An aerial corridor
Through the design of the air corridor passage, the combination of L-shaped steel plates and T-shaped steel plates is used to flexibly position and reinforce the buildings, which solves the problems of poor positioning and stability of the corridor installation in the existing technology, and achieves higher installation flexibility and stability.
Patent Information
- Application Number
- CN202410248260.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2044-03-05
AI Technical Summary
In the prior art, the corridor is positioned and fixed when installed in an industrial factory, and when no connecting corridor is designed during the construction process, the stability of subsequent connected corridors is poor.
The air corridor channel design is adopted, including the corridor assembly, the connecting assembly, the first connecting platform and the second connecting platform. Through the combination of L-shaped steel plates and T-shaped steel plates, flexible positioning and reinforcement between two adjacent buildings is achieved, and compensating components and stair platforms are adapted in the case of large height differences.
It realizes flexible and safe corridor installation between two adjacent buildings, improves connection stability, adapts to the situation of height difference, and enhances installation flexibility and reliability.
Smart Images

Figure CN117966880B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of corridors, and in particular to an aerial corridor passage. Background Art
[0002] The corridor is a form of ancient Chinese architecture, which is a structure connecting buildings. The setting of the corridor meets the requirements of architectural functions and can facilitate the connection between two adjacent buildings.
[0003] In industrial plants, corridors are also required in some locations. In the existing technology, most corridors require pre-embedded steel plates in two adjacent reinforced concrete buildings during installation, and the corridors are installed at the designed position. The positioning is relatively fixed, and in some cases, the need for a connecting corridor between two reinforced concrete buildings is not designed during the construction process, but in subsequent use, the design of a corridor is required. At this time, the installation of the corridor is more complicated and the stability of the subsequently connected corridor is poor. Summary of the invention
[0004] The present invention aims to solve the shortcomings existing in the background technology and provide an aerial corridor passage, which at least solves some of the technical problems in the prior art.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an aerial corridor passage; comprising a corridor assembly, a connection assembly, a first connection platform, and a second connection platform;
[0006] The corridor assembly comprises a steel-concrete passage and a load-bearing member, wherein the steel-concrete passage is connected to the load-bearing member, and both ends of the load-bearing member are respectively connected to the first connection platform or the second connection platform through a connection assembly;
[0007] The connecting component includes an L-shaped steel plate and a T-shaped steel plate. The L-shaped steel plate includes a horizontal plate area and a vertical plate area. The horizontal plate area is connected to the top surface of the corresponding first connecting platform or the second connecting platform, and the vertical plate area is fit-connected to the side of the corresponding first connecting platform or the side of the second connecting platform. The L-shaped steel plate is connected to the corresponding first connecting platform or the second connecting platform through the T-shaped steel plate.
[0008] In a further embodiment, the connection assembly further comprises a compensating member and a staircase platform;
[0009] The compensating member includes two vertical columns and a transverse steel pipe, the two ends of the transverse steel pipe are respectively connected to the top of the side of the vertical column, and the top of the staircase platform is connected to the side of the transverse steel pipe away from the corridor assembly;
[0010] The bottom surface of the vertical column and the bottom surface of the stair platform are connected to the same first connecting platform or the second connecting platform.
[0011] In a further embodiment, the bottom surface of the vertical column is connected to the first connecting platform or the second connecting platform through a flat steel plate; the bottom surface of the stair platform is connected to the first connecting platform or the second connecting platform through two flat steel plates; the flat steel plates are connected to the first connecting platform or the second connecting platform through multiple chemical bolts.
[0012] In a further embodiment, the load-bearing member includes a load-bearing frame and a plurality of connecting rods;
[0013] The supporting frame includes two long rods and two wide rods. The two long rods are connected to the two wide rods in sequence. The supporting frame is rectangular as a whole. The two ends of the connecting rod are respectively connected to the two long rods. Multiple connecting rods are arranged in parallel with the wide rods.
[0014] In a further solution, the side surface of the transverse steel pipe close to the corridor assembly is connected to the load-bearing member;
[0015] The transverse steel pipe is connected to the bearing member through an L-shaped steel plate and a T-shaped steel plate.
