Drainage basin water-wind-light system medium-term scheduling method considering short-term load characteristics of multi-receiving-end power grid
By establishing a time period division and load reconstruction model in the watershed and wind-storage system in the basin, combining peak-to-valley period division and cascade power station connection, a short-term nested scheduling model was built, which solved the problem of short-term load characteristics of multi-receptor power grids and achieved power transmission deviation significantly reduces and efficient consumption of clean energy.
Patent Information
- Application Number
- CN202411098739.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN119050993A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power system dispatching and relates to a medium-term dispatching method for a river basin water, wind and solar power system taking into account short-term load characteristics of multi-receiving power grids. Background Art
[0002] The inverse distribution characteristics of my country's energy resources and load demand determine that large-scale cross-provincial and cross-regional power transmission is a key way to promote the large-scale consumption of clean hydropower, wind and solar power in Southwest, Northwest and North China. However, due to the large differences in electricity demand in the receiving provinces (cities), different load characteristics and strong peak-shaving demand, high requirements are placed on the cross-provincial and cross-regional DC power receiving process. It is particularly important to accurately describe the load characteristics of multiple receiving ends in the power transmission plan arrangement. In addition, the scale and proportion of wind and solar installed capacity in clean energy bases have increased rapidly, and extreme operating scenarios have frequently occurred for many consecutive days, further increasing the difficulty of power transmission plan arrangement. It has become a bottleneck problem that needs to be urgently solved in the actual dispatching and operation of high-proportion new energy power grids and river basin clean energy bases.
[0003] In order to accurately describe the load characteristics of the power grid, the following indicators are usually used: daily load rate reflecting the load changes throughout the day, daily peak-to-valley difference rate reflecting the peak-shaving capacity of the power grid, daily maximum load utilization time reflecting the time utilization efficiency, and the maximum and minimum load occurrence time of peak and valley nodes reflecting the load changes in peak, flat and valley sections (Wan Q, Yu Y. Power load pattern recognition algorithm based on characteristic index dimension reduction and improved entropy weight method [J]. Energy Reports, 2020, 6: 797-806.), peak period, flat period and valley period load rates reflecting the load changes in peak, flat and valley sections (Si C, Xu S, Wan C, et al. Electric load clustering in smart grid: Methodologies, applications, and future trends [J]. Journal of Modern Power Systems and Clean Energy, 2021, 9 (2): 237-252.). These indicators generally start from the overall characteristics of the load, lacking a detailed description of local load changes and timing flexibility requirements. For this reason, some studies have proposed load reconstruction methods, mainly dividing the load curve within the dispatch cycle into time periods (Yang H, Gao Y, Ma Y, et al. Optimal modification of peak-valley period under multiple time-of-use schemes based on dynamic load point method considering reliability [J]. IEEE Transactions on Power Systems, 2021, 37 (5): 3889-3901.), and then constructing equivalent load curves based on the load characteristics in each time period. However, there are still problems such as the inability to avoid isolated points of the original load in the reconstructed curve and the difficulty in describing the equivalent characteristics of loads in non-adjacent time periods, which leads to frequent fluctuations in the hydropower, wind and solar power transmission plans and single-time period mutations, which brings great regulatory pressure to hydropower and is not conducive to the adjustment of the dispatch plan. Therefore, how to finely consider the complex load requirements of the receiving power grid is very important for the coordinated consumption of hydropower, wind and solar power generation.
[0004] At present, domestic and foreign research on the complementary operation of hydropower, wind and solar power generation mainly focuses on business issues such as power generation plan preparation, dispatch rule extraction, complementary capacity analysis, risk and benefit quantification, and joint peak regulation, with an emphasis on long-term power compensation optimization, short-term flexibility response, and evaluation of complementary operation effects. A few studies have begun to pay attention to the continuous extreme large-scale and small-scale scenarios that are prone to occur in wind and solar power generation, such as the identification and extraction of continuous extreme output scenarios of new energy (Jiang Haiyang, Du Ershun, Ma Jiahao, et al. A new power system planning method considering the risk of long-term supply and demand imbalance [J / OL]. Proceedings of the CSEE. https: / / doi.org / 10.13334 / j.0258-8013.pcsee.230440), and preventive and emergency dispatch methods under extreme weather (Junjie R, Ming Z, Zhi Z, et al. Coordination of preventive and emergency dispatch in renewable energy integrated power systems under extreme weather [J]. IET Renewable Power Generation, 2024, 18(7): 1164-1176.), risk analysis and optimization scheduling methods under extreme scenarios (Cai X, Qin Z, Hou Y. Improving wind power utilisation under stormy weather condition by risk-limiting unit commitment[J]. IET Renewable Power Generation, 2018, 12(15): 1778-1785.). These modeling methods provide effective ideas for dealing with multi-day extreme power generation of renewable energy. However, how to consider the hydroelectric coupling characteristics of multi-energy complementary systems at different time scales, the mutual constraints between water level and power scheduling boundaries, the complex hydraulic connections of "one station and multiple plants" cascade power stations and the refined modeling and calculation of branch power output, as well as the extremely different receiving-end power demand under the "one plant and multiple transmission" mode are new problems and new demands faced by the water, wind and solar power systems in super-large river basins. Modeling and solution methods that are adapted to them are needed to determine more efficient and practical power transmission plans.
