A computer software management system and method based on big data analysis

Through big data analysis technology, the operating status of computer software processes is solved, and the energy consumption increase caused by the large number of computer software is achieved, which can reduce computer energy consumption while ensuring the software is started quickly.

CN118051247BActive Publication Date: 2024-12-06HEFEI ZERO DISTANCE NETWORK TECHNOLOGY CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410094397.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-12-06
Estimated Expiration
2044-01-23

AI Technical Summary

Technical Problem

As user demand increases, more software installed on computers is frequently cold-started, resulting in increased computer energy consumption and power consumption. It is difficult for the prior art to effectively manage the background operation of software to reduce system power.

Method used

Using a computer software management system based on big data analysis, the energy consumption and user behavior of the software process are monitored and analyzed in real time through software information acquisition, software process acquisition, software energy consumption calculation, user behavior acquisition, time period prediction and software restriction modules, and predict the energy consumption and user behavior of the software process in real time. During the user's operation period, optimize the running status of the software process and select the appropriate software process to end to reduce energy consumption.

Benefits of technology

It realizes power consumption calculation based on user usage habits and software background operation, and selects the appropriate software process to end the operation, thereby reducing computer energy consumption while ensuring the software is started quickly and improving system efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118051247B_ABST
    Figure CN118051247B_ABST
Patent Text Reader

Abstract

The invention discloses a computer software management system and method based on big data analysis, which relate to the field of computer technology and include a software information acquisition module, a software process acquisition module, a software energy consumption calculation module, a user behavior acquisition module, a time period prediction module and a software restriction module. The computer software management system and method based on big data analysis can achieve the following functions: selecting appropriate software running in the background to end the operation according to the user's usage habits of each software and the calculation of the power consumption of each software running in the background and restarting, thereby reducing the energy consumption of the computer while ensuring that the software required by the user can be started in a timely and fast manner.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a computer software management system and method based on big data analysis. Background Art

[0002] Computer software is the computer programs, procedures, rules, and possible files, documents, and data related to the operation of a computer system. Software is the interface between the user and the hardware. Users communicate with computers mainly through software. In order to facilitate users and make the computer system have a higher overall utility, when designing a computer system, the combination of software and hardware, as well as the requirements of users and software must be considered comprehensively.

[0003] The invention patent with publication number CN112860304B discloses an open source software management system and a method for managing software thereof, including: a file management module for receiving and storing the source files and file description information of a plurality of software programs; an interactive management module for sending at least one current file description information to a terminal device, so that the terminal device displays the at least one current file description information; a download management module for receiving a file download request from the terminal device and sending a target source file to the terminal device according to the file download request; an operation management module for receiving a first software operation request from the terminal device and sending a second software operation request to a cloud platform; the software operation request includes an executable program obtained by the terminal device updating and compiling the target source file, so that the cloud platform runs the executable program. The open source software management system can accelerate the promotion of excellent scientific research software and lower the research threshold.

[0004] However, with the increase in user needs, computer software has also gradually increased, and more and more software has been installed on users' computers. According to different user needs, different software needs to be opened and used. However, after some software is opened, some programs will remain running in the background, which will not only occupy the computer's running memory, but also increase the computer's energy consumption and power consumption. However, if an application is completely exited and needs to be used again, it is necessary to restart the application, that is, cold start. Cold start has a higher demand for the computer's instantaneous power. Frequent cold starts may result in higher energy consumption. Therefore, it is necessary to decide whether to clean up the background after exiting the application based on the user's usage habits, so as to reduce the system power while ensuring the normal use of the current application. Summary of the invention

[0005] The purpose of the present invention is to provide a computer software management system and method based on big data analysis to solve the above-mentioned deficiencies in the prior art.