[0016] In a further embodiment, the first connecting platform includes a first horizontal platform and a first vertical side, and the first vertical side is connected to a side of the first horizontal platform close to the corridor assembly;
[0017] The second connecting platform includes a second horizontal platform and a second vertical side edge, and the second vertical side edge is connected to the side edge of the second horizontal platform.
[0018] In a further embodiment, the transverse plate area is connected to the top surface of the first horizontal platform or the top surface of the second horizontal platform or the top surface of the transverse steel tube;
[0019] The vertical plate area is connected to a side surface of the first vertical side close to the corridor assembly or a side surface of the second vertical side close to the corridor assembly or a side surface of the transverse steel pipe close to the corridor assembly;
[0020] The horizontal plate area and the vertical plate area of one L-shaped steel plate are connected to the same first connecting platform or the second connecting platform or the horizontal steel pipe.
[0021] In a further solution, the transverse plate area is connected to the top surface of the first horizontal platform or the top surface of the second horizontal platform or the top surface of the transverse steel pipe by a plurality of expansion bolts;
[0022] The T-shaped steel plate is connected to the vertical plate area by means of perforated plug welding. The T-shaped steel plate includes a flat plate area and a column plate area. One end of the column plate area is connected to the flat plate area, and the other side of the column plate area is connected to the vertical plate area by perforated plug welding.
[0023] The flat plate area is arranged on the side of the first vertical side away from the corridor component, on the side of the second vertical side away from the corridor component, or on the side of the transverse steel pipe away from the corridor component, and the column plate area passes through the first vertical side, the second vertical side or the transverse steel pipe and is connected to the corresponding vertical plate area.
[0024] In a further solution, one of the flat steel plates is connected to the first horizontal platform or the second horizontal platform by eight chemical bolts, and the chemical bolts are m14 chemical bolts;
[0025] One of the transverse plate areas is connected to the top surface of the first horizontal platform or the top surface of the second horizontal platform or the top surface of the transverse steel pipe by four expansion bolts, and the expansion bolts are m14 chemical bolts;
[0026] One of the L-shaped steel plates is connected to the first horizontal platform or the second connecting platform or the transverse steel pipe through four T-shaped steel plates.
[0027] In a further solution, the length of the steel-concrete passage and the load-bearing member is the same, which is 3m-8m, the flat plate area uses steel plates with dimensions of (50-150) mm: (50-150) mm: (15-15) mm, and the column plate area uses steel columns of m16;
[0028] The horizontal plate area adopts steel plates with dimensions of (350-450) mm: (150-250) mm: (15-25) mm, the vertical plate area adopts steel plates with dimensions of (350-450) mm: (350-450) mm: (15-25) mm, and the flat steel plates adopt steel plates with dimensions of (350-450) mm: (350-450) mm: (15-25) mm.
[0029] Beneficial effects of the present invention:
[0030] Compared with the prior art, the embodiment of the present invention uses L-shaped steel plates for reinforcement, and the steel plates are embedded in two adjacent buildings, which is safe and reliable, and can be flexibly positioned according to actual needs on site;
[0031] The embodiment of the present invention can also be arranged in two buildings with a height difference by providing a compensating member and a stair platform, wherein the compensating member is arranged on the lower building, and the top surface of the compensating member is the same height as the higher building. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 A schematic top view of an embodiment of the present invention;
[0033] Figure 2 A front cross-sectional view of an embodiment of the present invention;
[0034] Figure 3 A cross-sectional view of a connection between a corridor assembly and a first connection platform or a second connection platform in an embodiment of the present invention;
[0035] Figure 4 is a top view of a flat steel plate in an embodiment of the present invention;
[0036] In the figure: 1-corridor assembly; 3-first connecting platform; 4-second connecting platform;
[0037] 11-steel-concrete passage; 12-bearing member; 21-L-shaped steel plate; 22-T-shaped steel plate; 23-compensating member; 24-staircase platform; 25-flat steel plate; 26-chemical bolt; 31-first horizontal platform; 32-first vertical side; 41-second horizontal platform; 42-second vertical side;
[0038] 121- load-bearing frame; 122- connecting rod; 211- horizontal plate area; 212- vertical plate area; 213- expansion bolts; 221- flat plate area; 222- column plate area; 231- vertical column; 232- horizontal steel pipe;
[0039] 1211-long pole; 1212-wide pole. DETAILED DESCRIPTION
[0040] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0041] The disclosure below provides many different embodiments or examples for implementing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. Of course, they are only examples and are not intended to limit the present invention. In addition, the present invention may repeat reference numbers and / or reference letters in different examples. This repetition is for the purpose of simplicity and clarity, and does not in itself indicate the relationship between the various embodiments and / or settings discussed. In addition, the present invention provides examples of various specific processes and materials, but a person of ordinary skill in the art may be aware of the application of other processes and / or the use of other materials.