[0005] To solve the above problems, the present invention proposes a medium-term scheduling method for a basin water-wind-solar system considering the short-term load characteristics of multiple receiving-end power grids, and conducts application tests based on a certain basin water-wind-solar complementary system. The results show that the results of the present invention can significantly reduce the deviation between the power transmission plan and the receiving-end demand and reduce curtailment while ensuring the total power generation of the basin. The verification results show that, with the power generation basically unchanged, the calculation scheme of the present invention reduces the power transmission deviation during the dry season by 88.6% and the power transmission deviation during the flood season by 69.9% compared with the original method, showing good practicability. Summary of the Invention
[0006] The technical problem to be solved by the present invention is to provide a medium-term scheduling problem for a basin water-wind-solar system considering the short-term load characteristics of multiple receiving-end power grids. By accurately describing the differential load characteristics and peak shaving requirements of multiple receiving-end power grids, the receiving-end power demand process is reconstructed, and then a multi-objective medium-short-term nested scheduling model with the smallest power transmission deviation and the largest power generation is created to determine the efficient multi-day power transmission volume and the intra-day power transmission process plan of the water-wind-solar system.
[0007] The technical solution of the present invention:
[0008] A medium-term scheduling method for a basin water-wind-solar system considering the short-term load characteristics of multiple receiving-end power grids includes the following steps:
[0009] (1) According to the peak-valley characteristics of each provincial load, a time period division model is established with the criterion of the smallest load variance within the same type of time period set;
[0010] Objective function:
[0011]
[0012] Constraint conditions:
[0013]
[0014] In the formula: L t is the load at time period t, MW; g represents the time period type, g = 1 represents the valley time period, g = 2 represents the normal time period, and g = 3 represents the peak time period; represents the time period set included in the g-th time period type; I g represents the number of time periods included in the g-th time period type; represents the time period set the i-th element in;
[0015] (2) Based on the numpy module in the python programming language, a variable step size search strategy is established to solve the time period division model in step (1). The solution idea is to find two load demarcation points Y1 and Y2, where Y1 < Y2; when L t < Y1, the time period t is the valley time period; when Y1 ≤ Lt ≤Y2, time period t is a normal period; when L t >Y2, time period t is the peak time period; the specific steps are as follows:
[0016] Step 1: Sort the loads of each period of the original load curve from small to large to obtain an increasing load sequence l1, l2, …, l m ,…,l M , find l m With l m+1 The average value of the variable step length is obtained to obtain a search set {y1,y2,…,y m ,…,y M-1}, where y m =(l m +l m+1 ) / 2;
[0017] Step 2: Define k1 and k2 as the serial numbers of the elements in the search set, let k1 = 1, k2 = k1 + 1, Get a collection of time periods of various types And find the corresponding objective function value make
[0018] Step 3: Search upward until the highest load interval, set k1 = k1 + 1 or k2 = k2 + 1, until k1 = M-2, k2 = M-1, and find the corresponding objective function value like Then
[0019] Step 4: Get the optimal objective function value and its corresponding set of time periods
[0020] (3) Calculate load characteristic indicators and establish a load reconstruction model;
[0021] The objective function is as follows:
[0022]
[0023] Where: CI u Characteristic index representing the original load demand curve; RCI u represents the characteristic index of the reconstructed load demand curve; w u Represents the weight coefficient of the characteristic index; DR represents the gap between the characteristic index of the reconstructed load demand curve and the original load curve;
[0024] The constraints are as follows:
[0025] 1) Original load curve characteristic indicators
[0026] CI1=L ave (4)
[0027] CI2=L ave / L max (5)
[0028] CI3=(L max -L min ) / L max (6)
[0029] CI4=L ave,peak / L ave (7)
[0030] CI5=L ave,low / L ave (8)
[0031] CI6=T max (9)
[0032] CI7=T min (10)
[0033] Where: CI1, CI2, CI3, CI4, CI5, CI6, CI7 represent daily average load, daily load rate, daily peak-to-valley difference rate, peak load rate, valley load rate, peak time, valley time of the original load curve respectively; L ave , L max , L min Respectively represent the average value, maximum value and minimum value of daily load; L ave,peak , L ave,low Respectively represent the average value of the peak period and the average value of the valley period; T max , T min They represent the peak time and the trough time respectively;
[0034] 2) Reconstruction of load curve characteristic indicators
[0035]
