A gas storage compressor cluster control method and system
By predicting and optimizing control signals, the load balancing and automatic adjustment of the gas storage compressor cluster are realized, which solves the problems of low efficiency and insufficient stability in the existing technology, improves energy utilization and system response speed, and reduces energy waste. and human involvement.
Patent Information
- Application Number
- CN202410300655.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-03-15
AI Technical Summary
The existing gas storage compressor cluster control method has the problems of low efficiency, instability, insufficient reliability and insufficient flexibility, resulting in energy waste and unstable system operation.
By predicting the pressure and power results, combined with the type and performance data of the compressor, the RBF neural network improved by the PSO algorithm and the FCE fuzzy comprehensive evaluation algorithm are used to generate optimized control signals to achieve matching and automatic adjustment of the compressor unit, using the fuzzy PID control algorithm Optimize cluster control.
It achieves optimized scheduling and load balancing of compressors, improves energy utilization efficiency, enhances system stability and response speed, reduces manual participation, and extends equipment service life.
Smart Images

Figure CN118188443B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of gas storage compressors, and in particular relates to a gas storage compressor cluster control method and system. Background Art
[0002] In the pressure control system of the gas storage compressor, when the system issues a loading / unloading command according to the on-site load requirements, the system can only control the loading / unloading of the compressor according to the originally set basic loading / unloading sequence. However, this sequential start-stop method also has unreasonable aspects. For example, when the pipeline network pressure reaches the loading pressure, the on-site gas consumption is very small and the fluctuation is small. If the compressor started sequentially at this time is a large-power compressor, the system will have a "big horse pulling a small cart" phenomenon, and the compressor pipeline pressure will fluctuate violently; similarly, when the pipeline network pressure reaches the loading pressure, if a large-power compressor is required on site at this time, but a small-power air compressor is actually started according to the sequential control, the compressor system will start the next compressor sequentially after the small-power compressor reaches full load operation. This will cause the problem that originally only needs to be solved by starting a large-load compressor to be turned into starting multiple compressors, and the large-power air compressor is in an inefficient operating state, which will cause a lot of energy waste.
[0003] In recent years, most of the control methods for natural gas compressor units in gas storage facilities have adopted logic sequence control with programmable logic control technology as the core and automatic control of natural gas compressor unit PID control. Although this kind of logic control and automatic control technology is very mature, it still has the following shortcomings in terms of energy-saving optimization, efficiency and flexibility: 1. Lack of high efficiency: It is impossible to achieve the coordinated work of multiple compressors, reasonably distribute the load according to the gas demand and supply situation, and give full play to the efficiency of each compressor.
[0004] 2. Poor stability: It is impossible to coordinate and control multiple compressors to maintain the stable operation of the system. When one or more compressors fail or shut down, other compressors cannot automatically take over the load to ensure the normal operation of the gas storage.
[0005] 3. Insufficient reliability: There is a lack of backup and redundancy in the working conditions of multiple compressors. When a compressor fails, other compressors can take over the work to avoid paralysis of the entire system due to a single point failure.
[0006] 4. Insufficient flexibility: The gas storage compressor cluster control method can be flexibly adjusted according to actual needs. According to the changes in gas consumption, the number of compressors can be increased or decreased to adapt to different working conditions.
[0007] Therefore, in practical applications, in order to make the control of gas storage compressor cluster more efficient, stable, reliable and flexible, improve the operating efficiency of the system, reduce energy consumption, and meet the natural gas demand under different working conditions, it has become a technical problem that needs to be solved urgently. Summary of the invention
[0008] The present invention proposes a gas storage compressor cluster control method and system to solve the problems of low efficiency, instability, lack of reliability and flexibility in the prior art.
[0009] To achieve the above object, the present invention proposes the following technical solutions:
[0010] A gas storage compressor cluster control method comprises the following steps:
[0011] Step 1, obtaining the pressure and power prediction results of the gas storage compressor according to the downstream gas consumption change, the intake temperature, exhaust pressure and exhaust flow data of the compressor;
[0012] Step 2, obtaining a priority result according to the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage;
[0013] Step 3, matching the compressor groups according to the pressure and power prediction results and the priority results, and obtaining matching information of the gas storage compressor;
[0014] Step 4, inputting instructions to the control system based on the matching information, generating an optimized control signal, inputting the command to the cluster optimization control system, and obtaining an output signal;
[0015] Step 5: Calculate the adjustment signal data according to the optimized control signal and the output signal to obtain an optimized adjustment scheme, and adjust the gas storage compressor cluster based on the optimized adjustment scheme.
