A street lamp management method and device in a road construction scenario
By monitoring and clustering road flow and adjusting the distribution ratio of street lights, the problem of insufficient street light electricity in road construction scenarios is solved, and the stable management and energy-saving effect of street lights is achieved.
Patent Information
- Application Number
- CN202311784478.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-12-22
AI Technical Summary
In the road construction scenario, street light management faces the problem of insufficient power storage, especially solar and wind energy street lights, which are insufficient power due to environmental impacts. How to achieve energy saving to ensure long-term and stable operation of street lights is a challenge.
By monitoring the historical daily flow of the road, clustering branch roads, calculating the historical and current daily flow allocation ratios, and adjusting the street light switch control to achieve orderly management of street lights.
It realizes stable management and energy saving of street lights, ensuring that road lighting is reduced while under road construction, and improving the operating reliability of street lights.
Smart Images

Figure CN118075962B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of street lamps, and in particular to a street lamp management method and device in a road construction scenario. Background Art
[0002] With the continuous development of social economy, the scale of cities continues to grow. Street lamps, as public infrastructure of cities, are not only an important part of urban construction, but also inseparable from people's daily life. They can play an immeasurable role in the city's social security, traffic safety and urban appearance.
[0003] In the prior art, the switching control of each street lamp mainly relies on manual control or switching control through a light sensor, that is, when the light sensor senses that the ambient brightness is lower than the preset brightness, the street lamp is turned on, and when the light sensor senses that the ambient brightness is not lower than the preset brightness, the street lamp is turned off.
[0004] However, with the development of new energy technologies, more and more areas, especially those with relatively low road usage, are gradually using solar street lights and wind street lights for road lighting. However, since solar energy and wind energy are greatly affected by the environment, there is often a situation where the amount of electricity that street lights can use is insufficient. At this time, how to save energy while lighting the road to ensure the long-term stable operation of the street lights has become an important issue in street light management. Moreover, after the road is built, road maintenance is often required, which brings more uncertainty to the management of street lights.
[0005] In view of this, overcoming the defects of the prior art is an urgent problem to be solved in the field of this technology. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a street lamp management method in a road construction scenario.
[0007] The present invention adopts the following technical solution:
[0008] In a first aspect, the present invention provides a street lamp management method in a road construction scenario, comprising:
[0009] Before repairing the corresponding roads, monitor the historical daily traffic volume of each road, and for the branch roads connected to the corresponding upstream roads, count the historical daily traffic volume of each branch road within the first preset period to obtain the historical daily traffic volume change pattern of each branch road;
[0010] According to the similarity between the historical daily flow rate change patterns of each branch road, multiple branch roads connected to the same upstream road are clustered to obtain one or more aggregates. According to the historical daily flow rate of each branch road in the aggregate, the historical daily flow rate distribution ratio of the aggregate is calculated;
[0011] The historical daily flow of each aggregate is counted, and the historical daily flow distribution change law of the upstream road is obtained according to the change of the proportion of the historical daily flow of each aggregate in the historical daily flow of the upstream road within the first preset period;
[0012] When the first branch road is completely closed during road construction, the current daily flow of the first aggregate is calculated based on the historical daily flow distribution change law of the first upstream road and the current daily flow of the first upstream road; wherein the first upstream road is the upstream road connected to the first branch road, and the first aggregate is the aggregate to which the first branch road belongs;
[0013] The allocation amount of the first branch road in the historical daily flow distribution ratio is divided into other branch roads of the first aggregate to obtain a new daily flow distribution ratio; wherein the division is performed according to the allocation ratio of other branch roads;
[0014] The current daily flow of the first aggregate is divided according to the new daily flow distribution ratio to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
[0015] Preferably, clustering multiple branch roads connected to the same upstream road according to the similarity between the historical daily flow rate change patterns of each branch road to obtain one or more aggregates specifically includes:
[0016] Calculate the regularity difference between every two adjacent branch roads connected to the same upstream road; wherein the regularity difference is the difference between the historical daily flow change regularities corresponding to the two roads;
[0017] From a plurality of branch roads that have not been aggregated into any aggregate, two adjacent branch roads with the smallest regularity difference and the regularity difference less than or equal to a preset difference are selected to form a new aggregate, a target branch road adjacent to the new aggregate and not included in any aggregate is found, and the regularity difference between the target branch road and the new aggregate is calculated; wherein the regularity difference between the target branch road and the new aggregate is: the regularity difference between the target branch road and each branch road in the new aggregate is calculated, and the largest regularity difference is selected as the regularity difference between the target branch road and the new aggregate;
[0018] If the regular difference between the target branch road and the new aggregate is less than or equal to the preset difference, the target branch road is aggregated into the new aggregate until the regular difference between each target branch road and the new aggregate is greater than the preset difference, then clustering the new aggregate is stopped to obtain a complete aggregate.