[0036] Where: RCI1, RCI2, RCI3, RCI4, RCI5, RCI6, and RCI7 represent the daily average load, daily load rate, daily peak-to-valley difference rate, peak load rate, valley load rate, peak appearance time, and valley appearance time of the reconstructed load curve, respectively; They represent the average, maximum, and minimum values of the reconstructed load curve respectively; They represent the average value of the peak period and the average value of the valley period of the reconstructed load curve respectively; They represent the peak time and valley time of the reconstructed load curve respectively;
[0037] 3) Reconstruct the peak, flat and valley periods of the load curve
[0038]
[0039] Where: They represent the values of the reconstructed load curve during valley period, normal period, and peak period respectively;
[0040] (4) Using the python-numpy package, an equal-step search method is constructed to solve the load reconstruction model in step (3), as follows:
[0041] Step 1: Find the maximum value L from the load sequence max and the minimum value L min , determine the search step size sw, and obtain the search set {r1,r2,…,r a ,…,r A}, where r a =L min +sw*(a-1), where a is the index of the element in the search set, and A is the number of elements in the search set;
[0042] Step 2: Define b1, b2, and b3 as the serial numbers of the elements in the search set, and let b1 = 1, b2 = b1+1, b3 = b2+1. Get the corresponding reconstructed load curve and calculate the load characteristic index and target value make
[0043] Step 3: Let b1 = b1 + 1 or b2 = b2 + 1 or b3 = b3 + 1 until b1 = A-2, b2 = A-1, b3 = A, and find the corresponding objective function value like Then Find the reconstructed load curve corresponding to the optimal objective function value;
[0044] Step 4: Get the optimal objective function value DR and its corresponding reconstructed load curve;
[0045] (5) Considering the connections between the left and right banks and the upstream and downstream of the cascade power stations, and integrating the short- and medium-term scheduling constraints, a short- and medium-term nested scheduling model for the watershed water, wind and solar system is constructed:
[0046] The maximum power generation objective function is as follows:
[0047]
[0048] Where: E is the maximum objective function of power generation, MWh; represents the output of hydropower station n and power plant j on day d, MW; are the output of wind power plant and photovoltaic power plant bundled with hydropower plant n and power plant j on day d, MW; P n,j,d represents the total water, wind and solar power output bundled and delivered by hydropower station n and power station j on day d, MW; Δt represents the number of hours per day, h; n and N represent the hydropower station number and the total number of hydropower stations respectively; j represents the power plant number, j=1 represents the left bank power plant, j=2 represents the right bank power plant; d and D represent the day number and the total number of days respectively;
[0049] The minimum objective function of power transmission deviation is as follows:
[0050]
[0051] Where: ED is the minimum objective function of power transmission deviation, MW 2 ; represents the power transmission plan of power plant n and power plant j to province s at time t on day d, MW; s (t) represents the load demand of province s, using the load reconstruction curve obtained in Section 2; η s,n,j,d It represents the scaling factor of the load demand at the receiving end; s and S represent the province number and the total number of provinces respectively; t and T represent the time period number and the total number of time periods respectively;
[0052] 2) Constraints
[0053] In addition to considering medium-term and short-term scheduling, medium-term and short-term nested power constraints are also considered, that is, the daily power obtained by medium-term scheduling should be equal to the sum of the power generation in each period of the day, as shown in formula (15);
[0054]
[0055] (6) On the Gurobi solver platform, the Python program is used to convert the short-term nested scheduling model of the watershed water-wind-solar system into a mixed integer linear programming model to achieve efficient solution, as follows:
[0056] Step 1: The multi-objective model of the maximum power generation objective function and the minimum power transmission deviation objective function is converted into a single-objective model using the constraint conversion method. The specific method is to convert the maximum power generation objective function into the constraint condition of the minimum power transmission deviation objective, as shown in formula (16);
[0057]
[0058] stE≥E set
[0059] Where: E set Indicates the total hydropower, wind and solar power generation required in the basin during the dispatch period, MWh; E setThe initial value of is the maximum value of power generation when the power transmission deviation target is not considered, that is, the optimal value of the objective function of the maximum power generation model on a daily scale;
[0060] Step 2: For the one-dimensional nonlinear function relationship of water level and storage capacity, piecewise linearization is used for processing; for the two-dimensional nonlinear function relationship of hydropower generation function, parallelogram two-dimensional interpolation method is used for linearization processing;
[0061] Step 3: By gradually relaxing the power generation constraints, a set of non-inferior solutions (Pareto frontier) of the multi-objective model is obtained.
