An engineering monitoring system based on visual analysis

By using multiple monitoring reference points and image analyzers in the engineering monitoring system, combined with the projection technology of the laser generator, the accuracy of vertical prefabricated components is solved, the accuracy and timeliness of monitoring are improved, and the accuracy and timeliness of monitoring are achieved. Efficient monitoring of vertical prefabricated components.

CN118189905BActive Publication Date: 2024-11-15GUANGDONG JINGXIN ENG COST CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410282561.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-11-15
Estimated Expiration
2044-03-13

AI Technical Summary

Technical Problem

The existing engineering monitoring system based on visual analysis cannot effectively monitor the quality of vertical prefabricated components, and the detection reference points are difficult to transfer and advance, resulting in poor pertinence and accuracy of the monitoring process.

Method used

Using a combination of several monitoring reference points, points to be monitored, image analyzer and monitoring thruster, laser patterns are projected through the laser generator, coordinates, verticality and horizontal position information are monitored, the effectiveness of monitoring reference points is determined and the monitoring reference points is promoted. , improve the accuracy and timeliness of monitoring.

Benefits of technology

It effectively improves the accuracy and pertinence of engineering monitoring, improves the timeliness and controllability of monitoring points, reduces the utilization rate of monitoring resources, and improves the overall accuracy of engineering monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118189905B_ABST
    Figure CN118189905B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of engineering monitoring, and in particular to an engineering monitoring system based on visual analysis, comprising: a plurality of monitoring reference points; a plurality of points to be monitored, which are respectively arranged at corresponding positions of construction components, and, for adjacent points to be monitored, their connecting lines are parallel to or perpendicular to the horizontal plane; an image analyzer, which is connected to each monitoring reference point and is used for analyzing the position of the construction component corresponding to the point to be monitored according to the monitoring results of each reference monitoring point; a monitoring propeller, which is connected to each monitoring reference point, each point to be monitored and the image analyzer, and is used for setting the point to be monitored as a new monitoring reference point when the point to be monitored is under a preset stable condition, and determining that the monitoring reference point is invalid when the monitoring reference point is under a preset propulsion condition; the present invention transfers and propels the monitored reference points, and effectively improves the accuracy of engineering monitoring while effectively improving the accuracy of engineering monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering monitoring, and in particular to an engineering monitoring system based on visual analysis. Background Art

[0002] The current construction projects have increasingly stringent requirements for construction periods, and prefabricated components can effectively solve construction period issues and have a great advantage;

[0003] However, for vertical threshold structures such as partition walls, the construction is complicated during assembly and it is difficult to monitor the quality.

[0004] Commonly used engineering monitoring methods include Chinese patent authorization announcement number: CN113800263B discloses an engineering monitoring system based on visual analysis, including a frame and a carrier loading mechanical arm assembly, the carrier loading mechanical arm assembly is arranged on the front right side of the frame, and a chip carrier mechanism, a chip carrier photographing assembly, a four-axis robot, a CCD camera assembly and an intelligent placement mechanism are arranged on the frame in sequence, the chip carrier mechanism is fixed on the right side of the frame, the chip carrier photographing assembly is fixed on the right side of the chip carrier mechanism, the four-axis robot is fixed on the left side of the chip carrier mechanism, the CCD camera assembly is fixed behind the four-axis robot, and the intelligent placement mechanism is fixed on the left side of the four-axis robot. The intelligent placement mechanism includes a swing plate transmission assembly, a swing plate separation assembly, a top swing plate positioning assembly and a swing plate stacking assembly; the present invention has a high degree of intelligence and high placement efficiency, is suitable for large-scale production and processing, and has good market application value.

[0005] However, the above method has the following problems: it is impossible to monitor the quality of vertical prefabricated components, and the detection reference points are difficult to effectively transfer and advance, resulting in poor pertinence of the monitoring process. Summary of the invention

[0006] To this end, the present invention provides an engineering monitoring system based on visual analysis, which is unable to monitor the quality of vertical prefabricated components, and the detection reference points are difficult to effectively transfer and advance, resulting in poor targeting of the monitoring process, thereby causing inaccurate engineering monitoring.