[0006] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a computer software management system based on big data analysis, including a software information acquisition module, a software process acquisition module, a software energy consumption calculation module, a user behavior acquisition module, a time period prediction module, and a software restriction module;

[0007] The software information acquisition module is used to acquire software information installed on the computer, wherein the software information includes software and its name, software process and its name, and the corresponding relationship between software and software process; wherein each software name corresponds to at least one software process;

[0008] The software process acquisition module is used to acquire the running software process, wherein the software information acquisition and the software process acquisition can be obtained by docking with the task manager of the computer;

[0009] The software energy consumption calculation module is used to obtain computer operation data and running software processes, calculate the computer operation data occupied by each software process, and calculate the power of each software process and the power of each software according to the computer operation data occupied by each software process;

[0010] The user behavior acquisition module is used to acquire the user's operation information on the computer in real time and save the operation information, wherein the operation information includes the software process being operated by the user and the time period of the software process being operated;

[0011] The time period prediction module is used to train the time series model based on the operation information to obtain the time period prediction model, which is used to output the user operation time period predicted by the corresponding software process according to the software process input into the time period prediction module. Specifically, when training, the operation information is used as the sample set, and the sample set is evenly divided into a training set and a verification set, which is conducive to the training of the training set to select a good time series model, preliminarily determine the values ​​of each parameter of the time series model, and then use the verification set to verify the trained time series model, and judge whether the accuracy of the output of the time series model is greater than or equal to the set accuracy threshold. If so, determine the values ​​of each parameter of the time series model to obtain the time period prediction model. If not, adjust the parameters, or reselect the time series model, and repeat the training and verification steps until the accuracy of the time series model verified by the verification set is greater than or equal to the set accuracy threshold to determine the values ​​of each parameter of the time series model and obtain the time period prediction model.

[0012] The software restriction module is used to restrict software processes corresponding to software other than the software corresponding to the software process currently being operated by the user based on the operation information, computer operation data, and time period prediction model, and terminate all software processes corresponding to software whose predicted user operation time period does not overlap with the time period from the current time to the set time.

[0013] Furthermore, the computer operation data includes multiple items, which are respectively used to represent the occupation of various computer resources by the software process, the total amount of various resources, the power and temperature of various hardware. For example, each item of the computer operation data may be the current power of the CPU, the maximum power of the CPU, the temperature of the CPU, the current power of the GPU, the maximum power of the GPU, the temperature of the GPU, the size of the running memory, the size of the occupied running memory, the fan power, the power of the power supply, the total power, etc.; the computer operation data occupied by each software process refers to the CPU power, GPU power, running memory, total power, etc. that a software process needs to occupy when running, which can be obtained by checking the task manager or by calculation. For example, there is a first software process one. Before the first software process one is started, the computer operation data is obtained to obtain the computer operation data one, and then only the first software process one is started to obtain the computer operation data again to obtain the computer operation data two. Then the computer operation data occupied by the first software process one is i =Computer operation data 2 i -Computer operation data 1 i , where i represents the i-th item of computer operation data, for example, i=1 represents the current power of the CPU, i=2 represents the current power of the GPU, and i=3 represents the size of the occupied operation memory, etc. .

[0014] Furthermore, the power of each software process and the power of each software are calculated according to the computer operation data occupied by each software process, which specifically includes the following steps:

[0015] Based on historical computer operation data, the functional relationship between the usage of various computer resources and the corresponding hardware power is analyzed to obtain the power calculation model of various resources;

[0016] Obtain computer operation data occupied by each software process, and calculate the power of each software process and the total power of all software processes based on the power calculation model;

[0017] The total power of all software processes is calculated minus the sum of the powers of each software process to obtain the additional power. Based on common knowledge in related fields, it can be known that the higher the resource usage of components such as computer processors, the higher the power, the higher the temperature, the lower the working efficiency, and more power needs to be allocated for cooling and heat dissipation. Therefore, when calculating the power of each software process separately, the resource usage is lower, the working efficiency is higher, and the power required to process the same resource usage is lower, so the calculated sum of the power of each software process will be less than the total power of all software processes.

[0018] The extra power is divided by the number of ongoing software processes to obtain the average extra power occupied by each software process, and the average extra power occupied by each software process is updated to the power of each software process. The update formula is:

[0019] The power of a software process = the power of the software process + the average additional power consumed by each software process;

[0020] Based on the corresponding relationship between the software process and the software, the power of each software is obtained.