[0016] Preferably, the step 1 is specifically:
[0017] Preprocessing the gas consumption change information to generate structured data;
[0018] The RBF neural network algorithm improved based on the PSO algorithm performs a prediction model analysis on the structured data and the collected compressor intake temperature, exhaust pressure and exhaust flow data, calculates the intake pressure, exhaust temperature and shaft power that the gas storage compressor should have, and generates pressure and power prediction results.
[0019] Preferably, the step 2 is specifically:
[0020] The FCE fuzzy comprehensive evaluation algorithm is used to analyze and calculate the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage to obtain comprehensive data;
[0021] The comprehensive data is prioritized according to a two-way merge sort algorithm to obtain a priority result.
[0022] Preferably, in step 3, the prediction results and priorities are matched based on a KMP matching algorithm.
[0023] Preferably, the generation process of the optimization control signal in step 4 is specifically as follows:
[0024] Determine, based on the matching information, a start-up and drive scheme for a compressor in a gas storage compressor cluster that matches the matching table;
[0025] According to the startup and driving scheme, combined with the current operating conditions of the natural gas compressor and the frequency regulation limit, the optimal control data of the cluster is calculated to generate an optimal control signal.
[0026] Preferably, the step 5 is specifically:
[0027] The optimized control signal and the output signal data are calculated using a fuzzy PID control algorithm, and the adjustment signal data are output to obtain an optimized adjustment scheme.
[0028] A gas storage compressor cluster control system, comprising:
[0029] The intake pressure and shaft power prediction unit is used to calculate the intake pressure, exhaust temperature and shaft power that the gas storage compressor should have according to the downstream gas consumption change and the collected data, and generate pressure and power prediction results;
[0030] A priority system unit, which is used to match the compressor units according to the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage facility, as well as the pressure and power prediction results;
[0031] A cluster control optimization unit, which inputs instructions to the control system based on the matching information, generates an optimization control signal, inputs the optimized control signal to the cluster optimization control system, and obtains an output signal;
[0032] The regulating unit is used to calculate the regulating signal data according to the input signal and the new round of output signal, and automatically regulate and control the compressor unit.
[0033] Preferably, it also includes a collection unit, which is used to collect the intake temperature, exhaust pressure and exhaust flow data of the compressor.
[0034] Preferably, it also includes a driving unit, which is used to drive the motor and valve in the compressor system during the cluster control optimization process.
[0035] Preferably, the priority system unit specifically includes:
[0036] A priority calculation unit, used for calculating and arranging the priority of natural gas compressors according to the types, displacements, usage time and performance data of existing natural gas compressors in the gas storage facility;
[0037] The matching priority unit is used to match the compressor groups using the predicted intake pressure and shaft power data and the priority.
[0038] The present invention is beneficial in that:
[0039] The present invention proposes a gas storage compressor cluster control method, which can achieve optimal scheduling and load balancing of compressors and avoid unnecessary energy waste by predicting and arranging data, formulating an optimization adjustment plan, and rationally controlling the gas storage compressor cluster. At the same time, the control method can also automatically adjust the number and operating status of compressors according to changes in gas demand to maximize energy efficiency.
[0040] The present invention uses advanced sensor technology and data processing algorithms to obtain the operating information of the compressor cluster in real time. Through intelligent control strategies, it can more accurately predict changes in gas demand and quickly respond to adjust the working status of the compressor, thereby improving the response speed and processing capacity of the system. It can quickly detect abnormal situations and adopt corresponding control strategies. This can effectively prevent system failures and pressure fluctuations, maintain the stable operation of the gas storage system, and realize the automated management and monitoring of the compressor, greatly reducing the need for manual participation and human resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0042] Figure 1 It is a flow chart of a gas storage compressor cluster control method;
[0043] Figure 2 This is a schematic diagram of the structure of a gas storage compressor cluster control system; DETAILED DESCRIPTION
[0044] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.
[0045] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present invention belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present invention.
[0046] See also Figure 1 As shown, the present invention provides a gas storage compressor cluster control method, comprising the following steps:
[0047] Step 1: According to the change of downstream gas consumption, the intake temperature, exhaust pressure and exhaust flow data of the compressor are collected to calculate the intake pressure, exhaust temperature and shaft power of the gas storage compressor, and generate the pressure and power prediction results; specifically:
[0048] The gas consumption change information is preprocessed to generate structured data; the RBF neural network algorithm improved based on the PSO algorithm is used to perform a prediction model analysis on the structured data and the collected compressor intake temperature, exhaust pressure and exhaust flow data, and the intake pressure, exhaust temperature and shaft power that the gas storage compressor should have are calculated to generate pressure and power prediction results.
