A regional energy intelligent economic dispatch optimization system considering carbon emission costs
By designing a carbon emission cost optimization system in the regional energy intelligent agent, and combining the carbon emission cost and equipment operation constraints, the optimal economic operation of the regional energy intelligent agent is realized, and the problem of carbon emission cost not being considered in the existing technology is solved. Reduce power station operating costs and pollutant emissions.
Patent Information
- Application Number
- CN202410220179.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-02-28
AI Technical Summary
The existing technology lacks an economic dispatch optimization method for regional energy intelligence that considers the cost of carbon emissions, which results in the need to purchase power from the upper-level power grid to increase the carbon emissions of thermal power plants when facilities such as data centers and electric vehicle charging stations are operating.
Design a regional energy intelligence economic dispatch optimization system that considers carbon emission costs. Through the combination of centralized controllers, data collectors and dispatch allocators, an operation optimization model is constructed, combining carbon emission costs, power conservation constraints and the operation of each equipment. constraints to achieve the optimal output of the system.
It effectively reduces the power station operating costs and the abandonment of renewable energy, enhances the power station's ability to absorb renewable energy, and reduces the total carbon emissions and pollutant emissions.
Smart Images

Figure CN118117747B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of economic dispatch optimization, and in particular to a regional energy intelligent economic dispatch optimization system considering carbon emission costs. Background Art
[0002] With the vigorous development of the power system, more and more energy units have shown a trend towards intelligent development, and through the combination of various energy forms, the output mode of the power market has been further enriched. At present, in the new regional energy intelligent body with multiple stations integrating new energy power stations, renewable energy electricity can replace part of the thermal power output of the upper power grid, thereby reducing the carbon emissions of the upper power grid. When the load of data centers and electric vehicle charging stations increases, if they need to purchase electricity from the upper power grid, the carbon emissions of thermal power plants will increase.
[0003] Therefore, although regional energy intelligent entities do not directly generate carbon emissions, their exchange of electricity with the upper-level power grid will indirectly generate carbon emissions.
[0004] How to form an economic dispatch optimization system for regional energy intelligent entities that takes into account carbon emission costs based on the operating characteristics of traditional substations, data centers, electric vehicle charging stations and other facilities, consider carbon emission costs in the process of economic dispatch optimization, and achieve the optimal output of the system to achieve the goal of optimal economic operation of regional energy intelligent entities is a technical problem that needs to be solved urgently. Summary of the invention
[0005] In view of the above analysis, an embodiment of the present invention aims to provide a regional energy intelligent body economic dispatch optimization system considering carbon emission costs, so as to solve the problem that there is a lack of regional energy intelligent body economic dispatch optimization method considering carbon emission costs in the prior art.
[0006] The present invention discloses a regional energy intelligent body economic dispatch optimization system considering carbon emission costs, wherein the regional energy intelligent body is obtained by integrating equipment including a substation, a data center, an electric vehicle charging station, an energy storage power station and a new energy field station; the economic dispatch optimization system comprises: a centralized controller, and a data collector and a dispatch distributor respectively arranged at each device in the regional energy intelligent body; the centralized controller is respectively connected to each data collector and dispatch distributor in communication; wherein,
[0007] Data collector, used to collect the operation data of the corresponding equipment in each optimization cycle;
[0008] The centralized controller is used to receive the operation data collected by all data collectors in the same optimization period, and use the solver to solve the operation optimization model substituted into the operation data to obtain the economic dispatch optimization result of the corresponding optimization period; and is also used to send the dispatch optimization information belonging to each device in the economic dispatch optimization result to the corresponding dispatch distributor;
[0009] The scheduling allocator is used to send the received scheduling optimization information to the corresponding device and control the corresponding device to perform scheduling of the next optimization cycle based on the scheduling optimization information.
[0010] On the basis of the above scheme, the present invention further discloses the following contents:
[0011] Furthermore, the centralized controller pre-assigns a unique ID to each data collector and dispatch distributor.
