent feeder group zones at time t.

[0029] Furthermore, the variance of the active power of all adjacent feeder groups at time t is The expression is:

[0030]

[0031]

[0032] Where m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; Represents auxiliary variables; represents the active power of the mth feeder at time t; for It represents the sum of active loads carried by all main transformers in adjacent feeder group zones at time t.

[0033] Furthermore, the expression of the available transfer capacity is:

[0034]

[0035] in, Indicates the available transfer capacity; Indicates the maximum power supply capacity; It represents the sum of active loads carried by all main transformers in adjacent feeder group areas at time t.

[0036] Furthermore, the step 4 includes: determining the combination of the switch nodes to obtain an initial switch solution set; screening the initial switch solution set based on the constraints of the topological structure of the distribution network to obtain a switch solution set to be tested; judging by depth-first search whether the graph formed by the switch solutions in the switch solution set to be tested is a connected graph; if not, discarding the switch solution; if so, solving the load balance degree of the distribution network corresponding to the connected graph; and taking the switch solution with the smallest mean absolute value error of the load balance degree as the final mutual support solution.

[0037] Furthermore, the expression of the mean absolute error of the load balancing degree is:

[0038]

[0039] Among them, MAE represents the mean absolute error of load balancing; m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; represents the active load of the mth feeder; for It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; represents the reactive load of the mth feeder; It represents the sum of reactive loads carried by all main transformers in adjacent feeder group zones at time t.

[0040] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:

[0041] The beneficial effects of the present invention are as follows: the present invention can effectively solve the mutual assistance operation optimization problem between feeder group sections of the distribution network, and can realize the rapid solution of the problem. The present invention proposes a mutual assistance operation optimization model between adjacent feeder group sections. First, considering the large number of nodes between multiple feeder groups and the large complexity of mathematical calculations, based on the task characteristics of mutual assistance operation between feeder groups, a distribution network simplification method taking into account network reconstruction is proposed, and the original distribution network nodes are merged and simplified to support subsequent analysis and calculation. Secondly, based on the simplified distribution network, the maximum power supply capacity model of adjacent feeder group sections of the distribution network is established with the objective function of maximizing the sum of the loads carried by all main transformers in the adjacent feeder group sections and the load balance of each feeder, so as to calculate the maximum power supply capacity of adjacent feeder group sections under normal operation. Finally, a traversal optimization method based on the feasible solution of the radial network is proposed. The method aims to find a rapid mutual assistance support scheme between feeder groups with the optimal load balance, thereby improving the power supply capacity of the distribution network through load transfer between feeder groups. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 An exemplary flow chart of a method for optimizing the mutual assistance operation of a feeder group in a distribution network provided by the present invention;

[0043] Figure 2 An exemplary schematic diagram of network reconstruction provided by the present invention. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0045] Figure 1 An exemplary flow chart of a method for optimizing the mutual assistance operation of feeder groups in a distribution network provided by the present invention.

[0046] like Figure 1 As shown, the method for optimizing the mutual assistance operation of a distribution network feeder group provided by the present invention comprises the following steps:

[0047] Step 1: Reconstruct the original distribution network to obtain a reconstructed distribution network.

[0048] The original distribution network refers to an electric power transmission network composed of load nodes, switch nodes and substation nodes of the traditional distribution network. Network reconstruction refers to the process of dividing the load nodes into node sets of multiple regions based on the switch nodes in the distribution network to obtain a simplified new distribution network (i.e., a reconstructed distribution network). The reconstructed distribution network refers to the new distribution network obtained after executing the network reconstruction process on the original distribution network. Since the number of nodes between multiple feeder groups in the original distribution network is large and the mathematical calculation complexity is too large, the present invention proposes to reconstruct the network to merge and simplify the original distribution network nodes, and calculate the mutual operation of the distribution network feeder groups through the reconstructed distribution network obtained after simplification, thereby improving the speed of subsequent analysis and calculation. For more information on network reconstruction, see Figure 2 and its related description.

[0049] Step 2: Based on the reconstructed distribution network, a power supply capacity model is established; the power supply capacity model is related to the load carried by the main transformer of the adjacent feeder group partition and the load balance degree, and is used to determine the maximum power supply capacity of the adjacent feeder group partition. Specifically, the power supply capacity model takes maximizing the sum of the loads carried by all main transformers in the adjacent feeder group partition and the load balance degree of each feeder as the objective function, so as to calculate the maximum power supply capacity of the adjacent feeder group partition under normal operation of the distribution network. Each feeder group partition includes at least one feeder. Among them, the power supply capacity model includes power supply objective function and power supply constraint conditions;

[0050] The power supply objective function is:

[0051]

[0052] Among them, max( ) means taking the maximum value; It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; It represents the variance of active power of all adjacent feeder group partitions at time t, that is, the load balance degree of adjacent feeder group partitions. This objective function takes into account the transmission capacity between different feeder group partitions and tries to find the best trade-off.