[0049] Step 2: Calculate and arrange the priorities of the natural gas compressors according to the types, displacements, usage time and performance data of the existing natural gas compressors in the gas storage facility to obtain the priority results; specifically:
[0050] The FCE fuzzy comprehensive evaluation algorithm is used to analyze and calculate the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage to obtain comprehensive data;
[0051] The comprehensive data is prioritized according to a two-way merge sort algorithm to generate a priority sorting table.
[0052] Step 3, using the pressure and power prediction results obtained in step 1 and the priority results obtained in step 2, matching the compressor groups in the cluster priority system with the required type to obtain the matching information of the gas storage compressor; specifically:
[0053] The prediction results and priorities are matched based on the KMP matching algorithm, a matching table of the gas storage compressor is calculated, and the matching type and the compressor group in the cluster priority system are matched.
[0054] Step 4: Based on the matching information, process and obtain the input signal, transmit it to the cluster optimization control system, and automatically control the start, stop and drive of the gas storage compressor cluster; specifically:
[0055] Determine, based on the matching information, a start-up and drive scheme for a compressor in a gas storage compressor cluster that matches the matching table;
[0056] According to the startup and driving scheme, combined with the current operating conditions of the natural gas compressor and the frequency regulation limit, the optimal control data of the cluster is calculated to generate an optimal control signal.
[0057] Step 5, according to the input signal and the new round of output signal, calculate the adjustment signal data, and automatically adjust and control the compressor unit; specifically:
[0058] The input signal and a new round of output signal data are calculated using a fuzzy PID control algorithm, and the adjustment signal data is output to generate an optimized adjustment scheme.
[0059] like Figure 2 As shown, the present invention provides a gas storage compressor cluster control system, including a collection unit, an intake pressure and shaft power prediction unit, a priority system unit, a cluster control optimization unit, a drive unit and a regulating unit.
[0060] A collection unit, used to collect the compressor's intake temperature, exhaust pressure and exhaust flow data;
[0061] The intake pressure and shaft power prediction unit is used to calculate the intake pressure, exhaust temperature and shaft power that the gas storage compressor should have according to the downstream gas consumption change and the collected data, and generate pressure and power prediction results;
[0062] A priority system unit, used to calculate and arrange the priorities of natural gas compressors according to the types, displacements, usage time and performance data of existing natural gas compressors in the gas storage, calculate a matching table of gas storage compressors using the predicted intake pressure and shaft power data and the priorities, and match the compressor units of the corresponding types and the priority system;
[0063] A cluster control optimization unit, used to obtain and process input signals based on the matching information, and optimize the start, stop and drive of the gas storage compressor cluster;
[0064] A drive unit for driving the motor and valves in the compressor system;
[0065] The regulating unit is used to calculate the regulating signal data according to the input signal and the new round of output signal, and automatically regulate and control the compressor unit.
[0066] In a specific implementation, the priority system unit specifically includes:
[0067] A priority calculation and arrangement unit is used to calculate and arrange the priorities of the natural gas compressors according to the types, displacements, usage time and performance data of the existing natural gas compressors in the gas storage facility to obtain priority results;
[0068] A matching priority unit is used to calculate the pressure prediction results, power prediction results, shaft power data and the priority to obtain a matching table of the gas storage compressor, and match the compressor unit in the system with the required type and priority.
[0069] The gas storage compressor cluster control device provided by the technical solution of the present invention is applied to a gas storage compressor cluster composed of multiple high-power natural gas compressors of the same or different types and several low-power natural gas compressors connected in parallel to a natural gas pipeline. In the natural gas compressor cluster, the pressure sensor and temperature sensor used to collect data will timely sense the environmental information of the buffer tank, compressor and high-pressure gas tank, and then optimize and control the natural gas compressor cluster of the gas storage through the device of the present invention. The same or two basic types of high-power natural gas compressors meet the pressure requirements, and the flow and pressure of natural gas generally remain at a constant value, while a part of the low-power compressors are required to meet the pressure regulation requirements to achieve the adjustment function required for the comparison of the feedback signal and the input signal. When the gas storage is in the gas injection compression project, when the exhaust flow is regulated to a constant amount, the compressor group control system regulates the pressure by adjusting the opening of the self-operated regulating valve and the electric regulating valve.
[0070] The benefits of the present invention are mainly reflected in the following aspects:
[0071] 1. Improve energy utilization: By rationally controlling the gas storage compressor cluster, the optimal scheduling and load balancing of the compressors can be achieved, avoiding unnecessary energy waste. At the same time, the control method can also automatically adjust the number and operating status of the compressors according to the changes in gas demand to maximize energy efficiency.