[0012] When the data collector sends the collected operation data of the corresponding equipment in each optimization cycle to the centralized controller, it carries the corresponding ID;
[0013] The centralized controller sends the scheduling optimization information and ID belonging to each device to the corresponding scheduling distributor according to the ID of each scheduling distributor.
[0014] Furthermore, the scheduling allocator has a built-in ID audit unit for comparing the received ID with its own ID. If they are consistent, the scheduling allocator controls the corresponding device to adjust the scheduling based on the scheduling optimization information; otherwise, the scheduling allocator feeds back the scheduling error to the centralized controller.
[0015] Furthermore, the operation optimization model includes an objective function and constraints; wherein,
[0016] The objective function in the operation optimization model aims at the minimum economic operation cost of the regional energy intelligent body considering the carbon emission cost;
[0017] The constraints in the operation optimization model include: power conservation constraints, operation constraints of data centers, operation constraints of energy storage power stations, and operation constraints of electric vehicle charging stations.
[0018] Furthermore, the scheduling optimization information of each device is the power data of the corresponding device in each time period within an optimization cycle; wherein,
[0019] The power data of the substation are: the power purchased by the substation from the grid and the load power of the substation itself;
[0020] The power data of the data center is: the power consumption of each data computing load in the data center;
[0021] The power data of electric vehicle charging stations are: charging power and discharging power of energy storage power stations;
[0022] The power data of new energy stations are: renewable energy abandonment / load shedding power.
[0023] Furthermore, the objective function in the operation optimization model is expressed as:
[0024] minC W +C IT +C EV +C ESS +C aban +C load -C RE (1)
[0025] Among them, C W is the emission cost of the regional energy agent in an optimization cycle, C IT , C EV , C ESS , C load are the operating costs of the data center, electric vehicle charging station, energy storage power station, and substation in an optimization cycle, respectively. aban is the penalty cost of abandoning / shedding the renewable energy in an optimization cycle, C RE The power generation income of the new energy site within an optimization cycle.
[0026] further,
[0027]
[0028] Among them, c aban is the unit penalty cost, P aban (t) is the renewable energy abandonment / load shedding power in period t, and T represents an optimization cycle;
[0029]
[0030] Among them, f grid (t) is the power grid price in period t, P load (t) is the load power of the substation itself during period t;
[0031]
[0032] Among them, P RE (t) is the renewable energy power used by the substation during period t;
[0033] further,
[0034]
[0035] Among them, CCO2 (t) are respectively the CO2 and SO x 、NO x emission costs;
[0036]
[0037] Among them, P IT,j (t) is the power consumption of the jth data calculation load in the data center during period t, c IT Calculate the timeout penalty cost for the data, u IT,j is the timeout identifier of the jth data computing load in the data center, which is a Boolean variable. 0 represents that the current data computing load has not timed out, and 1 represents that the current data computing load has timed out. J represents the total number of data computing loads in the data center.
[0038] further,
[0039]
[0040] In the formula, Q ess is the capacity of the energy storage power station, c ESS is the depreciation cost of unit charging and discharging of the energy storage power station, Δt is the scheduling time interval between two adjacent time periods; They are respectively the charging power and discharging power of the energy storage power station during period t;
[0041]
[0042] In the formula, c ev (t) is the unit subsidy coefficient given to users during period t, are the charging power and discharging power of the i-th electric vehicle in period t, and I represents the total number of electric vehicles.
[0043] Furthermore, the power conservation constraint is:
[0044]
[0045] Among them, P grid (t) is the power purchased by the substation from the grid during period t.
