A processing method for structural parts of hydraulic support

By performing rough boring and coaxial positioning welding of the ribs without installing the patch panel group, the problems of heavy weight of the rib plate pre-assembly and heavy boring workload in the processing of existing hydraulic support structural parts are solved, and the processing and processing efficiency are improved. Production efficiency, reducing labor intensity and safety risks.

CN117921313BActive Publication Date: 2024-10-22CHINACOAL BEIJING COAL MINING MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410119060.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-10-22
Estimated Expiration
2044-01-29

AI Technical Summary

Technical Problem

In the existing processing method of hydraulic support structural parts, the rib plate pre-assembly has the risk of falling off due to its heavy weight, and the boring workload of the boring worker is large, which reduces the work efficiency.

Method used

Flame cutting is used to form the top plate and ribs. The ribs are rough-bored without installing the patch panel set, and then coaxially positioned and welded through the positioning assembly. The rough boring of the patch panel set is eliminated. , improving the number of installed cards and production efficiency.

Benefits of technology

It improves processing efficiency and production efficiency, reduces the labor intensity and operating difficulty of boring workers, and reduces the risk of safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117921313B_ABST
    Figure CN117921313B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of hydraulic support production, and in particular to a method for processing a structural member for a hydraulic support. The processing method adopts the following steps: forming a top plate, a plurality of rib plates and a plate group by flame cutting, and simultaneously forming hinge holes by heat cutting; aligning the shapes of the plurality of rib plates, and then rough boring the hinge holes on the rib plates after heat cutting, and after the rough boring of the plurality of rib plates is completed, the ribs are removed; coaxially positioning the plurality of rib plates by a positioning assembly, and then the top plate and the plurality of rib plates are welded firmly; removing the positioning assembly, and then fine boring the rough boring holes on the rib plates and the hinge holes on the plate group after heat cutting as a whole. Since the rib plate pre-assembly performs rough boring of the rib plates before the plate group is installed during rough boring, the number of rib plates installed is increased, and thus the rough boring of a plurality of rib plates can be performed at one time, thereby improving the processing efficiency. At the same time, since the plate group eliminates the rough boring, the production efficiency of the structural member is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydraulic support production, and in particular to a method for processing a structural member for a hydraulic support. Background Art

[0002] In the field of comprehensive mining intelligent manufacturing hydraulic support manufacturing, structural parts are usually composed of main ribs, transverse ribs, longitudinal ribs, cover plates and other parts or pre-assemblies. Among them, the rib plate pre-assembly is an important framework of the structural parts, and the hinge holes on the rib plates are used to connect the hinge holes of other structural parts. Therefore, the coaxiality and machining accuracy of the hinge holes in the rib plates are extremely high.

[0003] The rib plate pre-assembly includes a rib plate and a plate group, and the plate group includes multiple plates. The existing rib plate pre-assembly assembly steps are: first, each single piece is cut separately, and the diameter φ200 hole on each single piece is cut by hot cutting to form a diameter φ180 hole; secondly, the rib plate is hung on the work platform, and after the multiple plates and rib plates are aligned, the riveters position the welding points firmly and the welders complete the welding, and then the holes on the plate group are machined and roughly bored into holes with a diameter of φ189; then, after multiple groups of rib plate pre-assemblies are assembled and pre-welded to the top plate, a structural part is formed by penetrating a long shaft to achieve the purpose of coaxiality of multiple groups of rib plate pre-assemblies; finally, the long shaft is disassembled, and the holes after rough boring are overall fine bored to meet the requirements of the design drawings.

[0004] In the prior art, the plate assembly is welded on the rib plate, and a hook is needed to be used to hoist the assembly back and forth between the riveters and welders. The pre-assembly is at risk of falling off due to its heavy weight. Secondly, the rib plate and the plate assembly form multiple groups of pre-assemblies, which are first stacked and clamped before rough boring, and then rough boring. Due to the constraints of the effective stroke of the boring machine and the stacking thickness of the pre-assembly, only 1-2 groups can be clamped and bored each time. In mass production, the boring workload of the boring worker will increase, and the work efficiency will be reduced. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a method for processing structural parts for hydraulic supports, which solves the technical problems that the rib plate pre-assembly is repeatedly hoisted and circulated between the riveters and welders' sites with a hook, the pre-assembly is at risk of falling off due to its heavy weight, and the workload of boring workers is increased, thereby reducing work efficiency.