[0019] Preferably, the calculating of the regularity difference between every two adjacent branch roads connected to the same upstream road specifically includes:
[0020] Calculate the difference between the historical daily flow rates of branch road a and branch road b on the same day to obtain the historical daily flow rate difference between branch road a and branch road b on that day;
[0021] The variance or mean difference of the historical daily flow difference values within the first preset period is calculated to obtain the regular difference degree between the branch road a and the branch road b.
[0022] Preferably, the current daily flow of the first aggregate is calculated based on the historical daily flow distribution change rule of the first upstream road and the current daily flow of the first upstream road, specifically including:
[0023] Matching the historical daily traffic flow distribution change pattern of the first upstream road with the historical holiday distribution, and combining it with the current holiday distribution, to obtain the current daily traffic flow distribution;
[0024] According to the current daily flow distribution, the current daily flow of the first upstream road is divided to obtain the current daily flow of the first aggregate.
[0025] Preferably, when the first branch road is partially closed during road construction, the method further comprises:
[0026] Monitoring the historical daily flow of each branch road in the first aggregate within a second preset period after the first branch road is partially closed, and generating a new daily flow distribution ratio according to the historical daily flow of each branch road in the first aggregate within the second preset period;
[0027] The current daily flow of the first aggregate is divided according to the new daily flow distribution ratio to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
[0028] Preferably, after the first branch road is repaired, the method further includes, specifically including:
[0029] According to the historical daily flow distribution ratio of the first aggregate, the current daily flow of the first aggregate is divided to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
[0030] Preferably, when the first upstream road is not connected to the corresponding upstream road, the current daily flow of the first upstream road is obtained by analyzing the change rule of the historical daily flow of the first upstream road, specifically including:
[0031] The historical daily flow of the first upstream road in the past second preset period is monitored, and the historical daily flow of the first upstream road is substituted into the historical daily flow change rule of the first upstream road to obtain the current daily flow of the first upstream road.
[0032] Preferably, the historical daily traffic flow variation pattern of the first upstream road is obtained based on the historical daily traffic flow analysis of the first upstream road. Specifically, the historical daily traffic flow of the first upstream road is matched with the historical holiday distribution to obtain the historical daily traffic flow variation pattern of the first upstream road.
[0033] Preferably, the management and control of the street lamps according to the current daily flow of each branch road in the first aggregate specifically includes:
[0034] Determine whether the current daily flow rate of the corresponding branch road is greater than or equal to the preset flow rate, and if the current daily flow rate is greater than or equal to the preset flow rate, turn on all the street lights on the branch road;
[0035] Otherwise, partially turn on the street lights on the branch road.
[0036] In a second aspect, the present invention further provides a street light management device in a road construction scenario, which is used to implement the street light management method in the road construction scenario described in the first aspect, and the device includes:
[0037] At least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the processor to execute the street lamp management method in the road construction scenario described in the first aspect.
[0038] In a third aspect, the present invention further provides a non-volatile computer storage medium, wherein the computer storage medium stores computer executable instructions, which are executed by one or more processors to complete the street lamp management method in the road construction scenario described in the first aspect.
[0039] The present invention forms an aggregate between related branch roads by analyzing the relationship between each branch road, and uses the aggregate as a stable measurement unit, so as to stably measure the changing law of the flow allocated to each aggregate by the upstream road, and then further calculate the daily flow of the aggregate according to the changing law, and then according to the daily flow distribution ratio of each branch road in the aggregate and combined with the conditions of the branch roads, it is possible to directly obtain the impact of branch road construction on other roads, so as to directly calculate the daily flow of each surrounding road when the corresponding road is under construction, and realize orderly management and control of street lamps. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0041] Figure 1 It is a flowchart of a first street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0042] Figure 2 is a schematic diagram of a first street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0043] Figure 3 is a flow chart of a second street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0044] Figure 4 is a schematic diagram of a second street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0045] Figure 5 is a flowchart of a third street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0046] Figure 6 is a flowchart of a fourth street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0047] Figure 7 is a schematic diagram of a third street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0048] Figure 8 is a flowchart of a fifth street lamp management method in a road repair scenario provided by an embodiment of the present invention;
[0049] Fig. 9 It is a schematic diagram of the architecture of a street light management device in a road construction scenario provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0050] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0051] The terms "first", "second", etc. in the present invention are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0052] In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0053] Embodiment 1:
[0054] Embodiment 1 of the present invention provides a street lamp management method in a road construction scenario, such as Figure 1 As shown, including:
[0055] In step 201, before the corresponding road is repaired, the historical daily flow of each road is monitored, and for the branch roads connected to the corresponding upstream road, the historical daily flow of each branch road within the first preset period is counted to obtain the historical daily flow change pattern of each branch road; wherein, the first preset period is obtained by those skilled in the art based on empirical analysis. In an optional embodiment, the first preset period can be 1 year or more. The historical daily flow is the number of pedestrians and / or vehicles passing on the road in the past corresponding days.