[0046] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:
[0047] The regional energy intelligent economic dispatch optimization system considering carbon emission costs provided by the present invention includes a centralized controller, and a data collector and a dispatch distributor respectively arranged at each device. Through the mutual cooperation between the various devices, the regional energy intelligent economic dispatch optimization considering carbon emission costs can be realized. Specifically, the economic dispatch optimization system conducts a specific analysis of the operation constraints and economic cost calculation methods of different types of power stations, and linearizes and reconstructs some nonlinear optimization objectives and constraints to construct an operation optimization model of the regional energy intelligent body considering carbon emission costs, so as to achieve the optimal output of the system and achieve the purpose of optimal economic operation of the regional energy intelligent body. At the same time, the model can be solved using mature commercial optimization software such as Cplex and Gurobi, which effectively improves the optimization scheduling efficiency. The calculation results show that the system proposed in this embodiment can effectively enhance the renewable energy absorption capacity of the power station, reduce the operating cost of the power station and the phenomenon of renewable energy abandonment.
[0048] In the present invention, the above-mentioned technical solutions can also be combined with each other to achieve more preferred combination solutions. Other features and advantages of the present invention will be described in the subsequent description, and some advantages can become obvious from the description, or can be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained through the contents particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] The accompanying drawings are only used for the purpose of illustrating specific embodiments and are not to be considered as limiting the present invention. In the entire drawings, the same reference symbols represent the same components;
[0050] Figure 1 A schematic diagram of the structure of a regional energy intelligent economic dispatch optimization system considering carbon emission costs provided by an embodiment of the present invention;
[0051] Figure 2 A schematic diagram of the tiered carbon emission fee provided by an embodiment of the present invention;
[0052] Figure 3 A schematic diagram of daily power curves of wind power, photovoltaic power and substation loads provided in an embodiment of the present invention;
[0053] Figure 4 A schematic diagram of an electricity price curve provided by an embodiment of the present invention;
[0054] Figure 5 A schematic diagram of scheduling results of two comparison schemes provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0055] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of this application and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.
[0056] A specific embodiment of the present invention discloses a regional energy intelligent economic dispatch optimization system considering carbon emission costs, the structural diagram of which is shown in FIG. Figure 1 As shown. The regional energy intelligent body in this embodiment is obtained by the integration of equipment including substations, data centers, electric vehicle charging stations, energy storage power stations and new energy stations; the economic dispatch optimization system includes: a centralized controller, and a data collector and a dispatch distributor respectively arranged at each device in the regional energy intelligent body; the centralized controller is respectively connected to each data collector and dispatch distributor in communication; wherein, the data collector is used to collect the operation data of the corresponding equipment in each optimization cycle; the centralized controller is used to receive the operation data collected by all data collectors in the same optimization cycle, and use the solver to solve the operation optimization model substituted into the operation data to obtain the economic dispatch optimization result of the corresponding optimization cycle; it is also used to send the dispatch optimization information belonging to each device in the economic dispatch optimization result to the corresponding dispatch distributor; the dispatch distributor is used to send the received dispatch optimization information to the corresponding equipment, and control the corresponding equipment to perform the dispatch of the next optimization cycle based on the dispatch optimization information.
[0057] Preferably, in this embodiment, the centralized controller pre-assigns a unique ID to each data collector and scheduling distributor. At this time, when the data collector sends the collected operation data of the corresponding equipment in each optimization cycle to the centralized controller, it carries the corresponding ID; the centralized controller sends the scheduling optimization information and ID belonging to each device to the corresponding scheduling distributor according to the ID of each scheduling distributor. Preferably, the scheduling distributor has a built-in ID audit unit for comparing the received ID with its own ID. If they are consistent, the corresponding equipment is controlled to adjust the scheduling based on the scheduling optimization information; otherwise, the scheduling distributor feeds back the scheduling error to the centralized controller.
[0058] In addition, the centralized controller described in this embodiment is respectively connected to each data collector and dispatch distributor in communication, which can be realized by optical fiber bus, CAN bus and other methods, and can be selected according to the specific application environment.