[0007] (II) Technical solution

[0008] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0009] The embodiment of the present invention provides a method for processing a structural member for a hydraulic support, which comprises the following steps:

[0010] S1, forming a top plate, a plurality of rib plates and a plate assembly by flame cutting, and simultaneously forming hinge holes on the rib plates and the plate assembly by thermal cutting;

[0011] S2, aligning the shapes of multiple rib plates, stacking and installing the reinforcement, and then rough boring the hinge holes on the rib plates after thermal cutting. After the rough boring of multiple rib plates is completed, remove the reinforcement;

[0012] S3, the top plate is hung on the platform, and a plurality of rib plates with rough boring holes are vertically spaced and placed on the top plate;

[0013] S4, coaxially positioning the plurality of rib plates by means of a positioning assembly, and then firmly welding the top plate and the plurality of rib plates;

[0014] S5. Remove the positioning assembly, place a set of plate groups under each rib plate, align the corresponding rib plates and plate groups in appearance and weld them, then perform overall fine boring on the rough boring holes on the rib plates and the hinge holes on the plate groups after thermal cutting.

[0015] Preferably, in step S4, the positioning assembly includes a long shaft and multiple sleeves; a sleeve is respectively provided in the rough boring hole on each rib plate, and after the long shaft is matched with the sleeve, the long shaft is vertically oriented to coaxially position multiple rib plates; in step S5, the long shaft and the sleeve are removed.

[0016] Preferably, the panel group includes a plurality of panels; in step S1, hinge holes are formed by thermal cutting on the plurality of panels in the panel group.

[0017] Preferably, both the rib plate and the plate group have matching positioning parts extending outward; in step S5, the positioning parts of the rib plate and the plate group are aligned in shape to coaxially position the rough bored holes on the rib plate and the hinged holes on the plate group after heat cutting.

[0018] Preferably, the inner hole of the sleeve is clearance matched with the long shaft; the outer diameter of the sleeve is clearance matched with the rough boring hole of the rib plate.

[0019] Preferably, in step S1, the diameter of the thermally cut hinge hole of the rib plate is 180 cm; in step S2, the diameter of the rough bored hole of the rib plate is 189.5 cm; in step S5, the diameter of the fine bored hole of the rib plate is 200 cm.

[0020] Preferably, the outer diameter of the sleeve is 189 cm, the inner diameter of the sleeve is 94.7 cm; and the diameter of the major shaft is 93.7 cm.

[0021] Preferably, in step S2, the number of ribs is 8.

[0022] Preferably, the rib plate may be a main rib plate, a transverse rib plate or a longitudinal rib plate in a hydraulic support.

[0023] (III) Beneficial effects

[0024] The beneficial effects of the present invention are:

[0025] The present invention provides a method for processing a structural member for a hydraulic support. During the rough boring of a rib plate pre-assembly, the rough boring of the rib plate is performed before the plate group is installed, thereby increasing the number of rib plates that can be installed and thus being able to perform rough boring of multiple rib plates at one time, thereby improving the processing efficiency. At the same time, since the plate group eliminates the rough boring, the production efficiency of the structural member is further improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the stiffener plate pre-assembly;

[0027] Figure 2 It is a structural schematic diagram of positioning multiple sets of rib plate pre-assemblies in the prior art;

[0028] Figure 3 It is a structural schematic diagram of the prior art when the rib plate pre-assembly is rough bored and stacked;

[0029] Figure 4 It is a top view of the rib plate and multiple pasting plates;

[0030] Figure 5 It is a structural schematic diagram of positioning of multiple groups of rib plate pre-assemblies in the present invention.

[0031] [Description of Reference Numerals]

[0032] 1: rib plate pre-assembly; 11: rib plate; 12: plate pasting group; 121: plate pasting;

[0033] 2: Top plate;

[0034] 3: positioning assembly; 31: long shaft; 32: shaft sleeve;

[0035] 4: hinge hole;

[0036] 5: Positioning part. DETAILED DESCRIPTION

[0037] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0038] This embodiment provides a method for processing a structural member for a hydraulic support, which comprises the following steps:

[0039] S1, forming a top plate 2, a plurality of rib plates 11 and a plate group 12 by flame cutting, and simultaneously forming hinge holes 4 on the rib plates 11 and the plate group 12 by thermal cutting;

[0040] S2, aligning the shapes of multiple rib plates 11, stacking and installing the ribs, and then roughly boring the hinge holes 4 on the rib plates 11 after thermal cutting. After the rough boring of the multiple rib plates 11 is completed, the ribs are removed;

[0041] In step S2 , the number of the plurality of rib plates 11 is 8, and of course, the number of the plurality of rib plates 11 may be greater.