[0042] The present invention provides an aerial corridor passage, comprising a corridor component 1, a connection component, a first connection platform 3, and a second connection platform 4;
[0043] The corridor assembly 1 comprises a steel-concrete passage 11 and a load-bearing member 12. The steel-concrete passage 11 is connected to the load-bearing member 12. Both ends of the load-bearing member 12 are respectively connected to the first connection platform 3 or the second connection platform 4 through connection assemblies.
[0044] The connecting component includes an L-shaped steel plate 21 and a T-shaped steel plate 22. The L-shaped steel plate 21 includes a horizontal plate area 211 and a vertical plate area 212. The horizontal plate area 211 is connected to the top surface of the corresponding first connecting platform 3 or the second connecting platform 4, and the vertical plate area 212 is fit-connected to the side of the corresponding first connecting platform 3 or the side of the second connecting platform 4. The L-shaped steel plate 21 is connected to the corresponding first connecting platform 3 or the second connecting platform 4 through the T-shaped steel plate 22.
[0045] In a further implementation of this embodiment, the connection assembly further includes a compensating member 23 and a stair platform 24;
[0046] The compensating member 23 includes two vertical columns 231 and a transverse steel pipe 232. The two ends of the transverse steel pipe 232 are respectively connected to the top of the side of the vertical column 231. The top of the staircase platform 24 is connected to the side of the transverse steel pipe 232 away from the corridor component 1.
[0047] The bottom surface of the vertical column 231 and the bottom surface of the stair platform 24 are connected to the same first connecting platform 3 or the second connecting platform 4 .
[0048] In a further implementation manner of this embodiment, the bottom surface of the vertical column 231 is connected to the first connecting platform 3 or the second connecting platform 4 through a flat steel plate 25; the bottom surface of the stair platform 24 is connected to the first connecting platform 3 or the second connecting platform 4 through two flat steel plates 25; the flat steel plate 25 is connected to the first connecting platform 3 or the second connecting platform 4 through multiple chemical bolts 26.
[0049] In a further implementation of this embodiment, the load-bearing member 12 includes a load-bearing frame 121 and a plurality of connecting rods 122;
[0050] The supporting frame 121 includes two long rods 1211 and two wide rods 1212. The two long rods 1211 and the two wide rods 1212 are connected in sequence. The supporting frame 121 is rectangular as a whole. The two ends of the connecting rod 122 are respectively connected to the two long rods 1211, and multiple connecting rods 122 are arranged in parallel with the wide rods 1212.
[0051] In a further implementation of this embodiment, the side surface of the transverse steel pipe 232 close to the corridor assembly 1 is connected to the bearing member 12;
[0052] The transverse steel pipe 232 is connected to the bearing member 12 via an L-shaped steel plate 21 and a T-shaped steel plate 22 .
[0053] In a further implementation of this embodiment, the first connecting platform 3 includes a first horizontal platform 31 and a first vertical side 32, and the first vertical side 32 is connected to the side of the first horizontal platform 31 close to the corridor assembly 1;
[0054] The second connecting platform 4 includes a second horizontal platform 41 and a second vertical side 42 . The second vertical side 42 is connected to the side of the second horizontal platform 41 .
[0055] In a further implementation of this embodiment, the transverse plate area 211 is connected to the top surface of the first horizontal platform 31 or the top surface of the second horizontal platform 41 or the top surface of the transverse steel tube 232;
[0056] The vertical plate area 212 is connected to a side surface of the first vertical side 32 close to the corridor assembly 1 or a side surface of the second vertical side 42 close to the corridor assembly 1 or a side surface of the transverse steel pipe 232 close to the corridor assembly 1;
[0057] The transverse plate area 211 and the vertical plate area 212 of one of the L-shaped steel plates 21 are connected to the same first connecting platform 3 or the second connecting platform 4 or the transverse steel pipe 232 .