[0053] The sum of the active loads of all main transformers in adjacent feeder group zones at time t The expression is:

[0054]

[0055] Where m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; represents the active power of the mth feeder at time t.

[0056] In some embodiments, the variance of the active power of all adjacent feeder groups at time t is The expression is:

[0057]

[0058] in, It represents the sum of active loads carried by all main transformers in adjacent feeder group zones at time t.

[0059] In some other embodiments, the variance of the active power of all adjacent feeder groups at time t is The expression is:

[0060]

[0061]

[0062] Where m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; Represents auxiliary variables; represents the active power of the mth feeder at time t; for It represents the sum of active loads carried by all main transformers in adjacent feeder group zones at time t.

[0063] The power supply constraints include power balance constraints, safety constraints and distribution network topology radial constraints based on radial networks;

[0064] The power balance constraint of the distribution network based on the radial network is:

[0065]

[0066] in, Indicates the active load of the substation node; represents the active load of node j at time t; i, j and k represent different node variables in the reconstructed distribution network; represents the set of upstream nodes of node j in the reconstructed distribution network; represents the set of downstream nodes of node j in the reconstructed distribution network; represents the active power flow of the upstream line of node j in the reconstructed distribution network; represents the active power flow of the downstream line of node j in the reconstructed distribution network; B represents the set of all nodes in the reconstructed distribution network.

[0067] The safety constraints are:

[0068]

[0069] in, It represents the line current carrying capacity between node i and node j at time t; Indicates the upper limit of the line current carrying capacity; Indicates the active power of the substation; Indicates the upper limit of the load carried by the substation;

[0070] The radial constraint of the distribution network topology is:

[0071]

[0072]

[0073] Among them, ij represents the branch formed between node i and node j; E represents the branch set; Represents the set of branches where switches are installed; represents the opening and closing state of the branch switch between nodes j and j at time t; Indicates the number of nodes; Indicates the number of substations; Indicates the power of the virtual substation; represents a constant; Represents a set of substation nodes; Represents the virtual load of the virtual substation; represents the active power flow of the virtual branch between nodes j and k; represents the active power flow of the virtual branch between nodes j and j; Indicates the opening and closing state of the virtual branch switch between node i and node j. The variable of the change mark is 0-1. When it is 1, it indicates that the switch is in the closed state during the t period, and when it is 0, it indicates the open state; represents the virtual active load of node j; Indicates the minimum value of branch active power; It represents the line current carrying capacity between node i and node j at time t; Indicates the maximum value of branch active power; Indicates whether the switch on the branch between node i and node j changes from closed to open. Indicates whether the switch on the branch between node i and node j changes from open to closed; represents the opening and closing state of the branch switch between nodes j and j at time t-1; T represents the total time set; Indicates the maximum allowable number of switch adjustments within the T period.

[0074] Step 3: Based on the maximum power supply capacity output by the power supply capacity model, determine the available transfer capacity of the adjacent feeder group partition; the maximum power supply capacity refers to the maximum value of the active load provided by the power station; the available transfer capacity refers to the active load that the adjacent feeder group partition is used to transfer to other feeder group partitions. The expression of the available transfer capacity is:

[0075]

[0076] in, Indicates the available transfer capacity; Indicates the maximum power supply capacity; It represents the sum of active loads carried by all main transformers in adjacent feeder group areas at time t.

[0077] The power supply capacity model proposed in this paper can help power system planners and operators evaluate the power transmission capacity between different feeder group zones, so as to better manage and optimize the operation of the power system. It takes into account multiple key factors such as load balancing, line capacity and switch operation to ensure the reliability and stability of the power network.