[0072] 2. Enhance system stability: The gas storage compressor cluster control method and device can quickly detect abnormal conditions and adopt corresponding control strategies by real-time monitoring and analyzing the working status and operating parameters of the compressor cluster. This can effectively prevent system failures and pressure fluctuations and maintain the stable operation of the gas storage system.
[0073] 3. Improve response speed: Cluster control methods and devices can use advanced sensor technology and data processing algorithms to obtain real-time operating information of the compressor cluster. Through intelligent control strategies, they can more accurately predict changes in gas demand and quickly respond to and adjust the working status of the compressor, thereby improving the system's response speed and processing capabilities.
[0074] 4. Reduce operation and maintenance costs: The gas storage compressor cluster control method and device can realize the automatic management and monitoring of the compressor, greatly reducing the need for manual participation and human resources. In addition, by reasonably scheduling and optimizing the working mode of the compressor, the service life of the equipment can be extended and the maintenance and replacement costs can be reduced.
[0075] It is known from common technical knowledge that the present invention can be implemented by other embodiments that do not deviate from its spirit or essential features. Therefore, the above disclosed embodiments are only illustrative in all respects and are not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are included in the present invention.
[0076] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0077] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0078] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0079] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A gas storage compressor cluster control method, characterized in that: The steps include: Step 1, obtaining the pressure and power prediction results of the gas storage compressor according to the downstream gas consumption change, the intake temperature, exhaust pressure and exhaust flow data of the compressor; Step 2, obtaining a priority result according to the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage; Step 3, matching the compressor groups according to the pressure and power prediction results and the priority results, and obtaining matching information of the gas storage compressor; Step 4, inputting instructions to the control system based on the matching information, generating an optimized control signal, inputting the command to the cluster optimization control system, and obtaining an output signal; Step 5, calculating the adjustment signal data according to the optimized control signal and the output signal, obtaining an optimized adjustment scheme, and adjusting the gas storage compressor cluster based on the optimized adjustment scheme; The step 1 is specifically as follows: Preprocessing the gas consumption change information to generate structured data; The RBF neural network algorithm improved based on the PSO algorithm performs a prediction model analysis on the structured data and the collected compressor intake temperature, exhaust pressure and exhaust flow data, calculates the intake pressure, exhaust temperature and shaft power that the gas storage compressor should have, and generates pressure and power prediction results; The step 2 is specifically as follows: The FCE fuzzy comprehensive evaluation algorithm is used to analyze and calculate the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage to obtain comprehensive data; Prioritize the comprehensive data according to a two-way merge sort algorithm to obtain a priority result; In the step 3, the prediction result and the priority are matched based on the KMP matching algorithm; The generation process of the optimized control signal in step 4 is specifically as follows: Determine, based on the matching information, a start-up and drive scheme for a compressor in a gas storage compressor cluster that matches the matching table; According to the startup and driving scheme, combined with the current working conditions and frequency regulation limitations of the natural gas compressor, the optimal control data of the cluster is calculated to generate an optimal control signal; The step 5 is specifically as follows: The optimized control signal and the output signal data are calculated using a fuzzy PID control algorithm, and the adjustment signal data are output to obtain an optimized adjustment scheme.
2. A gas storage compressor cluster control system based on claim 1, characterized in that: include: The intake pressure and shaft power prediction unit is used to calculate the intake pressure, exhaust temperature and shaft power that the gas storage compressor should have according to the downstream gas consumption change and the collected data, and generate pressure and power prediction results; A priority system unit, which is used to match the compressor units according to the type, displacement, usage time and performance data of the existing natural gas compressors in the gas storage facility, as well as the pressure and power prediction results; A cluster control optimization unit, which inputs instructions to the control system based on the matching information, generates an optimization control signal, inputs the signal into the cluster optimization control system, and obtains an output signal; The regulating unit is used to calculate the regulating signal data according to the input signal and the new round of output signal, and automatically regulate and control the compressor unit.
3. A gas storage compressor cluster control system as claimed in claim 2, characterized in that: It also includes a collection unit, which is used to collect the intake temperature, exhaust pressure and exhaust flow data of the compressor.
4. A gas storage compressor cluster control system as claimed in claim 2, characterized in that: It also includes a driving unit, which is used to drive the motor and the valve in the compressor system during the cluster control optimization process.
5. A gas storage compressor cluster control system as claimed in claim 2, characterized in that: The priority system unit specifically includes: A priority calculation unit, used for calculating and arranging the priority of natural gas compressors according to the types, displacements, usage time and performance data of existing natural gas compressors in the gas storage facility; The matching priority unit is used to match the compressor groups using the predicted intake pressure and shaft power data and the priority.