[0059] In this embodiment, the regional energy intelligent body is obtained by integrating resources such as substations, data centers, electric vehicle charging stations, energy storage power stations and new energy stations (wind and solar power stations). Since different types of power stations have different power response characteristics and time characteristics, there is coupling and complementarity between power sources and load powers. Therefore, a comprehensive economic dispatch optimization system under the fusion mode of multiple types of power stations can be built to solve problems such as power supply and demand balance, power grid reliability, and efficient energy utilization. For this type of regional energy intelligent body, this embodiment provides the following regional energy intelligent body economic dispatch optimization method considering carbon emission costs. Preferably, the operation optimization model includes an objective function and constraints; wherein the objective function in the operation optimization model is to minimize the economic operation cost of the regional energy intelligent body considering carbon emission costs; the constraints in the operation optimization model include: power conservation constraints, operation constraints of data centers, operation constraints of energy storage power stations, and operation constraints of electric vehicle charging stations. Specifically, the scheduling optimization information of each device is the power data of the corresponding device in each time period within an optimization cycle; among them, the power data of the substation is: the power purchased by the substation from the power grid, and the load power of the substation itself; the power data of the data center is: the power consumption of the load calculated by each data in the data center; the power data of the electric vehicle charging station is: the charging power and discharging power of the energy storage power station; the power data of the new energy station is: the power of renewable energy abandonment / load shedding.
[0060] (1) Overall optimization model
[0061] In this embodiment, an operation optimization model of a regional energy intelligent body is established. The operation optimization model aims to optimize the operation economy and formulates the dispatch strategy of each power station according to the forecast data of new energy and load. The objective function of the operation optimization model of the regional energy intelligent body is:
[0062] minC W +C IT +C EV +C ESS +C aban +C load -C RE (1)
[0063] Among them, C W is the emission cost of the regional energy agent in an optimization cycle, C IT , C EV , C ESS , C load are the operating costs of the data center, electric vehicle charging station, energy storage power station, and substation in an optimization cycle, respectively. aban is the penalty cost of abandoning / shedding the renewable energy in an optimization cycle, C REThe power generation income of the new energy site within an optimization cycle.
[0064] 1) Penalty costs for renewable energy abandonment / load shedding
[0065]
[0066] Among them, c aban is the unit penalty cost, P aban (t) is the renewable energy abandonment / load shedding power in period t, and T represents an optimization cycle.
[0067] 2) Substation operating costs
[0068]
[0069] Among them, f grid (t) is the power grid price in period t, P load (t) is the load power of the substation itself during period t.
[0070] 3) Power generation revenue from new energy stations
[0071]
[0072] Among them, P RE (t) is the renewable energy power used by the substation during period t.
[0073] 4) Power conservation constraint
[0074]
[0075] Among them, P grid (t) is the power purchased by the substation from the grid during period t, are the charging power and discharging power of the energy storage power station during period t, are the charging power and discharging power of the i-th electric vehicle in period t, P IT,j (t) is the power consumption of the jth data computing load in the data center during period t; I represents the total number of electric vehicles, and J represents the total number of data computing loads in the data center.
[0076] In addition to the above optimization objectives (1)-(4) and power conservation constraints (5), the operation optimization model of the regional energy intelligent body must also calculate the operation cost of each power station and set operation constraints based on the operation characteristics of each type of power station.
[0077] (2) Carbon emission cost model
[0078] This embodiment considers incorporating carbon emissions into the operation research of regional energy intelligent bodies and establishing a carbon emission cost model. In order to better control the total amount of carbon emissions, this paper establishes a step-by-step carbon emission cost model as follows:
[0079]
[0080] Q CO2 (t) = τ CO2 P grit (t) (7)
[0081]
[0082] Among them, C CO2 (t) represents the emission cost of CO2 in the regional energy intelligent body during period t, Q CO2 (t) is the equivalent carbon emission of the regional energy intelligent body in period t, τ CO2 is the carbon emission coefficient per unit of electricity generation, is the step-wise carbon emission fee corresponding to time period t, L is the length of the carbon emission interval; α is the increase in the carbon emission price in the interval, f ini is the initial carbon emission cost, [Q CO2 The “[]” in (t) / L+1] is a rounding symbol. The schematic diagram of the tiered carbon emission fee is as follows: Figure 2 shown.