[0078] Step 4: Based on the available transfer capacity of the feeder group section, determine the mutual support scheme; the mutual support scheme is implemented by adjusting the opening and closing states of the switch nodes in the distribution network. The mutual support scheme refers to adjusting the structure of the feeder in the distribution network by adjusting the opening and closing states of the switches, and when the power supply pressure of the feeder group section is high, it is supplied with power through the adjacent feeder group section of the feeder group section to alleviate the power supply pressure. Each feeder group section can include at least one feeder. The mutual support scheme can be determined by the traversal optimization method of the feasible solution of the radial network. The traversal optimization method of the feasible solution of the radial network is a method for improving the topology of the distribution network to achieve load balancing. The core goal of this method is to find the most load-balanced distribution network topology under the premise of satisfying a series of constraints, including:

[0079] Determine the combination of the switch nodes and obtain the initial switch solution set. The initial switch solution set refers to the set of solutions that can be combined with all switches and their states. In this step, we must first consider the switches in the distribution network. The state of the switch is a 0-1 variable, so all switch combinations are listed through permutations and combinations. Assuming that there are n switches in a distribution network, there are 2n possible combinations of switches, and the solutions are enumerated from 1 to 2n.

[0080] Based on the constraints of the topological structure of the distribution network, the initial switch solution set is screened to obtain the switch solution set to be tested. The switch solution set to be tested refers to the set of solutions that can be combined by switches and their states in the initial switch solution set that conform to the topological structure of the distribution network. In order to ensure that the obtained topological structure is feasible, a series of constraints must be met. Among them, the radial constraints play a key role. These conditions include that there is no sub-connected graph that does not contain substation nodes and the number of lines is equal to the number of nodes minus the number of substations. These conditions help to exclude topological structures that do not meet the basic power system structure requirements and only retain feasible solutions, thereby reducing the search space.

[0081] Determine whether the graph formed by the switch solutions in the switch solution set to be tested is a connected graph by depth-first search; if not, discard the switch solution; if so, solve the load balance degree of the distribution network corresponding to the connected graph. The content of determining whether the graph is a connected graph includes:

[0082] (1) Create an auxiliary function, such as dfs(), to implement depth-first search. This function accepts the current node, a visit mark array (used to mark visited nodes), and the adjacency list of the graph (indicating the connection relationship of the graph) as parameters.

[0083] (2) In the dfs() function, first mark the current node as visited.

[0084] (3) Then, traverse all neighbor nodes of the current node. For each neighbor node, if it has not been visited, recursively call the dfs() function to perform a depth-first search.

[0085] (4) After traversing all neighbor nodes, if there are still unvisited nodes, the graph is not a connected graph and False is returned.

[0086] (5) If all nodes have been visited, the graph is a connected graph and returns True.

[0087] (6) Finally, in the main function, you can call the dfs() function from any node and pass the access tag array as a parameter. If the dfs() function returns True, it means that the graph is a connected graph; if it returns False, it means that the graph is not a connected graph.

[0088] The switch solution with the smallest mean absolute error of the load balancing degree is taken as the final mutual support solution.

[0089] In a complex distribution network, uneven load distribution has a great impact on the distribution network loss. Assuming that the equivalent resistance Re of n lines is the same, the active loss when the load is unevenly distributed is P1 and the active loss when the load is evenly distributed is P2, then the additional active loss caused by the uneven distribution of load in the network is:

[0090]

[0091] Where: and represents the line current, where , Represents equivalent resistance. It can be seen from the above formula that when the load distribution on the feeder is uneven, the additional active power loss will increase greatly. Therefore, the present invention takes the load balance as the objective function, aiming to make the load of each feeder more balanced, so as to reduce the network loss of the total line of the distribution network.

[0092] In this step, the load balance of the distribution network needs to be considered. In order to find the most balanced solution, the substation nodes in the network are first removed and the distribution network is divided into sub-connected graphs for each feeder. Then, for each sub-connected graph, the loads of all its nodes are calculated and accumulated to obtain the load of each outgoing line. In order to measure the load balance, the mean absolute error (MAE) of the load balance is used:

[0093]

[0094] Among them, MAE represents the mean absolute error of load balancing; m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; represents the active load of the mth feeder; for It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; represents the reactive load of the mth feeder; It represents the sum of reactive loads carried by all main transformers in adjacent feeder group zones at time t.

[0095] Combining this method with the characteristics of the distribution network, we can more comprehensively understand and describe how to search for different switch combinations, screen out feasible solutions based on radial constraints, and ultimately select the most balanced distribution network topology. This method is expected to help improve the performance of the power system, improve load balancing, and thus provide more reliable and efficient power distribution.

[0096] According to the distribution network feeder group interval mutual assistance operation optimization method proposed in the present invention which takes into account the available transfer capacity of adjacent feeder group intervals, a feeder group feeder group interval rapid mutual assistance support scheme with optimal load balancing can be found, thereby improving the power supply capacity of the distribution network through load transfer between feeder groups.