[0007] To achieve the above object, the present invention provides an engineering monitoring system based on visual analysis, comprising:

[0008] The several monitoring reference points;

[0009] A plurality of monitoring points are connected to corresponding monitoring reference points and are respectively arranged at corresponding positions of the construction components. For any monitoring point, the height of the monitoring point on the corresponding construction component is the same and the distance from the left side is the same;

[0010] An image analyzer, which is connected to each monitoring reference point and is used to analyze the position of the construction component corresponding to the point to be monitored according to the monitoring results of each reference monitoring point;

[0011] a monitoring propeller connected to each monitoring reference point, each point to be monitored and the image analyzer, and used to set the point to be monitored as a new monitoring reference point when the point to be monitored is in a preset stable condition, and

[0012] When the monitoring reference point is under a preset advancing condition, determining that the monitoring reference point is invalid;

[0013] Wherein, the monitoring result includes the coordinate information, the verticality information and the horizontal position information;

[0014] The preset stability condition is that the point to be monitored no longer moves;

[0015] The preset advancement condition is that the number of the points to be monitored that can be monitored by the monitoring reference point is no more than a preset number.

[0016] Furthermore, a single monitoring benchmark includes:

[0017] A coordinate monitor, which is used to obtain the coordinate information of the corresponding point to be monitored;

[0018] A longitudinal monitor, which is used to obtain verticality information between a point to be monitored and an adjacent point to be monitored;

[0019] A horizontal monitor, used to obtain horizontal position information of the point to be monitored and adjacent points to be monitored;

[0020] A laser generator, which is connected to the coordinate monitor, the longitudinal monitor and the horizontal monitor respectively, and is used to emit a laser of a preset shape to the point to be monitored;

[0021] Among them, each point to be monitored is set on the corresponding construction component;

[0022] The preset shape is related to the outer contour size of the construction component in the vertical direction.

[0023] Furthermore, a single point to be monitored corresponds to the single construction component, and the monitoring point includes a basic structure for setting a monitoring reference point.

[0024] Furthermore, the laser generator takes the corresponding monitoring reference point as a target projection object to form a projection line connecting each reference point adjacent to the reference point.

[0025] Furthermore, when monitoring the single monitored point, the image analyzer determines whether the monitored point is offset according to the positions of the projection line and adjacent monitored points.

[0026] Furthermore, a preset monitoring cycle is provided in the monitoring propeller. If any point to be monitored is in the same state in consecutive preset monitoring cycles, the monitoring propeller determines that the point to be monitored is fixed and is in the preset stable condition.

[0027] Further, the monitoring propeller determines for any monitoring reference point that when the number of the points to be monitored corresponding to the monitoring reference point that are not in the preset stable condition is not greater than the preset number, or

[0028] The number of the monitored points corresponding to the monitoring reference point is not greater than the preset number, and the monitoring propeller determines that the monitoring reference point is invalid.

[0029] Furthermore, the coordinate monitor is also used to capture the corresponding point to be monitored, and to focus each monitor in the monitoring reference point with the point to be monitored.

[0030] Further, the longitudinal monitor is used to monitor the longitudinal deviation degree of the corresponding point to be monitored;

[0031] The longitudinal offset degree is the offset degree of the connecting line of the upper and / or lower monitored points adjacent to the monitored point;

[0032] The horizontal monitor is used to monitor the horizontal deviation degree of the corresponding point to be monitored;

[0033] The horizontal offset degree is the offset degree of the connecting line of the left and / or right side points to be monitored adjacent to the point to be monitored.

[0034] Furthermore, the image analyzer analyzes each point to be monitored with a preset time period as a cycle, and determines whether each point to be monitored is offset.

[0035] Compared with the prior art, the beneficial effect of the present invention lies in that, by setting up a number of monitoring reference points, a number of points to be monitored, an image analyzer and a monitoring propeller, the monitoring reference points are advanced in engineering monitoring, thereby effectively improving the accuracy of engineering monitoring.

[0036] Furthermore, by setting a number of monitors at the reference points, the relative position changes of the monitored points are judged, which effectively improves the timeliness of monitoring the monitored points and further improves the accuracy of engineering monitoring.