[0021] Furthermore, the software restriction module restricts software processes corresponding to software other than the software corresponding to the software process being operated by the user, specifically including the following steps:

[0022] Obtain operation information and computer operation data, and obtain the software process being operated by the user and the software corresponding to the software process;

[0023] Set up a custom process whitelist;

[0024] Restrict software processes that are neither the software currently being operated by the user nor the software processes in the custom process whitelist, so that they can keep running but not perform tasks.

[0025] Further, the software restriction module terminates all software processes corresponding to the software whose predicted user operation time periods do not overlap with the time period from the current time to the set time, specifically including the following steps:

[0026] Acquire the set time, and use the time period prediction model to predict all software processes operated by users whose time period is from the current time to the set time, to obtain the standby software processes;

[0027] Obtaining the custom process whitelist, and if the software process being performed other than the software process corresponding to the software being operated by the user is neither a standby software process nor a software process in the custom process whitelist, terminating the software process;

[0028] Otherwise, it is determined whether the occupancy rate of the computer running data is lower than the set occupancy rate threshold, and if not, the standby software process is selected to end.

[0029] Further, the step of determining whether the occupancy rate of the computer running data is lower than a set occupancy rate threshold, and if not, selecting the standby software process to end, specifically includes the following steps:

[0030] Selecting a standby software process until the selected standby software process ends and the calculated occupancy rate of the computer running data is lower than a set occupancy rate threshold, thereby obtaining a plurality of end groups;

[0031] Calculate the power saving from the time when the standby software process of each termination group ends to the start time of the predicted user operation period closest to the current time for each standby software process;

[0032] calculating the restart power consumption of the inactive software processes of each termination group;

[0033] The inactive software process of the termination group having the largest value of power saving minus restart power consumption is terminated.

[0034] A computer software management method based on big data analysis comprises the following steps:

[0035] Obtain the user's historical operation information, and train a time period prediction model based on the historical operation information to predict the operation period of each software process;

[0036] Obtain the running software processes and computer operation data, and calculate the power of each software process and the total power;

[0037] Obtain the user's current operation information to obtain the software process the user is operating, and restrict or terminate the remaining software processes;

[0038] Based on the user's current operation information, the time period prediction model is updated to obtain a newly predicted operation time period for each software process.

[0039] Compared with the prior art, the present invention provides a computer software management system and method based on big data analysis. By setting a software information acquisition module, a software process acquisition module, a software energy consumption calculation module, a user behavior acquisition module, a time period prediction module, and a software restriction module, it is possible to select appropriate software running in the background to end its operation according to the user's usage habits of each software and the calculation of the power consumption of each software running in the background and restarting, thereby reducing the energy consumption of the computer while ensuring that the software that the user needs to use can be started in a timely and fast manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0041] Figure 1 A system structure block diagram provided for an embodiment of the present invention;

[0042] Figure 2 A diagram of the method steps provided for an embodiment of the present invention. DETAILED DESCRIPTION

[0043] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0044] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0045] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] Example embodiments will be described more fully below with reference to the accompanying drawings, but the example embodiments may be embodied in different forms and should not be construed as limited to the embodiments set forth herein. On the contrary, the purpose of providing these embodiments is to make the present disclosure thorough and complete and to enable those skilled in the art to fully understand the scope of the present disclosure.

[0047] In the absence of conflict, the various embodiments of the present disclosure and the various features therein may be combined with each other.

[0048] As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.

[0049] The terms used herein are only used to describe specific embodiments and are not intended to limit the present disclosure. As used herein, the singular forms "a", "an" and "the" are also intended to include the plural forms, unless the context clearly indicates otherwise. It will also be understood that when the terms "comprising" and / or "made of" are used in this specification, the presence of the features, wholes, steps, operations, elements and / or components is specified, but the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or groups thereof is not excluded.

[0050] The embodiments described herein may be described with reference to plan views and / or cross-sectional views by means of idealized schematic diagrams of the present disclosure. Therefore, the example illustrations may be modified according to manufacturing techniques and / or tolerances. Therefore, the embodiments are not limited to the embodiments shown in the accompanying drawings, but include modifications of the configurations formed based on the manufacturing process. Therefore, the regions illustrated in the accompanying drawings have schematic properties, and the shapes of the regions shown in the figures illustrate the specific shapes of the regions of the elements, but are not intended to be limiting.