[0097] Figure 2 An exemplary schematic diagram of network reconstruction provided by the present invention.

[0098] like Figure 2 As shown, in step 1, the original distribution network is reconstructed to obtain a process of reconstructing the distribution network, including:

[0099] According to the connection relationship between the load node and the substation and switch node, a non-connected graph formed by multiple isolated grid sub-areas is obtained; the switch node includes a section switch s and a tie switch c; the vertex of the non-connected graph is the grid sub-area. A grid sub-area refers to an area in the distribution network that is not directly connected to other load nodes, for example, Figure 2For example, the lines directly connected to the substation and the lines directly connected to the switch in the distribution network can be identified and separated, and the load nodes in the distribution network are divided by the substation and the switch to form multiple isolated grid sub-areas. These isolated grid sub-areas are taken as a whole and regarded as a new load node set. Then, the multiple load node sets formed by the multiple grid sub-areas can be considered as a non-connected graph.

[0100] The load node sets of multiple sub-connected graphs in the non-connected graph are determined respectively by the connectivity calculation method; the vertices in the sub-connected graph are the load nodes in the corresponding power grid sub-area, and the edges are the connection relationships of the corresponding load nodes. The load node set refers to the set formed by the load nodes of the original distribution network contained in the sub-connected graph. The load node set of each sub-connected graph in the non-connected graph is determined respectively by the connectivity calculation method, including: starting from any load node in the sub-connected graph, sequentially accessing other load nodes connected to the load node through a breadth-first search traversal algorithm, and taking the load node and other load nodes connected to it as the load node set of the sub-connected graph. For example, first, starting from a node (i.e., a load node set), sequentially accessing all nodes connected to the node through a breadth-first search traversal algorithm, and adding them to the same sub-connected graph. Secondly, for multiple sub-connected graphs in the non-connected graph, repeat the above steps until all nodes are traversed. Finally, the load node set of each sub-connected graph is obtained.

[0101] According to the connection relationship between the load nodes in the multiple load node sets and the load nodes in the substation, switch node and other load node sets, the connection relationship of each vertex in the non-connected graph is determined to obtain the reconstructed distribution network; including: when at least one load node in the load node set is connected to the substation, switch node and / or other load node sets, it is determined that the vertex corresponding to the load node set has a connection relationship with the vertex corresponding to the substation, the switch node and / or the other load node set. The number of nodes in the non-connected graph (i.e., new nodes formed by the load node set) is:

[0102]

[0103] in, represents the number of substations, Represents the number of connected subgraphs.

[0104] The nodes in the reconstructed distribution network are numbered. For example, the nodes in the reconstructed distribution network can be numbered according to the corresponding sub-connected graphs. Furthermore, the numbers of the new nodes can be matched with the numbers of the original nodes for further calculation and analysis.

[0105] The present invention reorganizes the topological structure of the distribution network by merging switch nodes and load nodes between the switch nodes to support rapid optimization of complex distribution networks.