[0037] Furthermore, by using a laser generator to project a pattern on the point to be monitored, and monitoring each point to be monitored based on the positional relationship between the nearby points to be monitored and this point, the relative positional relationship of each point to be monitored to the adjacent points is determined, which effectively improves the controllability of non-standard building monitoring and further improves the accuracy of engineering monitoring.

[0038] Furthermore, by utilizing the monitoring propeller to transform the function of each monitored point, the utilization rate of monitoring resources is effectively improved while reducing the distance between the monitored point and the monitoring reference point, thereby further improving the accuracy of engineering monitoring.

[0039] Furthermore, by periodically analyzing each monitoring point, the monitoring timeliness of each monitoring point is effectively improved while further improving the accuracy of engineering monitoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a structural schematic diagram of the engineering monitoring system based on visual analysis of the present invention;

[0041] Figure 2 This is a schematic diagram of the structure of a single monitoring reference point in an embodiment of the present invention;

[0042] Figure 3 Schematic diagram of laser image according to an embodiment of the present invention. DETAILED DESCRIPTION

[0043] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0044] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0045] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0046] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] See also Figure 1 As shown, it is a structural schematic diagram of the engineering monitoring system based on visual analysis of the present invention, including:

[0048] Several monitoring benchmarks;

[0049] A number of monitoring points are connected to corresponding monitoring reference points and are respectively arranged at corresponding positions of the construction components. For any monitoring point, the height of the monitoring point on the corresponding construction component is the same and the distance from the left side is the same;

[0050] An image analyzer connected to each monitoring reference point is used to analyze the position of the construction component corresponding to the monitoring point according to the monitoring results of each reference monitoring point;

[0051] A monitoring propeller connected to each monitoring reference point, each point to be monitored and the image analyzer, for setting the point to be monitored as a new monitoring reference point when the point to be monitored is in a preset stable condition, and for determining that the monitoring reference point is invalid when the monitoring reference point is in a preset propulsion condition;

[0052] The monitoring results include coordinate information, verticality information, and horizontal position information;

[0053] The preset stability condition is that the monitored point no longer moves;

[0054] The preset advancement condition is that the number of monitored points that can be monitored by the monitoring reference point does not exceed the preset number.

[0055] The present invention utilizes a method of setting a plurality of monitoring reference points, a plurality of points to be monitored, an image analyzer and a monitoring propeller to propel the monitoring reference points in engineering monitoring, thereby effectively improving the accuracy of engineering monitoring and the pertinence of engineering monitoring.

[0056] See also Figure 2 As shown, it is a schematic diagram of the structure of a single monitoring reference point in an embodiment of the present invention, and the single monitoring reference point includes:

[0057] A coordinate monitor, which is used to obtain the coordinate information of the corresponding point to be monitored;

[0058] A longitudinal monitor, which is used to obtain verticality information between a point to be monitored and an adjacent point to be monitored;

[0059] A horizontal monitor, which is used to obtain horizontal position information of a point to be monitored and adjacent points to be monitored;

[0060] A laser generator, which is connected to the coordinate monitor, the longitudinal monitor and the horizontal monitor respectively, and is used to emit a laser of a preset shape to the point to be monitored;

[0061] Among them, each point to be monitored is set on the corresponding construction component;

[0062] The preset shape is related to the outer contour size of the construction component in the vertical direction.

[0063] By setting up several monitors at the reference points, the relative position changes of the monitored points can be judged, which effectively improves the timeliness of monitoring the monitored points and further improves the accuracy of engineering monitoring.

[0064] Specifically, a single point to be monitored corresponds to a single construction component, and the monitoring point includes a basis for setting a monitoring reference point.

[0065] Specifically, the laser generator takes the corresponding monitoring reference point as the target projection object, and forms a projection line connecting each reference point adjacent to the reference point.

[0066] Specifically, when monitoring a single monitored point, the image analyzer determines whether the monitored point is offset according to the positions of the projection line and adjacent monitored points.

[0067] Example 1

[0068] See also Figure 3 As shown, it is a schematic diagram of a laser image according to an embodiment of the present invention. In the figure, for the convenience of description, the monitored point to be monitored is marked as A, and its adjacent left and right monitored points are 1A and 3A, and its adjacent upper and lower monitored points are A1 and A3, respectively.