[0062] Step 4: Calculate the comprehensive benefit index and select the decision-making plan from the solution set. The index calculation formula is shown in formula (17);
[0063]
[0064] Compared with the existing methods, the beneficial effects of the present invention are as follows: the reconstruction curve obtained by the load demand reconstruction method based on the peak, flat and valley time period division can accurately reflect the characteristics and changing trends of the receiving power grid load; the medium- and short-term nested scheduling model of hydropower, wind power and solar power can significantly reduce the deviation between the power transmission plan and the receiving demand while ensuring the total power generation of the basin, effectively alleviating the regulation pressure on the receiving provinces; it can significantly reduce power abandonment and improve the clean energy absorption capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1 It is the principle diagram of time period division;
[0066] Figure 2 It is a schematic diagram of the short- to medium-term nesting method;
[0067] Figure 3 It is a schematic diagram of parallelogram meshing;
[0068] Figure 4 It is the relationship curve between power generation and power transmission deviation (dry season);
[0069] Figure 5 It is the relationship curve between power generation and power transmission deviation (flood season). DETAILED DESCRIPTION
[0070] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings and technical solutions.
[0071] The medium-term dispatching method of the basin hydropower, wind and solar power system considering the short-term load characteristics of the multi-receiving power grid is implemented as follows:
[0072] (1) According to the peak-valley characteristics of the load of each provincial power grid, a time period division model is established with the minimum load variance within the same type of time period as the criterion.
[0073] Objective function
[0074]
[0075] Constraint condition
[0076]
[0077] In the formula: L t is the load at time period t, in MW; g represents the time period type, g = 1 represents the valley period, g = 2 represents the normal period, and g = 3 represents the peak period; represents the set of time periods included in the g-th time period type; I g represents the number of time periods included in the g-th time period type; represents the set of time periods the i-th element in.
[0078] (2) Establish a variable step size search strategy based on the numpy module in the python programming language, solve the time period division model in (1), and obtain the time period division result. The solution idea is to find two load demarcation points Y1 and Y2, where Y1 < Y2. When L t < Y1, time period t is the valley period; when Y1 ≤ L t ≤ Y2, time period t is the normal period; when L t > Y2, time period t is the peak period. The principle is shown in Figure 1 , and the specific steps are as follows:
[0079] Step1: Sort the loads at each moment from small to large to obtain an increasing sequence l1, l2,..., l m ,..., l M , calculate the average value of l m and l m+1 to obtain a variable step size search set {y1, y2,..., y m ,..., y M-1}, where y m =(l m +l m+1 ) / 2.
[0080] Step2: Define k1 and k2 as the sequence numbers of the elements in the search set, let k1 = 1, k2 = k1 + 1, obtain the set of time periods of each type and calculate the corresponding objective function value Var 1,2 , let Var = Var 1,2 .
[0081] Step 3: Search upward until the highest load interval, set k1 = k1 + 1 or k2 = k2 + 1, until k1 = M-2, k2 = M-1, and find the corresponding objective function value like Then
[0082] Step 4: Get the optimal objective function value and its corresponding set of time periods
[0083] (3) Taking the minimum difference between the reconstructed load demand process and the original load process as the criterion, the maximum and minimum load occurrence time as the constraint condition, and the peak, flat and valley load values of the reconstructed curve as the decision variables, a reconstruction model is established. The objective function is shown in formula (20).
[0084]
[0085] Where: RCI u , CI u Respectively represent the characteristic indexes of the reconstructed load curve and the original load curve; w u Represents the weight coefficient of the feature index.