[0083] Similarly, you can get SO x 、NO x The emission cost model of pollutants such as is as follows:
[0084]
[0085] In the formula, is the SO in the regional energy intelligent body during period t x The emission costs, For unit SO x The emission costs, SO for period t x emissions; is the NO in the regional energy intelligent body during period t x The emission costs, Unit NO x The emission costs, NO for period t x emissions.
[0086] Emission cost of the regional energy agent in an optimization cycle:
[0087]
[0088] (3) Data Center Optimization Model
[0089] The data center can calculate the data load requested by the user. For batch processing loads such as scientific computing, image processing, financial analysis, and web index updates, the data center only needs to complete the processing within the specified time period, and can delay processing according to actual conditions. These characteristics make the data center one of the best load types to participate in the joint scheduling of the source side. Therefore, the data center takes the minimum "electricity cost + data calculation timeout penalty cost" as the optimization goal, and the optimization goal calculation formula is as follows:
[0090]
[0091] Where P IT,j (t) is the power consumption of the jth data calculation load in the data center during period t, c IT Calculate the timeout penalty cost for the data, u IT,j is the timeout identifier of the j-th data calculation load in the data center, which is a Boolean variable. 0 represents that the current data calculation load has not timed out, and 1 represents that the current data calculation load has timed out.
[0092] The operating constraints of the data center include:
[0093] 1) The number of units involved in data calculation at each moment cannot exceed the total number of units in the data center
[0094]
[0095] Where, d IT,j (t) is the number of units assigned to the j-th data computing load in the data center during period t, D is the total number of units in the data center, and q is the number of reserved units in the data center, which is a constant.
[0096] 2) The upper and lower limit constraints of the load that can be allocated to each data calculation unit
[0097]
[0098] In the formula, are the upper and lower limits of the number of units allocated to the jth data computing load in the data center, I IT,j (t) is the processing identifier of the j-th data computing load in the data center during period t, which is a Boolean variable. 0 represents that the current data computing load is not being processed, and 1 represents that the current data computing load is being processed.
[0099] 3) The final load calculation amount should be equal to the application amount
[0100]
[0101] In the formula, Aj The total amount of computing load for the jth data in the data center, expressed as the number of units required per unit time.
[0102] 4) Load calculation state constraints
[0103]
[0104] In order to linearize the load calculation state constraints, the maximum and minimum values are introduced, and M and m are the upper and lower limits of the number of data calculation load timeouts, respectively. To ensure that when the calculation of the jth data calculation load is not delayed, u in the first and second inequalities IT,j is 0. At the same time, the third inequality will ensure that the data load exits the queue in time after the jth data computing load is processed in the computing data center, and no longer occupies the server resources of the data center. j is the access time of the jth data load calculation in the data center, h j Calculate the exit time of the load for the jth data in the data center.
[0105] (4) Energy storage power station optimization model
[0106] Energy storage power stations can store and release electric energy, thereby achieving the effect of peak load shifting and valley filling and serving as an uninterruptible power supply for data centers. The energy storage power station takes the minimum depreciation cost of charging and discharging as the optimization goal:
[0107]
[0108] In the formula, Q ess is the capacity of the energy storage power station, c ESS is the depreciation cost of unit charging and discharging of the energy storage power station, and Δt is the scheduling time interval between two adjacent time periods.