[0069] It can be seen that the monitored point A in the figure is higher than 1A and 3A, and is offset to the right relative to A1. On this basis, with point A as the reference, the laser generator emits laser to point A, which is Figure 3 As shown:

[0070] The coordinate monitor obtains the coordinates of point A;

[0071] The longitudinal monitor obtains the offset between point A and A1;

[0072] The horizontal monitor obtains the offset between point A and 1A, and between point A and 3A.

[0073] By using a laser generator to project a pattern on the point to be monitored, and monitoring each point based on the positional relationship between the nearby points to be monitored and this point, the relative positional relationship of each point to be monitored to the adjacent points is determined, which effectively improves the controllability of non-standard building monitoring and further improves the accuracy of engineering monitoring.

[0074] Specifically, a preset monitoring cycle is provided in the monitoring propeller. When any monitored point is in the same state for consecutive preset monitoring cycles, the monitoring propeller determines that the monitored point is fixed and is in a preset stable condition.

[0075] It is understood that when the concrete or grouting material connected to any building component is completely solidified, its relative position with respect to each adjacent building component will no longer change;

[0076] In particular, in practice, the shortest time that the preset stability conditions can be achieved is 3 natural days. When a foaming agent is added to the connecting material, the time can be shortened to several hours. For safety reasons, 3 natural days is the best time to set this value.

[0077] In particular, during implementation, multiple lasers may cause confusion in identification. To avoid interference, monitoring points can be set on each floor during monitoring.

[0078] Example 2

[0079] Please continue reading Figure 3 As shown, based on Example 1, the difference is that the point A3 to be monitored is already in a preset stable condition;

[0080] At this time, the monitoring of the monitored point A can be based on A3. Figure 3 In the figure, the laser line based on point A and the laser line based on point A3 coincide with each other, so it can be judged that point A is qualified in the vertical position at this time;

[0081] Example 3

[0082] Please continue reading Figure 3 As shown, based on the embodiment 1, the difference is that the point 1A to be monitored is already in a preset stable state;

[0083] At this time, the monitoring of the monitored point A can be based on 1A. Figure 3 In the figure, there is a height difference between the laser based on point A and the laser based on point 1A. It can be judged that point A is higher than point 1A in horizontal position at this time.

[0084] For Example 3, it can be determined that the construction component corresponding to point A is higher during installation, and further determination can be made on the construction component corresponding to point A accordingly.

[0085] Specifically, the monitoring propeller determines for any monitoring reference point that when the number of the monitored points corresponding to the monitoring reference point that are not in the preset stable condition is not greater than the preset number, or,

[0086] The number of the monitoring points corresponding to the monitoring reference point is not greater than the preset number, and the monitoring propeller determines that the monitoring reference point cannot work and determines that the monitoring reference point is invalid.

[0087] Example 4

[0088] Please continue reading Figure 3 As shown, based on Example 1, the difference is that the monitored points A1, A3, 1A, and 3A are all in a preset stable state, and corresponding monitoring reference points are set;

[0089] At this time, if the monitoring reference point of the monitored point A only monitors the monitored point A, it is determined that the monitored point is invalid;

[0090] It is understandable that the monitored points A1, A3, 1A, and 3A are all in a preset stable state and are set with corresponding monitoring reference points. They can monitor the monitored point A by themselves without monitoring from the original monitoring reference points.

[0091] Specifically, the coordinate monitor is also used to capture the corresponding point to be monitored, and to focus each monitor in the monitoring reference point with the point to be monitored.

[0092] Specifically, the longitudinal monitor is used to monitor the longitudinal deviation degree of the corresponding point to be monitored;

[0093] The longitudinal offset degree is the offset degree of the connecting line of the upper and / or lower monitored points adjacent to the monitored point;

[0094] The horizontal monitor is used to monitor the horizontal deviation degree of the corresponding point to be monitored;

[0095] The horizontal offset degree is the offset degree of the connecting line of the left and / or right side points to be monitored adjacent to the point to be monitored.

[0096] By using the monitoring propeller to transform the function of each monitored point, the utilization rate of monitoring resources is effectively improved while reducing the distance between the monitored point and the monitoring reference point, thereby further improving the accuracy of engineering monitoring.

[0097] Specifically, the image analyzer analyzes each point to be monitored with a preset time period as a cycle, and determines whether each point to be monitored is offset.