[0086] The constraints are as follows:
[0087] 1) Original curve characteristic index
[0088] CI1=L ave (twenty one)
[0089] CI2=L ave / L max (twenty two)
[0090] CI3=(L max -L min ) / L max (twenty three)
[0091] CI4=L ave,peak / L ave (twenty four)
[0092] CI5=L ave,low / L ave (25)
[0093] CI6=T max (26)
[0094] CI7=T min (27)
[0095] Where: CI1, CI2, CI3, CI4, CI5, CI6, CI7 represent daily average load, daily load rate, daily peak-to-valley difference rate, peak load rate, valley load rate, peak time, valley time of the original load curve respectively; L ave , L max , L min Respectively represent the average value, maximum value and minimum value of daily load; L ave,peak , L ave,low Respectively represent the average value of the peak period and the average value of the valley period; T max 、T min They represent the peak time and the trough time respectively.
[0096] 2) Reconstruction of load curve characteristic indicators
[0097]
[0098] Where: RCI1, RCI2, RCI3, RCI4, RCI5, RCI6, and RCI7 represent the daily average load, daily load rate, daily peak-to-valley difference rate, peak load rate, valley load rate, peak appearance time, and valley appearance time of the reconstructed load curve, respectively; They represent the average, maximum, and minimum values of the reconstructed load curve respectively; They represent the average value of the peak period and the average value of the valley period of the reconstructed load curve respectively; They represent the peak time and valley time of the reconstructed load curve respectively.
[0099] 3) Reconstruct the peak, flat and valley periods of the load curve
[0100]
[0101] Where: They represent the values of the reconstructed load curve during valley period, normal period and peak period respectively.
[0102] (4) The python-numpy package is used to construct an equal-step search method to solve the reconstructed load model in (3), as follows:
[0103] Step 1: Find the maximum value L from the load sequence max and the minimum value L min , determine the search step size sw, and obtain the search set {r1,r2,…,r a ,…,r A}, where r a =L min +sw*(a-1), where a is the index of the element in the search set, and A is the number of elements in the search set.
[0104] Step 2: Define b1, b2, and b3 as the serial numbers of the elements in the search set, and let b1 = 1, b2 = b1+1, b3 = b2+1. Get the corresponding reconstructed load curve and calculate the load characteristic index and target value make
[0105] Step 3: Let b1 = b1 + 1 or b2 = b2 + 1 or b3 = b3 + 1 until b1 = A-2, b2 = A-1, b3 = A, and find the corresponding objective function value like Then Find the reconstructed load curve corresponding to the optimal objective function value;
[0106] Step 4: Get the optimal objective function value DR and its corresponding reconstructed load curve.
[0107] (5) Considering the connections between the left and right banks and the upstream and downstream of the cascade power stations, and integrating the medium- and short-term scheduling constraints, a medium- and short-term nested scheduling model is constructed for the water-wind-solar system in the basin. The medium- and short-term nested idea is to use the daily power generation obtained by medium-term scheduling as the control condition for short-term scheduling, and to finely decompose it into each period within the day to determine the time sequence of hydropower output process to smooth out the fluctuations of wind and solar power as much as possible and meet the complex load requirements of the receiving end, such as Figure 2 The model is as follows:
[0108] 1) Objective function
[0109]
[0110] Where: E is the maximum objective function of power generation, MWh; represents the output of hydropower station n and power plant j on day d, MW; are the output of wind power plant and photovoltaic power plant bundled with hydropower plant n and power plant j on day d, MW; P n,j,d It represents the total output of water, wind and solar power bundled and delivered by hydropower station n and power plant j on day d, in MW; Δt represents the number of hours per day, in h; n and N represent the hydropower station number and the total number of hydropower stations respectively; j represents the power plant number, j=1 represents the left bank power plant, and j=2 represents the right bank power plant; d and D represent the day number and the total number of days respectively.
[0111]
[0112] Where: ED is the minimum objective function of power transmission deviation, MW 2 ; represents the power transmission plan of power plant n and power plant j to province s at time t on day d, MW; s(t) represents the load demand of province s, using the load reconstruction curve obtained in Section 2; η s,n,j,d Indicates the scaling factor of the load demand at the receiving end. s and S represent the province number and the total number of provinces respectively; t and T represent the time period number and the total number of time periods respectively.
[0113] 2) Constraints
[0114] In addition to considering traditional medium-term scheduling and short-term scheduling, the present invention also considers medium-term and short-term nested power constraints, that is, the daily power obtained by medium-term scheduling should be equal to the sum of the power generation in each time period within the day, as shown in formula (32).