[0042] S3, the top plate 2 is hung on the platform, and the rib plates 11 with a plurality of rough bored holes are vertically spaced and placed on the top plate 2;

[0043] S4, coaxially positioning the plurality of ribs 11 by the positioning assembly 3, and then firmly welding the top plate 2 and the plurality of ribs 11;

[0044] S5, remove the positioning assembly 3, place a set of plate groups 12 under each rib plate 11, align the corresponding rib plates 11 and plate groups 12 in shape and weld them, then perform overall fine boring on the rough boring holes on the rib plates 11 and the hinge holes 4 on the plate groups 12 after thermal cutting. Figure 5 For example, the plate assembly 12 is located at the lower side of the rib plate 11 .

[0045] It should be noted that, in actual application, the board group 12 in step S1 may be one board 121, or multiple boards 121, such as Figure 4 As shown, when the panel group 12 is composed of multiple panels 121, after forming a single panel 121 by flame cutting, the multiple panels 121 in the panel group 12 are thermally cut to form hinge holes 4. Then, in step S5, the panels are aligned in shape and then welded in sequence.

[0046] in, Figure 1 FIG. 1 is a schematic diagram of the structure of the rib plate pre-assembly 1. In the prior art of manufacturing structural parts, a plurality of rib plate pre-assemblies 1 in the structural part are usually welded first, and then Figure 2 As shown, positioning, welding and assembly are then performed on the top plate 2. Figure 3 As shown, before the rib plate pre-assembly 1 is assembled, the rib plate pre-assembly 1 needs to be rough bored as a whole to facilitate the installation of the long shaft 31 for positioning. However, due to the constraints of the effective stroke of the boring machine and the stacking thickness of the pre-assembly, only 1-2 groups can be clamped and bored each time, so the rough boring efficiency is low, and the plate group 12 also needs to be rough bored. After the rough boring of the rib plate pre-assembly, the assembly shaft needs to be inserted when it is assembled into a structural part. As the diameter of the hole increases, the diameter of the corresponding shaft will also increase, and it is a solid shaft, which will cause the weight of the shaft to increase accordingly. When inserting the shaft, multiple operators are required to push and pull and the overhead crane hoist the shaft in conjunction. This will bring difficulties to the riveter during operation, increase his workload, and cause safety accidents due to improper operation.

[0047] The present embodiment provides a method for processing structural parts for hydraulic supports. Since the rib plate pre-assembly 1 is rough bored before the plate group 12 is installed, the number of rib plates 11 installed is increased, so that multiple rib plates 11 can be rough bored at one time, thereby improving the processing efficiency. At the same time, since there is no need to position the installation long axis 31 of the plate group 12, the rough boring of the plate group 12 is cancelled, further improving the production efficiency of the structural parts.

[0048] like Figure 5 As shown, in step S4, the positioning assembly 3 includes a long shaft 31 and a plurality of sleeves 32, and a sleeve 32 is respectively provided in the rough boring hole on each rib plate 11. After the long shaft 31 is matched with the sleeve 32, the long shaft 31 is vertically oriented to coaxially position the plurality of rib plates 11. In step S5, the long shaft 31 and the sleeve 32 are removed.

[0049] In this embodiment, the hole-forming structural member on the main rib is assembled in the form of a long shaft 31 and a sleeve 32, which improves the utilization rate of the long shaft 31. The diameters of the rough boring holes on the main rib are different, and there is no need to manufacture long shafts 31 with different diameters, but only to replace sleeves 32 with different diameters. The weight of the through-long shaft 31 is reduced, and the labor intensity and operation difficulty of the riveter are reduced, effectively preventing safety accidents.

[0050] To facilitate positioning in step 5, both the rib plate 11 and the plate group 12 have matching positioning portions 5 extending outward. In step S5, the positioning portions 5 of the rib plate 11 and the plate group 12 are aligned in shape to coaxially position the rough bored hole on the rib plate 11 and the hinge hole 4 after heat cutting on the plate group 12.