[0056] In step 202, based on the similarity between the historical daily flow rate variation patterns of each branch road, multiple branch roads connected to the same upstream road are clustered to obtain one or more aggregates, and based on the historical daily flow rate of each branch road in the aggregate, the historical daily flow rate distribution ratio of the aggregate (i.e., the flow rate distribution ratio of each branch road in the aggregate) is calculated; wherein, when the historical daily flow rate variation patterns of multiple branch roads with similar locations are relatively similar, it can be considered that the factors affecting the daily flow rate of these multiple branch roads are consistent, such as these multiple branch roads have a common or similar destination, etc. At this time, it can be considered that a certain mutual compensation relationship can be formed between these multiple branch roads in terms of flow rate, that is, when one of the branch roads cannot be used, other roads can be used to divert traffic to achieve the effect of reaching the destination.
[0057] In step 203, the historical daily flow of each aggregate is counted, and according to the change of the proportion of the historical daily flow of each aggregate in the historical daily flow of the upstream road within the first preset period, the historical daily flow distribution change law of the upstream road is obtained (that is, the change law of the flow ratio allocated to each aggregate by the upstream road, wherein a single branch road that has not formed an aggregate is regarded as an aggregate to participate in the establishment of the historical daily flow distribution change law); that is, each aggregate is taken as a whole, and the change law of the flow of the upstream road in each aggregate is analyzed. Since after clustering in the above step 202, it can be considered that each aggregate is relatively independent and has little influence on each other, so in step 203, the aggregate can be taken as a whole to analyze and obtain a stable flow change law.
[0058] In step 204, when the first branch road is completely closed during road construction, the current daily flow of the first aggregate is calculated according to the historical daily flow distribution change law of the first upstream road and the current daily flow of the first upstream road; wherein the first upstream road is the upstream road connected to the first branch road, and the first aggregate is the aggregate to which the first branch road belongs; wherein, when the first upstream road is also connected to the corresponding upstream road (such as the first upstream road is Figure 4 When the first upstream road is still a branch road of the corresponding upstream road (such as road a), the current daily flow of the first upstream road is still obtained according to steps 201 to 206 combined with the current daily flow of road a.
[0059] If the first upstream road is not a branch road but a main road (such as the first upstream road is Figure 4 When the first upstream road is connected to the corresponding upstream road, the current daily flow of the first upstream road is obtained according to the historical daily flow change law of the first upstream road; specifically: the historical daily flow of the first upstream road in the past second preset period is monitored, and the historical daily flow of the first upstream road is substituted into the historical daily flow change law of the first upstream road to obtain the current daily flow of the first upstream road, such as Figure 2 The historical daily flow change pattern of the first upstream road is obtained based on the historical daily flow analysis of the first upstream road. Specifically, the historical daily flow of the first upstream road is matched with the historical holiday distribution to obtain the historical daily flow change pattern of the first upstream road. The second preset period is obtained by those skilled in the art based on empirical analysis. In an optional implementation, the second preset period is 1 week.
[0060] by Figure 2For example, the daily traffic volume of the corresponding statistical period (e.g., within one year) before the second preset period is collected. The daily traffic volume changes show a stable trend during non-holidays, an upward trend in the early stage of a holiday, a partial decline in the middle of the holiday, and a rebound trend in the late stage of the holiday. The current time is before the holiday, and the daily traffic volume obtained in the second preset period in the past relative to the current time is as follows: Figure 2 As shown in the figure, the daily flow rate has decreased compared with the previous year, so it is believed that there is a trend of overall daily flow rate decrease this year compared with last year. Therefore, the daily flow rate after the decrease (that is, the daily flow rate within the preset period) is substituted into the historical daily flow rate change law, and the current daily flow rate of the first upstream road is obtained as follows: Figure 2 shown.