[0058] In a further implementation of this embodiment, the transverse plate area 211 is connected to the top surface of the first horizontal platform 31 or the top surface of the second horizontal platform 41 or the top surface of the transverse steel pipe 232 by a plurality of expansion bolts 213;
[0059] The T-shaped steel plate 22 is connected to the vertical plate area 212 by means of plug welding. The T-shaped steel plate 22 includes a flat plate area 221 and a column plate area 222. One end of the column plate area 222 is connected to the flat plate area 221, and the other side of the column plate area 222 is connected to the vertical plate area 212 by plug welding.
[0060] The flat plate area 221 is arranged on the side of the first vertical side 32 away from the corridor assembly 1 or on the side of the second vertical side 42 away from the corridor assembly 1 or on the side of the transverse steel pipe 232 away from the corridor assembly 1, and the column plate area 222 passes through the first vertical side 32 or the second vertical side 42 or the transverse steel pipe 232 and is connected to the corresponding vertical plate area 212.
[0061] In a further implementation of this embodiment, one of the flat steel plates 25 is connected to the first horizontal platform 31 or the second horizontal platform 41 by eight chemical bolts 26, and the chemical bolts 26 are m14 chemical bolts;
[0062] One of the transverse plate areas 211 is connected to the top surface of the first horizontal platform 31 or the top surface of the second horizontal platform 41 or the top surface of the transverse steel pipe 232 through four expansion bolts 213, and the expansion bolts 213 are m14 chemical bolts;
[0063] One of the L-shaped steel plates 21 is connected to the first horizontal platform 31 or the second horizontal platform 41 or the transverse steel pipe 232 through four T-shaped steel plates 22 .
[0064] In a further implementation of this embodiment, the lengths of the steel-concrete passage 11 and the bearing member 12 are the same, 3m-8m, the flat plate area 221 uses steel plates with dimensions of (50-150) mm: (50-150) mm: (15-15) mm, and the column plate area 222 uses steel columns of m16;
[0065] The horizontal plate area 211 adopts a steel plate with dimensions of (350-450) mm: (150-250) mm: (15-25) mm, the vertical plate area 212 adopts a steel plate with dimensions of (350-450) mm: (350-450) mm: (15-25) mm, and the flat steel plate 25 adopts a steel plate with dimensions of (350-450) mm: (350-450) mm: (15-25) mm.
[0066] It should be noted that: when the first connecting platform 3 and the second connecting platform 4 are at the same height, the compensation member 23 does not need to be provided, and the two ends of the bearing member 12 respectively connect the corridor component 1 to the first connecting platform 3 and the second connecting platform 4 through connecting components;
[0067] Specifically: the connection component uses four L-shaped steel plates 21, wherein the connection method of the two L-shaped steel plates 21 and the first connection platform 3 is as follows: the horizontal plate areas 211 of the two L-shaped steel plates 21 are connected to the first horizontal platform 31, and the vertical plate areas 212 are connected to the first vertical side 32. Each horizontal plate area 211 is connected to the first horizontal platform 31 through four expansion bolts 213 of m14 specification, and each vertical plate area 212 is connected to the first vertical side 32 through four T-shaped steel plates 22. The flat plate area 221 of the T-shaped steel plate 22 is arranged on the inner side wall of the first vertical side 32, and the column plate area 222 of the T-shaped steel plate 22 passes through the side wall of the first vertical side 32 and is connected to the vertical plate area 212 by perforation plug welding. The vertical plate area 212 is fixedly connected (the fixed connection method can be welding or other connection methods) on the wide rod 1212 on the side away from the first vertical side 32;
[0068] The connection method of the other two L-shaped steel plates 21 and the second connection platform 4 is the same as the connection method of the above two L-shaped steel plates 21 and the first connection platform 3 .
[0069] When the heights of the first connecting platform 3 and the second connecting platform 4 are different, assuming that the height of the first connecting platform 3 is lower than that of the second connecting platform 4, a compensating member 23 is provided on the first connecting platform 3, wherein the number of the L-shaped steel plates 21 is also set to four, wherein the connection method of the two L-shaped steel plates 21 and the second connecting platform 4 is the same as the connection method when the heights of the first connecting platform 3 and the second connecting platform 4 are the same;
[0070] The transverse plate area 211 of the other two L-shaped steel plates 21 is connected to the top surface of the transverse steel pipe 232 and is fixed by four M14 expansion bolts 213. The vertical plate area 212 is connected to the side of the transverse steel pipe 232 close to the corridor component 1. The four column plate areas 222 corresponding to the vertical plate area 212 pass through the transverse steel pipe 232 and are connected to the vertical plate area 212 by perforation plug welding. The flat plate area 221 is arranged on the side of the principle corridor component 1 of the transverse steel pipe 232.