[0109] The operating constraints of energy storage power stations include:
[0110] 1) Constraints on the state of charge of batteries in energy storage power stations
[0111]
[0112] In the formula, SOC ess (t) is the state of charge of the energy storage power station during period t, σ ess is the self-discharge coefficient of the energy storage power station, They are the charging efficiency and discharging efficiency of the energy storage power station respectively; is the charging identifier of the energy storage power station during period t, which is a Boolean variable, 0 means not charging, and 1 means charging; is the discharge identifier of the energy storage power station in period t, which is a Boolean variable, 0 means no discharge, and 1 means discharge.
[0113] 2) Upper and lower limits of charge and discharge power
[0114]
[0115] In the formula, They are respectively the upper limit of charging power and the upper limit of discharging power of the energy storage power station.
[0116] 3) Upper and lower limit constraints of state of charge
[0117]
[0118] In the formula, They are respectively the upper and lower limits of the state of charge of the energy storage power station.
[0119] 4) Charging and discharging cannot be performed at the same time
[0120]
[0121] (5) Electric vehicle charging station optimization model
[0122] Since electric vehicles can store electrical energy, they can participate in grid peak regulation similar to energy storage power stations. The optimization goal of electric vehicle charging stations is to minimize the total operating cost (charging cost - discharging cost + user subsidy cost):
[0123]
[0124] In the formula, c ev (t) is the unit subsidy coefficient given to the user during period t.
[0125] The operating constraints of the electric vehicle charging station are:
[0126] 1) Constraints on the state of charge of electric vehicle batteries
[0127]
[0128] In the formula, SOC ev,i (t) is the state of charge of the i-th electric vehicle in period t, are the charging efficiency and discharging efficiency of the i-th electric vehicle, Q ev,i is the battery capacity of the i-th electric vehicle; is the charging identifier of the i-th electric vehicle in period t, which is a Boolean variable, 0 represents not charging, and 1 represents charging; is the discharge identifier of the i-th electric vehicle in period t, which is a Boolean variable, 0 represents not discharging, and 1 represents discharging.
[0129] 2) Charge and discharge power and battery state of charge upper and lower limit constraints
[0130]
[0131] In the formula, are the upper limit of charging power and the upper limit of discharging power of the i-th electric vehicle, respectively. are the upper and lower limits of the state of charge of the i-th electric vehicle respectively.
[0132] 3) Charging and discharging cannot be performed at the same time
[0133]
[0134] 4) The final battery state of charge must meet user requirements
[0135] [SOC ev,i (t i +h i )-SOC ev,i (t i )]Q ev,i =E ev,i (25)
[0136] In the formula, E ev,i is the power demand of the ith electric vehicle, t i is the access time of the i-th electric vehicle, h i is the departure time of the i-th electric car.
[0137] 5) The charge and discharge power cannot be less than the user's previous charge
[0138]
[0139] In order to ensure that the power requirement of the user is met when leaving in advance before the set departure time, the above constraints are set to ensure that the battery power of the electric vehicle is always greater than the power when the user is connected to charging at any time when leaving.
[0140] By linearizing and reconstructing the optimization objectives and constraints, this model can be solved using mature commercial optimization software such as Cplex and Gurobi.
[0141] Another embodiment of the present invention also provides a case analysis, which performs a case simulation on a regional energy intelligence entity including a substation, a data center, an electric vehicle charging station, an energy storage power station, and a new energy power station to verify the effectiveness of the economic dispatch optimization system proposed in this embodiment.
[0142] In the regional energy intelligent body provided in this embodiment, the daily power curve diagram of wind power, photovoltaic power and substation load is as follows: Figure 3 The electricity price curve diagram is shown in Figure 4The load of the data center and the load of the electric vehicle charging station are shown in Table 1 and Table 2 respectively, where each load of the electric vehicle charging station is 20 electric vehicles; the parameters of the data center, the electric vehicle charging station and the energy storage power station are shown in Table 3.