[0098] By periodically analyzing each monitoring point, the monitoring timeliness of each monitoring point is effectively improved while further improving the accuracy of project monitoring.

[0099] In particular, the preset duration of the image analyzer is related to the workability of the concrete and the total weight of the building components corresponding to the monitored point. It is generally set to 3 hours. For more important parts of the structure, it can be set to a shorter duration, such as:

[0100] For cantilever structures, set the preset duration to 1.5 hours.

[0101] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

[0102] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An engineering monitoring system based on visual analysis, characterized in that: include: Several monitoring benchmarks; A plurality of monitoring points are connected to corresponding monitoring reference points and are respectively arranged at corresponding positions of the construction components. For any monitoring point, the height of the monitoring point on the corresponding construction component is the same; An image analyzer, which is connected to each monitoring reference point and is used to analyze the position of the construction component corresponding to the point to be monitored according to the monitoring results of each reference monitoring point; a monitoring propeller connected to each monitoring reference point, each point to be monitored and the image analyzer, and used to set the point to be monitored as a new monitoring reference point when the point to be monitored is in a preset stable condition, and When the monitoring reference point is under a preset advancing condition, determining that the monitoring reference point is invalid; Wherein, the monitoring results include coordinate information, verticality information and horizontal position information; The preset stability condition is that the point to be monitored no longer moves; The preset advancement condition is that the number of the points to be monitored that can be monitored by the monitoring reference point is no more than a preset number; Among them, the single monitoring benchmark points include: A coordinate monitor, which is used to obtain the coordinate information of the corresponding point to be monitored; A longitudinal monitor, which is used to obtain verticality information between a point to be monitored and an adjacent point to be monitored; A horizontal monitor, used to obtain horizontal position information of the point to be monitored and adjacent points to be monitored; A laser generator, which is connected to the coordinate monitor, the longitudinal monitor and the horizontal monitor respectively, and is used to emit a laser of a preset shape to the point to be monitored; Among them, each point to be monitored is set on the corresponding construction component; The preset shape is related to the outer contour size of the construction component in the vertical direction; The longitudinal monitor is used to monitor the longitudinal deviation degree of the corresponding point to be monitored; The longitudinal offset degree is the offset degree of the connecting line of the upper and / or lower monitored points adjacent to the monitored point; The horizontal monitor is used to monitor the horizontal deviation degree of the corresponding point to be monitored; The horizontal offset degree is the offset degree of the connecting line of the left and / or right side points to be monitored adjacent to the point to be monitored.

2. The engineering monitoring system based on visual analysis according to claim 1, characterized in that: A single point to be monitored corresponds to a single construction component, and the monitoring point includes a basic structure for setting a monitoring reference point.

3. The engineering monitoring system based on visual analysis according to claim 1 is characterized in that: The laser generator takes the corresponding monitoring reference point as a target projection object to form a projection line connecting each reference point adjacent to the reference point.

4. The engineering monitoring system based on visual analysis according to claim 3 is characterized in that: When monitoring a single monitored point, the image analyzer determines whether the monitored point is offset according to the positions of the projection line and adjacent monitored points.

5. The engineering monitoring system based on visual analysis according to any one of claims 2 or 4, characterized in that: The monitoring propeller is provided with a preset monitoring cycle. If any point to be monitored is in the same state during consecutive preset monitoring cycles, the monitoring propeller determines that the point to be monitored is fixed and is in the preset stable condition.

6. The engineering monitoring system based on visual analysis according to claim 5, characterized in that: The monitoring propeller determines for any monitoring reference point that the number of the points to be monitored corresponding to the monitoring reference point that are not in the preset stable condition is not greater than the preset number, or The number of the monitored points corresponding to the monitoring reference point is not greater than the preset number, and the monitoring propeller determines that the monitoring reference point is invalid.

7. The engineering monitoring system based on visual analysis according to claim 6, characterized in that: The coordinate monitor is also used to capture the corresponding point to be monitored, and to align each monitor in the monitoring reference point with the point to be monitored.

8. The engineering monitoring system based on visual analysis according to any one of claims 1, 6 or 7, characterized in that: The image analyzer analyzes each point to be monitored with a preset time period as a cycle, and determines whether each point to be monitored is offset.