[0115]
[0116] (6) On the Gurobi solver platform, the Python program is used to convert the short-term nested scheduling model of the watershed water-wind-solar system into a mixed integer linear programming model to achieve efficient solution, as follows:
[0117] Step 1: Use the constraint conversion method to convert the multi-objective model into a single-objective model. The specific method is to convert the power generation target into the constraint condition of the power transmission deviation minimum model, see formula (33).
[0118]
[0119] stE≥E set
[0120] Where: E set It represents the total power generation requirement of the basin's hydropower, wind power and solar power in the dispatch period, in MWh. Its initial value is the maximum power generation without considering the power transmission deviation target, that is, the optimal value of the objective function of the maximum power generation model on a daily scale.
[0121] Step 2: For the one-dimensional nonlinear function relationship of water level and storage capacity, piecewise linearization is used for processing; for the two-dimensional nonlinear function relationship of hydropower generation function, the parallelogram two-dimensional interpolation method is used for linearization processing, and the power generation flow Q and water level Z are discretized, such as Figure 3 As shown (taking a 2×2 grid as an example), Q a,b and Z b is the sampling point, PP a,b =f PZQ (Z b ,Q a,b ), A and B are the number of rows and columns of the grid respectively, a and b are sequence indices, a∈{1,2,…,A+1}, b∈{1,2,…,B+1}.
[0122] Step 3: By gradually relaxing the power generation constraints, a set of non-inferior solutions (Pareto frontier) of the multi-objective model is obtained.
[0123] Step 4: Calculate the comprehensive benefit index and select the decision-making plan from the solution set. The index calculation formula is shown in formula (34).
[0124]
[0125] The present invention is verified by taking the water-wind-solar complementary base in the downstream of a certain river basin as an example. The cascade power station uses four reservoirs, WDD, BHT, XLD, and XJB, with a total installed capacity of 46,460MW. Currently, 10,487MW of new energy is being connected to cascade hydropower, and clean electricity is being transmitted to the southeast load center through ultra-high voltage direct current. The present invention uses four hydropower stations and wind power and photovoltaic power bundled with each hydropower station as simulation calculation objects to verify the effectiveness of the method of the present invention. Since the continuous extreme output scenarios of new energy often occur within ten days, the scheduling cycle is 10 days. The present invention selects two typical time periods, the dry season and the flood season of a certain year, as examples for analysis, and refers to the actual operation data of the hydropower station interval flow, initial and final water levels, load process, etc.
[0126] In order to fully reflect the peak and valley characteristics of the receiving-end load, the present invention selects the hourly load sequence of the day with the largest peak-to-valley difference within the scheduling cycle for load reconstruction. Tables 1 and 2 respectively compare the characteristic indicators of the reconstructed load curves and the original load curves during the dry season and flood season. It can be seen from the table that the difference in each characteristic indicator is small. Among them, the daily load rate is completely equal to the daily peak-to-valley difference rate, indicating that the reconstructed load curve can accurately reflect the imbalance and variation of the daily load; the difference in the daily average load is within 1%, reflecting that the daily load level of the reconstructed load curve is equivalent to that of the original load curve; the difference between the peak load rate and the valley load rate is within 6.5%, indicating that the reconstructed load curve fully reflects the changes in the peak and valley periods of the load. The correlation coefficients between the reconstructed load curve and the original load curve are both above 90%, reflecting the overall consistency of the two.
[0127] Table 1 Comparison of load characteristic indicators (dry season)
[0128]
[0129]
[0130] Table 2 Comparison of load characteristic indicators (flood season)
[0131]
[0132] This method transforms the multi-objective model into a single-objective model through the constraint conversion method, and obtains a set of non-inferior solutions by gradually relaxing the constraints. Figure 4 and Figure 5The relationship curves between power generation and power transmission deviation in the dry season and flood season are given respectively. It can be seen from the figure that when the power generation is greater than a certain value, there is an obvious contradictory relationship between the power generation and the power transmission deviation. The greater the power generation, the greater the power transmission deviation; conversely, the smaller the power generation, the smaller the power transmission deviation. When the power generation is less than this value, the power transmission deviation reaches the minimum value and no longer changes. The pursuit of maximum power generation alone will cause a large deviation between the power transmission process and the demand of the receiving end, increase the regulation pressure of the receiving end power grid, and be unfavorable to the consumption of clean energy; the pursuit of minimum power transmission deviation alone will lose power generation benefits. Therefore, it is necessary to comprehensively consider the demands of both the power generation side and the power receiving side to select a scheduling plan.