[0143] Table 1 Data center load
[0144]
[0145] Table 2 Load of electric vehicle charging station
[0146]
[0147] Table 3 Parameters of data centers, electric vehicle charging stations, and energy storage power stations
[0148]
[0149]
[0150] Table 4 Carbon, nitrogen and sulfide emission parameters
[0151]
[0152] In addition to the above data, the penalty cost for abandoning renewable energy is set to 2 times the current grid electricity price, and the depreciation cost of the energy storage power station is 0.05 yuan / kW. Based on the above data, the commercial optimization solution software Gurobi is used to solve the model proposed in this embodiment. In order to verify the effectiveness of the system proposed in this embodiment, this section sets up 2 groups of comparative simulations:
[0153] (1) Case 1: The economic dispatch optimization method of integrating multiple types of power stations proposed in this embodiment;
[0154] (2)Case 2: Without considering the integrated dispatch of multiple types of power stations, each power station responds to load / business in real time.
[0155] The scheduling results of the two comparison schemes are as follows: Figure 5 As shown, case 1 corresponds to Figure 5 The bar chart on the left, case 2 corresponds to Figure 5 The bar graph on the right.
[0156] The optimized scheduling results of the two scheduling schemes are shown in Table 5. The economic scheduling optimization method of integrating multiple types of power stations proposed in this embodiment achieves peak load shaving and valley filling of electric energy load by adjusting the shiftable loads such as data centers and electric vehicle charging stations, enhances the system's ability to absorb renewable energy, and effectively reduces the emission of various pollutants. The total carbon emissions are reduced by 5.7%, the carbon emission cost is reduced by 39.6%, and the emissions of sulfur oxides and nitrogen oxides can be reduced by 5.1% and 6.0%, respectively.
[0157] In terms of dispatching costs, since the load of the substation itself needs to respond in real time and there is no room for optimization, the operating cost of the substation is 8,611 yuan. As can be seen from the above table, the economic dispatch optimization method of the multi-type power station integration proposed in this embodiment can effectively reduce the operating costs of multi-type integrated power stations, among which the operating costs of data centers and electric vehicle charging stations are the lowest. There is no wind and light abandonment phenomenon in wind and light new energy power stations, and renewable energy can be fully absorbed. The total operating cost can be reduced by 19.9% compared with case 2.
[0158] Table 5 Scheduling optimization results (unit: yuan)
[0159]
[0160] In summary, this embodiment specifically analyzes the operation constraints and economic cost calculation methods of different types of power stations, and linearizes some nonlinear optimization objectives and constraints, so that the model can be solved using mature commercial optimization software such as Cplex and Gurobi. The calculation results show that the system proposed in this embodiment can effectively enhance the renewable energy absorption capacity of power stations, reduce the operation costs of power stations and the phenomenon of renewable energy abandonment.
[0161] Those skilled in the art will appreciate that all or part of the processes of the above-mentioned embodiment system can be implemented by instructing related hardware through a computer program, and the program can be stored in a computer-readable storage medium, wherein the computer-readable storage medium is a disk, an optical disk, a read-only storage memory, or a random access memory, etc.