[0051] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by those of ordinary skill in the art. It will also be understood that terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant art and the present disclosure, and will not be interpreted as having an idealized or overly formal meaning unless explicitly defined as such herein.

[0052] See also Figure 1-Figure 2 , a computer software management system based on big data analysis, including a software information acquisition module, a software process acquisition module, a software energy consumption calculation module, a user behavior acquisition module, a time period prediction module, and a software restriction module;

[0053] The software information acquisition module is used to acquire the software information installed on the computer, the software information includes the software and its name, the software process and its name, and the corresponding relationship between the software and the software process; wherein each software name corresponds to at least one software process;

[0054] The software process acquisition module is used to acquire the running software process, wherein the software information acquisition and the software process acquisition can be obtained by docking with the task manager of the computer;

[0055] The software energy consumption calculation module is used to obtain computer operation data and running software processes, calculate the computer operation data occupied by each software process, and calculate the power of each software process and the power of each software according to the computer operation data occupied by each software process, which specifically includes the following steps:

[0056] A1. Based on historical computer operation data, analyze the functional relationship between the usage of various computer resources and the corresponding hardware power, and obtain the power calculation model of various resources;

[0057] A2. Obtain computer operation data occupied by each software process, and calculate the power of each software process and the total power of all software processes based on a power calculation model;

[0058] A3. Calculate the total power of all software processes minus the sum of the powers of each software process to get the additional power. Based on common knowledge in the relevant field, it can be known that the higher the resource usage of components such as computer processors, the higher the power, the higher the temperature, the lower the working efficiency, and more power needs to be allocated for cooling and heat dissipation. Therefore, when calculating the power of each software process separately, the resource usage is lower, the working efficiency is higher, and the power required to process the same resource usage is lower. Therefore, the calculated sum of the power of each software process will be less than the total power of all software processes.

[0059] A4. Divide the extra power by the number of ongoing software processes to obtain the average extra power occupied by each software process, and update the average extra power occupied by each software process to the power of each software process. The update formula is:

[0060] The power of a software process = the power of the software process + the average additional power consumed by each software process;

[0061] A5. Based on the corresponding relationship between software processes and software, the power of each software is obtained.

[0062] Among them, there are multiple items of computer operation data, which are respectively used to represent the occupation of various computer resources by the software process, the total amount of various resources, the power and temperature of various hardware. For example, each item of computer operation data can be CPU current power, CPU maximum power, CPU temperature, GPU current power, GPU maximum power, GPU temperature, running memory size, occupied running memory size, fan power, power supply power, total power, etc.; the computer operation data occupied by each software process refers to the CPU power, GPU power, running memory, total power, etc. required for a software process to run, which can be obtained by checking the task manager or by calculation. For example, there is a first software process one. Before the first software process one is started, the computer operation data is obtained to obtain computer operation data one, and then only the first software process one is started to obtain the computer operation data again to obtain computer operation data two. Then the computer operation data occupied by the first software process one is i =Computer operation data 2 i -Computer operation data 1 i, where i represents the i-th item of computer operation data, for example, i=1 represents the current power of the CPU, i=2 represents the current power of the GPU, i=3 represents the size of the occupied operating memory, etc.

[0063] The user behavior acquisition module is used to obtain the user's operation information on the computer in real time and save the operation information. The operation information includes the software process the user is operating and the time period of the software process;

[0064] The time period prediction module is used to train the time series model based on the operation information to obtain the time period prediction model, which is used to output the user operation time period predicted by the corresponding software process according to the software process input into the time period prediction module. Specifically, during training, the operation information is used as the sample set, and the sample set is evenly divided into a training set and a validation set, which is conducive to the training of the training set to select a good time series model, preliminarily determine the values ​​of each parameter of the time series model, and then use the validation set to verify the trained time series model to determine whether the accuracy of the output of the time series model is greater than or equal to the set accuracy threshold. If so, determine the values ​​of each parameter of the time series model to obtain the time period prediction model. If not, adjust the parameters, or reselect the time series model, and repeat the training and verification steps until the accuracy of the time series model verified by the validation set is greater than or equal to the set accuracy threshold to determine the values ​​of each parameter of the time series model to obtain the time period prediction model.