[0071] It should be noted that the load of this sky corridor is calculated according to the "Steel Structure Design Standard" GB50017-2017;
[0072] When the length of the sky corridor is 8m, the deadweight of the corridor assembly is 2152kg, the estimated load capacity is 4005kg, and the parameters of the steel structure connection interface are as described in Table 1 below:
[0073] Table 1: Steel structure connection interface parameters
[0074] 1. Basic parameters Connection Type Ordinary bolts, anchors, rivets Connecting components Ordinary bolts Number of shear surfaces of components 2 Rod diameter d(mm) 16 Effective diameter of the rod at the thread de (mm) 16 Minimum total thickness of pressure-bearing components in the same direction of force (mm) 10 Design value of shear strength of rod fv (N / mm2) 125 Design value of compressive strength of rod fc (N / mm2) 360 Design value of tensile strength of rod ft(N / mm2) 360 Shear force Nv (kN) borne by the member 5.03 Tension Nt (kN) on the rod 5.03
[0075] The load calculation of this sky corridor is as follows:
[0076] 1. When ordinary bolts are connected in shear, the design value of the bearing capacity of each ordinary bolt should be the smaller of the design value of shear and pressure bearing capacity.
[0077] The design value of shear bearing capacity shall be calculated as follows:
[0078] Nvb = nvπd2fvb / 4
[0079] Where d is the bolt rod diameter, take d = 16 mm;
[0080] nv – the number of sheared surfaces, take nv = 2;
[0081] fvb - the design value of the shear strength of the bolt, take fvb = 125 N / mm2;
[0082] Calculation: Nvb = 2×3.1415×162×125 / 4=50265.482 N;
[0083] The design value of the compressive bearing capacity shall be calculated as follows:
[0084] Ncb = d∑tfcb
[0085] Where d is the bolt rod diameter, take d = 16 mm;
[0086] ∑t - the minimum total thickness of the pressure-bearing member in the same force direction, take ∑t = 10 mm;
[0087] fcb - the design value of compressive strength of ordinary bolts, take fcb = 360 N / mm2;
[0088] Calculation: Ncb = 16×10×360=57600 N;
[0089] Therefore: The design value of the bearing capacity of ordinary bolts is 50265.482 N;
[0090] 2. When ordinary bolts are connected in tension in the axial direction of the rod, the design value of the bearing capacity of each ordinary bolt should be calculated as follows:
[0091] Ntb = πde2ftb / 4
[0092] The effective diameter of ordinary bolts or anchor bolts at the thread is de = 16 mm;
[0093] ftb - the design value of tensile strength of ordinary bolts, take ftb = 360 N / mm2;
[0094] Calculation: Ntb = 3.1415×162×360 / 4 = 72382.295 N;
[0095] 3. When ordinary bolts are connected by shear and tension at the same time, each ordinary bolt should be subjected to shear force and tension in the rod axis direction at the same time, which should meet the following requirements:
[0096] ((Nv / Nvb)2 + (Nt / Ntb)2)1 / 2 ≤ 1
[0097] Nv ≤ Ncb
[0098] Where Nv is the shear force borne by ordinary bolts, take Nv = 5.03 kN = 5.03 × 103 N;
[0099] Nt - the tensile force borne by ordinary bolts, take Nt = 5.03 kN = 5.03 × 103 N;
[0100] [(Nv / Nvb)2+(Nt / Ntb)2]1 / 2=[(5.03×103 / 50265.482)2+(5.03×103 / 72382.295)2]1 / 2 = 0.122 ≤ 1;
[0101] Nv = 5030 N ≤ Ncb = 57600 N;
[0102] Therefore, the bearing capacity verification of ordinary bolts can meet the requirements.
[0103] The above is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modifications to equivalent embodiments of the above disclosed technical contents without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of the technical solution of the present invention.