[0061] In step 205, the allocation amount belonging to the first branch road in the historical daily flow distribution ratio is divided into other branch roads of the first aggregate to obtain a new daily flow distribution ratio; wherein, when dividing, the division is performed according to the allocation ratio of other branch roads; if there are 3 branch roads in the first aggregate, namely branch road 1, branch road 2 and branch road 3, the historical daily flow distribution ratio is 3:4:5, wherein branch road 3 is completely closed due to road construction, then part of the flow originally borne by branch road 3 is distributed to branch road 1 and branch road 2, that is, the flow in the first aggregate was originally divided into 12 parts, and branch road 3 borne 5 parts of the flow, now 3 / (3+4) of the 5 parts are distributed to branch road 1, and 4 / (3+4) of the 5 parts are distributed to branch road 2, and the new daily flow distribution ratio is obtained as follows: The final result is 3:4:0, that is, the traffic in the first aggregate is finally divided into 7 parts, 3 of which are borne by branch road 1, 4 of which are borne by branch road 2, and branch road 3 does not bear any traffic.
[0062] In step 206, the current daily flow of the first aggregate is divided according to the new daily flow distribution ratio to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
[0063] In an optional implementation, the management and control of the street lamps according to the current daily flow of each branch road in the first aggregate specifically includes: determining whether the current daily flow of the corresponding branch road is greater than or equal to a preset flow, if the current daily flow is greater than or equal to the preset flow, turning on all the street lamps on the branch road; otherwise, turning on part of the street lamps on the branch road. The preset flow is obtained by those skilled in the art based on empirical analysis.
[0064] It should be noted that this embodiment is directed to a one-way road or a branch road with an upstream road at only one end. Daily flow refers to the flow of the corresponding road on a certain day, and the historical daily flow refers to the daily flow obtained by statistics in the past. The current daily flow is the calculated daily flow of the day, which can also be understood as the calculated future daily flow. Since street lamps provide lighting for passing vehicles or pedestrians, it is obviously not real-time enough to control street lamps after the corresponding flow of a certain day is obtained by statistics. Therefore, street lamps are actually controlled in advance based on the calculated future daily flow, that is, before the street lamps are lit on a certain day, the current daily flow of the day is calculated in advance, and the street lamps are controlled according to the current daily flow. It can be considered that the current daily flow is predicted based on the historical daily flow. However, in the prior art, when the corresponding road is repaired, it may cause the road to be unable to pass normally, and vehicles may detour from the surrounding area, thereby causing changes in the surrounding flow, resulting in a large difference between the current daily flow predicted using the original rules and the actual current daily flow, thereby affecting the management and control of street lamps.
[0065] This embodiment analyzes the relationship between each branch road to form an aggregate between related branch roads, and uses the aggregate as a stable measurement unit, so as to stably measure the changing pattern of the flow allocated to each aggregate by the upstream road, and then further calculate the daily flow of the aggregate according to the changing pattern, and then according to the daily flow distribution ratio of each branch road in the aggregate and combined with the conditions of the branch roads, it is possible to directly obtain the impact of branch road construction on other roads, so as to directly calculate the daily flow of surrounding roads when the corresponding road is under construction, thereby realizing orderly management and control of street lights.
[0066] In a preferred embodiment, according to the similarity between the historical daily flow change patterns of each branch road, multiple branch roads connected to the same upstream road are clustered to obtain one or more aggregates, such as Figure 3 As shown, specifically including:
[0067] In step 301, the regularity difference between every two adjacent branch roads connected to the same upstream road is calculated; wherein the regularity difference is the difference between the historical daily traffic change patterns corresponding to the two roads; the adjacent actually refers to the adjacent connection point between the branch road and the upstream road.
[0068] In step 302, two adjacent branch roads with the smallest regular difference and the regular difference less than or equal to the preset difference are selected from multiple branch roads that have not been aggregated into any aggregate to form a new aggregate, and a target branch road adjacent to the new aggregate and not included in any aggregate is found, and the regular difference between the target branch road and the new aggregate is calculated; wherein the regular difference between the target branch road and the new aggregate is: the regular difference between the target branch road and each branch road in the new aggregate is calculated, and the largest regular difference is selected as the regular difference between the target branch road and the new aggregate; wherein the preset difference is obtained by those skilled in the art based on empirical analysis; the regular difference between adjacent branch roads is directly obtained from the result obtained in step 301, without repeated calculation. If the smallest regular difference is still greater than the preset difference, it is considered that the branch roads under the upstream road are relatively independent, and each branch road is regarded as an aggregate.
[0069] In step 303, if the regular difference between the target branch road and the new aggregate is less than or equal to the preset difference, the target branch road is aggregated into the new aggregate until the regular difference between each target branch road and the new aggregate is greater than the preset difference, then clustering of the new aggregate is stopped to obtain a complete aggregate.