[0051] To facilitate the installation and matching of the sleeve 32 and the long shaft 31 , the inner hole of the sleeve 32 and the long shaft 31 are clearance matched, and the outer diameter of the sleeve 32 and the rough boring hole of the rib plate 11 are clearance matched.

[0052] Specifically, in step S1, the diameter of the thermally cut hinge hole 4 of the rib plate 11 is 180 cm; in step S2, the diameter of the rough boring hole of the rib plate 11 is 189.5 cm; in step S5, the diameter of the fine boring hole of the rib plate 11 is 200 cm. The outer diameter of the sleeve 32 is 189 cm, the inner diameter of the sleeve 32 is 94.7 cm; and the diameter of the long shaft 31 is 93.7 cm.

[0053] It should be noted that, in this embodiment, the rib plate 11 may be a main rib plate, a transverse rib plate or a longitudinal rib plate in the hydraulic support.

[0054] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0055] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.

[0057] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0058] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A method for processing a structural member for a hydraulic support, characterized in that: Use the following steps: S1, forming a top plate (2), a plurality of rib plates (11) and a plate group (12) by flame cutting, and simultaneously forming hinge holes (4) on the rib plates (11) and the plate group (12) by thermal cutting; S2, aligning the shapes of the plurality of rib plates (11), stacking and installing the ribs, and then rough boring the hinge holes (4) on the rib plates (11) after thermal cutting. After the rough boring of the plurality of rib plates (11) is completed, the ribs are removed; S3, hanging the top plate (2) on a platform, and vertically placing the rib plates (11) with a plurality of rough-bored holes on the top plate (2) at intervals; S4, coaxially positioning the plurality of rib plates (11) using a positioning assembly (3), and then firmly welding the top plate (2) and the plurality of rib plates (11); S5, remove the positioning assembly (3), place a group of the plate groups (12) corresponding to the lower side of each rib plate (11), align the shapes of the corresponding rib plates (11) and the plate groups (12) and weld them, and then fine bore the rough holes on the rib plates (11) and the hinge holes (4) on the plate groups (12) after thermal cutting; In step S4, the positioning assembly (3) comprises a long shaft (31) and a plurality of shaft sleeves (32); one shaft sleeve (32) is provided in each rough boring hole on the rib plate (11); after the long shaft (31) is matched with the shaft sleeve (32), the long shaft (31) is oriented vertically to coaxially position the plurality of rib plates (11); In step S5, the long shaft (31) and the shaft sleeve (32) are removed; The plate group (12) comprises a plurality of plates (121); in the step S1, the hinge holes (4) are respectively formed by thermal cutting on the plurality of plates (121) in the plate group (12); The rib plate (11) and the plate assembly (12) both have matching positioning portions (5) extending outwards; In the step S5, the positioning portion (5) of the rib plate (11) and the positioning portion (5) of the plate assembly (12) are aligned in shape to coaxially position the rough bored hole on the rib plate (11) and the hinge hole (4) after heat cutting on the plate assembly (12).

2. The method for processing a structural member for a hydraulic support according to claim 1, characterized in that: The inner hole of the shaft sleeve (32) is clearance-matched with the long shaft (31); The outer diameter of the shaft sleeve (32) is clearance-matched with the rough boring hole of the rib plate (11).

3. The method for processing a structural member for a hydraulic support according to claim 2, characterized in that: In the step S1, the diameter of the hinge hole (4) thermally cut in the rib plate (11) is 180 cm; In the step S2, the diameter of the rough boring hole of the rib plate (11) is 189.5 cm; In step S5, the diameter of the precision-bored hole of the rib plate (11) is 200 cm.

4. The method for processing a structural member for a hydraulic support according to claim 3, characterized in that: The outer diameter of the shaft sleeve (32) is 189 cm, and the inner diameter of the shaft sleeve (32) is 94.7 cm; The diameter of the major axis (31) is 93.7 cm.

5. The method for processing a structural member for a hydraulic support according to claim 1, characterized in that: In step S2, the number of the rib plates (11) is 8.

6. The method for processing a structural member for a hydraulic support according to claim 1, characterized in that: The rib plate (11) is a main rib plate, a transverse rib plate or a longitudinal rib plate in a hydraulic support.