[0065] The software restriction module is used to restrict the software processes corresponding to the software other than the software corresponding to the software process being operated by the user based on the operation information, computer operation data, and the time period prediction model, and terminate all software processes corresponding to the software whose predicted user operation time period does not overlap with the time period from the current time to the set time, specifically including the following steps:

[0066] B1. Obtain operation information and computer operation data to obtain the software process being operated by the user and the software corresponding to the software process;

[0067] B2. Set a custom process whitelist;

[0068] B3. Restrict software processes that are neither corresponding to the software currently being operated by the user nor in the custom process whitelist, so that they remain running but do not perform tasks.

[0069] B4. Obtain the set time, and use the time period prediction model to predict all software processes operated by users in the time period from the current time to the set time, and obtain the standby software processes;

[0070] B5. Obtain a custom process whitelist. If the software process in progress other than the software process corresponding to the software being operated by the user is neither a standby software process nor a software process in the custom process whitelist, terminate the software process.

[0071] B6. Otherwise, determine whether the occupancy rate of the computer running data is lower than the set occupancy rate threshold. If not, select the standby software process to end, which specifically includes the following steps:

[0072] C1. Selecting a standby software process until the selected standby software process ends and the occupancy rate of the computer running data calculated is lower than a set occupancy rate threshold, thereby obtaining multiple end groups;

[0073] C2, calculating the power saving from the time when the standby software process of each end group ends to the start time of the predicted user operation period closest to the current time of each standby software process;

[0074] C3. Calculate the restart power consumption of the standby software process of each termination group;

[0075] C4. Select the end group with the largest value of power saving minus restart power consumption and end the standby software process.

[0076] For example, there are standby software processes 1 to 6. After the standby software processes 1 and 2, the standby software processes 1 and 3, and the standby software processes 2 and 4 are terminated, the calculated occupancy rate of the computer operation data is lower than the set occupancy rate threshold. At this time, the standby software processes 1 and 2, the standby software processes 1 and 3, and the standby software processes 2 and 4 are respectively the termination group 1, the termination group 2, and the termination group 3. Calculate the power saving after the termination group 1, the termination group 2, and the termination group 3 are closed. Calculate the restart power consumption after the termination group 1, the termination group 2, and the termination group 3 are closed. Calculate the power saving of the termination group 1 minus the restart power consumption of the termination group 1, the power saving of the termination group 2 minus the restart power consumption of the termination group 2, and the power saving of the termination group 3 minus the restart power consumption of the termination group 3. The value of the power saving of the termination group 3 minus the restart power consumption of the termination group 3 is the largest, then the standby software processes 2 and 4 corresponding to the termination group 3 are selected to be terminated, so that more power consumption can be saved, or less power consumption is wasted.

[0077] A computer software management method based on big data analysis comprises the following steps:

[0078] Obtain the user's historical operation information, and train a time period prediction model based on the historical operation information to predict the operation period of each software process;

[0079] Obtain the running software processes and computer operation data, and calculate the power of each software process and the total power;

[0080] Obtain the user's current operation information to obtain the software process the user is operating, and restrict or terminate the remaining software processes;

[0081] Based on the user's current operation information, the time period prediction model is updated to obtain a newly predicted operation time period for each software process.