Claims
1. An aerial corridor passage, characterized in that; It includes a corridor component, a connection component, a first connection platform, and a second connection platform; The corridor assembly comprises a steel-concrete passage and a load-bearing member, wherein the steel-concrete passage is connected to the load-bearing member, and both ends of the load-bearing member are respectively connected to the first connection platform or the second connection platform through a connection assembly; The connection assembly includes an L-shaped steel plate and a T-shaped steel plate, wherein the L-shaped steel plate includes a horizontal plate area and a vertical plate area, wherein the horizontal plate area is connected to the top surface of the corresponding first connection platform or the second connection platform, and the vertical plate area is connected to the side surface of the corresponding first connection platform or the side surface of the second connection platform in a close fit, and the L-shaped steel plate is connected to the corresponding first connection platform or the second connection platform through the T-shaped steel plate; Wherein, the connection assembly also includes a compensating member and a stair platform; The compensating member includes two vertical columns and a transverse steel pipe, the two ends of the transverse steel pipe are respectively connected to the top of the side of the vertical column, and the top of the staircase platform is connected to the side of the transverse steel pipe away from the corridor assembly; The bottom surface of the vertical column and the bottom surface of the stair platform are connected to the same first connecting platform or the second connecting platform; The bottom surface of the vertical column is connected to the first connecting platform or the second connecting platform through a flat steel plate; the bottom surface of the staircase platform is connected to the first connecting platform or the second connecting platform through two flat steel plates; the flat steel plates are connected to the first connecting platform or the second connecting platform through a plurality of chemical bolts; The load-bearing member comprises a load-bearing frame and a plurality of connecting rods; The bearing frame includes two long rods and two wide rods, the two long rods are connected to the two wide rods in sequence, the bearing frame is rectangular as a whole, the two ends of the connecting rod are respectively connected to the two long rods, and the connecting rods are arranged in parallel with the wide rods; The side surface of the transverse steel pipe close to the corridor assembly is connected to the load-bearing member; The transverse steel pipe and the load-bearing member are connected by an L-shaped steel plate and a T-shaped steel plate; The first connecting platform includes a first horizontal platform and a first vertical side, wherein the first vertical side is connected to a side surface of the first horizontal platform close to the corridor assembly; The second connecting platform comprises a second horizontal platform and a second vertical side, wherein the second vertical side is connected to a side of the second horizontal platform; The transverse plate area is connected to the top surface of the first horizontal platform or the top surface of the second horizontal platform or the top surface of the transverse steel pipe; The vertical plate area is connected to a side surface of the first vertical side close to the corridor assembly or a side surface of the second vertical side close to the corridor assembly or a side surface of the transverse steel pipe close to the corridor assembly; The horizontal plate area and the vertical plate area of one L-shaped steel plate are connected to the same first connecting platform or the second connecting platform or the horizontal steel pipe.
2. The sky corridor according to claim 1, characterized in that: The transverse plate area is connected to the top surface of the first horizontal platform or the top surface of the second horizontal platform or the top surface of the transverse steel pipe by a plurality of expansion bolts; The T-shaped steel plate is connected to the vertical plate area by means of perforated plug welding. The T-shaped steel plate includes a flat plate area and a column plate area. One end of the column plate area is connected to the flat plate area, and the other side of the column plate area is connected to the vertical plate area by perforated plug welding. The flat plate area is arranged on the side of the first vertical side away from the corridor component, on the side of the second vertical side away from the corridor component, or on the side of the transverse steel pipe away from the corridor component, and the column plate area passes through the first vertical side, the second vertical side or the transverse steel pipe and is connected to the corresponding vertical plate area.
3. The sky corridor according to claim 2 is characterized in that: One of the flat steel plates is connected to the first horizontal platform or the second horizontal platform by eight chemical bolts, and the chemical bolts are m14 chemical bolts; One of the transverse plate areas is connected to the top surface of the first horizontal platform or the top surface of the second horizontal platform or the top surface of the transverse steel pipe by four expansion bolts, and the expansion bolts are m14 chemical bolts; One of the L-shaped steel plates is connected to the first horizontal platform or the second connecting platform or the transverse steel pipe through four T-shaped steel plates.
Citation Information
Patent Citations
Adjustable corridor for outdoor elevator
CN214657695U
Corridor connecting structure of additionally-built elevator shaft of existing building
CN216974270U