[0133] The maximum power generation scheme (Scheme 1) that gives priority to the power generation target, the decision-making scheme (Scheme 2), and the minimum power transmission deviation scheme (Scheme 3) that gives priority to the power transmission deviation target are selected for comparative analysis.
[0134] From the perspective of power generation, in the dry season example, the total power generation of the basin of the three schemes was 4610.87GWh, 4610.00GWh, and 4608.50GWh, respectively. The power generation of Scheme 2 and Scheme 3 was 0.02% and 0.05% less than that of Scheme 1, respectively; in the flood season example, the total power generation of the basin of the three schemes was 7135.93GWh, 7115.00GWh, and 7071.39GWh, respectively. The power generation of Scheme 2 and Scheme 3 was 0.29% and 0.91% less than that of Scheme 1, respectively, and the change in power generation was small.
[0135] From the perspective of power transmission deviation, in the dry season example, the power transmission deviation of the three schemes is 11.52GW respectively. 2 , 1.31GW 2 , 0, the power transmission deviation of Scheme 2 and Scheme 3 is reduced by 88.6% and 100% respectively compared with Scheme 1; in the flood season example, the power transmission deviation of the three schemes is 100.86GW 2 、30.36GW 2 , 0, the power transmission deviation of Scheme 2 and Scheme 3 is reduced by 69.9% and 100% respectively compared with Scheme 1, and the reduction in power transmission deviation is relatively large.
Claims
1. A medium-term dispatching method for a river basin water, wind and solar power system considering the short-term load characteristics of multiple receiving-end power grids, characterized in that: The steps include: (1) According to the peak and valley characteristics of provincial loads, a time period division model is established with the minimum load variance within the same type of time period as the criterion; Objective function: Constraints: Where: L t is the load in period t, MW; g represents the period type, g = 1 represents the valley period, g = 2 represents the normal period, and g = 3 represents the peak period; represents the time period set included in the g-th time period type; I g Indicates the number of time periods included in the g-th time period type; Represents a time period collection The i-th element in ; (2) Establish a variable step - length search strategy based on the numpy module in the Python programming language to solve the time - period division model in step (1). The solution idea is to find two load demarcation points Y1 and Y2, where Y1 < Y2; when L t < Y1, the time period t is the valley period; when Y1 ≤ L t ≤ Y2, the time period t is the normal period; when L t > Y2, the time period t is the peak period. The specific steps are as follows: Step1: Sort the loads of each time period of the original load curve from small to large to obtain an increasing load sequence l1, l2, …, l m , …, l M . Calculate the average value of l m and l m+1 to obtain a variable step - length search set {y1, y2, …, y m , …, y M-1}, where y m =(l m +l m+1 ) / 2; Step 2: Define k1 and k2 as the serial numbers of the elements in the search set, let k1 = 1, k2 = k1 + 1, Get a collection of time periods of various types And find the corresponding objective function value make Step 3: Search upward until the highest load interval, set k1 = k1 + 1 or k2 = k2 + 1, until k1 = M-2, k2 = M-1, and find the corresponding objective function value like Then Step 4: Get the optimal objective function value and its corresponding set of time periods (3) Calculate load characteristic indicators and establish a load reconstruction model; The objective function is as follows: Where: CI u Characteristic index representing the original load demand curve; RCI u represents the characteristic index of the reconstructed load demand curve; w u Represents the weight coefficient of the characteristic index; DR represents the gap between the characteristic index of the reconstructed load demand curve and the original load curve; The constraints are as follows: 1) Original load curve characteristic indicators CI1=L ave (4) CI2=L ave / L max (5) CI3=(L max -L min ) / L max (6) CI4=L ave,peak / L ave (7) CI5=L ave,low / L ave (8) CI6=T max (9) CI7=T min (10) Where: CI1, CI2, CI3, CI4, CI5, CI6, CI7 represent daily average load, daily load rate, daily peak-to-valley difference rate, peak load rate, valley load rate, peak time, valley time of the original load curve respectively; L ave , L max , L min Respectively represent the average value, maximum value and minimum value of daily load; L ave,peak , L ave,low Respectively represent the average value of the peak period and the average value of the valley period; T max , T min They represent the peak time and the trough time respectively; 2) Reconstruction of load curve characteristic indicators Where: RCI1, RCI2, RCI3, RCI4, RCI5, RCI6, and RCI7 represent the daily average load, daily load rate, daily peak-to-valley difference rate, peak load rate, valley load rate, peak appearance time, and valley appearance time of the reconstructed load curve, respectively; They represent the average, maximum, and minimum values of the reconstructed load curve respectively; They represent the average value of the peak period and the average value of the valley period of the reconstructed load curve respectively; They represent the peak time and valley time of the