[0162] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A regional energy intelligent economic dispatch optimization system considering carbon emission costs, characterized in that: The regional energy intelligent body is obtained by integrating equipment including substations, data centers, electric vehicle charging stations, energy storage power stations and new energy stations; the economic dispatch optimization system includes: a centralized controller, and a data collector and a dispatch distributor respectively arranged at each device in the regional energy intelligent body; the centralized controller is respectively connected to each data collector and dispatch distributor in communication; wherein, Data collector, used to collect the operation data of the corresponding equipment in each optimization cycle; The centralized controller is used to receive the operation data collected by all data collectors in the same optimization period, and use the solver to solve the operation optimization model substituted into the operation data to obtain the economic dispatch optimization result of the corresponding optimization period; and is also used to send the dispatch optimization information belonging to each device in the economic dispatch optimization result to the corresponding dispatch distributor; A scheduling distributor, used to send the received scheduling optimization information to the corresponding device, and control the corresponding device to perform scheduling of the next optimization cycle based on the scheduling optimization information; The centralized controller pre-assigns a unique ID to each data collector and dispatch distributor. When the data collector sends the collected operation data of the corresponding equipment in each optimization cycle to the centralized controller, it carries the corresponding ID; The centralized controller sends the scheduling optimization information and ID belonging to each device to the corresponding scheduling distributor according to the ID of each scheduling distributor; The dispatch distributor has a built-in ID audit unit for comparing the received ID with its own ID. If they are consistent, the dispatch distributor controls the corresponding device to adjust the dispatch based on the dispatch optimization information; otherwise, the dispatch distributor feeds back the dispatch error to the centralized controller. The operation optimization model includes an objective function and constraints; wherein, The objective function in the operation optimization model aims at the minimum economic operation cost of the regional energy intelligent body considering the carbon emission cost; The constraints in the operation optimization model include: power conservation constraints, operation constraints of data centers, operation constraints of energy storage power stations, and operation constraints of electric vehicle charging stations; The scheduling optimization information of each device is the power data of the corresponding device in each period within an optimization cycle; The power data of the substation are: the power purchased by the substation from the grid and the load power of the substation itself; The power data of the data center is: the power consumption of each data computing load in the data center; The power data of electric vehicle charging stations are: charging power and discharging power of energy storage power stations; The power data of the new energy stations are: renewable energy abandonment / load shedding power; The objective function in the operation optimization model is expressed as: minC W +C IT +C EV +C ESS +C aban +C load -C RE (1) Among them, C W is the emission cost of the regional energy agent in an optimization cycle, C IT , C EV , C ESS , C load are the operating costs of the data center, electric vehicle charging station, energy storage power station, and substation in an optimization cycle, respectively. aban is the penalty cost of abandoning / shedding the renewable energy in an optimization cycle, C RE The power generation income of the new energy site within an optimization cycle; Among them, C CO2 (t) are respectively the CO2 and SO x 、NO x emission cost; T represents an optimization cycle.
2. The regional energy intelligent economic dispatch optimization system considering carbon emission costs according to claim 1 is characterized in that: Among them, c aban is the unit penalty cost, P aban (t) is the renewable energy abandonment / load shedding power during period t; Among them, f grid (t) is the power grid price in period t, P load (t) is the load power of the substation itself during period t; Among them, P RE (t) is the renewable energy power used by the substation during period t.
3. The regional energy intelligent economic dispatch optimization system considering carbon emission costs according to claim 2 is characterized in that: Among them, P IT,j (t) is the power consumption of the jth data calculation load in the data center during period t, c IT Calculate the timeout penalty cost for the data, u IT,j is the timeout identifier of the jth data computing load in the data center, which is a Boolean variable. 0 represents that the current data computing load has not timed out, and 1 represents that the current data computing load has timed out. J represents the total number of data computing loads in the data center.
4. The regional energy intelligent economic dispatch optimization system considering carbon emission costs according to claim 3 is characterized in that: In the formula, Q ess is the capacity of the energy storage power station, c ESS is the depreciation cost of unit charging and discharging of the energy storage power station, Δt is the scheduling time interval between two adjacent time periods; They are respectively the charging power and discharging power of the energy storage power station during period t; In the formula, c ev (t) is the unit subsidy coefficient given to users during period t, are the charging power and discharging power of the i-th electric vehicle in period t, and I represents the total number of electric vehicles.
5. The regional energy intelligent economic dispatch optimization system considering carbon emission costs according to claim 4 is characterized in that: The power conservation constraint is: Among them, P grid (t) is the power purchased by the substation from the grid during period t.
Citation Information
Patent Citations
Flexible resource cooperative scheduling method in integrated energy system
CN117595403A
Blockchain-based system and method for management and operation of enterprise carbon emission and energy consumption data