[0106] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for optimizing the mutual assistance operation of a distribution network feeder group, characterized in that: include: Step 1: Reconstruct the original distribution network to obtain a reconstructed distribution network; Step 2: Establishing a power supply capability model based on the reconstructed distribution network; The power supply capacity model is related to the load and load balance of the main transformers of the adjacent feeder group partitions, and is used to determine the maximum power supply capacity of the adjacent feeder group partitions; Step 3: Based on the maximum power supply capacity output by the power supply capacity model, determine the available transfer capacity of adjacent feeder group zones; The maximum power supply capacity refers to the maximum value of the active load provided by the power station; the available transfer capacity refers to the active load that the adjacent feeder group partition can transfer to other feeder group partitions; Step 4: Determine the mutual support plan based on the available transfer capacity of the feeder component intervals; The mutual assistance support scheme is implemented by adjusting the opening and closing states of the switch nodes in the distribution network; The step 1 comprises: According to the connection relationship between the load node and the substation and the switch node, a non-connected graph formed by a plurality of isolated power grid sub-regions is obtained; the vertices of the non-connected graph are the power grid sub-regions; By using a connectivity calculation method, the load node sets of multiple sub-connected graphs in the non-connected graph are respectively determined; the vertices in the sub-connected graphs are the load nodes in the corresponding power grid sub-areas, and the edges are the connection relationships of the corresponding load nodes; Determine the connection relationship of each vertex in the non-connected graph according to the connection relationship between the load nodes in the multiple load node sets and the substations, switch nodes and load nodes in other load node sets, and obtain the reconstructed distribution network; The method of respectively determining the load node sets of each sub-connected graph in the non-connected graph by the connectivity calculation method includes: Starting from any load node in the sub-connected graph, the other load nodes connected to the load node are visited in sequence through a breadth-first search traversal algorithm, and the load node and the other load nodes connected to the load node are taken as the load node set of the sub-connected graph; Determining the connection relationship of each vertex in the non-connected graph according to the connection relationship between the load nodes in the plurality of load node sets and the substation, the switch node and the load nodes in other load node sets respectively includes: When at least one load node in the load node set is connected to a substation, a switch node and / or a load node in another load node set, determining that a vertex corresponding to the load node set has a connection relationship with a vertex corresponding to the substation, the switch node and / or the other load node set; The power supply capability model includes a power supply objective function and power supply constraint conditions; The power supply objective function is: ; Among them, max(*) means taking the maximum value; It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; It represents the variance of active power of all adjacent feeder group partitions at time t, that is, the load balance degree of adjacent feeder group partitions; The power supply constraints include power balance constraints, safety constraints and distribution network topology radial constraints based on radial networks; The power balance constraint of the distribution network based on the radial network is: ; in, Indicates the active load of the substation node; represents the active load of node j at time t; i, j and k represent different node variables in the reconstructed distribution network; represents the set of upstream nodes of node j in the reconstructed distribution network; represents the set of downstream nodes of node j in the reconstructed distribution network; represents the active power flow of the upstream line of node j in the reconstructed distribution network; represents the active power flow of the downstream line of node j in the reconstructed distribution network; B represents the set of all nodes in the reconstructed distribution network; The safety constraints are: ; in, It represents the line current carrying capacity between node i and node j at time t; Indicates the upper limit of the line current carrying capacity; Indicates the active power of the substation; Indicates the upper limit of the load carried by the substation; The radial constraint of the distribution network topology is: ; ; Among them, ij represents the branch formed between node i and node j; E represents the branch set; Represents the set of branches where switches are installed; represents the opening and closing state of the branch switch between nodes j and j at time t; Indicates the number of nodes; Indicates the number of substations; Indicates the power of the virtual substation; represents a constant; Represents a set of substation nodes; Represents the virtual load of the virtual substation; represents the active power flow of the virtual branch between nodes j and k; represents the active power flow of the virtual branch between nodes j and j; Indicates the opening and closing state of the virtual branch switch between node i and node j. The variable of the change mark is 0-1. When it is 1, it indicates that the switch is in the closed state during the t period, and when it is 0, it indicates the open state; represents the virtual active load of node j; Indicates the minimum value of branch active power; It represents the line current carrying capacity between node i and node j at time t; Indicates the maximum value of branch active power; Indicates whether the switch on the branch between node i and node j changes from closed to open. Indicates whether the switch on the branch between node i and node j changes from open to closed; represents the opening and closing state of the branch switch between nodes j and j at time t-1; T represents the total time set; Indicates the maximum allowable number of switch adjustments within the T period; The sum of the active loads of all main transformers in adjacent feeder group zones at time t The expression is: ; Where m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; represents the active power of the mth feeder at time t; The variance of active power of all adjacent feeder groups at time t is The expression is: ; in, It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; The variance of active power of all adjacent feeder groups at time t is The expression is: ; ; Where m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; Represents auxiliary variables; represents the active power of the mth feeder at time t; for It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; The expression of the available transfer capacity is: ; in, Indicates the available transfer capacity; Indicates the maximum power supply capacity; It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; The step 4 comprises: Determine a combination mode of the switch nodes to obtain an initial switch solution set; Based on the constraints of the topological structure of the distribution network, the initial switch solution set is screened to obtain a switch solution set to be tested; Determine whether a graph formed by using the switch solutions in the set of switch solutions to be tested is a connected graph by depth-first search; if not, discard the switch solution; If so, then solve the load balance degree of the distribution network corresponding to the connectivity graph; The switch solution with the smallest mean absolute error of the load balancing degree is taken as the final mutual support solution.

2. The method for optimizing the mutual assistance operation of feeder groups in a distribution network according to claim 1, characterized in that: The expression of the mean absolute error of the load balancing degree is: ; Among them, MAE represents the mean absolute error of load balancing; m represents the feeder variable; M represents the number of outgoing lines of the substation, that is, the total number of feeders; represents the active load of the mth feeder; for It represents the sum of active loads of all main transformers in adjacent feeder group zones at time t; represents the reactive load of the mth feeder; It represents the sum of reactive loads carried by all main transformers in adjacent feeder group zones at time t.