[0070] by Figure 4 For example, the downstream of road 1 is connected to roads 11, 12, 13, 14, 15, 16 and 17, and the downstream of road 12 is connected to roads 121 and 122. diff(i, j) represents the regular difference between road i and road j. When road 1 is taken as the upstream road, diff(11, 12), diff(12, 13), diff(13, 14), diff(14, 15), diff(15, 16) and diff(16, 17) are calculated respectively, and the one with the smallest regular difference and the regular difference less than or equal to the preset difference is selected to form the first aggregate. For example, when diff(12, 13) is the smallest and less than or equal to the preset difference, roads 12 and 13 form an aggregate group-1, and then the branch roads adjacent to the aggregate (in Figure 4In this case, the regularity difference between the adjacent branch roads and each branch road in the aggregate is calculated, and the largest regularity difference is used as the measurement standard (i.e. the regularity difference between the target branch road and the aggregate). For example, if the aggregate group-1 currently contains roads 12 and 13, the larger of diff(11, 12) and diff(11, 13) is used as the regularity difference between road 11 and aggregate group-1. If the comparison shows that road 11 is also aggregated into aggregate group-1, then aggregate group-1 contains roads 11, 12 and 13. When judging road 14, It is necessary to calculate diff(14, 11), diff(14, 12) and diff(14, 13), and select the largest one among the three as the regular difference between road 14 and aggregate group-1, until it is compared that the branch roads adjacent to the aggregate cannot be aggregated into the aggregate, and then execute steps 302 and 303 for the remaining branch roads that are not included in any aggregate, until no new aggregate can be formed under the upstream branch, and each aggregate cannot aggregate the adjacent branch roads into it, and then all aggregates under the upstream road are obtained. As for road 12, its downstream is also connected to branch roads, and steps 301 to 303 are also executed for its branch roads to obtain all aggregates under road 12.
[0071] The calculation of the regularity difference between each two adjacent branch roads connected to the same upstream road is as follows: Figure 5 As shown, specifically including:
[0072] In step 401, the difference between the historical daily flow rates of branch road a and branch road b on the same day is calculated to obtain the historical daily flow rate difference between branch road a and branch road b on that day.
[0073] In step 402, the variance or mean difference of the historical daily flow difference values within the first preset period is calculated to obtain the regular difference between the branch road a and the branch road b.
[0074] For example, when the first preset period is 365 days, the regularity difference between branch road a and branch road b is:
[0075]
[0076] Among them, diff(a, b) is the regular difference between branch road a and branch road b, flow a is the historical daily flow of branch road a, flow b is the historical daily traffic volume of branch road b.
[0077] In actual use, the change of flow of each branch road is also related to holidays, but the distribution of holidays in each year may not be completely consistent. Therefore, this embodiment also provides the following preferred implementation method, that is, according to the historical daily flow distribution change law of the first upstream road and the current daily flow of the first upstream road, the current daily flow of the first aggregate is calculated, such as Figure 6 As shown, specifically including:
[0078] In step 501, the historical daily traffic flow distribution change pattern of the upstream road is matched with the historical holiday distribution, and then combined with the current holiday distribution to obtain the current daily traffic flow distribution.
[0079] In step 502, the current daily flow of the upstream road is divided according to the daily flow distribution to obtain the current daily flow of the first aggregate. The historical daily flow distribution change law is mainly the change law of the daily flow distribution ratio before, during and after each historical holiday. Figure 4 The branch roads downstream of the road 1 are clustered to obtain a cluster group-1 including the branch roads 11, 12 and 13, and a cluster group-2 including the branch roads 15, 16 and 17, while the branch road 14 alone forms a cluster group-3. For example, Figure 7 As shown, if during Holiday 1 in 2022, the traffic share of aggregate group-3 increases, correspondingly, the traffic share of group-1 and group-2 decreases. After Holiday 1, the traffic share of aggregate group-3 decreases, and the traffic share of group-1 and group-2 increases, and gradually tends to be stable. During Holiday 2, the traffic share of group-1 increases, and the traffic share of group-2 and group-3 decreases. The three show a law of one increasing while the other decreasing, and the sum of the traffic shares of multiple aggregates is 1. According to this law, it is inferred that on a certain day during Holiday 1 in 2023, the traffic share of group-1, group-2 and group-3 is consistent with the traffic share on the same day during Holiday 1 in 2022, that is, Figure 7As shown during holiday 1, assuming that on holiday 1 in 2022, the traffic proportions of group-1, group-2 and group-3 are 28%, 28% and 44% respectively, and assuming that it is calculated that the current daily traffic of road 1 on holiday 1 in 2023 is 50,000 vehicles, then the current daily traffic of group-1, group-2 and group-3 are 50,000×28%=14,000 vehicles, 50,000×28%=14,000 vehicles, and 50,000×44%=22,000 vehicles respectively.