reconstructed load curve respectively; 3) Reconstruct the peak, flat and valley periods of the load curve Where: They represent the values of the reconstructed load curve during valley period, normal period, and peak period respectively; (4) Using the python-numpy package, an equal-step search method is constructed to solve the load reconstruction model in step (3), as follows: Step 1: Find the maximum value L from the load sequence max and the minimum value L min , determine the search step size sw, and obtain the search set {r1,r2,…,r a ,…,r A }, where r a =L min +sw*(a-1), where a is the index of the element in the search set, and A is the number of elements in the search set; Step 2: Define b1, b2, and b3 as the serial numbers of the elements in the search set, and let b1 = 1, b2 = b1+1, b3 = b2+1. Get the corresponding reconstructed load curve and calculate the load characteristic index and target value make Step 3: Let b1 = b1 + 1 or b2 = b2 + 1 or b3 = b3 + 1 until b1 = A-2, b2 = A-1, b3 = A, and find the corresponding objective function value like Then Find the reconstructed load curve corresponding to the optimal objective function value; Step 4: Get the optimal objective function value DR and its corresponding reconstructed load curve; (5) Considering the connections between the left and right banks and the upstream and downstream of the cascade power stations, and integrating the short- and medium-term scheduling constraints, a short- and medium-term nested scheduling model for the watershed water, wind and solar system is constructed: The maximum power generation objective function is as follows: Where: E is the maximum objective function of power generation, MWh; represents the output of hydropower station n and power plant j on day d, MW; are the output of wind power plant and photovoltaic power plant bundled with hydropower plant n and power plant j on day d, MW; P n,j,d represents the total water, wind and solar power output bundled and delivered by hydropower station n and power station j on day d, MW; Δt represents the number of hours per day, h; n and N represent the hydropower station number and the total number of hydropower stations respectively; j represents the power plant number, j=1 represents the left bank power plant, j=2 represents the right bank power plant; d and D represent the day number and the total number of days respectively; The minimum objective function of power transmission deviation is as follows: Where: ED is the minimum objective function of power transmission deviation, MW 2 ; represents the power transmission plan of power plant n and power plant j to province s at time t on day d, MW; s (t) represents the load demand of province s, using the load reconstruction curve obtained in Section 2; η s,n,j,d It represents the scaling factor of the load demand at the receiving end; s and S represent the province number and the total number of provinces respectively; t and T represent the time period number and the total number of time periods respectively; 2) Constraints In addition to considering medium-term and short-term scheduling, medium-term and short-term nested power constraints are also considered, that is, the daily power obtained by medium-term scheduling should be equal to the sum of the power generation in each period of the day, as shown in formula (15); (6) On the Gurobi solver platform, the Python program is used to convert the short-term nested scheduling model of the watershed water-wind-solar system into a mixed integer linear programming model to achieve efficient solution, as follows: Step 1: The multi-objective model of the maximum power generation objective function and the minimum power transmission deviation objective function is converted into a single-objective model using the constraint conversion method. The specific method is to convert the maximum power generation objective function into the constraint condition of the minimum power transmission deviation objective, as shown in formula (16); Where: E set Indicates the total hydropower, wind and solar power generation required in the basin during the dispatch period, MWh; E set The initial value of is the maximum value of power generation when the power transmission deviation target is not considered, that is, the optimal value of the objective function of the maximum power generation model on a daily scale; Step 2: For the one-dimensional nonlinear function relationship of water level and storage capacity, piecewise linearization is used for processing; for the two-dimensional nonlinear function relationship of hydropower generation function, parallelogram two-dimensional interpolation method is used for linearization processing; Step 3: By gradually relaxing the power generation constraints, a set of non-inferior solutions of the multi-objective model is obtained; Step 4: Calculate the comprehensive benefit index and select the decision-making plan from the solution set. The index calculation formula is shown in formula (17);
Citation Information
Patent Citations
Short-term power generation dispatching method for cascade hydropower station group based on coupling of clustering analysis and decision-making tree
CN108470249A
Cited By
Water-wind-light multi-energy complementary multi-cycle nested optimization modeling solving method
CN119809868A
A multi-energy complementary and multi-cycle nested optimization modeling and solution method for water, wind and light
CN119809868B