[0082] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A computer software management system based on big data analysis, Features: It includes software information acquisition module, software process acquisition module, software energy consumption calculation module, user behavior acquisition module, time period prediction module and software restriction module; The software information acquisition module is used to acquire software information installed on the computer, wherein the software information includes software and its name, software process and its name, and the corresponding relationship between software and software process; The software process acquisition module is used to acquire the running software process; The software energy consumption calculation module is used to obtain computer operation data and running software processes, calculate the computer operation data occupied by each software process, and calculate the power of each software process and the power of each software according to the computer operation data occupied by each software process; The power of each software process and the power of each software are calculated according to the computer operation data occupied by each software process, which specifically includes the following steps: Based on historical computer operation data, the functional relationship between the usage of various computer resources and the corresponding hardware power is analyzed to obtain the power calculation model of various resources; Obtain computer operation data occupied by each software process, and calculate the power of each software process and the total power of all software processes based on the power calculation model; Calculate the total power of all software processes minus the sum of the power of each software process to get the additional power; The extra power is divided by the number of ongoing software processes to obtain the average extra power occupied by each software process, and the average extra power occupied by each software process is updated to the power of each software process. The update formula is: The power of a software process = the power of the software process + the average additional power consumed by each software process; Based on the corresponding relationship between software processes and software, the power of each software is obtained; The user behavior acquisition module is used to acquire the user's operation information on the computer in real time and save the operation information, wherein the operation information includes the software process being operated by the user and the time period of the software process being operated; The time period prediction module is used to train a time series model based on the operation information to obtain a time period prediction model, and is used to output a user operation time period predicted by a corresponding software process according to a software process input into the time period prediction module; The software restriction module is used to restrict software processes corresponding to software other than the software corresponding to the software process being operated by the user based on the operation information, computer operation data, and time period prediction model, and terminate all software processes corresponding to software whose predicted user operation time periods do not overlap with the time period from the current time to the set time; The software restriction module restricts software processes corresponding to software other than the software corresponding to the software process being operated by the user, specifically including the following steps: Obtain operation information and computer operation data, and obtain the software process being operated by the user and the software corresponding to the software process; Set up a custom process whitelist; Limit the software processes that are neither the software currently being operated by the user nor the software processes in the custom process whitelist, so that they can keep running but not perform tasks; The software restriction module terminates all software processes corresponding to the software whose predicted user operation time periods do not overlap with the time period from the current time to the set time, specifically including the following steps: Acquire the set time, and use the time period prediction model to predict all software processes operated by users whose time period is from the current time to the set time, to obtain the standby software processes; Obtaining the custom process whitelist, and if the software process being performed other than the software process corresponding to the software being operated by the user is neither a standby software process nor a software process in the custom process whitelist, terminating the software process; Otherwise, determine whether the occupancy rate of the computer running data is lower than the set occupancy rate threshold, if not, select the standby software process to end; The step of judging whether the occupancy rate of the computer running data is lower than the set occupancy rate threshold, and if not, selecting the standby software process to end, specifically comprises the following steps: Selecting a standby software process until the selected standby software process ends and the calculated occupancy rate of the computer running data is lower than a set occupancy rate threshold, thereby obtaining a plurality of end groups; Calculate the power saving from the time when the standby software process of each termination group ends to the start time of the predicted user operation period closest to the current time for each standby software process; calculating the restart power consumption of the inactive software processes of each termination group; The inactive software process of the termination group having the largest value of power saving minus restart power consumption is terminated.

2. A computer software management system based on big data analysis according to claim 1, Features: The computer operation data includes multiple items, which are respectively used to represent the occupation of various computer resources by the software process, the total amount of various resources, and the power and temperature of various hardware.

3. A computer software management method based on big data analysis, applicable to a computer software management system based on big data analysis as claimed in any one of claims 1 to 2, Features: The following steps are involved: Obtain the user's historical operation information, and train a time period prediction model based on the historical operation information to predict the operation period of each software process; Obtain the running software processes and computer operation data, and calculate the power of each software process and the total power; Obtain the user's current operation information to obtain the software process the user is operating, and restrict or terminate the remaining software processes; Based on the user's current operation information, the time period prediction model is updated to obtain a newly predicted operation time period for each software process.

Citation Information

Patent Citations

  • An open-source software management system and a method for managing the software thereon

    CN112860304B

  • Method and device for cleaning processes of mobile terminal

    CN103345397A

  • Application management method and apparatus, storage medium, and electronic device

    CN107835311A

  • Terminal process management method, terminal and computer readable storage medium

    CN107896273A

  • Application preloading method and device, storage medium and terminal

    CN108762831A