[0080] In actual use, some roads may only be partially repaired. In this case, only part of the road may be closed. Although the road is inconvenient to travel, it is still passable. In view of this situation, this embodiment further provides a preferred implementation method, that is, when the first branch road is partially closed during road repair, the method further includes:
[0081] Monitor the historical daily flow of each branch road in the first aggregate within the second preset period after the first branch road is partially closed, and generate a new daily flow distribution ratio according to the historical daily flow of each branch road in the first aggregate within the second preset period; it should be noted here that: the first branch road is actually the closest to the current one within the second preset period after the partial closure and within the second preset period after the road is closed, if the time after the closure has not reached the second preset period, the street light is not controlled according to the flow, but the street light is kept on until the second preset period is reached, and then the street light is controlled by the flow.
[0082] The current daily flow of the first aggregate is divided according to the new daily flow distribution ratio to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
[0083] In this case, the original daily flow distribution ratio of the aggregate is no longer applicable, but the overall flow of the aggregate remains stable, so the subsequent flow is divided according to the flow distribution ratio of each branch road within the aggregate within the second preset period closest to the current one.
[0084] After the first branch road is repaired, the method further includes: dividing the current daily flow of the first aggregate according to the historical daily flow distribution ratio of the first aggregate to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lamps according to the current daily flow of each branch road in the first aggregate. That is, after the road repair is completed, the original historical daily flow distribution ratio is restored for division.
[0085] In an optional implementation manner, the management and control of the street lamps according to the current daily flow of each branch road in the first aggregate specifically includes:
[0086] Determine whether the current daily flow rate of the corresponding branch road is greater than or equal to the preset flow rate. If the current daily flow rate is greater than or equal to the preset flow rate, all the street lights on the branch road are turned on; otherwise, some of the street lights on the branch road are turned on, such as turning on the street lights on one side of the road at intervals, turning off the street lights on the other side of the road, or turning on the street lights on both sides of the road in a staggered manner. The preset flow rate is obtained by those skilled in the art based on empirical analysis.
[0087] In a preferred embodiment, before issuing the energy-saving level to the primary street lights on each road according to the daily traffic conditions of each road, the method further includes: a central control platform receiving weather forecast information from a third-party meteorological agency; when it is confirmed according to the weather forecast information that severe weather occurs in the area where the corresponding road is located in the current period, determining that the energy-saving level of the street lights on the road is level 3; the severe weather includes one or more of heavy fog, rain and snow, and haze.
[0088] Among them, the judgment conditions for each severe weather are obtained by technical personnel in this field based on the analysis of meteorological indicators to ensure sufficient lighting in severe weather.
[0089] Considering that in actual use, there may be a situation where roads are expanded and repaired. The newly expanded roads may increase the flow rate in the area, or may have no significant impact on the overall flow rate growth in the area, but will affect the flow diversion of each road. These will cause the daily flow rate of each road in the area to change, and ultimately cause the flow rate change law of the road to fluctuate greatly, making it impossible to continue to use the historical daily flow rate change law. In order to solve this problem, this embodiment also provides a preferred implementation method, which specifically includes:
[0090] When a new branch road is built on the corresponding road, the new daily flow in the target upstream road after the new branch road is built is counted. If the difference between the new daily flow and the old daily flow is less than the first preset difference, the target upstream road and other roads further upstream of the target upstream road follow the established historical daily flow change law (i.e., the flow change law obtained by daily flow analysis); wherein the old daily flow refers to the daily flow of the target upstream road before the new branch road is built. The difference can be expressed by the difference between the new daily flow and the old daily flow. The first preset difference is obtained by those skilled in the art based on empirical analysis.
[0091] If the difference between the new daily flow and the old daily flow is greater than or equal to the first preset difference, then the upstream road of the target upstream road is searched, and the upstream road of the target upstream road is used as the next target upstream road for comparison, until the historical daily flow change law of the corresponding target upstream road can be continued to be used, and this target upstream road is also referred to as a stable upstream road in the future; or, when comparing to an upstream road with a higher preset level number than the newly built branch road, a stable upstream road cannot be obtained; wherein, the first target upstream road is the upstream road of the newly built branch road. The preset level number is obtained by those skilled in the art based on empirical analysis.
[0092] If a stable upstream road cannot be obtained when comparing to an upstream road that is higher than the preset level number of the newly created branch road, the historical daily traffic flow change pattern of each road is recounted and re-clustered to obtain the aggregate, and the historical daily traffic flow distribution change pattern of each upstream road and the historical daily traffic flow distribution ratio of each aggregate are re-obtained. After accumulating these data, execute steps 201-206 to calculate the current daily traffic flow of each road.
[0093] After obtaining the stable upstream road, only the historical daily flow change patterns of each road downstream of the stable upstream road are re-counted and re-clustered to obtain aggregates, and the historical daily flow distribution change patterns of the corresponding upstream roads in the downstream of the upstream road and the historical daily flow distribution ratio of each aggregate are re-obtained.
[0094] by Figure 8 For example, a certain area includes main road 1, and downstream roads 11, 111, 112, 12, 121, 122, 1211, 12111, 12112, 1212, 12121 and 12122. Here, each downstream road is named by the serial number of the upstream road followed by its corresponding branch serial number. Then, a new branch road 12120 is built on the road where 1212 is located. This road is the newly built branch road. First, visit the upstream from the location of the newly built branch road in sequence. Its direct upstream is road 1212. If the daily flow of road 1212 has changed significantly (that is, the difference between the new daily flow and the old daily flow is greater than or equal to the first preset difference), continue to trace it upward, to road 121, road 12 and road 1 in sequence, until the upstream road with a higher preset level than the newly built branch road is traced back (for example, when the preset level is 2, the road two levels higher than road 12120 is road 121, then the traceback stops at road 121). If the daily flow of the traced road still changes significantly, the historical daily flow change patterns of all roads in the area, aggregates, historical daily flow distribution ratios of aggregates, and historical daily flow distribution change patterns of each upstream road are re-counted.
[0095] If when tracing back to a certain road, such as road 12, it is found that the daily flow rate of this road has changed little (that is, the difference between the new daily flow rate and the old daily flow rate is less than the first preset difference), then the historical daily flow rate change pattern of this road will continue to be used, and only the downstream roads will be re-counted.
[0096] Embodiment 2:
[0097] like Fig. 9 , which is a schematic diagram of the architecture of a street light management device in a road construction scenario according to an embodiment of the present invention. The street light management device in a road construction scenario according to this embodiment includes one or more processors 21 and a memory 22. Fig. 9 A processor 21 is taken as an example.
[0098] The processor 21 and the memory 22 may be connected via a bus or other means. Fig. 9 The example of connecting through bus is taken in the following.
[0099] The memory 22 is a non-volatile computer-readable storage medium that can be used to store non-volatile software programs and non-volatile computer executable programs, such as the street light management method in the road construction scenario in Example 1. The processor 21 executes the street light management method in the road construction scenario by running the non-volatile software programs and instructions stored in the memory 22.
[0100] The memory 22 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices. In some embodiments, the memory 22 may optionally include a memory remotely arranged relative to the processor 21, and these remote memories may be connected to the processor 21 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0101] The program instructions / modules are stored in the memory 22, and when executed by the one or more processors 21, the street lamp management method in the road construction scenario in the above-mentioned embodiment 1 is executed.
[0102] It is worth noting that the information interaction, execution process, etc. between the modules and units within the above-mentioned devices and systems are based on the same concept as the processing method embodiment of the present invention. The specific contents can be found in the description of the method embodiment of the present invention and will not be repeated here.
[0103] A person skilled in the art may understand that all or part of the steps in the various methods of the embodiments may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, and the storage medium may include: a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, etc.
[0104] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A street lamp management method in a road construction scenario, characterized in that: include: Before repairing the corresponding roads, monitor the historical daily traffic volume of each road, and for the branch roads connected to the corresponding upstream roads, count the historical daily traffic volume of each branch road within the first preset period to obtain the historical daily traffic volume change pattern of each branch road; According to the similarity between the historical daily flow rate change patterns of each branch road, multiple branch roads connected to the same upstream road are clustered to obtain one or more aggregates. According to the historical daily flow rate of each branch road in the aggregate, the historical daily flow rate distribution ratio of the aggregate is calculated; The historical daily flow of each aggregate is counted, and the historical daily flow distribution change law of the upstream road is obtained according to the change of the proportion of the historical daily flow of each aggregate in the historical daily flow of the upstream road within the first preset period; When the first branch road is completely closed during road construction, the current daily flow of the first aggregate is calculated based on the historical daily flow distribution change law of the first upstream road and the current daily flow of the first upstream road; wherein the first upstream road is the upstream road connected to the first branch road, and the first aggregate is the aggregate to which the first branch road belongs; The allocation amount of the first branch road in the historical daily flow distribution ratio is divided into other branch roads of the first aggregate to obtain a new daily flow distribution ratio; wherein the division is performed according to the allocation ratio of other branch roads; The current daily flow of the first aggregate is divided according to the new daily flow distribution ratio to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
2. The street lamp management method in the road construction scene according to claim 1, characterized in that: According to the similarity between the historical daily flow change patterns of each branch road, multiple branch roads connected to the same upstream road are clustered to obtain one or more aggregates, specifically including: Calculate the regularity difference between every two adjacent branch roads connected to the same upstream road; wherein the regularity difference is the difference between the historical daily flow change regularities corresponding to the two roads; From a plurality of branch roads that have not been aggregated into any aggregate, two adjacent branch roads with the smallest regularity difference and the regularity difference less than or equal to a preset difference are selected to form a new aggregate, a target branch road adjacent to the new aggregate and not included in any aggregate is found, and the regularity difference between the target branch road and the new aggregate is calculated; wherein the regularity difference between the target branch road and the new aggregate is: the regularity difference between the target branch road and each branch road in the new aggregate is calculated, and the largest regularity difference is selected as the regularity difference between the target branch road and the new aggregate; If the regular difference between the target branch road and the new aggregate is less than or equal to the preset difference, the target branch road is aggregated into the new aggregate until the regular difference between each target branch road and the new aggregate is greater than the preset difference, then clustering the new aggregate is stopped to obtain a complete aggregate.
3. The street lamp management method in the road construction scene according to claim 2 is characterized in that: The calculating of the regularity difference between every two adjacent branch roads connected to the same upstream road specifically includes: Calculate the difference between the historical daily flow rates of branch road a and branch road b on the same day to obtain the historical daily flow rate difference between branch road a and branch road b on that day; The variance or mean difference of the historical daily flow difference values within the first preset period is calculated to obtain the regular difference degree between the branch road a and the branch road b.
4. The street lamp management method in a road construction scenario according to claim 1, characterized in that: The step of calculating the current daily flow of the first aggregate according to the historical daily flow distribution change rule of the first upstream road and the current daily flow of the first upstream road specifically includes: Matching the historical daily traffic flow distribution change pattern of the first upstream road with the historical holiday distribution, and combining it with the current holiday distribution, to obtain the current daily traffic flow distribution; According to the current daily flow distribution, the current daily flow of the first upstream road is divided to obtain the current daily flow of the first aggregate.
5. The street lamp management method in the road construction scene according to claim 1, characterized in that: When the first branch road is partially closed during road construction, the method further includes: Monitoring the historical daily flow of each branch road in the first aggregate within a second preset period after the first branch road is partially closed, and generating a new daily flow distribution ratio according to the historical daily flow of each branch road in the first aggregate within the second preset period; The current daily flow of the first aggregate is divided according to the new daily flow distribution ratio to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
6. The street lamp management method in the road construction scene according to claim 1, characterized in that: After the first branch road is repaired, the method further includes, specifically: According to the historical daily flow distribution ratio of the first aggregate, the current daily flow of the first aggregate is divided to obtain the current daily flow of each branch road in the first aggregate, so as to manage and control the street lights according to the current daily flow of each branch road in the first aggregate.
7. The street lamp management method in a road construction scenario according to claim 1, characterized in that: When the first upstream road is not connected to the corresponding upstream road, the current daily flow of the first upstream road is obtained by analyzing the change rule of the historical daily flow of the first upstream road, specifically including: The historical daily flow of the first upstream road in the past second preset period is monitored, and the historical daily flow of the first upstream road is substituted into the historical daily flow change rule of the first upstream road to obtain the current daily flow of the first upstream road.
8. The street lamp management method in the road construction scene according to claim 7, characterized in that: The historical daily traffic flow variation pattern of the first upstream road is obtained based on the historical daily traffic flow analysis of the first upstream road. Specifically, the historical daily traffic flow of the first upstream road is matched with the historical holiday distribution to obtain the historical daily traffic flow variation pattern of the first upstream road.
9. The street lamp management method in a road construction scenario according to any one of claims 1 to 8, characterized in that: The management and control of the street lamps according to the current daily flow of each branch road in the first aggregate specifically includes: Determine whether the current daily flow rate of the corresponding branch road is greater than or equal to the preset flow rate, and if the current daily flow rate is greater than or equal to the preset flow rate, turn on all the street lights on the branch road; Otherwise, partially turn on the street lights on the branch road.
10. A street lamp management device in a road construction scenario, characterized in that: include: at least one processor; And, a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the processor to execute the street lamp management method in the road construction scenario as described in any one of claims 1-9.
